1 ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect INTERIM CRITERIA FOR INSPECTION AND VERIFICATION OF CONCRETE AND AC178 June 2003 (Effective July 1, 2003) Previously issued April 2001 PREFACE Legacy evaluation reports issued by ICC Evaluation Service, Inc. (ICC-ES), are based upon performance features of the Uniform family of codes and the International family of codes. Section of the 1997 Uniform Building Code (UBC), Section of the 2000 International Building Code (IBC) and Section R of the 2000 International Residential Code (IRC) are the primary charging sections upon which evaluation reports are issued. Section of the UBC reads as follows: The provisions of this code are not intended to prevent the use of any material, alternate design or method of construction not specifically prescribed by this code, provided any alternate has been approved and its use authorized by the building official. The building official may approve any such alternate, provided the building official finds that the proposed design is satisfactory and complies with the provisions of this code and that the material, method or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code in suitability, strength, effectiveness, fire resistance, durability, safety and sanitation. The building official shall require that sufficient evidence or proof be submitted to substantiate any claims that may be made regarding its use. The details of any action granting approval of an alternate shall be recorded and entered in the files of the code enforcement agency. Similar provisions are contained in Sections and R of the IBC and IRC, respectively. The attached acceptance criteria has been issued to provide all interested parties with guidelines on implementing performance features of the applicable code(s) referenced in the acceptance criteria. The criteria was developed and adopted following public hearings conducted by the ICC-ES Subcommittee on Uniform Codes and is effective on the date shown above. All reports issued or reissued on or after the effective date must comply with this criteria, while reports issued prior to this date may be in compliance with this criteria or with the previous edition. If the criteria is an updated version from a previous edition, a solid vertical line ( ) in the margin within the criteria indicates a technical change, addition, or deletion from the previous edition. A deletion indicator ( ) is provided in the margin where a paragraph has been deleted if the deletion involved a technical change. This criteria may be further revised as the need dictates. ICC-ES may consider alternate criteria, provided the proponent submits valid data demonstrating that the alternate criteria are at least equivalent to the attached criteria and otherwise meet the applicable performance requirements of the codes. Notwithstanding that a material, type or method of construction, or equipment, meets the attached acceptance criteria, or that it can be demonstrated that valid alternate criteria are equivalent and otherwise meet the applicable performance requirements of the codes, if the material, product, system or equipment is such that either unusual care with its installation or use must be exercised for satisfactory performance, or malfunctioning is apt to cause unreasonable property damage or personal injury or sickness relative to the benefits to be achieved by the use thereof, ICC- ES retains the right to refuse to issue or renew an evaluation report. Copyright 2003 Business/Regional Office P 5360 Workman Mill Road, Whittier, California P (562) Regional Office P 900 Montclair Road, Suite A, Birmingham, Alabama P (205) Regional Office P 4051 West Flossmoor Road, Country Club Hills, Illinois P (708)

2 INTERIM CRITERIA FOR INSPECTION AND VERIFICATION OF CONCRETE AND 1.0 INTRODUCTION 1.1 Scope: This criteria establishes minimum requirements for the inspection of both prefabricated and field-applied fiber-reinforced polymer (FRP) composite systems recognized under the ICBO ES Acceptance Criteria for Concrete and Reinforced and Unreinforced Masonry Strengthening Using Fiber-reinforced Polymer (FRP) Composite Systems (AC125) in ICBO ES evaluation reports under the 1997 Uniform Building Code TM (UBC) and the 2000 International Building Code (IBC). 1.2 References: ACI 546R, 1996, Concrete Repair Guide ACI 503R, 1997, Guide for Use of Polymer Adhesives in Concrete ASTM D , Standard Test Method for Properties of Polymer Matrix Composite Materials ASTM D , Standard Test Method for Transition Temperatures of Polymers by Differential Scanning Calorimetry ASTM D Standard Test Method for Pull-off Strength of Coatings Using Portable Adhesion Testers ICBO ES Acceptance Criteria for Laboratory Accreditation (AC89) ISO/IEC Standard 17025, 1999, General Requirements for the Competence of Testing and Calibration Laboratories ICBO ES Acceptance Criteria for Test Reports and Product Sampling (AC85) ICBO ES Acceptance Criteria for Quality Control Agency Accreditation (AC98) ISO/IEC 17020, 1998, General Criteria for the Operation of Various Types of Bodies Performing Inspection ISO/IEC Guide 58, 1993, Calibration and Testing Laboratory Accreditation Systems - General Requirements for Operation and Recognition ICBO ES Acceptance Criteria for Concrete and Reinforced and Unreinforced Masonry Strengthening Using Fiber-reinforced Composite Systems (AC125) ICRI Guideline No , 1995, Guide for Surface Preparation for the Repair of Deteriorated Concrete Resulting from Reinforcing Steel Corrosion ICRI Guideline No , 1997, Guide for Selecting and Specifying Surface Preparation for Sealers, Coatings and Membranes. 1.3 Definitions: Fiber-reinforced Polymer (FRP) Composite System: For purposes of this criteria, the definition must conform to the definition in ICBO ES AC Composite Material: A combination of highstrength fibers and polymer matrix material. This composite may be applied either during manufacture of the structural element or after construction. The FRP composite can be either precured or preimpregnated (prepreg) off-site by the manufacturer under controlled conditions, or can be composed at the site using wet lay-up method or any other approved method Precured: These composites consist of a fiber or fiber sheet material containing resin applied off-site, and are cured off-site with the application of heat, pressure, water or other substances. The resulting materials are in the form of sheets, grids or shells Preimpregnated (prepreg): These composites consist of a fiber or fiber sheet material containing resin applied off-site, that is advanced to a tacky consistency. Multiple plies of prepreg are typically cured in the field with the application of heat, pressure, water or other substances Wet lay-up: A method of preparing a laminate product at the jobsite by applying the resin system as a liquid when the fabric or mat is put in place Engineer: For purposes of this criteria, the engineer must be approved by owner for the specific project. When engineer is used in combination with licensed, registered or professional, the terms are to be considered interchangeable Accredited Testing Laboratory: Laboratory accredited by ICBO ES or under ISO/IEC Standard by an accrediting organization recognized to be operating under ISO/IEC Guide 58 and approved by the building official Inspector: Must be employed by an ICBO ES accredited quality control agency and approved by the building official. 2.0 REQUIRED INFORMATION Inspector must receive from the contractor: 2.1 Project drawings from engineer. 2.2 Project specifications from engineer. 2.3 Installation instructions approved by the engineer. These shall include the following items: 1. Description of how the product or system will be used, installed, cured, and protected at the site. 2. Procedures establishing quality control in field installation. 3. Requirements for product handling, storage and disposal. 4. Anchor or joining details (including composite and noncomposite details, e.g., wall footing, beam-to-column) installation into structural elements. 2.4 Quality control manual for specified FRP composite system. 2

