1 NFL Building Sloped Roof Replacement Summary of Scope of Work The NFL Building has sloped asphalt shingle roofs and flat roofs, this project includes the replacement of the sloped main roofs and small canopy type sloped roofs only, no work is to be done on the flat roofs. The existing roof has asphalt shingles over asbestos shingles. Work under this contract includes having a licensed asbestos and lead abatement contractor strip the shingles both asphalt and asbestos and remove the deteriorated molding, fascia and soffit which are coated with peeling lead based paint as well as the existing gutters and leaders. The contractor that is awarded this contract will be required to coordinate work with the abatement contractor that will do the removals and the crew that will install new soffits, fascia, roofing, gutters downspouts, vents etc. The abatement contractor is to work nights and remove as much roofing as can be replaced in one day. The installation crew will work days and replace the woodwork and roofing on the section of roof that was stripped the previous evening and all materials removed to be disposed off to a legally approved site. This contract includes new gutters, downspouts, soffits and fascias. Lead and asbestos abatement The abatement contractor must be licensed to perform lead and asbestos abatement projects in Suffolk County and must comply with all pertinent federal, state and local regulatory requirements for the removal of asbestos containing material and lead. The college will hire an independent environmental testing firm to monitor the abatement activities and perform the requisite testing. Products to be used This specification is based on GAF products, equivalent products by other manufacturers may be used if the substitution is approved by the college. Shingles Timberline HD or approved equal Starter strip Weather Blocker Eve/Rake starter strip or approved equal Leak Barrier Weather Watch or approved equal to be used at all valleys, ridges, and eaves. Shingle Underlayment Deck Armor Premium breathable deck protection or approved equal Ridge vent Cobra Snow Country Advanced or approved equal Flashing.032 inch aluminum painted white Fascia and blocking pressure treated #2 or better. Soffits perforated vinyl or aluminum soffit material. Drip edge inch minimum, aluminum painted white. Installation specification As per GAF spec sheet included with this document. Air intakes and vents The three air intake louvers that penetrate the roof (shown in the photo below) are to be replaced with aluminum goose neck screened air intakes that are raised so that they are at least 18 inches above the roof so that they are above the snow line.
2 Exterior louver and ductwork to be painted aluminum, submit shop drawing for approval. Roof Deck The existing roof deck is constructed of tongue and groove lumber and appears to be in good condition, however bidders are required to provide a unit cost (per square foot) to replace decking that is found to be unsound. Dimensions The drawing provided below is provided as a guide actual dimensions should be verified by bidders prior to submitting bids. Fascias, Gutters and Soffits The existing wood fascias and soffits are decayed and covered with peeling lead based paint. They will be removed by the abatement contractor and replaced by the installation contractor as part of this bid. When originally constructed the building did not have gutters, instead it has decorative molding applied to the fascia (as shown in the attached drawings). The molding prevented the proper installation of the gutters. The contractor is to replace the fascia removed by the abatement contractor and add continuous pressure treated wood blocking (as shown in the attached drawings) to which the new gutters will be installed. The replacement soffits are to be perforated vinyl (white). Contractors Lump Sum Bid Price. $ Contractors Unit Price for removing and replacing existing Damaged Tongue and Grooved (T&G) roofing plank with New similar T&G plank. $.. /sq.ft. Company Name: Name of Contact: Signature Date:. Seal
