1 BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Kenpark Bangladesh Apparel Pvt. Ltd (Unit 2) UNITS AUDITED SUPPLIER ADDRESS Wash Building Plot # 69-85, Karnaphuli Export Processing Zone, Chittagong, Bangladesh AUDIT DATE March 2014 AUDIT PERFORMED BY Department of Civil Engineering, Bureau of Research, Testing and Consultation, Bangladesh University of Engineering and Technology (BUET) AUDIT TEAM 2 auditors GRAVITY LOADING EVALUATION GREEN The building is fully safe. Wash Building GREEN The building is fully safe. SEISMIC PERFORMANCE RATING POOR Possible significant structural and nonstructural damage Wash Building POOR and/or result in falling hazards in a major seismic disturbance, representing appreciable life hazards. BRIEF DESCRIPTION OF METHODOLOGY Visual inspection and ASCE Tier-1 Analysis BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 1/6
2 DETAILED CONTENT VISUAL INSPECTION AND CONCLUDING REMARKS... 2 MAIN BUILDING... 2 WASH BUILDING... 2 SEISMIC PERFORMANCE EVALUATION... 3 I. BASIC STRUCTURAL CHECKLIST NON-COMPLIANCES... 3 II. GEOLOGICAL SITE HAZARDS AND FOUNDATIONS CHECKLIST NON-COMPLIANCES... 4 III. BASIC NON-STRUCTURAL COMPONENT CHECKLIST NON-COMPLIANCES... 4 DETAILED DESCRIPTION OF METHODOLOGY... 5 VISUAL INSPECTION AND CONCLUDING REMARKS MAIN BUILDING Based on the Visual Assessment, we have decided that this building has fallen in safe, GREEN, category. There may be potential causes of pounding due to different vibration modes of two dissimilar structures. The factory management has already arranged a Detail Engineering Assessment (DEA) from CUET and it has been concluded that the structure is properly designed as per code requirement. The 4 storied washing plant and the single storied factory building have different framing system and both of them are connected at the ground floor level; during occurrence of an earthquake pounding may occur. Sufficient gap based on DEA need to be provided to avoid pounding immediately. The cracked masonry wall of the internal mezzanine floor should be repaired using FRP or by other means immediately. Bracings need to be provided to the steam pipes and other utility items which are hanging from the roof, immediately. The use of the building in its present condition may continue with due regards to the observations made above. WASH BUILDING At present there is no distress in the structure. However, the owner/users of the building should be vigilant about development of any new distress, particularly, in primary structural elements such as columns, beams and slabs. This building has fallen in GREEN (safe) category considering the Factor of Safety (FOS) of all types of columns. The 4 storied washing plant and the single storied factory building have different framing system and both of them are connected at the ground floor level; during occurrence of an earthquake pounding may occur. Sufficient gap based on DEA need to be provided to avoid pounding immediately. The double height ground floor with presence of mezzanine floor makes the structure vertically irregular. Also some columns have high slenderness ratio. From ASCE31 checklist, it is observed BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 2/6
3 that the ground floor has become soft story with respect to other floors (see Appendix B). The affected columns need to be strengthened immediately to avoid soft story failure. The use of the building in its present condition may continue with due regards to the observations made above. SEISMIC PERFORMANCE EVALUATION I. BASIC STRUCTURAL CHECKLIST NON-COMPLIANCES Criteria Description of Conditions Comments Unit Building System - General The single-storied main All factory building with a mezzanine floor and the single-storied canteen have different framing system and The clear distance between the building both of them are connected being evaluated and any adjacent at the ground floor level Adjacent building shall be greater than 4 percent through a covered Buildings of the height of the shorter building for passageway. Also the 4 Life Safety and Immediate Occupancy. storied washing plant and the single storied main factory building with a mezzanine floor are connected at the ground floor level. Mezzanines Configuration Soft Story Torsion Interior mezzanine levels shall be braced independently from the main structure, or shall be anchored to the lateral-force-resisting elements of the main structure. The stiffness of the lateral-force resisting system in any story shall not be less than 70 percent of the lateral-forceresisting system stiffness in an adjacent story above or below, or less than 80 percent of the average lateral-forceresisting system stiffness of the three stories above or below for Life Safety and Immediate Occupancy. The estimated distance between the story center of mass and the story center of rigidity shall be less than 20 percent of the building width in either Mezzanine floor exists in two locations. The main mezzanine where the office is located is anchored. The other mezzanine which is located inside the warehouse area and not shown in the structural drawings may not be anchored properly. Ground floor is soft story based on measured story height and given column dimensions The distance between story center of mass and center of rigidity is not less than the 20% of plan dimension in Wash Building BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 3/6
