1 FHWA Geotech/Substructure: ABC Efficiency through technology and collaboration Benjamin Beerman, PE Federal Highway Atlanta, GA (404)

2 What are some of the trends in ABC specific to Geotech/Substructures?

3 PBES PBES: Pile Lagging Conventional Paradigm Shift old practices PBES: Grouted Couplers PBES: Pile Pockets

4 Foundation/Substructure work under a separate phase

5 Video Link

6 Walls

7 Walls

8 Straddle Cap

9 Abutments: New or Existing?

10 GRS-IBS

11 GRS-IBS

12

13

14

15

16

17

18 GRS-IBS

19 GRS-IBS

20 CIP w/ T-wall

21 T-Wall

22 Ontario: Hwy 401 Cornwall Center Rd. Overpass (4/2015) GRS

23 SPMT Example

24 SPMT Example

25 SPMT Example

26 SPMT Example

27 GRS good!

28 Sleeper Slabs no?

29 SPMT Example (surcharge) I-80 State Street to 1300 East

30 Lateral Loads occur: Bid-Well Demolition Landing Wind Devils are in the details

31 Fixity and lateral stability is provided Much Better!

32 WVDOH: Basnettville 2016 Layout!

33 PBES/ABC

34 PBES/ABC

35 PBES/ABC

36 PBES/ABC

37 PBES/ABC

38 PBES/ABC $2.4M $2.1 $1.5 $1.43M

39 PBES/ABC

40 PBES/ABC

41 Cassion Shells Tappan Zee: $4Billion

42 Other Example

43 Boeing Bridge

44 Boeing Bridge

45 Boeing Bridge

46 Lake Bridges (KYDOT) 30 dia x 1 x 210 ft 72 dia x 2 x 180 ft ~500,000 ft-lb, 80 Ton

47 ~60% less material no rebar cage no rebar fabrication no on-site crew no rebar lift CFST

48 Re-Use Foundations Milton Madison ~$30-50M SR30 over Bessemer Avenue District 11, 57 hours

49 Re-Use Foundations Re-Use & ABC compliment one another!!! Benefits: Alignment Studies NEPA / Environmental Right-of-Way Utility MOT

50 Chapter 1- Introduction Bridge Foundation Reuse Best Practice Guideline (~ end of summer 17) Chapter 2- Reuse Decision Model Chapter 3- Evaluation of Existing Foundations / Substructure Chapter 4- Foundations / Substructure Strengthening In Progress Chapter 5- Case Histories Contact: Frank Jalinoos, FHWA R&D (202) ; frank.jalinoos@dot.gov For more information, visit

51 Increased use of separate stage construction -- under/adjacent/around, different strategies Changes in structural elements -- GeoGrid (SPMTs/Approach Slabs) -- Straddle cap ~40 -- CFST Changes in construction equipment -- larger/different hammers Changes in practices -- Foundation/Substructure re-use Summary

52 State of the Industry Updates

53 2014 AASHTO HSCOBS Strategic Plan Program Objective No. 5 of 8: Accelerated Bridge Delivery and Construction

54 12-98: Guidelines for PBES Tolerances and Dynamic Effects of Bridge Moves : Development of an ABC Design and Construction Specification : System Performance of ABC Connection in Moderate-to-High Seismic Regions

55 ABC Subcommittee Reorganization AFF10 General Structures parent committee AFF10(3) Subcommittee for ABC AFF00 Design Section (parent) AFH00 Construction Section AFF00(2) Joint Subcommittee for ABC

56 Meeting & Workshop materials is posted

57 New Publications

58 FHWA Tech Notes 58 infrastructure/structures/14084/index.cfm

59 FHWA - Tech Notes

60 ars/ DispForm.aspx?ID=1269

61 Monthly ABC Webinars: 78 th webinar to date! Thursday May18, :00 to 2:00 p.m. EST VADOTs High Performance Concrete Link Slabs & Overlay 61

62 Project Examples use PBES/ABC - Project Summary - Contract Plans - Specifications - Bid Tabs - Schedule - Pictures

63 170 Technical Papers 9 four hour workshops: -Geo Tools for ABC -LWC, part 1 & 2 -DB & CMGC procurement -Lateral Slide Overview -LRFD concrete & steel -GRS-IBS

