FHWA Geotech/Substructure: ABC
|
|
- Scott Hudson
- 5 years ago
- Views:
Transcription
1 FHWA Geotech/Substructure: ABC Efficiency through technology and collaboration Benjamin Beerman, PE Federal Highway Atlanta, GA (404)
2 What are some of the trends in ABC specific to Geotech/Substructures?
3 PBES PBES: Pile Lagging Conventional Paradigm Shift old practices PBES: Grouted Couplers PBES: Pile Pockets
4 Foundation/Substructure work under a separate phase
5 Video Link
6 Walls
7 Walls
8 Straddle Cap
9 Abutments: New or Existing?
10 GRS-IBS
11 GRS-IBS
12
13
14
15
16
17
18 GRS-IBS
19 GRS-IBS
20 CIP w/ T-wall
21 T-Wall
22 Ontario: Hwy 401 Cornwall Center Rd. Overpass (4/2015) GRS
23 SPMT Example
24 SPMT Example
25 SPMT Example
26 SPMT Example
27 GRS good!
28 Sleeper Slabs no?
29 SPMT Example (surcharge) I-80 State Street to 1300 East
30 Lateral Loads occur: Bid-Well Demolition Landing Wind Devils are in the details
31 Fixity and lateral stability is provided Much Better!
32 WVDOH: Basnettville 2016 Layout!
33 PBES/ABC
34 PBES/ABC
35 PBES/ABC
36 PBES/ABC
37 PBES/ABC
38 PBES/ABC $2.4M $2.1 $1.5 $1.43M
39 PBES/ABC
40 PBES/ABC
41 Cassion Shells Tappan Zee: $4Billion
42 Other Example
43 Boeing Bridge
44 Boeing Bridge
45 Boeing Bridge
46 Lake Bridges (KYDOT) 30 dia x 1 x 210 ft 72 dia x 2 x 180 ft ~500,000 ft-lb, 80 Ton
47 ~60% less material no rebar cage no rebar fabrication no on-site crew no rebar lift CFST
48 Re-Use Foundations Milton Madison ~$30-50M SR30 over Bessemer Avenue District 11, 57 hours
49 Re-Use Foundations Re-Use & ABC compliment one another!!! Benefits: Alignment Studies NEPA / Environmental Right-of-Way Utility MOT
50 Chapter 1- Introduction Bridge Foundation Reuse Best Practice Guideline (~ end of summer 17) Chapter 2- Reuse Decision Model Chapter 3- Evaluation of Existing Foundations / Substructure Chapter 4- Foundations / Substructure Strengthening In Progress Chapter 5- Case Histories Contact: Frank Jalinoos, FHWA R&D (202) ; frank.jalinoos@dot.gov For more information, visit
51 Increased use of separate stage construction -- under/adjacent/around, different strategies Changes in structural elements -- GeoGrid (SPMTs/Approach Slabs) -- Straddle cap ~40 -- CFST Changes in construction equipment -- larger/different hammers Changes in practices -- Foundation/Substructure re-use Summary
52 State of the Industry Updates
53 2014 AASHTO HSCOBS Strategic Plan Program Objective No. 5 of 8: Accelerated Bridge Delivery and Construction
54 12-98: Guidelines for PBES Tolerances and Dynamic Effects of Bridge Moves : Development of an ABC Design and Construction Specification : System Performance of ABC Connection in Moderate-to-High Seismic Regions
55 ABC Subcommittee Reorganization AFF10 General Structures parent committee AFF10(3) Subcommittee for ABC AFF00 Design Section (parent) AFH00 Construction Section AFF00(2) Joint Subcommittee for ABC
56 Meeting & Workshop materials is posted
57 New Publications
58 FHWA Tech Notes 58 infrastructure/structures/14084/index.cfm
59 FHWA - Tech Notes
60 ars/ DispForm.aspx?ID=1269
61 Monthly ABC Webinars: 78 th webinar to date! Thursday May18, :00 to 2:00 p.m. EST VADOTs High Performance Concrete Link Slabs & Overlay 61
62 Project Examples use PBES/ABC - Project Summary - Contract Plans - Specifications - Bid Tabs - Schedule - Pictures
63 170 Technical Papers 9 four hour workshops: -Geo Tools for ABC -LWC, part 1 & 2 -DB & CMGC procurement -Lateral Slide Overview -LRFD concrete & steel -GRS-IBS
64 What is good for our customers is good for all of us, ABC Demonstrates: good government/ good stewardship Garners and fosters public/political support for transportation programs Positive message of our contracting and engineering community Better product: safer, less risk, better quality, better use of our time/resources
65 U.S.A. is the Global Leader No other country has completed more ABC projects in terms of Volume Diversity Complexity Effectiveness