3 LEGEND: EXISTING FLAT ROOF N.I.C. NEW ROOF NOTES: PRIOR TO BID CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD CONTRACTOR TO REVIEW EXISTING CONDITIONS PRIOR TO DEMOLITION & COORDINATE W/SCCC FOR ANY MODIFICATION REQUIRED TO CONTRACT DOCUMENTS CONTRACTOR. TO REPLACE EXISTING DOWN SPOTS WITH NEW, VERIFY LOCATION IN FIELD CONTRACTOR TO FLASH AROUND ALL EXISTING ROOF PENETRATION. PRIME AND PAINT ALL NEW WOOD TO MATCH EXISTING ADJACENT FINISHES. NEW GUTTER ROOF OVER HANG SEE A1.04 REMOVE EXIST. VENT AND BLOCK OFF ROOF OPENING W/ P.T. PLYWOOD 10' 63' " N.I.C. 7' 28' " NOTES: REMOVE EXISTING (3) FRESH AIR INTAKES FROM ROOF AND REPLACE WITH NEW GOOSE NECK FRESH AIR INTAKES (VERIFY LOCATION IN FIELD) OPENING TO BE A MIN 150 SQ. INCHES AND TO BE 18" ABOVE TOP OF ROOF SHINGLES BELOW. TIE IN NEW INTAKE TO HVAC UNIT IN THE ATTIC SPACE. DEMO SEE D1.01 TYP. NEW SEE A1.02 TYP. NEW GUTTER ROOF CANOPY NEW GUTTER ABOVE ROOF OVER HANG VENT. NEW RIDGE VENT REZENE,BAHRE KHALID,OMARI NFL BULDING ROOFING PAUL,COOPER A1.01 AMMERMAN N.T.S. CAMPUS Drawing Title ROOF PLAN VALLEY DOWN SPOTS VERIFY LOCATION IN FIELD 35' ROOF OVER HANG 33' NEW GUTTER ROOF OVER HANG 56' " 17' DEMO SEE D1.01 TYP. NEW SEE A1.02 TYP. NEW GUTTER DEMO SEE D1.01 TYP. NEW SEE A1.02 TYP. ROOF CANOPY SEE A College Road, Selden NY
4 EXISTING TOP PLATE EXISTING T&G WOOD PLANKS REMOVE EXISTING ROOFING SYSTEM & EXPOSE REMOVED AND REPLACE EXISTING DEMOLITION DETAILS AT OVERHANG 6 LEGEND: EXISTING NEW EXISTING RAFTER 2'-0" O/C 12 EXISTING T & G WOOD PLANKS EXISTING SOFFIT BLOCK REMOVE GUTTER EXISTING WALL 1" 6" V.I.F. REMOVE DRIP EDGE REMOVE EXISTING MOLDING REMOVE EXISTING FASCIA BOARD " V.I.F. REMOVE EXISTING HORIZONTAL SOFFIT 1' " College Road, Selden NY AMMERMAN XXX CAMPUS XXX NFL BULDING ROOFING Drawing Title DEMO DETAIL OVERHANG REZENE,BAHRE KHALID,OMARI PAUL,COOPER N.T.S. D1.01
5 EXT. P.T. PLY WOOD EXISTING T & G WOOD PLANKS NEW 2X4 P.T. WOOD 2' O/C NEW ICE SHIELD TYP. CONT. NEW 4" PVC SOFFIT VENT ON 3/4" NEW ROOFING AND NEW OVERHANG LEGEND: EXISTING NEW 6 12 NEW ROOF SHINGLE SYSTEM EXIST.ING RAFTERS EXISTING TOP PLATE EXISTING BLOCK EXISTING WALL EXISTING MOLDING " " 4" 1' " " 6" SCREW TO RAFTER ABOVE NEW DRIP EDGE NEW 6" ALUMINUM GUTTER PROVIDE NEW CONTINUOUS PRESSURE TREATED WOOD BLOCKING AS REQUIRED, ANCHOR TO EXISTING SOFFIT BLOCK AND NEW HANGER PROVIDED College Road, Selden NY AMMERMAN CAMPUS NFL BULD. ROOFING Drawing Title PROPOSED DET. OVERHANG REZENE,BAHRE KHALID,OMARI PAUL,COOPER N.T.S. A1.02
6 RIDGE VENT REMOVE EXISTING T&G PLANKS & COORDINATE WITH RIDGE VENT RIDGE CAP VENT TYP. PROVIDE SHINGLES ROOFING SYSTEM SEE SPECS EXIST. 2'-0" O/C EXIST. T & G ROOF PLANKS TYP. COORDINATE OPENING W/ NEW RIDGE VENT College Road, Selden NY AMMERMAN CAMPUS NFL BULD. ROOFING Drawing Title PROPOSED RIDGE VENT REZENE,BAHRE KHALID,OMARI PAUL,COOPER N.T.S. A1.03
7 METAL COPING REMOVE & REPLACE MEMBRANE FLASHING NEW SHINGLE ROOFING W/ METAL COVER WALL AND CONTINUE OVER EXISTING PARAPET WALL ADHERED MEMBRANE FLASHING TO WALL EXISTING WALL NEW ICE SHIELD EXIST. T & G WOOD EXT. FLAT ROOF SECTION 1-2 7' 28' " ' " VALLEY KEY PLAN NFL BULDING ROOFING REZENE,BAHRE KHALID,OMARI 1 2 AMMERMAN Drawing Title PROPOSED DETAIL PAUL,COOPER N.T.S.
8 NEW ICE SHIELD VALLEY NEW SHINGLES NEW ICE SHIELD TYP. VALLEY NEW SHINGLES T & G WOOD PLANKS SECTION PLAN VIEW College Road, Selden NY AMMERMAN CAMPUS NFL BULDING ROOFING Drawing Title PROPOSED VALLEY REZENE,BAHRE KHALID,OMARI PAUL,COOPER N.T.S. 1-7
9 CONNECT TO UNDER GROUND STORM DRAINAGE SYSTEM VERIFY AND MATCH PROVIDE SUPPORT AS REQ. PROVIDE SPLASH BLOCK PROVIDE NEW 4" X 4" 2 PROPOSED ROOFING W/ NEW DOWNSPOUT NEW 6" ALUMINUM GUTTER DOWNSPOUT EXISTING FIELD CONDITIONS. IF DOWN SPOUT IS NOT CONNECTED TO UNDERGROUND DRAINAGE SYSTEM College Road, Selden NY AMMERMAN CAMPUS NFL BULDING ROOFING Drawing Title PROPOSED GUTTER W/ DOWN SPOT REZENE,BAHRE KHALID,OMARI PAUL,COOPER N.T.S. A1.06
10
11
12
13
14
15
16
17
18
Trent Hills Public Library 98 Bridge Street East Campbellford, Ontario
6 7 8 0± 688± 0± 86± 8± 68± 878± A U/S OF SOFFIT,68± 66± A0 STACK PENETRATION RIDGE HEIGHT 7,7± A0 7 King St. Peterborough ON K9J R8 t. 70 7 f. 70 7 006 B NOTE: ROOFTOP MECHANICAL UNITS ARE TO BE LIFTED
More informationThe better way to build TM. Installation Manual NAILBASE PANELS
The better way to build TM Installation Manual PANELS November 2018 SIPs Installation Manual Table of Contents Topics General Requirements................................... 3 Materials..............................................
