CITY AND COUNTY OF DENVER CONTRACT No Glycol Facility Drainage Improvements Denver International Airport ADDENDUM NUMBER THREE

Size: px
Start display at page:

Download "CITY AND COUNTY OF DENVER CONTRACT No Glycol Facility Drainage Improvements Denver International Airport ADDENDUM NUMBER THREE"

Transcription

1

2 CITY AND COUNTY OF DENVER CONTRACT No Glycol Facility Drainage Improvements Denver International Airport ADDENDUM NUMBER THREE June 11, 2014 Scope of this Addendum Addendum Number Three includes modification to the following Contract Documents issued May 9, These modifications are deemed necessary by the City and County of Denver. PART 1 PROJECT REQUIREMENTS 1. SCHEDULE OF PRICES AND QUANTITIES Replace Schedule 1, prices and quantities, dated May 9, 2014 with the revised attached schedule of prices and quantities dated June 11, 2014 incorporating the following changes: a. Schedule 1, Item D-701.1: Item description revised to include Class 3. PART II DIVISION TECHNICAL SPECIFICATIONS 1. ITEM D-701 PIPE FOR STORM DRAINS, SANITARY SEWER AND CULVERTS Replace this Item in its entirety with the revised Item that includes this addition: a. Section 6.01: Item D inch reinforced concrete pipe (class 3) per linear foot PART III CONTRACT DRAWINGS 1. SHEET C0011-SUMMARY OF QUANTITIES Replace Sheet C0011 dated 5/7/14 with revised attached Sheet C0011 dated 6/4/14. For Line Number 20, Class 3 has been added to the item description. 2. SHEET C0020-GENERAL NOTES Replace Sheet C0020 dated 5/7/14 with revised attached Sheet C0020 dated 6/4/14. In Note 26, the pay rate for Gate Guards has been updated to $38.00 per hour. 3. SHEET C0103-OVERALL CONSTRUCTION ACCESS PLAN Replace Sheet C0103 dated 5/7/14 with revised attached Sheet C0103 dated 6/4/14. In Note 6, the pay rate for Gate Guards has been updated to $38.00 per hour. The total number of pages (including this cover sheet) contained in this Addendum Number Three is two (2) plus five (5) attachments. ** END OF ADDENDUM **

3 , CONTRACT SCHEDULE OF PRICES and QUANTITIES ITEM ITEM DESCRIPTION ESTIMATED QUANTITY UNIT UNIT COST TOTAL COST POTHOLES 17 EA LAYOUT OF WORK AND SURVEY 1 LS MOBILIZATION / DEMOBILIZATION 1 LS HAUL ROUTE MONITOR 1,620 HR GATE GUARD 700 HR TRAFFIC CONTROL MONITOR 270 HR GATE GUARD SHACK 1 EA TRAFFIC CONTROL 1 LS LOW PROFILE BARRICADES (10-INCH x 96-INCH) 96 EA CONSTRUCTION DELINEATOR CONES (LIGHTED CONES) 200 EA CHECK DAM 17 EA SEDIMENT CONTROL LOG 1,000 LF CULVERT PROTECTION 7 EA INLET PROTECTION 1 EA SEDIMENT TRAP 2 EA CONCRETE WASHOUT AREA 1 EA VEHICLE TRACKING CONTROL 7 EA DIVERSION DITCH 1,150 LF ORANGE CONSTRUCTION FENCE 3,200 LF D INCH REINFORCED CONCRETE PIPE (CLASS 3) 223 LF

4 D GROUTED ROCK RIPRAP TYPE (L) 35 CY D ' I.D. MANHOLE WITH CONCENTRIC CONE 6 EA D MODIFIED CDOT TYPE D INLET 1 EA D CONCRETE HEADWALL 3 EA D CONCRETE DITCH 135 CY P REMOVE CONCRETE PAD 370 SY P REMOVE STORM DRAIN PIPE 94 LF P DRAINAGE EXCAVATION 1,255 CY P-304C.1 CDOT AGGREGATE BASE COURSE 9.5 CY T TOPSOIL 1,925 CY T SEEDING 3.50 ACRE T MULCHING 0.30 ACRE T SOIL RETENTION BLANKET 16,085 SY GATES 3 EA Total Bid = ISSUED FOR ADDENDUM #3: June 11, 2014

5 ITEM D-701 PIPE FOR STORM DRAINS, SANITARY SEWER AND CULVERTS PART 1 GENERAL 1.01 DESCRIPTION. This item shall consist of the construction of pipe culverts, storm drains and sanitary sewer in accordance with these specifications and in reasonably close conformity with the lines and grades shown on the plans. PART 2 MATERIALS 2.01 Materials shall meet the requirements shown on the plans and specified below PIPE Metallic Coated Corrugated Steel Pipe (Type I, IR or II) ASTM A 760 Galvanized Steel Corrugated Structural Plates and Fasteners ASTM A 761 for Pipe, Pipe-Arches, and Arches Polymer Precoated Corrugated Steel Pipe for Sewers and ASTM A 762 Drains Post-Coated and Lined (Bituminous or Concrete) Corrugated ASTM A 849 Steel Sewer and Drainage Pipe Fiber-Bonded Asphalt, Composite Coated, Corrugated Steel ASTM A 885 Pipe Corrugated Aluminum Alloy Culvert Pipe ASTM B 745 Non-Reinforced Concrete Pipe ASTM C 14 Reinforced Concrete Pipe ASTM C 76 Reinforced Concrete D-Load Pipe ASTM C 655 Reinforced Concrete Arch Pipe ASTM C 506 Reinforced Concrete Elliptical Pipe ASTM C 507 Precast Reinforced Concrete Box Sections ASTM C 789 & C 850 Poly (Vinyl Chloride) Ribbed Drain Pipe & Fittings Based on ASTM F 794 Controlled Inside Diameter (46 psi min. Pipe Stiffness) Poly (Vinyl Chloride) (PVC) Corrugated Sewer Pipe with a ASTM F 949 Smooth Interior and Fittings Bituminous-Coated Corrugated Metal Pipe and Pipe Arches AASHTO M 190 Corrugated Aluminum Alloy Culvert Pipe AASHTO M 196 Bituminous-Coated Corrugated Aluminum Alloy Culvert Pipe AASHTO M 190 and M 196 Bituminous-Coated Structural Plate Pipe, Pipe Arch, and AASHTO M 167 and M 243 Arches Aluminum Alloy Structural Plate for Pipe, Pipe Arch, and AASHTO M 219 Arches Polyvinyl Chloride (PVC) Pipe, (Sewer SDR 35) ASTM D 3034 Corrugated Polyethylene Drainage Tubing AASHTO M 252 Corrugated Polyethylene Pipe AASHTO M 294M PVC Truss Pipe (200 psi min. Pipe Stiffness) ASTM D CONCRETE. Concrete for pipe cradles and/or collars shall conform to the requirements of Technical Specification P-610 Structural Portland Cement Concrete and meet the minimum strength requirements as detailed in P B. D-701-1

6 2.04 RUBBER GASKETS. Rubber gaskets for rigid pipe shall conform to the requirements of ASTM C 443. Rubber gaskets for PVC pipe shall conform to the requirements of ASTM F 477. Rubber gaskets for zinc-coated steel pipe and precoated galvanized pipe shall conform to the requirements of ASTM D 1056, for the "RE" closed cell grades JOINT MORTAR. Pipe joint mortar shall consist of one part portland cement and two parts sand. The portland cement shall conform to the requirements of ASTM C 150, Type I. The sand shall conform to the requirements of ASTM C JOINT FILLERS. Poured filler for joints shall conform to the requirements of ASTM D PLASTIC GASKETS. Plastic gaskets shall conform to the requirements of AASHTO M 198 (Type B). PART 3 CONSTRUCTION METHODS 3.01 EXCAVATION. The width of the pipe trench shall be sufficient to permit satisfactory jointing of the pipe and thorough tamping of the bedding material under and around the pipe, but it shall not be less than the external diameter of the pipe plus 6 inches (150 mm) on each side. The trench walls shall be in accordance with all applicable local, state and federal regulations. Where hardpan, or other unyielding material is encountered, the Contractor shall remove it from below the foundation grade for a depth of at least 12 inches (300 mm) or one-half inch (12 mm) for each foot of fill over the top of the pipe (whichever is greater) but for no more than three-quarters of the nominal diameter of the pipe. The width of the excavation shall be at least 1 foot (30 cm) greater than the horizontal outside diameter of the pipe. The excavation below grade shall be backfilled with selected fine compressible material, such as silty clay or loam, and lightly compacted in layers not over 6 inches (150 mm) in uncompacted depth to form a uniform but yielding foundation. Where a firm foundation is not encountered at the grade established, due to soft, spongy, or other unstable soil, the unstable soil shall be removed and replaced with approved material for the full trench width. The Project Manager shall determine the depth of removal necessary. The material shall be compacted to provide adequate support for the pipe. In the event of ground water invasion of the trench, the contractor shall be responsible for all dewatering work as subsidiary to the contract pay items. There will be no additional payment for pumping, dewatering wells, over excavation, etc. due to ground water. The excavation for pipes that are placed in embankment fill shall not be made until the embankment has been completed to a height above the top of the pipe as shown on the plans BEDDING. The pipe bedding shall conform to the class specified on the plans. When no bedding class is specified or detailed on the plans, the requirements for Class B bedding shall apply. A. Rigid Pipe Class A bedding shall consist of a continuous concrete cradle conforming to the plan details. Class B bedding shall consist of a bed of Controlled Low-strength Material (CLSM) as specified in Specification Section P-162. See pipe trench detail on Drawings for bedding location. When CLSM is used, all joints shall have gaskets. B. Flexible Pipe For flexible pipe, the bedding material shall be Controlled Low-Strength Material in accordance with P-162. C. PVC and Polyethylene Pipe For PVC and polyethylene pipe, the bedding material shall be CLSM. D-701-2

