Road rehabilitation in the Normandy operating block, Caribou Forest. Brad Sutherland Senior Researcher

Size: px
Start display at page:

Download "Road rehabilitation in the Normandy operating block, Caribou Forest. Brad Sutherland Senior Researcher"

Transcription

1 Field Note March 2011 Road rehabilitation in the Normandy operating block, Caribou Forest Site Brad Sutherland Senior Researcher In July 2010, FPInnovations visited a road rehabilitation site northeast of Sioux Lookout, Ontario, in the Caribou Forest. The area is operated by AbitibiBowater Inc. Disc trenching and regeneration of roads conducted in the northern portion of the Normandy operating block in 2005 and the southern portion in 2010 were investigated. Objective Roads in the northern portion of the Normandy operating block were decommissioned by permanently blocking vehicle access in 2005 through the removal of water crossing structures and with an excavated berm at the block entrance. In addition, road surfaces were disc trenched to facilitate regeneration, and seeded or planted to jack pine to rehabilitate to forest conditions similar to that of the adjacent regenerated cutblock. Remaining roads in the southern portion of the Normandy block were disc trenched in July 2010 and will be regenerated to jack pine in Road decommissioning was conducted to meet tourism requirements while the regeneration of road surfaces addressed caribou management guidelines. The objective of FPInnovations visit was to document current practices of road decommissioning activities in Ontario. Details of the operations In July 2010, road surfaces were disc trenched using two TTS-35 passive disc trenchers mounted on John Deere 748 and Timberjack 660 skidders. The operating technique was to travel one way down the road in a zigzag path, and then return, crossing over the original path, resulting in a double-helix final pattern (Figure 1). Treated roads that are easily accessible will be planted to pine in 2011, while more remote portions of the block will be aerially seeded. Figure 1. Site preparation of main road with a disc trencher using a double-helix pattern. In 2005, roads in the northern portion were disc trenched using the same equipment and zigzag pattern as observed in As the treatment was exploratory, a portion of the treated roads was aerially seeded to jack pine (Figure 2) and the other portion was planted with jack pine container stock (Figure 3). Productivity Disc trencher productivity on block roads was approximately 600 m of road per hour to produce the double-helix pattern. 1

2 Observations and comments Depth of disc trencher furrows was variable and appeared deepest on branch roads (approximately 10 to 20 cm deep) where there was no additional aggregate added to the sandy parent soil. On main roads where a built-up aggregate base course was evident and the level of road traffic higher, furrow depth was shallower (approximately 5 to 10 cm deep) even though the contractor indicated that both trenchers were used on main roads in an effort to penetrate the compacted road surface. Each trencher produced a double-helix pattern. The contractor responsible for the disc trenching felt that any towed implement such as a passive or powered disc trencher cannot achieve adequate disc penetration on high-traffic main roads with compacted aggregate base-course layers. In addition, the equipment is subject to greater wear and tear on skidder tire chains, trencher disc bearings, and teeth than would be expected from use on low-traffic branch roads where little or no gravel has been applied. In a case study of landing rehabilitation in central British Columbia, disc penetration depth averaged 30 cm using a powered disc trencher following double passing over the same furrow (Sutherland 2000). Soils in this study did not have an aggregate surface applied but were highly prone to compaction due to the presence of finer textured silt and clay particles. Figure 2. Pine regeneration showing variable results four years after seeding of disctrenched main roads. Regarding the relative success of planting versus seeding, the stocking to pine on branch roads that were disc trenched and planted in 2005 appeared noticeably higher and more consistent in 2010 than with seeding on the main roads. With less compaction and built-up aggregate layers than on main roads, Figure 3. Pine regeneration four years after container branch roads can offer a more favorable microsite for regeneration. In addition, planting of disc-trenched other variables can affect seed germination and survival in any given year. branch roads. Therefore, relative comparisons of success between the two alternatives for regeneration of rehabilitated roads can be difficult to make. In choosing between the option to plant or seed decommissioned roads, access to road systems that are closed and have water crossings removed can present an obstacle to planting crews thus making aerial seeding a more attractive and less costly alternative. Road surfaces are a harsh environment for seedling establishment, so any treatments that can improve microsite quality such as tilling or the addition of organic material prior to seeding should improve the success of regeneration efforts. References Sutherland, B Comparison of five treatments used to rehabilitate compacted landings. For. Eng. Res. Inst. Can. (FERIC), Vancouver, BC. Advantage 1 (16) 12 p. Contact: brad.sutherland@fpinnovations.ca FPInnovations would like to thank the Ontario Ministry of Northern Development, Mines and Forestry for providing funding support for these field visits and AbitibiBowater Inc. for their cooperation in providing background information for this Field Note. 2