More informationOREGON ROOF CONSULTING - ROOF INSPECTION FORM
Oregon CCB: 199121 PO Box 220190, Milwaukie, OR 97222 Washington License: OREGORC871MR OREGON ROOF CONSULTING - ROOF INSPECTION FORM General Roof Conditions: NA = Not Applicable Debris on Roof Physical
More informationWesleyan University 1.1 RELATED INFORMATION, DOCUMENTS AND REQUIREMENTS
Wesleyan University SCOPE OF WORK 346 WASHINGTON STREET ASPHALT ROOF REPLACEMENT PROJECT 23AB VINE STREET ASPHALT ROOF REPLACEMENT PROJECT 72 HOME NORTH SIDE ROOF REPLACEMENT 64 FOUNTAIN AVE ROOF REPAIR
More informationROOF DETAILS RD-0 CONSTRUCTION DOCUMENTS - AGENCY/ FEBRUARY 13, 2017 MURRAY ASSOCIATES ARCHITECTS, P.C.
ROOF DETAILS CONSTRUCTION DOCUMENTS - 350/ GENERAL PENNSYLVANIA CONSTRUCTION HOUSING PHASE FINANCE 1 AGENCY/ FEBRUARY 13, 017 RD-0 TERMINATION BAR AND SEALANT 1" STAINLESS STEEL METAL RIDGE COPING - PROVIDE
More informationRoofing City of Owatonna BUILDING DEPARTMENT
Roofing City of Owatonna BUILDING DEPARTMENT 507-444-4370 www.ci.owatonna.mn.us This handout is intended only as a guide and is based in part on the 2007 Minnesota State Building Code, City of Owatonna
More informationADDENDUM # 2 LOUISA COUNTY PUBLIC LIBRARY ROOF REPLACEMENT PROJECT IFB# GS-18-02
August 25, 2017 To: From: Prospective Bidders, and Plan Holders County of Louisa, Dewberry and HDH Associates ADDENDUM # 2 LOUISA COUNTY PUBLIC LIBRARY ROOF REPLACEMENT PROJECT IFB# GS-18-02 CHANGES AND
More informationTABLE OF CONTENTS A-1 TITLE PAGE A-2 EXISTING FOUNDATION AND 1ST FLOOR PLAN
FOR VISUALIZATION PURPOSES ONLY - SEE ELEVATIONS FOR GREATER DETAIL TABLE OF CONTENTS A-1 PAGE A- EXISTING FOUNDATION AND 1ST FLOOR PLAN A-3 EXISTING ND FLOOR DEMO AND ELEVATIONS A-4 PROPOSED FOUNDATION
More informationChapter 32 - Garage. June 2015 Garages 32-1
Chapter 32 - Garage Contents Chapter 32 - Garage... 32-1 Foundation... 32-3 Walls... 32-3 Roof Framing... 32-4 Roofing... 32-4 Exterior Dow Board... 32-5 Doors... 32-5 Siding... 32-5 Gutters... 32-6 Painting...
More informationDistances are not shown to scale. Existing porch. Community. Building. Distances are not shown to scale
patio and deck 00 Building Two story Four-plex Entrance 0 0 00 Building Single Story Duplex 0 patio Contact Information: Owner: Housing Authority of Yamhill County, NE Dunn Place, McMinnville, OR 9. Contact:
More informationSSL-175. Specifications
SSL-175 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Preformed Metal Roofing PART 1: GENERAL 1.01 SECTION INCLUDES
More informationENGINEERING BUILDING ROOF REPLACEMENT
ENGINEERING BUILDING ROOF REPLACEMENT SOLICITATION NO. 2017-06 March 13, 2017 St. Clair County, Illinois, through the Public Building Commission (herein after referred to as OWNER ), hereby gives notice
More informationPORCH PLAN. Existing House. New Porch. Page A.1. Boxed Beams. 5/4x6 Cedar Decking. Roof Overhang. Wood Columns. Hip Roof. Step
Porch Plan 28 68 2'-0" 7'-8" 2'-0" 7'-0" PORCH PLAN SCALE: /4" = '-0" CD24 0 SECT D A.6 7 /4" 7 /4" Boxed Beams Existing House 23'-2 /4" 30 68 New Porch Step Wood Columns 8'-0" 2'-0 /2" 2'-0 /2" 8'-0"
More informationTYPICAL ROOF CONDITION LAYOUT
FIXED POINTS TYPICAL ROOF CONDITION LAYOUT 15 17 9 16 29 12 14 11 3 7 35 20 6 23 30 31 24 13 18 Typical Roof Condition Layout... 1 Low Eave Isometric View - Fixed/ Floating... 2 Low Eave Section - Fixed/
More informationROME ART AND COMMUNITY CENTER
ROME ART AND COMMUNITY CENTER 308 W. Bloomfield St. Rome, NY 13440 INSULATION AND SLATE ROOFING REPAIRS SCOPE OF WORK: A. SPRAY FOAM INSULATE ATTIC AREA B. FRONT ROOF REPAIR C. REAR ROOF REPAIRS D. INTERIOR
More informationArchitectural Inspection Pitched Roofing
Architectural Inspection Pitched Roofing 0511 Pitched Roofing All components of the roof system including insulation Description of the building system Three types of pitched roofing are found at the Gastineau
More informationCustom 22' x 40' - 16' Tall Garage Plan #g227 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 22' x 40' - 16' Tall Garage Plan #g22 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical
More informationMalarkey s well-designed, competitively-priced Endura products can assist with completing projects ON TIME AND ON BUDGET.