7 3.03 LAYING PIPE. The pipe laying shall begin at the lowest point of the trench and proceed upgrade. The lower segment of the pipe shall be in contact with the bedding throughout its full length. Bell or groove ends of rigid pipes and outside circumferential laps of flexible pipes shall be placed facing upgrade. Paved or partially lined pipe shall be placed so that the longitudinal center line of the paved segment coincides with the flow line. Elliptical and elliptically reinforced pipes shall be placed with the manufacturer's top of pipe mark within five degrees of a vertical plane through the longitudinal axis of the pipe JOINING PIPE. Joints shall be made with (1) portland cement mortar, (2) portland cement grout, (3) rubber gaskets, (4) plastic gaskets, or (5) coupling bands. Mortar joints shall be made with an excess of mortar to form a continuous bead around the outside of the pipe and shall be finished smooth on the inside. Molds or runners shall be used for grouted joints in order to retain the poured grout. Rubber ring gaskets shall be installed to form a flexible watertight seal. A. Concrete Pipe. Concrete pipe shall be bell and spigot. The method of joining pipe sections shall be such that the ends are fully entered and the inner surfaces are reasonably flush and even. Joints shall be thoroughly wetted if mortar or grout are required. Where concrete collars are required for joining different size pipes they shall be constructed according to the details on the plans. The cost of the concrete collars shall be considered incidental to the cost of the pipe being laid. B. Metal Pipe. Metal pipe shall be firmly joined by form fitting bands conforming to the requirements of ASTM A 760 for steel pipe and AASHTO M 196 for aluminum pipe. C. PVC and Polyethylene Pipe. Joints for PVC pipe shall conform to the requirements of ASTM D Fittings for polyethylene pipe shall conform to the requirements of AASHTO M BACKFILLING. Pipes shall be inspected before any backfill is placed; any pipes found to be out of alignment, unduly settled, or damaged shall be removed and relaid or replaced at the Contractor's expense. For PVC, polyethylene, and concrete pipe, the backfill shall be placed, compacted, and tested in accordance with Section P TRENCHING. The Contractor shall do such trench bracing, sheathing, or shoring necessary to perform and protect the excavation as required for safety and conformance to governing laws. The bracing, sheathing, or shoring shall not be removed in one operation but shall be done in successive stages as determined by the Contractor to prevent overloading of the pipe during backfilling operations. The cost of the bracing, sheathing, or shoring and the removal of same shall be included in the unit price bid per foot for the pipe. PART 4 - QUALITY ASSURANCE/QUALITY CONTROL 4.01 QUALITY ASSURANCE/QUALITY CONTROL A. Qualifications. (1) Pipe Manufacturer: The Contractor shall submit verifiable information of satisfactory manufacturing experience for the past 5 years with design and fabrication of reinforced concrete pipe of similar size and design. D-701-3

8 (2) Installer: Contractor shall submit verifiable information of satisfactory experience in the installation of reinforced concrete storm sewer pipe of similar size and extent, with a minimum of 5 years experience. B. Testing. All pipe shall be certified by the pipe manufacturer. (1) Yard testing of Pipe for Certification. Testing shall be performed in accordance with ASTM C 443 on a minimum of two (2) lengths of pipe and one (1) complete joint for every 500 linear feet of pipe, or less. (2) Testing of Installed Pipe. ASTM C 1103 shall be followed to field test pipe joints. The test procedure shall be used for joint acceptance of all installed concrete pipe. All field joints shall be tested and certified before backfilling operations are allowed to begin. Acceptance testing may involve hazardous materials, operations and equipment. These specifications do not address the safety problems associated with the testing procedures. It is the responsibility of the Contractor to establish appropriate safety and health practices. (3) Repair of Joints that Test as Unacceptable. In the event of a reinforced concrete pipe joint failing the in-place pressure test, identified above, the Contractor shall repair the joint by injecting a chemical grout into the joint circumference. The chemical grout shall be a non-flammable liquid which, when activated by water, forms a flexible closed-cell polyurethane foam. The chemical grout shall be resistant to petroleum products. The chemical grout shall be Flex LV or Flex 44, as applicable, manufactured by Deneef America, Inc., 122 North Mill Street, St. Louis, Michigan , or approved equal. Chemical grout shall be prepared, mixed, injected and cured in accordance with the manufacturer s recommendations. The equipment used to inject the chemical grout shall be of construction similar to that of the pressure testing equipment. Chemical grout shall be injected into the joint at a minimum 40 psi to insure the grout penetrates through the leak to the outside of the joint. After injecting the chemical grout, the injection valves shall be shut off to prevent backflow of the grout. The chemical grout shall have adequate time to cure prior to removal of the injection equipment. The joint shall be retested after repair in accordance with the pressure testing procedure described in these specifications. (4) Gasket Material Test. Gaskets may be exposed to petroleum products. Gasket material shall be certified to have complied with ASTM C 443 and petroleum resistant characteristics of ASTM C 361. (5) Backfill Tests. Refer to Section P-152, Part 6 for test and test frequency. C. Submittals. The Contractor shall make the following submittals to the Project Manager for review and approval, or testing, as the case may be: (1) Pipe Design and Detail Drawings. If the Contractor elects to use an alternate pipe, then the Contractor shall prepare or cause to be prepared, complete design calculations, plans, cross-sections, shop details for all pipe and accessories, and trench shoring/bracing system design for all trenches 20 feet in depth or greater. All final design calculations, plans, and shop drawings shall be sealed by a currently registered Professional Engineer in the State of Colorado whose disciplines is in the field of civil or structural engineering. D-701-4

9 (2) Qualifications. Refer to , Item A. (3) Pipe Certification. The Contractor shall submit the results and certifications for tested pipe made in the pipe manufacturer s shop (refer to Part , Item A1). The Contractor shall further provide certification of each spool piece of pipe as it is delivered to the job site. This certification shall accompany the pipe bill of lading. D. Pipe Field Joint Test Certification. The Contractor shall maintain records of all pipe joint tests. A copy of these test records shall be turned over to the Project Manager with a letter certifying that all joints under construction have been tested in accordance with the specifications for joint seal and integrity. E. Pipe Manufacturer s QA/QC Program. The manufacturer of reinforced concrete pipe shall have in place at all times an active Quality Assurance and Quality Control Program. A written copy of this program shall be on file in the manufacturer s shop at all times. The Contractor shall submit copies of the QA/QC Program to the Project Manager for review and approval prior to the start of manufacture of pipe. F. Mill Test Certificates. The pipe manufacturer to retain on file a copy of mill certification reports for the reinforcing steel and cement used in the manufacture of the concrete pipe. An appropriate number of copies of said certifications shall be submitted to the Project Manager. G. Pipe Gasket Certification Test. The Contractor shall selectively test the O ring synthetic rubber gasket material at an approved independent testing laboratory. Certified results shall be submitted to the Project Manager for review and approval. H. Inspection. All pipe shall be inspected at the yard prior to shipment, at the point of receipt and when placed in the trench prior to backfilling. The Project Manager shall inspect all pipe to be used for damage prior to installation. Pipe shall be inspected for damage and compliance to the manufacturer s specifications and Contract Drawings. Units that are damaged shall be evaluated for the extent of damage. If, in the opinion of the Project Manager, damage is extensive enough to reduce the strength, durability, integrity, or ability to properly function with other parts of an installation (i.e. joint damage), the unit shall be rejected and the Contractor shall immediately remove the unit from the Project site. The Contractor may repair minor damage, if so authorized by the Project Manager, but at no cost to the City. PART 5 - METHOD OF MEASUREMENT 5.01 The length of pipe shall be measured in linear feet of pipe in place, completed, and approved. It shall be measured along the centerline of the pipe from end or inside face of structure to the end or inside face of structure, whichever is applicable. The several classes, types and size shall be measured separately. All fittings shall be included in the footage as typical pipe sections in the pipe being measured. PART 6 - BASIS OF PAYMENT 6.01 Payment will be made at the contract unit price per linear foot (meter) for each kind of pipe of the type and size designated. These prices shall fully compensate the Contractor for furnishing all materials and for all preparation, excavation, and installation of these materials; and for all labor, equipment, tools, and incidentals necessary to complete the item. Payment shall be made under: Item D inch reinforced concrete pipe (class 3)... per linear foot D-701-5

