1 Owners- How to contract for BIM and actually get what you want Birgitta Foster & Cindy Baldwin
2 Introduction Virtual Design Construction Operations Check us out at.. VDCOtech.com Owner BIM representative
3 Aligning organizational goals with BIM Deliverables OVERVIEW Keeping your Eye on the data Owners How to contract for BIM and actually get what you want Dictating platformspecific BIM Practical and achievable BIM To Do or Not to do Record Model
4 BIM Deliverables and Organizational goals Expectations Unsatisfactory experience : o Requiring BIM without defining why or how their BIM o Results unsure why they are doing BIM. Best chance at success o Business BIM Uses - Business reasons to use BIM o Not a one time savings but the ANNUALIZED savings o Contracting for the BIM you can use
5 ESTABLISH DEFINE DEVELOP CONTRACT Business BIM Uses User Requirements Deliverable Requirements Contracts Requirements 2D CD CAD Excel Geometry Data Emergency Mgt CMMS Space Mgt 3D EHS Requirements File Formats PDF Word Documents Submittals Record Commissioning report Geometry - MP Spec/LOD Spec/M3 Data - Facility Data Spec/COBie/LOD Attributes Data Schedules Naming Conventions Design Team Programming CD Package Sheet Views Equip Schedules BIM Uses Schedule File Format Software Contractor Submittals Commissioning BIM Guidelines Digital Deliverable Guide Geometry - MP Spec Facility Data Spec File Formats BIMPxP Design Team Deliverables Contractor Schedule Software Documents BIM Uses
6 Business BIM Uses BIM Deliverables and Organizational goals Start here Assessment based on 1- Current need 2- short term need 3- long term need Begin your BIM roadmap
7 BIM Deliverables and Organizational goals A pain point o is a problem, real or perceived. o creates opportunities for themselves by creating solutions. o Solutions create value for everyone. Business Value Uncover most common organizational Pain Points
8 8 Keeping your Eye on the data What data can do we need? get?
9 9 Keeping your Eye on the data KISS principal : Data we need
10 Keeping your Eye on the data Go beyond COBie with data
11 Keeping your Eye on the data EHS check : Equipment Utilities = Room Utilities Reformat the data for Owner data schedules FMS System Data set for upload Missing
12 Dictating platformspecific BIM Pros and Cons
13 September 2016 Owner ( Year released) Broward County Aviation Department - BCAD ( 2013) Design Software Construction Software 3D viewer IFC requirements Record - Design As-built - GC Neutral- Native & IFC compliant Acceptable : ArchiCAD; Bentley Ach V8i, Bentley Building, Revit Neutral- Native & IFC compliant Acceptable : ArchiCAD; Bentley Ach V8i, Bentley Building, Revit Broward Health - FLA ( 2013) Revit Revit N/A N/A DELIVERABLES YES - compliant 2x3 for Record & As built YES - IFC compliance for file transfer & Solibri checker YES_ Design -Native/IFC YES_ A/S/MEPF Models must reflect as-built geometry & Data. Native- Navisworks/IFC/RVT YES- Native and IFC YES_ A/S/MEPF Models;2D PDF; BIM-Native- Navisworks/RVT/IFC Dictating platformspecific BIM Denver Airport ( 2013) Revit Revit Navisworks/Revit N/A N/A YES_ Navisworks/Revit Record AS-built Department of Defense Military Health System - DOD-MHS ( 2011) Federal Aviation Administration- FAA (2012) Neutral- Native- IFC certified Neutral- IFC Compliant - Arch/Struct: Revit Architecture, Bentley Architecture(Triforma), Tekla MEPF Revit MEP, AutoCAD MEP, Bentley BIM Neutral- Native- IFC certified Neutral- IFC Compliant - Revit MEP, AutoCAD MEP, Bentley BIM, CAD-Duct, CAD-Pipe,AutoSprink, PipeDesigner 3D Navisworks /Navigator/ Adobe/Google earth Navisworks /Navigator/ Adobe/Google earth YES - certified 2x3 or better for Coord view for all deliverable YES - certified 2x3 or better for Coord view for all deliverable N/A N/A YES_Design & Contractor - As-built conditions and updated parameters YES -Record models Florida International Unv (2014) Revit Revit/Navisworks Navisworks Yes- at close out for record keeping and interoperability NO_ See as-built YES_ Design update Arch & Struct through construction/ Contractor MEPF Reviewed Fifteen (15) Standards University California San Francisco Medical Ctr (2015) Massport ( 2015) Revit Revit N/A Univ Southern California (USC) Design Bid Build (2012) Revit Revit Navisworks Revit Neutral- Not specified- Native Navisworks YES- IFC file may be required on some projects for model quality review at handover NO - Only when used for coordination YES -May be required- all subs have capability to save into most recent version YES_The Record Model is the Design Intent Model updated to show the as-built locations of the elements within this model and does not reflect all As Built components geometry. will contain accurate attribute data on major equipment and systems for FM. Typically updated by the Designer from information provided by the Constructor (digital mark-ups, photography, laser scans). It may be used by Commissioning YES_The As-Built Model (.nwd) is submitted to MPA by the Contractor. The As-Built Model is typically an Autodesk Navisworks file that includes shop models and drawing information from trades and fabricators with detail of the as-built conditions. This model may also include laser scan data. It is used as a detailed reference document of all as-built conditions, but is not the basis of FM. N/A YES- By Contractor Called Record for LOD 500 YES_ As Constructed YES_ As