1 LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: 9 DEC 2014 PERIODIC INSPECTION REPORT PREPARED BY THE U.S. ARMY CORPS OF ENGINEERS, SAN FRANCISCO DISTRICT SUBMITTED: NOVEMBER 2013 INSPECTED: MARCH 19-21, 2013
2 EXECUTIVE SUMMARY This Executive Summary provides an introduction to the Ballona Creek 4 (BC4) Levee System Periodic Inspection Report No. 1, an overview o the system, a summary o the major indings o the periodic inspection, and the overall rating or the system. 1.1 Scope and Purpose o Periodic Inspections The purpose o this levee system periodic inspection is to identiy deiciencies that pose hazards to human lie or property. The inspection is intended to identiy the issues in order to acilitate uture studies and associated repairs, as appropriate. This assessment o the general condition o the levee system is based on available data and visual inspections. Detailed investigation and analysis involving hydrologic design, topographic mapping, subsurace investigations, testing, and detailed computational evaluations is beyond the scope o this levee system inspection. 1.2 System Summary The BC4 Levee System is located in the City o Los Angeles in Los Angeles County, Caliornia. The levee length, as scoped, consisted o Segment 4a, maintained by the Los Angeles County Department o Public Works (LACDPW), and Segment 4b, maintained by the Corps o Engineers. During the inspection, it was ound that all o Segment 4b and part o Segment 4a were channels with no levee prism. The total length o the system is approximately 2.63 miles, not including the channel reaches. The BC4 Levee System runs along the let bank o Ballona Creek between the Centinela Creek conluence at Station to Overland Avenue at approximately Station Figure 1 shows the extent o the levee system. Note that a levee does not exist along the reach upstream o the Overland Avenue, thereore, the upper reach o the original BC4a Segment and the BC4b Segment have been removed rom the BC4 Levee System, and are thus not discussed in the main body o the periodic inspection report. The BC4 Levee System downstream o Centinela Avenue bridge at Station consists o a sot or earthen bottom trapezoidal channel with stone revetment on the lower part o the bank, and reinorced concrete revetment on the upper part o the bank where the levee had been raised. The bottom o the channel upstream o the Centinela Avenue bridge crossing is concrete. The BC4 Levee System transitions rom a trapezoidal channel to a concrete U-wall channel with side slopes at the top o each bank between Station and It is a rectangular channel upstream rom Station According to the as-built drawings, the BC4 Levee System consists o 5 side drainage structures and 8 bridge crossings. The BC4 Levee System, along with other similar works in the Los Angeles County Drainage Area (LACDA), was authorized initially by the Emergency Relie Act o 1935 to provide drainage and lood control. On 30 June 1937 it was transerred to the more comprehensive project adopted in the Flood Control Act o 22 June The Flood Control Acts approved 22 June 1936 and 15 May 1937, authorized the construction o reservoirs and channel improvements on the Los Angeles and San Gabriel rivers and Ballona Creek, and tributaries thereo. The Flood Control Act approved 18 August 1941, approved the general comprehensive plan or lood control and other purposes in the basins o these streams. Page 2 o 5
3 1.3 Summary o Major Deiciencies Found and Subsequent Repairs The levee system was inspected on 19 through 21 March During the periodic inspection o the system, several deiciencies were noted or which remedial actions are required. The corroded corrugated metal pipe (CMP) at Station just downstream o the Sawtelle Boulevard bridge was critically unacceptable. The Los Angeles County Department o Public Works (LACDPW) has since made repairs to: the 18-inch diameter CMP at Station and the caved-in stone revetment just downhill o the pipe; the 30-inch diameter CMP at Station ; and the 24-inch diameter CMP at Station These deiciencies and repairs are urther discussed under item 9, Interior Drainage System checklist in Appendix III o the Periodic Inspection Report. Photos and s documented completion o the repairs, and were provided by 11 September Other major deiciencies that were noted during the periodic inspection o the project eatures are: non-compliant vegetation growth; encroachments that prevent proper inspection o the landside slope (e.g. ence) and/or negatively impact the integrity o the levee (e.g. culverts); unknown condition o the culvert penetrations (i.e. internal inspection has not been perormed); elevations or the levee system have not been re-evaluated based on guidance provided in ER The levee crest elevations could not be directly compared to the as-built elevations to assess settlement and capacity (with respect to top o system elevation); depression observed in the stone revetment near the downstream end o the levee system; crack longitudinal to the levee was observed approximately ¼ way up rom the toe o the bank. The crack propagated through both wing walls o the drainage structure at approximately Station and had a vertical oset o ¾ at Station ; and spalling and cracking was observed in the reinorced concrete revetment on the waterside levee slope. 