1 Section Contents Five-Year Capital Plan FY through FY Project Funding Type Five - Year Plan Total ( $ 000 s ) State match to existing City funding bonded $79,200 Critical Maintenance for Community Colleges bonded $235,000 Health and Safety bonded Facilities Preservation bonded ADA bonded $29,000 C. of O. / P.A. Program bonded Energy Conservation bonded Science Lab Upgrades bonded $11,798 Minor Repairs hard dollar $20,000 Five-Year Plan Total $627,998 City Reso-A Requests FY 2019 (City Council and Borough Presidents) Project FY 2019 Request ( $ 000 s ) Health and Safety Projects at Community Colleges $4,000 Community Colleges Educational Technology Initiatives $3,000 Reso-A FY 2019 Request Total $7,000
2 Five-Year Capital Plan FY through FY Projects in priority order / costs in $ thousands Project Name FY FY FY FY FY (B) State match to existing City funding DC $79,200 (B) Critical Maintenance for Community DC $10,000 DC $30,000 DC $50,000 DC $65,000 DC $80,000 Colleges (B) Health and Safety DC $12,000 DC $20,000 DC $20,000 DC $20,000 DC $25,000 (B) Facilities Preservation DC $12,000 DC $20,000 DC $20,000 DC $20,000 DC $25,000 (B) ADA DC $3,000 DC $5,000 DC $6,000 DC $7,000 DC $8,000 (B) C. of O. / P.A. Program DC $3,000 DC $5,500 DC $6,000 DC $7,000 DC $8,000 (B) Energy Conservation DC $3,000 DC $5,500 DC $6,000 DC $7,000 DC $8,000 (B) Science Lab Upgrades DCE $1,365 DCE $1,433 DCE $2,000 DCE $3,000 DCE $4,000 (R) Minor Repairs DCE $4,000 DCE $4,000 DCE $4,000 DCE $4,000 DCE $4,000 Subtotal $127,565 $91,433 $114,000 $133,000 $162,000 Five-Year Plan Total Five-Year Need $79,200 $235,000 $29,000 $11,798 $20,000 $627,998 Project Descriptions (B) State match to existing City funding State match requested for city funding received in Fiscal Year 2018; represents state's 50% share of community college funding. $79,200 (B) Critical Maintenance for Community Colleges CUNY's community colleges comprise more than 100 buildings totaling approximately 7.4 million gross square feet. This initiative will implement a state-of-good-repair program to systematically address the University's capital facility renewal needs by replacing or renovating systems that are past their useful lives. Items to be addressed will include utilities and related controls, equipment and distribution systems; exterior walls, roofs, doors and windows; electrical equipment, power, wiring and lighting; built-ins in science facilities; campus hardscapes; and interior finishes. These repairs and renewal activities are essential to maintaining a state of good working order for facilities and infrastructure. $235,000
3 (B) Health and Safety This ongoing critical-maintenance effort will correct health and safety deficiencies identified in building condition assessment surveys and by college and Central Office personnel. This program includes projects that address campus safety and security, such as the provision of fire alarms and emergency phone stations, where appropriate. (B) Facilities Preservation This ongoing critical-maintenance effort will correct building systems deficiencies identified in condition assessment surveys by the colleges and Central Office staff. It focuses on restoring and preserving critical building infrastructure, including interior building systems and exterior building envelopes. (B) ADA This ongoing critical-maintenance effort will continue the removal of access barriers identified in building condition assessment surveys by the colleges and Central Office staff to advance compliance with the Americans with Disabilities Act and other federal and state statutes. The work includes remodeling of toilet facilities, stair landings and railings, signage, door widths and other building elements. $29,000 (B) C. of O. / P.A. Program This ongoing critical-maintenance effort will bring CUNY facilities into compliance with New York City Department of Buildings regulations by making minor corrections. Compliance is determined by issuance of certificates of occupancy and public assembly from the city.