4 plan dimension for Life Safety and Immediate Occupancy. both direction due to mezzanine. II. GEOLOGICAL SITE HAZARDS AND FOUNDATIONS CHECKLIST NON-COMPLIANCES Criteria Description of Conditions Comments Unit III. BASIC NON-STRUCTURAL COMPONENT CHECKLIST NON-COMPLIANCES Criteria Description of Conditions Comments Unit Lighting Fixtures Emergency lighting shall be anchored or Emergency Emergency lighting is not braced to prevent falling during an Lighting securely fixed. earthquake. Building Contents and Furnishing Tall Narrow Contents Contents over 4 feet in height with a height-to-depth or height-to-width ratio greater than 3-to-l shall be anchored to the floor slab or adjacent structural walls. A height-to-depth or height-towidth ratio of up to 4-to-l is permitted where only the Basic Nonstructural Component Checklist is required. Mechanical and Electrical Equipment Attached Equipment Condition of Materials Cracks In Infill Walls Equipment weighing over 20 lb that is attached to ceilings, walls; or other supports 4 feet above the floor level shall be braced. There shall be no existing diagonal cracks in the infilled walls that extend throughout a panel greater than 1/8 inch for Life Safety and 1/16 inch for Immediate Occupancy, or out-of-plane offsets in the bed joint greater than 1/8 inch for Life Safety and 1/16 inch for Immediate Occupancy. The height to width ratio of tall rack is greater than 4 and are needed to be braced. External AC units may not be adequately braced. The wall of the internal mezzanine floor has such cracks. All BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 4/6
5 DETAILED DESCRIPTION OF METHODOLOGY 1. The following criteria are used for the building integrity inspection: A. Permit review and verification. B. Visual assessment. C. Detailed assessment following ASCE-31 standards. i. Level of Investigation ii. Level of Performance Evaluation to Life Safety Performance Level (L.S.) iii. Level of Seismicity According to BNBC (1993) and based on geotechnical investigation report 1. Zone coefficient 2. Site Class (as per BNBC 1993) Design short period response acceleration S DS Design spectral response acceleration at 1 sec. SD 1 iv. Building Type v. Screening Phase (Tier 1) vi. Basic Structural Checklist vii. Geological Site Hazards and Foundation Checklist viii. Basic Non-structural Component Checklist 2. Gravity Loading Evaluation Definitions GREEN YELLOW AMBER RED Factor of Safety (FS) of Column Strength is greater than the building is fully safe Factor of Safety (FS) of Column Strength is between 1.5 and the building is marginally safe Factor of Safety (FS) of Column Strength is between 1.25 and the building's safety is not fully ensured Factor of Safety (FS) of Column Strength is less than the building is unsafe 3. Seismic Performance Ratings ( ) GOOD Buildings and other structures whose performance during a major seismic disturbance is anticipated to result in structural and nonstructural damage and/or falling hazards that would not significantly jeopardize life. Buildings and other structures with a GOOD rating would represent an acceptable level of BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 5/6
6 earthquake safety, such that funds need not be spent to improve their seismic resistance to gain greater life safety. FAIR POOR VERY POOR Buildings and other structures whose performance during a major seismic disturbance is anticipated to result in structural and nonstructural damage and/or falling hazards that would represent low life hazards. Buildings and other structures with a FAIR seismic rating would be given a low priority for expenditures to improve their seismic resistance and/or to reduce falling hazards so that the building could be reclassified GOOD. Buildings and other structures expected to sustain significant structural and nonstructural damage and/or result in falling hazards in a major seismic disturbance, representing appreciable life hazards. Such buildings or structures either would be given a high priority for expenditures to improve their seismic resistance and/or to reduce falling hazards so that the building could be reclassified GOOD, or would be considered for other abatement programs, such as reduction of occupancy. Buildings and other structures whose performance during a major seismic disturbance is anticipated to result in extensive structural and nonstructural damage, potential structural collapse, and/or falling hazards that would represent high life hazards. Such buildings or structures either would be given the highest priority for expenditures to improve their seismic resistance and/or to reduce falling hazards so that the building could be reclassified GOOD, or would be considered for other abatement programs, such as reduction of occupancy. BUILDING INTEGRITY INSPECTION SUMMARY KENPARK BANGLADESH APPAREL PVT LTD (UNIT 2) PAGE 6/6
BUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Kenpark Bangladesh Pvt.Ltd (Unit 1) UNITS AUDITED SUPPLIER ADDRESS Dry Process Building Sector 8, Plot 31-42, Chittagong Export Processing Zone, Chittagong,
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY Cosmopolitan Industries Pvt Ltd Khejur Bagan, Bara Ashulia, Savar, Dhaka, Bangladesh Department
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills 4X 6X Denim Rope Denim SSL SSL3 Utility Diesel SUPPLIER ADDRESS AUDIT DATE January 2014 AUDIT PERFORMED BY AUDIT TEAM Kanchpur,
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME Karnafuli Shoes Industries Ltd (Garments Unit) SUPPLIER ADDRESS Building No 17, Building No 16, Canteen Building No 2, Canteen Building No 1; Building No
More informationBUILDING INTEGRITY SUMMARY REPORT
BUILDING INTEGRITY SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Ananta Denim Technology Ltd. Main production Wash plant SUPPLIER ADDRESS AUDIT DATE May 2015 AUDIT PERFORMED BY AUDIT TEAM Kashpara, Noyabari,
More informationSonnet Textile Industries Ltd.
