OPTIMUM COMPRESSOR CONTROLS FOR CLOSED LOOP REFRIGERATION

Size: px
Start display at page:

Download "OPTIMUM COMPRESSOR CONTROLS FOR CLOSED LOOP REFRIGERATION"

Transcription

1 OPTIMUM COMPRESSOR CONTROLS FOR CLOSED LOOP REFRIGERATION William P. Schmidt Janet Firley Mitchell Matthew J. Okasinski Jeremy D. Beard Air Products and Chemicals Abstract This paper discusses compressor control for closed refrigeration systems used in LNG liquefaction. Similarities and differences between open and closed systems are presented. This paper focuses on one key difference: an open system s mass inventory can change; it is often controlled by adjusting a compressor flowrate. However, in a closed system, the refrigeration circuit inventory does not change (that is the definition of a closed system), so it cannot be changed using compressor flowrate. This paper focuses on the mixed refrigerant (MR) system frequently used in LNG liquefaction processes. Specific results presented are: A simple model demonstrates a key feature of a closed refrigeration system: it has two degrees of freedom; selecting two parameters specifies the system. For LNG liquefaction, the required refrigerant mass flowrate is determined by the LNG production rate, leaving a single degree of freedom. Compressor speed is often chosen as this degree of freedom. Steady state process simulations show that over a range of production rates, power consumption is minimized by running the compressor at the design speed and adjusting the refrigerant system inventory. At turndown production, less refrigerant flowrate is needed. The process efficiency can be improved by lowering the MR system inventory. If the MR inventory is not changed, slightly reducing compressor speed improves process efficiency, but not as much as reducing the MR inventory. The MR compressor speed should not be varied to control suction pressure, because the suction pressure is mostly affected by circuit inventory and mass flowrate. These will compete with the speed control. Changing the MR compressor speed has a large impact on compressor head, which can affect process efficiency. LNG process control strategies can be improved by automatically setting compressor speed based on refrigeration demand. This can be effectively integrated into the overall plant control strategy. William Schmidt, Air Products

2 INTRODUCTION Liquefied Natural Gas (LNG) that is produced in large baseload plants is an increasingly important clean energy source. The vast majority of the world s LNG is produced in Precooled Mixed Refrigerant (MR) LNG Processes. These processes cool and liquefy natural gas using two refrigeration systems: precooling and main (Figure ). The precooling system cools the feed and main refrigerant stream to between -5 to -50 C. The main refrigerant then liquefies and subcools the natural gas, converting it to LNG in the Main Cryogenic Heat Exchanger (MCHE), which is a Coil Wound Heat Exchanger (CWHE) (). The LNG leaves between -40 and -60 C and is sent to storage. Pre-cooling Feed Pre-cooling MRV MR MRL Mixed Refrigerant (MR) Figure LNG Liquefaction Process The main refrigerant is a mixture, typically containing N, C, C and C 3, so it is called Mixed Refrigerant (MR). The precooling refrigerant is most often pure C 3, in which case the liquefaction process is referred to as the Air Products AP-C3MR TM LNG process. In other cases, the precooling refrigerant is a mixture of hydrocarbon components from C to C 4, referred to as the Air Products AP-DMR TM LNG processes (DMR stands for Dual Mixed Refrigerant ). In the MR refrigeration circuit, the high pressure MR is cooled against propane to approximately -35 C, and it partially liquefies. The stream is separated in the HP MR separator into MR Liquid (MRL) and MR Vapor (MRV). The MRL enters the MCHE, where it is subcooled, removed from the MCHE at an intermediate point, flashed over a Joule-Thomson (JT) valve and sent to the MCHE shell. The MRV enters the MCHE, where it liquefies and is subcooled. It exits at the LNG temperature, flashes over a JT valve, and returns to the shell. The MRV and MRL boil on the shell side, providing the refrigeration to liquefy and subcool the incoming natural gas and MR. The vapor MR which leaves the MCHE is compressed in a two or three stage centrifugal compressor. Concepts that are used throughout this paper are closed and open systems. In a closed system, mass neither enters nor leaves. An open system has mass entering and/or leaving. To operate an open system at steady state, the system inventory must not change. The inventory is measured as shown below: Liquid inventory is measured by liquid level. Vapor inventory is measured by pressure. To maintain a constant inventory in an open system, the inlet and outlet flows must be equal. In an LNG liquefaction process, the LNG circuit is an open system. Vapor natural gas enters the MCHE and leaves as a liquid. In most LNG liquefaction process, the refrigerant circuits are closed systems; the refrigerants are recycled, so that none is added or subtracted when the plant is running at steady state. A key question for the LNG liquefaction process is how to control the MR compressor. This paper will first look at the general principles of controlling open and closed systems, and then apply these to controlling the MR compressor. It will primarily focus on the proper control schemes to keep the LNG process operating at a steady state, and it also discusses how these control schemes function when ramping the process between steady states. William Schmidt, Air Products

3 OPEN LIQUID SYSTEMS Figure is a simple example of an open system, where a liquid flows into a vessel and is withdrawn by a pump. When the inlet and outlet flows are equal, the system is at steady state and the vessel level is constant. The question is how to control the pump so that the two flows are equal. LI Figure Figure 3a shows one possible control method. The pump recycle valve is manipulated to maintain a constant liquid level. Figure 3b uses speed to control the outlet flowrate; speeding up the pump increases the outlet flowrate; slowing it down decreases the outlet flowrate. P-34 LIC P-40 LIC SIC Figure 3a Adjust recycle valve Figure 3b Adjust pump speed This example illustrates two key points: It is not necessary to measure flowrate of - or - to match the flowrates. Flowrates are matched by maintaining a constant level. The vessel can be in material balance (i.e., no gain or loss of mass) at any level. OPEN VAPOR SYSTEMS Vapor and liquid systems are similar. However, because a vapor is compressible, the inventory is measured by pressure, and a constant pressure indicates steady state. Figures 4a and 4b show two possible control schemes for an open vapor system. In Figure 4a, adjusting the compressor recycle valve will keep the vessel pressure constant. In Figure 4b, the speed is adjusted to maintain the pressure setpoint.

4 P-5 PIC P-45 PIC SIC Figure 4a Figure 4b The same two basic principles from the liquid system apply, except that pressure is substituted for level : It is not necessary to measure flowrate of - or - to match the flowrates. Flowrates are matched when the vessel pressure is maintained constant. The vessel can be in material balance with no accumulation at any pressure. COMPRESSOR EFFECTS ON OPEN VAPOR SYSTEMS Baseload LNG facilities use centrifugal or axial refrigerant compressors. These compressors have a key relationship between head and suction volumetric flow, and Figure 5 shows the general relationship: as suction volume flow increases, the head decreases 30 Surge Limit 0 Head (% Design Point) % Speed 90% Speed Design Point Stonewall Volumetric Flow (% Design Point) Figure 5 Typical Relationship between Flow and Head An important point for compressor control is that head and pressure ratio are linked through the equation below: H = ZRT in (n ) n n ((P out n ) ) (Eqn ) P in The implications of Eqn are that for a fixed head: Higher inlet temperature (Tin) decreases the pressure ratio (Pout/Pin). Lower suction pressure (Pin) decreases the discharge pressure (Pout) because the pressure ratio is constant