1.4 Overall Rating The Levee Saety Out-Brie Meeting was held 23 July The BC4 Levee System is tentatively rated Minimally Acceptable until urther review rom USACE Los Angeles District (herein reerred to as USACE). A Minimally Acceptable system rating is deined as: One or more items are rated as Minimally Acceptable or one or more items are rated as Unacceptable and an engineering determination concludes that the Unacceptable items would not prevent the segment/ system rom perorming as intended during the next signiicant runo event. The local sponsors will be notiied o the overall rating o the levee system by letter with instructions to correct the Unacceptable rated items as soon as possible, not to exceed two years, Page 3 o 5
4 and to correct the Minimally Acceptable rated items so that they do not deteriorate urther and become Unacceptable. Page 4 o 5
5 u ;_... 0 I t. ~ n ~! c...,...,w.. i....,.,, e w--! !I. ~. :1 ~..,.,.... g.. or~ (II. ; ~ \..,.,...,, Playa Vista ~-. i """.-oo I. i r CwllllPl... Alsace!!.,~br ~-~.., Blanco-Culver Crest, I. I - channel - Levee Leveed A rea EJ:I Proposed Leveed Area Blair Hills I~ 0 \, ,200 ~-----""======:::I Feet Basemap Source: ESRI. World Imagery. Last updated June Accessed on maps/world_lmagery. \., Figure 1: Ballona Creek 4 Levee System Page 5 o 5 "llr.. ~... 1,... 4 ~hu;~~d;;n, ~lon;;;~avte~~ USGS. ~ptermap. PC, NRCAN, Esri,dapan. METI, Esn Ch1na (Ho..ng Kong), Esn, om om, ~!>...,..,.. ~ ~\. ~ ~ g i LOCATION AND LEVEED AREA MAP r ~ U.S. ARMY CORPS OF ENGINEERS LOS ANGELES DISTRICT
SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN GABRIEL RIVER/SAN JOSE CREEK 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010052 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More informationLOS ANGELES RIVER 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010078 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: AUGUST 26, 2015 PERIODIC INSPECTION
More informationCOYOTE CREEK 4 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD ID #
LOS ANGELES COUNTY, CALIFORNIA NLD ID # 3805010027 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY SEPTEMBER 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: 19 SEPTEMBER 2012 PERIODIC
More informationSAN DIMAS WASH 6 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010067 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: FEBRUARY 27, 2015 PERIODIC
More informationCOYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010025 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: MARCH
More informationAGUA FRIA RIVER 5 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID #
AGUA FRIA RIVER 5 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID # 3805020001 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING
More informationSAN DIMAS WASH 7 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010066 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: FEBRUARY 27, 2015 PERIODIC
More informationSAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: APRIL 19, 2017 PERIODIC
More informationLOS ANGELES RIVER/ COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/ COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010033 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationMILL CREEK LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010056 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: SEPTEMBER 23, 2013
More informationSANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA ANA RIVER/ SAN TIMOTEO CREEK 1 LEVEE SYSTEM SAN BERNARDINO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805030015 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationSAN GABRIEL RIVER/COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID #
SAN GABRIEL RIVER/COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID # 3805010035 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationSAN GABRIEL RIVER 1 LEVEE SYSTEM LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES AND ORANGE COUNTIES, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: MARCH 15, 2013
More informationSANTA ANA RIVER 1 LEVEE SYSTEM (UPSTREAM REACH) ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA ANA RIVER 1 LEVEE SYSTEM (UPSTREAM REACH) ORANGE COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010039 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More informationSANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID #
SANTA MARIA RIVER 3A LEVEE SEGMENT SANTA BARBARA COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010095 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL
More informationSAN LUIS REY RIVER 3 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010012 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: DECEMBER 15, 2017 PERIODIC INSPECTION
More informationSAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN GABRIEL RIVER/ COYOTE CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010031 PERIODIC INSPECTION REPORT NO. 2 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE
More informationLOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationLOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/RIO HONDO DIVERSION 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010047 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationCOYOTE CREEK 3 LEVEE SYSTEM LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD ID #
LOS ANGELES COUNTY AND ORANGE COUNTY, CALIFORNIA NLD ID # 3805010025 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY SEPTEMBER 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE: 19
More informationLOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010033 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationINDIAN BEND WASH 2 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID #
INDIAN BEND WASH 2 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID # 3805020008 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING
More informationLOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID #
LOS ANGELES RIVER/COMPTON CREEK 2 LEVEE SYSTEM LOS ANGELES COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010033 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE
More informationINDIAN BEND WASH 4 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID #
INDIAN BEND WASH 4 LEVEE SYSTEM MARICOPA COUNTY, ARIZONA NLD SYSTEM ID # 3805020009 PERIODIC INSPECTION REPORT NO. 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: MINIMALLY ACCEPTABLE FINAL RATING
More informationVENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID #
VENTURA RIVER 1 LEVEE SYSTEM VENTURA COUNTY, CALIFORNIA NLD ID # 380510086 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY 8 JUNE 2012 FINAL RATING: MINIMALLY ACCEPTABLE FINAL RATING DATE:
More informationSAN DIEGO RIVER 2 LEVEE SYSTEM SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID #
SAN DIEGO COUNTY, CALIFORNIA NLD SYSTEM ID # 3805010007 PERIODIC INSPECTION REPORT NO 1 GENERALIZED EXECUTIVE SUMMARY FINAL SYSTEM RATING: UNACCEPTABLE FINAL RATING DATE: MARCH 7, 2016 PERIODIC INSPECTION
More informationLEVEE DEFICIENCY CORRECTION PROCEDURES
LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 24 APRIL 2015 LEVEE SAFETY PROGRAM Deficiencies noted on the inspection checklist portion of the Periodic Inspection Report shall be addressed
More informationLEVEE DEFICIENCY CORRECTION PROCEDURES
LEVEE DEFICIENCY CORRECTION PROCEDURES USACE, LOS ANGELES DISTRICT 26 JANUARY 2016 LEVEE SAFETY PROGRAM Revised 26 MARCH 2018 Deficiencies noted on the inspection checklist portion of the Periodic Inspection
More informationUSACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED
USACE LEVEE RISK ASSESSMENT PROCESS LESSONS LEARNED 1 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56
More informationFlood Damage Reduction Segment / System Inspection Report
Name of Segment / System: Public Sponsor(s): Public Sponsor Representative: Sponsor Phone: 219-595-0599 Sponsor Email: Little Cal - Borman NPS Federal Sponsor - Little Calumet River Basin Development Commission,
More informationPRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS
PRESENTATION FOR THE POTENTIAL ADDITION OF SPECIAL FLOOD HAZARD AREAS 1 255 255 255 237 237 237 217 217 217 200 200 200 Part 1: Summary of Floodplain Analysis for Los 0 Angeles 163 131 River239 110 112
More informationARKANSAS & LOUISIANA LEVEE AND DRAINAGE DISTRICTS MEETINGS
ARKANSAS & LOUISIANA LEVEE AND DRAINAGE DISTRICTS MEETINGS Rodney Nordby Vicksburg District Red River Projects Office Bossier City, LA. 25-26 January 2017 AGENDA - Types of Inspections - Levee Maintenance
More informationFlood Damage Reduction Segment / System Inspection Report
Name of Segment / System: Public Sponsor(s): Public Sponsor Representative: Sponsor Phone: 219-595-0599 Sponsor Email: Federal Sponsor - Little Calumet River Basin Development Commission, Owner - Town
More informationUSACE SPL Levee Safety Program Driving Risk Down NEVADA
Los Angeles District COE Jody Fischer P.E. Levee Safety Program Manager Patti Sexton P.E. VP Tetra Tech OREGON USACE SPL Levee Safety Program Driving Risk Down NEVADA IDAHO WYOMING A Presentation for the
More informationENGINEERING REPORT STRUCTURAL STABILITY ANALYSIS FLOODWALLS. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1
ENGINEERING REPORT STRUCTURAL STABILITY ANALYSIS FLOODWALLS HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1 ANSONIA and DERBY, CONNECTICUT December 2010 MMI #1560-119 and #3118-03
More informationPrince George s County, MD Levee Response and Remediation Plan
Prince George s County, MD Levee Response and Remediation Plan Presented By: Hilary Stephens-Kendro Prepared for: Prince George s County Department of Public Works and Transportation Project Background
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2016 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-16-163 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More information(b) The written request must include 5 components: 1 The Permit Review and Approval Process. (1) Step 1: Pre-Coordination.