Malarkey s well-designed, competitively-priced Endura products can assist with completing projects ON TIME AND ON BUDGET. Ridge Vent Multi-Ply or Modified Vented Fascia Raised Profile RP Tapered Version
More informationCustom 30 x 48-14' Tall Garage Plan #g226 By SDS-CAD Specialized Design Systems
P O Box 34 Mendon, Utah Custom 30 x 48-14' Tall Garage Plan #g226 By Page 1 Title Page Page 2 Main Floor Plan Page 3 Foundation Plan Page 4 Elevation Views Page 5 Framing and Details Page 6 Typical Section
More informationRECREATIONAL EAGLE CENTER METAL ROOF ASSESSMENT AND SOLUTION
RECREATIONAL EAGLE CENTER METAL ROOF ASSESSMENT AND SOLUTION Recreational Eagle Center (00550) La Crosse, WI DSF Project No. 07H1E SEG Project No. 10975 Prepared for Division of State Facilities 101 E.
More informationDL-200. Specifications
DL-200 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Structural Preformed Metal Roofing PART 1: GENERAL 1.01
More informationNEW BEDFORD, MA, ARCHITECTS STAMP
NB BROOKLAWN SENIOR CENTER NEW BEDFORD, MA, 74 Jul 13, 28-11:32am T-100 TITLE SHEET.dwg DRAWINGS PREPARED FOR CITY OF NEW BEDFORD 133 WILLIAM ST NEW BEDFORD, MA, 740 ARCHITECT JM BOOTH & ASSOCIATES, INC.
More informationSee EMERGENCY REPAIRS on page 7 for special considerations.
ROOFS The prominent, large expanse presented by the roof makes it a significant architectural feature. Originally, most of the houses in Kalamazoo s historic districts probably had split cedar shingles.
More informationREPORT OF ROOF CONDITION STUDY. YOUR FACILITY Your Facilities Location. Date YOUR FACILITY S IDENTIFICATION. Prepared for Your Company
REPORT OF ROOF CONDITION STUDY YOUR FACILITY Your Facilities Location YOUR FACILITY S IDENTIFICATION Date Prepared for Your Company 1114 Grindstone, Union, Kentucky 41091 (859) 657-6677 [Report Date] [Client]
More information1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights
1 Exam Prep Architectural Sheet Metal Manual Tabs and Highlights These 1 Exam Prep tabs are based on the 2012 Sheet Metal and Air Conditioning Contractors' National Association, Inc., seventh edition.
More informationThermaCal Nail Base Roof Insulation Panels (all versions) Installation Instructions
ThermaCal Nail Base Roof Insulation Panels (all versions) Installation Instructions PRODUCTS a. ThermaCal 1 Ventilating Roof Insulation Panel is a venting nailable composite roof insulation panel with
More informationTown of Atkinson, New Hampshire INVITATION TO BID. Town Garage Roof Replacement Issued: June 30, 2015
Town of Atkinson, New Hampshire INVITATION TO BID Town Garage Roof Replacement Issued: June 30, 2015 The Town of Atkinson invites qualified contractors to bid on the replacement of the roof of the Town
More informationFORTIFIED Home High Wind. Bronze New Roof Requirements
THE DECK (PREP MATERIAL, FASTENING) THE ROOF DECK SEALING THE ROOF DECK All existing roof cover and flashings shall be removed; deck shall be a clean, workable surface free from debris. Damaged or rotten
More informationProject Name: the candlelight. Project No. Scale: sewer line. water line 1 8"=1'-0"
sewer line water line Site Plan scale: 1/8" = 1' 1709 POWERS BLVD. RYAN GLENN SUBDIVISON PHASE 1, BLOCK 5, LOT 3 10,84 SQ. FT. slope grade away from foundation min " in 10' or 5% if 10' is unavailable
More informationHIGHLANDVIEW CEMETERY CHAPEL
HIGHLANDVIEW CEMETERY CHAPEL CONTACT: Ferris State University Small Town Studio Christopher Cosper, AIA, LEED, AP, Assistant Professor cosperc@ferris.edu 23.59.33 Sheet List Sheet Name Sheet # COVER A00
More informationGARAGE MAIN FLOOR PLAN
12'-0" 4'-6" 3'-0" 4'-6" 3040 14'-0" LADDER LT LINE BUNK CABIN 11'-4" x 13'-4" 14'-0" BUILDING CONTRACTOR/HOME OWNER TO REVIEW AND VERIFY ALL DIMENSIONS, SPECS, AND CONNECTIONS BEFORE CONSTRUCTION BEGINS.