5 The characteristics as expressed in Figure 5 and Eqn give additional control possibilities when using a centrifugal compressor in an open vapor system: Throttle the compressor discharge (Figure 6a) to raise the discharge pressure and lower the volumetric flow through the compressor. In turn, this decreases the mass flowrate. The mechanism is that the higher discharge pressure and the same inlet conditions increases the pressure ratio. This moves the operating point to the left on Figure 5, reducing the volumetric and mass flowrates. Throttle the compressor suction (Figure 6b). The lower suction pressure requires a higher head for the same discharge pressure, so the compressor volumetric flow falls, reducing the mass flowrate. The mass flowrate is further reduced due to the lower suction pressure and density, relative to the pressure/density in the tank; i.e., the same volume of flow contains less mass. PIC PIC ASC ASC Figure 6a Figure 6b Compressor Control with Suction or Discharge Throttling CLOSED SYSTEMS The concepts presented so far have been for open systems, in which a fluid enters and leaves the system. However, most refrigeration circuits are closed systems; the refrigerant fluid moves within the closed circuit, but no mass is added or removed. Refrigerant systems typically used in LNG facilities (e.g., MR or propane) are closed systems. Returning to the simple liquid pump example, such a system is shown in Figure 7 (the vapor closed system will be described later). P-6 LIC Figure 7 Closed Liquid System with Invalid Control Scheme Figure 7 shows that the inlet to the vessel is now connected to its outlet. - and - are now always equal because they are on the same line. Because this closed system operates with a constant inventory, one can see that attempting to change the level by adjusting the recycle valve will be ineffective. Adjusting the pump recycle will change the circulating flowrate, but it will not change the level. This contrasts with an open system (Figure 3a), where it is possible to control the level (inventory) with pump recycle flowrate. If this fundamental difference between an open and closed system is not recognized, and the control system in Figure 7 is used, the recycle valve will end up in one of two positions, depending on the choice of the level setpoint:

6 Operating level below setpoint: The controller will attempt to raise the level by opening the pump recycle valve to reduce - flow. This action has no effect on the operating level, so the pump recycle valve will be driven fully open, resulting in minimum circulating flowrate. Operating level above setpoint: The control system will attempt to lower the level by closing the pump recycle valve to increase the - flow. Because this action has no effect on the operating level, the pump recycle valve will be driven fully closed, resulting in maximum circulating flowrate. Table below contrasts open and closed liquid systems as shown in Figures 3a and 7: Table Comparing Open and Closed Systems Open System Closed System Inventory Can Vary Fixed Flowrates at constant inventory Matches inlet flowrate Can Vary Now consider a closed system that circulates vapor. In a closed system, the inventory is fixed. The total mass inventory in the refrigeration circuit is the sum of the masses in the high and low pressure volumes: where M total M total M LP M HP = M LP + M HP = total mass in the system = mass in the low pressure portion of the system = mass in the high pressure portion of the system For an ideal gas, the total mass inventory can be written as where M total MW P V T R = (MW x PV/RT) LP + (MW x PV/RT) HP = Molecular weight of the vapor (assumed constant) = Pressure of the section of the system (high or low pressure) = Volume of section of the system (high or low pressure) = Temperature (assumed constant) = Gas constant Which can be simplified and re-arranged ( a and b are constants made from the other variables): P LP = a - b * P HP (Eqn ) This shows that for a defined closed system (i.e., fixed volumes, total mass and temperatures), there is a linear relationship between the high and low pressures; if one goes up, the other must go down. (For non-ideal gases, the relationship is conceptually the same, but mathematically more complex). This is a key learning: in a closed system, the high and low pressures are not independent of each other. Now consider the centrifugal compressor. It has a characteristic relationship between pressure ratio (head) vs. volumetric flowrate, as shown in Figure 5 above. In addition, a different compressor speed gives a different curve. In mathematical terms, Q = f (P HP / P LP, rpm) (Eqn 3) where Q rpm = Compressor volumetric flowrate = Compressor speed This equation assumes that the compressor Anti-Surge Valve (ASV) is closed. The model can be extended to include this feature; however, it complicates the model. The simple model is used to illustrate the key features of closed vapor systems.

7 Finally, because the Molecular Weight (MW) of the fluid is known, the mass flowrate (W) can be computed with equation 4: W = MW P LP Q / RT (Eqn 4) where W = Compressor mass flowrate This gives three equations (Eqn s, 3 and 4) and 5 variables: P LP, P HP, Q, W and rpm. Therefore, the refrigeration circuit has two degrees of freedom; if two of these five variables are selected, the other 3 are determined. This leads to the system in (Figure 8). To make this a working system, an aftercooler is added to remove the heat of compression and a discharge valve is added to provide resistance to flow and develop a pressure rise across the compressor. PI C Figure 8 Closed System Vapor System with Simplified Control System Expanding this explanation, the system is specified by setting the following: Volumes of high and low-pressure circuits Total mass inventory charged to the system Head/flow curve (Compressor characteristics) First consider the case with a fixed speed, leaving a system with degree of freedom. The single degree of freedom can then be chosen as mass flowrate, and the results plotted with mass flowrate as the independent variable. With parameters chosen to give similar values to an MR system of an AP-C3MR LNG Liquefaction Process, Figure 9 shows the suction and discharge pressures as a function of mass flowrate for different inventories. The mass flowrate is reduced by closing the compressor discharge valve, increasing the flow resistance, while simultaneously increasing the compressor head and pressure ratio. The increased pressure ratio lowers the suction pressure and raises the discharge pressure. The magnitude of the pressure change depends on the relative high and low pressure volumes and the refrigerant inventory. This shows that for a fixed inventory, each chosen flowrate results in a single set of high and low pressures.

8 Discharge P (bara) P,disch: Base Inventory+0% Pdisch: Base Inventory P,suct: Base Inventory + 0% P,suct: Base Inventory % 60% 70% 80% 90% 00% 0% 0% 30% Mass Flow Figure 9 Closed Vapor System Operating Map Figure 9 also shows the effects of adding 0% mass inventory to the system. For a given mass flowrate, the operating pressures increase. Note that for a given volumetric flowrate, as the suction pressure rises, the mass flow increases. Therefore, adding mass inventory shifts the operating curves up and to the right. A key learning from this example is that adding mass inventory allows higher circulating mass flowrates and removing mass inventory allows reduced circulating mass flowrates. Dual shaft gas turbines are being used more frequently in LNG liquefaction plants, where in the past, single shaft turbines have been used. Because single shaft turbines have a very small speed range (typically 95-0% of design), speed control cannot give a wide flow variation. However, the dual shaft turbines can drive the compressor over a much wider speed range (nominally 70% to 0% of design. Varying speed may help to improve operation at off-design conditions (e.g., turndown). However, speed has more effects on the system than just capacity. While capacity varies proportionally with speed, head varies with the square of speed. This means that reducing the speed to reduce flowrate also reduces the compressor head, which translates into significantly lower pressure ratio. This will decrease the discharge pressure and raise the suction pressure. Figure 0 shows the simple all-vapor system, where the speed is reduced 5%, with the following characteristics for a given mass flowrate: Suction P (bara) The compressor is closer to surge The suction pressure rises and the discharge pressure falls

9 Discharge P (bara) % speed 95% speed 95% speed 00% speed % 60% 70% 80% 90% 00% 0% 0% 30% Mass Flow Figure 0 Closed System Operating Map, with Speed Variation This simple model shows that it is possible to independently set the circulating mass flowrate and suction pressure with the discharge valve and compressor speed, which then determine the pressures and volumetric flowrate. However, this may have undesirable consequences for the LNG liquefaction process if the discharge pressure is too low to efficiently produce refrigeration. This section provides some key learnings about closed vapor systems: Suction P (bara) The suction and discharge pressures are linked. If the suction pressure goes up, the discharge pressure must come down, by simple material balance. For a closed vapor system with a centrifugal compressor at a constant speed, there is one degree of freedom, so setting the circulating flowrate determines the suction pressure. Combined with the first point above, the discharge pressure is also determined. Increasing the system inventory (i.e., raising the suction pressure) allows for higher circulating mass flowrates, and increases the discharge pressure. Adding speed control gives an additional degree of freedom. It allows the circulating mass flowrate and suction pressure to be independently adjusted. However, changing speed has a large impact on compressor head, which strongly impacts the discharge pressure. Reducing the compressor speed raises the suction pressure but decreases the discharge pressure. As will be discussed below, this can have significant effects on LNG liquefaction processes. EXTENDING TO MR SYSTEMS MR systems are more complicated than the all-liquid and all-vapor systems discussed above. However, concepts from these simple studies can be readily applied. The MR systems contain significant amounts of both vapor and liquid. The vapor phase inventory is the primary factor in setting the MR system pressures. Vapor inventory is adjusted by adding or subtracting the light components, (N and C ) and affects the system pressures. The liquid inventory is primarily adjusted by adding or subtracting the higher boiling components (C and C 3 ). The liquid inventory is in the HPMR separator, MCHE shellside and piping.. The biggest difference between the simple systems discussed above and the MR system is that the MR system has some significant constraints placed on it by the LNG liquefaction needs. The constraints are The LNG feed rate determines how much refrigeration is needed, which sets the required MR flowrate. Refrigeration per unit mass of refrigerant is strongly affected by the pressure ratio. While there are specific requirements of each facility, the optimum MR compressor suction pressure is typically -4 barg and the