3 2.5 Proof of installer s certification for FRP composite system, as per Annex A. 3.0 REQUIRED INSPECTION Inspector shall be at the jobsite during the composite system application for the following purposes: 3.1 To document that all materials conform to the ICBO ES evaluation report, engineering drawings and specifications. 3.2 To verify completed surface preparation as per Section To verify at least two batch mixes of resin, primer and adhesives per day, as per Section 6.2. For precured or preimpregnated laminates, the mixing of resin used to saturate the composite fibers shall be monitored in the manufacturing plant, and the verification requirements shall be addressed in the manufacturer s quality control manual. [For precured or preimpregnated laminates that require field application of adhesives (having more than one constituent) for bonding to the substrate or field application of resins (having more than one constituent) for bonding of two laminates together, the field verification of such adhesive or resin batch mixes shall comply with this Section and Section 6.2.] 3.4 To verify proper application of resin to fibers for wet lay-up systems, and the proper application of adhesives for precured or preimpregnated laminates as per Section 6.0. For precured or preimpregnated laminates, the application of the resin to the composite fibers shall be monitored in the manufacturing plant, and the verification requirements shall be addressed in the manufacturer s quality control manual. 3.5 To spot-check at least five areas per day, to verify fiber alignment, number of layers, and the direction of fibers of each layer (as per Sections ). 3.6 To verify proper curing of composite system, as per Section To examine each segment of entire project upon completion of installation, through at least visual inspection and sounding. 3.8 To verify correct preparation and curing of test samples as per, Section To verify that all required testing is performed by an accredited testing laboratory and to witness all field testing, as per Section To identify and map any defects or substandard areas, as per Section To inspect the repair of all defects and verify that they meet engineer s recommendations (as per Section 8.2) To inspect composite for galvanic corrosion. There should be no direct contact between any FRP composite carbon-based system and any metallic parts, including newly installed details required for the strengthening system (such as steel angles, plates, bolts and any other existing metallic part). If such conditions exist, the engineer shall be notified immediately. 4.0 INSPECTION OF MATERIALS 4.1 Inspector must verify that the specified FRP composite system is being applied. This includes verifying the following: Fabric certificate of compliance in accordance with ICBO ES evaluation report, plans and specifications Polymer matrix certificate of analysis in accordance with ICBO ES evaluation report, plans and specifications. Polymer resins shall be verified to be within shelf life specifications Coating system certification in accordance with ICBO ES evaluation report, plans and specifications, if required. 4.2 Inspector must verify that all materials are stored as per manufacturer s recommendations. 5.0 SURFACE PREPARATION 5.1 Surface must be properly prepared as per manufacturer s recommendations. Surface preparation requirements are based upon intended application of composite material and the type of substrate. Applications of FRP composite systems are divided into two categories: contact-critical and bond-critical. For example, columns wrapped for confinement are a contact-critical application, and one-sided wall applications are a bond-critical Contact-critical applications require complete contact between the FRP composite system and the structural member. At a minimum, the surface to receive composite shall be free from fins, sharp edges and protrusions that may cause voids behind the installed casing or that may damage the fibers. One of the most important steps is removing any unsound concrete or masonry and repairing these areas using a compatible bonding agent and epoxy mortar according to ACI 546R and ICRI Guidelines # Uneven existing surfaces may be filled with resin filler or other material approved by the engineer. Welladhered paint may not require removal, as long as it is compatible with the specified FRP composite system and is approved by the engineer. Sharp and chamfered corners must be rounded as per the ICBO ES evaluation report, plans and specifications, when they are perpendicular to the direction of major reinforcement Bond-critical applications require a complete bond between the FRP system and the structural member. The surface to receive composite shall be free from fins, sharp edges and protrusions that will cause voids behind the installed casing or that will damage the fibers. Existing uneven surfaces may be filled with resin filler or other material approved by the engineer. As for contact-critical applications, the most important step is removing any unsound concrete or masonry and repairing these areas using a compatible bonding agent and epoxy mortar according to ACI 546R and ICRI Guidelines No Surface preparation should be in accordance with the recommendations of ACI 546R and ICRI Guideline No The concrete surface should be prepared to a minimum amplitude as per plans and specifications. Sharp and chamfered corners must be rounded as per the ICBO ES evaluation report, plans and specifications, when the corners are perpendicular to the direction of major reinforcement. 3

4 5.2 A system-compatible primer should be applied to the surface to receive composite. The primer should be placed uniformly on prepared surface as per manufacturer s specifications. 6.0 INSTALLATION OF FRP COMPOSITE SYSTEM 6.7 Verify splice and overlap. Conditions of Acceptance: All splices and overlaps shall comply with project plans and specifications. 6.8 Verify number of layers. 6.1 Verify ambient and concrete temperatures and surface dryness. Conditions of Acceptance: No work shall proceed if the temperature of the air or the concrete surface being repaired or strengthened is outside the range of the manufacturer s recommendations. The humidity and dew point are to be considered as per manufacturer s recommendations. All surfaces shall meet moisture content recommendations of the FRP composite system manufacturer. 6.2 Verify resin and/or adhesive mixes. Conditions of Acceptance: Prepare the resin or adhesive mix by combining components by the weight or volume ratio specified by the manufacturer. The components of the resin or adhesive shall be mixed through use of a mechanical mixer. Complete combination of all components shall be verified as per manufacturer s specs. No modifications of the resin or adhesive system are allowed, excluding manufacturer prefabricated additives approved by the registered design professional and the building official. (For precured or preimpregnated laminates requiring application of resin to the composite fibers in the manufacturing plant, the requirements for verification of resin mixes are as noted in Section 3.3) 6.3 Verify proper saturation for wet lay-up systems. Conditions of Acceptance: Wetting of the fabric shall be performed according to manufacturer s specified fiber-resin ratio approved by the engineer. Full saturation of the fibers must be achieved. A calibrated saturation machine may be used to ensure proper fiber-resin ratio. If hand saturation or any other method is being used, a field test must be performed to verify that the correct amount of resin is being applied as per manufacturer s recommendations. (For precured or preimpregnated laminates requiring application of resin to the composite fibers in the manufacturing plant, the requirements for verifying proper saturation are as noted in Section 3.4.) 6.4 Verify precured systems. Conditions of Acceptance: The precured laminates or panels shall be adhered to the wet adhesive in a manner recommended by the manufacturer. 6.5 Verify proper application. Conditions of Acceptance: Pockets of air between layers should be released or rolled out before the resin sets. 6.6 Verify fiber orientation. Conditions of Acceptance: Fiber orientation shall comply with project plans and specifications. A misalignment of more than 1 inch per foot (8 cm per meter) shall be reported to the engineer. Also, any fabric kinks, folds or severe waviness shall be reported by the inspector to the engineer. Conditions of Acceptance: Completed application must have the specified number of layers per the engineering drawings. 6.9 Verify application of special coatings. Conditions of Acceptance: Where required, all special coatings shall be applied per manufacturer s recommendations described in the project specifications. Also, verify that the coating being applied is compatible with the FRP composite system. 7.0 EVALUATION OF CURING Conditions of Acceptance: Cure temperature ranges and corresponding curing times shall be determined by the manufacturer. For preimpregnated systems that require field application of heat, pressure, water or other means of curing, the inspector shall perform evaluations per the manufacturer s recommendations. The inspector can evaluate relative cure of the resin by visual observation of resin tackiness and the hardness of retained resin samples relative of the surrounding temperature. Samples shall be handled with care so as to not affect the cure. For precured or preimpregnated systems, adhesive hardness evaluation should follow manufacturer s recommendation. The composite system shall be protected from weather and other damaging conditions as per manufacturer s recommendations, until cured. 8.0 IDENTIFICATION AND REPAIR OF DEFECTS 8.1 All installed areas shall be visually inspected for defects. The installed composite shall be completely adhered to the substrate. Any suspect areas should be sounded with a ball peen hammer. A light tapping will indicate the presence of any voids behind the installed composite. Caution should be used so as not to damage the installed composite system during inspection. Inspector shall map all defects and the corresponding repairs after approval by the engineer. Conditions of Acceptance: a. Small entrapped air pockets and voids [on the order of 1 / 16 inch (1.6 mm) - 1 / 8 inch (3.2 mm) diameter] naturally occur in mixed resin systems and do not require repair or treatment. b. Except at the edges or boundaries, delaminations of less than 2 square inches (13 square cm) are permissible. No more than 10 delaminations of this size shall be allowed per 10 square feet (approximately 1 meter squared) of the laminated area. Delaminations larger than 2 square inches shall be repaired by any method approved by the engineer. c. Any delaminations spanning more that 5 percent of the surface area shall be repaired by any method approved by the engineer. 8.2 Inspector shall supervise repair of all defects. 4