10 PART 7 MATERIAL REQUIREMENTS ASTM A 760 ASTM A 761 ASTM A 762 ASTM A 849 ASTM A 885 ASTM B 745 ASTM C 14 ASTM C 76 ASTM C 94 ASTM C 144 ASTM C 150 ASTM C 361 ASTM C 425 ASTM C 443 ASTM C 506 ASTM C 507 ASTM C 655 ASTM C 789 ASTM C 850 ASTM C 1103 ASTM D 1056 ASTM D 1190 ASTM D 3034 Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains Steel Galvanized, Corrugated Structural Plates and Fasteners for Pipe, Pipe-Arches, and Arches Precoated (Polymeric) Galvanized Steel Sewer and Drainage Pipe Post-Coated and Lined (Bituminous or Concrete) Corrugated Steel Sewer and Drainage Pipe Steel Sheet, Zinc and Aramid Fiber Composite Coated for Corrugated Steel Sewer, Culvert, and Underdrain Pipe Corrugated Aluminum Alloy Culvert Pipe Concrete Sewer, Storm Drain, and Culvert Pipe Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe Ready Mixed Concrete Aggregate for Masonry Mortar Portland Cement Standard Specification for Reinforced concrete Low-Head Pressure Pipe Compression Joints for Vitrified Clay Pipe Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets Reinforced Concrete Arch Culvert, Storm Drain, and Sewer Pipe Reinforced Concrete Elliptical Culvert, Storm Drain and Sewer Pipe Reinforced Concrete D-Load Culvert, Storm Drain and Sewer Pipe Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers Precast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers with Less than 2 feet of Cover Standard Practice for Joint Acceptance Testing of Installed Precast Concrete Pipe Sewer Lines Flexible Cellular Materials--Sponge or Expanded Rubber Concrete Joint Sealer, Hot Poured Elastic Type Type PSMPoly (Vinyl Chloride) (PVC) Sewer Pipe and Fittings D-701-6

11 ASTM D 3212 ASTM F 477 AASHTO M 190 AASHTO M 196 AASHTO M 198 AASHTO M 219 AASHTO M 243 AASHTO M 252 AASHTO M 294 Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals Elastomeric Seals (Gaskets) for Joining Plastic Pipe Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe Arches Corrugated Aluminum Alloy Culverts and Underdrains Joints for Circular Concrete Sewer and Culvert Pipe Using Flexible Watertight Gaskets Aluminum Alloy Structural Plate for Pipe, Pipe-Arches, and Arches Field Applied Coating of Corrugated Metal Structural Plate for Pipe, Pipe-Arches, and Arches Corrugated Polyethylene Drainage Tubing Corrugated Polyethylene Pipe END OF ITEM D-701 D-701-7

12 INTENTIONALLY LEFT BLANK D-701-8

13 CITY & COUNTY of DENVER LINE NUMBER ITEM ITEM DESCRIPTION ESTIMATED QUANTITY UNIT DENVER INTERNATIONAL AIRPORT POTHOLES 17 EA LAYOUT OF WORK AND SURVEY 1 LS MOBILIZATION / DEMOBILIZATION 1 LS HAUL ROUTE MONITOR 1,620 HR GATE GUARD 700 HR TRAFFIC CONTROL MONITOR 270 HR GATE GUARD SHACK 1 EA TRAFFIC CONTROL 1 LS LOW PROFILE BARRICADES (10-INCH x 96-INCH) 96 EA CONSTRUCTION DELINEATOR CONES (LIGHTED CONES) 200 EA CHECK DAM 17 EA SEDIMENT CONTROL LOG 1,000 LF CULVERT PROTECTION 7 EA INLET PROTECTION 1 EA SEDIMENT TRAP 2 EA CONCRETE WASHOUT AREA 1 EA VEHICLE TRACKING CONTROL 7 EA DIVERSION DITCH 1,150 LF ORANGE CONSTRUCTION FENCE 3,200 LF 20 D INCH REINFORCED CONCRETE PIPE (CLASS 3) 223 LF 21 D ROCK RIPRAP TYPE (L) 35 CY 22 D ' I.D. MANHOLE WITH CONCENTRIC CONE 6 EA 23 D MODIFIED CDOT TYPE D INLET 1 EA 24 D CONCRETE HEADWALL 3 EA 25 D CONCRETE DITCH 135 CY 26 P REMOVE CONCRETE PAD 370 SY 27 P REMOVE STORM DRAIN PIPE 94 LF 28 P DRAINAGE EXCAVATION 1,255 CY 29 P-304C.1 CDOT AGGREGATE BASE COURSE 9.5 CY 30 T TOPSOIL 1,925 CY 31 T SEEDING 3.50 ACRE 32 T MULCHING 0.30 ACRE 33 T SOIL RETENTION BLANKET 16,085 SY GATES 3 EA *APPROXIMATELY 65 CU. YD. OF THE EXCAVATED MATERIAL WILL BE USED AS FILL FOR THE CONSTRUCTION OF DITCHES WITHIN THE PROJECT. THE REMAINING EXCESS QUANTITY OF EXCAVATION WILL BE USED TO REPAIR EROSION ON THE TAXIWAY F EMBANKMENT (SEE SHEET C0500) AND WASTED OFF-SITE. DESIGNER OF RECORD GLYCOL FACILITY DRAINAGE IMPROVEMENTS ISSUE RECORD NO. BY PURPOSE DATE CKD SCALE NTS DATE 05/07/14 DRAWN BY: CRM CHECKED BY: DMI FAA AIP NO: N/A WORK BREAKDOWN NO. DESIGN CONTRACT NO. CE03057 CONST. CONTRACT NO VOLUME NO. SHEET TITLE SUMMARY OF QUANTITIES SHEET NO. CADD FILE NO. C OF 36 _CE03057-G1CQTY-03 1