1 The Permit Review and Approval Process The processing of a Section 408 Permit request begins with a written request from an applicant. Along with the written request, a permit application (attached)
More informationCOACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE
COACHELLA VALLEY WATER DISTRICT GUIDELINE K-2 SLOPE (BANK) PROTECTION DESIGN GUIDANCE K.2.1 General Requirements The design and construction of slope protection works may be required for several types
More informationHYDROLOGY STUDY LA MIRADA BOULEVARD La Mirada, California
HYDROLOGY STUDY 12000 LA MIRADA BOULEVARD La Mirada, California TTM 73119 Prepared for: The Olson Company 3010 Old Ranch Parkway, Suite 100 Seal Beach, CA 90740 Contact: Mr. Aaron Orenstein (562) 370-9531
More informationUSACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES
USACE LEVEE AND DAM SAFETY PROGRAM AND ISSUES 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130
More informationPrepared for: City of Jeffersonville. November Prepared by
JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington
More informationDESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2017-18 THROUGH 2021-22 Project Number Stg No. Project
More informationTechnical Memorandum Channel Capacity Report 2018 Restoration Year
Technical Memorandum Channel Capacity Report 2018 Restoration Year 1 Table of Contents 2 1.0 Executive Summary... ES-1 3 4 2.0 Introduction... 1 5 2.1 Objective... 2 6 2.2 CCAG Roles and Responsibilities...
More informationU.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT
PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS BUILDING STRONG LOS ANGELES DISTRICT APPLICATION FOR PERMIT Rancho Paloma Residential Development Public Notice/Application No.: SPL-2014-00044-PC Project: Rancho
More informationDESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS THROUGH
RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT DESIGN & CONSTRUCTION BUDGET AND FIVE YEAR CIP PROJECT SUMMARY - ZONE 1 FISCAL YEARS 2018-19 THROUGH 2022-23 Project Number Stg No. Project
More informationLimited Visual Dam Safety Inspections OA Wahiawa Dam. Oahu, Hawaii
Limited Visual Dam Safety Inspections OA00017 Wahiawa Dam Oahu, Hawaii Prepared by: U.S. ARMY CORPS OF ENGINEERS HONOLULU DISTRICT STATE OF HAWAII DEPARTMENT OF LAND AND NATURAL RESOURCES May 2006 Dam
More informationAMERICAN ELECTRIC POWER (SWEPCO)
2015 DAM & DIKE INSPECTION REPORT ASH PONDS GERS-15-034 WELSH POWER PLANT AMERICAN ELECTRIC POWER (SWEPCO) CASON, TEXAS NATIONAL INVENTORY NO. TX4357 PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION
More information09 July 2013 Revision
09 July 2013 Revision This flowchart was created by the Flood Protection and Navigation Section of the.s. rmy Corps of Engineers (SCE) Sacramento District (SPK) in consultation with the Geotechnical Engineering
More informationRegulation 18 August 2009 NO Operations and Maintenance LEVEE ENCROACHMENT STANDARDS AND PROCEDURES
CENWP-EC DEPARTMENT OF THE ARMY PDR 30-2-5 Portland District, Corps of Engineers (Draft) P.O. Box 2946 Portland, Oregon 97208 Regulation 8 August 2009 NO. 30-2-5 Operations and Maintenance LEVEE ENCROACHMENT
More informationU.S. Army Corps of Engineers Los Angeles District. US Army Corps of Engineers BUILDING STRONG
U.S. Army Corps of Engineers Los Angeles District US Army Corps of Engineers BUILDING STRONG 1. Opening Comments; 2. Los Angeles County Drainage Area Project As-Built Condition, Current Condition, and
More informationHYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006
HYDROLOGY REPORT HEACOCK & CACTUS CHANNELS MORENO VALLEY, CALIFORNIA NOVEMBER 2005 REVISED APRIL 2006 REVISED AUGUST 2006 RIVERSIDE COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT TABLE OF CONTENTS