5 Conditions of Acceptance: Repairs can be performed by backfilling delaminations with resin or replacing the damaged section. Repairs shall be made in accordance with project specifications and the engineer s recommendations. 8.3 Precured system. Conditions of Acceptance: Each defect shall be evaluated and repaired according to the manufacturer s procedures approved by the engineer. 9.0 TESTING REQUIREMENTS 9.1 Testing of FRP Composite Wet Lay-up Systems: A minimum of two sample sets measuring 12 inches by 12 inches (30 cm by 30 cm), made of two composite layers, with the major reinforcement in the same direction for both layers, should be fabricated for testing each day the wet layup system is applied. Samples shall be tested by accredited laboratories per ASTM Standard D Test reports shall comply with ICBO ES AC85. Each sample shall be coded and dated, and shall be accompanied with the site environmental information such as temperature and relative humidity. These samples shall be cured at the site under the same environmental conditions. The engineer shall determine the required percentage of coupons requiring testing. It is recommended that a minimum of 15 percent of all sample sets be tested. If the tested samples do not meet the conditions of acceptance, it is recommended that 25 percent of all sample sets be tested. Conditions of Acceptance: Tensile properties must meet or exceed FRP composite system properties as defined in project specifications. If one coupon does not achieve the design properties, additional coupons from the same sample shall be tested. If these coupons fail (on average), coupons from the other 12-inch-by-12-inch sample, from the same batch for that day, shall be tested. 9.2 Testing of Precured Systems: Four sets of samples shall be tested per job. Samples shall be tested by accredited laboratories per ASTM Standard D Test reports shall comply with ICBO ES AC85. Conditions of Acceptance: Tensile properties must meet or exceed FRP composite system properties as defined in project specifications. If one coupon does not achieve the design properties, additional coupons from the same sample shall be tested. If these coupons fail (on average), coupons from the other 12-inch-by-12-inch sample, from the same batch for that day, shall be tested. 9.3 Field-testing: Inspector shall be present to supervise all field-testing. The following tests may be performed at the request of the owner, engineer or inspector, but are not required: Pull-off Test: Testing shall be conducted in accordance with ASTM Standard D or ACI 503R Resin Test: Test shall comply with ASTM Standard D If resin does not meet project specifications, the engineer must be notified, and the affected area of the FRP must be removed and replaced Cured Thickness Test: Small core samples may be taken to ascertain the laminate thickness and/or number of plies. After sampling, hole should be filled as per manufacturer s recommendations. Taking samples from high-stress or splice areas should be avoided. Conditions of Acceptance: All results must meet project specifications. If material fails to meet specifications, repairs must be made according to engineer-approved methods REQUIRED DOCUMENTATION PROVIDED BY INSPECTOR Daily inspection reports shall include: 10.1 Date and time of installation Ambient temperature and general atmospheric observations Surface temperature of structural member to be strengthened Surface dryness Surface preparation methods and the resulting profile Surface cleanliness Widths of cracks not injected with epoxy Fiber or prefabricated-cured laminate batch number(s) and approximate location in structure Batch numbers, mix ratios, mixing times, and mixed color of all resins, including primers, saturants, adhesives and coatings mixed for the day Observations on progress of cure of resins Conformance with installation procedures FRP system properties from panel test (if required) Results from field tests (if required) Location and size of any delaminations or air voids General progress of work. Note: A sample copy of the FRP system inspection checklist is provided in Appendix A.# 5

6 ANNEX A Fiber-reinforced Polymer (FRP) Composite System Installer s Certification Name of fiber-reinforced polymer (FRP) composite system: Fiber-reinforced polymer (FRP) composite system manufacturing company name and address: Telephone number: INSTALLATION A. Designer s requirements, details and instructions B. Manufacturer's details and requirements CONFORMS The information entered above is offered in testimony that the fiber-reinforced polymer (FRP) composite system installation conforms to the FRP composite system manufacturer s installation methods and procedures. Fiber-reinforced polymer (FRP) composite system installer company name and address: Signature of responsible officer for certification: Typed name and title of officer: Telephone number: ( ) 6

7 ANNEX A Fiber-reinforced Polymer (FRP) Composite System Inspection Checklist Project Name: Location: Required Information for Project to Proceed: Project drawings Project specifications Installation instructions Quality control manual Installer s certification (See Annex A) ICBO ES evaluation report Date: Time In: Time Out: Temperature: General Weather: Relative Humidity: Surface Temperature of Element to Receive FRP Composite: 1. What is the specified FRP composite system being used? 2. Has the installer s certification been verified? 3. Are materials being stored as per manufacturer s recommendations? 4. Are environmental conditions within the manufacturer s recommendations for application? 5. Has surface prep been completed per project or manufacturer s specification? 6. What is the resulting surface profile? 7. Is surface free of dust, debris, oil or other contaminants? 8. Record lot numbers for all fiber or prefabricated-cured laminates to be used today. 9. Record all lot and batch numbers for resins, primers, saturants, etc. 10. Have two random batches of resins been checked to assure proper mix ratio? 11. Have resins been mixed per manufacturer s specification? 12. For wet lay-up systems, are fibers being saturated using the manufacturer s recommended procedure? 13. Is the proper fiber-resin ratio being achieved? 14. Have composites been installed per project plans and manufacturer s specifications, including proper orientation, alignment, required number of layers, and required splices and overlaps? 15. Has any entrapped air been released from between layers? 16. Record location(s) of installation in structure. 17. Have resins been checked to ensure proper progress of curing? 18. Have all edges and seams been protected with system compatible resin? 19. Have all test samples been made and environmental information been included? 20. Record name of accredited laboratory to be used for testing. 21. Record results from any field tests. 22. Have repairs been made if field testing does not meet project specifications? 23. Record (map) the location of delaminations or voids. 24. Have delaminations or voids been repaired per manufacturer s specification? 25. Have required coatings, including fireproofing, been blended and applied per manufacturer s specification? 26. Upon completion, has entire project been visually inspected, including sounding? 27. Has final certification been issued by inspector that the installed system meets all specified requirements? Inspector Signature Date Owner Signature Date 7