10 discharge pressure is 45 to 60 barg. If the pressure ratio deviates from the optimum, the process becomes less efficient, and if pushed too far, then the process no longer functions. This latter observation puts an additional constraint on using compressor speed to control MR compressor capacity. For the MR system, it is better to think of speed primarily changing the compressor head, with a more subdued effect on flowrate. CASE STUDY STEADY STATE SIMULATION The goal of this case study is to determine the best compressor speed for a given production rate. As the production decreases, less refrigeration is needed. It has been proposed that less refrigeration demand means that the MR compressor is too big and reducing its speed will reduce energy consumption. To test this hypothesis, the optimized operating conditions have been calculated at several turndown production rates using steady state process simulations. The study covered the liquefaction process, with the following assumptions: The simulations minimize the power consumption for a fixed LNG production. The precooling system is kept constant; these studies only consider the main MR refrigeration system. A typical compressor curve was used to determine the suction and discharge pressure. The compressor speed was allowed to change from 70 to 00%. The circulating MR composition at the compressor is fixed. The compressors will recycle to prevent surge, if needed. Inventory in the system is not constrained. The inventory is resultant from the system pressures. Steady state solutions were found, and the results are shown in Table. Production is decreased in cases SS- through SS-3, while the speed is calculated for optimum performance. Case SS-4 is at both reduced speed and production. ( SS signifies Steady State ). Table Optimum Performance Steady State Simulations Case SS- SS- SS-3 SS-4 LNG % Nameplate 00% 90% 84% 85% MR compressor Speed 00% 00% 00% 95.3% Suction Pressure (bara) Discharge Pressure (bara) Ratio Power to recycle 0% 0% 0% 0% MR Spec Power (relative) 00% 96.4% 96.% 0.4% The learnings from this study are ) As the production decreases from SS-, the specific power decreases for SS- and SS-3. This is because the MCHE and other equipment are oversized for the given LNG flowrate. This improves the heat transfer in the MCHE and reduces the pressure drops. ) As the production decreases, less refrigeration is needed, which reduces the MR flowrate. Options to reduce the flow are: a. Reduce suction pressure by removing inventory. b. Maintain the suction pressure and recycle the compressor. However, this consumes more power. Cases SS- through SS-3 show that the most efficient method to reduce the MR flowrate is to lower the suction pressure, i.e. reduce inventory, and keep the compressor from recycling. 3) Reducing the compressor speed raises the suction pressure and lowers the discharge pressure (SS-4), and also increases power consumption.

11 a. In cases SS- through SS-3, the simulation optimization was free to adjust the speed which minimized power. In all three cases, the design speed gave the minimum power, primarily because it kept a high pressure ratio. b. In case SS-4, the upper limit on speed was set to 95.3% of design. At this lower speed, the head decreased significantly, reducing the pressure ratio from over to nearly 9. 4) Comparing cases SS-3 and SS-4 show there is no benefit to decreasing speed at turndown; decreasing the speed increased the overall power consumption. 5) This study allows the inventory to vary, as shown by the reduction in suction and discharge pressures. This is effective for long term turndown operation; however, for short term operation, it is impractical to vent refrigerant. CASE STUDY DYNAMIC SIMULATIONS To address the issue of turndown with a constant MR inventory, a constant inventory study was performed using dynamic simulation. This case study also investigates if speed control could provide significant benefits for turndown or off-design operation. Using dynamic simulation to study off-design conditions is a more realistic model of the plant. There are two primary benefits: The system is maintained at a constant mass inventory. As shown in the simple vapor-only study, the inventory has a large effect on the operating conditions. Ignoring this, as the steady state simulations did, misses a key factor in setting the operating conditions. Dynamic simulation shows that it is possible to move from one state to another and provides a control strategy to get there. Three cases were run ( DS stands for Dynamic Simulation): Case DS- Baseline at 00%, to match the steady state design run SS- Case DS- Turndown to 85% production, keeping the system inventory constant, while maintaining the MR compressor speed at 00% Case DS-3 Turndown to 85% production, keeping the system inventory constant, reducing the MR compressor speed by 4.7%. The table below shows the results for these three cases, along with the results from SS-3, the optimized steady state simulation at turndown production (effectively, turndown with the optimum reduced system inventory). Table 3 Dynamic Simulation with Constant MR Inventory Case DS- DS- DS-3 SS-3 LNG % Nameplate 00.0% 85.0% 85.0% 84% Speed 00.0% 00.0% 95.3% 00.0% Suction Pressure (bara) Discharge Pressure (bara) Compression Ratio Power to recycle 0.0% 4.5%.7% 0% MR Spec Power (relative) 00% 06.8% 03.8% 96.% The following observations can be made: Case DS- shows that if the compressor is not slowed down and the inventory is maintained constant, the compressor must recycle to prevent surge. This contrasts with Cases SS- and SS-3 of the steady state simulation study, which reduce the refrigerant inventory which lowers the suction pressure and mass flowrate and prevents the compressor from recycling. Comparing cases DS- and DS-3 show that at turndown, slowing down the compressor does decrease the power consumption, relative to turndown at full speed. The benefit comes from reducing the recycle flowrate. Note that although the production is reduced by 5%, the speed is only reduced by 4.7%.

12 As expected from the simulations above, slowing the speed from DS- to DS-3 dramatically affects the system pressures. The suction pressure rose from 3.79 to 4.45 bara, the discharge pressure fell from 45.7 to bara and the compression ratio decreased from.05 to Comparing DS- and DS-3 to the steady state simulation SS-3 shows that although reducing the speed from DS- to DS-3 did decrease power consumption, SS-3 shows that the power could be further reduced by reducing the MR inventory and speeding up the compressor. This would be the best operating mode if the plant were to run at turndown for prolonged periods. These studies also show that the MR compressor speed should not be controlled with the MR suction pressure. It is true that the speed does impact the suction pressure, as can be seen when comparing SS-3 vs SS-4 and DS- vs DS-3. However, other variables have a far greater impact, such as MR inventory and required MR mass flowrate. In particular, the MR inventory will have a large impact on the suction pressure, and this will dominate any impact of speed variation. Also, varying speed has the unintended consequence of significantly changing the discharge pressure, a key parameter in LNG liquefaction. Therefore, if the speed is varied, it should be varied based on MRL flowrate and the change in speed should be small. PRODUCTION RATE CHANGES The previous discussion focused on the optimum operating parameters for a steady state. An additional study was performed to demonstrate that the Air Products Enhanced Control Scheme (AP-ECS, described in references () and (3)) can be extended to include speed control when moving between production rates. The AP-ECS operating philosophy treats LNG liquefaction as a refrigeration-led process: the refrigeration is set, and the LNG flow is varied to absorb it. The extension that follows from the reasoning is that as the MRL flowrate is reduced, the compressor size can be reduced by decreasing speed. That is, a smaller MRL flowrate requires a smaller MR compressor. Work done shows that the fractional speed reduction should be much less than the fractional MRL flow reduction, primarily to prevent excessively decreasing the compressor head. However, once the MR compressor anti-surge system becomes active and opens the anti-surge valves (ASV), the speed control is disabled. This prevents the speed control and anti-surge control (ASC) from simultaneously trying to control the MR compressor performance. Ramping simulations were done in which production decreases from 00% to a target over one hour, is stabilized for.5 hours, and is then ramped back up in approximately hour. To do this, the production setpoint is ramped. The AP-ECS then adjusts all other process parameters (valve position, compressor speed) to smoothly and efficiently move to the new production setpoint. Two cases were run, from 00% to 85% production and back, and from 00% to 70% and back. Figures and 3 show the results of these ramping simulations. Figure shows production and speed as a function of time. It shows that when the compressor speed was reduced to about 95% of design, the ASV s opened to prevent surge, so that control system stopped reducing the speed. These figures also show that the key operating parameters are within the desired range: production, LNG temperature (i.e., the LNG product quality) and MCHE warm end ΔT (efficiency measurement). The production moves smoothly between endpoints. The LNG temperature barely moves from the desired setpoint. The MCHE WEΔT ranges between.5 and 5 C, which is very close to the setpoint of.8 C. (During manual ramping, the WEΔT can vary between 0 and 0 C, with rapid changes.) These graphs show that the production met the product requirements of flow and temperature while maintaining good efficiency. These dynamic simulations confirmed that the AP-ECS can be effectively used with speed control when varying production