Sonnet Textile Industries Ltd. 49/B, Baizid Bostami Road, Nasirabad I/A, Chittagong. (22.31733N,91.80721E) 12 th June 2014 DEA 1 2 Observations 3 High column stresses, uncontrolled live loads and no loading
More information0306 SEISMIC LOADS GENERAL
0306 SEISMIC LOADS 0306.1 GENERAL Every structure, and portion thereof, including nonstructural components such as architectural, mechanical, and electrical components, shall be designed and constructed
More informationBUILDING INTEGRITY DEA SUMMARY REPORT
BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME UNITS AUDITED Opex Mills SSL2 Building 4X Generator Building 6X Generator Building Denim Generator Building Rope Denim Generator Building SSL Generator
More informationEQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT
EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Plot No.: 74-77, Sector -02, Karnaphuli EPZ North Patenga, Chittagong Chittagong Chittagong Bangladesh The Alliance for Bangladesh Worker Safety Page 1/11
More informationBUILDING INTEGRITY DEA SUMMARY REPORT
BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME OPEX Apparels Ltd. UNITS AUDITED Washing Plant 3 WG -5 WG 5 Extension (SKL) WG -3 Security Building SUPPLIER ADDRESS Kanchipur, Narayangonj, Dhaka, Bangladesh
More information3.5 Tier 1 Analysis Overview Seismic Shear Forces
Chapter 3.0 - Screening Phase (Tier ) 3.5 Tier Analysis 3.5. Overview Analyses performed as part of Tier of the Evaluation Process are limited to Quick Checks. Quick Checks shall be used to calculate the
More informationFakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh ( N, E) 19 December 2013
1 Fakir Knitwears Ltd. Kayempur, Fatullah, Narayanganj-1400, Bangladesh (23.64049N, 90.50106E) 19 December 2013 2 Observations 3 High Column Loads - Main Building Engineering Assessment Required Cursory
More informationBUILDING INTEGRITY DEA SUMMARY REPORT
BUILDING INTEGRITY DEA SUMMARY REPORT SUPPLIER NAME UNITS AUDITED SUPPLIER ADDRESS Kenpark Bangladesh Pvt. Ltd. AUDIT DATE 10 th May, 2014 AUDIT PERFORMED BY AUDIT TEAM 1-storied prefabricated steel structure-
More informationSTRUCTURAL DESIGN REQUIREMENTS (SEISMIC PROVISIONS) FOR EXISTING BUILDING CONVERTED TO JOINT LIVING AND WORK QUARTERS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LABC Chapter 85 Effective: 01-01-2011 DOCUMENT NO.: P/BC 2011-110 Revised: Previously Issued As: P/BC 2002-110 STRUCTURAL DESIGN REQUIREMENTS
More informationEFFECTS OF SOFT FIRST STORY ON SEISMIC PERFORMANCE OF RC BUILDINGS AND SUSTAINABLE APPROACH TO RETROFIT
EFFECTS OF SOFT FIRST STORY ON SEISMIC PERFORMANCE OF RC BUILDINGS AND SUSTAINABLE APPROACH TO RETROFIT MD. KAMRUZZAMAN Supervisor: Matsutaro SEKI MEE77 ABSTRACT The structural configuration with a soft
More informationVolume 1. HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents
Preparation of Seismic Design Manuals for Earthquake Disaster Mitigation Volume 1 HOW TO MAKE A DREAM HOUSE EARTHQUAKE RESISTANT Contents Part I: A house and its behavior during earthquake A House? How
More informationABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 ( N, E) 08 MARCH 2014
ABA Fashions Ltd. Plot #9, Block F, Tongi, Gazipur-1710 (23.885176N, 90.399821E) 08 MARCH 2014 1 2 Observations 3 Highly stressed columns Cursory calculations indicate column at a high working stress.
More informationEQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT
EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT Factory C.D.A Plot No. C-49, Sagarika Road, Pahartaly, Chittagong Chittagong 18 May 2014 The Alliance for Bangladesh Worker Safety Page 1/12 18 May 2014
More informationTABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION AND PROJECT SCOPE... 1 BUILDING DESCRIPTION... 1 OBSERVATIONS
TABLE OF CONTENTS DESCRIPTION PAGE NO. INTRODUCTION AND PROJECT SCOPE... 1 BUILDING DESCRIPTION... 1 OBSERVATIONS... 2-5 STRUCTURAL EVALUATIONS... 5 10 GENERAL SUMMARY AND RECOMMENDATIONS... 11 APPENDIX
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: 10, HSS Road Chittagong Chittagong Chittagong Bangladesh 21 May 2014 The Alliance for Bangladesh Worker Safety Page 1/12 21 May 2014
More informationSEAU 5 th Annual Education Conference 1. ASCE Concrete Provisions. Concrete Provisions. Concrete Strengths. Robert Pekelnicky, PE, SE
ASCE 41-13 Concrete Provisions Robert Pekelnicky, PE, SE Principal, Degenkolb Engineers Chair, ASCE 41 Committee* *The view expressed represent those of the author, not the standard s committee as a whole.
More informationEQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT
EQUIVALENT INITIAL STRUCTURAL SAFETY ASSESSMENT A-23, 24, 25, 26 BSCIC, Industrial Estate, Kalurghat, Chittagong The Alliance for Bangladesh Worker Safety Page 1/15 Introduction to the Report The following
More information"Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures
"Impact of New IS 1893 & Related Codes on Design of tall Buildings, Including Trend Setting Structures Conference on Planning and Design of Tall Buildings including Earthquake and Wind Effects By S. C.
More informationSpecial Civil Engineer Examination Seismic Principles Test Plan
SDR Workbook 2015 IBC Version Special Civil Engineer Examination Definition of Seismic Principles Seismic Principles is defined as the fundamental principles, tasks and knowledge s underlying those activities
More informationTable 3. Detailed Comparison of Structural Provisions of IRC 2000 and 1997 NEHRP (Continued)
2000 IRC 1997 NEHRP Section Provision Section Provision Comments CHAPTER 3 BUILDING PLANNING R301 DESIGN CRITERIA R301.2.2 Seismic Provisions R301.2.2.1 Determination of Seismic Design Category R301.2.2.1.1
More informationVOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.)
DIVISION 94 VOLUNTARY - EARTHQUAKE HAZARD REDUCTION IN EXISTING HILLSIDE BUILDINGS (Division 94 Added by Ord. No. 171,258, Eff. 8/30/96.) SEC. 91.9401. PURPOSE. (Amended by Ord. No. 172,592, Eff. 6/28/99,
More informationCODE ANALYSIS REPORT SECOND FLOOR
CODE ANALYSIS REPORT SECOND FLOOR 384 DWIGHT STREET HOLYOKE, MA Prepared by Dietz & Company Architects, Inc. 17 Hampden Street Springfield, MA March 2014 INTRODUCTION The following report is a preliminary
More informationQuestion 8 of 55. y 24' 45 kips. 30 kips. 39 kips. 15 kips x 14' 26 kips 14' 13 kips 14' 20' Practice Exam II 77
Question 8 of 55 A concrete moment frame building assigned to SDC = D is shown in the Figure. Equivalent lateral force analysis procedure is used to obtain the seismic lateral loads, E h, as shown. Assume
More informationEARTHQUAKE HAZARD REDUCTION IN EXISTING CONCRETE BUILDINGS AND CONCRETE WITH MASONRY INFILL BUILDINGS
CHAPTER A5 EARTHQUAKE HAZARD REDUCTION IN EXISTING CONCRETE BUILDINGS AND CONCRETE WITH MASONRY INFILL BUILDINGS The provisions contained in this chapter have not been adopted by the City of Dallas. SECTION
More informationBadhan Knit Fashions Ltd
1 Badhan Knit Fashions Ltd A-16/17, BSCIC Hoisery Industrial Area, Shashongaon, Enayetnagar Fatullah, Narayangnaj (23.623200, 90.479000) 5 th April 2014 2 Observations 3 High Column Loads: Detailed Engineering
More informationSECTION NON-STRUCTURAL SEISMIC DESIGN CRITERIA PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 014100 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply
More informationDESIGN CRITERIA. Allowable Stress Design (ASD) AISC-1999.
DESIGN CRITERIA 1. INTRODUCTION This appendix summarizes the codes, standards, criteria, and practices that are generally used in the design and construction structural engineering system for the Sarker
More informationLEARNING OF ETABS. 15 ft
LEARNING OF ETABS Ram Krishna Mazumder, Institute of Earthquake Engineering Research, Chittagong University of Engineering and Technology, Chittagong 4349, Bangladesh rkmazumder@gmail.com +8801712862281
More informationTechnical Specification for Concrete Structures of Tall Building
UDC PROFESSIONAL STANDARD OF THE PEOPLE'S REPUBLIC OF CHINA p JGJ 3-2010 Record Number: J 186-2010 Technical Specification for Concrete Structures of Tall Building JGJ 3-2010 -- How to BUY & immediately
More informationSEISMIC DESIGN OF STRUCTURE
SEISMIC DESIGN OF STRUCTURE PART I TERMINOLOGY EXPLANATION Chapter 1 Earthquake Faults Epicenter Focal Depth Focus Focal Distance Epicenter Distance Tectonic Earthquake Volcanic Earthquake Collapse Earthquake
More informationStructural Inspection Report
Revision: Issue 2 Date: 23 rd June 2014 Cherry Pvt. Ltd. Florence Fashions Ltd. Ultimate Ltd. Chandand Fashion Ltd. Joy Fashion Ltd. Structural Inspection Report Authors: Adrian Ryan, Cathal Mac an tsearraigh
More information3. Analysis Procedures
3. Analysis Procedures 3.1 Scope This chapter sets forth requirements for analysis of buildings using the Systematic Rehabilitation Method. Section 3.2 specifies general analysis requirements for the mathematical
More informationTanzila Textile Ltd.