ACCEPTANCE CRITERIA FOR ROOF UNDERLAYMENT FOR USE IN SEVERE CLIMATE AREAS PREFACE

ACCEPTANCE CRITERIA FOR ROOF UNDERLAYMENT FOR USE IN SEVERE CLIMATE AREAS PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR ROOF UNDERLAYMENT FOR USE IN SEVERE CLIMATE AREAS AC48 Approved January 2000 Effective February 1, 2000 (Editorially revised

More information

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE

ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR METAL PLASTER BASES (LATH) AC191 Approved May 2008 Effective June 1, 2008 Previously approved February 2008, October 2007,

More information

June 9, 2008 PARTIES INTERESTED IN EVALUATION REPORTS ON TERMITE- RESISTANT FOAM PLASTICS

June 9, 2008 PARTIES INTERESTED IN EVALUATION REPORTS ON TERMITE- RESISTANT FOAM PLASTICS ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect June 9, 2008 TO: PARTIES INTERESTED IN EVALUATION REPORTS ON TERMITE- RESISTANT FOAM PLASTICS SUBJECT: Acceptance Criteria for Termite-resistant

More information

ACCEPTANCE CRITERIA FOR WATER-RESISTIVE BARRIERS PREFACE

ACCEPTANCE CRITERIA FOR WATER-RESISTIVE BARRIERS PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR WATER-RESISTIVE BARRIERS AC38 Approved June 2004 Effective July 1, 2004 Previously approved July 2000, September 1990 PREFACE

More information

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER PREFACE

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER AC51 Approved February 2008 Effective March 1, 2008 Previously approved October 2007, January 2001,

More information

Trusted ICC ES. Conformity! Look. Evaluation. ICC-ES Evaluation

Trusted ICC ES. Conformity! Look. Evaluation. ICC-ES Evaluation 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.orgg ESR 3288 Reissued 12/2017 This report is subject to renewal 12/2018. DIVISION: 03 00

More information

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL SECTION xxxx STRENGTHENING OF CONCRETE WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) GENERAL PROVISIONS PART 1 - GENERAL A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections

More information

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE REPORT HOLDER: STRUCTURAL TECHNOLOGIES, LLC

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE REPORT HOLDER: STRUCTURAL TECHNOLOGIES, LLC 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3606 Reissued 01/2018 This report is subject to renewal 01/2019. DIVISION: 03 00

More information

PROPOSED ICC-ES EVALUATION GUIDELINE FOR VOLATILE ORGANIC COMPOUND (VOC) CONTENT AND EMISSIONS OF PAINTS AND COATINGS PUBLIC COMMENT DRAFT

PROPOSED ICC-ES EVALUATION GUIDELINE FOR VOLATILE ORGANIC COMPOUND (VOC) CONTENT AND EMISSIONS OF PAINTS AND COATINGS PUBLIC COMMENT DRAFT PROPOSED ICC-ES EVALUATION GUIDELINE FOR VOLATILE ORGANIC COMPOUND (VOC) CONTENT AND EMISSIONS OF PAINTS AND COATINGS PUBLIC COMMENT DRAFT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 PROPOSED

More information

June 22, 2009 PARTIES INTERESTED IN EVALUATION REPORTS ON COMPOSITE COLD-FORMED LIGHT GAGE STEEL AND CONCRETE MASONRY LINTELS

June 22, 2009 PARTIES INTERESTED IN EVALUATION REPORTS ON COMPOSITE COLD-FORMED LIGHT GAGE STEEL AND CONCRETE MASONRY LINTELS June 22, 2009 TO: SUBJECT: PARTIES INTERESTED IN EVALUATION REPORTS ON COMPOSITE COLD-FORMED LIGHT GAGE STEEL AND CONCRETE MASONRY LINTELS Acceptance Criteria for Composite Cold-formed Light Gage Steel

More information

Special Inspections for Externally Applied FRP: How Much is Enough? Peter B. Larson P.E. SECB

Special Inspections for Externally Applied FRP: How Much is Enough? Peter B. Larson P.E. SECB Special Inspections for Externally Applied FRP: How Much is Enough? Peter B. Larson P.E. SECB FRP Special Inspections Why even talk about this stuff? Because FRP Special Inspections are expensive.sometimes

More information

The purpose of this memo is to respond to the comments received in response to the May 1, 2007, staff letter and the revised criteria.

The purpose of this memo is to respond to the comments received in response to the May 1, 2007, staff letter and the revised criteria. ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect #19 To: From: ICC-ES Evaluation Committee Brian Gerber, S.E., and Irni Yani Date: June 1, 2007 Subject: Revisions to the Proposed Acceptance Criteria

More information

ACCEPTANCE CRITERIA FOR POLYMER-BASED AND POLYMER-MODIFIED EXTERIOR AND INTERIOR WALL CLADDING

ACCEPTANCE CRITERIA FOR POLYMER-BASED AND POLYMER-MODIFIED EXTERIOR AND INTERIOR WALL CLADDING www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR POLYMER-BASED AND POLYMER-MODIFIED EXTERIOR AND INTERIOR WALL CLADDING AC92 Approved

More information

ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT PREFACE

ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT PREFACE www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT AC237 Approved June 2009

More information

Trusted ICC ES MILAN ITALY SYSTEMS. Look. Conformity! Evaluation. ICC-ES Evaluation

Trusted ICC ES MILAN ITALY SYSTEMS. Look. Conformity! Evaluation. ICC-ES Evaluation 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.orgg ESR 3499 Reissued 02/2016 This report is subject to renewal 02/2018. DIVISION: 03 00

More information

Legacy report on the 1997 Uniform Building Code, the 2000 International Building Code and the 2000 International Residential Code.