64 What is good for our customers is good for all of us, ABC Demonstrates: good government/ good stewardship Garners and fosters public/political support for transportation programs Positive message of our contracting and engineering community Better product: safer, less risk, better quality, better use of our time/resources

65 U.S.A. is the Global Leader No other country has completed more ABC projects in terms of Volume Diversity Complexity Effectiveness

66 Thank You! FHWA Benjamin Beerman, P.E.

New Development in Accelerated Bridge Design and Construction in WA

New Development in Accelerated Bridge Design and Construction in WA Delivery of Accelerated Bridge Construction WSDOT Workshop Wednesday April 1st, 2015 New Development in Accelerated Bridge Design and Construction in WA Washington State Department of Transportation Bridge

More information

Accelerated Bridge Construction Award

Accelerated Bridge Construction Award Accelerated Bridge Construction Award PBES SR 288 Main Street Bridge Project Wampum Borough, Pennsylvania This is a first for PADOT to incorporate an all precast project built in an accelerated manner

More information

Accelerated Bridge Construction Research, Design and Practice

Accelerated Bridge Construction Research, Design and Practice Accelerated Bridge Construction Research, Design and Practice University it of Buffalo April 2011 Presented by: Presented by: Carmen Swanwick, SE UDOT Chief Structural Engineer Presentation Outline Research

More information

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction

Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Boeing North Bridge: Lessons Learned in Accelerated Bridge Construction Gregory A. Banks, Myles Parrish, Charles W. Spry WSDOT ABC Workshop April 2015 Project Overview Location Located in Renton, WA PROJECT

More information

An Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015

An Overview of the SIBC Process and Projects. Presented By: Rebecca Nix, SE Michael Arens, SE Michael Baker International February 2015 An Overview of the SIBC Process and Projects Presented By: Rebecca Nix, SE Michael Arens, SE UDOT Michael Baker International February 2015 ABC Development to Standard Practice Procurement Tools to Implement

More information

West Virginia s Basnettville Bridge Lateral Slide

West Virginia s Basnettville Bridge Lateral Slide Welcome to Webinar on Accelerated Bridge Construction West Virginia s Basnettville Bridge Lateral Slide Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida

More information

ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation

ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future. Nevada Department of Transportation ABC in Nevada PBES/ABC Practices in Nevada Past, Present and Future Nevada Department of Transportation Mark Elicegui, Chief Structures Engineer Troy Martin, Asst. Chief Structures Engineer - Design May

More information

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Welcome to Webinar on Accelerated Bridge Construction Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Sponsored by Accelerated Bridge Construction University

More information

Accelerated Bridge Construction in New York State

Accelerated Bridge Construction in New York State Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in New York State Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida

More information

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge ABC History in Colorado 1. Promote Using Prefabricated Bridge & CBC Members since Early 1990 (Partnership

More information

Welcome to Webinar on Accelerated Bridge Construction

Welcome to Webinar on Accelerated Bridge Construction Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: ABC Short-Span Low-Volume Bridge Types & Lessons Learned Part 2: Composites Sponsored by Center for Accelerated Bridge Construction

More information

Accelerated Bridge Construction (ABC) National Status

Accelerated Bridge Construction (ABC) National Status Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction

More information

Accelerated Bridge Construction in Pennsylvania

Accelerated Bridge Construction in Pennsylvania Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in Pennsylvania Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida

More information

Accelerated and Innovative Bridge Construction In Washington State

Accelerated and Innovative Bridge Construction In Washington State Accelerated and Innovative Bridge Construction In Washington State Bijan Khaleghi Bijan.Khaleghi@WSDOT.WA.Gov Washington State Department of Transportation Bridge and Structures Office Olympia Washington

More information

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction

Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction Applications of Ultra High Performance Concrete and Prefabricated Concrete Elements in Accelerated Bridge Construction 2018 Virginia Concrete Conference March 2, 2018 Bardia Emami, PE Outline Projects