66 Thank You! FHWA Benjamin Beerman, P.E.
New Development in Accelerated Bridge Design and Construction in WA
Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge
More informationAccelerated Bridge Construction Award
Accelerated Bridge Construction Award PBES SR 288 Main Street Bridge Project Wampum Borough, Pennsylvania This is a first for PADOT to incorporate an all precast project built in an accelerated manner
More informationAccelerated Bridge Construction Research, Design and Practice
Accelerated Bridge Construction Research, Design and Practice University it of Buffalo April 2011 Presented by: Presented by: Carmen Swanwick, SE UDOT Chief Structural Engineer Presentation Outline Research
More informationBoeing North Bridge: Lessons Learned in Accelerated Bridge Construction
Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT
More informationAn Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015
An Overview of the SIBC Process and Projects Presented By: Rebecca Nix, SE Michael Arens, SE UDOT Michael Baker International February 2015 ABC Development to Standard Practice Procurement Tools to Implement
More informationWest Virginia s Basnettville Bridge Lateral Slide
Welcome to Webinar on Accelerated Bridge Construction West Virginia s Basnettville Bridge Lateral Slide Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida
More informationABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation
ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future Nevada Department of Transportation Mark Elicegui, Chief Structures Engineer Troy Martin, Asst. Chief Structures Engineer - Design May
More informationPrestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction
Welcome to Webinar on Accelerated Bridge Construction Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Sponsored by Accelerated Bridge Construction University
More informationAccelerated Bridge Construction in New York State
Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in New York State Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida
More informationInnovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge
Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge ABC History in Colorado 1. Promote Using Prefabricated Bridge & CBC Members since Early 1990 (Partnership
More informationWelcome to Webinar on Accelerated Bridge Construction
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: ABC Short-Span Low-Volume Bridge Types & Lessons Learned Part 2: Composites Sponsored by Center for Accelerated Bridge Construction
More informationAccelerated Bridge Construction (ABC) National Status
Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction
More informationAccelerated Bridge Construction in Pennsylvania
Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in Pennsylvania Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida
More informationAccelerated and Innovative Bridge Construction In Washington State
Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington
More informationApplications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction
Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects
More informationOatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C
87-Hour Bridge Construction in Arizona ABC and ARC at the Speed of Commerce Mohave County (Topock), Arizona Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No. 0000
More informationWelcome to Webinar on Accelerated Bridge Construction
Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Economical Details over Piers Using Simple-forDead-Load & Continuous-for-Live-Load Design Part 1: ABC Concrete Girder Bridges
More informationAccelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents
Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi
More informationSTRUCTURE AND BRIDGE DIVISION
VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights
More informationABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017
ABC Techniques for Rapid Bridge Replacement Bala Sivakumar 03.08.2017 HNTB Corporation Purdue Road School 2017 Outline Introduction to ABC ABC Technologies Precast Decks SHRP2 ABC Toolkit Implementing
More informationSHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal
SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges
More informationGet In, Get Out, Stay Out!
Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration
More informationNCHRP Project Michael Culmo, PE CME Associates, Inc.
NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT
More informationABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead
ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead September 9, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***
More informationBoeing North Bridge in Washington State
Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing
More information1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY
Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be
More informationPresenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer
Presenter: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Contributing Authors: Bill Hazelton St. Clair County Road Commission Director of Engineering Dewayne Rogers St. Clair County Road
More informationWell Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.
Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan
More informationAutomated Machine Guidance
House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)
More informationSR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA
ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN
More informationA precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability
A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability John Stanton Marc Eberhard University of Washington PCI Fall Convention 15 Sept 2009, San Antonio, TX.
More informationABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead
ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***
More informationInexpensive Durable Bridges with Simple Rapid Construction
Inexpensive Durable Bridges with Simple Rapid Construction Alan Cukurs P.E., S.E. J-U-B ENGINEERS Scott Ellsworth P.E., P.L.S. LOCAL HIGHWAY TECHNICAL ASSISTANCE COUNCIL (LHTAC) 1 Three Take Away Questions
More informationPrestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction
Thursday, November 16, 2017, 1:00 PM - 2:00 PM EDT ABC-UTC at Florida International University (FIU) presents: Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction
More informationMPC-405 January 1, 2012 December 31,2012
MPC-405 January 1, 2012 December 31,2012 Project Title: Seismic Retrofit of Spliced Sleeve Connections for Precast Bridge Piers University: University of Utah Principal Investigator: Chris P. Pantelides,
More informationAccelerated Bridge Construction in USA
Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration
More informationAccelerated Bridge Construction (ABC)
BRIDGE LATERAL MOVE TECHNOLOGY Accelerated Bridge Construction (ABC) April 3, 2014; 10:00am MST 1 SIBC Webinars Owner/Policy Maker Perspective November 2013 (complete) 2nd session scheduled later in year
More informationI-70 over SR 121 Bridge Slide Construction and Engineering
I-70 over SR 121 Bridge Slide Construction and Engineering March 6, 2018 Kevin Gorak, American Structurepoint Pete Jerrell, Walsh Construction Project Overview Project Location I-70 in Richmond, IN Project
More informationFrom HCB to ABC - The Knickerbocker Bridge, Boothbay, Maine
From HCB to ABC - The Knickerbocker Bridge, Boothbay, Maine John Hillman, PE, SE President & CEO HCB, Inc. hillmanjr@hcbridge.com Wayne Frankhauser, Jr., PE Bridge Program Manager Maine DOT Wayne.FrankhauserJr@maine.
More informationAugust 4, 2015; 11:00am-noon (MST)
August 4, 2015; 11:00am-noon (MST) Today s Agenda: >Welcome/Overview (~5 min.) >Engineer/Designer Perspective Presentation (~40 min.) >Questions & Answers (~15 min.) >Next Steps (~3 min.) TARGET AUDIENCE:
More informationLessons Learned Meeting Notes
EXTERNAL MEMORANDUM Lessons Learned Meeting Notes Distribution Date: April 24, 2017 Date of Meeting: April 19, 2017 Project: Sacramento Wash Crossing at Oatman Highway TRACS No. T0021 01D Federal Project
More informationAASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded
AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded MANAGEMENT Bridge Preservation 1) Will your state adopt the national MAP-21 bridge performance
More informationABC Technology and Steel Bridges
ABC Technology and Steel Bridges Accelerated Bridge Construction (ABC) Technologies C. C. Fu, Ph.D., P.E. Director/Research Professor Bridge Engineering Software & Technology (BEST) Center Department of
More informationEvery Day Counts Faster better smarter
Every Day Counts Faster better smarter Michael Arasteh Materials Engineer Atlantic City, NJ February 6, 2014 47 th Annual Mid-Atlantic QAW Feb 4-6, 2014 1 Today s Presentation What is Every Day Counts
More informationEconomical Design / Case Studies
Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of
More informationJohn James Audubon Bridge. Introduction
John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of
More informationResearch Projects at Accelerated Bridge Construction University Transportation Center at FIU. Atorod Azizinamini, Ph.D., P.E.