Legacy report on the 1997 Uniform Building Code, the 2000 International Building Code and the 2000 International Residential Code. LEGACY REPORT ER-2895 Reissued March 1, 2004 www.icc-es.org Business/Regional Office 5360 Workman Mill Road, Whittier, California 90601 (562) 699-0543 Regional Office 900 Montclair Road, Suite A, Birmingham,

More information

The Rehabilitation of Existing Building Drains and Building Sewers by the

The Rehabilitation of Existing Building Drains and Building Sewers by the Inversion or Pulled-in-Place Method and Curing of Resin-impregnated Tube Page 1 of 7 www.icc-es.org/pmg (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council PROPOSED PMG LISTING

More information

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL

Contract Specs Version 1 Project XXX. SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL GENERAL PROVISIONS SECTION xxxx STRENGTHENING OF MASONRY WITH FRCM (FABRIC REINFORCED CEMENTITIOUS MATRIX) PART 1 - GENERAL A. Attention is directed to the CONTRACT AND GENERAL CONDITIONS and all Sections

More information

ACCEPTANCE CRITERIA FOR FASTENERS POWER-DRIVEN INTO CONCRETE, STEEL AND MASONRY ELEMENTS PREFACE

ACCEPTANCE CRITERIA FOR FASTENERS POWER-DRIVEN INTO CONCRETE, STEEL AND MASONRY ELEMENTS PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR FASTENERS POWER-DRIVEN INTO CONCRETE, STEEL AND MASONRY ELEMENTS AC70 Approved October 2006 Effective January 1, 2007 Previously

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS REPORT HOLDER: PAREX USA, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2045 Reissued 01/2017 This report is subject to renewal 01/2019. DIVISION: 07 00

More information

December 3, 2012 PARTIES INTERESTED IN INTUMESCENT FIRE-RESISTANT COATINGS FIELD-APPLIED TO PREFABRICATED WOOD I-JOISTS

December 3, 2012 PARTIES INTERESTED IN INTUMESCENT FIRE-RESISTANT COATINGS FIELD-APPLIED TO PREFABRICATED WOOD I-JOISTS December 3, 2012 TO: PARTIES INTERESTED IN INTUMESCENT FIRE-RESISTANT COATINGS FIELD-APPLIED TO PREFABRICATED WOOD I-JOISTS SUBJECT: Proposed Acceptance Criteria for Intumescent Fire-resistant Coatings

More information

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER

ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR PRECAST STONE VENEER AC51 Approved February 2008 Effective March 1, 2008 (Editorially

More information

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued January 1, Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued January 1, Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued January 1, 2004 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900 Montclair

More information

*Corrected October 2005

*Corrected October 2005 ESR-1056* Reissued December 1, 2004 This report is subject to re-examination in two years. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California

More information

June 1, 2017 PARTIES INTERESTED IN POST-TENSIONING ANCHORAGES AND COUPLERS OF PRESTRESSED CONCRETE

June 1, 2017 PARTIES INTERESTED IN POST-TENSIONING ANCHORAGES AND COUPLERS OF PRESTRESSED CONCRETE June 1, 2017 TO: PARTIES INTERESTED IN POST-TENSIONING ANCHORAGES AND COUPLERS OF PRESTRESSED CONCRETE SUBJECT: Proposed Revisions to the Acceptance Criteria for Post-Tensioning Anchorages and Couplers

More information

ESR ICC Evaluation Service, Inc. Reissued January 1, 2008 This report is subject to re-examination in one year.

ESR ICC Evaluation Service, Inc. Reissued January 1, 2008 This report is subject to re-examination in one year. ESR-1967 Reissued January 1, 2008 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California

More information

STRENGTH AND DURABILITY OF THE INSTALLED STONE

STRENGTH AND DURABILITY OF THE INSTALLED STONE BEAUTY STRENGTH DURABILITY At Cast Natural Stone, we build each and every stone to stand up to the most brutal weather conditions. And with our manufacturing and headquarters located in Wisconsin, we know

More information

Underwater Structures

Underwater Structures Field Application and Installation Guidelines General The integrity and quality of DowAksa CarbonWrap finished systems critically depends on a careful initial planning and evaluation of the project. All

More information

July 23, 2010 PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION

July 23, 2010 PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION July 23, 2010 TO: SUBJECT: PARTIES INTERESTED IN REFLECTIVE FOIL INSULATION Revisions to the Acceptance Criteria for Reflective Foil Insulation, Subject AC02-0610-R1 (LS/RB) Dear Madam or Sir: In June

More information

ESR ICC Evaluation Service, Inc. Issued March 1, 2006 This report is subject to re-examination in one year.

ESR ICC Evaluation Service, Inc. Issued March 1, 2006 This report is subject to re-examination in one year. ESR-1328 Issued March 1, 2006 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601

More information

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE DIVISION: MASONRY SECTION: MAINTENANCE OF UNIT MASONRY

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE DIVISION: MASONRY SECTION: MAINTENANCE OF UNIT MASONRY 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3944 Issued 03/2018 This report is subject to renewal 03/2019. SECTION: 03 01 00

More information

April 2, 2018 PARTIES INTERESTED IN CROSS LAMINATED TIMBER PANELS USED AS COMPONENTS IN FLOOR AND ROOF DECKS

April 2, 2018 PARTIES INTERESTED IN CROSS LAMINATED TIMBER PANELS USED AS COMPONENTS IN FLOOR AND ROOF DECKS April 2, 2018 TO: PARTIES INTERESTED IN CROSS LAMINATED TIMBER PANELS USED AS COMPONENTS IN FLOOR AND ROOF DECKS SUBJECT: Proposed Revisions to the ICC-ES Acceptance Criteria for Cross-laminated Timber

More information

June 1, 2009 PARTIES INTERESTED IN EVALUATION REPORTS ON STRUCTURAL WOOD-BASED PRODUCTS USED AS STUDS

June 1, 2009 PARTIES INTERESTED IN EVALUATION REPORTS ON STRUCTURAL WOOD-BASED PRODUCTS USED AS STUDS June 1, 2009 TO: PARTIES INTERESTED IN EVALUATION REPORTS ON STRUCTURAL WOOD-BASED PRODUCTS USED AS STUDS SUBJECT: Proposed Revisions to the Acceptance Criteria for Wood-based Studs, Subject AC202-0609-R1

More information

ESR-2269 Reissued November 1, 2008 This report is subject to re-examination in one year.

ESR-2269 Reissued November 1, 2008 This report is subject to re-examination in one year. Reissued November, 008 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office 60 Workman Mill Road, Whittier, California 9060 (6) 699-0

More information

SPECIAL SPECIFICATION 4897 Repair Structural Concrete

SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1993 Specifications CSJ 0331-04-045 SPECIAL SPECIFICATION 4897 Repair Structural Concrete 1. Description. This Item shall govern for the repair of delaminated, spalled and chipped areas of concrete foundations,

More information

ESR ICC Evaluation Service, Inc. Reissued July 1, 2006 This report is subject to re-examination in two years.