More information

Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C

Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No MO MMO T C 87-Hour Bridge Construction in Arizona ABC and ARC at the Speed of Commerce Mohave County (Topock), Arizona Oatman Highway at Sacramento Wash Crossing Federal Aid No. 000-MMO-0(216)T ADOT Project No. 0000

More information

Welcome to Webinar on Accelerated Bridge Construction

Welcome to Webinar on Accelerated Bridge Construction Welcome to Webinar on Accelerated Bridge Construction Featured Presentation: Economical Details over Piers Using Simple-forDead-Load & Continuous-for-Live-Load Design Part 1: ABC Concrete Girder Bridges

More information

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents

Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Accelerated Bridge Construction (ABC) webinar Thursday, October 24, 2013 ABC Center at Florida International University (FIU) presents Washington State s Skagit River Bridge Emergency Slide Bijan Khaleghi

More information

STRUCTURE AND BRIDGE DIVISION

STRUCTURE AND BRIDGE DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Corrosion Resistant Reinforcing Steels (CRR) SPECIFIC SUBJECT: Plan Modifications

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017

ABC Techniques for Rapid Bridge Replacement. Bala Sivakumar HNTB Corporation. Purdue Road School 2017 ABC Techniques for Rapid Bridge Replacement Bala Sivakumar 03.08.2017 HNTB Corporation Purdue Road School 2017 Outline Introduction to ABC ABC Technologies Precast Decks SHRP2 ABC Toolkit Implementing

More information

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges

More information

Get In, Get Out, Stay Out!

Get In, Get Out, Stay Out! Get In, Get Out, Stay Out! FHWA Accelerated Bridge Construction Program By Gary Jakovich, P.E. Senior Bridge Engineer, FHWA Virginia Concrete Conference Richmond, VA March 6-7, 2007 Federal Highway Administration

More information

NCHRP Project Michael Culmo, PE CME Associates, Inc.

NCHRP Project Michael Culmo, PE CME Associates, Inc. NCHRP Project 12-102 Michael Culmo, PE CME Associates, Inc. Acknowledgements NCHRP: Waseem Dekelbab Project Panel Ahmad Abu-Hawash Iowa DOT Norman P. Marzano Jr. Rhode Island DOT Carmen Swanwick Utah DOT

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead September 9, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Boeing North Bridge in Washington State

Boeing North Bridge in Washington State Boeing North Bridge in Washington State Gregory A. Banks ABC-UTC Webinar May 2015 Project Overview -Location Located in Renton, WA PROJECT SITE RENTON 2 Project Overview Site Layout Lake Washington Existing

More information

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY

1/26/2015 DETAILS CIP DETAIL EXAMPLES WHY SIMPLIFY DETAILS? CIP DETAIL EXAMPLES DETAILING FOR SIMPLICITY Detailing of ABC Bridges for Simplicity and Durability Michael P. Culmo, P.E. CME Associates, Inc. East Hartford, CT DETAILS This presentation contains many preferred details My favorite details will be

More information

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer

Presenter: Contributing Authors: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Presenter: Guy C. Nelson PE, SE TEG Engineering, LLC Structural Engineer Contributing Authors: Bill Hazelton St. Clair County Road Commission Director of Engineering Dewayne Rogers St. Clair County Road

More information

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E. Presentation Outline Project History Project Scope Construction Alternatives Plan

More information

Automated Machine Guidance

Automated Machine Guidance House Select Committee on Strategic Planning and Long Term Funding Solutions October 24, 2016 Automated Machine Guidance Lamar Sylvester, PE State Construction Engineer Automated Machine Guidance (AMG)

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability

A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability A precast Concrete Bridge Bent for Seismic Regions: Achieving both Performance and Constructability John Stanton Marc Eberhard University of Washington PCI Fall Convention 15 Sept 2009, San Antonio, TX.