Constructed - Native USC GMP Contracts (2012) Revit Revit Navisworks/ Revit N/A YES YES_ Revit or Native USC PRevitXP (2015) Revit Revit N/A N/A YES- with shared parameters & COBie data YES_ Revit/Native(trade models) University South Florida- USF (2015) Revit Revit Navisworks N/A See as-builts YES_Construction updates by Contractor then sent to Design team for final As built -Revit/Navisworks Veterans Administration - VA - (2010) Neutral- IFC Compliant - Arch/Struct: Revit, Bentley BIM, ArchiCAD, Tekla, Vectorworks; MEPF: ArchiCAD MEP, Revit, AutoCAD MEP, Bentley BIM, Neutral- IFC Compliant - ArchiCAD MEP, Revit, AutoCAD MEP, Bentley BIM, CAD-Duct, CAD-Pipe, AutoSprink, PipeDesigner 3D N/A YES_- IFC file format of the consolidated building systems models - Coordination view YES- Native file format(s) of Design Model - YES_ Contractor Native file formats of the final Design Intent model remains current with all consolidated as-built Model(s) for building systems used approved bulletins for overall scope. It is NOT in the multi-discipline coordination process. The expected that product specific information will be Model(s) shall be fully coordinated and align with the added to this model. Design Model for architecture and structure; General Services Admin -GSA Series 8 FM (2012) United States Army Corp of Engineers- USACE ( 2012) Birgitta Foster/VDCO Tech 2016 Neutral- IFC Compliant - should create IFCs in compliance with the coordination view, spatial program validation view and COBie Neutral- IFC Compliant - should create IFCs in compliance with the coordination view, spatial program validation view and COBie N/A YES- Design Intent BIMs: Record BIMs deliverable -- not required for Construction or Coordination BIMs YES_ Native and IFC - represent the final asconstructed building and components configuration, including Architectural Supplemental Instructions, Change Notices, and field changes YES_Native and IFC, Editable copy of the Record BIM that is constantly updated to represent the current completed state of the building and systems configuration. Neutral-Revit or AECOsim Neutral-Revit or AECOsim N/A IFC coord view - archive n/a YES -Record models
14 Dictating platformspecific BIM Pros o Healthier competition no software requirements to limit the set of bidders o The team members work with their own software platforms o Do not use unfamiliar software o Or pay a third party to produce the BIMs. Cons Owners may have oless control of the final software selection orisk receiving a less desirable platform. osupport multiple software platforms odifficultly hiring experienced staff in the multiple platforms oa platform not compatible downstream applications.
15 To Do or Not to do Record Model Record vs As-Built Record should be reserved for models being provided by the designers of record. As-built is associated with contractor provided as-installed building models.
16 To Do or Not to do Record Model Wide range Record BIM ostrategies o Arch/Struct CD BIMs with Contractor MEPF models o Design intent models to incorporate as-constructed conditions o Design record models use As-built model elements with product data OWNER Example : Design Intent model remains current with all approved bulletins for overall scope. It is NOT expected that product specific information will be added to this model. oterminology mix and matching = confusing o As-built Record o Record As-built o Design As-built o Contractor Record o Contractor Record As-built
17 To Do or Not to do Record Model Contractors As-Built Deliverables omost consistent owner BIM requirement. onative common deliverable file formats. osome cases IFC and Navisworks files. ohybrid mix of BIM/3D CAD/2D CAD ofederated Models- A trend to merge into a single deliverable o limits the number of BIMs the owner ultimately stores, manages and updates
18 To Do or Not to do Record Model Design Teams Deliverable Record BIMs PROS - Provides record models of changes recorded by the Design Team - More accurate starting point for renovations - Better investment than 2D record drawing from Contactor redlines - Reuse of Contractor models to capture undocumented changes CONS - Perceived risk will come with a price tag - Hard to identify level of effort for each project - No industry-wide best practice/guidelines/standards available
19 Practical and achievable BIM Ensure practical and achievable oproven obest Practice examples oresource Model ovalidation Tools
20 Practical and achievable BIM Proven to be achievable All required tested o As acceptable for intended use by End User o Produced with existing project software o Workflows are possible and practical
21 Practical and achievable BIM Best Practice - Example Building Systems YARD SALE! Set systems with specific color When placing - wrong color = wrong system Use the software to stop before it happens
22 Practical and achievable BIM Transfer using INSERT FROM FILE Provide a Resource Model Contains Owner Specific o Data Schedules o Sheet Views o Libraries o Shared Parameters NOT A Model TEMPLATE Transfer as PROJECT INFO
23 Practical and achievable BIM Automate checking your staff doesn't have time to do thoroughly AV Equipment at required height? Building Systems Pipe material correct? System components assigned no Yard Sale! Fire dampers in all Fire walls? More control of your Data Validation Tools Data Clash detection Acceptable Manufactures? Motor voltages?