3 Field Note March 2011 Site Road rehabilitation on Wind Road, Lac Seul Forest Brad Sutherland Senior Researcher In July 2010, FPInnovations visited a road rehabilitation site north of Sioux Lookout, Ontario, near Upper Wapesi Lake in the Lac Seul Forest. The area is under a Sustainable Forestry Licence to McKenzie Forest Products Inc. of Hudson. Ripping of branch roads and recontouring of gravel pit activities were investigated. Objective Upper Wapesi Lake is a remote tourist outfitter lake where the current forest management plan for the area requires that roads within a buffer zone surrounding the lake be decommissioned to prevent vehicle access. Roads immediately adjacent to the lake would be rehabilitated to forest conditions similar to that of the adjacent cutblock. In addition, drainage structures along Wind Road were removed to meet caribou management guidelines and gravel pits were recontoured and cutbank edges removed to meet safety requirements and improve aesthetics. The objective of FPInnovations visit was to document current practices of road decommissioning and rehabilitation activities in Ontario. Details of the operations Approximately 10 km of branch roads were ripped using a single standard ripper tooth on a Caterpillar D8N crawler tractor (Figure 1). The operating technique was to rip to a depth of approximately 1 m down one side of a block road and return on the opposite side (Figure 2). Aerial seeding of jack pine would be conducted on the ripped roads the following spring. Figure 1. Standard ripper used for 2-pass road ripping. 1

4 Figure 2. Branch road treated with two passes of a ripper tooth. Gravel pits in the area were recontoured using a crawler tractor and blade to remove over-steepened banks and achieve a more natural angle of repose. A Caterpillar 330 CL excavator with standard bucket was used along pit edges to minimize disturbance of pine regeneration. Productivity Ripper tooth productivity was approximately 750 m of road per hour on branch roads using a double pass. Observations and comments The goal of the ripping treatment was to decompact roads and produce a roughened surface. Ripping to a depth of 1 m will fracture the road surface and substrate thereby improving infiltration and allow easier root penetration from regenerating seedlings. On the cohesive soils (sandy clay) observed on the branch roads, ripping produced a pronounced berm. This raised and roughened surface provides shade that will enhance the microclimate for vegetation growth. It is expected that ripping in sandy soils without the clay fines present may not result in the same degree of disturbance. This is a consideration if one of the goals of ripping is to prevent vehicle access. In terms of adequate machine size needed for ripping, the operator indicated that in these heavier soils, the D8 was lugging in 1 st gear using the single ripper tooth at full depth. Multiple ripper teeth may be considered to improve the efficiency of ripping operations, but horsepower requirements to achieve the desired depth and degree of disturbance will dictate the minimum prime mover size category required. A case study of road rehabilitation of forest roads in Alberta and Saskatchewan highlights examples of several different ripper tooth configurations (Sutherland and Gillies 2001). References Sutherland, B.; Gillies, C Rehabilitation of temporary forest roads in Alberta and Saskatchewan. For. Eng. Res. Inst. Can. (FERIC), Vancouver, BC. Advantage 2 (6) 11 p. Contact: brad.sutherland@fpinnovations.ca FPInnovations would like to thank the Ontario Ministry of Northern Development, Mines and Forestry for providing funding support for these field visits and McKenzie Forest Products Inc. for their cooperation in providing background information for this Field Note. 2

5 Field Note March 2011 Road decommissioning and rehabilitation near Jorick Lake, Lac Seul Forest Location Brad Sutherland Senior Researcher In July 2010, FPInnovations visited a road decommissioning/rehabilitation site approximately 40 km southeast of Sioux Lookout, Ontario, near Jorick Lake in the Lac Seul Forest. The area is under a Sustainable Forestry Licence to McKenzie Forest Products Inc. of Hudson. Excavation for road closure and brush raking, as well as rehabilitation of branch roads were investigated. Objective Jorick Lake is a remote tourist operator lake where the current forest management plan for the area requires that road access within a buffer zone surrounding the lake be decommissioned to prevent vehicle access. Roads immediately adjacent to the lake would be rehabilitated to forest conditions similar to that of the adjacent cutblock. The objective of FPInnovations visit was to view the state of the rehabilitated roads four years after treatment. Details of the operations Block road surfaces in the buffer zone were bladed to a maximum depth of approximately 60 cm with a brush rake mounted on a Caterpillar D8 crawler tractor in December 2005 followed by helicopter seeding to jack pine in March 2006 (Figures 1 and 2). Figure 1. Road screefing with a brush rake (Photo courtesy of McKenzie Forest Products Inc.). Figure 2. Pine regeneration on brush-raked roads four years after aerial seeding. Road closure to the area was completed in October 2006 using a Caterpillar 330 excavator with a standard bucket and live thumb. Two operating patterns were employed. On road surfaces within the buffer zone, a 1

6 five-of-dice pattern (four scoops outlining a square plus one scoop in the middle) was repeated along the road surface (Figure 3). At the entrance to the block, a culvert water crossing was removed and the operating pattern was switched to a series of cross-berms on the road approach to the crossing. Logging debris including stumps from roadside slash piles was included in the berms of all excavated surfaces. Productivity Figure 3. Road decommissioning with an excavator using a five-of-dice pattern. Scarification of road surfaces with the brush blade consisted of two passes (out and back) to achieve complete coverage. Productivity was estimated at 1000 m of road per hour. Excavation of the road using the full depth of the excavator bucket and the five-of-dice pattern resulted in a productivity of 500 m of road per hour. Observations and comments The decommissioning of roads with a brush rake was exploratory in this case study. Brush rakes are typically designed to pile brush on the ground surface and lightly scarify surface organic layers for pine regeneration. According to company staff, decommissioning packed road surfaces proved challenging with a brush rake. A more robust design and possibly different tooth configuration may have improved the suitability of this implement for the task. Rather than undertake such modifications, the company has opted to conduct road decommissioning with either an excavator, a disc trencher, or crawler tractor mounted ripper tooth. Excavator berms and scoops proved to be an effective barrier to vehicle entry into the block as there was no sign of vehicle travel four years after treatment. Further, after four years of settling, the hummocky surface still presented a major deterrent even to foot travel. Immediately following the excavation treatment, it was felt that the treatment depth and spacing was probably excessive and that a shallower depth and wider spacing of excavated berms and scoops would prove adequate as a barrier. Reducing the intensity of the treatment in this manner should reduce costs through increased machine productivity. Identifying the minimum effort or intensity of road decommissioning required to prevent access is a case-specific challenge that can involve a number of factors. Contact: brad.sutherland@fpinnovations.ca FPInnovations would like to thank the Ontario Ministry of Northern Development, Mines and Forestry for providing funding support for these field visits and McKenzie Forest Products Inc. for their cooperation in providing background information for this Field Note. 2