1 Tanzila Textile Ltd. Baroypara, Ashulia, Savar, Dhaka. (24.017986, 90.243410) 12 April 2014 2 Observations 3 Highly Stressed Columns (Building 03) Cursory calculations indicate column at high working
More informationAssessment of Infill Framed Building Constructed after 2005 Earthquake in Muzzafrabad
Assessment of Infill Framed Building Constructed after 2005 Earthquake in Muzzafrabad Aslam Faqeer Mohammad Structural Engineer Assistant Professor, NED University of Engineering & Tech., Karachi, Pakistan
More informationChapter 2 QUALITY ASSURANCE
Chapter 2 QUALITY ASSURANCE 2.1 GENERAL 2.1.1 Scope. This chapter provides minimum requirements for quality assurance for seismic-forceresisting systems and designated seismic systems. These requirements
More informationMcMULLAN & ASSOCIATES, INC.
McMULLAN & ASSOCIATES, INC. SEISMIC EVALUATION REPORT for the The Castle Building Prepared For Smithsonian Institution Washington, D.C. February 28, 2002 86 Seismic Evaluation G.2 THE CASTLE BUILDING WASHINGTON,
More informationEARTHQUAKE HAZARD REDUCTION IN EXISTING CONCRETE BUILDINGS AND CONCRETE WITH MASONRY INFILL BUILDINGS
CHAPTER A5 EARTHQUAKE HAZARD REDUCTION IN EXISTING CONCRETE BUILDINGS AND CONCRETE WITH MASONRY INFILL BUILDINGS SECTION A501 PURPOSE The purpose of this chapter is to promote public safety and welfare
More informationADDENDA #4- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services
ADDENDA #4- RFP Sylvania CC building Re-Roof Progressive Design Build for Sylvania Campus CC Building Re-Roof Services Addenda Dated: 01/16/2018 PURPOSE: The purpose of this Addenda #4 is to provide a
More informationS. Gandhi *1, Syed Rizwan 2
2017 IJSRSET Volume 3 Issue 3 Print ISSN: 2395-1990 Online ISSN : 2394-4099 Themed Section: Engineering and Technology Analysis and Design of Tall Building (G+21) Using ETABS S. Gandhi *1, Syed Rizwan
More informationEARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS. By Ir. Heng Tang Hai
EARTHQUAKE DESIGN CONSIDERATIONS OF BUILDINGS By Ir. Heng Tang Hai SYPNOSIS 1. Earthquake-Induced Motions 2. Building Configurations 3. Effectiveness Of Shear Walls 4. Enhancement Of Ductility In Buildings
More informationSupplemental Plan Check List for Unreinforced Masonry (URM) Retrofit
Supplemental Plan Check List for Unreinforced Masonry (URM) Retrofit Plan Check/PCIS App #: Job Address: P.C. Engineer: Phone: (E -mail: first name.last name@ lacity.org) For instructions and other information,
More informationEarthquake Damage Assessment of Reinforced Concrete Hotel Buildings in Hawaii
Earthquake Damage Assessment of Reinforced Concrete Hotel Buildings in Hawaii C.C. Simsir, C. Ekwueme, G.C. Hart & A. Dumortier Weidlinger Associates Inc., Marina del Rey, CA, USA SUMMARY: This paper presents
More informationSEISMIC DESIGN GUIDELINES
INTRODUCTION The purpose of these Seismic Design Guidelines is to provide additional information and clarification to Civil or Structural engineers in order to comply with Ordinance No. 18-O- 2767 for
More informationChristchurch City Council
36 Lichfield Street Detailed Engineering Evaluation Quantitative Assessment Report Christchurch City Council 36 Lichfield Street Kathmandu/Rexel Building Detailed Engineering Evaluation Quantitative Assessment
More informationPushover Analysis Of RCC Building With Soft Storey At Different Levels.