24 Practical and achievable BIM Leverage BIM deliverable software Record BIMs o Reverse Clash detection o Value-Add approach
25 Design Intent Vs As Constructed = off by more than 12 Reverse Clash Detection
26 Contractor Routing Design Intent Routing Value Add to update?? Contractor Routing Design Intent Routing CHILLED WATER LINES CHILLED WATER RISERS
27 Contractor Location VAV & Duct Design Intent Location Value Add to update?? Contractor Routing Ductwork Design Intent Routing
28 Contractor Piping Design Intent Piping Pumps Value Add to update?? Contractor Routing Ductwork Design Intent Routing
29 Record modeling o MEANS contains the same content and level of development as the Design Intent BIMs for Construction Documents. o Does NOT Mean. to contain all the construction details in the trade models.
30 Owner example Rules of thumb Design Intent Model updated when Contractor Models are either : A) Location of element* deviates o 6 or more in any space o 12 or more in any concealed spaces, mechanical spaces for MEP & other building systems. o 12 or more by any slab openings, steel members greater than 10 in depth and other major structural elements. B) Equipment* or system component* has been o Replaced by an owner-approved alternate or o Added during the construction phase of the project. *Vague= $$.. must define to what Equipment/system/component
31 ESTABLISH DEFINE DEVELOP CONTRACT Business BIM Uses User Requirements Deliverable Requirements Contracts Requirements 2D CD Geometry Data Emergency Mgt CMMS Space Mgt 3D Record EHS Requirements Geometry - MP Spec/LOD Spec/M3 Data - Facility Data Spec/COBie/LOD Attributes Data Schedules Naming Conventions BIM Guidelines Digital Deliverable Guide Geometry - MP Spec Facility Data Spec Documents Best Practices BIMPxP CAD Excel File Formats PDF Word Documents Submittals Commissioning report Design Team Programming CD Package Sheet Views Equip Schedules BIM Uses Schedule File Format Software Contractor Submittals Commissioning Contractor Design Team Deliverables Schedule Software BIM Uses
32 Owners How to contract for BIM and actually get what you want THANK YOU! Birgitta Foster Cindy Baldwin
EcoDomus, Inc
www.ecodomus.com Introduction BIM Data Requirements & Guidelines COBie: Data Entry and Responsibility Matrix COBie: Quality Control BIM and BAS Integration: Use Cases Mobile BIM and Work Orders Asset View
More informationADDENDUM TO USC BIM GUIDELINES VS.
Addendum for Negotiated Contracts BIM Guidelines NEGOTIATED CONTRACTS ADDENDUM TO USC BIM GUIDELINES VS. 1.6 ADDENDUM #1 Building Information Modeling (BIM) Guidelines V 1.6 (April 18,2012) FOR DELIVERY
More informationBIM Design & Construction Requirements Indiana University
BIM Design & Construction Requirements Indiana University AGC BIM Forum - Philadelphia October 9, 2009 www.shp.com Opening Comments Two years ago Indiana University began the process of embracing the use
More informationBIM Design & Construction Requirements. Follow-up Seminar. September 10,
BIM Design & Construction Requirements Follow-up Seminar September 10, 2009 www.indiana.edu/~uao/iubim.html Opening Comments Two years ago Indiana University began the process of embracing the use of Building
More informationThe USC School of Cinematic Arts is the oldest and largest film school in the United States. In 2006, George Lucas donated US$175 million to expand
The USC School of Cinematic Arts is the oldest and largest film school in the United States. In 2006, George Lucas donated US$175 million to expand the film school with a new 137,000 square foot facility.
More informationDeliver higher value and maximize lifecycle building performance to support VA s mission to deliver excellent medical service.
VA-BIM-Guide 1. VA s Building Information Lifecycle Vision:- Deliver higher value and maximize lifecycle building performance to support VA s mission to deliver excellent medical service. 2. Implementation:-
More information2008 Building Information Modeling AEC Statewide BIM Adoption Survey
A PRESENTATION FOR THE 2009 TEXAS COLLEGE & UNIVERSITY FACILITIES CONFERENCE BUILDING INFORMATION MODELING PER-CONFERENCE WORKSHOP SURVEY SPONSORS AIA HOUSTON BIM COMMITTEE TEXAS SOCIETY OF ARCHITECTS
More informationDelivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc.
Delivering Building Information to Owners Birgitta Foster Vice President, Facilities Integration VDCO Tech, Inc. bfoster@vdcotech.com Michael Tardif, Assoc. AIA, LEED AP Senior Partner BLCI Building Life
More informationCHAPTER 7 Building Information Modeling
CHAPTER 7 Building Information Modeling Dr Nabil Elsawalhi Associate Professor of Construction Management 1 Information and Communication Technology/ Building Information Modeling New approaches to construction
More informationUnderstanding Your Facilities Information Needs and the Potential of BIM to Your Organization
Understanding Your Facilities Information Needs and the Potential of to Your Organization Post-Occupancy Study April 2011 What is your role within the organization as it relates to facilities and facilities
More informationState of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements. Version 1.0
State of Tennessee Office of the State Architect {TN OSA) Building Information Modeling {BIM) Requirements Version 1.0 April 22, 2013 Table of Contents 1. Introduction...... 1 1.1. Mission of the TN OSA
More informationIV.E.8 - BIM Standards
Contents 1. General... 3 1.1. Strategy & Objective... 3 1.2. Road Map... 4 2. Process... 7 2.1. Start... 7 2.2. Plan... 9 2.3. Execute... 12 2.4. Monitor... 14 2.5. Close-out... 16 3. Execution... 19 3.1.