Research Projects at Accelerated Bridge Construction University Transportation Center at FIU Atorod Azizinamini, Ph.D., P.E. Director, ABC-UTC ABC-UTC Award Announcement : September 2013 Consortium of
More informationWest Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation
West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre 10.26.2016 HNTB Corporation Outline Overview of WV TPK Ghent NB Bridge Existing Conditions ABC Deck Replacement Alternatives
More informationUse of Grade 80 Reinforcement in Oregon
Use of Grade 80 Reinforcement in Oregon Craig Shike, PE Bridge Operations & Standards Managing Engineer PRESENTATION OUTLINE Material Properties of High Strength Reinforcement Recent Grade 80 Research
More informationHALLS RIVER BRIDGE REPLACEMENT
HALLS RIVER BRIDGE REPLACEMENT FDOT District 7 Structures Design Office Cristina Kay Suarez Mamunur Siddiqui, P.E. David Pelham Structures Designer Structures Design Engineer - SEOR Senior Structures Designer
More informationEvery Day Counts Market Ready Options
Every Day Counts Market Ready Options Every Day Counts (EDC ) is a state-based model to identify and rapidly deploy proven, but underutilized innovations to shorten the project delivery process, enhance
More informationSystem Preservation in Louisiana
System Preservation in Louisiana LA Transportation Conference Baton Rouge, LA January 9, 2009 Danny Tullier, P.E. Bridge Preventive Maintenance LA DOTD How Louisiana Obtained Highway Bridge Program Funding
More informationMILTON-MADISON BRIDGE REPLACEMENT
MILTON-MADISON BRIDGE REPLACEMENT Andy Barber P.E. Kevin Hetrick P.E. 1 Presentation Overview KYTC lead Environmental Study TIGER Grant INDOT lead Design Build solution Bridge Sliding Project Status Questions
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT Oct. 1, 2015 to December 31, 2015 Period Submitted by M. Saiidi, A. Itani, and A. Mohebbi Department of Civil and Environmental Engineering
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationJohn James Audubon Bridge
John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationSUMMARY SHEETS OF GROUTED DUCT CONNECTIONS
APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix B B-1 APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix
More informationSchnabel Foundation Company
Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square
More informationNational Cooperative Highway Research Program (NCHRP)
National Cooperative Highway Research Program (NCHRP) Presentation to AASHTO Highway Subcommittee on Construction by Gary E. Angles, P.E. Research Steering Committee Chair In Little Rock AR on August 12,
More informationThe State of Ohio Bridges
Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.
More informationUS 34 Over the Missouri River Philip Rossbach, PE - HDR
2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. US 34 Over the Missouri River Philip Rossbach, PE - HDR Project Info Preliminary Type Study Design Considerations Fabrication Shipping
More informationAccelerated Bridge Construction Developments on the Earthquake Frontier
Accelerated Bridge Construction Developments on the Earthquake Frontier John Stanton University of Washington AASHTO SCOBS meeting Spokane WA, 12 June 2017 Outline ABC in Seismic Regions What are the challenges?
More informationWilliam N. Nickas, P.E. Managing Technical Director of Transportation Precast/Prestressed Concrete Institute Chicago, IL
PCI Overview Comprehensive Quality Systems: A Smart Choice for Bridges 2011 Caltrans-PCMAC Precast Bridge Workshop Sacramento, CA November 17, 2011 William N. Nickas, P.E. Managing Technical Director of
More informationASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa
2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price
More informationAASHTO STANDING COMMITTEE ON RESEARCH AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
AASHTO STANDING COMMITTEE ON RESEARCH AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS TRB Section AFS00, Soil Mechanics TRB Committee AFS30, Foundations of Bridges and other Structures
More informationABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017
ABC-UTC Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC ABSTRACT March, 2017 Accelerated Bridge Construction (ABC) is a method of bridge construction designed
More informationDECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids
General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:
More informationSimple Span Bridge Design with espan140
Simple Span Bridge Design with espan140 Short Span Steel Bridge Alliance NACE 2017 Short Span Steel Bridge Workshop Cincinnati, OH April 9, 2017 Michael Barker, PE University of Wyoming & SSSBA Bridge
More information2014 NBPPC. Siva Venugopalan Principal Engineer Siva Corrosion Services, Inc.