13 00% 95% Speed or Production (% Design) 90% 85% 80% 75% 70% 65% Speed 85% TD Speed 70% TD Prod 85% TD Prod 70% TD 60% Hours Figure Production and Speed During Ramping T or ΔT ( C) Time (hrs) WE DT 85% TD WE DT 70% TD WE DT SetPt LNG T, Δ fr Setpt 85% TD LNG T, Δ fr Setpt 70% TD Figure 3 WEΔT and LNG T during ramping. PRECOOLING REFRIGERANT SYSTEM This paper has discussed how to control the circulating flowrate for a closed refrigeration system. It has focused on the MR system in an LNG liquefaction process. It has not discussed the precooling system, either in a dual mixed refrigerant (AP-DMR) or propane precooled mixed refrigerant process (for example, AP-C3MR). The precooling systems in these processes are similar to the MR system, in that they are closed systems. They differ in one key aspect the refrigerant leaving the compressor is completely condensed, whereas in the MR system, it is only partially condensed. Because of this, the precooling compressor discharge pressure is set by the heat sink temperature and the approach temperature of the condensing heat exchanger. The suction pressure is then set by the compressor head. This difference prevents the conclusions from this paper being directly applied to a precooling compressor.

14 CONCLUSIONS While open systems need to adjust compressor flow to maintain a steady state inventory, in a closed system, the inventory is not affected by the circulating flowrate. A compressor operating in a closed system has two degrees of freedom; for example, specifying the compressor flow and speed determine the other dependent parameters. In an LNG liquefaction process, the compressor flowrate is determined by the LNG refrigeration requirement, leaving a single degree of freedom. Speed can be selected as this degree of freedom. For a fixed speed gas turbine, the system is defined. For variable speed drivers, it must be recognized that changing the MR compressor speed has a large impact on compressor head and a lesser impact on flowrate. The compressor speed should not be varied to maintain a constant suction pressure, because while the speed does have a small effect on the suction pressure, other variables have a far greater impact, such as MR inventory and required MR mass flowrate. These will compete with the speed control. For the steady state cases studied for this paper, power at turndown is minimized by running at design speed with reduced MR inventory. This simulates changing the refrigerant inventory with production. Constant inventory calculations show that the process efficiency may be improved by slightly reducing speed as production is decreased. This paper demonstrates that it is possible to control the compressor speed based on the MRL flowrate, and speed control can be added to the existing Air Products Enhanced Control Scheme. References. Coil Wound Heat Exchanger Design for an Evolving Market. Dally, John, Chris Butler, Warren Miller, William Schmidt, Jason Styer. Barcelona : GasTech, 08.. An Innovative Control Scheme of a C3MR LNG Plant. Bronfenbrenner, Jim, Matthew Okasinski, Scott Trautmann. New Orleans : AIChE Spring Meeting, Air Products Enhanced Control Scheme. Air Products and Chemicals Corporate Website. [Online] January, 09.

DYNAMICS OF BASELOAD LIQUEFIED NATURAL GAS PLANTS ADVANCED MODELLING AND CONTROL STRATEGIES

DYNAMICS OF BASELOAD LIQUEFIED NATURAL GAS PLANTS ADVANCED MODELLING AND CONTROL STRATEGIES DYNAMICS OF BASELOAD LIQUEFIED NATURAL GAS PLANTS ADVANCED MODELLING AND CONTROL STRATEGIES Dr. Matthew J. Okasinski, P.E. Principal Engineer Air Products and Chemicals, Inc. Allentown, Pennsylvania, USA

More information

Precooling strategies for efficient natural gas liquefaction

Precooling strategies for efficient natural gas liquefaction Originally appeared in: September/October 217, pgs 19-29. Used with permission. SPECIAL FOCUS: LNG TECHNOLOGY Precooling strategies for efficient natural gas liquefaction G. KRISHNAMURTHY, M. J. ROBERTS

More information

Maximising LNG revenue by operating at peak performance

Maximising LNG revenue by operating at peak performance Maximising LNG revenue by operating at peak performance Brian Barr, Robin Pearsall, Jim Bronfenbrenner Air Products and Chemicals Inc. 7201 Hamilton Boulevard Allentown, PA 18195-1501 Meshal Hassan Al-Mohannadi

More information

MLNG DUA DEBOTTLENECKING PROJECT

MLNG DUA DEBOTTLENECKING PROJECT MLNG DUA DEBOTTLENECKING PROJECT Yahya Ibrahim Senior General Manager Malaysia LNG Malaysia yahyai@petronas.com.my Tariq Shukri LNG Consultant Foster Wheeler Energy Limited Reading, U.K. Tariq_shukri@fwuk.fwc.com

More information

ARCTIC LNG PLANT DESIGN: TAKING ADVANTAGE OF THE COLD CLIMATE

ARCTIC LNG PLANT DESIGN: TAKING ADVANTAGE OF THE COLD CLIMATE 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) ARCTIC LNG PLANT DESIGN: TAKING ADVANTAGE OF

More information

Standardized, Modular Liquefaction Equipment and Technology

Standardized, Modular Liquefaction Equipment and Technology Standardized, Modular Liquefaction Equipment and Technology The world leader in equipment and technology brings vast expertise to the small and mid-scale market. Standardized and modular plant designs

More information

THE CONCEPT OF INTEGRATED CRYOGENIC ENERGY STORAGE FOR LARGE SCALE ELECTRICITY GRID SERVICES. Finland *corresponding author

THE CONCEPT OF INTEGRATED CRYOGENIC ENERGY STORAGE FOR LARGE SCALE ELECTRICITY GRID SERVICES. Finland *corresponding author THE CONCEPT OF INTEGRATED CRYOGENIC ENERGY STORAGE FOR LARGE SCALE ELECTRICITY GRID SERVICES Sakari Kaijaluoto 1, Markus Hurskainen 1,* and Pasi Vainikka 2 1 VTT Technical Research Centre of Finland, Koivurannantie

More information

An Introduction to the Patented. VX TM Cycle. Small-Scale Production of LNG from Low-Pressure Gas by Methane Expansion

An Introduction to the Patented. VX TM Cycle. Small-Scale Production of LNG from Low-Pressure Gas by Methane Expansion An Introduction to the Patented VX TM Cycle Small-Scale Production of LNG from Low-Pressure Gas by Methane Expansion A. What opportunities and problems does the VX TM Cycle address? The VX Cycle (short

More information

A new re-liquefaction system of MRS-F (Methane Refrigeration System Full re-liquefaction) for LNG Carriers

A new re-liquefaction system of MRS-F (Methane Refrigeration System Full re-liquefaction) for LNG Carriers A new re-liquefaction system of MRS-F (Methane Refrigeration System Full re-liquefaction) for LNG Carriers DongKyu Choi *, Hyunjun Shin DAEWOO SHIPBUILDING AND MARINE ENGINEERING Co., Ltd. Dual fuel slow-speed