More informationDoD BIM Contract Requirements BEST PRACTICES
DoD BIM Contract Requirements BEST PRACTICES Leo Fernandez, Assoc. AIA Aerospace & Defense Production Technology Leader Hurricane Harvey Hurricane Irma Hurricane Maria Thousands Without Homes Combined
More informationDIVISION 1 GENERAL REQUIREMENTS CONSULTANT/VENDOR REQUIREMENTS BUILDING INFORMATION MODELING (BIM) REQUIREMENTS
DIVISION 1 GENERAL REQUIREMENTS CONSULTANT/VENDOR REQUIREMENTS BUILDING INFORMATION MODELING (BIM) REQUIREMENTS PART 1 - GENERAL 1.0 RELATED DOCUMENTS 1.0.1 Drawings, General Conditions of the Contract
More informationDoD BIM Contract Requirements BEST PRACTICES
DoD BIM Contract Requirements BEST PRACTICES Leo Fernandez, Assoc. AIA Aerospace & Defense Production Technology Leader Hurricane Harvey Hurricane Irma Hurricane Maria Thousands Without Homes Combined
More informationATTACHMENT 4. New Eastside Regional Park Phase 1. BIM (Building Information Modeling) 3D Design & Modeling Program Requirements
ATTACHMENT 4 New Eastside Regional Park Phase 1 BIM (Building Information Modeling) 3D Design & Modeling Program Requirements Bidders to be aware all BIM are for your information only and are not for estimating
More informationW205 BIM Best Practices December 9, 2008 Kurt D. Maldovan
W205 BIM Best Practices December 9, 2008 Kurt D. Maldovan kurt.maldovan@jacobs.com BIM in Planning: Early Design Tool Links to Cost Model/ Program BIM in Design: 35 Active Full BIM Designs All Disciplines,
More informationBIM Requirements & Asset Management. AUDREY VOORHIES, BIM COORDINATOR DENVER INTERNATIONAL AIRPORT OCTOBER 19 th, 2016
BIM Requirements & Asset Management AUDREY VOORHIES, BIM COORDINATOR DENVER INTERNATIONAL AIRPORT OCTOBER 19 th, 2016 BIM Software 4 Software Platforms Autodesk Revit Buildings and building systems Autodesk
More information2010 Bentley Systems Incorporated. FM Handover (COBie2) Aquarium
FM Handover (COBie2) Aquarium Intermediate Status March 17, 2010 Topics of Discussion About Bentley software for infrastructure design, construction and operations and global business BIM Collaboration
More informationIntroduction. Definition Benefits Applications Costs/ROI Getting Started Examples Resources
Jeffrey Gee, AIA Vice President, General Manager Swinerton Management & Consulting Introduction Definition Benefits Applications Costs/ROI Getting Started Examples Resources NASA Ames Research Facility
More informationBuilding Information Modeling to Facilities Information Management and Beyond
Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, Thomas Koltoniak, & Geoffrey Coon Carolinas HealthCare System Join the conversation #AU2016 Class summary Carolinas
More informationBIM Execution Plan. Copyright 2009 Rights Reserved - The Trustees of Indiana University and SHP
BIM Execution Plan Copyright 2009 Rights Reserved - The Trustees of Indiana University and SHP By signature below, this BIM Execution Plan is herewith adopted and incorporated into the Agreement, dated,
More informationMEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems
MEP21252 Revit Plug-in: Automated Hanger and Seismic Bracing Layout and Design for MEP Systems Alan Espinoza MMC Contractors Jake Olsen, PE DEWALT Learning Objectives Learn how Revit can be used to efficiently
More informationAll Rights Reserved 2013 Bradley Corporation
BradleyBIM.com Daniel Hughes Bradley BIM Strategist 1. Taught 700 professionals Revit (2002 - present) 2. Managed Revit Implementations for 120 Companies 3. Personally Directed $5 Billion of Revit Client
More informationHBC Owners & Industry Partners Discussion Oakland, CA February 2, 2011
HBC Owners & Industry Partners Discussion Oakland, CA February 2, 2011 Healthcare Owners Present: DoD-MHS (included PPMD and USAHFPA), Kaiser Permanente, Veterans Affairs, Sutter Health, Mayo Clinic Comments
More informationTop 50 BIM Bugs and Things to Avoid
Top 50 BIM Bugs and Things to Avoid Nicholas M Kramer HMC Architects Class Summary Whether you are new to building information modeling (BIM) or you are a seasoned BIM pro, this class is for you. BIM is
More informationBU21079 Building Information Modeling to Facilities Information Management and Beyond
BU21079 Building Information Modeling to Facilities Information Management and Beyond Meghan Ruffo, BIM Manager / Carolinas HealthCare System Thomas Koltoniak, BIM Specialist / Carolinas HealthCare System
More informationPROJECT NAME. Duke University. Architect (Specify Design Vs. AOR If Multiple) Construction Manager. Civil Engineer. Structural Engineer
PROJECT NAME By signature below, this Execution Plan is herewith adopted and incorporated into the Agreement, dated, for Professional Design Services between and Duke University. Duke University Architect
More informationBack to Where We Once Belonged FM Global s road to SlimBIM
Back to Where We Once Belonged FM Global s road to SlimBIM By Thomas A. Gay Assistant Vice President FM Global - Engineering Plan Services Past Chair Board of Direction buildingsmart alliance Vice Chair
More informationBIM: Why Create Content?