4 (B) Energy Conservation This ongoing critical-maintenance effort will reduce energy consumption University-wide and promote compliance with New York City Local Law 86 as well as reduce carbon dioxide emissions under the mayor's "One City: Built to Last" initiative. This effort will include upgrading and/or installing advanced boiler controls in University facilities; retro-commissioning of facility energy-consuming infrastructure and systems; implementing a steam trap replacement program and an LED lighting program; and modifying laboratory ventilation systems to reduce energy consumption to acceptable levels while increasing the health and safety of occupants. (B) Science Lab Upgrades This ongoing critical-maintenance effort will renovate labs for instruction and research. Renovations will correct building service deficiencies in specific labs so that state-of-the-art equipment can be fully utilized and maintained. This project also will provide additional equipment for the laboratories. $11,798 (R) Minor Repairs This continuing initiative will permit the colleges to respond quickly to small emergencies as well as practice preventive maintenance. The funding also will support minor space modifications that promote more efficient program delivery. $20,000
5 City Reso-A Requests FY 2019 (City Council and Borough Presidents) In priority order / costs in $ thousands Health and Safety Projects at Community Colleges Phase: This is a request for city funding to correct identified health and safety deficiencies at the community colleges. This program includes projects that address campus safety and security, such as the provision of fire alarms and emergency phone stations, as well as upgrades to building mechanical systems and correction of code violations. DC FY 2019 City Request $4,000 State match $4,000 Community Colleges Educational Technology Initiatives Phase: This ongoing project provides upgrades to information technologies at CUNY community colleges to include expansion of data center technology to provide for the demands of increasing technology in education; upgrades to enterprise-class technologies that span integrated network management and security; enhancements to campus networks; and development of virtual environments that enable delivery of sophisticated academic technology offerings off-campus and via non-traditional devices. Latest efforts include the deployment of technologies to support mobile computing and implementation of technologies to address the changing delivery of higher education, including online courses and internet delivery. City Reso-A Request FY 2019 Total E FY 2019 City Request $3,000 State match $3,000 $7,000
6
Bronx Community College. Five-Year Capital Plan FY through FY
Five-Year Capital Plan FY 2019-20 through FY 2023-24 Projects in priority order / costs in $ thousands Project Name FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 (B) Campus-Wide Fire Alarm Replacement DC
More informationBorough President and City Council Capital Funding Requests FY 2008
Borough President and City Council Capital Funding Requests FY 2008 CIP Number Phase* Request $ Performing Arts Center - Phase 1 BY-1008031127 C $1,000,000 148 Ingersoll Roof Replacement BY-0928061526
More informationProject #1 (Prioritized): Proposed Project Title:
Six-Year Appropriated Capital Improvements Projects Plan 2009 through 2015 Institution Name: North Carolina A&T State University Project #1 (Prioritized): Proposed Project Title: Engineering Research Center
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 7 L DATE: June 27-29, 2017 ****************************************************************************** SUBJECT: FY18 HEFF M&R Projects
More informationKingsborough Community College
Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan FY 2018-19 through FY 2022-23 Project Funding Type Five - Year Plan Total ( $ 000 s ) Performing Arts Renovations
More informationKingsborough Community College
Section Contents College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY 2016-17 through FY 2020-21 Project Funding Type Five - Year Request Total ( $ 000 s ) Roof Replacement
More informationOBJECTIVE 1.1: To establish the acceptable use and capacity of each building.