More informationCity of Republic Community Development Department. Residential Roofs REVISION DATE: JANUARY 2017
City of Republic Community Development Department Residential Roofs REVISION DATE: JANUARY 2017 A residential roof permit is required for new roofs and for replacement roofs when the replacement area is
More informationDIVISION 7 THERMAL AND MOISTURE PROTECTION
DIVISION 7 THERMAL AND MOISTURE PROTECTION UCSC Campus Standards Handbook Waterproofing Standards 07100 1 SECTION 07100: WATERPROOFING STANDARDS A. Guarantee 1. Provide a guarantee on Contractor's letterhead
More informationMAGNUM. I N S P E C T I O N S Inc. ROOF Walked on roof, crawled attic where accessible.
NAME: DATE: October 6, 2006 METHOD OF INSPECTION: ROOF Walked on roof, crawled attic where accessible. ADDRESS: MAIN ROOF COVERING SECONDARY ROOF COVERING Cement Tile: Strip Shingle: XX Tar and Gravel:
More informationBidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.
McKee and Associates Architecture and Interior Design Addendum No. ONE Date: 11.26.18 Project: Re-Roofing Various Buildings at Westdale Apartments for the Luverne Housing Authority Luverne, Alabama McKee
More informationSECTION METAL ROOF AND SOFFIT PANELS
Metal Panel Systems, Inc. 11506 Reading Road Cincinnati, Ohio 45241-2512 Telephone: 800-554-6126 or 513-554-6120 Fax: 513-554-6121 www.metalpanelsystems.com info@metalpanelsystems.com Specifications for
More informationArchitectural Roof Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification
More informationREROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA
McKee and Associates Architecture and Interior Design Addendum No. FOUR Date: 07.17.17 Project: REROOFING THE CAREER TECHNICAL SCHOOL FOR THE CLEBURNE COUNTY BOARD OF EDUCATION HEFLIN, ALABAMA A4.1 GENERAL
More informationCITY OF RICHMOND PINE CAMP COMMUNITY CENTER ROOF REPLACEMENT PROJECT RCS PROJECT NO
SECTION 01010 - SCOPE OF WORK PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General provisions of Contract, General Conditions and Technical Specification Sections, apply to this Section. 1.02 PROJECT DESCRIPTION
More informationWICOMICO COUNTY BOARD OF EDUCATION
GLEN AVENUE ELEMENTARY SCHOOL RO REPLACEMENT PROJECT NUMBER: PSC #.00.9 SR CURRENT CODES: 05 INTERNATIONAL BUILDING CODE 05 INTERNATIONAL MECHANICAL CODE NATIONAL STANDARD PLUMBING CODE (MBPS) 05 EDITION
More informationPresents. Roofing Basics
Presents Roofing Basics Terminology Tile: A roof tile may be curved or flat piece of baked (at times glazed) clay or a synthetic material. It is the basic block used in covering roofs, walls, and floors.
More informationAddendum 1 Residential Reroofing at Multiple Public Housing Developments. Town of Chapel Hill, NC ZAKIA ALAM, PURCHASING & CONTRACTS MANAGER
Addendum I For Residential Reroofing at Multiple Public Housing Developments Town of Chapel Hill, NC BID: Q18-141 TO: FROM: SUBJECT: ALL PROSPECTIVE BIDDERS ZAKIA ALAM, PURCHASING & CONTRACTS MANAGER DATE:
More informationRoof Systems ROOFS. Inspections
ROOFS Roof Systems Since your roof is overhead, not easily accessible and tends to be out of sight, out of mind, it is particularly necessary to develop and follow a strategy and program for its inspection
More informationAddendum No. TWO Date:
Addendum No. TWO Date: 08.20.2018 Project: PUBLIC HOUSING COMMUNITY RE-ROOFING PROJECT FOR THE ALBERTVILLE HOUSING AUTHORITY, ALBERTVILLE, ALABAMA MCKEE PROJECT NO. 18-174 The following modifications/
More informationSCOPE OF WORK BID TAB
Housing and Neighborhood Services of Rock Hill SCOPE OF WORK BID TAB Job # BID-CDBG #23 Bid is to be turn-key, including all applicable code requirements, materials, labor, City Business License permits,
More informationBrava Spanish Tile. Installation Manual. Brava Roof Tile Phone: Fax:
Brava Spanish Tile Installation Manual Brava Roof Tile Phone: 319-338-5706 Fax: 319-343-1038 www.bravarooftile.com This document includes the recommended and suggested installation procedures for Brava
More informationJ.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT
J.DAVID POUNDER LIMITED CONSULTING ENGINEER AND ARCHITECT Using a Multidisciplinary Approach to Projects for Over 0 Years Project 5 Mapleview Terrace Apartments, 59 South Pelham Road, Welland Addendum
More informationNEW ILLUMINATED LED SIGNAGE PAINTED STOREFRONT W/ VINYL GRAPHIC AND NEW LED SIGNAGE PAINT FINISHES (PROVIDE (2) COATS FOR ALL PAINTING) PT-1
MTA RR APPARATUS NEW ILLUMINATED LED SIGNAGE LIGHTWEIGHT REMOVABLE ALUMINUM PANEL FENCE 88 NORTH AVE CDR JOB NO. 60 NORTH AVE NORTH AVE CURRENT VIEW OF 88 NORTH AVENUE PROPOSED FACADE AT 88 NORTH AVENUE
More informationC. Jointing of Exterior Vertical Surfaces. Section D. The Secretary of the US Department of the Interior s Standards for Rehabilitation.