BIM: Why Create Content? Dan Rau Ruskin Company Senior Engineering Manager Tuesday 15 th May 2012 Objectives Ruskin Company Overview Review Ruskin s Experience with BIM Content Discuss Alternative Paths
More informationBIM Competency Delivers Competitive Advantages
Volume 9, Number 2 Summer 2014 The official publication of the PHCC Wisconsin Association and Master Plumbers/Heating & Cooling Contractors of Wisconsin BIM Competency Delivers Competitive Advantages INSIDE:
More informationBIM Requirements & Asset Management
BIM Requirements & Asset Management AUDREY VOORHIES, BIM COORDINATOR DENVER INTERNATIONAL AIRPORT OCTOBER 19 th, 2016 BIM Software 4 Software Platforms Autodesk Revit Buildings and building systems Autodesk
More informationOwner has determined that this project is a Major Capital Renovation project as that term is defined herein.
BUILDING INFORMATION MODELING REQUIREMENTS Owner has determined that this project is a Major Capital Renovation project as that term is defined herein. PART 1 GENERAL 1.1. RELATED DOCUMENTS 1.1.1. Attention
More informationBIM Event. Martin Huggins Senior R&D Consultant University of Wolverhampton. Black Country Constructing Excellence Club
Black Country Constructing Excellence Club BIM Event Martin Huggins Senior R&D Consultant University of Wolverhampton Why Needed? 30% of construction is rework 60% of labour effort is wasted 10% loss due
More informationINTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN
INTEGRATED LIFECYCLE MANAGEMENT BIM/VDC REQUIREMENTS IMPLEMENTATION PLAN Manual for VDC, BIM/VDC and Lifecycle Data for design and construction projects at UNC Charlotte. February 2018 Integrated Lifecycle
More informationINTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE
INTEGRATED PROJECT DELIVERY AIA / AGC JOINT COMMITTEE 03.24.09 INTRODUCTION: PRESENTERS CLYMER CEASE, AIA, LEED AP / PRINCIPAL / PEARCE BRINKLEY CEASE + LEE ARCHITECTURE SHANN RUSHING, AIA / ASSOCIATE
More informationAlberta Infrastructure. Digital Project Delivery Building Information Modelling Design-Builder Requirements
Alberta Infrastructure Digital Project Delivery Building Information Modelling Design-Builder Requirements Table of Contents Building Information Modelling Objective 2 1. BIM Manager 3 2. BIM Execution
More informationAlberta Infrastructure. Digital Project Delivery Building Information Modelling Consultant Requirements
Alberta Infrastructure Digital Project Delivery Building Information Modelling Consultant Requirements Table of Contents Building Information Modelling Objective 2 1. BIM Manager 3 2. BIM Execution Plan
More informationACEC CAD AND BIM FOR SENIOR FIRM LEADERS
ACEC CAD AND BIM FOR SENIOR FIRM LEADERS Michael DeLacey President Microdesk, Inc. mdelacey@microdesk.com Steve Zocco Business Development Microdesk, Inc. Szocco@Microdesk.com Agenda Changing Expectations
More informationBIM guide for members of the Institution of Mechanical Engineers
BIM guide for members of the Institution of Mechanical Engineers Background Autodesk has prepared this guide for members of the Institution of Mechanical Engineers to: Explain what Building Information
More informationAutodesk and the UK BIM Level 2 Mandate
Autodesk and the UK BIM Level 2 Mandate BIM Level 2 Mandate The UK Cabinet Office is in the midst of a multi-year effort to reform the way in which the UK government procures construction helping to ensure
More informationBeyond Design and Construction Advancing BIM for Post Occupancy in Healthcare
Beyond Design and Construction Advancing BIM for Post Occupancy in Healthcare Chuck Mies LEED AP, Assoc. AIA Sr. Manager, Ecosystem Business Development - AEC Division - Autodesk, Inc. Disclaimer We may
More information2012 Kristine Fallon Associates, Inc. Complete Facility Lifecycle Management
Complete Facility Lifecycle Management BIM Strategies for Owners KFA BIM Experience Consulted to Revit Technology prior to initial product release Construction phase MEP coordination > 3 million SF GSA
More informationBIM Execution Plan Template. CPG-DGN-PLN-085 Revision 0 08/08/2016