7 Field Note April, 2012 Site Removal of water crossing structures on the Wind road, Lac Seul Forest Brad Sutherland Senior Researcher In July 2010, FPInnovations visited a road decommissionning site north of Sioux Lookout Ontario near Upper Wapisi Lake in the Lac Seul Forest. The area is under a Sustainable Forestry Licence to McKenzie Forest Products Inc. of Hudson. Culvert and bridge removal and stabilization against erosion and sedimentation activities were investigated. Objective Upper Wapesi Lake is a remote tourist outfitter lake where the current forest management plan for the area requires that roads within a buffer zone surrounding the lake be decommissioned to prevent vehicle access. As part of rehabilitation measures to meet caribou management guidelines, drainage structures were removed along Wind road to block access to the area. These locations were then stabilized to reestablish natural drainage patterns and minimize erosion and sedimentation to water courses. The objective of FPInnovations visit was to document current practices of road decommissioning and rehabilitation activities in Ontario. Details of the operations Culvert removal included back spreading of fills onto the road surface on either side of the crossing using a Caterpillar 330 CL excavator with a standard bucket and live thumb. Woody debris from nearby slash piles were spread along stream banks for erosion control, and newly disturbed soil surfaces were hand seeded with turf lawn seed mix (Figure 1). Where road approaches were sloped down towards decommissioned crossings, water bars were constructed using an excavator to divert road surface runoff onto the adjacent forest floor for filtering of sediments (Figure 2). Removal of the temporary bridge involved lifting decking panels and carefully sliding stringers off of cribbing using an excavator (Figures 3). Cribbing was left intact to maintain the stability of stream banks (Figure 4). Exposed soils around cribbing were seeded and water bars constructed on crossing approaches. At the beginning of the road system, a berm was constructed to block vehicle access just before the first decommissioned water crossing. Figure 1. Water crossing with rock and woody debris armouring following culvert removal. 1

8 Figure 2. Water bars constructed on approach to newly removed culvert crossing. Productivity Figure 3. Removal of deck panels from a 12 m span bridge. Figure 4. Cribbing left intact to stabilize banks following removal of decking and stringers. The 12 m span bridge removal observed during the site visit required 135 minutes and included removal of four deck sections and stringers using the excavator, cables and chains, loading of these components onto a flatbed, hand seeding one approach, and constructing one water bar. I-beam stringers were held in position at each end on the sill plates of the support cribbing using rebar rods embedded in the sill plate. Prior to sliding the I-beam structure off of the cribbing, the four rebar attach points were cut to facilitate stringer removal without disturbing crib structures. Cutting was done manually with a hack saw and required 60 out of the total of 135 minutes. The site foreman estimates that typical removal times for decommissioning a crossing with a 12 m bridge is approximately 1.5 hours. Decommissioning a culvert crossing requires approximately 1 hour for culverts up to 1500 mm diameter and approximately 2 hours for culverts between 1500 and 2000 mm diameter. Observations and comments The excavator operator indicated that a 330 size-class machine was required for this type of work to offer the counter weight needed to handle bridge stringers and the reach height necessary to load stringers onto the flatbed. Using temporary bridge structures is more cost-effective than dismantling a permanent structure while leaving the cribs in place. Water bars are an inexpensive solution to block access and redirect water flow and could be built at multiple locations on the approaches to a water course, especially on long grades. Contact: brad.sutherland@fpinnovations.ca FPInnovations would like to thank the Ontario Ministry of Northern Development, Mines and Forestry for providing funding support for these field visits and McKenzie Forest Products Inc. for their cooperation in providing background information for this Field Note. 2

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group

Best Practices for Building High-Performance Resource Roads. Road Drainage. Developed by: The Roads and Infrastructure Group Best Practices for Building High-Performance Resource Roads Road Drainage Developed by: The Roads and Infrastructure Group THIS GUIDE IS INTENDED FOR EQUIPMENT OPERATORS CONSTRUCTION CONTRACTORS FIELD

More information

Mechanical Site Preparation

Mechanical Site Preparation Mechanical Site Preparation 1 Mechanical Site Preparation Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...5 Design Outcomes To Maintain Soil Productivity...6 Planning...7 Planning