14 R GENERAL NOTES: 1. THE INFORMATION SHOWN ON THESE DRAWINGS CONCERNING TYPE AND LOCATION OF EXISTING UTILITIES (UNDER AND ABOVE GROUND) IS NOT GUARANTEED TO BE ACCURATE OR ALL INCLUSIVE. THE CONTRACTOR IS RESPONSIBLE FOR MAKING HIS OWN DETERMINATION AS TO TYPE AND LOCATION OF UTILITIES AS MAY BE NECESSARY TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL VERIFY LOCATIONS OF ALL UTILITIES BY CONTACTING OWNER OF UTILITIES. CONTRACTOR TO CONTACT UTILITY NOTIFICATION CENTER OF COLORADO AT A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATION, IN ACCORDANCE WITH STATE REGULATIONS. THE CONTRACTOR SHALL POTHOLE ALL EXISTING UTILITIES USING HIGH PRESSURE WATER AT 100' INTERVALS WITHIN 30 DAYS OF NTP TO DETERMINE DEPTHS OF EXISTING UTILITIES AND TO PROVIDE ADEQUATE PROTECTION OF THE UTILITIES DURING CONSTRUCTION. THE CONTRACTOR SHALL RECORD THE EXISTING UTILITY INFORMATION ON THE AS-BUILT DRAWINGS WHICH ARE PROVIDED TO DIA PROJECT MANAGER. ADDITIONAL NONDESTRUCTIVE POT HOLING DURING THE PROJECT, IF NECESSARY, IS THE RESPONSIBILITY OF THE CONTRACTOR. 2. FOREIGN OBJECT DEBRIS (FOD) IS A MAJOR CONCERN ON THIS PROJECT. FOD CAN BE FROM TRASH LEFT ON THE AIRFIELD, EXCESSIVE DUST, CONSTRUCTION MATERIALS SPILLAGE, AND CONSTRUCTION ACTIVITIES. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND NEAT WORK AREA AT ALL TIMES. WATER TRUCKS SHALL BE UTILIZED TO CONTROL ALL BLOWING DUST AT ALL TIMES AND AS REQUESTED BY THE ENGINEER, SWEEPERS SHALL BE USED BEHIND ALL HAUL TRUCKS ON HAUL ROUTES, VSR, AND ON ADJACENT TAXILANES, AND APRON AREAS TO MAINTAIN A FOD FREE ENVIRONMENT. 3. THE CONTRACTOR SHALL PROVIDE A MINIMUM OF ONE BROOM TRUCK TO CONTINUOUSLY CLEAN THE SURFACE OF TAXIWAYS AND PAVED VEHICLE SERVICE ROADS OF ANY FOREIGN OBJECT DEBRIS (FOD) THAT MAY RESULT FROM HAULING ACTIVITIES OR ANY OTHER CONSTRUCTION ACTIVITIES. ADDITIONAL BROOM TRUCKS MAY BE REQUIRED TO EXPEDITE THE CLEANING PROCESS OR TO MAINTAIN MULTIPLE WORK SITES. OPENING THE TAXIWAY TO AIRCRAFT OPERATIONS SHALL ONLY BE PROVIDED AFTER A VISUAL INSPECTION OF THE TAXIWAY BY THE ON-DUTY DIA AIRPORT OPERATION MANAGER. NO FOD WILL BE ALLOWED ON THE ACTIVE APRON OR TAXIWAYS. 4. THE CONTRACTOR SHALL CONDUCT FINAL VACUUM CLEANING OF AFFECTED AIRPORT PAVEMENTS, TO THE CITY'S SATISFACTION, PRIOR TO REOPENING THE PAVEMENTS TO AIRCRAFT AND VEHICLE TRAFFIC. IN AREAS WHERE A DAILY CLOSURE EXISTS, THE CONTRACTOR MUST ABIDE BY THESE CONSTRAINTS AS WELL. THE SWEEPER/VACUUM VEHICLE SHALL BE IN 100% WORKING ORDER AND CAPABLE OF CLEANING BOTH WET AND DRY PAVEMENTS. 5. THE CONTRACTOR SHALL CONTINUOUSLY MAINTAIN THE CONSTRUCTION WORK AREA FREE OF TRASH. ALL TRASH SHALL BE TOTALLY REMOVED FROM THE WORK AREA BEFORE THE END OF EACH WORK PERIOD. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AT LEAST ONE COVERED DISPOSAL SITE FOR TRASH DISPOSAL AT AN APPROVED LOCATION. NO ONSITE BURNING OF TRASH IS PERMITTED. 6. UPON COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL CLEAN AND RESTORE THE CONSTRUCTION WORK AREA. ALL RUBBISH, SLURRY WASTE, AND OTHER MATERIALS SHALL BE DISPOSED OF OFF AIRPORT PROPERTY IN ACCORDANCE WITH ALL CURRENT CITY, COUNTY, STATE, AND FEDERAL REGULATIONS AT THE CONTRACTOR'S DISCRETION AND EXPENSE. THE CONTRACTOR SHALL RESTORE ALL AREAS TO THEIR PRE-CONSTRUCTION CONDITION. IN AREAS WHERE A DAILY CLOSURE EXISTS, THE CONTRACTOR MUST ABIDE BY THESE CONSTRAINTS AS WELL. 7. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE FLAGGED FOR DAYTIME VISIBILITY AND IF APPROPRIATE, LIGHTED FOR NIGHTTIME OPERATIONS. VEHICLES WHICH ARE NOT MARKED AND LIGHTED SHALL BE ESCORTED BY A VEHICLE THAT IS EQUIPPED WITH APPROPRIATE MARKING AND LIGHTING DEVICES. MARKING AND LIGHTING SHALL BE IN CONFORMATION WITH FAA AC 150/5210-5, CURRENT EDITION. 8. ALL CONSTRUCTION EQUIPMENT, VEHICLES, PERSONNEL, AND MATERIALS MUST BE CLEARED FROM THE RUNWAY OR TAXIWAY SAFETY AREAS IMMEDIATELY WHEN SO DIRECTED BY THE DIA PROJECT MANAGER OR DIA OPERATIONS PERSONNEL. 9. HAUL ROUTES - THE LOCATION OF HAUL ROUTES ON THE AIRPORT SHALL BE AS SHOWN ON THE PLANS OR AS DIRECTED BY THE AUTHORITY. IT IS THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE OFF-SITE HAUL ROUTES WITH THE PARTY HAVING JURISDICTION OVER THE AFFECTED ROUTE. ON-SITE HAUL ROUTES SHALL BE MAINTAINED CONTINUOUSLY BY THE CONTRACTOR AND SHALL BE RESTORED IMMEDIATELY TO THEIR ORIGINAL CONDITION, IF DAMAGED. THE CONTRACTOR SHALL TRAVEL TO AND FROM EACH WORK AREA ON DESIGNATED HAUL ROUTES ONLY. UNLESS SHOWN OTHERWISE, PRIOR TO COMPLETION OF THE PROJECT, THE CONTRACTOR SHALL REPAIR ANY DAMAGED HAUL ROUTE PAVEMENT TO THE SATISFACTION OF THE AUTHORITY AT NO ADDITIONAL COST. 10. ALL CONTRACTORS AND SUBCONTRACTORS MUST BE MADE AWARE OF ALL SAFETY REQUIREMENTS AND HAZARDS ASSOCIATED WITH AIRCRAFT OPERATIONS AND CONSTRUCTION ACTIVITIES. REFER TO SECTION CONSTRUCTIONS SAFETY- AIRSIDE IN THE GENERAL PROVISIONS PORTION OF THE CONTRACT DOCUMENTS. A CONTRACTOR'S SUPERVISOR IN RADIO CONTACT WITH DIA OPERATIONS WILL BE ON-SITE AT ALL TIMES. DAILY RADIO COMMUNICATION WITH OPERATIONS WILL BE PERFORMED THROUGH DIA PM. CONTRACTOR'S RADIO SHALL BE FOR EMERGENCY USE ONLY. OPERATIONS SHALL BE NOTIFIED THROUGH DIA PM PRIOR TO ANY CONTRACTOR PERSONNEL ENTERING THE SITE AND AT THE END OF ON SITE OPERATIONS. 11. ALL CONSTRUCTION TRAFFIC SHALL BE RESTRICTED TO THE ACCESS AND HAUL ROUTES WITHIN THE AOA EXCEPT WHEN WITHIN THE DESIGNATED CONSTRUCTION AREA. THE HAUL TRUCKS MUST BE COVERED AT ALL TIMES. 12. THE CONTRACTOR SHALL NOT AT ANYTIME BE WITHIN 310 FEET OF THE CENTERLINE OF AN ACTIVE RUNWAY OR WITHIN 160 FEET OF THE CENTERLINE OF AN ACTIVE TAXIWAY WITHOUT THE APPROVAL OF THE DIA PROJECT MANAGER. 13. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND LOCAL REGULATIONS AND CODES IN REGARD TO SAFETY, NOISE CONTROL, EROSION CONTROL, WATERSHED PROTECTION, AND EMISSIONS DURING CONSTRUCTION. 14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY PAVEMENT, PAVEMENT MARKINGS, LIGHTING, UTILITIES, MANHOLES, SIGNAGE, AND OTHER APPURTENANCES DAMAGED DUE TO CONSTRUCTION ACTIVITIES. 15. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL HAUL ROADS AND ACCESS ROADS. HAUL ROADS CONSTRUCTED BY THE CONTRACTOR SHALL BE REMOVED AND RESTORED AT THE COMPLETION OF THE CONTRACT OR LEFT IN PLACE AT THE DISCRETION OF THE DIA PROJECT MANAGER. 16. ALL CONTRACTOR EMPLOYEES SHALL BE REQUIRED TO PARK IN THE CONTRACTORS DESIGNATED STAGING AREA ONLY AND DRIVEN TO THE PROJECT SITE BY DESIGNATED CONSTRUCTION VEHICLES ONLY, SEE SPECIFICATION SECTION ALL WATER REQUIRED BY THE CONTRACTOR THAT IS OBTAINED FROM DIA SOURCE SHALL BE METERED AND PAID FOR BY THE CONTRACTOR AS DESCRIBED BY SPECIFICATION P-153, PART THE CONTRACTOR WILL BE REQUIRED TO OBTAIN A HYDRANT METER PERMIT FROM DENVER WATER LISTING EACH HYDRANT USED AND A WATER TANK WAGON PERMIT FOR EACH TANK WAGON USED. THE PERMIT(S) SHALL BE IN POSSESSION OF THE CONTRACTOR AT THE HYDRANT DURING THE TIME THE HYDRANT IS BEING USED. HYDRANT METER PERMITS WILL BE VALID FOR A PERIOD OF ONE (1) YEAR FROM THE TIME OF ISSUANCE OR UNTIL CONTRACT COMPLETION, WHICHEVER OCCURS FIRST. ANY DAMAGE DONE TO THE HYDRANT BY THE CONTRACTOR WILL BE REPAIRED BY DENVER WATER, WITH THE ACTUAL COST OF SUCH REPAIRS BILLED TO THE CONTRACTOR. IN ACCORDANCE WITH DENVER WATER'S ENGINEERING STANDARDS AND OPERATING RULES, CONTRACTOR SHALL PROVIDE AND USE THE REQUIRED, APPROVED AND PROPERLY SUPPORTED FIRE HYDRANT METER, BACKFLOW PREVENTION ASSEMBLY AND GATE VALVE. CONTRACTOR IS SUBJECT TO DENVER WATER'S HYDRANT USE RULES, REGULATIONS AND FINES FOR VIOLATION. THE CONTRACTOR SHALL ARRANGE BILLING FOR WATER USE THROUGH DENVER WATER. 18. FOUR FOOT SAFETY FENCE WILL BE PLACED AROUND ALL OPEN EXCAVATIONS AND TRENCHES FOR SAFETY. 19. ALL DISTURBED AREAS WITHIN THE PROJECT LIMITS INCLUDING THE BACKFILL, STAGING AND WASTE DISPOSAL AREA SHALL BE TOPSOILED AND SEEDED IN ACCORDANCE WITH SPECIFICATIONS T-901 AND T CRAWLER TRACKED VEHICLES SHALL NOT BE ALLOWED ON PAVED SURFACES EXCEPT FOR CRANES WITH APPROVED PAVEMENT PROTECTION. TRACKED VEHICLES MUST BE MOVED ACROSS PAVED SURFACES ON WHEELED VEHICLES. SEPARATION OF CRAWLER TYPE EQUIPMENT ON PAVED AREAS WILL REQUIRE USE OF PROTECTIVE MATS TO ENSURE NO DAMAGE TO PAVEMENT. THE CONTRACTOR WILL BE RESPONSIBLE FOR REPAIRS OR REPLACEMENT NECESSARY DUE TO CONSTRUCTION ACTIVITIES. USE OF PADS AND PAVEMENT/UTILITY PROTECTION SHALL BE SUBMITTED TO THE DIA PROJECT MANAGER FOR APPROVAL PRIOR TO OPERATIONS. 21. THE CONTRACTOR IS RESPONSIBLE FOR ALL EROSION, STORM WATER AND SEDIMENTATION CONTROL AND ENVIRONMENTAL PROTECTION MEASURES IN ACCORDANCE WITH THE APPROVED CONTRACTORS EROSION AND SEDIMENTATION CONTROL PLAN FOR THE PROJECT SITE, STAGING AREAS, STOCKPILE AREAS, WASTE AREAS AND HAUL ROUTES THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS. INCLUDING DEWATERING AND STORM WATER MANAGEMENT PLAN (SWMP). REFER TO DRAWINGS C0201, C0202, C0203, C0204, AND DIVISION 2 OF THE SPECIFICATIONS FOR ADDITIONAL INFORMATION. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING COLORADO PE STAMPED APPLICATION FOR SWMP REQUIRED BY CITY OF DENVER. 22. ALL ENVIRONMENTAL PROTECTION MEASURES SHALL BE INSTALLED AND FUNCTIONAL AT THE SITE PRIOR TO PERFORMING ANY WORK, UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL MAINTAIN ALL ENVIRONMENTAL PROTECTION MEASURES UNTIL FINAL COMPLETION. 23. THE CONTRACTOR SHALL COMPLY WITH ALL CITY, COUNTY, AND STATE TRAFFIC REGULATIONS CONCERNING THE USE OF STREETS AND ROADWAYS FOR HAULING. ANY DAMAGE DONE TO THE ROADWAYS DUE TO THE CONTRACTOR'S EQUIPMENT OR HAULING OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR, TO THE CITY'S SATISFACTION, AT NO COST TO THE CITY. CONTRACTOR SHALL MAINTAIN CLEANLINESS OF ALL AFFECTED STREETS AND ROADWAYS TO THE CITY'S SATISFACTION. 24. ALL DEMOLITION AND REMOVAL WORK SHALL BE IN ACCORDANCE WITH SPECIFICATIONS. SPECIAL ATTENTION IS DIRECTED TO THE NEED TO COORDINATE WITH EXISTING FACILITIES AND MAINTAIN ACCESS AND FACILITY OPERATIONS 25. CONTRACTOR SHALL MAINTAIN EMERGENCY ACCESS THROUGH PROJECT SITE AT ALL TIMES. ALL PROJECT ROADWAYS (TEMPORARY OR PERMANENT) SHALL BE MAINTAINED BY CONTRACTOR. 26. MINIMUM OF TWO (2) GATE GUARDS WILL BE SUPPLIED BY THE CITY AND PAID FOR BY THE CONTRACTOR WHENEVER THE CONTRACTOR USES THE CONSTRUCTION ACCESS GATE TO THE AOA, SEE SPECIFICATION SECTION THE CONTRACTOR SHALL REQUEST GATE GUARDS FROM DIA A MINIMUM OF 48 HOURS PRIOR TO REQUIRING GATE GUARDS. CANCELLATION OF GATE GUARDS MUST BE MADE BY THE CONTRACTOR TO DIA A MINIMUM OF 24 HOURS PRIOR TO THE DATE REQUESTED OR THE CONTRACTOR WILL PAY FOR THE SCHEDULED SHIFT. AT BID TIME, GATE GUARDS ARE PAID $38.00 PER HOUR; BUT THIS IS SUBJECT TO CHANGE. CONTRACTOR SHALL PROVIDE A 10' X 12' PORTABLE BUILDING AT THE ACCESS GATE FOR GATE GUARDS USE WITH A PORTABLE GENERATOR AND LIGHT PLANT FOR NIGHT USE, AND A POLE MOUNTED CONVEX MIRROR 24" IN DIAMETER FOR VIEWING INTO TRUCK BEDS. MULTIPLE ACTIVE PROJECTS UTILIZE THE CONSTRUCTION ACCESS GATE DEPENDING UPON CURRENT LEVEL OF ACTIVITY. THE CONTRACTOR SHALL COORDINATE THIS ACCESS WITH OTHER ACTIVE PROJECTS AND MAY SHARE GUARDS WITH OTHER PROJECTS TO STAFF ACCESS. COSTS INCURRED FOR GUARDS SHALL BE THE RESPONSIBILITY OF CONTRACTOR UNLESS AGREEMENT OF COST SHARING BETWEEN CONTRACTORS IS PROVIDED IN WRITING TO DIA PROJECT MANAGER. 27. ALL MATERIALS AND WORKMANSHIP SHALL BE IN CONFORMANCE WITH THE LATEST STANDARDS AND SPECIFICATIONS OF THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR AND CONTRACTOR'S FIELD CREW SHALL HAVE IN THEIR POSSESSION AT ALL TIMES ONE COPY OF THE PLANS, STANDARDS AND SPECIFICATIONS AS APPROVED BY THE APPROPRIATE GOVERNING AGENCY. THE CONTRACTOR SHALL OBTAIN WRITTEN APPROVAL FOR ANY VARIANCE TO THE ABOVE DOCUMENTS. 28. THE CONTRACTOR SHALL OBTAIN, AT HIS OWN EXPENSE, ALL APPLICABLE CODES, LICENSES, STANDARDS, SPECIFICATIONS, PERMITS, BONDS, ETC. WHICH ARE NECESSARY TO PERFORM THE WORK. 29. THE CONTRACTOR SHALL ATTEND A PRE-CONSTRUCTION CONFERENCE PRIOR TO BEGINNING WORK TO COORDINATE WORK PROCEDURES WITH ALL INTERESTED PARTIES. THE CONTRACTOR SHALL ALSO ATTEND ALL JOB MEETINGS CALLED BY THE CITY. 30. THE CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL BE SUBMITTED AND APPROVED BY THE CITY BEFORE WORK COMMENCES. 31. THE CONTRACTOR IS ADVISED THAT OTHER CONSTRUCTION MAY BE IN PROGRESS DURING ALL OR PART OF THIS PROJECT. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHER CONTRACTORS, INCLUDING CITY AND COUNTY OF DENVER PERSONNEL. 32. NO ADJUSTMENT FOR ADDITIONAL COMPENSATION AND TIME WILL BE MADE FOR TIME LOST IN WORK AREAS DUE TO NON-ROUTINE AIRCRAFT TRAFFIC AND INCIDENTS. 33. THE CONTRACTOR SHALL NOTIFY ALL PUBLIC UTILITY COMPANIES AND DETERMINE THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES PRIOR TO PROCEEDING WITH CONSTRUCTION. ALL WORK PERFORMED IN THE AREA OF PUBLIC UTILITIES SHALL BE PERFORMED ACCORDING TO THE REQUIREMENTS OF THESE AGENCIES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ANY EXISTING UTILITY (INCLUDING DEPTH) WHICH MAY CONFLICT WITH THE PROPOSED CONSTRUCTION PRIOR TO PROCEEDING WITH CONSTRUCTION. THE CONTRACTOR SHALL PROTECT, AT HIS OWN EXPENSE, ALL EXISTING UTILITIES AND BE RESPONSIBLE FOR THEIR REPAIR IF THEY ARE DAMAGED DURING CONSTRUCTION. 34. ALL KNOWN EXISTING UTILITIES ARE SHOWN IN APPROXIMATE LOCATION ON THE PLANS. THE ACTUAL LOCATION MAY VARY FROM THE PLANS, ESPECIALLY IN THE CASE OF UNDERGROUND UTILITIES. WHENEVER CONTRACTOR DISCOVERS A DISCREPANCY IN LOCATIONS, HE SHALL CONTACT THE PROJECT MANAGER IMMEDIATELY. 35. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL PROVIDE ALL LIGHTS, SIGNS, BARRICADES, FLAGMEN, OR OTHER DEVICES NECESSARY TO PROVIDE FOR PUBLIC SAFETY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 36. NO FIELD CHANGES OR DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS SHALL BE MADE WITHOUT THE PRIOR APPROVAL OF THE CITY AND COUNTY OF DENVER PROJECT MANAGER. PROJECT SURVEY CONTROL: 1. FOR SURVEY CONTROL INFORMATION FOR THIS PROJECT, CONTACT THE SURVEY SECTION. CONTACT THOMAS BREITNAUER AT TO ARRANGE AN APPOINTMENT. CALL 2-BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE, OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER UTILITIES. CITY & COUNTY of DENVER DENVER INTERNATIONAL AIRPORT DESIGNER OF RECORD GLYCOL FACILITY DRAINAGE IMPROVEMENTS ISSUE RECORD NO. BY PURPOSE DATE CKD SCALE DATE DRAWN BY: CHECKED BY: FAA AIP NO: WORK BREAKDOWN NO. DESIGN CONTRACT NO. CE03057 CONST. CONTRACT NO VOLUME NO. SHEET TITLE SHEET NO. GENERAL NOTES CADD FILE NO. C OF 36 _CE03057-B1CGNN-04 NTS 05/07/14 CWC DMI N/A 1