More information

Modified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas

Modified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas Modified Reverse-Brayton Cycles for Efficient Liquefaction of Natural Gas H.M. Chang 1, J.H. Park 1, K.S. Cha 2, S. Lee 2 and K.H. Choe 2 1 Hong Ik University, Seoul, Korea 121-791 2 Korea Gas Corporation,

More information

Compact liquefied gas expander technological advances

Compact liquefied gas expander technological advances Compact liquefied gas expander technological advances Joel V. Madison President Ebara International Corporation SYNOPSIS LNG expanders are now an important part of every new LNG liquefaction plant. The

More information

YAMAL LNG: MEETING THE CHALLENGES OF NATURAL GAS LIQUEFACTION IN THE ARCTIC

YAMAL LNG: MEETING THE CHALLENGES OF NATURAL GAS LIQUEFACTION IN THE ARCTIC YAMAL LNG: MEETING THE CHALLENGES OF NATURAL GAS LIQUEFACTION IN THE ARCTIC Christopher Ott 1, Igor Chasnyk 2, Sander Kaart 2, Christian Bladanet 3, Benoit Laflotte 3, Guillaume Le-Ridant 3, Benoit Delva

More information

Thermodynamics: An Engineering Approach, 6 th Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2008

Thermodynamics: An Engineering Approach, 6 th Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2008 Thermodynamics: An Engineering Approach, 6 th Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2008 Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES SUMMARY 1 CONSERVATION OF MASS Conservation

More information

Enhancement of LNG Propane Cycle through Waste Heat Powered Absorption Cooling

Enhancement of LNG Propane Cycle through Waste Heat Powered Absorption Cooling Enhancement of LNG Propane Cycle through Waste Heat Powered Absorption Cooling A. Mortazavi 1, P. Rodgers 2, S. Al-Hashimi 2, Y. Hwang 1 and R. Radermacher 1 1 Department of Mechanical Engineering, University

More information

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT

UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT UNIQUE DESIGN CHALLENGES IN THE AUX SABLE NGL RECOVERY PLANT Presented at the 81 st Annual Convention of the Gas Processors Association March 11, 2002 Dallas, Texas Joe T. Lynch, P.E. Ortloff Engineers,

More information

[Ansari* et al., 5(8): August, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

[Ansari* et al., 5(8): August, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY OPERATING PARAMETERS ACCUMULATION OF HELIUM LIQUEFICATION SYSTEM: (H.E & TURBINE) Abdul Mannan Ansari*, Vinod Sehrawat, Tarun

More information

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology

Gastech Singapore October Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology Gastech Singapore October 2015 Capital Cost and Efficiency Data for the ZR-LNG Dual Methane Expander Liquefaction Technology Authors: GW Howe, GF Skinner, AD Maunder Presenter: GW Howe Introduction LNG

More information

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE

ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE ADVANCED PROCESS CONTROL QATAR GAS ONE YEAR EXPERIENCE Bouchebri El-Hadi Senior Process Engineer Benmouley Abdelkader Head of Process Qatar Liquefied Gas Company Limited. Ras Laffan Industrial Area, Doha,

More information

Large scale hydrogen liquefaction in combination with LNG re-gasification

Large scale hydrogen liquefaction in combination with LNG re-gasification Large scale hydrogen liquefaction in combination with LNG re-gasification Andres Kuendig a, Karl Loehlein a, Gert Jan Kramer b, Joep Huijsmans c a Linde Kryotechnik AG, Daettlikonerstrasse 5, 8422 Pfungen,

More information

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications

Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Paper 4d Magnetically Coupled Submerged Cryogenic Pumps and Expanders for Ammonia Applications Liquefied Ammonia, or Liquid NH3, is (like LNG or liquefied natural gas) a cryogenic fluid and production

More information

Yemen LNG Operational feedbacks

Yemen LNG Operational feedbacks Yemen LNG Operational feedbacks APCI Owners Seminar XI September 2013 1 Yemen LNG - Agenda 1. Yemen LNG general presentation 2. Feedback on Plant restarts optimization 3. Other operational feedbacks 2

More information

VANDOR S EXPANSION CYCLE: The VX Cycle

VANDOR S EXPANSION CYCLE: The VX Cycle An Introduction to the Patent Pending VANDOR S EXPANSION CYCLE: The VX Cycle Small-Scale Production of LNG from Low-Pressure Pipeline Gas by Methane Expansion A. What opportunities and problems does the

More information

DESIGNING FLEXIBLE LNG PLANTS FOR MARKET ADAPTATION

DESIGNING FLEXIBLE LNG PLANTS FOR MARKET ADAPTATION DESIGNING FLEXIBLE LNG PLANTS FOR MARKET ADAPTATION Jonathan Berg, William Schmidt, Dr. Fei Chen, Christopher Ott Air Products and Chemicals, Inc. In today s LNG market with the addition of new gas sources,

More information

Dynamic Simulation: a Tool for Advanced Design and Operating Behaviour Prediction

Dynamic Simulation: a Tool for Advanced Design and Operating Behaviour Prediction A publication of CHEMICAL ENGINEERING TRANSACTIONS VOL. 57, 2017 Guest Editors: Sauro Pierucci, Jiří Jaromír Klemeš, Laura Piazza, Serafim Bakalis Copyright 2017, AIDIC Servizi S.r.l. ISBN 978-88-95608-48-8;

More information

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach 8th Edition in SI Units Yunus A. Ç engel, Michael A. Boles McGraw-Hill, 2015 CHAPTER 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Objectives Develop the conservation

More information

REFRIGERATION CYCLES

REFRIGERATION CYCLES REFRIGERATION CYCLES Carnot Cycle We start discussing the well-known Carnot cycle in its refrigeration mode. Figure 2-1: Carnot Cycle In this cycle we define the coefficient of performance as follows:

More information

Liquefaction Process to Extend Lifetime of Depleting Gas Fields

Liquefaction Process to Extend Lifetime of Depleting Gas Fields Liquefaction Process to Extend Lifetime of Depleting Gas Fields Munir Amsyari Corporate Secretary munir@badaklng.co.id P.T.Badak Jakarta, Indonesia Muljono Sutedjo Director muljono.sutedjo@indobara.co.id

More information

Chapter 5: Thermodynamic Processes and Cycles

Chapter 5: Thermodynamic Processes and Cycles Chapter 5: Thermodynamic Processes and Cycles 5-6) This problem examines the Rankine heat engine introduced in Figure 5-5. Saturated steam at T = 250 C enters the turbine and the condenser operates at

More information

This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research and

This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research and This article appeared in a journal published by Elsevier. The attached copy is furnished to the author for internal non-commercial research and education use, including for instruction at the authors institution

More information

Power Recovery in LNG Regasification Plants

Power Recovery in LNG Regasification Plants Power Recovery in LNG Regasification Plants Harry K. Clever Director of Sales hclever@ebaraintl.com Hans E. Kimmel Executive Director R&D hkimmel@ebaraintl.com Ebara International Corporation Sparks, Nevada,

More information

LNG PROCESS USES AERODERIVATIVE GAS TURBINES AND TANDEM COMPRESSORS

LNG PROCESS USES AERODERIVATIVE GAS TURBINES AND TANDEM COMPRESSORS 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) 17 th INTERNATIONAL CONFERENCE & EXHIBITION ON LIQUEFIED NATURAL GAS (LNG 17) LNG PROCESS USES AERODERIVATIVE GAS TURBINES

More information

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET

ME ENGINEERING THERMODYNAMICS UNIT III QUESTION BANK SVCET 1. A vessel of volume 0.04m 3 contains a mixture of saturated water and steam at a temperature of 250 0 C. The mass of the liquid present is 9 kg. Find the pressure, mass, specific volume, enthalpy, entropy

More information

Refrigerant Expanders Improve LNG Liquefaction Process

Refrigerant Expanders Improve LNG Liquefaction Process Refrigerant Expanders Improve LNG Liquefaction Process Chen-Hwa Chiu TEXACO Bellaire, TX 77401, USA Hans E. Kimmel EBARA INTERNATIONAL CORPORATION Sparks, Nevada 89434, USA In conventional natural gas