GOAL 1: To implement planned and routine maintenance programs which will extend the useful life of all buildings and prevent premature capital outlay for replacement. Through managed maintenance, Facilities
More informationCOMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION
COMMERCIAL TENANT IMPROVEMENT PERMIT APPLICATION OFFICIAL USE ONLY Date: Permit #: Received by: For Staff Use Only: OFD ELEC Planning SITE LOCATION Site Address: Tax Parcel Number: TYPE OF WORK Building
More informationBorough President and City Council Capital Funding Requests FY 2009
Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ New Biology Lab LG-0927061401 DCE $1,000,000 Smart Classrooms LG-1010061511 CE $1,156,000 Subtotal $2,156,000
More informationTEXAS A&M ENGINEERING
TEXAS A&M ENGINEERING 312 Jack K. Williams Administration Building I 3126 TAMU I College Station, Texas 77843-3126 M. Katherine Banks, Ph.D., P.E. Vice Chancellor and Dean of Engineering Director, Texas
More informationNORTHEAST IOWA COMMUNITY COLLEGE 2018 FACILITY ASSESSMENT MAY 15, 2018
NORTHEAST IOWA COMMUNITY COLLEGE 2018 FACILITY ASSESSMENT MAY 15, 2018 INTENT The overriding goal of this assessment was to evaluate existing facilities to determine a scope of work that should be done
More informationEnergy Reduction Strategy Through 2020
Through 2020 Revised: August 2017 Executive Summary Auburn University is a land, sea and space grant university established in 1856. The university consists of 11,629,000 square feet on 1,840 acres and
More informationLUFacilities Policy Service Level Agreement v1.1
PURPOSE The Service Level Agreement (SLA) for University provides a detailed list of services offered by the LU Department. The SLA identifies which services are funded by the approved Lehigh University
More informationFacilities Maintenance & Operations Update. Presidents Executive Cabinet March 6, 2017
Facilities Maintenance & Operations Update Presidents Executive Cabinet March 6, 2017 1 Update Proposition 39 Year 4: March 6 March 31 Will complete all exterior lighting upgrades to LED Aquatic Center
More informationSOUTH DAKOTA BOARD OF REGENTS. Budget and Finance Consent ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Budget and Finance Consent AGENDA ITEM: 4 P DATE: December 5-7, 2017 ****************************************************************************** SUBJECT FY19 HEFF M&R Projects
More informationBALLOU SENIOR HIGH SCHOOL
INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE
More informationBorough President and City Council Capital Funding Requests FY 2009
Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ Aronow Theater Upgrades CC-1002070748 DC $1,433,000 Aaron Davis Interior Upgrades CC-1207051505 DC $1,261,000
More informationCOMMERCIAL PROJECT INFORMATION
Community Development Building and Inspection Services 2100 Ridge Avenue Evanston, Illinois 60201-2798 T 847.448.4311 FAX 847.448.8020 www.cityofevanston.org COMMERCIAL PROJECT INFORMATION The Community
More informationFacilities Feasibility Study Frederick Douglass HS Condition Assessment
Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies
More informationBUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION
I. PURPOSE BUCKNELL UNIVERSITY PROCEDURES FOR RENOVATIONS AND NEW CONSTRUCTION To ensure the proper process to request and obtain approval for all renovation or new construction projects within Bucknell
More informationSOUTH DAKOTA BOARD OF REGENTS. Committee on Budget and Finance ******************************************************************************