ESR ICC Evaluation Service, Inc. Reissued July 1, 2006 This report is subject to re-examination in two years. ESR-1178 Reissued July 1, 2006 This report is subject to re-examination in two years. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California

More information

March 6, 2012 PARTIES INTERESTED IN THE DETERMINATION OF FORMALDEHYDE EMISSIONS OF COMPOSITE WOOD PRODUCTS

March 6, 2012 PARTIES INTERESTED IN THE DETERMINATION OF FORMALDEHYDE EMISSIONS OF COMPOSITE WOOD PRODUCTS March 6, 2012 TO: SUBJECT: PARTIES INTERESTED IN THE DETERMINATION OF FORMALDEHYDE EMISSIONS OF COMPOSITE WOOD PRODUCTS Revisions to the Environmental Criteria for Determination of Formaldehyde Emissions

More information

PMG LISTING CRITERIA FOR STRUCTURAL ADHESIVE JOINING SYSTEMS FOR FITTINGS PREFACE

PMG LISTING CRITERIA FOR STRUCTURAL ADHESIVE JOINING SYSTEMS FOR FITTINGS PREFACE www.icc-es.org/pmg (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council PMG LISTING CRITERIA FOR STRUCTURAL ADHESIVE JOINING SYSTEMS FOR FITTINGS Approved March 2009 (Editorially

More information

February 1, 2010 PARTIES INTERESTED IN EVALUATION REPORTS ON ROOF UNDERLAYMENTS FOR USE IN SEVERE CLIMATE AREAS

February 1, 2010 PARTIES INTERESTED IN EVALUATION REPORTS ON ROOF UNDERLAYMENTS FOR USE IN SEVERE CLIMATE AREAS February 1, 2010 TO: PARTIES INTERESTED IN EVALUATION REPORTS ON ROOF UNDERLAYMENTS FOR USE IN SEVERE CLIMATE AREAS SUBJECT: Proposed Revisions to the Acceptance Criteria for Roof Underlayments for Use

More information

December 1, 2014 PARTIES INTERESTED IN STRUCTURAL WOOD-BASED PRODUCTS

December 1, 2014 PARTIES INTERESTED IN STRUCTURAL WOOD-BASED PRODUCTS December 1, 2014 TO: PARTIES INTERESTED IN STRUCTURAL WOOD-BASED PRODUCTS SUBJECT: Proposed Revision to the ICC-ES Acceptance Criteria for Structural Wood-Based Products, Subject AC47-1214-R2-2 (JF/PC)

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 Product Guide Specification SECTION 03935 RESTORATION MORTAR AND EPOXY

More information

ENVIRONMENTAL CRITERIA FOR DETERMINATION OF RECYCLED CONTENT OF MATERIALS EC101 PREFACE

ENVIRONMENTAL CRITERIA FOR DETERMINATION OF RECYCLED CONTENT OF MATERIALS EC101 PREFACE www.icc-es.org/save 1-800-423-6587 (562) 699-0543 A Subsidiary of the International Code Council ENVIRONMENTAL CRITERIA FOR DETERMINATION OF OF MATERIALS EC101 Effective date: March 1, 2012 Previously

More information

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar

ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar ARDEX GUIDE SPECIFICATION ARDEX TRM Transportation Repair Mortar Fast-Setting Concrete Repair Mortar SECTION 03 92 50 PART 1 - GENERAL 1.1 SUMMARY A. This section includes Portland cement-based, microsilica-modified,

More information

ACCEPTANCE CRITERIA FOR PREFABRICATED WOOD SHEAR PANELS PREFACE

ACCEPTANCE CRITERIA FOR PREFABRICATED WOOD SHEAR PANELS PREFACE ICC EVALUATION SERVICE, INC. Evaluate P Inform P Protect ACCEPTANCE CRITERIA FOR PREFABRICATED WOOD SHEAR PANELS AC130 Approved October 2007 Effective November 1, 2007 Previously approved February 2004,

More information

SECTION VINYL-COATED FABRIC WALL COVERINGS

SECTION VINYL-COATED FABRIC WALL COVERINGS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 09 72 16 VINYL-COATED FABRIC WALL COVERINGS SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS Re-Ply Roofing Systems Application Specification # AC - 2010-A & MB PART I GENERAL 1.01 DESCRIPTION A. This guideline specification includes

More information

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770)

Madewell Products Corporation December Industrial Court Alpharetta, GA Office: (770) Fax: (770) Madewell Products Corporation December 2014 7561 Industrial Court Alpharetta, GA 30004 Office: (770) 475-8199 Fax: (770) 475-8167 PART 1 GENERAL Product Guide Specification SECTION 03935 SPRAYABLE MICROSILICA

More information

SECTION POLYURETHANE MIC COATINGS. A. Furnish and install special coating systems in accordance with the Contract Documents.

SECTION POLYURETHANE MIC COATINGS. A. Furnish and install special coating systems in accordance with the Contract Documents. SECTION 09802 POLYURETHANE MIC COATINGS PART 1 -- GENERAL 1.01 THE REQUIREMENTS A. Furnish and install special coating systems in accordance with the Contract Documents. B. Polyurethane MIC Coating 1.

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof SECTION 07550 MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof This section is based on the products of MFM Building Products Corp., which is located at: 525 Orange St. P. O. Box 340 Coshocton, OH 43812

More information

ICBO Evaluation Service, Inc. A subsidiary corporation of the International Conference of Building Officials

ICBO Evaluation Service, Inc. A subsidiary corporation of the International Conference of Building Officials ICBO Evaluation Service, Inc. A subsidiary corporation of the International Conference of Building Officials 30 WORKMAN MILL ROAD WHITTIER, CALIFORNIA 9001-2299 (2) 99-03 FAX (2) 9-9 ACCEPTANCE CRITERIA

More information

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262

REPORT HOLDER: HUBER ENGINEERED WOODS, LLC ONE RESOURCE SQUARE DAVID TAYLOR DRIVE, SUITE 300 CHARLOTTE, NORTH CAROLINA 28262 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 1473 Reissued 09/2017 This report is subject to renewal 09/2019. SECTION: 06 16 00

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 1 of 12 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE V/O CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

SECTION POLYPROPYLENE FABRIC WALL COVERING

SECTION POLYPROPYLENE FABRIC WALL COVERING PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 09 72 31 POLYPROPYLENE FABRIC WALL COVERING SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. Also delete any other item or paragraph not

More information

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS

ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS ASTEC Re-Ply Roof System for ASPHALT & MODIFIED BITUMEN ROOFS Re-Ply Roofing Systems Application Specification # AC-2014-A & MB-15 (15 Year Material & Labor Warranty) PART I - GENERAL 1.01 DESCRIPTION

More information

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams

SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed

More information

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE DIVISION: MASONRY SECTION: MAINTENANCE OF UNIT MASONRY

DIVISION: CONCRETE SECTION: MAINTENANCE OF CONCRETE DIVISION: MASONRY SECTION: MAINTENANCE OF UNIT MASONRY 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2103 Reissued 11/2016 This report is subject to renewal 11/2017. DIVISION: 03 00

More information

REPORT HOLDER: SOPREMA, INC. 310 QUADRAL DRIVE WADSWORTH, OHIO EVALUATION SUBJECT:

REPORT HOLDER: SOPREMA, INC. 310 QUADRAL DRIVE WADSWORTH, OHIO EVALUATION SUBJECT: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3966 Reissued 07/2017 This report is subject to renewal 07/2019. DIVISION: 07 00

More information

Legacy report on the 1997 Uniform Building Code, the 2000 International Building Code and the 2000 International Residential Code

Legacy report on the 1997 Uniform Building Code, the 2000 International Building Code and the 2000 International Residential Code LEGACY REPORT ER-4203 Reissued June 1, 2004 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office #

More information

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM PART 1- GENERAL 1.1 SUMMARY A. Section Includes: SECTION 084523 - SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM 1. Flat factory prefabricated structural insulated translucent sandwich panels; with glazed endwalls.