More informationFlood Fighting and Surveillance
Flood Fighting and Surveillance Don Moses Civil Engineer February 2016 US Army Corps of Engineers 1 Agenda Levee Design Common Failure Modes Surveillance/Inspection Flood Fighting 2 Levee Design Issues
More informationRegional Vegetation Variance
Paige Caldwell, P.E. Emergency Manager Overview Key points from the ETL guidance Vegetation variance authority and background Key points of variance guidance Next Steps Key points from the newly revised
More informationNOTICE OF PREPARATION
NOTICE OF PREPARATION Date: June 12, 2014 To: From: Subject: Governor s Office of Planning and Research/State Clearinghouse Unit, Responsible Agencies, Trustee Agencies, and Interested Parties Announcement
More informationVisual Inspection Checklist
APPENDIX Q. Visual Inspection Checklist Thispageintentionallyleftblank. VISUAL INSPECTION CHECKLIST CITY OF AUBURN PUBLIC WORKS DEPARTMENT INSPECTION YEAR: TYPE OF INSPECTION: (Informal, Regular, Formal):
More informationSupplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania
Supplemental Watershed Plan Agreement No. 10 for Neshaminy Creek Watershed Core Creek Dam (PA-620) Bucks County, Pennsylvania Project Authorization USDA's Small Watershed Program is carried out under the
More informationPatterson Irrigation District Policy Regarding Urban Developments and Encroachments
Patterson Irrigation District Policy Regarding Urban Developments and Encroachments The purpose of this policy is to set reasonable requirements for new developments impacting DISTRICT s mission, facilities
More informationChapter A-13 STRUCTURAL ANALYSIS ARGENTINE RAISE
Kansas Citys, Missouri and Kansas Flood Damage Reduction Feasibility Study (Section 216 Review of Completed Civil Works Projects) Engineering Appendix to the Interim Feasibility Report Chapter A-13 STRUCTURAL
More informationAppendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South
Appendix Q Draft Location Hydraulic Study Report For the State Route 32 Widening Between Fir Street and Yosemite Drive at Dead Horse Slough and South Fork Dead Horse Slough in the, California Draft Location
More informationFlood Damage Reduction Segment / System Inspection Report
Name of Segment / System: Public Sponsor(s): Public Sponsor Representative: Sponsor Phone: 219-595-0599 Sponsor Email: Little Cal - Highland Little Calumet River Basin Development Commission Dan Repay
More informationFEMA Levee Certification Ventura County, California
Ventura County Watershed Protection District FEMA Levee Certification Ventura County, California Ventura River Levee (VR-1) Pacific Ocean to Canada de San Joaquin Evaluation Report February 20, 2009 TETRA
More informationENGINEERING REPORT. Blair Lane to Blairmont Drive Drainage Improvements. PREPARED FOR: City of Lebanon Engineering Department
engineers planners surveyors environmental scientists landscape architects ENGINEERING REPORT Blair Lane to Blairmont Drive Drainage Improvements PREPARED FOR: City of Lebanon Engineering Department PREPARED
More informationMODEL Stormwater Local Design Manual. City of Centerville
MODEL Stormwater Local Design Manual City of Centerville Adopted December 6, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 1 2.1. DETENTION REQUIREMENTS... 1 2.1.1. Discharge
More informationDry Creek Flood Control Improvement Project
Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)
More informationWestside Water Quality Treatment Project Proposition 13 Photo Diary Final Report March /31/02 QMM02B
Westside Water Quality Treatment Project Proposition 13 Photo Diary Final Report March 2008 Southern California Region Westside Water Quality Treatment Project Project Objective: Design and construct a