2014 NBPPC by Siva Venugopalan Principal Engineer Siva Corrosion Services, Inc. Deterioration Mechanism Cost of Maintenance Service Life Performance Potential Failure Damage Accelerates Critical Point
More informationIndiana ABC Experience
Introduction to the Milton-Madison Bridge Project Anne Rearick, PE INDOT Bridge Director Kevin Hetrick, PE INDOT Project Manager 10/14/2014 Slide 1 Indiana ABC Experience 2003 Bridge slide CSX RR over
More informationFHWA Bridge Program Initiatives - Bridge Design and Analysis
FHWA Bridge Program Initiatives - Bridge Design and Analysis 2015 RADBUG Thomas Saad, P.E. FHWA, Resource Center (708) 283.3521 Thomas.saad@dot.gov Regulation Update National Performance Management Measures
More informationPARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS
PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for
More informationNCHRP LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS. Final Report September 2009
NCHRP 24-31 LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS Final Report September 2009 APPENDIX B FINDINGS STATE OF PRACTICE, SERVICEABILITY, AND DATABASES Prepared for National Cooperative Highway
More informationRt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening
Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction
More informationEXODERMIC DEXKS AND STEEL BRIDGES
EXODERMIC DEXKS AND STEEL BRIDGES Recent revisions to the Exodermic design promise to further reduce costs and simplify erection By Robert A. Bettigole Pictured at top is part of the Boston Central Artery/Tunnel
More informationDemolition Requirements for Bridge Construction Projects Best Practices Guidelines
Demolition Requirements for Bridge Construction Projects Best Practices Guidelines QUARTERLY REPORT Ending March 31, 2016 Period Submitted by: David Garber Department of Civil and Environmental Engineering
More information2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE
Gusset Plates 2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE (50 Responses) Page 1 of 11 1) How many trusses are in your state? 2302 trusses owned by the state 8202 trusses owned by local agencies 2) What percentage
More informationRESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO
RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,
More informationBRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)
SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART
More informationWilliam R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008
William R. Bennett Bridge W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008 Contract Details Scope: Design & Build the new W.R. Bennett Floating Bridge & Decommission existing Okanagan
More informationINDOT Wall System Approval Criteria and Design Review
INDOT Wall System Approval Criteria and Design Review Yuhui Hu, P.E. Office of Geotechnical Services, INDOT March 12, 2014 Slide 1 Outline Types of earth retaining structures Types of Mechanically Stabilized
More informationBRIDGE MAINTENACE EMERGENCY PROJECTS
BRIDGE MAINTENACE EMERGENCY PROJECTS PILE DRIVING ANALYZER (PDA) Bridge Maintenance works with the Geotechnical section to determine pile capacity Bridge Maintenance collects the PDA restrike data required
More informationApplication of Accelerated Bridge Construction for Local Agencies
Application of Accelerated Bridge Construction for Local Agencies APWA Public Works Conference November 9, 2017 Dorie Mellon Senior Bridge Engineer, Caltrans Matt Randall Senior Engineer, County of Placer
More informationPennDOT e-notification No. 13
PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change
More informationLRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1
LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,
More informationSIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE
SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA
More informationThe Pennsylvania Rapid Bridge Replacement Project
1 The rebuilding of 558 structurally deficient bridges in the Commonwealth of Pennsylvania over a 3+ year span April 2017 Charles Zugell The Plenary Walsh Keystone Partners believe engaging local community
More informationTENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1
TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions
More informationBayonne Bridge Raise the Roadway Project
Bayonne Bridge Raise the Roadway Project RAISING THE NAVIGATIONAL CLEARANCE OF THE BAYONNE BRIDGE Chester Werts, PE SE Sr. Bridge Engineer/Professional Associate Western Bridge Engineers Seminar September
More informationSpecification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010
Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications
More informationShort Span Steel Bridges
Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics
More informationFoundation Strengthening Of Bascule Piers At The Bridge Of Lions
Paper No. 22 Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Structural Elements Jian Huang, Ph.D., P.E. G. Alan Klevens, P.E. Lichtenstein Consulting Engineers TENTH BIENNIAL SYMPOSIUM
More informationProgrammatic Implementation of ABC: Module 3 Innovative Contracting and ABC
Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC 2 Presentation Outline Construction Manager/General Contractor (CM/GC) and ABC CM/GC Project Highlights Hartford Bridge Replacement
More informationMark L. Reno, P.E. September 11, 2015
Ogden Ogden Siphon Canyon Pipe Siphon Suspension Structural Assessment Bridge Mark L. Reno, P.E. September 11, 2015 Seismic Retrofit of Designed in 1936 by U.S. Bureau of Reclamation 1,044 feet of 31.25
More informationContinuously Reinforced Concrete Pavement California Practices
Continuously Reinforced Concrete Pavement California Practices Mehdi Parvini, PhD., P.E., Sr. Pavement Engineer California Department of Transportation 2012 CRCP California Workshop Why Continuously Reinforced
More informationMANUAL OF THE STRUCTURE AND BRIDGE DIVISION
MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design
More information$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000
$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000
More information