More information

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead

ABC, FHWA SHRP2 R04: Project update, lessons learned. Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead ABC, FHWA SHRP2 R04: Project update, lessons learned Finn Hubbard, Fish & Associates Inc. SHRP2 ABC/PBES Implementation Technical Lead January 11, 2015 Goals for ABC Enhanced Mobility Safety Reduced Costs***

More information

Inexpensive Durable Bridges with Simple Rapid Construction

Inexpensive Durable Bridges with Simple Rapid Construction Inexpensive Durable Bridges with Simple Rapid Construction Alan Cukurs P.E., S.E. J-U-B ENGINEERS Scott Ellsworth P.E., P.L.S. LOCAL HIGHWAY TECHNICAL ASSISTANCE COUNCIL (LHTAC) 1 Three Take Away Questions

More information

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction

Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction Thursday, November 16, 2017, 1:00 PM - 2:00 PM EDT ABC-UTC at Florida International University (FIU) presents: Prestressed/Precast Florida-Slab- Beams for Robust Local Bridges and Accelerated Construction

More information

MPC-405 January 1, 2012 December 31,2012

MPC-405 January 1, 2012 December 31,2012 MPC-405 January 1, 2012 December 31,2012 Project Title: Seismic Retrofit of Spliced Sleeve Connections for Precast Bridge Piers University: University of Utah Principal Investigator: Chris P. Pantelides,

More information

Accelerated Bridge Construction in USA

Accelerated Bridge Construction in USA Accelerated Bridge Construction in USA Abstract Rush hour traffic is a common daily occurrence in the USA. Highway and bridge construction further aggravates the situation. The Federal Highway Administration

More information

Accelerated Bridge Construction (ABC)

Accelerated Bridge Construction (ABC) BRIDGE LATERAL MOVE TECHNOLOGY Accelerated Bridge Construction (ABC) April 3, 2014; 10:00am MST 1 SIBC Webinars Owner/Policy Maker Perspective November 2013 (complete) 2nd session scheduled later in year

More information

I-70 over SR 121 Bridge Slide Construction and Engineering

I-70 over SR 121 Bridge Slide Construction and Engineering I-70 over SR 121 Bridge Slide Construction and Engineering March 6, 2018 Kevin Gorak, American Structurepoint Pete Jerrell, Walsh Construction Project Overview Project Location I-70 in Richmond, IN Project

More information

From HCB to ABC - The Knickerbocker Bridge, Boothbay, Maine

From HCB to ABC - The Knickerbocker Bridge, Boothbay, Maine From HCB to ABC - The Knickerbocker Bridge, Boothbay, Maine John Hillman, PE, SE President & CEO HCB, Inc. hillmanjr@hcbridge.com Wayne Frankhauser, Jr., PE Bridge Program Manager Maine DOT Wayne.FrankhauserJr@maine.

More information

August 4, 2015; 11:00am-noon (MST)

August 4, 2015; 11:00am-noon (MST) August 4, 2015; 11:00am-noon (MST) Today s Agenda: >Welcome/Overview (~5 min.) >Engineer/Designer Perspective Presentation (~40 min.) >Questions & Answers (~15 min.) >Next Steps (~3 min.) TARGET AUDIENCE:

More information

Lessons Learned Meeting Notes

Lessons Learned Meeting Notes EXTERNAL MEMORANDUM Lessons Learned Meeting Notes Distribution Date: April 24, 2017 Date of Meeting: April 19, 2017 Project: Sacramento Wash Crossing at Oatman Highway TRACS No. T0021 01D Federal Project

More information

AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded

AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded AASHTO SUBCOMMITTEE ON BRIDGES & STRUCTURES ANNUAL STATE BRIDGE ENGINEERS SURVEY (2015) 47 States Responded MANAGEMENT Bridge Preservation 1) Will your state adopt the national MAP-21 bridge performance

More information

ABC Technology and Steel Bridges

ABC Technology and Steel Bridges ABC Technology and Steel Bridges Accelerated Bridge Construction (ABC) Technologies C. C. Fu, Ph.D., P.E. Director/Research Professor Bridge Engineering Software & Technology (BEST) Center Department of

More information

Every Day Counts Faster better smarter

Every Day Counts Faster better smarter Every Day Counts Faster better smarter Michael Arasteh Materials Engineer Atlantic City, NJ February 6, 2014 47 th Annual Mid-Atlantic QAW Feb 4-6, 2014 1 Today s Presentation What is Every Day Counts

More information

Economical Design / Case Studies

Economical Design / Case Studies Economical Design / Case Studies Alabama Technology Transfer Center Workshop Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation Competitiveness of

More information

John James Audubon Bridge. Introduction

John James Audubon Bridge. Introduction John James Audubon Bridge Introduction The Project Why build the bridge? The bridge--proposed to be the longest cable-stayed bridge in America--will replace an existing ferry between the communities of

More information

Research Projects at Accelerated Bridge Construction University Transportation Center at FIU. Atorod Azizinamini, Ph.D., P.E.