15 CITY & COUNTY of DENVER HAUL/ACCESS FOR PHASE 1, 2, 3 WORK GATE P15 ACCESS FOR PHASE 4, 5, 6 WORK DENVER INTERNATIONAL AIRPORT PROJECT WORK AREA DESIGNER OF RECORD YAKIM ST. HAUL / ACCESS FOR PHASE 1, 2 AND 3 WORK GOLD BUG ST. GRANDBAY ST. B4 1. CONTRACTOR IS RESPONSIBLE TO MAINTAIN A CLEAN HAUL ROUTE AT ALL TIMES. AT THE END OF CONSTRUCTION, FULLY CLEAN AND REPAIR ALL DAMAGE THAT MAY HAVE BEEN CAUSED, AT NO ADDITIONAL COST. AREA SHALL BE CLEANED / REPAIRED TO THE DIA PROJECT MANAGERS SATISFACTION. 2. THE CONTRACTOR IS REQUIRED TO SUBMIT A TRAFFIC CONTROL PLAN AND SCHEDULE TO MAINTAIN VEHICULAR ACCESS, 10 DAYS PRIOR TO CONSTRUCTION FOR REVIEW AND APPROVAL BY DIA PROJECT MANAGER. THE PLAN SHALL IDENTIFY THE NUMBER OF HAUL ROUTE MONITORS, LOCATION OF THE HAUL ROUTE MONITORS, TEMPORARY SIGNAGE AND OTHER TRAFFIC CONTROL DEVICES TO MAINTAIN VEHICULAR TRAFFIC CONTROL AT ALL TIMES. RUNWAY 34L/16R WB D3 KELLER MAN CIR 79TH AVE. D6 PARRALLEL TAXIWAY D D IEL SF D5 OS AY CR XIW TA B3 HAUL / ACCESS FOR PHASE 1 AND 3 WORK D8 D5 TAXIWAY WC KE JACKSON GAP ST. TAXIWAY WB LL E W RM AY A N TAXIWAY WA D2 34L KEWAUNEE ST. PHASE 2, 3 3. ALL TRAFFIC CONTROL MEASURES (VEHICULAR AND AIRCRAFT) REQUIRED FOR THIS CONTRACT SHALL BE REFLECTED IN SPECIFICATION CONTRACTOR SHALL PROVIDE HAUL ROUTE MONITORS ALONG THE HAUL ROUTE WHEN INSIDE THE AOA FENCE TO PROVIDE VISUAL LINE OF SIGHT AND CONTROL OF TRUCK TRAFFIC. THE NUMBER OF FLAGMAN/HAUL ROUTE MONITORS SHALL BE APPROVED BY DIA-OPS-SECURITY. 5. CONTRACTOR'S HAUL ROUTE SHALL REMAIN ON EXISTING DIA SERVICE ROADS. THE CONTRACTOR HAS THE OPTION TO USE EITHER THE CONTRACTOR'S HAUL ROUTE AS INDICATED OR THE ALTERNATE SOUTH HAUL ROUTE FOR THE COMPLETE DURATION OF THE PROJECT. RUNWAY 16L/34R RAMP TAXIWAY G CONCOURSE C DATE CKD 101ST AVE. QUEENBURG ST. GATE G4 SHADY GROVE ST. SCALE 1" = 1000' DATE 6. POWHATON RD. 99TH AVE. CONCOURSE B CONCOURSE A PENA BLVD. 96TH AVE. RAMP TAXIWAY Z ST E TL GATE 1 100TH AVE. OAK HILL ST OAK HILL ST TERMINAL ISSUE RECORD NO. BY PURPOSE NEWBERN ST ACCESS FOR PHASE 4, 5, 6 NIGHT WORK CA S W NE WC F3 PHASE 6 PHASE 5 NEWBERN ST. PENA BLVD. 75TH AVE. F6 100TH AVE. TAXIWAY G RAMP TAXIWAY H SERVICE RD. F4 RAMP TAXIWAY WC PHASE 4 VAN ALLMAN ST. 25 F2 PHASE 1, 3 TAXIWAY F. 78TH AVE. RAMP TAXIWAY D F1 F G 84TH AVE. 34R GLYCOL FACILITY DRAINAGE IMPROVEMENTS 88TH AVE. 81ST AVE. PARALLEL TAXIWAY B PENA BLVD. PENA BLVD. GUN CLUB RD. GATE GUARDS WILL BE SUPPLIED BY THE CITY AND PAID FOR BY THE CONTRACTOR WHENEVER THE CONTRACTOR USES THE CONSTRUCTION ACCESS GATE TO THE AOA. THE CONTRACTOR SHALL REQUEST GATE GUARDS FROM DIA A MINIMUM OF 48 HOURS PRIOR TO REQUIRING GATE GUARDS. CANCELLATION OF GATE GUARDS MUST BE MADE BY THE CONTRACTOR TO DIA A MINIMUM OF 24 HOURS PRIOR TO DATE REQUESTED OR THE CONTRACTOR WILL PAY FOR THE FULL DAY. AT BID TIME, THE GATE GUARDS ARE PAID $38.00 PER HOUR, BUT THIS IS SUBJECT TO CHANGE. CONTRACTOR SHALL PROVIDE A 10' x 12' PORTABLE BUILDING AT THE ACCESS GATE FOR GATE GUARDS USE WITH A PORTABLE GENERATOR, RESTROOM FACILITY AND LIGHT PLANT FOR NIGHT USE. 05/07/14 DRAWN BY: CWC CHECKED BY: WLV FAA AIP NO: N/A WORK BREAKDOWN NO. DESIGN CONTRACT NO. CE03057 CONST. CONTRACT NO TH AVE. VOLUME NO. 1 SHEET TITLE HARRY B. COMBS PKWY VANDRIVER ST. OVERALL CONSTRUCTION ACCESS PLAN SHEET NO. C C0103 OVERALL CONSTRUCTION ACCESS 8 OF 36 CADD FILE NO. _CE03057-B1CHRT-108