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 3172 Reissued 02/2018 This report is subject to renewal 02/2019. DIVISION: 07 00

More information

ENVIRONMENTAL CRITERIA FOR DETERMINATION OF SOURCE OF RECOVERY, EXTRACTION, HARVEST AND MANUFACTURE FOR MATERIALS OR PRODUCTS EC114

ENVIRONMENTAL CRITERIA FOR DETERMINATION OF SOURCE OF RECOVERY, EXTRACTION, HARVEST AND MANUFACTURE FOR MATERIALS OR PRODUCTS EC114 www.icc-es.org/ep 1-800-423-6587 (562) 699-0543 A Subsidiary of the International Code Council ENVIRONMENTAL CRITERIA FOR DETERMINATION OF SOURCE OF RECOVERY, EXTRACTION, HARVEST AND MANUFACTURE FOR OR

More information

DESIGN MANUAL FOR FORTRESS CARBON-KEVLAR STRAP FRP STRENGTHNING COMPOSITE SYSTEM FOR MASONRY STRUCTURES. ESR No ICC-ES AC 125

DESIGN MANUAL FOR FORTRESS CARBON-KEVLAR STRAP FRP STRENGTHNING COMPOSITE SYSTEM FOR MASONRY STRUCTURES. ESR No ICC-ES AC 125 RECORD Page 1 of 21 DESIGN MANUAL FOR FORTRESS CARBON-KEVLAR STRAP FRP STRENGTHNING COMPOSITE SYSTEM FOR MASONRY STRUCTURES ESR No. 3815 ICC-ES AC 125 THIS MANUAL IS PROPERTY OF FORTRESS STABILIZATION

More information

A. Section includes Sprayed Fire-Resistive Materials: (SFRM) A. Pre-Installation Conference: Conduct conference at Project Site.

A. Section includes Sprayed Fire-Resistive Materials: (SFRM) A. Pre-Installation Conference: Conduct conference at Project Site. SECTION 078100 - APPLIED FIREPROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Amendments to General Conditions and Division 01 Specification

More information

LEGACY REPORT ER-5608* Reissued February 1, Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5608*   Reissued February 1, Legacy report on the 1997 Uniform Building Code LEGACY REPORT ER-5608* Reissued February 1, 2004 www.icc-es.org Business/Regional Office 5360 Workman Mill Road, Whittier, California 90601 (562) 699-0543 Regional Office 900 Montclair Road, Suite A, Birmingham,

More information

ESR ICC Evaluation Service, Inc. Reissued September 1, 2008 This report is subject to re-examination in one year.

ESR ICC Evaluation Service, Inc. Reissued September 1, 2008 This report is subject to re-examination in one year. ESR- Reissued September, 00 This report is subject to re-examination in one year. ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 0 Workman Mill Road, Whittier, California 900 #

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PEDESTRIAN TRAFFIC COATINGS REPORT HOLDER: AVM INDUSTRIES, INC.

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: PEDESTRIAN TRAFFIC COATINGS REPORT HOLDER: AVM INDUSTRIES, INC. 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2125 Reissued 07/2018 This report is subject to renewal 07/2019. DIVISION: 07 00

More information

REPORT HOLDER: BASF CORPORATION EVALUATION SUBJECT: MASTERSEAL AWB 660 I VAPOR RETARDER, AIR AND WATER-RESISTIVE BARRIER AND FLEXIBLE FLASHING

REPORT HOLDER: BASF CORPORATION EVALUATION SUBJECT: MASTERSEAL AWB 660 I VAPOR RETARDER, AIR AND WATER-RESISTIVE BARRIER AND FLEXIBLE FLASHING 0 Most Widely Accepted and Trusted ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org ESR-3310 Reissued 07/2018 This report is subject to renewal 07/2020. DIVISION: 07 00

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR THE TESTING AND ANALYSIS OF STEEL SHEET SHEATHING FOR WOOD AND COLD FORMED STEEL LIGHT

More information

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER:

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF PANELS SECTION: METAL WALL PANELS REPORT HOLDER: 0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 4 6587 (562) 699 0543 www.icc es.org ESR 3152 Reissued 08/2017 This report is subject to renewal 08/2018. DIVISION: 07 00 00

More information

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES

June 7, 2012 PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES June 7, 2012 TO: PARTIES INTERESTED IN HVAC DUCT ENCLOSURE ASSEMBLIES SUBJECT: Revisions to the Acceptance Criteria for Metallic HVAC Duct Enclosure Assemblies, Subject AC179-0612-R1 (MB/CA) Dear Colleague:

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1007 REVISION 13 DECEMBER 2013 EFFECTIVE DATE DECEMBER 16,

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

Strengthening of an Impact-Damaged PC Girder

Strengthening of an Impact-Damaged PC Girder Strengthening of an Impact- PC Girder By Antonio Nanni, PhD, PE R epair of impacted prestressed and reinforced concrete (PC and RC, respectively) structures using traditional and emerging technologies

More information

October 26, 2011 PARTIES INTERESTED IN MASONRY AND CONCRETE STRENGTHENING USING FIBER-REINFORCED CEMENTITIOUS MATRIX (FRCM) COMPOSITE SYSTEMS

October 26, 2011 PARTIES INTERESTED IN MASONRY AND CONCRETE STRENGTHENING USING FIBER-REINFORCED CEMENTITIOUS MATRIX (FRCM) COMPOSITE SYSTEMS October 26, 2011 TO: PARTIES INTERESTED IN MASONRY AND CONCRETE STRENGTHENING USING FIBER-REINFORCED CEMENTITIOUS MATRIX (FRCM) COMPOSITE SYSTEMS SUBJECT: Acceptance Criteria for Masonry and Concrete Strengthening

More information

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician?

2/16/17. Copyright Material. A Repair Technician s Guide to the ACI Chapter 10 Quality Assurance. The Big Picture. Who is a Repair Technician? Copyright Material This presentation is protected by US and International copyright laws. Reproduction, distribution, display and use of the presentation without permission of the speaker is prohibited.