More information

Fire Management CONTENTS. The Benefits of Guidelines...3 Considerations...4

Fire Management CONTENTS. The Benefits of Guidelines...3 Considerations...4 Fire Management CONTENTS Fire Management 1 Introduction...3 The Benefits of Guidelines...3 Considerations...4 Planning...5 Burn Plan Development...5 Operational Activities...8 Pre-Ignition Activities...8

More information

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013

Flood Hazard Assessment Report Falls Gulch, Larimer County, Colorado January 16, 2013 United States Department of Agriculture Natural Resources Conservation Service Denver Federal Center Building 56, Room 2604 P.O. Box 25426 Denver, CO 80225 720-544-2818-OFFICE alton.albin@co.usda.gov Flood

More information

Site Preparation: The First Step to Regeneration

Site Preparation: The First Step to Regeneration Site Preparation: The First Step to Regeneration People have been clearing land for agricultural purposes for centuries. They recognized early that weeds, brush, and stones had to be removed if crops were

More information

Lac Seul Forest Independent Forest Audit. Management Unit Action Plan

Lac Seul Forest Independent Forest Audit. Management Unit Action Plan Lac Seul Forest 2006-2011 Independent Forest Audit Management Unit Action Plan INTRODUCTION In September 2011 an Independent Forest Audit (IFA) was conducted on the Lac Seul Forest for the period April

More information

Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service

Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service Forest Management Nancy L. Young, Forester USAID/USDA Natural Resources Conservation Service Material translated by: Mohammadullah Karimi, Training & Liaison Officer Afghan Conservation Corps Managing

More information

Power Rakes by Harley and FFC. Mount to compact tool carriers, skid steer loaders and tractors. There is also a self-propelled, walk behind version.

Power Rakes by Harley and FFC. Mount to compact tool carriers, skid steer loaders and tractors. There is also a self-propelled, walk behind version. POWER RAKES POWER RAKES FFC and Harley Power Rakes, by Paladin, are the perfect choice for preparing seedbeds, cutting grades, grading dirt or gravel roads, and cleaning up and finish grading residential

More information

Forest Recreation Management

Forest Recreation Management Forest Recreation Management 1 Forest Recreation Management Introduction...3 CONTENTS The Benefits of Guidelines...3 Considerations...4 Planning...5 Construction of Recreation Areas...6 Protecting Cultural

More information

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

W. Goodrich Jones State Forest. Best Management Practices Virtual Demonstration Tour

W. Goodrich Jones State Forest. Best Management Practices Virtual Demonstration Tour W. Goodrich Jones State Forest Best Management Practices Demonstrations of commonly implemented Texas Forestry BMPs for Water Quality Protection Texas Forest Service Water Resources P.O. Box 310 Lufkin,

More information

Grassed Waterway Improvement and Gully Restoration

Grassed Waterway Improvement and Gully Restoration Revised April 2007 Agdex 573-5 Grassed Waterway Improvement and Gully Restoration Each year, tonnes of topsoil are eroded from localized areas on some Alberta farms. This loss is serious for several reasons:

More information

The Good, The Bad, and The Ugly

The Good, The Bad, and The Ugly Overview The Good, The Bad, and The Ugly Stormwater Regulations for the Construction Industry Seminar March 20, 2012 Wendy Terlizzi Arizona Department of Transportation Office of Environmental Services

More information

Diversion Dikes. Fe=0.95

Diversion Dikes. Fe=0.95 2.2 Diversion Dike Erosion Control Description: A diversion dike is a compacted soil mound, which redirects runoff to a desired location. The dike is typically stabilized with natural grass for low velocities

More information

Best Management Practice (BMP) Guidance Manual

Best Management Practice (BMP) Guidance Manual Best Management Practice (BMP) Guidance Manual INTRODUCTION BMP examples in this guide provide ways to meet erosion and sediment control requirements. Best Management Practices are not limited to these

More information

Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned. Engineering from Site Approval through Construction

Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned. Engineering from Site Approval through Construction Solar Facilities on Landfills Engineering, Permitting, Construction, and Lessons Learned Engineering from Site Approval through Construction Presented By: Mr. Duane C. Himes Team Leader Solid Waste Group

More information

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS The objective of these specifications is to provide the construction requirements for haul roads and

More information

Modular Sediment Barriers (Instream)

Modular Sediment Barriers (Instream) Modular Sediment Barriers (Instream) INSTREAM PRACTICES Flow Control No Channel Flow Dry Channels Erosion Control Low Channel Flows Shallow Water Sediment Control High Channel Flows Deep Water Symbol Photo

More information

GRAYBACK THINNING KV PROJECT ROAD REHABILITATION AND SEDIMENT CONTROL

GRAYBACK THINNING KV PROJECT ROAD REHABILITATION AND SEDIMENT CONTROL Maureen Joplin, Hydrologist June 25, 2009 Background GRAYBACK THINNING KV PROJECT ROAD REHABILITATION AND SEDIMENT CONTROL Thinning and fuels reduction activities were completed in a managed stand located

More information

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED

FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED FISH HABITAT RESTORATION DESIGNS FOR CAVE CREEK, WITHIN THE NAHWITTI RIVER WATERSHED Prepared for: Tom Cole, RPF Richmond Plywood Corporation 13911 Vulcan Way Richmond, B.C. V6V 1K7 March 2004 Prepared