BIM Execution Plan Template CPG-DGN-PLN-085 Revision 0 08/08/2016 Contents Section Page References... 1 Acronyms and Abbreviations... 1 Capital Projects Group BIM Execution Plan Template Guide... 2 Tables
More informationBIM Uncovered. Collaborate Effectively and Deliver Better Design, Construction and Operational Models
BIM Uncovered Collaborate Effectively and Deliver Better Design, Construction and Operational Models BIM BIM History Government BIM BIM for Architects BIM for Construction BIM for Infrastructure BIM for
More informationFacilities Management
Facilities Management October 6, 2017 THIS PAGE INTENTIONALLY LEFT BLANK University of South Florida BIM Guidelines and Standards Page 2 of 30 BIM Guidelines and Standards Table of Contents SECTION 1:
More informationManagement. Igor Starkov, EcoDomus. EcoDomus, Inc. 2011
Building Lifecycle Data Management enabled by COBie and BIM Igor Starkov, EcoDomus Hyde Griffith, Broaddus & Associates About EcoDomus Software and consulting firm with headquarters in San Francisco, and
More informationBIM Checklist. Introduction
Introduction This Building Information Modeling (BIM) Checklist is intended to be used as a guide for project stakeholders who are looking to implement BIM/VDC in a design-build project. Since integration
More informationBIM in Statsbygg TWN - September 17ᵗᵸ Øivind Christoffersen Director General
BIM in Statsbygg TWN - September 17ᵗᵸ 2012 Øivind Christoffersen Director General Agenda BIM Statement National and international cooperation Impacting the market Open BIM (IFC) as a standard information
More information20/02/2016. The BIM Hub. A trusted environment for BIM professionals. Why BIM? Why BIM? We need a more Sustainable Model of Building Procurement
BENEFIT 20/02/2016 The BIM Hub A trusted environment for BIM professionals The I in BIM Why BIM? What is BIM? Benefits of BIM? BIM for Product Manufacturers thebimhub and Cadenas Why BIM? We need a more
More informationSaurabh Gangwar 2018 Project Management Symposium
Name UMD Project Management Symposium May 10-11, 2018 Slide 1 FROM PEOPLE MANAGEMENT TO INFORMATION MANAGEMENT Impact of technology on project management in the design and construction industry Saurabh
More informationBIM and the Consultant / Client s Quantity Surveyor
BIM and the Consultant / Client s Quantity Surveyor Mark McKane MRICS, MSc, PGCF&HEd Lecturer in Quantity Surveying School of the Built Environment BSc (Hons) Quantity Surveying & Commercial Management
More informationFIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF
ARCHITECTURE & BUILDING ENGINEERING AEC COLLECTION EBOOK FIVE WAYS YOUR MOVE TO A BIM WORKFLOW PAYS OFF Get started > 01 02 03 04 05 DELIVER HIGHER- QUALITY WORK OPERATE MORE EFFICIENTLY EXPAND YOUR BILLABLE
More informationVIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Airport Construction Strategy Summit. Special Thanks To:
VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION 2016 Special Thanks To: VIRTUAL DESIGN & CONSTRUCTION, THE NEXT LEVEL OF COLLABORATION AND INTEGRATION Overview Moderator:
More informationTechnion Graduate BIM Course
Technion Graduate BIM Course Advanced Building Information Modeling for Students of Architecture, Engineering and Construction 019627 for CEE Students 209XXX for Arch students Goals and Outline Design
More informationVDC Plan of Work. Develop a plan to implement people, process and technology
Hensel Phelps Employee-Owned 8 Districts Markets Aviation Commercial Development Education Healthcare Hospitality Justice Mission Critical Public Renewable Energy Facility Life Solutions Diverse project
More informationPromoting better business outcomes through the use of BIM and digital technologies.
Promoting better business outcomes through the use of BIM and digital technologies. Introduction The Role of the BIM Manager Agenda 18:00 Introduction + BIM update by Mike Turpin, Innovating Futures 18:10
More informationBIM TECHNOLOGY THE IMPACT ON THE PLANNING AND UTILIZATION PHASE HDR TMK, all rights reserved.