SOUTH DAKOTA BOARD OF REGENTS Committee on Budget and Finance AGENDA ITEM: III E DATE: December 4-5, 2013 ****************************************************************************** SUBJECT: FY15 HEFF
More informationFacilities Feasibility Study Laurence G. Paquin Building Condition Assessment
Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies
More informationFacilities Council Minutes October 4, 2016
Facilities Council Minutes October 4, 2016 Building I, Room I-202 3:00 p.m./3:05 pm Attendees: Melinda Merrell, Barry Baker, Mark Daniels, Mike Biell, Dave Parker, Mark White, Jose Perdomo, Doug Medbury,
More informationFunding Source. Ranking
Military Affairs Projects Summary ($ in thousands) Project Title Priority Ranking Funding Source Project Requests for State Funds 2016 2018 2020 West St. Paul 1 GO $ 4,500 $ 0 $ 0 St Cloud Facility Batch
More informationTO MEMBERS TO THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM UNIVERSITY SEISMIC SAFETY POLICY AND UPDATE ON PROGRAM FOR SEISMIC IMPROVEMENTS
Office of the President GB3 TO MEMBERS TO THE COMMITTEE ON : For Meeting of DISCUSSION ITEM UNIVERSITY SEISMIC SAFETY POLICY AND UPDATE ON PROGRAM FOR SEISMIC IMPROVEMENTS EXECUTIVE SUMMARY This discussion
More information/ Policy Number: Policy Name: Capital Planning and Development Processes Definitions
Page 1 7-101 Definition A. Alternative Construction Delivery Methods: Building Delivery Processes that vary from the more standard Design-Bid-Build model. These may include Construction Manager-At-Risk
More informationBOARD OF TRUSTEES OCTOBER 13, 2014
Measure E BOARD OF TRUSTEES OCTOBER 13, 2014 FACILITIES UPDATE Measure Q 1 RECENTLY COMPLETED PROJECTS Santa Ana College Perimeter Site Improvements Building G Renovation Artesia Street Improvements Property
More informationExterior Elevated Elements Inspection Guidelines
Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code
More informationEQUIVALENT INITIAL FIRE SAFETY ASSESSMENT
EQUIVALENT INITIAL FIRE SAFETY ASSESSMENT Factory 191-192 Baizid Bostami Road, Nasirabad Industrial Area, Chittagong 24 May 2014 The Alliance for Bangladesh Worker Safety Page 1/13 24 May 2014 Introduction
More informationUAS Capital Requests FY11
UAS Capital Requests FY11 August 4, 2009 FY11 UAS Request Increments in Planning Group and Priority Order Capital Request in Priority Order Request Planning Group Total GF NGF Total Request MAU Priority
More informationA PRESENTATION OF THE SCHEMATIC DESIGN FOR THE HILTON COLISEUM IMPROVEMENTS 1999 PROJECT WILL BE MADE AT THE MARCH BOARD MEETING MEMORANDUM
A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE HILTON COLISEUM IMPROVEMENTS 1999 PROJECT WILL BE MADE AT THE MARCH BOARD MEETING ISU B-1 MEMORANDUM To: From: Subject: Board of Regents Board Office Register
More informationBorough President and City Council Capital Funding Requests FY 2008
Borough President and City Council Capital Funding Requests FY 28 CIP Number Phase* Request $ Upgrade Library Videocasting Technology CL-9266125 E $352, Building Exterior Improvements CL-146922 DCE $454,
More informationTO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: ACTION ITEM CONSENT
Office of the President TO MEMBERS OF THE FINANCE AND CAPITAL STRATEGIES COMMITTEE: For the Meeting of November 16, 2016 ACTION ITEM CONSENT APPROVAL OF THE NON-STATE BUDGET, CENTER FOR THE HEALTH SCIENCES
More informationWelcome Center, New Student Services, and Career and Employment Services
Architectural Program Welcome Center, New Student Services, and Career and Employment Services East Memorial Stadium Renovation May 2014 Prepared By Table of Contents Introduction.... 1 Competitive Market....