More information

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay

SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.

More information

Originally Issued: 09/07/2016 Revised: 09/28/2018 Valid Through: 09/30/2019

Originally Issued: 09/07/2016 Revised: 09/28/2018 Valid Through: 09/30/2019 130 WELSCO RD. SMACKOVER, AR 71762 (870) 725-3902 www.spiderlath.com REINFORCING FIBERGLASS MESH WITH A MULTI-FUNCTION STRIP SYSTEM CSI Sections: 09 22 36 Lath 1.0 RECOGNITION SpiderLath Reinforcing Fiberglass

More information

Protective Industrial Polymers - USA Manufacturer s Specification February 11, 2015

Protective Industrial Polymers - USA Manufacturer s Specification February 11, 2015 This specification covers InhibiChem SR-GF-L Enhanced Chemical and Solvent-Resistant Glass-Flake Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats

More information

February 1, SUBJECT: Proposed Revisions to the Acceptance Criteria for Staples, Subject AC R1 (EL/JF)

February 1, SUBJECT: Proposed Revisions to the Acceptance Criteria for Staples, Subject AC R1 (EL/JF) February 1, 2018 TO: PARTIES INTERESTED IN STAPLES SUBJECT: Proposed Revisions to the Acceptance Criteria for Staples, Subject AC201-0218-R1 (EL/JF) Dear Colleague: We are seeking your comments on proposed

More information

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , &

TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS. Financial Project ID , & TECHNICAL SPECIAL PROVISION FOR CONCRETE REPAIRS Financial Project ID 429140-1-52-01, 429140-2-52-01 & 428267-1-52-01 The official record of this Technical Special Provision is the electronic file signed

More information

PRODUCT GUIDE SPECIFICATION

PRODUCT GUIDE SPECIFICATION PRODUCT GUIDE SPECIFICATION Specifier Notes: This product guide specification is written according to the Construction Specifications Institute (CSI) 3-Part Format, including MasterFormat, SectionFormat,

More information

June 1, 2010 PARTIES INTERESTED IN EVALUATION REPORTS ON REFLECTIVE FOIL INSULATION

June 1, 2010 PARTIES INTERESTED IN EVALUATION REPORTS ON REFLECTIVE FOIL INSULATION June 1, 2010 TO: PARTIES INTERESTED IN EVALUATION REPORTS ON REFLECTIVE FOIL INSULATION SUBJECT: Proposed Revisions to the Acceptance Criteria for Reflective Foil Insulation, Subject AC02-0610-R1 (LS/RB)

More information

REINFORCED CONCRETE MASONRY SECTION

REINFORCED CONCRETE MASONRY SECTION SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification

More information

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES

INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS UNIFORM EVALUATION SERVICES EVALUATION CRITERIA FOR ANCHORED MASONRY VENEER SYSTEM WITH POLYSTYRENE FOAM PLASTIC BACKING EC 021-2014 (Adopted

More information

ACCEPTANCE CRITERIA FOR METAL COMPOSITE MATERIAL (MCM) PREFACE

ACCEPTANCE CRITERIA FOR METAL COMPOSITE MATERIAL (MCM) PREFACE www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR METAL COMPOSITE MATERIAL (MCM) AC25 Approved October 2010 (Editorially revised August

More information

EXECUTION REQUIREMENTS

EXECUTION REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01

More information

April 30, Proposed Revisions to the Acceptance Criteria for Post-installed Adhesive Anchors in Concrete Elements, Subject AC R1 (AHG/HS)

April 30, Proposed Revisions to the Acceptance Criteria for Post-installed Adhesive Anchors in Concrete Elements, Subject AC R1 (AHG/HS) Thomas Associates, Inc. Executive Director AC308-0613-R2 #1 CONCRETE ANCHOR MANUFACTURERS ASSOCIATION 1300 Sumner Ave Cleveland, Ohio 44115 (T) +1 216 241 7333 (F) +1 216 241 0105 info@anchors.org www.anchors.org

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR WARRANTY ON CONCRETE SURFACE COATING OFS:BDB 1 of 5 APPR:JAB:CER:02-10-17 FHWA:APPR:02-28-17 a. Description. This work consists of furnishing

More information

October 12, Yours very truly, Gary G. Nichols, P.E., SECB Vice President. GGN/md Enclosure Evaluation Committee

October 12, Yours very truly, Gary G. Nichols, P.E., SECB Vice President. GGN/md Enclosure Evaluation Committee October 12, 2010 TO: SUBJECT: PARTIES INTERESTED IN EVALUATION REPORTS ON STAY-IN-PLACE, FOAM PLASTIC INSULATING CONCRETE FORM (ICF) SYSTEMS FOR SOLID CONCRETE WALLS Revisions to the Acceptance Criteria

More information

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC

AMERICAN INSTITUTE OF TIMBER CONSTRUCTION AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION 7012 South Revere Parkway Suite 140 Centennial, Colorado 80112 Telephone (303) 792-9559 http://www.aitc-glulam.org AITC 115-2009 STANDARD FOR FABRICATED STRUCTURAL

More information

1.04 REFERENCES STANDARDS.1 For reference standards tests & results refer to Manufactures Product Data Sheets

1.04 REFERENCES STANDARDS.1 For reference standards tests & results refer to Manufactures Product Data Sheets This specification covers InhibiChem CR-GF-L Chemical-Resistant Glass Flake-Reinforced Steel Tank Lining System. This system consists of a vinyl ester primer, and two troweled coats of glass flake filled

More information

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-04 01 20.75 (November 2015) Change 1-08/17 -------------------------------- Preparing Activity: USACE Superseding UFGS-04 01 21 (October 2007) UNIFIED FACILITIES GUIDE

More information

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates:

A. Section includes surface preparation and the application of high-performance coating systems on the following substrates: ILLINOIS STATE UNIVERSITY CORDOGAN, CLARK & ASSOCIATES, INC. WATTERSON DINING EXPANSION PROJECT 960 RIDGEWAY AVENUE NORMAL, ILLINOIS AURORA, ILLINOIS CCA PROJECT NUMBER: 14362 630-896-4678 BID SET JULY

More information

SECTION CORROSION PROTECTION FOR CONCRETE STRUCTURES

SECTION CORROSION PROTECTION FOR CONCRETE STRUCTURES 0590-104217 PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 09850 CORROSION PROTECTION FOR CONCRETE STRUCTURES A. This specification covers work, materials and equipment required for protecting the interior

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.   (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 15 DESIGN-A-SPEC GUIDELINES FIVE STAR STRUCTURAL CONCRETE CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS

More information

FABRICATED STEEL PIPE AND SPECIALS

FABRICATED STEEL PIPE AND SPECIALS SECTION 02420 - PART 1 -- GENERAL 1.1 WORK OF THIS SECTION A. The WORK of this Section includes providing fabricated steel pipe, specials and connections to new and existing piping. Polyurethane and fusion

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information