Research Projects at Accelerated Bridge Construction University Transportation Center at FIU. Atorod Azizinamini, Ph.D., P.E. Research Projects at Accelerated Bridge Construction University Transportation Center at FIU Atorod Azizinamini, Ph.D., P.E. Director, ABC-UTC ABC-UTC Award Announcement : September 2013 Consortium of

More information

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation

West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre HNTB Corporation West Virginia s First ABC Deck Replacement Project Bill Manuel & Johann Aakre 10.26.2016 HNTB Corporation Outline Overview of WV TPK Ghent NB Bridge Existing Conditions ABC Deck Replacement Alternatives

More information

Use of Grade 80 Reinforcement in Oregon

Use of Grade 80 Reinforcement in Oregon Use of Grade 80 Reinforcement in Oregon Craig Shike, PE Bridge Operations & Standards Managing Engineer PRESENTATION OUTLINE Material Properties of High Strength Reinforcement Recent Grade 80 Research

More information

HALLS RIVER BRIDGE REPLACEMENT

HALLS RIVER BRIDGE REPLACEMENT HALLS RIVER BRIDGE REPLACEMENT FDOT District 7 Structures Design Office Cristina Kay Suarez Mamunur Siddiqui, P.E. David Pelham Structures Designer Structures Design Engineer - SEOR Senior Structures Designer

More information

Every Day Counts Market Ready Options

Every Day Counts Market Ready Options Every Day Counts Market Ready Options Every Day Counts (EDC ) is a state-based model to identify and rapidly deploy proven, but underutilized innovations to shorten the project delivery process, enhance

More information

System Preservation in Louisiana

System Preservation in Louisiana System Preservation in Louisiana LA Transportation Conference Baton Rouge, LA January 9, 2009 Danny Tullier, P.E. Bridge Preventive Maintenance LA DOTD How Louisiana Obtained Highway Bridge Program Funding

More information

MILTON-MADISON BRIDGE REPLACEMENT

MILTON-MADISON BRIDGE REPLACEMENT MILTON-MADISON BRIDGE REPLACEMENT Andy Barber P.E. Kevin Hetrick P.E. 1 Presentation Overview KYTC lead Environmental Study TIGER Grant INDOT lead Design Build solution Bridge Sliding Project Status Questions

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT Oct. 1, 2015 to December 31, 2015 Period Submitted by M. Saiidi, A. Itani, and A. Mohebbi Department of Civil and Environmental Engineering

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2017 to December 31, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

John James Audubon Bridge

John James Audubon Bridge John James Audubon Bridge Cable-Stayed Main Span Over the Mississippi River Johns Hopkins University Whiting School of Engineering September 10, 2008 The Project Scheduled Time to Complete Estimated Number

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT July 1, 2017 to September 30, 2017 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS

SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix B B-1 APPENDIX B SUMMARY SHEETS OF GROUTED DUCT CONNECTIONS NCHRP 12-88 Connection Evaluations Appendix

More information

Schnabel Foundation Company

Schnabel Foundation Company Micropiles for Roadway Support, Bridge Abutments and Metal Signal Poles on US-158 from US-17B to East of Pasquotank River, in Elizabeth City, NC Schnabel Foundation Company Presenter: Stephen Dimino, P.E.