More information

DEVELOPMENT AND TESTING OF PORTABLE GLULAM TIMBER BRIDGE SYSTEMS

DEVELOPMENT AND TESTING OF PORTABLE GLULAM TIMBER BRIDGE SYSTEMS DEVELOPMENT AND TESTING OF PORTABLE GLULAM TIMBER BRIDGE SYSTEMS Steven E. Taylor Associate Professor Biosystems Engineering Department Auburn University, AL 36849-5417 334-844-3534 (Voice) 334-844-3530

More information

NOVEMBER 2016 GRANDWALL. retaining walls installation guide

NOVEMBER 2016 GRANDWALL. retaining walls installation guide NOVEMBER 2016 GRANDWALL retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry Grandwall retaining wall blocks are an ideal choice for retaining

More information

2.1 Backfill - General

2.1 Backfill - General 2.1 Backfill - General Excavations are made for the purpose of constructing bridge substructure elements, and consequently requiring competent backfill material. The backfill material must be adequately

More information

Kicking Horse Cantilever Structure. Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd.

Kicking Horse Cantilever Structure. Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd. Kicking Horse Cantilever Structure Bruce Hamersley, P.Eng., Klohn Crippen Berger Ltd. Keith Mitchell, P.Eng., Klohn Crippen Berger Ltd. Brian Borton, P. Eng., Klohn Crippen Berger Ltd. Paper prepared for

More information

E. STORMWATER MANAGEMENT

E. STORMWATER MANAGEMENT E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson

More information

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields 4.1-d SUBSURFACE INFILTRATION SYSTEM Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields BMP DESIGN APPROACH Pollutant Source Control Hydrologic Source Control Stormwater

More information

NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012

NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012 NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012 CONSTRUCTING A TEMPORARY ACCESS ROAD ACROSS AN ATLANTIC WHITE CEDAR ORGANIC BOG FOR THE PURPOSE OF MINING GRAVEL TEMPORARY BOG CROSSING

More information

Examining Reforestation Practices

Examining Reforestation Practices Lesson B3 6 Examining Reforestation Practices Unit B. Plant Wildlife Management Problem Area 3. Forest Management Lesson 6. Examining Reforestation Practices New Mexico Content Standard: Pathway Strand:

More information

Hydraulic Excavators

Hydraulic Excavators Chapter 8 Hydraulic Excavators Hydraulic excavators are designed to excavate below the ground surface on which the machine rests. These machines have good mobility and are excellent for general-purpose

More information

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL 901.1 DESCRIPTION Install, maintain and remove temporary erosion and pollution control devices as required during the construction of the project. BID

More information

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below. SEDIMENT CONTROL NOTES 1.0 GENERAL 1.1 The Developer and Contractor shall comply with the requirements of all regulatory authorities, federal, provincial and municipal government departments including

More information

Excavation Safety Program

Excavation Safety Program Excavation Safety Program Excavation, Trenching & Shoring Safety I. Purpose The purpose of this policy is to establish safe operating procedures for any earthwork or underground work that is done on a

More information

Protection of Rangeland and Pastures from Wildfire

Protection of Rangeland and Pastures from Wildfire Protection of Rangeland and Pastures from Wildfire Grazing lands are subject to wildfire because of an abundance of fine fuel (grass), frequent dry conditions, and proximity to an ignition source -usually

More information

Construction of Dariali HEPP. Reinstatement Plan

Construction of Dariali HEPP. Reinstatement Plan Construction of Dariali HEPP Reinstatement Plan 2016 Table of Content 1. Introduction... 3 2. Site Clean-up... 4 3. Headwork Site Reinstatement... 4 4. Reinstatement Of The Pipeline Corridor.9 5. Cable

More information

IDE JA[H. anitoba. In Southeastern OF JACK PINE ON PREPARED SEEDBEDS A COMPENDIUM OF RESEARCH SURVIVAL AND GROWTH BY H. P.

IDE JA[H. anitoba. In Southeastern OF JACK PINE ON PREPARED SEEDBEDS A COMPENDIUM OF RESEARCH SURVIVAL AND GROWTH BY H. P. JA[H In Southeastern IDE anitoba A COMPENDIUM OF RESEARCH 1967-1970 SURVIVAL AND GROWTH OF JACK PINE ON PREPARED SEEDBEDS BY H. P. SIMS JACK PINE IN SOUTHEASTERN MANITOBA; A COMPENDIUM OF RESEARCH, 1967-1970

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

Erosion & Sedimentation Control Policy

Erosion & Sedimentation Control Policy Issue Date 10/22/2010 Page 1 of 8 Erosion & Sedimentation Control Policy Introduction: Soil erosion is the removal of soil by water, wind, ice or gravity and sediment deposition occurs when the rate of

More information

NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH

NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH NORTH CAROLINA DEPARTMENT OF HEALTH AND HUMAN SERVICES DIVISION OF PUBLIC HEALTH ENVIRONMENTAL HEALTH SECTION ON-SITE WATER PROTECTION BRANCH INNOVATIVE WASTEWATER SYSTEM APPROVAL INNOVATIVE WASTEWATER

More information

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION

INTERLOCK BETWEEN PARTICLES AT EACH PERFORATION for Storm Water Management RUN OFF CONTROLS Porous Parking & Vehicle Access Cellular Confinement Systems (CCS) A Cellular Confinement System (CCS) is an engineered, expandable, polyethylene, honeycomb-like