PART 1: GENERAL 1.01 Scope Of Standard A. This standard provides general guidance concerning the specific preferences of the University of Texas at Austin for roofing systems. B. UT recognizes that project
More informationfront elevation right elevation
Ridge Approx. 21'-7" :12 continuous ridge vents 30 year asphalt shingles 8" Lap Hardie Plank Siding 3 1 2" MiraTech window & door trim 3 1 2" MiraTech corner trim 40" Tall Foundation Wall front elevation
More informationArchitectural Roof Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Roof Products Guide Specifications FORMED METAL ROOF AND WALL PANELS This Guide Specification
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification
More informationArchitectural Roof and Wall Products Guide Specifications
Architectural Roof and Wall Products Guide Specifications 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL ROOF AND WALL PANELS This Guide Specification is to be used
More informationR-Matte Plus-3: Insulation for the Building Envelope
Attic and Crawl Space Applications R-Matte Plus-3 may be applied to the interior face of stud walls or roof rafters within attics and crawl spaces to provide a layer of continuous insulation (ci). Simply
More informationCarroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage
Carroll County Bureau of Permits and Inspection Residential Code Compliance Guidelines Detached Garage The following list of code requirements is intended to assist you in complying with the Code of Public
More informationPacific Tile Counter Batten and Batten
Pacific Tile Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation
More informationPacific Tile Counter Batten and Batten
Pacific Tile Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com Page2 INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation
More informationInstallation Guide. Titan Slate. Rev102606
Installation Guide Titan Slate Rev102606 Titan Manufacturing 200 bella citta blvd. Davenport, fl 33897 Phone: (920) 716-1411 Fax: (866) 601-4395 www.titanroofsystems.com This document includes the recommended
More informationGYPSUM BOARD. 2x WALL FRAMING EXTERIOR SHEATHING 3/4" PT WOOD FURRING WEATHER RESISTIVE BARRIER FIBERCEMENT SIDING COR-A-VENT OR SIM PT STARTER STRIP
6' - 0" 6' - 0" 10x12 BEDROOM BATHROOM 36" CLEAR @ KITCHEN DECK 10x12 LIVING ROOM PORCH 3' - 0" 6' - 0" 3' - 0" 6' - 0" 14' - 0" 6' - 0" 12' - 0" OPTIONAL DOOR/WINDOW/SLIDING DOOR 1 BEDROOM 380 SF 1 FLOOR
More informationATHENS TOWNSHIP ROOF PERMIT APPLICATION
DATE RECEIVED PERMIT # Andy Schreder CBO Email: andy@rumrivercc.com Cell: 763-291-3704 ATHENS TOWNSHIP ROOF PERMIT APPLICATION NOTICE: THIS IS AN APPLICATION ONLY. PERMIT WILL BE ISSUED AFTER APPROVAL
More informationNorth Village Condominiums
North Village Condominiums An ambient community in Douglas, Massachusetts encompassing the luxury of Blackstone Valley s serene country surroundings FOUNDATION Builders General Specifications (As of 1/1/2017)
More informationClassic and NB Tile Counter Batten and Batten
Classic and NB Tile Counter Batten and Batten INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation
More informationLight-Metal Roof Edge, Raised
NAIL WOOD CANT TO BLOCKING 2 ROWS STAGGERED EACH ROW 24 O.C. 1/2 MIN. 10 0 MAX. FASTEN 18 O.C. WITH NEOPRENE GASKETED FASTENERS 3-1/2 MIN. 4 6 JOINT COVER PLATE SET IN TWO BEADS OF SEALANT 4 MIN. SPECIFIED
More informationDIVISION 07 THERMAL AND MOISTURE PROTECTION ROOFING
07 00 00 PART 1 - GENERAL 1.01 DESIGN CRITERIA A. Preferred roofing types include Membrane, Metal, and Composition Shingles. 1. Membrane roofing is preferred for flat roof decks. 2. Use of asphalt-based
More informationSheet Metal Flashing and Trim
University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 076200 - Sheet
More informationINSTALLATION GUIDE.