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS 701-1 DESCRIPTION 701-1.1 This item shall consist of the construction of pipe culverts, and storm drains, removal of existing storm pipes, connections to existing

More information

GLYCOL FACILITY DRAINAGE IMPROVEMENTS

GLYCOL FACILITY DRAINAGE IMPROVEMENTS of DIA CONSTRUCTION PROJECT NO. 204623 SUMMARY OF WORK: : GRADING,, PIPING, AND UTILITY MODIFICATIONS ASSOCIATED WITH THE PERFORMANCE OF THIS CONTRACT NEAR THE EXISTING LOCATED BETWEEN TAXIWAY H AND NORTH

More information

SECTION STORM DRAINAGE

SECTION STORM DRAINAGE SECTION 02720 STORM DRAINAGE PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of storm drains and appurtenances. E. Installation

More information

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe

SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 2004 Specifications CSJ 0264-07-028 SPECIAL SPECIFICATION 4425 Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm

More information

ADDENDUM NO. 1. CITY OF FORT MORGAN CONSTRUCT RUNWAY BID AIP Project No March 7, 2014

ADDENDUM NO. 1. CITY OF FORT MORGAN CONSTRUCT RUNWAY BID AIP Project No March 7, 2014 ADDENDUM NO. 1 CONSTRUCT RUNWAY 14-32 BID AIP Project No. 3-08-0024-11 March 7, 2014 To all prospective bidders: This Addendum is hereby made a part of the Contract Documents and Specifications of the

More information

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete.

SECTION STORM DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-place Concrete. SECTION 02720 STORM DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-place Concrete. 1.02 REFERENCES

More information

***************************************************************************************************************

*************************************************************************************************************** 02720 STORM DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 33 40 00. ***************************************************************************************************************

More information

1 Revised: 2019 Edition

1 Revised: 2019 Edition STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe

DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION. Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Revised: October 25, 2007 Revised: June 11, 2010 DEPARTMENT OF TRANSPORTATION STATE OF GEORGIA SPECIAL PROVISION Section 550 Storm Drain Pipe, Pipe-Arch Culverts, and Side Drain Pipe Delete Section 550

More information

SPECIAL SPECIFICATION 4653 Polypropylene Pipe

SPECIAL SPECIFICATION 4653 Polypropylene Pipe 2004 Specifications CSJ 2158-01-013, Etc. SPECIAL SPECIFICATION 4653 Polypropylene Pipe 1. Description. Furnish and install polypropylene pipe for constructing polypropylene pipe culverts or polypropylene

More information

SECTION STORM DRAIN

SECTION STORM DRAIN PART 1 - GENERAL 1-01 SECTION INCLUDED A. Furnishing and installing storm drainage facilities, including pipe, cleanout, manhole structures and inlet structures. 1-02 RELATED SECTIONS A. Division 00 Contract

More information

50.20 Drainage Structure Design

50.20 Drainage Structure Design 50.20 Drainage Structure Design All drainage structures, with the exception of bridges, culvert bridges and, in some cases, culverts, shall be designed for HS20-44 loading. Refer to Section 50.22 for design

More information

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm Sewers B. Abandonment of Storm Sewers 1.02 DESCRIPTION OF WORK A. Construct storm sewers. B. Abandon storm sewers. 1.03 SUBMITTALS Comply with

More information

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete.

SECTION WASTE WATER DRAINAGE SYSTEM Excavating, Backfilling, and Compaction for Utilities Cast-in-Place Concrete. SECTION 02735 WASTE WATER DRAINAGE SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02221 - Excavating, Backfilling, and Compaction for Utilities. 2. 03300 - Cast-in-Place Concrete. 1.02 REFERENCES

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 PRECAST CONCRETE PIPE 10.1.1 General This section covers material requirements,

More information

***************************************************************************************************************

*************************************************************************************************************** 02735 WASTE WATER DRAINAGE SYSTEM *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 22 14 00 ***************************************************************************************************************

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

GWINNETT COUNTY STORM SEWER PIPE STANDARDS

GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.0 Standard Specifications GWINNETT COUNTY STORM SEWER PIPE STANDARDS 1.1 Unless otherwise specifically set forth herein or in the Gwinnett County Standard Drawings, all of the materials, methods of the

More information

SECTION 300 STORM SEWER TABLE OF CONTENTS

SECTION 300 STORM SEWER TABLE OF CONTENTS SECTION 300 STORM SEWER TABLE OF CONTENTS Starts on Page 300 GENERAL... 2 301 MATERIALS... 2 302 CONSTRUCTION PROCEDURES... 5 303 TESTING... 5 304 ABANDONMENT OF EXISTING STORM SEWER FACILITIES... 6 305

More information

Special Provision No. 421F01 April 2006

Special Provision No. 421F01 April 2006 RIGID PIPE CULVERTS Item No. FLEXIBLE PIPE CULVERTS Item No. CSP ARCH CULVERTS Item No. STRUCTURAL PLATE CSP Item No. CORRUGATED STEEL PIPE EXTENSIONS Item No. ROCK EXCAVATION FOR CULVERTS Item No. CLAY