More information

SECTION RIPRAP, BOULDERS, AND BEDDING

SECTION RIPRAP, BOULDERS, AND BEDDING SECTION 31 37 00 RIPRAP, BOULDERS, AND BEDDING PART 1 GENERAL 1.01 SECTION INCLUDES A. The WORK includes excavation, grading, and installation of riprap, boulders, soil riprap, void-filled riprap, and

More information

Section 1I-3 - Bioswales

Section 1I-3 - Bioswales BIOSWALES (Numbering pending) These specifications compliment the bioswale design portion of the Iowa Stormwater Management Manual in Chapter 2, Section 2I-3. Sections of the following documents, as referenced

More information

Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative

Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative Oatka Creek Stream Stabilization and Habitat Restoration Project Narrative This project was started from a previous Great Lakes Grant to identify concerns in the Oatka and Black Creek watersheds. Through

More information

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION 1 TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION Draft 2/08/10 (Revised 02-14-11,Revised 02-21-11, Revised 03-03-11, Revised 04-19-11, Revised 04-20-11, Revised 05-05-11, Revised 05-09-11). DEFINITIONS

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

Temporary Watercourse Crossing: Culverts

Temporary Watercourse Crossing: Culverts Temporary Watercourse Crossing: Culverts DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent Symbol

More information

4 EXTREME FOUNDATION PANELS

4 EXTREME FOUNDATION PANELS 4 EXTREME FOUNDATION PANELS For Garages On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils

More information

SECTION 903 EROSION CONTROL

SECTION 903 EROSION CONTROL SECTION 903 EROSION CONTROL Delete this Section in its entirety and replace with the following: SECTION 903 EROSION CONTROL 903-1 DESCRIPTION: This work consists of providing all; administrative, labor,

More information

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions) Adams Co. Conservation District 670 Old Harrisburg Road, Suite 201 Gettysburg, PA 17325 Telephone: 334-0636 Fax: 337-0730 www.adamscounty.us Erosion and Sediment Pollution Control Guidelines for Residential

More information

Brush layering construction

Brush layering construction Brush layering construction Brush layering consists of embedding live branches on successive horizontal rows along contours on the face of a slope. Rooted plants can also be placed among the live branches.

More information

APPENDIX E. CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005)

APPENDIX E. CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005) APPENDIX E CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS (January 2005) i TABLE OF CONTENTS 1.0 INTRODUCTION...1 2.0 CONSTRUCTION SPECIFICATIONS FOR ACCESS ROADS................... 1 3.0 PLANNING AND LOCATION...2

More information

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $

Invitation to Tender No. T170523EN. lump sum $ days $1,500 $ ha 0.4 $ $ m 3 18,000 $ $ m 3 31,000 $ $ m 3 1,175 $ $ m 130 $ $ t 210 $ $ Addendum No. 1 TOWNSHIP ROAD 510 RECONSTRUCTION Invitation to Tender No. T170523EN Amendment 1. Bidders shall note the following: a) Revised Section 3.3.2 Unit Price Table : REVISED Schedule A : Invitation

More information

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR

PUBLIC WORKS SKAGIT COUNTY SAMISH ISLAND ROAD SAMISH ISLAND ROAD SLIDE REPAIR EASEMENT NOTES:. EASEMENT LIMIT SHOWN AS PROVIDED BY. TESC NOTES:. CONTRACTOR SHALL DEVELOP TEMPORARY EROSION AND SEDIMENT CONTROL PLAN AND PROVIDE ONSITE CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL)

More information

Harvesting Systems and Equipment in British Columbia

Harvesting Systems and Equipment in British Columbia Harvesting Systems and Equipment in British Columbia Ministry of Forests Forest Practices Branch Harvesting Systems and Equipment Part One EQUIPMENT SELECTION Chart 1 to 13 The handbook does not attempt

More information

ontario.ca/speciesatrisk

ontario.ca/speciesatrisk Ministry of Natural Resources Best Management Practices for Renewable Energy, Energy Infrastructure and Energy Transmission Activities and Woodland Caribou in Ontario ontario.ca/speciesatrisk Best Management

More information

TURF CELL Porous Paving System

TURF CELL Porous Paving System TURF CELL Porous Paving System DESCRIPTION: Turf Cell is a structure which provides incredible load bearing strength while protecting vegetation root systems from deadly compaction. High void spaces within

More information

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers 4.1-a PERVIOUS PAVEMENT Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers DESCRIPTION Pervious pavement is any system comprised of a load bearing surface that allows for movement of

More information

Training on Roads for Water and Resilience

Training on Roads for Water and Resilience Training on Roads for Water and Resilience 1 DRAINAGE FROM UNPAVED ROADS Outline 3 1. 2. 3. 4. 5. 6. 7. Introduction Important considerations Drainage management Surface drainage features Subsurface drainage

More information

APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA

APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA APPENDIX A AQUATIC/RIPARIAN SPECIES AND HABITAT PROJECT DESIGN CRITERIA Development of design criteria for aquatic and riparian species and habitats with treatments proposed within occupied or suitable

More information

POND CONSTRUCTION. Woodland Steward Series

POND CONSTRUCTION. Woodland Steward Series POND CONSTRUCTION Woodland Steward Series BOB TWOMEY DISTRICT CONSERVATIONIST USDA NATURAL RESOURCES CONSERVATION SERVICE COURSE OUTLINE DEFINITION OF A POND OR LAKE TYPES OF PONDS GEOLOGIC CONSIDERATIONS

More information

Best Management Practices

Best Management Practices Forestry Best Management Practices to Protect Water Quality in Colorado 2010 Contents Introduction... 1 Watersheds... 2 Planning... 3 Roads... 4 Planning, Design and Location... 4 Standards and Use...