Pushover Analysis Of RCC Building With Soft Storey At Different Levels. Achyut S. Naphade 1, Prof. G. R. Patil 2 1 (M.E. (Structure) Student, Department of Civil Engineering Rajarshi Shahu College of Engineering,
More informationAmena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara ( N, E) 15.June.2014
Amena (Pvt.) Ltd. (9817) Abdul Latif Market, Ahalia,Sector #5,Road #9-C,Uttara (+23.863478N, 90.388429E) 15.June.2014 Identified 1 st Priority 3 Concern 1 st Priority 3 Concern Uncontrolled storage loading
More informationSuman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka ( N, E) 09 March 2014
Suman Fashion Garments Ltd. Nipunika Ltd. Cha-72/1/B, Moddha Badda, Holland Centre, Progoti Sarani, Dhaka (23.78287N, 90.42559E) 09 March 2014 1 2 Observations 3 Columns appear to be stressed in excess
More informationHome Not Anchored to Foundation
IDENTIFY WEAKNESSES Home Not Anchored to Foundation Houses that are not bolted to the foundation can move off their foundations during earthquakes. Go down into the crawl space the area between the first
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Assessor: 936, Vogra Chowdhury Bari, Joydevpur, Gazipur Joydebpur, Gazipur Emkay Enterprises 16 May 2015 The Alliance for Bangladesh Worker
More informationA Study on Seismic Analysis of High Rise Irregular Floor Plan Building with Different Position of Shear Walls
International Journal of Engineering and Advanced Technology (IJEAT) ISSN: 2249 8958, Volume-6 Issue-6, August 2017 A Study on Seismic Analysis of High Rise Irregular Floor Plan Building with Different
More informationDEFINING RIGID VS. FLEXIBLE NONSTRUCTURAL COMPONENTS
10NCEE Tenth U.S. National Conference on Earthquake Engineering Frontiers of Earthquake Engineering July 21-25, 2014 Anchorage, Alaska DEFINING RIGID VS. FLEXIBLE NONSTRUCTURAL COMPONENTS B. E. Kehoe 1
More informationSeismic Behavior of Soft First Storey
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 78-168 Volume, Issue 5 (Nov. - Dec. 1), PP 8-33 Seismic Behavior of Soft First Storey 1 P.B.Lamb, Dr R.S. Londhe 1 PG Student Applied
More informationRecent Advances in Seismic and Wind Design of Wood Structures &Historic Preservation Examples
SEAoA 2015 Conference and Convention Recent Advances in Seismic and Wind Design of Wood Structures &Historic Preservation Examples Kelly Cobeen Wiss Janney Elstner Associates, Inc. Seminar Outline 1. NEHRP
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Address: 50, New Chaktai (4th & 5th Floor), Haji Delware Hosen Sowdagar Market, Chittagong Chittagong Chittagong Bangladesh 05 May 2014 The
More informationBabylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd
Babylon Casualwear Ltd Aboni Fashions Ltd Suravee Garments Ltd Plot-23,24, Tetulzhora, Hemayetpur, Savar, Dhaka (23.792784N, 90.254587E) 29 March 2014 1 2 Observations 3 Potentially Highly-stressed columns
More informationIJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol. 4, Issue 05, 2016 ISSN (online): 2321-0613 Seismic analysis of RC Building Frame with Different Bracing Systems Mohammed Ali Khan
More informationSeismic Evaluation of an Existing Building Using Performance Based Design. Sammar Iqbal. Junior Design Engineer, EA Consulting Pvt. Ltd.
Seismic Evaluation of an Existing Building Using Performance Based Design Sammar Iqbal Junior Design Engineer, EA Consulting Pvt. Ltd., Karachi Introduction This paper is based on the seismic evaluation
More informationIS 1893 and IS Codal Changes
IS 1893 and IS 13920 Codal Changes Reading between the lines Alpa Sheth IS 1893-2016 Changes In Estimation Of The Hazard a) Design spectra extended up to natural period up of 6 s; b) Same design response
More informationEarthquake Resistant Design. Dr. S. K. PRASAD Professor of Civil Engineering S. J. College of Engineering, Mysore
Earthquake Resistant Design Dr. S. K. PRASAD Professor of Civil Engineering S. J. College of Engineering, Mysore Email : skprasad@sjce.ac.in Natural Disasters Earthquake Tornado, Cyclone Floods Fire Natural
More informationApparel Gallery Ltd.
Apparel Gallery Ltd. 147-148, Norshinghpur, Asulia, Savar, Dhaka (23.929985N,90.304914E) 23 March 2014 1 2 Observations Building 1 Heavy loading due to raised floor area on Ground Floor 3 Building 1 Raised
More informationInvestigation of Expected Seismic Performance on Existing Buildings: A Case Study
Investigation of Expected Seismic Performance on Existing Buildings: A Case Study Arun Kumar 1, Ajay Singh Chauhan 2, Khushpreet Singh 3, Aditya Tiwary 4 1, 2, (PG student, Department of Civil Engineering,
More informationMandatory Wood Frame Soft-story Retrofit Program STRUCTURAL DESIGN GUIDELINES
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC Division 93 Effective: 11/22/15 DOCUMENT NO.: P/BC 2014-137 Revised: 06/07/16 Previously Issued As: N/A Mandatory Wood Frame Soft-story
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Assessor: Plot M-4/3, Road 7, Section 7 Mirpur, Dhaka Dhaka Dhaka Bangladesh Emkay Enterprises The Alliance for Bangladesh Worker Safety Page 1/7 Introduction
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Plot 47-52 & 68-73, KEPZ North Patenga Chittagong Chittagong The Alliance for Bangladesh Worker Safety Page 1/10 Introduction to the Report The following
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: Karardi, Shibpur, Narsingdi, Narsingdi Dhaka Bangladesh 10 May 2013 The Alliance for Bangladesh Worker Safety Page 1/15 10 May 2013 Introduction
More informationAl Islam Textile Ltd.