More informationPigeon Lake Regional High School Falun, Alberta
Pigeon Lake Regional High School School Facilities Evaluation Project Pigeon Lake High Wetaskiwin Regional District No.11 Pigeon Lake High EXECUTIVE SUMMARY In November 1999 Alberta Infrastructure engaged
More informationBiddeford School Department
Biddeford School Department 5 Plan Buildings, Grounds & Equipment Table of Contents: John F Kennedy Memorial School Page: 1-2 Biddeford Primary School Page: 3-4 Biddeford Intermediate School Page: 5-6
More informationBorough President and City Council Capital Funding Requests FY 2009
Borough President and City Council Capital Funding Requests FY 2009 CIP Number Phase* Request $ New Gym Flooring and Bleachers QC-1114051810 C $750,000 HVAC for Tennis Bubble QC-0928061800 DC $511,000
More informationDAVIS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-
More informationLOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN
INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS
More informationMCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND
MCKINLEY INSTITUTE OF TECHNOLOGY N E I G H B O R H O O D M E E T I N G A P R I L 2 4, 2 0 1 7 1 1 LPA MASTER PLAN 2 PHASE 1 SCOPE Blue Line 3 PHASE 1 SCOPE Blue Line 4 BOND T REVISED PROGRAM SCOPE 1 Modernize
More information(Continued on next page)
FULL TEXT OF BALLOT MEASURE E LONG BEACH UNIFIED SCHOOL DISTRICT REPAIR AND SAFETY MEASURE. To improve outdated classrooms/neighborhood schools by: improving technology/labs/career education classrooms/electrical
More informationFacilities Feasibility Study Matthew A. Henson ES Condition Assessment
Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for
More informationELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015
ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION
More informationSEATON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationProposed Project Title: _
REQUEST FOR CAPITAL PROJECT OR FEASIBILITY STUDY UNIVERSITY OF ILLINOIS SPRINGFIELD CAMPUS Proposed Project Title: _ Building Name and Number: Room Number(s): Project Description/Scope of Work/Floorplan
More informationMAURY ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More information0B MAGNOLIA HALL. Scale: 1:110. Date: Feb Time: 7:40 pm. User: brady. 10 ft
0B 2 m 1:110 7:40 pm. 01 5 m 1:230 7:38 pm. 02 5 m 1:230 7:38 pm. 03 5 m 1:230 7:45 pm. Facility Profile ( FP-1 ) City: State: Country: Address: Stories: Attic: Basement: Glassboro New Jersey United States
More informationCornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2017 Annual Analysis Purpose and Methodology. ECI Campus Summary:
Purpose and Methodology ECI Campus Summary: Starting in the 2011/2012 fiscal year, a yearly energy metrics analysis is being performed. This analysis supports creating Facilities Metrics and evaluation
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior
More informationTABLE OF CONTENTS Page
TABLE OF CONTENTS Page Executive Summary i Facility Profile and Summary 1 Section 1 Site Conditions 4 Section 2 Building Exterior 7 Section 3 Building Interior 11 Section 4 Mechanical Systems 14 Section
More informationINSTRUCTIONS FOR DIVISION 00 DOCUMENTS
INSTRUCTIONS FOR DIVISION 00 DOCUMENTS Division 00 is the first section of the specifications for construction. For each advertised bid project, the College/University must direct the Architect/Engineer
More informationHUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014
HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing
More informationUNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL NEW CONSTRUCTION AND/OR IMPROVEMENTS
For Office Use Only Received By: Date: 234 Pittsburgh Street Uniontown, PA 15401 724-439-3440 Phone 724-439-3144 Fax Amount Paid: Check #: UNIFORM CONSTRUCTION CODE (UCC) BUILDING PERMIT APPLICATION RESIDENTIAL
More informationArchitectural Services Consultant Registration Form
Architectural Services Consultant Registration Form Send three copies of the completed registration form to: San Bernardino Community College District, Facilities Project Management, Attn: Scott Stark,
More informationFifteen Year Plan for Energy Efficiency and Conservation Projects
Fifteen Year Plan for Energy Efficiency and Conservation Projects Presented to the Board of Trustees of the Northeastern Ohio Universities Colleges of Medicine and Pharmacy, December, 2008, in accordance
More informationCity of South Pasadena COMMUNITY IMPROVEMENT
City of South Pasadena COMMUNITY IMPROVEMENT Office Address: Mailing Address: 6940 Hibiscus Ave S 7047 Sunset Dr S South Pasadena, FL 33707 South Pasadena, FL 33707 *PHONE: (727) 343-4192 * FAX: (727)
More informationMorehouse School of Medicine
/0/00 Print /0/00 00 Campus General Building ID Built 7098 98 Renovated Gross Square Feet Building Type Current Replace Value 00 - ACADEMIC FALITIES $ FC/QI (%) > 00.00 Electrical Lighting upgrades/retrofits
More informationInspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.
Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure
More informationPRESCRIPTIVE COMPLIANCE METHOD
CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already
More informationAPPA Institute for Facilities Management
Project Costs & Investments Institute for Facilities Management Do you ever have this question Why does it cost so much?? High Compared to What? Frame of reference 1 High Compared to What? Compared to
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationMeasure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014
Measure T Project List 2014 Santa Maria-Bonita School District Prop 39 School Bond November 4, 2014 Measure T DEFINED: Measure T is a local ballot measure on the November 2014 ballot seeking voter authorization
More informationPiping system (steam, hot water, chilled water system) including pipe and duct insulation needs replacement.
NW Corridor Transit Planning Union Station Existing Conditions Technical Memorandum (Physical and Operational Assessments) Executive Summary Capitol Region Council of Governments Prepared in cooperation
More informationWATKINS ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationREQUEST FOR QUALIFICATIONS DESIGN BUILD SERVICES FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNEX FAIR PARK DALLAS, TEXAS
REQUEST FOR QUALIFICATIONS for DESIGN BUILD SERVICES for FACILITY IMPROVEMENTS AT MUSIC HALL, AFRICAN AMERICAN MUSEUM & AQUARIUM ANNE at FAIR PARK DALLAS, TEAS ISSUED: MARCH 8, 2018 DUE: APRIL 6, 2018
More informationCONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS
CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL
More informationSANTA ROSA JUNIOR COLLEGE
EXPENDITURES Eligible Bond Program Costs 1,363,848 451,690 622,090 74,757 10,295 85,053 2,522,681 RENOVATION AND MODERNIZATION Upgrade classrooms, laboratories, support service space at all locations 298,139
More informationHartsville Area Schools - Building Evaluations
Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:
More informationWILKINSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More information1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %
BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope
More informationT H E T O W N O F G U I L F O R D V E R M O N T
Project Title: Contact: Capital Needs Assessments Town of Guilford Buildings Peder Rude, Town Administrator Email: pederrude@guilfordvt.net (802) 254-6857, ext. 105 Town of Guilford 236 School Road Guilford,
More informationCornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2014 Annual Analysis Purpose and Methodology. ECI Campus Summary:
Purpose and Methodology ECI Campus Summary: Starting in the 2011/2012 fiscal year, a yearly energy metrics analysis is being performed. This analysis supports creating Facilities Metrics and evaluation
More informationArchitect and Engineer: Friar Associates inc.
Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities
More informationHATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES
HATFIELD TOWNSHIP DECK/PATIO PERMIT PROCEDURES A deck/patio permit is required for all construction including decks, renovation of existing decks/patio, paver patios, and retaining walls (over 30 inches).
More informationThe Richard Stockton College of New Jersey Capital Project Budget Expenditure Report November 30, 2015 Table of Contents
The Richard Stockton College of New Jersey Capital Project Budget Expenditure Report November 30, 2015 Table of Contents Page Internal Capital Projects Summary 1 FY14 Carryforward Internal Capital Projects
More informationMadison School District. Strategic Five-Year Facility Maintenance Plan
Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since
More informationVelma F Thomas Early Childhood Center
Facility Assessment Summary This report summarizes the findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility feature and system by visual
More informationQuality Safety Service Value
Quality Safety Service Value Generating Value Through Sustainable Asset & Energy Solutions MOPAC is a multi-specialty services contractor focused on the design, construction and preservation of commercial,
More informationRenovation and Renewal Five Year Plan 2011/2012
11/12 ADA Accessibility and Disability Act CAM CAM: ALL FY Miscellaneous ADA Interior Construction $1,217,500 $1,217,500 ADD Additional Funding CMA CMA: Renewal of HVAC System (Replacement) HVAC $500,000
More informationa collaborative process
2017 Referendum Belleville Public Schools July 26, 2017 a collaborative process Introduction Di Cara Rubino Architects Jerry Rubino, AIA Firm Principal Allen Barnett, AIA, LEED AP Senior Project Manager
More informationHERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW
HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW 27 September 2007 prepared by: J. CHRIS EVANS ARCHITECT 3220 E. Terra Alta Blvd. No. 9 Tucson, Arizona 85716 520.319.8835 evansarch@hotmail.com
More informationCornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2015 Annual Analysis Purpose and Methodology. ECI Campus Summary:
Purpose and Methodology ECI Campus Summary: Starting in the 2011/2012 fiscal year, a yearly energy metrics analysis is being performed. This analysis supports creating Facilities Metrics and evaluation
More informationConnecticut Housing Finance Authority. Construction Guidelines: Energy Conservation 2018
Connecticut Housing Finance Authority Construction Guidelines: Energy Conservation 2018 These Guidelines are effective January 1, 2018 I. Energy Conservation Guidelines Construction Guidelines: Energy
More informationAdministration Building Needs Assessment
Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural
More informationCondition Assessments
2017 Webinar Condition Assessments How to Keep Deferred Maintenance from Nipping at Your Heels August 31, 2017 Presented By: Christopher M. Kopach, AVP, The University of Arizona; APPA President Henry
More informationMANASQUAN PUBLIC SCHOOL DISTRICT PROPOSED JANUARY 24, 2017 BOND REFERENDUM PROGRAM
PROPOSED JANUARY 24, 2017 BOND REFERENDUM PROGRAM 713 Creek Road Bellmawr, NJ 08031 Telephone (856) 396-6200 Facsimile (856) 396-6205 Please visit us on the web at www.garrisonarch.com AGENDA 1. NJDOE
More informationRebuilding our schools for health, safety, and cutting edge 21 st century learning
Rebuilding our schools for health, safety, and cutting edge 21 st century learning The problem The state of our schools: aging infrastructure The plan The Sustainable Built Environment Strategy: deep retrofits
More informationBARNARD ELEMENTARY SCHOOL
INITIAL YEAR BUILT 2002 BUILDING AREA 67,000 SF CURRENT PROGRAM CAPACITY 520 ENROLLMENT 2008 329 WARD 4 PROPOSED PROGRAM CAPACITY 450 Site Plan BARNARD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationTOWN OF PERINTON 1350 TURK HILL ROAD. FAIRPORT, NEW YORK (585) , Fax: (585) ,
BUILDING PERMIT REQUIREMENTS FOR BASEMENT REMODELING 1. Provide two copies of a detailed floor plan and elevation drawing, see sample drawings on page 9 and 10. Include materials, sizes, supports, heating,
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationAmos Alonzo Stagg Elementary School 7424 S Morgan St Chicago, IL 60621
2 S Morgan St Chicago, IL 21 Facility Assessment Report This report contains a summary of the results from the facility assessment completed on the date noted in the document footer below. This report
More informationStevens High School Pre Bond Presentation Claremont, NH
Stevens High School Pre Bond Presentation Claremont, NH Existing Conditions Existing Conditions Existing Conditions Existing Conditions Proposed site features New main entry that is ADA accessible New
More informationLECKIE ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationBENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY
BENSON CITY HALL/POLICE DEPARTMENT FACILITY ASSESSMENT AND FEASIBILITY STUDY Prepared for the City of Benson, Minnesota by Widseth Smith Nolting May 2016 City of Benson, Minnesota CITY HALL/POLICE STATION
More informationHealth Life Safety Survey and Master Facilities Plan
Health Life Safety Survey and Master Facilities Plan Community Presentation Board Meeting June 22, 2015 June 22, 2014 Board Presentation Overview and Summary of the Health Life Safety Survey and Master
More informationdate: 10 july 2012 the pennsylvania state university: burrowes building
the pennsylvania state university: burrowes building. faculty/staff committee project overview introductions goals of the renovation critical considerations exterior envelope mechanical systems interior
More informationSchool Without Walls
INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationGoverning Board Capital Construction Program Annual Workshop September 10, 2013 Agenda
Governing Board Capital Construction Program Annual Workshop September 10, 2013 Agenda Prop R Status Projects Completed Status of Facilities Master Plans Prop R 5-Year Construction Plan Summary; IPP s
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationDeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016
DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016 PARSONS School Assessment Report Table of Contents School Executive Summary 4 School Condition Summary