More information

LECTURE - 5 TILLAGE - OBJECTIVES AND TYPES. FURROW TERMINOLOGY AND METHODS OF PLOUGHING. FIELD CAPACITY AND FIELD EFFICIENCY TILLAGE Mechanical

LECTURE - 5 TILLAGE - OBJECTIVES AND TYPES. FURROW TERMINOLOGY AND METHODS OF PLOUGHING. FIELD CAPACITY AND FIELD EFFICIENCY TILLAGE Mechanical LECTURE - 5 TILLAGE - OBJECTIVES AND TYPES. FURROW TERMINOLOGY AND METHODS OF PLOUGHING. FIELD CAPACITY AND FIELD EFFICIENCY TILLAGE Mechanical manipulation of soil to provide favourable condition for

More information

Construction Inspection Checklists

Construction Inspection Checklists III. Construction Inspection Checklists 33 Bioretention - Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: Construction Sequence Satisfactory / Unsatisfactory Comments

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting

ALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing

SECTION Stabilizer Apache Warning Track Mix for baseball or softball field surfacing Stabilizer Solutions, Inc. 33 S. 28 th St. Phoenix, AZ 85034 800-336-2468 (Fax) 602-225-5902 Website: stabilizersolutions.com E-Mail: info@stabilizersolutions.com SECTION 1 STABILIZER APACHE WARNING TRACK

More information

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS) Definitions SWPPP: Storm Water Pollution Prevention Plan BMP: Best Management Practice(s) to control pollution IDNR: Iowa Department

More information

Unit E: Basic Principles of Soil Science. Lesson 8: Employing Conservation Tillage Practices

Unit E: Basic Principles of Soil Science. Lesson 8: Employing Conservation Tillage Practices Unit E: Basic Principles of Soil Science Lesson 8: Employing Conservation Tillage Practices 1 Terms Conservation tillage Continuous cropping Conventional tillage Crop rotation Double cropping Organic farming

More information

Alabama s Best Management Practices

Alabama s Best Management Practices Alabama s Best Management Practices Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource

More information

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS

CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS CHAPTER 6 ADDITIONAL STANDARDS APPLYING TO SHORELAND AREAS AND PUBLIC WATERS Section 1 Intent. 49 Section 2 Floodplain Requirements 49 Section 3 Water-Oriented Accessory Structures 50 Section 4 Stairways,

More information

Section 401. PIPE CULVERTS

Section 401. PIPE CULVERTS 401.02 Section 401. PIPE CULVERTS 401.01. Description. This work consists of constructing pipe culverts of the size and class required, including excavation and backfill. 401.02. Materials. Provide materials

More information

5.0 SURFACE WATER CONTROL MEASURES

5.0 SURFACE WATER CONTROL MEASURES 5.0 SURFACE WATER CONTROL MEASURES After performing the analysis summarized above, Burns & McDonnell civil engineers, construction personnel, and environmental personnel walked both Newgate/Phelps Road

More information

CCSB Contact: William F. Mascaro Telephone (703) Item Description Class

CCSB Contact: William F. Mascaro Telephone (703) Item Description Class Re: Grading or Road Making Attachments or Implements CCSB Contact: William F. Mascaro Telephone (703) 838-1834 mascaro@nmfta.org Proponent: Commodity Classification Standards Board Present Classification

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

BEST MANAGEMENT PRACTICES FOR GRAZING

BEST MANAGEMENT PRACTICES FOR GRAZING BEST MANAGEMENT PRACTICES FOR GRAZING Courtesy NRCS INTRODUCTION The purpose of the brochure is to give the reader some basic range management practices useful for reducing impacts to surface and ground

More information

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS

WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS WEST VIRGINIA DIVISION OF FORESTRY STATE FOREST STANDARDS for LOGGING ROADS AND SKID TRAILS HAUL ROADS The objective of these specifications is to provide the construction requirements for haul roads and

More information

10 EXTREME BASEMENT PANELS

10 EXTREME BASEMENT PANELS 10 EXTREME BASEMENT PANELS On Granular Footings 1. The type of soil is a factor in determining foundation construction details such as footing design, backfill, and drainage provisions. Soils are classified

More information

To maximize the effectiveness and sustainability

To maximize the effectiveness and sustainability S u m m e r 2 0 4 O n t a r i o s T r a n s p o r t a t i o n T e c h n o l o g y T r a n s f e r D i g e s t M i n i s t r y o f T r a n s p o r t a t i o n It s a Snap! Ministry introduces new Oval Culvert

More information

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas. July 2007 Update to Design Bulletin #16/2003: Added under Design Criteria Culverts of 600mm diameter are commonly used to

More information

TRENCHING AND EXCAVATION

TRENCHING AND EXCAVATION TRENCHING AND EXCAVATION The following guide is an aid intended for students who have completed the ClickSafety training course or module associated with Trenching and Excavation. This guide is a resource

More information

Canadian Solar Developers Ltd.