Al Islam Textile Ltd. 9 Kornopara,Savar,Dhaka-1340 (23.824207N, 90.256342E) 27 APRIL 2014 1 2 Observations Item 1 observation Column loads in excess of design loads Verify concrete strengths in columns
More informationAvailable at: Last Modified: December 2012
6.4 Mechanical, Electrical, and Plumbing Components 6.4.9 Light Fixtures 6.4.9.2 Surface-Mounted lighting This category covers surface-mounted light fixtures that are overhead in a finished ceiling. The
More informationLATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS
1 LATERAL DRIFT DESIGN IN COLD FORMED STEEL WALL SYSTEMS Thomas Castle, S.E. 2 This presentation is published by the Cold-Formed Steel Engineers Institute ( CFSEI ). The information herein shall not constitute
More informationMOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS
MOUNTAIN STATE BLUE CROSS BLUE SHIELD HEADQUARTERS PARKERSBURG, WEST VIRGINIA DOMINIC MANNO STRUCTURAL OPTION FACULTY CONSULTANT: DR. ANDRES LEPAGE Technical Report 3 11-21-08 TABLE OF CONTENTS TABLE OF
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Name: FCI BD, Ltd. Plot-36-39 Dhaka EPZ, Ganakbari, Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/9 Introduction
More informationDetails for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses
Details for Exterior Brick Masonry Veneer Supported by Metal Plate Connected Wood Trusses Released May 20, 2009 Updated March 9, 2011 Introduction: Wood frame structures with attached brick masonry veneer
More informationTable 1. Detailed Comparison of Structural Provisions of 2000 IBC to 1997 NEHRP (continued)
1997 NEHRP 2000 IBC Section Provision Section Provision Comments 1 GENERAL PROVISIONS 1.1 PURPOSE No corresponding provision The lack of a purpose statement does not make IBC 1.2 SCOPE AND APPLICATION
More informationr clarke 1 INTRODUCTION TO IBC SEISMIC FORCES
r clarke 1 INTRODUCTION TO IBC SEISMIC FORCES 1.0 INTRODUCTION This presentation discusses seismic forces mainly from the perspective of the core requirements of the ICC s IBC 2009. The IBC 2009 caters
More informationDew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka ( N, E) 22 June 2014
1 Dew Fashions Ltd. Le-Nouveautex Ltd. House-65,Board Bazar, Gazipur, Dhaka (+23.93941N,90.38554E) 22 June 2014 2 Observations Main Factory Building - Columns appear to be stressed to levels that require
More informationIJSRD - International Journal for Scientific Research & Development Vol. 2, Issue 07, 2014 ISSN (online):
IJSRD - International Journal for Scientific Research & Development Vol., Issue, ISSN (online): - Importance of ing of Masonry and Effect of Soft Storey on Seismic Performance of R.C High Rise Building
More informationKeywords: Discrete Staggered Shear Wall, High-Rise Building, Response Spectrum Analysis, Storey Drift.
www.semargroup.org, www.ijsetr.com ISSN 2319-8885 Vol.03,Issue.09 May-2014, Pages:1830-1835 Seismic Response of High-Rise Structure with Staggered Shear Wall AUNG MON 1, TIN TIN HTWE 2 1 Dept of Civil
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory 81, Kalmessar, "Jalal Shopping Complex" Board Bazar, Gazipur. 20 May 2014 The Alliance for Bangladesh Worker Safety Page 1/11 20 May 2014 Introduction
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Factory Gilarchala, Gorgaria Master bari Sreepur, Gazipur Sreepur, Gazipur 22 Apr 2014 The Alliance for Bangladesh Worker Safety Page 1/10 Factory
More informationPlan Check No. Checked by: An Appointment Is Required for Verification
SUPPLEMENTAL CORRECTION SHEET UNREINFORCED MASONRY (URM) RETROFIT ( 2002 LABC ) Plan Check No. Checked by: Permit Appl. # An Appointment Is Required for Verification Job Address: For appt. call: APPLICATION
More informationAvailable at: Last Modified: December 2012
6.4 Mechanical, Electrical, and Plumbing Components 6.4.9 Light Fixtures 6.4.9.4 Heavy Light Fixtures This category covers heavy or special purpose overhead light fixtures that require engineered support
More informationSection 1 Introduction
Section 1 Introduction Concern over the possibility of damaging earthquakes in the eastern United States developed through the 1970 s as a result of improved knowledge of both the history of eastern U.S.