More information

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver

Heat Recovery Systems and Heat Exchangers in LNG Applications. Landon Tessmer LNG Technical Workshop 2014 Vancouver Heat Recovery Systems and Heat Exchangers in LNG Applications Landon Tessmer LNG Technical Workshop 2014 Vancouver Presentation Overview LNG plant arrangement with heat recovery (OSMR Process by LNG Limited)

More information

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach Seventh Edition in SI Units Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2011 Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Copyright The McGraw-Hill Companies,

More information

A NOVEL DESIGN FOR MTPA LNG TRAINS

A NOVEL DESIGN FOR MTPA LNG TRAINS A NOVEL DESIGN FOR 10-12 MTPA TRAINS Sander Kaart Wiveka Elion Barend Pek Rob Klein Nagelvoort Shell Global Solutions International B.V. P.O. Box 541, 2501 CM The Hague, The Netherlands ABSTRACT Shell

More information

ME 215. Mass and Energy Analysis of Control Volumes CH-6 ÇANKAYA UNIVERSITY. Mechanical Engineering Department. Open Systems-Control Volumes (CV)

ME 215. Mass and Energy Analysis of Control Volumes CH-6 ÇANKAYA UNIVERSITY. Mechanical Engineering Department. Open Systems-Control Volumes (CV) ME 215 Mass and Energy Analysis of Control Volumes CH-6 ÇANKAYA UNIVERSITY Mechanical Engineering Department Open Systems-Control Volumes (CV) A CV may have fixed size and shape or moving boundaries Open

More information

The following sub-systems are provided and the integration of these is described below:

The following sub-systems are provided and the integration of these is described below: The following sub-systems are provided and the integration of these is described below: Pretreatment Plant The Pretreatment Plant typically comprises an amine system for gas sweetening and a molecular

More information

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG

Yokogawa Corporation of America Receives Analyzer Systems and Shelters Order from Freeport LNG PRESS RELEASE Yokogawa Corporation of America 12530 West Airport Blvd. Sugar Land, TX 77478 (800) 888-6400 Contact Us FOR IMMEDIATE RELEASE Date: August 8, 2016 Contact Phone: (800) 888-6400 Release #:

More information

Advanced Centrifugal Compression and Pumping for CO 2 Applications

Advanced Centrifugal Compression and Pumping for CO 2 Applications Advanced Centrifugal Compression and Pumping for CO 2 Applications Southwest Research Institute Team: J. Jeffrey Moore, Ph.D. Hector Delgado Andrew Lerche Timothy Allison, Ph.D. Brian Moreland Project

More information

Process Integration for Power-dominated Cryogenic Energy Systems 1. Introduction 2. Multi-period Synthesis of Power Systems

Process Integration for Power-dominated Cryogenic Energy Systems 1. Introduction 2. Multi-period Synthesis of Power Systems CHEMICAL ENGINEERING TRANSACTIONS Volume 21, 2010 Editor J. J. Klemeš, H. L. Lam, P. S. Varbanov Copyright 2010, AIDIC Servizi S.r.l., ISBN 978-88-95608-05-1 ISSN 1974-9791 DOI: 10.3303/CET1021044 259

More information

Active constraint regions for a natural gas liquefaction process

Active constraint regions for a natural gas liquefaction process Active constraint regions for a natural gas liquefaction process Magnus G. Jacobsen a, Sigurd Skogestad a, a Department of Chemical Engineering, Norwegian University of Science and Technology, 7491 TRONDHEIM,

More information

Fluid Mechanics, Heat Transfer, and Thermodynamics Design Project. Production of Acrylic Acid

Fluid Mechanics, Heat Transfer, and Thermodynamics Design Project. Production of Acrylic Acid Fluid Mechanics, Heat Transfer, and Thermodynamics Design Project Production of Acrylic Acid We are investigating the feasibility of constructing a new, grass-roots, 50,000 metric tons/year, acrylic acid

More information

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach Seventh Edition in SI Units Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2011 Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Mehmet Kanoglu University of

More information

Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks

Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks Korean J. Chem. Eng., 25(1), 7-12 (2008) SHORT COMMUNICATION Optimal operation of the boil-off gas compression process using a boil-off rate model for LNG storage tanks Myung Wook Shin, Dongil Shin*, Soo

More information

Problems in chapter 9 CB Thermodynamics

Problems in chapter 9 CB Thermodynamics Problems in chapter 9 CB Thermodynamics 9-82 Air is used as the working fluid in a simple ideal Brayton cycle that has a pressure ratio of 12, a compressor inlet temperature of 300 K, and a turbine inlet

More information

Energy Optimization Using Pinch Analysis

Energy Optimization Using Pinch Analysis Energy Optimization Using Pinch Analysis Practical Considerations By Richard Beaman, PE, and Cliff Reese, PE, SSOE Group Pinch analysis is a systematic method to maximize energy recovery from process streams

More information

AREN 2110: Thermodynamics Spring 2010 Homework 7: Due Friday, March 12, 6 PM

AREN 2110: Thermodynamics Spring 2010 Homework 7: Due Friday, March 12, 6 PM AREN 2110: Thermodynamics Spring 2010 Homework 7: Due Friday, March 12, 6 PM 1. Answer the following by circling the BEST answer. 1) The boundary work associated with a constant volume process is always

More information

Natural Gas Processing Unit Modules Definitions

Natural Gas Processing Unit Modules Definitions Natural Gas Processing Unit Modules Definitions Alberta Climate Change Office Draft Version 1.0 December 2018 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

More information

Development in the Air Separation Unit Addressing the Need of Increased Oxygen Demand from the Oxy-Blast Furnace

Development in the Air Separation Unit Addressing the Need of Increased Oxygen Demand from the Oxy-Blast Furnace Development in the Air Separation Unit Addressing the Need of Increased Oxygen Demand from the Oxy-Blast Furnace Paul Higginbotham Air Products PLC, Hersham Place, Molesey Road, Walton-on-Thames, Surrey,

More information

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant

Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant International Journal of Engineering and Technology Volume 3 No. 1, January, 2013 Estimation of Boil-off-Gas BOG from Refrigerated Vessels in Liquefied Natural Gas Plant Wordu, A. A, Peterside, B Department

More information

Title slide. LNG Technology. Compiled by PD.Supriyadi

Title slide. LNG Technology. Compiled by PD.Supriyadi Title slide LNG Technology Compiled by PD.Supriyadi 1 What is LNG? Colorless, odorless, non toxic hydrocarbon in very low temperature liquid form (cryogenic) Mainly (90% plus) is Methane, the lightest

More information

MONITORING CRYOGENIC TURBINES USING NO-LOAD CHARACTERISTICS

MONITORING CRYOGENIC TURBINES USING NO-LOAD CHARACTERISTICS 8th International Symposium on Transport Phenomena and Dynamics of Rotating Machinery, ISROMAC-8, March 26-30, 2000, Honolulu, HI, USA MONITORING CRYOGENIC TURBINES USING NO-LOAD CHARACTERISTICS Gilbert

More information

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES

Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Thermodynamics: An Engineering Approach Seventh Edition Yunus A. Cengel, Michael A. Boles McGraw-Hill, 2011 Chapter 5 MASS AND ENERGY ANALYSIS OF CONTROL VOLUMES Copyright The McGraw-Hill Companies, Inc.

More information

Cryogenic Carbon Capture

Cryogenic Carbon Capture Cryogenic Carbon Capture Sustainable Energy Solutions Sustainable Energy Solutions Sustainable Energy Solutions (SES) was founded in 2008 in response to a growing need for solutions to sustainability problems

More information

Fluid Mechanics, Heat Transfer, and Thermodynamics. Design Project. Production of Acetone

Fluid Mechanics, Heat Transfer, and Thermodynamics. Design Project. Production of Acetone Fluid Mechanics, Heat Transfer, and Thermodynamics Design Project Production of Acetone We are investigating the feasibility of constructing a new, grass-roots, 15,000 metric tons/year, acetone plant.