BIM TECHNOLOGY THE IMPACT ON THE PLANNING AND UTILIZATION PHASE 2014 HDR TMK, all rights reserved. Since 2008 Vorstandsbereichsleitung Infrastructure, Technique and Services kbo Kliniken des Bezirks Oberbayern,
More informationBIM Support for the Construction Project from a Suppliers POV
CS10324 BIM Support for the Construction Project from a Suppliers POV Dr. Nils Krönert Hilti AG, Schaan, Liechtenstein Connor Christian Lead Designer, Kiewit Learning Objectives The possibilities of project
More informationIndiana University. Vice President for Capital Planning and Facilities
Indiana University Vice President for Capital Planning and Facilities DELIVERABLES REQUIREMENTS for CONSTRUCTION DOCUMENTS and AS-BUILT & RECORD DOCUMENTS Revised June 1, 2014 1 Overview of Project Document
More informationBUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm. Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction
BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction Omicron AEC + Architecture, Engineering, & Construction
More information- DATA REQUIREMENTS BIM
UHS BIM Protocol S E C T I O N 1 - DATA REQUIREMENTS BIM authoring software: The design team is required to use parametric BIM authoring software for creation of models that include all geometry, physical
More informationWhite Paper Microsoft SharePoint for Engineering Document Management and Control
www.cadac.com White Paper Microsoft SharePoint for Engineering Document Management and Control Microsoft SharePoint is a powerful platform for document management and project collaboration. Many project-driven
More information1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL
1.1 IT Requirement of Employer - MMRCL Digital Project management platform to be used for PMRCL 1.1.1 Employer s Enterprise wide IT system i.e. Digital Project Management Platform will be the working environment
More informationBIM M Masonry Wall Project and Revit Guide BIM FOR MASONRY MISSION STATEMENT
BIM M Masonry Wall Project and Revit Guide November 13, 2015 BIM FOR MASONRY Jamie L. Davis, PE, LEED AP BIM-M Initiative MUD LOD for Masonry Modeling Limitations The Guide Contractors/ Downstream Use
More informationG U I D E T O P LANNING. Should I use BIM on my project? BIM DECISION MATRIX. A standardized framework including: Helps Harvard stakeholders
G U I D E T O BIM E XECUTION P LANNING YOU ARE HERE The BIM Execution Plan Template and accompanying Guide to BIM Execution Planning are the last elements in Harvard s Getting Started with Building Information
More informationCS21793 Transition to Operations with Building Ops: The (Eye) in BIM
CS21793 Transition to Operations with Building Ops: The (Eye) in BIM Mark Mergenschroer Bernhard TME Learning Objectives Learn how to track maintenance data before taking ownership Learn how to increase
More informationBIM for Contractors: Kickin It Off the Right Way
BIM for Contractors: Kickin It Off the Right Way David Epps Manager Building Information Modeling Holder Construction Company John Mack VDC / BIM Dept. Manager Herrero Contractors, Inc. John Mack VDC /
More informationThe Special: Upgrading PlantSpace
The Special: Upgrading PlantSpace 85 PlantSpace P&ID to OpenPlant PowerPID Available Since August 2009 in SELECTseries 1 86 Value Proposition For Migration of PlantSpace P&ID to OpenPlant PowerPID Data
More informationBIM Management Training Course One Day Course on the fundamentals of BIM Management. ciobacademy.org
BIM Management Training Course One Day Course on the fundamentals of BIM Management ciobacademy.org Agenda The importance of BIM? What is BIM Management? Tasks and Daily Activities for BIM Management Summary
More informationCLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Wednesday 24 th September Cardiff
CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Wednesday 24 th September Cardiff Welcome Ed Evans Director of Exemplar and Demonstration Programme Agenda CLAW/CEW BIM
More informationCLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Monday 22nd September 2014 Swansea
CLAW/CEW BIM Toolkit for Clients Client Training and Supplier Awareness Sessions Monday 22nd September 2014 Swansea Welcome Ed Evans Director of Exemplar and Demonstration Programme Agenda CLAW/CEW BIM
More information10 BIM for FM Deliverables in 20 Minutes
10 BIM for FM Deliverables in 20 Minutes 10 BIM for FM Deliverables 20 Minutes brian.krause@clarkconstruction.com ava.norton@clarkconstruction.com @bkrausevt Objectives Understand Different BIM-FM Deliverables
More information1. PROJECT BIM BRIEF BIM 1.1 GENERAL. Cross references. 1.2 Application of this Project BIM Brief. 1.3 BIM Project Team
1. PROJECT BIM BRIEF 1.1 GENERAL Cross references NATSPEC National BIM Guide v NATSPEC BIM Reference Schedule v NATSPEC BIM Scheduling Guidelines BIM FORUM Level of Development Specification 2013 DEPARTMENT
More informationBIM Standard and Specifications for San Mateo County. Project Development Unit
BIM Standard and Specifications for San Mateo County Project Development Unit Table of Contents A. INTRODUCTION AND GENERAL REQUIREMENTS... 2 B. DEFINITIONS, TERMS, AND DESCRIPTIONS... 3 C. BIM KICK OFF
More informationPandya Paragkumar U Civil Engineering Graduate Student Lamar University
BUILDING INFORMATION MODELING AND SUSTAINABILITY Pandya Paragkumar U Civil Engineering Graduate Student Lamar University Dr.Enno Ed Koehn, P.E., F.ASCE Professor, Civil Engineering Department Lamar University
More informationThe benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM
Page 1 of 5 The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM By Rick Oehmcke, S.E. Not that many years ago, few structural engineers
More informationOverview of the BIM Execution Plan... 1
BIM Execution Plan A guide to using industry standards, best practices and data exchange procedures in order to successfully coordinate and collaborate with other cross disciplines using BIM. Contents
More informationBIM MANAGER TRAINING AGENDA
The GRAPHISOFT Certified BIM Manager Training Program provides professional BIM Manager skills highlighting the typical challenges and tasks involved with this role. BIM MANAGER TRAINING AGENDA GRAPHISOFT
More informationThe BIM implementation in Hong Kong s construction industry by CIC is taking both:
Construction in the 21st Century Building design, construction and maintenance sector could be conceived as... Cavemen wielding ipads! image source = caveman Hong Kong Approach The BIM implementation in
More informationAutodesk MEP Engineering Solutions. Engineer for energy efficiency.