More informationCase Study 15. Moonlight Crossing Concrete Box Vented Ford
Appendix A Case Study 15 Case Study 15. Moonlight Crossing Concrete Box Vented Ford Location Northeastern California. Plumas National Forest. On Lights Creek, 8 miles north of Taylorsville, CA., Forest
More informationCurrent / Recent Construction Projects
Zone 1 Report to the Zone Commissioners By Jason Uhley, General Manager-Chief Engineer November 2017 Current / Recent Construction Projects Monroe MDP - Monroe Channel Stage 4 (1-8-00071-04) In June 2017,
More informationStrathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A
Strathcona County Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830 A P P E N D I X G BRIDGE ASSESSMENT E00311A BF 73649 E/W Bridge Culverts Highway 15 Crossing Astotin Creek Bridge
More informationDEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA PUBLIC NOTICE
DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT 1325 J STREET SACRAMENTO CA 95814-2922 408 Permission Section PUBLIC NOTICE REQUEST FOR PERMISSION TO ALTER A U.S. ARMY CORPS OF
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationCODORUS CREEK FLOOD RISK MANAGEMENT PROJECT - STAKEHOLDERS MEETING
CODORUS CREEK FLOOD RISK MANAGEMENT PROJECT - STAKEHOLDERS MEETING 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 Ray Tracy, P.E. 163 163 163 131 132 122 239 65 53 110 135
More informationSUBJECT: PL Waitsburg Levee Emergency Rehabilitation Project: Walla Walla County, WA
REPLY TO ATTENTION OF: DEPARTMENT OF THE ARMY WALLA WALLA DISTRICT, CORPS OF ENGINEERS 201 NORTH THIRD AVENUE WALLA WALLA WA 99362-1876 Cultural Resources Branch May 15, 2018 Robert Whitlam, Ph.D. State
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More information9. Levee Maintaining Agency Projects
9. Levee Maintaining Agency Projects 9.1. Overview This chapter summarizes the known deficiencies identified for each local levee maintaining agency (LMA) within the Regions. Note that although the focus
More information2017 ANNUAL DAM AND DIKE INSPECTION REPORT
2017 ANNUAL DAM AND DIKE INSPECTION REPORT ASH PONDS WELSH POWER PLANT CASON, TEXAS November, 2017 Prepared by: American Electric Power Service Corporation 1 Riverside Plaza Columbus, OH 43215 GERS-17-067
More informationREVIEW PLAN For Plans and Specifications For Toe Drain Repairs Falls Lake Dam Wake County, North Carolina Wilmington District
REVIEW PLAN For Plans and Specifications For Toe Drain Repairs Falls Lake Dam Wake County, North Carolina Wilmington District September 2011 APPROVED 20 September 2011 THE INFORMATION CONTAINED IN THIS
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationWarner Robins Stormwater Local Design Manual
Warner Robins Stormwater Local Design Manual Prepared for Houston County City of Warner Robins City of Perry City of Centerville May 17, 2005 Version 4 (As presented with adopted Stormwater Ordinance)
More information2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio
Prepared for: FirstEnergy Generation, LLC 76 South Main St Akron, Ohio 44308 2016 ANNUAL INSPECTION REPORT W.H. Sammis Coal Plant South Pond Stratton, Ohio Prepared by: 10211 Wincopin Circle, Floor 4 Columbia,
More informationacquiring, managing, and disposing of federal lands and facilities;
2.2.1 HYDROLOGY AND FLOODPLAIN This section discusses and analyzes the surface hydrology and water quality characteristics of the project. The information provided in this section is based on the Preliminary
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More informationHydrology and Flooding
Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.