More information

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS

NEW RECYCLE PROCESS SCHEME FOR HIGH ETHANE RECOVERY NEW PROCESS SCHEME FOR HIGH NGL RECOVERY INTRODUCTION. Abstract PROCESS FUNDAMENTALS Author: Jorge Foglietta, ABB Randall Corporation Tel (713) 821-4313, Fax (713) 821-3544 Mailing Address: Randall Division ABB Lummus Global Inc. P.O. Box 420087 Houston, Texas 77242-0087 NEW PROCESS SCHEME

More information

Steady-state operational degrees of freedom with application to refrigeration cycles

Steady-state operational degrees of freedom with application to refrigeration cycles Steady-state operational degrees of freedom with application to refrigeration cycles Jørgen Bauck Jensen Sigurd Skogestad Department of Chemical Engineering, Norwegian University of Science and Technology,

More information

Modeling and simulation of main cryogenic heat exchanger in a base-load liquefied natural gas plant

Modeling and simulation of main cryogenic heat exchanger in a base-load liquefied natural gas plant 17 th European Symposium on Computer Aided Process Engineering ESCAPE17 V. Plesu and P.S. Agachi (Editors) 2007 Elsevier B.V. All rights reserved. 1 Modeling and simulation of main cryogenic heat exchanger

More information

ecosmrt LNG Reliquefaction INTERTANKO 2 nd May 2018

ecosmrt LNG Reliquefaction INTERTANKO 2 nd May 2018 ecosmrt LNG Reliquefaction INTERTANKO 2 nd May 2018 Babcock International - at a glance The UK s leading engineering support services organisation Headquartered in London Delivering circa 600 services

More information

Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes. Gastech 2017

Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes. Gastech 2017 Brazed Aluminum Heat Exchangers (BAHX) for Optimisation of Natural Gas Liquefaction Processes Authors: Doug Ducote / Paul Shields Introduction Gastech 2017 Brazed aluminum heat exchangers (BAHX), also

More information

DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN

DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN DYNAMIC SIMULATION FOR DESIGN IMPROVEMENTS, COST REDUCTION AND OPERATIONAL STABILITY IN LNG PLANT DESIGN SIMULATION DYNAMIQUE POUR L AMELIORATION DU PROCEDE, REDUCTION DES COUT, ET STABILITE DE L OPERATION

More information

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares.

HYSYS WORKBOOK By: Eng. Ahmed Deyab Fares. HYSYS WORKBOOK 2013 By: Eng. Ahmed Deyab Fares eng.a.deab@gmail.com adeyab@adeyab.com Mobile: 002-01227549943 - Email: adeyab@adeyab.com 1 Flash Separation We have a stream containing 15% ethane, 20% propane,

More information

There are many cryogenic

There are many cryogenic Tray revamp for demethaniser ethane recovery As a first step in an ethane extraction plant s operational improvement plan, a tray revamp was performed to improve both tray efficiency and ethane recovery

More information

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY

CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY CONVERTING DOMINION COVE POINT LNG INTO BIDIRECTIONAL FACILITY Pascal Bocherel, Jim Strohman, Juan Martinez Dominion Cove Point LNG, LP Brett Wink, Kamal Shah, John Ray IHI E & C International Corporation

More information

A Comparative Study of Propane Recovery Processes

A Comparative Study of Propane Recovery Processes A Comparative Study of Propane Recovery Processes Kent A. Pennybaker, Scott E. Wolverton, Steven W. Chafin, Thomas R. Ruddy River City Engineering, Inc. Lawrence, Kansas ABSTRACT There are many processes

More information

Green FSRU for the future

Green FSRU for the future Green FSRU for the future Presentation at GREEN4SEA Athens April 6 th 2016 Dr. John Kokarakis Vice President Technology & Business Development, Africa, S. Europe Hellenic, Black Sea & Middle East Zone

More information

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT

OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT UNIT 47: Engineering Plant Technology Unit code: F/601/1433 QCF level: 5 Credit value: 15 OUTCOME 2 TUTORIAL 2 STEADY FLOW PLANT 2 Be able to apply the steady flow energy equation (SFEE) to plant and equipment

More information

SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS

SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS SIMPACK - MODEL DEVELOPMENT PACKAGE FOR POWER PLANTS 1.0 OVERVIEW SIMPACK is a totally integrated set of simulation software development modules for power plants. It is template based modeling tool and

More information

ENERGY SAVING IN CRYOGENIC AIR SEPARATION PROCESS APPLYING SELF HEAT RECUPERATION TECHNOLOGY

ENERGY SAVING IN CRYOGENIC AIR SEPARATION PROCESS APPLYING SELF HEAT RECUPERATION TECHNOLOGY Proceedings of the International Conference on Mechanical Engineering and Renewable Energy 05 (ICMERE05) 6 9 November, 05, Chittagong, Bangladesh ICMERE05-PI-03 ENERGY SAVING IN CRYOGENIC AIR SEPARATION

More information

Utilization of THERMOPTIM Optimization Method

Utilization of THERMOPTIM Optimization Method Utilization of THERMOPTIM Optimization Method Thermoptim optimization method is dedicated to complex systems where a large number of fluids exchange heat, the overall behaviour of the system being governed

More information

CONTROL VOLUME ANALYSIS USING ENERGY. By Ertanto Vetra

CONTROL VOLUME ANALYSIS USING ENERGY. By Ertanto Vetra CONTROL VOLUME ANALYSIS USING ENERGY 1 By Ertanto Vetra Outlines Mass Balance Energy Balance Steady State and Transient Analysis Applications 2 Conservation of mass Conservation of mass is one of the most

More information

Bringing greater efficiency to small-scale LNG with multi-section integrally geared compressors HANDLE THE PRESSURE

Bringing greater efficiency to small-scale LNG with multi-section integrally geared compressors HANDLE THE PRESSURE Bringing greater efficiency to small-scale LNG with multi-section integrally geared compressors Tushar Patel, Marketing Manager for Atlas Copco Gas and Process. For more information, please contact the

More information

Fluid Mechanics, Heat Transfer, and Thermodynamics Fall Design Project. Production of Dimethyl Ether

Fluid Mechanics, Heat Transfer, and Thermodynamics Fall Design Project. Production of Dimethyl Ether Fluid Mechanics, Heat Transfer, and Thermodynamics Fall 2001 Design Project Production of Dimethyl Ether We are investigating the feasibility of constructing a new, grass-roots, 50,000 tonne/y, (1 tonne

More information

How to Evaluate an Existing NGL Recovery Plant Before Finalizing a Process Retrofit Design

How to Evaluate an Existing NGL Recovery Plant Before Finalizing a Process Retrofit Design How to Evaluate an Existing NGL Recovery Plant Before Finalizing a Process Retrofit Design GPA Midstream Convention April 15-18, 2018 Austin, TX USA Daryl R. Jensen, P.E. Daryl.Jensen@ortloff.com Adebola

More information

Steam balance optimisation strategies

Steam balance optimisation strategies Steam balance optimisation strategies Publicado en Chemical Engineering, Noviembre 2002 Background Optimising a steam balance in a plant with several steam mains pressures is not always a simple intuitive

More information

Supercritical CO2 Brayton Cycles and Their Application as a Bottoming Cycle. Grant Kimzey UTSR Intern Project Summary Webcast September 7, 2012

Supercritical CO2 Brayton Cycles and Their Application as a Bottoming Cycle. Grant Kimzey UTSR Intern Project Summary Webcast September 7, 2012 Supercritical CO2 Brayton Cycles and Their Application as a Bottoming Cycle Grant Kimzey UTSR Intern Project Summary Webcast September 7, 2012 Contents Introduction Assumptions and Design Parameters Benchmarks