Canadian Solar Developers Ltd. Canadian Solar Developers Ltd. Type of Document Draft Report Project Name Proposed Ground Mount Solar Facility L.P #5 8338 Scotchmere Drive, Strathroy, ON OPA FIT Program: FIT-FL67GB5 Project Number V00002250-00

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS

Saturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS Saturated Buffer To intercept tile drainage prior to discharging to surface waters and redistribute the water laterally in the soil profile of the streamside buffer. Subsurface drainage, also known as

More information

PART 1 GENERAL REQUIREMENTS

PART 1 GENERAL REQUIREMENTS PART 1 GENERAL REQUIREMENTS Contract Closeout Plan 110 Arrow diagram for project close-out...3 Erosion Control 121 Straw bale barrier... 5 122 Silt fence... 7 123 Diversion dike... 9 124 Inlet protection...

More information

Nez Perce National Forest Moose Creek Ranger District

Nez Perce National Forest Moose Creek Ranger District United States Department of Agriculture Forest Service Nez Perce National Forest Moose Creek Ranger District 831 Selway Road Kooskia, ID 83539 208 926-4258 TTY 208 926-7725 File Code: 1950 Date: Dec 30,

More information

Planning & Building Department. Requirements for Erosion and Sediment Control

Planning & Building Department. Requirements for Erosion and Sediment Control Planning & Building Department 455 County Center, 2nd Floor Redwood City, California 94063 Tel: 540/863-4161/Fax: 650/363-4849 Mail Drop PLN122 plngbldg@smcgov.org http://planning.smcgov.org Requirements

More information

ORDER UNGULATE WINTER RANGE #U2-005

ORDER UNGULATE WINTER RANGE #U2-005 ORDER UNGULATE WINTER RANGE #U2-005 The following order applies to the area identified within the attached Schedule A and takes effect on the 28 th day of February, 2005. This order is given under the

More information

AUGUST 2017 HASTINGS. retaining walls installation guide

AUGUST 2017 HASTINGS. retaining walls installation guide AUGUST 2017 HASTINGS retaining walls installation guide RETAINING WALL INSTALLATION GUIDE RETAINING WALL information Austral Masonry retaining wall blocks are an ideal choice for retaining walls in gardens,

More information

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) Tararua District Council Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP) NOTE: This is a draft ESCP in current preparation. Additional and updated information will

More information

Horseshoe West Fuels Reduction and Restoration Project

Horseshoe West Fuels Reduction and Restoration Project Horseshoe West Fuels Reduction and Restoration Project Transportation Report Prepared by: Chris Bielecki Logging Engineer for: Seeley Lake Ranger District Lolo National Forest 7/11/11 The U.S. Department

More information

VERTICAL TILLAGE. Viking

VERTICAL TILLAGE. Viking VERTICAL TILLAGE Viking GROUNDBREAKING POWER WORKING DEPTH 0 to 5" THE QUALITY AND DURABILITY YOU'VE COME TO EXPECT FROM VERSATILE IS NOW AVAILABLE IN A NEW LINE OF VERTICAL TILLAGE. Versatile tillage

More information

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide Roscommon County SESC Program 500 Lake Street Roscommon, Michigan 48653 Phone: 989-275-8323 Fax: 989-275-8640 Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide INCLUDED ATTACHMENTS

More information

Post-Fire BAER Assessment Burned Area Emergency Response (BAER)

Post-Fire BAER Assessment Burned Area Emergency Response (BAER) November 2017 Post-Fire BAER Assessment Burned Area Emergency Response (BAER) Information Brief Diamond Creek Fire Values at Risk Matrix and Treatments CentralWashingtonFireRecovery.info EMERGENCY DETERMINATION

More information

iv) Alberta fish weirs

iv) Alberta fish weirs Fish passage at culverts in New Zealand 36 iv) Alberta fish weirs The fish weirs used by Alberta Transportation are weir baffles with a partial slot (Figure 16). The best designs from Rajaratnam et al.

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff. Technical Guidance for the Use of Polyacrylamides (PAM) and PAM Blends for Soil Erosion Control and Storm Water clarification (Courtesy of Applied Polymer Systems, Inc.) Practice Description PAM is a water-soluble

More information

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual Prepared by: Mike Shaw Stormwater Program Manager City of Mountlake Terrace January 2010 Section I General Information This

More information

Appendix E. Best Management Practices

Appendix E. Best Management Practices Appendix E. Best Management Practices INTRODUCTION The Forest Service is required by law to comply with water quality standards developed under authority of the Clean Water Act. The Environmental Protection

More information

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction

CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction 2.7 Generic Mitigation Measures 2.7.1 Avifauna CONSTRUCTION PHASE ENVIRONMENTAL ISSUE MITIGATION REQUIREMENTS 1. Access road selection and construction Vehicles and machinery can impact on natural vegetation

More information

Road Cards Appendix 2

Road Cards Appendix 2 Appendix 2 Appendix 2 Introduction The following road cards are organized with new National Forest System (NFS) roads first, followed by reconstructed NFS roads second, and roads with bridge replacements

More information