INSTALLATION GUIDE www.gerardusa.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Gerard Canyon Shake counter batten
More informationInterim Logbook ROOFER
Interim Logbook ROOFER Department of Advanced Education and Skills Apprenticeship and Trades Certification Division Note to Apprenticeship Applicants This form can only be used to record hours and skills
More informationShingle Asphalt Asbestos-cement Slate Wood, edge-grain Aluminum. Roll Roofing Mineral-surface 19" selvage edge Lowest Mineral-surface
ROOFING MATERIALS Roofing or roofing materials can be said to have two basic purposes. Primarily, a building is roofed to protect the structure and its contents from the effects of weather. Secondary to
More informationEradicating ice dams begins below the roof deck. by Maciek Rupar
B U S T I N G Eradicating ice dams begins below the roof deck by Maciek Rupar 44 www.professionalroofing.net JUNE 2012 I f you do business in areas where ice damming is a problem, take the opportunity
More informationROOF MITIGATION STRUCTURE EVALUATION FORM. For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018)
ROOF MITIGATION STRUCTURE EVALUATION FORM For Single Family Residential Re-Roof Effective October 1, 2007 (Revised February 2, 2018) Check One Value of home does not exceed $300,000 based on insured value
More informationSiding and Soffit Installation Guidelines
Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field
More informationCRM Homes BUILDER Mangan Drafting Jim Mangan
BACK ELEVATION 1/8" = 1' LEFT SIDE 1/8" = 1' RIGHT SIDE 1/8" = 1' ROOF LINE NTS FRONT VIEW 1/4" = 1' A-1 Springfield MO 65610 Fremont Hills Lot 57 12/12 12/12 14/12 14/12 12/12 12/12 12/12 MAIN ROOF PITCH
More informationROOF ASSEMBLIES CHAPTER 9
CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION
More informationC. All roofs shall be installed according to manufacturers guidelines. Corrections due to workmanship shall be at contractors expense.
PART 1: GENERAL 1.01 Scope Of Standard 1.03 Reference Standards 1.04 Quality Control A. This standard provides general guidance concerning the specific preferences of the Sam Houston State University for
More informationTired of the Band-Aid or Short Term Solutions in our Industry. Our Industry Cuts Too Many Corners! To Save the Contractors Time and Money, not yours!
WHY Tired of the Band-Aid or Short Term Solutions in our Industry Our Industry Cuts Too Many Corners! To Save the Contractors Time and Money, not yours! STOP Replacing Windows, Doors, Siding and Roofing!
More informationAPPLICANT IS THE: OWNER CONTRACTOR SITE ADDRESS: CITY STATE/ZIP
Andy Schreder CBO Email: andy@rumrivercc.com PERMIT APPLICATION NOTICE: THIS IS AN APPLICATION ONLY. PERMIT WILL BE ISSUED AFTER APPROVAL AND PAYMENT OF FEES. WORK IS NOT AUTHORIZED TO BEGIN PRIOR TO ISSUANCE.
More informationSRP-AirOutshield ROOF Issued:
SECTION 07276: Breathable Underlayment Guide Specification This specification is a guide only and may need editing for the specific intended application. It is the responsibility of the design professional
More informationBUILDING EXTERIOR SHELL TRAINING
BUILDING EXTERIOR SHELL TRAINING Course Handout Part 1 Background and Insurance Issues (19min) Causes of Building Exterior Shell Problems Bad Design Poor Planning Failure to Follow Manufacturer s Recommendations
More informationZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -# Sunrise, Florida Phone
12 ZARA & ASSOCIATES, INC. Peter L. Zara 8435 Sunrise Lake Blvd -#43-307 Sunrise, Florida 33322 Phone 305-345-3793 E-Mail: peterizara@hotmail.com COURSE MATERIALS ROOFING COURSE WITH UPDATED MATERIALS
More informationArchitectural Wall Products Guide Specifications
Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 Architectural Wall Products Guide Specifications FORMED METAL WALL PANELS This Guide Specification is
More informationProject Number BID NO. CAG 18 2 ROOF REPLACEMENT FOR HARFORD COUNTY PUBLIC SCHOOLS NORTH HARFORD ELEMENTARY. Addendum # 2
Project Number.0 BID NO. CAG ROOF REPLACEMENT FOR HARFO COUNTY PUBLIC SCHOOLS NORTH HARFO ELEMENTARY Addendum # This addendum is to be attached to the North Harford Elementary School Roof Replacement bid
More informationMETAL ROOFING: RE-ROOFING QUESTIONS & ANSWERS
METAL ROOFING: RE-ROOFING QUESTIONS & ANSWERS Building contractors are always looking for installation methods that will provide them with savings on labor and materials expenses. Here are some important
More informationROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION
ROOFING CONTRACTORS GENERAL TRADE KNOWLEDGE EXAMINATION CONTENT INFORMATION Revised September 14 The General Trade Knowledge portion of the examination is administered daily in Computer Based Testing (CBT)
More informationADDENDUM # 2. - Page 1 of 2
2013-03-20 REQUEST FOR TENDER AFRICA RESTAURANT ROOF REPLACEMENT RFT # 11 (2013-03) ADDENDUM # 2 - Page 1 of 2 This addendum shall be incorporated into, and form part of RFT # 11 (2013-03) and take precedence
More informationDIVISION: THERMAL AND MOISTURE PROTECTION SECTION: METAL ROOF TILES REPORT HOLDER: GERARD ROOFING TECHNOLOGIES EVALUATION SUBJECT:
0 ICC-ES Evaluation Report ICC-ES 000 (800) 423-6587 (562) 699-0543 www.icc-es.org Most Widely Accepted and Trusted ESR-1188 Reissued 05/2018 Revised 08/2018 This report is subject to renewal 05/2019.