More informationKing County Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds
News Release Contact: Al Sanders 206-477-1016 August 31, 2015 Flood Control District approves grants for flood prevention projects Regional projects to benefit from district funds The Flood Control District
More informationDEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA SEP
DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA 30260-1777 REPLY TO ATTENTION OF Regulatory Division SAS-2000-03600 SEP - 4 2014 PUBLIC NOTICE
More information3.3 FLOOD CONTROL AND HYDROLOGY
3.3 FLOOD CONTROL AND HYDROLOGY 3.3.1 AFFECTED ENVIRONMENT The sublease boundary is located approximately 0.25-miles north of the San Gabriel River. The San Gabriel River flows from the San Gabriel Mountains
More informationsewers ANd storm drains Storm Drain Under Construction, 1916
sewers ANd storm drains Storm Drain Under Construction, 1916 A d o p t e d C A p I t A L I M p R o V e M e N t p R o G R A M F I s C A L Y e A R 2 1 9 FY 219-223 Capital Improvement Program FY 218 FY 219
More informationFlood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project
Flood Risk Management on the Elwha: Case Study of the Federal Levee Modification Project US Army Corps of Engineers Zac Corum, PE, Hydraulic Engineer Travis Ball, PE, CFM, Hydraulic Engineer Seattle District
More informationAPPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models
APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:
More informationMemorandum. April 15, 2010 CITY OF DALLAS. David A. Neumann (Chairman) Carolyn R. Davis. Steve Salazar (Vice-Chair) Vonciel Jones Hill
April 15, 2010 CITY OF DALLAS TO Trinity River Corridor Project Committee Members: SUBJECT Periodic Inspection Report No 9 Dallas, the City that works: diverse, vibrant, and progressive o 6 items related
More informationThis is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.
This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact
More informationManhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas
Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1
More informationAppendix VI: Illustrative example
Central Valley Hydrology Study (CVHS) Appendix VI: Illustrative example November 5, 2009 US Army Corps of Engineers, Sacramento District Prepared by: David Ford Consulting Engineers, Inc. Table of contents
More information- Site Location and Conditions. A. Project Location. B. Existing Conditions
H&H Report - Site Location and Conditions Page 1 of 2 A. Project Location 1. Site Identification District County Mu nicipali ty 06 Bucks Hilltown (Twp) Site MINSI TRAIL S.R. 4019 Section 60M Segment 0050
More informationFlood Damage Reduction Segment / System Inspection Report
Name of Segment / System: Public Sponsor(s): Public Sponsor Representative: Sponsor Phone: 219-595-0599 Sponsor Email: Little Cal - Hammond Little Calumet River Basin Development Commission Dan Repay drepay@littlecalumetriverbasin.org
More informationMissouri River Degradation (Lower 498 River Miles)
BUILDING STRONG Missouri River Degradation (Lower 498 River Miles) for Mid-America Regional Council and U.S. Army Corps of Engineers Stakeholder Meeting March 5, 2009 BUILDING STRONG Reconnaissance Study
More informationPERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE BRIDGE COLUMNS
PERFORMANCE-BASED SEISMIC DESIGN OF REINFORCED CONCRETE BRIDGE COLUMNS Dawn E LEHMAN 1 And Jack P MOEHLE 2 SUMMARY There is a new ocus in seismic design on the perormance o reinorced concrete bridges.
More informationHydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E
Prepared for: Prepared by: Marquette County Road Commission AECOM Ishpeming, MI Marquette, MI 60240279 December 9. 2011 Hydraulic Report County Road 595 Bridge over Mulligan Creek Prepared By AECOM Brian
More informationFINAL ENGINEER S REPORT SACRAMENTO AREA FLOOD CONTROL AGENCY CONSOLIDATED CAPITAL ASSESSMENT DISTRICT
FINAL ENGINEER S REPORT SACRAMENTO AREA FLOOD CONTROL AGENCY CONSOLIDATED CAPITAL ASSESSMENT DISTRICT Prepared for: Sacramento Area Flood Control Agency Prepared by: PB April 19, 2007 TABLE OF CONTENTS
More information