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 1 Project Development and Seismic Evaluation of Pier Systems w/ Pocket Connections and Square

More information

National Cooperative Highway Research Program (NCHRP)

National Cooperative Highway Research Program (NCHRP) National Cooperative Highway Research Program (NCHRP) Presentation to AASHTO Highway Subcommittee on Construction by Gary E. Angles, P.E. Research Steering Committee Chair In Little Rock AR on August 12,

More information

The State of Ohio Bridges

The State of Ohio Bridges Ohio Department of Transportation John R. Kasich, Governor Jerry Wray, Director ABCD NEOH Chapter The State of Ohio Bridges Tim Keller, P.E. Administrator ODOT Office of Structural Engineering Agenda 1.

More information

US 34 Over the Missouri River Philip Rossbach, PE - HDR

US 34 Over the Missouri River Philip Rossbach, PE - HDR 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. US 34 Over the Missouri River Philip Rossbach, PE - HDR Project Info Preliminary Type Study Design Considerations Fabrication Shipping

More information

Accelerated Bridge Construction Developments on the Earthquake Frontier

Accelerated Bridge Construction Developments on the Earthquake Frontier Accelerated Bridge Construction Developments on the Earthquake Frontier John Stanton University of Washington AASHTO SCOBS meeting Spokane WA, 12 June 2017 Outline ABC in Seismic Regions What are the challenges?

More information

William N. Nickas, P.E. Managing Technical Director of Transportation Precast/Prestressed Concrete Institute Chicago, IL

William N. Nickas, P.E. Managing Technical Director of Transportation Precast/Prestressed Concrete Institute Chicago, IL PCI Overview Comprehensive Quality Systems: A Smart Choice for Bridges 2011 Caltrans-PCMAC Precast Bridge Workshop Sacramento, CA November 17, 2011 William N. Nickas, P.E. Managing Technical Director of

More information

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa

ASCE STRUCTURAL ENGINEERING CONFERENCE. Ames Iowa 2014 HDR Architecture, 2014 HDR, Inc., all rights reserved. ASCE STRUCTURAL ENGINEERING CONFERENCE Ames Iowa WHAT DO YOU DO IF YOU HAVE MORE PROJECT THAN BUDGET? DESIGN BUILDER SELECTION METHOD Fixed Price

More information

AASHTO STANDING COMMITTEE ON RESEARCH AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

AASHTO STANDING COMMITTEE ON RESEARCH AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS AASHTO STANDING COMMITTEE ON RESEARCH AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS TRB Section AFS00, Soil Mechanics TRB Committee AFS30, Foundations of Bridges and other Structures

More information

ABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017

ABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017 ABC-UTC Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC ABSTRACT March, 2017 Accelerated Bridge Construction (ABC) is a method of bridge construction designed

More information

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids

DECEMBER 5, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $5,000,000) Bids General Info Number: PROJECT NO. 43-17-04 : BRIDGE DECK REPAIR AND BRIDGE REMOVAL OHIO TURNPIKE OVER QUARRY ROAD, M.P. 138.0 OHIO TURNPIKE OVER INACTIVE RAILROAD, M.P. 138.2 LORAIN COUNTY, OHIO Deadline:

More information

Simple Span Bridge Design with espan140

Simple Span Bridge Design with espan140 Simple Span Bridge Design with espan140 Short Span Steel Bridge Alliance NACE 2017 Short Span Steel Bridge Workshop Cincinnati, OH April 9, 2017 Michael Barker, PE University of Wyoming & SSSBA Bridge

More information

2014 NBPPC. Siva Venugopalan Principal Engineer Siva Corrosion Services, Inc.

2014 NBPPC. Siva Venugopalan Principal Engineer Siva Corrosion Services, Inc. 2014 NBPPC by Siva Venugopalan Principal Engineer Siva Corrosion Services, Inc. Deterioration Mechanism Cost of Maintenance Service Life Performance Potential Failure Damage Accelerates Critical Point

More information

Indiana ABC Experience

Indiana ABC Experience Introduction to the Milton-Madison Bridge Project Anne Rearick, PE INDOT Bridge Director Kevin Hetrick, PE INDOT Project Manager 10/14/2014 Slide 1 Indiana ABC Experience 2003 Bridge slide CSX RR over