More information

PUBLIC WORKS DEPARTMENT GENERAL NOTES

PUBLIC WORKS DEPARTMENT GENERAL NOTES PUBLIC WORKS DEPARTMENT GENERAL NOTES 1. All construction shall be in strict accordance with the standards of the City of Southlake and governed by the North Central Texas Council of Government's Standard

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

SECTION 1 GENERAL NOTES

SECTION 1 GENERAL NOTES ISSUE DATE NOVEMBER 1st, 2011 SECTION 1 Page List Page Number Page Title COVER COVER GN-01 PAGE 1 GN-02 PAGE 2 GN-03 PAGE 3 GN-04 PAGE 4 GN-05 PAGE 5 GN-06 PAGE 6 GN-07 PAGE 7 : 1. (CCU) STANDARD SPECIFICATIONS

More information

APPENDIX A MEASUREMENT AND PAYMENT

APPENDIX A MEASUREMENT AND PAYMENT P-150 DEMOLITION 4.01 Removal of pavement shall be measured per square yard based on the area shown on the plans. Any pavement removed outside the designed limits of removal because the pavement was damaged

More information

Item 460 Corrugated Metal Pipe

Item 460 Corrugated Metal Pipe Item 460 Corrugated Metal Pipe 1. DESCRIPTION 2. MATERIALS Furnish and install corrugated metal pipes, materials for constructing corrugated metal pipe culverts, or corrugated metal storm drain mains,

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

SECTION STORM SEWER COLLECTION SYSTEM

SECTION STORM SEWER COLLECTION SYSTEM SECTION 02722 STORM SEWER COLLECTION SYSTEM PART 1 GENERAL 1.01 SUMMARY A. This section addresses the installation of storm sewer collection mains and includes the acceptable products, materials, and construction

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

REGIONAL CONSTRUCTION STANDARDS

REGIONAL CONSTRUCTION STANDARDS REGIONAL CONSTRUCTION STANDARDS SIXTH EDITION Publication Update 6.5 (Full Committee Approved Proposed Revision 6.5 Storm Sewer Joint Wrap - Section 302 As Publication Update 6.5) March 27, 2018 Copyright

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

SECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section

SECTION UNDERDRAINS. 1. Protection of the environment; Section Trench excavation, backfill, and compaction; Section 02510-1 of 7 SECTION 02510 UNDERDRAINS 02510.01 GENERAL A. Description Underdrain installation shall include, but not necessarily be limited to, constructing underdrains using pipe, filter fabric, and

More information

SECTION SANITARY SEWER SYSTEM

SECTION SANITARY SEWER SYSTEM SECTION 02731 SANITARY SEWER SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Sanitary sewer system including necessary accessories indicated on drawings and specified in this section. Contractor

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS

SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS SECTION CS-2. TRENCH EXCAVATION CONSTRUCTION STANDARDS CS-2-01. GENERAL: Trench excavation shall conform with the City Standard Specifications. In general a trench is defined as an excavation in which

More information

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe

SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 2004 Specifications SPECIAL SPECIFICATION 4xxx Thermoplastic Pipe 1. Description. Furnish and install thermoplastic pipe for constructing thermoplastic pipe culverts or thermoplastic storm sewer mains,

More information

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS

STANDARD SPECIFICATIONS JULY 2012 S-11 CULVERTS, HEADWALLS AND ROADSIDE DRAINAGE TABLE OF CONTENTS TABLE OF CONTENTS 11.01 SCOPE OF WORK... 1 11.02 REFERENCES... 1 11.03 MATERIALS... 2 11.04 GRANULAR & NATIVE BACKFILL... 2 11.05 CONSTRUCTION... 2 11.06 MEASUREMENT FOR PAYMENT... 5 11.07 BASIS OF PAYMENT...

More information

Job Order Sewer Repair Services

Job Order Sewer Repair Services Job Order Sewer Repair Services Bid Addendum No. 1 October 10, 2018 All Contractual Requirements as defined within the Contract Documents shall remain in full force to the extent that they are not modified

More information

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE

CITY OF FARGO SPECIFICATIONS ASPHALT LEVELING COURSE ASPHALT LEVELING COURSE PART 1 DESCRIPTION OF WORK The work to be done under these Specifications and the accompanying plans consist of furnishing all labor, material, accessories, and plant necessary

More information

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered

RFB for Wastewater Force Main #3. October 2, Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered RFB for Wastewater Force Main #3 October 2, 2015 Addendum 3: Clarifications and Questions from Pre-Bid Meeting Answered The proposed force main will be required to transmit up to 1000 gallons of wastewater

More information

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219. ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 848 SANITARY SEWERS ITEM NO. 848 SANITARY SEWERS 848.1 DESCRIPTION: This item shall govern the furnishing, installation and jointing of sanitary sewer pipe of the size and type specified by the project's plans and specifications.

More information

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS

STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS STANDARD SPECIFICATIONS SECTION 16 STORM SEWER SYSTEMS 16.01 GENERAL Specifications in this section shall apply to the construction of storm sewer systems including excavation, trenching, backfilling,

More information

This type of masonry shall consist of brick laid in full beds of cement mortar.

This type of masonry shall consist of brick laid in full beds of cement mortar. SECTION 11.0 DRAINAGE STRUCTURES 11.01 Scope of Work This item shall consist of installation and construction of storm drainage pipes, culverts, basins, headwalls, manholes, junction boxes, head ditches,

More information

SECTION STORM SEWER PIPE

SECTION STORM SEWER PIPE SECTION 4200 - STORM SEWER PIPE 4200.1 SCOPE: This section covers the requirements for all labor, equipment and materials for the installation of storm sewers pipes. Trenching guidelines are provided in

More information

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS SECTION 02670 UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS PART 1 - GENERAL 1.01 WORK INCLUDED A. Trenching and other excavation. B. Ground water control. C. Pipe bedding. D. Installation of containment

More information

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section

SECTION STORM DRAIN REHABILITATION. 1. Protection of environment; Section O Trench excavation, backfill, and compaction; Section 02540-1 of 10 SECTION 02540 STORM DRAIN REHABILITATION 02540.01 GENERAL A. Description Storm drain rehabilitation shall include, but not necessarily be limited to, pipe joint sealing, inlet and manhole

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum

2013 ANNUAL AIRFIELD PAVEMENT REHABILITATION CONTRACT NO ADDENDUM NUMBER TWO. Scope of this Addendum D E N V E R I N T E R N A T I O N A L A I R P O R T CONTRACT NO. 201208796 ADDENDUM NUMBER TWO Scope of this Addendum Addendum Number Two includes modifications to the following Contract Documents issued

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices. SECTION 01220 UNIT PRICES PART 1 GENERAL 1.01 SUMMARY A. This Section specifies administrative and procedural requirements for the unit prices. B. The omission of any unit price description from this Section

More information

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS

17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.0 CONSTRUCTION OF OPEN DRAINAGE SYSTEMS 17.1 Description The work covered by this section of the specifications consists of furnishing all labor, the construction and installation of open storm drain

More information

SECTION EROSION CONTROL DEVICES

SECTION EROSION CONTROL DEVICES SECTION 02374 PART 1 GENERAL EROSION CONTROL DEVICES 1.1 SUMMARY A. Section Includes: 1. Diversion Channels. 2. Rock Energy Dissipator. 3. Paved Energy Dissipator. 4. Rock Basin. 5. Rock Barriers. 6. Sediment

More information

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT

SECTION STORM DRAINAGE AND STORMWATER MANAGEMENT SECTION 322 - STORM DRAINAGE AND STORMWATER MANAGEMENT 322.01 DESCRIPTION Work includes all labor, material and equipment to construct storm drain systems and stormwater management facilities, including

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted.

Testing. Test drainage products according to the applicable AASHTO or ASTM specification, except as otherwise noted. 909.01 Section 909. DRAINAGE PRODUCTS 909.01 General Requirements. If only the size and class are specified for a culvert or sewer, use the pipe materials as shown in Table 401-1 and 402-1 respectively.