More informationIndex terms Diagrid, Nonlinear Static Analysis, SAP 2000.
Pushover Analysis of Diagrid Structure Ravi K Revankar, R.G.Talasadar P.G student, Dept of Civil Engineering, BLDEA S V.P Dr P.G Halakatti College of Engineering & Technology Bijapur-586101 Associate Professor,
More informationApplication of Performance Based Nonlinear. of RC Buildings. A.Q. Bhatti National University of Sciences and Technology (NUST), Islamabad, Pakistan
Application of Performance Based Nonlinear Seismic Static Pushover Design and Analysis Simulation for Seismic Design of RC Buildings A.Q. Bhatti National University of Sciences and Technology (NUST), Islamabad,
More informationBackground and Purpose Acknowledgments. 1.1 Background The Architect s Role in Seismic Design Contents The Bottom Line 1-8
FOREWORD AND ACKNOWLEDGMENTS Background and Purpose Acknowledgments i iii CHAPTER 1 INTRODUCTION Christopher Arnold 1.1 Background 1-1 1.2 The Architect s Role in Seismic Design 1-4 1.3 Contents 1-5 1.4
More informationA. Are Plan Reviews Important? B. Statement of Special Inspections C. Deferred Submittals D. DFCM Requirements
A. Are Plan Reviews Important? B. Statement of Special Inspections C. Deferred Submittals D. DFCM Requirements Is it okay to simply accept the engineer s stamp? Some key items to consider Life safety All
More informationContents. Tables. Terminology and Notations. Foreword. xxi
Tables x Terminology and Notations xi Foreword xxi 1 Aim and scope 1 1.1 Aim 1 1.2 The Eurocode system 2 1.3 Scope of Manual 3 1.3.1 General 3 1.3.2 Basis of the Manual 5 1.3.3 Other general requirements
More informationA Comparative Study on Seismic Analysis of Bangladesh National Building Code (BNBC) with Other Building Codes
J. Inst. Eng. India Ser. A (August October 2013) 94(3):131 137 DOI 10.1007/s40030-014-0053-3 ORIGINAL ARTICLE A Comparative Study on Seismic Analysis of Bangladesh National Building Code (BNBC) with Other
More informationBrent Ellmann Structural Option 200 Minuteman Park, Andover, MA Structural Consultant: Dr. Hanagan
Structural Design: Goals: The original design of 200 Minuteman Drive was dictated largely by Brickstone Properties, the building s owner. The new design of 200 Minuteman Drive, with additional floors,
More informationTechnical Report #3. Matthew R Peyton
Technical Report #3 This Document is Technical Report #3 for 5th year senior thesis in the Architectural Engineering Departments at The Pennsylvania State University. In this report the existing reinforced
More information4.2 Tier 2 Analysis General Analysis Procedures for LSP & LDP
4.2 Tier 2 Analysis 4.2.1 General Four analysis procedures are provided in this section: Linear Static Procedure (LSP), Linear Dynamic Procedure (LDP), Special Procedure, and Procedure for Nonstructural
More informationSIGNIFICANCE OF SHEAR WALL IN FLAT SLAB MULTI STORIED BUILDING - A REVIEW. Vavanoor, India
SIGNIFICANCE OF SHEAR WALL IN FLAT SLAB MULTI STORIED BUILDING - A REVIEW Athira M. V 1, Sruthi K Chandran 2 1PG Student, Department of Civil Engineering, Sreepathy Institute of Management And Technology,
More informationEffects of Building Configuration on Seismic Performance of RC Buildings by Pushover Analysis
Open Journal of Civil Engineering, 2015, 5, 203-213 Published Online June 2015 in SciRes. http://www.scirp.org/journal/ojce http://dx.doi.org/10.4236/ojce.2015.52020 Effects of Building Configuration on
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) Plot 33-35, Dhaka (EPZ), Savar Savar Dhaka Bangladesh The Alliance for Bangladesh Worker Safety Page 1/11 Introduction to the Report The following
More informationProject Findings: Appendix 2
NSF Final Report CMMI-1034874 Project Findings: Appendix 2 Selected Damage Photos of Engineered Buildings PART 1. St. Louis Gonzague Cafeteria Building Civil Engineering and Engineering Mechanics Department
More informationINITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR)
INITIAL STRUCTURAL INTEGRITY ASSESSMENT REPORT (SIAR) 234/8, Kafrul Tower Kachukhate Road Kafrul, Dhaka Cantonment Dhaka The Alliance for Bangladesh Worker Safety Page 1/10 16 Apr 2014 Introduction to