More information

CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT

CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT CO 2 RECOVERY FROM CO 2 REMOVAL UNIT AT GL1Z PLANT Hocine Friha Chemical Engineer Technical Department GL1Z/ Sonatrach Bethioua, Oran, Algeria hfriha@avl.sonatrach.dz ABSTRACT Algeria which has ratified

More information

Brazed aluminium heat exchangers (BAHXs), also referred to

Brazed aluminium heat exchangers (BAHXs), also referred to Brazed aluminium heat exchangers (BAHXs), also referred to as plate fin heat exchangers, are at the heart of many of the processes used for the liquefaction of natural gas. They are deployed across the

More information

Transfer and Storage of Flammable Liquefied Hydrocarbon Gases

Transfer and Storage of Flammable Liquefied Hydrocarbon Gases Transfer and Storage of Flammable Liquefied Hydrocarbon Gases GPA Technical Meeting Antwerp, Belgium 22-24 February, 2012 Moving Fluids - Developments in Machinery Joel V. Madison CEO & President Ebara

More information

The book has been printed in the camera ready form

The book has been printed in the camera ready form The book has been printed in the camera ready form All right reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic,

More information

EBARA INTERNATIONAL CORPORATION Cryodynamics Division. Cryogenic Turbine Expanders. cryodynamics. Cryogenic Expanders for Liquefied Gas

EBARA INTERNATIONAL CORPORATION Cryodynamics Division. Cryogenic Turbine Expanders. cryodynamics. Cryogenic Expanders for Liquefied Gas EBARA INTERNATIONAL CORPORATION Cryodynamics Division Cryogenic Turbine Expanders cryodynamics Cryogenic Expanders for Liquefied Gas Who we are Liquefaction EBARA International Corporation, Cryodynamics

More information

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core

Qualitative Phase Behavior and Vapor Liquid Equilibrium Core 2/22/2017 Qualitative Phase Behavior and Qualitative Phase Behavior Introduction There are three different phases: solid, liquid, and gas (vapor) Energy must be added to melt a solid to form liquid If

More information

Chapter 10 POWER CYCLES. Department of Mechanical Engineering

Chapter 10 POWER CYCLES. Department of Mechanical Engineering Chapter 10 VAPOR AND COMBINED POWER CYCLES Dr Ali Jawarneh Department of Mechanical Engineering Hashemite University it 2 Objectives Analyze vapor power cycles in which h the working fluid is alternately

More information

Linde Kryotechnik AG. Effects of oil contamination on cryogenic plants. Ionic Liquids.

Linde Kryotechnik AG. Effects of oil contamination on cryogenic plants. Ionic Liquids. Linde Kryotechnik AG. Effects of oil contamination on cryogenic plants. Ionic Liquids. Andreas Rüegge Coventry, 6 th September 2017 Contents 1. Company Profile 2. Oil contamination in cryogenic systems

More information

ANALYSIS ON NON-UNIFORM FLOW IN STEAM GENERATOR DURING STEADY STATE NATURAL CIRCULATION COOLING

ANALYSIS ON NON-UNIFORM FLOW IN STEAM GENERATOR DURING STEADY STATE NATURAL CIRCULATION COOLING ANALYSIS ON NON-UNIFORM FLOW IN STEAM GENERATOR DURING STEADY STATE NATURAL CIRCULATION COOLING Susyadi 1 and T. Yonomoto 2 1 Center for Reactor Technology and Nuclear Safety - BATAN Puspiptek, Tangerang

More information

Fluid Mechanics, Heat Transfer, Thermodynamics. Design Project. Production of Ammonia

Fluid Mechanics, Heat Transfer, Thermodynamics. Design Project. Production of Ammonia Fluid Mechanics, Heat Transfer, Thermodynamics Design Project Production of Ammonia Your assignment is to continue evaluating the details of a process to produce 50,000 tonne/y of ammonia from a syngas

More information

Steady State Modeling of Advanced Vapor Compression Systems with Multiple Air and Refrigerant Loops

Steady State Modeling of Advanced Vapor Compression Systems with Multiple Air and Refrigerant Loops Steady State Modeling of Advanced Vapor Compression Systems with Multiple Air and Refrigerant Loops Mohamed Beshr, Vikrant Aute, Reinhard Radermacher Center for Environmental Energy Engineering Department

More information

HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT

HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT HOW TO COMPARE CRYOGENIC PROCESS DESIGN ALTERNATIVES FOR A NEW PROJECT Presented at the 86 th Annual Convention of the Gas Processors Association March 12, 2007 San Antonio, Texas Joe T. Lynch, P.E. Ortloff

More information

Energy Balances and Numerical Methods Design Project. Production of Maleic Anhydride

Energy Balances and Numerical Methods Design Project. Production of Maleic Anhydride Energy Balances and Numerical Methods Design Project Production of Maleic Anhydride Maleic anhydride is a chemical intermediate that is used to produce resins, surface coatings, lubricant additives, and

More information

State of the Art of Air-source Heat Pump for Cold Regions

State of the Art of Air-source Heat Pump for Cold Regions State of the Art of Air-source Heat Pump for Cold Regions Changqing Tian Nan Liang Ph D, Associate Prof. Ph D candidate Technical Institute of Physics and Chemistry, Chinese Academy of Sciences Beijing,

More information

Optimising. the LNG process. The rapidly expanding global LNG industry continues. Projects

Optimising. the LNG process. The rapidly expanding global LNG industry continues. Projects Optimising the LNG process John Baguley, Liquefied Natural Gas Ltd, Australia, outlines the benefits of an innovative liquefaction process technology for mid scale LNG projects. The rapidly expanding global

More information

Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants

Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants Improved efficiency and lifetime reliability with new hydraulic energy recovery design for CO2 removal in ammonia plants PREM KRISH, JEREMY MARTIN, JOHN SIENKIEWICZ, ANDREA GAINS-GERMAIN Energy Recovery

More information

Superior Efficiency Reduced Costs Viable Alternative Energy Kalex Kalina Cycle Power Systems For Ocean Thermal Energy Conversion Applications

Superior Efficiency Reduced Costs Viable Alternative Energy Kalex Kalina Cycle Power Systems For Ocean Thermal Energy Conversion Applications Superior Efficiency Reduced Costs Viable Alternative Energy Kalex Kalina Cycle Power Systems For Ocean Thermal Energy Conversion Applications Copyright 2011, Kalex LLC. Introduction: Ocean Thermal Energy

More information

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL

ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL International Gas Union Research Conference 2011 ECO-FRIENDLY LNG SRV: COMPLETION OF THE REGAS TRIAL Youngchul.Eum Seunghyuk.Kim Kyoungmin.Doh MunKeun.Ha SAMSUNG HEAVY INDUSTRIES, Geoje-Si, Gyeongsangnam-do,

More information

Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine Cycle

Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine Cycle Purdue University Purdue e-pubs International Refrigeration and Air Conditioning Conference School of Mechanical Engineering 2010 Low-Grade Waste Heat Recovery for Power Production using an Absorption-Rankine

More information

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile

20/06/2011 Seminar on Geothermal Exploitation Santiago de Chile Contents Power Plants Steam Power plants Binary Power plants Geothermal Power Plants Single flash systems Binary systems 1 Equipment Well head Gathering piping system Steam separators and moisture separators

More information

Improving energy efficiency in an ammonia plant

Improving energy efficiency in an ammonia plant Improving energy efficiency in an ammonia plant D. Velázquez, F. Rossi and J. Rodríguez of DVA Global Energy Services and F.Galindo of Fertiberia present the results of an energy study carried out in an

More information

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature

Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature Integrated production of liquid sulphur dioxide and sulphuric acid via a lowtemperature cryogenic process by M. Verri* and A. Baldelli* Synopsis The paper describes the design options available for the

More information

Simple Dew Point Control HYSYS v8.6

Simple Dew Point Control HYSYS v8.6 Simple Dew Point Control HYSYS v8.6 Steps to set up a simulation in HYSYS v8.6 to model a simple dew point control system consisting of: Gas chiller Flash separator Liquid stabilizer with gas recycle &

More information