More information

FHWA Bridge Program Initiatives - Bridge Design and Analysis

FHWA Bridge Program Initiatives - Bridge Design and Analysis FHWA Bridge Program Initiatives - Bridge Design and Analysis 2015 RADBUG Thomas Saad, P.E. FHWA, Resource Center (708) 283.3521 Thomas.saad@dot.gov Regulation Update National Performance Management Measures

More information

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS

PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS PARTIAL-DEPTH PRECAST DECK PANEL DESIGN AND CONSTRUCTION IN TEXAS Gregg Freeby, P.E., Leon Flournoy, P.E. & Sara Watts, E.I.T TxDOT Bridge Division Prefabricated Elements TxDOT s primary technique for

More information

NCHRP LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS. Final Report September 2009

NCHRP LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS. Final Report September 2009 NCHRP 24-31 LRFD DESIGN SPECIFICATIONS FOR SHALLOW FOUNDATIONS Final Report September 2009 APPENDIX B FINDINGS STATE OF PRACTICE, SERVICEABILITY, AND DATABASES Prepared for National Cooperative Highway

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

EXODERMIC DEXKS AND STEEL BRIDGES

EXODERMIC DEXKS AND STEEL BRIDGES EXODERMIC DEXKS AND STEEL BRIDGES Recent revisions to the Exodermic design promise to further reduce costs and simplify erection By Robert A. Bettigole Pictured at top is part of the Boston Central Artery/Tunnel

More information

Demolition Requirements for Bridge Construction Projects Best Practices Guidelines

Demolition Requirements for Bridge Construction Projects Best Practices Guidelines Demolition Requirements for Bridge Construction Projects Best Practices Guidelines QUARTERLY REPORT Ending March 31, 2016 Period Submitted by: David Garber Department of Civil and Environmental Engineering

More information

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE

2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE Gusset Plates 2010 STATE BRIDGE ENGINEERS QUESTIONNAIRE (50 Responses) Page 1 of 11 1) How many trusses are in your state? 2302 trusses owned by the state 8202 trusses owned by local agencies 2) What percentage

More information

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO

RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO RESEARCH PROJECT AT UNIVERSITY OF NEVADA, RENO QUARTERLY REPORT October 1, 2016 to December 31, 2016 Period Year 2 Project Shake Table Studies of a Bridge System with ABC Connections Submitted by M. Saiidi,

More information

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT)

BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) SPECIAL PROVISION August 31, 2009 PROJECT # S-R399(42) PROJECT # S-R399(59) PIN # 6697/7236 SECTION 03253S BRIDGE CONSTRUCTION USING SELF-PROPELLED MODULAR TRANSPORTERS (SPMT) Add Section 03253S: PART

More information

William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008

William R. Bennett Bridge. W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008 William R. Bennett Bridge W.R. Bennett Bridge, Kelowna, B.C. Canada. July 2005 to December 2008 Contract Details Scope: Design & Build the new W.R. Bennett Floating Bridge & Decommission existing Okanagan

More information

INDOT Wall System Approval Criteria and Design Review

INDOT Wall System Approval Criteria and Design Review INDOT Wall System Approval Criteria and Design Review Yuhui Hu, P.E. Office of Geotechnical Services, INDOT March 12, 2014 Slide 1 Outline Types of earth retaining structures Types of Mechanically Stabilized

More information

BRIDGE MAINTENACE EMERGENCY PROJECTS

BRIDGE MAINTENACE EMERGENCY PROJECTS BRIDGE MAINTENACE EMERGENCY PROJECTS PILE DRIVING ANALYZER (PDA) Bridge Maintenance works with the Geotechnical section to determine pile capacity Bridge Maintenance collects the PDA restrike data required

More information

Application of Accelerated Bridge Construction for Local Agencies

Application of Accelerated Bridge Construction for Local Agencies Application of Accelerated Bridge Construction for Local Agencies APWA Public Works Conference November 9, 2017 Dorie Mellon Senior Bridge Engineer, Caltrans Matt Randall Senior Engineer, County of Placer

More information

PennDOT e-notification No. 13

PennDOT e-notification No. 13 PennDOT e-notification No. 13 Bureau of Project Delivery Bridge Design and Technology Division April 3, 2006 (Revised April 2016) Interim Revision to Bridge Standard Drawing(s) Drawing 86-353 PE (Change