Autodesk MEP Engineering Solutions Engineer for energy efficiency. Deliver Sustainable Building Systems More Quickly and Economically Autodesk MEP Engineering Solutions help MEP engineers, designers, and
More informationVirtual Design Engineering. An introduction to our BIM Strategy
Virtual Design Engineering An introduction to our BIM Strategy Executive Statement Virtual Design Engineering The services we deliver to our customers Virtual Design Engineering are committed to the implementation
More informationTHEME: Enabling Tomorrow s Connected Infrastructure
1 2 November 2018 Novotel Amsterdam City, The Netherlands THEME: Enabling Tomorrow s Connected Infrastructure Mieczyslaw (Mitch) Boryslawki Co-Founder Executive Director EcoDomus While building information
More informationLEVELS OF BIM COMPLIANCE FOR MODEL HANDOVER
www.itcon.org - Journal of Information Technology in Construction - ISSN 1874-4753 LEVELS OF BIM COMPLIANCE FOR MODEL HANDOVER SUBMITTED: March 2018 REVISED: September 2018 PUBLISHED: November 2018 at
More informationBenefits of Employing BIM on Unique Designs: Art Gallery of Alberta. Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011
Benefits of Employing BIM on Unique Designs: Art Gallery of Alberta Bob Walker Ledcor Construction Limited Edmonton, Alberta May 2011 The Evolution of the new Art Gallery of Alberta Ledcor Construction
More informationAUGUST 1, 2017 VA BIM STANDARD BIM MANUAL V2.2
AUGUST 1, 2017 IM VA BIM STANDARD BIM MANUAL V2.2 Table of Contents 1. GENERAL INFORMATION... 1 1.1. VA BUILDING INFORMATION LIFECYCLE VISION... 1 1.1.1. Purpose... 1 1.1.2. VA Objectives for BIM use...
More informationBIM V.1 Tables A1
APPENDIX FORMS: Note: All forms to be completed by project Architect/Engineer in conjunction with Illinois State University. APPENDIX B1: PROJECT INFORMATION 1. Owner: Illinois State University 2. Name:
More information(BIM) Guidelines version 1.6
Table of Contents University of Southern California Building Information Modeling (BIM) Guidelines Building Information Modeling (BIM) Guidelines version 1.6 For Design Bid Build Contracts USC Capital
More informationBIM for FM Opportunities: Overcoming Challenges and Sharing Lessons Learned
BIM for FM Opportunities: Overcoming Challenges and Sharing Lessons Learned Angela Lewis 1, P.E., PhD, LEED AP; Deke Smith 2, FAIA, Jim Whittaker 1, CFM, P.E. 1 Facility Engineering Associates, 2 buildingsmart
More informationCRC-CI Project EP National BIM Guidelines and Case Studies
CRC-CI Project 2007-002-EP National BIM Guidelines and Case Studies Tom Fussell - Team Leader Executive Director and Chief Architect, QLD Department of Public Works Scott Beazley - Project Manager BIM
More informationBuilding Information Modeling (BIM) Execution Plan
10/19/2017 for [Stanford Project Name] [Stanford Project Number] Developed by [Primary A/E] TABLE OF CONTENTS USE OF THE BIM EXECUTION PLAN... 3 1. PROJECT INFORMATION... 3 2. PROJECT SCHEDULE AND MILESTONES...
More informationBIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE]
BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] DEVELOPED BY [AUTHOR COMPANY] SECTION A. BIM PROJECT EXECUTION PLAN OVERVIEW... 1 SECTION B. PROJECT REFERENCE INFORMATION... 2 SECTION C. KEY PROJECT CONTACTS...
More informationOctober 17-19, 2016 ATLANTA, GEORGIA. Coordination. Closing the Loop Between Design and Construction
October 17-19, 2016 ATLANTA, GEORGIA Coordination Closing the Loop Between Design and Construction COORDINATION Closing the Loop Between Design and Construction October 19, 2016 COORDINATION October 19,
More informationHYBRID COLLABORATIVE DELIVERY TEAM/ INTEGRATED PROJECT DELIVERY DOCUMENTS SUBMITTAL PROCESS
HYBRID COLLABORATIVE DELIVERY TEAM/ INTEGRATED PROJECT DELIVERY DOCUMENTS SUBMITTAL PROCESS HOW THE SYSTEM WORKS General Description...3 Definitions...3 Background of the Hybrid Collaborative Delivery
More information6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)
Building Information Modeling Overview Pirtle s History with Building Information Modeling (BIM) 1 Pirtle & BIM Pirtle & BIM Pirtle delivers first As-Build Model to FAU and UF Pirtle delivers 4D model
More information6 BIM FAILURES. The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak!
6 BIM FAILURES The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak! To meet the owner s performance requirements and complete the project
More informationBIM education at VIA UC & Development of on-line courses in Denmark and Spain 4D BIM for CM education
Gør tanke til handling VIA University College BIM education at VIA UC & Development of on-line courses in Denmark and Spain 4D BIM for CM education 22. juli 2015 BIM STATE of the ART Waves of Innovation
More information