More informationALLMET CONTINENTAL INSTALLATION GUIDE
ALLMET CONTINENTAL INSTALLATION GUIDE www.allmet.com INSTALLATION NOTIFICATION The installation procedures demonstrated in this manual are recommended methods for the installation of the Allmet Continental
More informationSECTION ASPHALT SHINGLE ROOFING SYSTEMS. Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text".
SECTION 07311 ASPHALT SHINGLE ROOFING SYSTEMS Display hidden notes to specifier by using "Tools"/"Options"/"View"/"Hidden Text". PART 1 GENERAL 1.1 SECTION INCLUDES A. Granule surfaced asphalt shingle
More informationDrexel Metals Inc. DMC 5V 26 Gauge min. Face-Fastening Metal Roof System over Plywood
Drexel Metals Inc. DMC 5V 26 Gauge min. Face-Fastening Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationGOLD KEY INTERNATIONAL ROOFING DIVISION
Date: 6/17/15 John Hains 442 Orionvista Way Oakland FL 34787 Phone: (864) 508-0451 Email: jvhains@gmail.com Bid Price Includes: SHINGLE ROOF ~ Provide proper permitting and insurance. ~ Remove existing
More informationCalculated Quantities and Details
Estimate # 8/14/2007 Estimate For: Bill Johnston Finest Quality Homes 1234 Heght Blvd #204 Houston Tx 77079- Ph: (281) 555-5555 Fax: (281) 555-5556 P.O. Box 323 Simonton Tx. 77476 Phone: (281) 346-2462
More informationROOF ASSEMBLIES CHAPTER 9
CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION
More information#G445 Plans, 48'x28' x 10' detached garage with bonus room By SDS-CAD Specialized Design Systems
Architectural asphalt shingles and horizontal True Wood 7" Reveal siding over structural panel. Nailing schedule is 6" on ends 12" on centers 6d nails. Trusses are engineered on Bonus attic trusses 24"
More informationThe Homeowner s Building Application Checklist for Constructing a Residential Addition
The Homeowner s Building Application Checklist for Constructing a Residential Addition This checklist provides homeowners a summary of the Building Permit submission requirements for constructing a residential
More informationTELEPHONE: (215) ADDENDUM No. 1
THE SCHOOL DISTRICT OF PHILADLPHIA SCHOOL REFORM COMMISSION Office of Capital Programs 440 North Broad Street, 3 rd Floor Suite 371 Philadelphia, PA 19130 TELEPHONE: (215) 400-4730 ADDENDUM No. 1 Subject:
More informationSECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT
SECTION 07 30 05.01 SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT SPEC WRITERS NOTE: This specification includes materials and installation procedures for SlopeShield SA Self-Adhered Water-Resistive Vapor
More informationItem 2.3 Unit pricing GC to provide a square foot unit cost for material and labor to replace plywood decking beneath new concrete walkway slab.
Willow Glen Housing Repairs Project #9-59 Addendum Item. Change to bid date The bid date will be extended to March 8, 09, :00pm at the Housing Authority of Columbus Central Office,000 Wynnton Road Columbus,
More informationREPORT HOLDER: RARE MANUFACTURING INC A AVENUE SURREY, BRITISH COLUMBIA V4N 4P2 CANADA EVALUATION SUBJECT: IRONWOOD SHAKE
0 Most Widely Accepted and Trusted ICC ES Evaluation Report ICC ES 000 (800) 423 6587 (562) 699 0543 www.icc es.org ESR 2134 Reissued 12/2017 This report is subject to renewal 12/2018. DIVISION: 07 00
More informationSCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC Permit Requirements
SCREEN PORCHES 101 DEVELOPMENT RESOURCES, INC. 320-226.5189 www.101developmentresources.com While every attempt has been made to insure the correctness of this handout, no guarantees are made to its accuracy
More informationTECHNICAL INFORMATION
TECHNICAL INFORMATION SECTION 07320 TWO-PIECE TAPERED MISSION CLAY ROOFING TILE PART 1 GENERAL 1.01 SECTION INCLUDES A. Formed clay roofing tiles, complete with components and other required accessories
More informationSiding and Soffit Installation Guidelines
Siding and Soffit Installation Guidelines email web phone 07 46 16 Longboard Siding & Soffit INTRODUCTION INSTALLATION GUIDELINES NOTE: These instructions are prepared for persons experienced in the field
More information