More information

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1

LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE. Mark S. Mahan 1 LRFD SEISMIC BRIDGE DESIGN, CALIFORNIA EXAMPLE Mark S. Mahan 1 Abstract The newly approved AASHTO Guide Specification for LRFD Seismic Bridge Design (referred to as LRFD Seismic Guide Spec), July 2007,

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT PROJECT ROUTE 2, CANAAN/PITTSFIELD, MAINE G. Keith Donington, PE, Parsons Brinckerhoff, Manchester, NH Hany L. Riad, PhD, PE, Parsons Brinckerhoff, Boston, MA

More information

The Pennsylvania Rapid Bridge Replacement Project

The Pennsylvania Rapid Bridge Replacement Project 1 The rebuilding of 558 structurally deficient bridges in the Commonwealth of Pennsylvania over a 3+ year span April 2017 Charles Zugell The Plenary Walsh Keystone Partners believe engaging local community

More information

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1

TENDER BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 TENDER 2334-2019 BASTION STREET BRIDGE RENEWAL AND SEISMIC RETROFIT ADDENDUM 1 This addendum shall be read in conjunction with and considered as an integral part of the Tender Contract 2334-2019. Revisions

More information

Bayonne Bridge Raise the Roadway Project

Bayonne Bridge Raise the Roadway Project Bayonne Bridge Raise the Roadway Project RAISING THE NAVIGATIONAL CLEARANCE OF THE BAYONNE BRIDGE Chester Werts, PE SE Sr. Bridge Engineer/Professional Associate Western Bridge Engineers Seminar September

More information

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010

Specification Changes and Their Effect on Plans. Bridge Construction Issues. BRG VTC April, 2010 Specification Changes and Their Effect on Plans Bridge Construction Issues BRG VTC April, 2010 Brian D. Merrill, P.E. BRG Construction & Maintenance Branch Also: Common Plan Review Items Revised Specifications

More information

Short Span Steel Bridges

Short Span Steel Bridges Short Span Steel Bridges MINK 2015 Michael Barker, PE University of Wyoming & SSSBA Bridge Technology Center Outline of Today s Presentation SSSBA & espan140 Design Competitiveness of Steel Bridges Economics

More information

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Paper No. 22 Foundation Strengthening Of Bascule Piers At The Bridge Of Lions Structural Elements Jian Huang, Ph.D., P.E. G. Alan Klevens, P.E. Lichtenstein Consulting Engineers TENTH BIENNIAL SYMPOSIUM

More information

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC

Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC Programmatic Implementation of ABC: Module 3 Innovative Contracting and ABC 2 Presentation Outline Construction Manager/General Contractor (CM/GC) and ABC CM/GC Project Highlights Hartford Bridge Replacement

More information

Mark L. Reno, P.E. September 11, 2015

Mark L. Reno, P.E. September 11, 2015 Ogden Ogden Siphon Canyon Pipe Siphon Suspension Structural Assessment Bridge Mark L. Reno, P.E. September 11, 2015 Seismic Retrofit of Designed in 1936 by U.S. Bureau of Reclamation 1,044 feet of 31.25

More information

Continuously Reinforced Concrete Pavement California Practices

Continuously Reinforced Concrete Pavement California Practices Continuously Reinforced Concrete Pavement California Practices Mehdi Parvini, PhD., P.E., Sr. Pavement Engineer California Department of Transportation 2012 CRCP California Workshop Why Continuously Reinforced

More information

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION

MANUAL OF THE STRUCTURE AND BRIDGE DIVISION MANUAL OF THE STRUCTURE AND BRIDGE DIVISION DESIGN AIDS AND TYPICAL DETAILS VIRGINIA DEPARTMENT OF TRANSPORTATION VDOT GOVERNANCE DOCUMENT VDOT Manual of the Structure and Bridge Division: Part 02: Design

More information

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000

$600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000 $100,000,000 $- Other Programs Highway Program $800,000,000 $700,000,000 $600,000,000 $500,000,000 $400,000,000 $300,000,000 $200,000,000

More information