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER

TABLE OF CONTENTS. Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES. Chapter 4 - SANITARY SEWER. Chapter 5 - STORM SEWER Chapter 3 - WATER MAIN, VALVES, HYDRANTS AND APPURTENANCES Chapter 4 - SANITARY SEWER Chapter 5 - STORM SEWER Chapter 6 - EXCAVATION, TRENCING, BACKFILLING, AND BEDDING Chapter 11 - CONCRETE CURBS, CURB

More information

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING)

TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) PART 1 - GENERAL TRENCHLESS CONSTRUCTION (BORING, JACKING, AND TUNNELING) 1.01 SECTION INCLUDES A. Trenchless Installation of Carrier Pipe with Casing Pipe B. Trenchless Installation of Carrier Pipe without

More information

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings

SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings 1993 Specifications CSJ 0144-01-060 SPECIAL SPECIFICATION 5925 Polyvinyl Cloride (PVC) Sewer Pipe and Fittings 1. General. (1) Scope. This Section includes the furnishing, installation, and subsequent

More information

SECTION GRAVITY WASTEWATER LINES

SECTION GRAVITY WASTEWATER LINES SECTION GRAVITY WASTEWATER LINES 1. DESCRIPTION This specification shall govern all work required for furnishing, handling and installing gravity wastewater lines required to complete the project. 2. MATERIALS

More information

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form

REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form Proposed Revision To: REGIONAL CONSTRUCTION STANDARDS Proposed Revision Form General Provisions (Division 1) Technical Specifications (Divisions 2-8) Standard Details Change No. Hampton Roads Planning

More information

SECTION 920 SANITARY AND STORM SEWER MANHOLES

SECTION 920 SANITARY AND STORM SEWER MANHOLES SECTION 920 SANITARY AND STORM SEWER MANHOLES 920.1 GENERAL This section contains items which are relative to the installation of sanitary and storm sewer manholes. 920.2 REFERENCES 920.2.1 ASTM C 43 C

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS AFTER FEBRUARY 1, 2011 ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS 481.1 Description. This specification shall govern for the construction of monolithic, reinforced concrete box sewers of the size,

More information

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2007 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS

More information

SPECIAL SPECIFICATION 3504 Septic Tank System

SPECIAL SPECIFICATION 3504 Septic Tank System 1993 Specifications CSJ s 3136-01-126, etc. & 0683-01-070, etc. SPECIAL SPECIFICATION 3504 Septic Tank System 1. Description. This Item shall govern for all materials, equipment and labor necessary for

More information

SECTION 10 - TRENCHING AND BACKFILLING

SECTION 10 - TRENCHING AND BACKFILLING SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements

More information

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS 6.1 DESCRIPTION This work shall consist of constructing curbs, gutters, sidewalks, ramps, local depressions and driveways of the form and dimensions shown

More information

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT

CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 421 NOVEMBER 2012 CONSTRUCTION SPECIFICATION FOR PIPE CULVERT INSTALLATION IN OPEN CUT TABLE OF CONTENTS 421.01 SCOPE 421.02 REFERENCES 421.03 DEFINITIONS

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

207 TEMPORARY SEDIMENT AND EROSION CONTROLS

207 TEMPORARY SEDIMENT AND EROSION CONTROLS 2013 Construction and Material Specifications Hydraulics and Environmental Summary Ron Trivisonno, Office of Construction Administration 207 TEMPORARY SEDIMENT AND EROSION CONTROLS This item has been removed

More information

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe.

ITEM 460 REINFORCED CONCRETE PIPE Description. This Item shall govern for the furnishing of reinforced concrete pipe. AFTER MARCH 1, 2012 ITEM 460 REINFORCED CONCRETE PIPE 460.1 Description. This Item shall govern for the furnishing of reinforced concrete pipe. 460.2 Materials. A. Except as modified herein, materials,

More information

ITEM 706 PIPE SLOPE DRAIN

ITEM 706 PIPE SLOPE DRAIN AFTER NOVEMBER 1, 2008 ITEM 706 PIPE SLOPE DRAIN 706.1 Description. This work shall consist of the installation of temporary erosion protection and sediment control pipe slope drains, utilized during construction

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:]

[ADD / DELETE / MODIFY FOLLOWING ITEMS AS APPROPRIATE TO THE PROJECT:] SECTION 14 - REMOVALS 14-1 GENERAL This item shall consist of removing, [salvaging], [abandoning,] [stockpiling] and/or disposing of existing [pavements,] [asphalt-treated bases (ATB),] [cement-treated

More information

General Water Bid Items Item No.

General Water Bid Items Item No. BID PROPOSAL PROPOSAL OF, a corporation organized and existing under the laws of the State of, a partnership consisting of, an individual doing business as. Enclosed with this bid are (1) Bid Bond, and

More information

SANBORN COUNTY

SANBORN COUNTY Sheet 1 of 12 SPECIFICATIONS ESTIMATE OF QUANTITIES BID ITEM NUMBER ITEM QUANTITY UNIT 009E0010 Mobilization Lump Sum LS 110E0500 Remove Pipe Culvert 134 Ft 110E1010 Remove Asphalt Concrete Pavement 178

More information

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES

San Antonio Water System Specifications for Construction ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES ITEM NO. 853 SANITARY SEWER GLASS-FIBER REINFORCED POLYESTER (FRP) MANHOLES 853.1 DESCRIPTION: This item shall govern the construction of FRP sanitary sewer manholes, complete in place and the materials

More information

SECTION 303 CULVERTS

SECTION 303 CULVERTS 303.01 Scope - This section covers the construction of pipe culverts. 303.01.01 Definitions for the purposes of this section, the following general terms are defined as follows: a) Backfilling means the

More information

CHAPTER 6 - SANITARY SEWER

CHAPTER 6 - SANITARY SEWER CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. 6.2 PIPE PVC gravity sewer pipe and fittings

More information

ITEM 432 TUNNEL CONSTRUCTION

ITEM 432 TUNNEL CONSTRUCTION AFTER MARCH 1, 2012 ITEM 432 TUNNEL CONSTRUCTION 432.1 Description. This Item shall govern for tunnel lines under railroads, state highways, and concrete paved streets or other obstructions indicated.

More information

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances

SPECIAL SPECIFICATION. Water and Sewer System and Appurtenances 2004 Specifications CSJ 2250-01-021, etc SPECIAL SPECIFICATION 5243 Water and Sewer System and Appurtenances 1. Description. This Item governs for the furnishing of all equipment, labor and materials to

More information

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM

GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM 1. GENERAL 1.01 DESCRIPTION GENERAL SPECIFICATION FOR THE REHABILITATION OF SEWERS USING THE THERMOFORM (PVC) PIPE LINING SYSTEM A. The Contractor shall furnish all labor, equipment and materials necessary

More information

STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE

STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE STORM DRAINAGE - 1 DETAILED SPECIFICATIONS - STORM DRAINAGE 2-7-1 Scope 2-7-2 General 2-7-3 Location and Grade of Sewers 2-7-4 Order of Work 2-7-5 Existing Water, Sanitary Sewer, Gas, and Other Utility

More information

TABLE OF CONTENTS

TABLE OF CONTENTS DIVISION 33: SEWER AND SEPTIC SYSTEMS 33 3633 UTILITY SEPTIC TANK DRAINAGE FIELD TABLE OF CONTENTS 33 0000-1 SECTION 33 3633-- UTILITY SEPTIC TANK DRAINAGE FIELD PART 1 - GENERAL 1.1 SUMMARY A. Includes

More information

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections.

SANITARY SEWERS. B. Construct or relocate building sanitary sewer services, stubs, and connections. SANITARY SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Sanitary Sewer Gravity Mains B. Sanitary Sewer Force Mains C. Sanitary Sewer Services 1.02 DESCRIPTION OF WORK A. Construct sanitary sewer gravity

More information

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2

INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS SCOPE... 2 INDEX FOR SPECIFICATIONS FOR JACKING CULVERTS THROUGH EMBANKMENTS 410. 1 SCOPE... 2 410. 2 DEFINITIONS 2.1 Tunneling and Jacking... 2 2.2 Tunneling... 2 2.3 Jacking... 2 410. 3 MATERIALS 3.1 General...

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SECTION BORING AND/OR JACKING PIPE

SECTION BORING AND/OR JACKING PIPE 02910-1 of 6 SECTION 02910 BORING AND/OR JACKING PIPE 02910.01 GENERAL A. Description Boring and/or jacking pipe shall include, but not necessarily be limited to, furnishing and installing carrier pipe

More information

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS REMOVALS PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of all labor, material, and equipment necessary to perform vegetation

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01026 PART 1 GENERAL 1.1 SECTION INCLUDES A. Explanation and Definitions B. Measurement C. Payment D. Schedule of Values E. Application for Payment 1.2 EXPLANATION AND DEFINITIONS A. The following

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

SECTION SANITARY UTILITY SEWERAGE PIPING

SECTION SANITARY UTILITY SEWERAGE PIPING SECTION 33 31 00 SANITARY UTILITY SEWERAGE PIPING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Sanitary sewer pipe and fittings. 2. Underground pipe markers. 3. Connection to existing manholes. 4.

More information

Special Provision No. 421S01 November 2006

Special Provision No. 421S01 November 2006 RIGID PIPE CULVERTS (75 Year DSL) Item No. RIGID PIPE CULVERTS (50 Year DSL) Item No. RIGID PIPE CULVERTS (25 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (75 Year DSL) Item No. FLEXIBLE PIPE CULVERTS (50

More information

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1

INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS SCOPE... 1 March 2002 No. 400 INDEX FOR SPECIFICATIONS FOR REMOVING CULVERTS AND PLACING CULVERTS 400. 1 SCOPE... 1 400. 2 REMOVING CULVERTS AND TIMBER STRUCTURES 2.1 Concrete and Metal Pipe Culverts... 1 2.2 Structural

More information

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE

III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE III. TECHNICAL SPECIFICATIONS DIVISION 56 BORED PIPE PART I - GENERAL 56.01 SCOPE: The Contractor shall furnish all labor, material, equipment and supplies and shall perform all work necessary for the

More information

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS Section Page 13-1 GENERAL... 13.1 13-1.01 Preservation of Property... 13.1 13-1.02 Overloading, Pavement Protection & Repair... 13.1 13-2 REMOVING EXISTING

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

SPECIAL SPECIFICATION 6664 Level (3) Communications System

SPECIAL SPECIFICATION 6664 Level (3) Communications System 2004 Specifications CSJ 1200-05-014 SPECIAL SPECIFICATION 6664 Level (3) Communications System 1. Description. A. This Item will govern the installation of all facilities belonging to Level (3) Communications,

More information