Poolbeg Generating Station

Size: px
Start display at page:

Download "Poolbeg Generating Station"

Transcription

1 Poolbeg Generating Station Annual Environmental Report For the period of 1 st January to 31 st December 2011

2 Table of Contents 1. Introduction IPPC licence number Name and Location of site Description of Activities Environmental Policy Environmental Management Structure and Responsibility 4 Page No. 2. Emission Reports and Summary Information Emissions to Water Summary of Emissions to Water Emissions to Sewer Summary of Emissions to Sewer Emissions to Atmosphere Summary of Emissions to Atmosphere Surface Water Monitoring Agency Monitoring and Enforcement Fuel Use, Energy Input and Water Consumption Environmental Incidents and Complaints Waste Report Management of the Activity 3.1 Objectives and Targets (5 year) Environmental Management Programme Report Environmental Management Programme Proposal Licence Specific Reports Total Annual Emissions of SO 2, NO x and CO List I/II Substances Bund Report Residual Management Plan update 4.6 Ground Water Monitoring Appendix I PRTR Appendix II Monitoring Well Map

3 1. Introduction 1.1 IPPC Licence Number P Name and Location Electricity Supply Board Poolbeg Generating Station Pigeon House Road Dublin Description of Activities The production of energy in combustion plant, rated thermal input of which is greater than 50 MW. Poolbeg Generating Station currently has a total electricity generating capacity of 470MWe from a combined cycle gas turbine (CCGT) generating unit. The CCGT plant is made up of two gas turbines of 155 MWe each and a steam turbine of 170 MWe. The station is fired on natural gas from the national gas network and gas oil is stored as a secondary fuel which is normally only used for testing purposes and in times of grid system emergency. On 31 st March 2010, 510 MW of Thermal Generating Units ceased to operate. The CCGT will continue to operate into the future on the Poolbeg site. Note during 2011 the two Gas Turbine and Steam Turbines underwent major overhauls and were offload during the following periods; Gas Turbine 14 8 th April 2 nd June Gas Turbine th July 23 rd September Steam Turbine 8 th April 6 th June 1.4 Environmental Policy See page 5. 3

4 1.5 Environmental Management Structure and Responsibility Environmental Management is fully integrated into all aspects of management on site. The management structure is shown in figure 1.1. The Station Chemist is currently the Environmental Co-ordinator and is responsible for the co-ordination of all environmental activity at the station. The Environmental Co-ordinator works with the management team and environmental management group to ensure that The station prioritises full compliance with the provisions specified under its IPPC licence, other licences, planning permission and environmental legislation. The Station s EMS is operated and maintained to the required standard. By way of audit and review cycle, the EMS is effective, is adaptive to changing circumstances and is delivering continuous improvement. The station has been ISO accredited since April 1999 and received it original Integrated Pollution Control Licence in April 2002, a revised Integrated Pollution Prevention and Control licence was issued in December

5 POOLBEG STATION ENVIRONMENTAL POLICY STATEMENT Poolbeg Generating Station is situated in the heart of Dublin Bay, we are very aware of the areas of environmental importance in the locality. Poolbeg is bounded on the north by the River Liffey and to the east and south by Dublin Bay. South Dublin Bay is designated as a Natural Heritage Area, Special Area of Conservation and a Special Protection Area for Birds. In the vicinity is also the Bull Island Nature Reserve, Tolka Estuary Mudflats and Irishtown Nature Park. We are also aware of our presence in the local community. Poolbeg station has a total electricity generating capacity of 470MWe from a combined cycle gas turbine (CCGT) generating unit. The 510 MW Thermal power station ceased operation on 31 st March We at Poolbeg commit ourselves to meeting customer demand for electricity in a safe, efficient, sustainable and environmentally responsible manner, while recognising the technical and financial constraints within which we must operate. Environmental risks are minimised by the use of appropriate technologies and working procedures. We strive for continual improvement in our environmental performance and prevention of pollution through the operation of the station s environmental management system and adherence to our Integrated Pollution Prevention and Control Licence No. P By maintaining both ISO and OHSAS accreditation, we will continue to operate and improve on our Environmental and Safety Performance. We carry out our activities in conformance with the policy principles outlined below: Responsibilities and Accountabilities Regard the achievement of the station s annual environmental targets and objectives as a line management responsibility requiring personal involvement and commitment from all management and staff. Ensure that appropriate resources are allocated to environmental matters. Compliance Issues Ensure compliance with the terms and conditions of our IPPCL, Greenhouse Gas Permit and all other relevant legal requirements and conformance with all relevant in-house standards and procedures relating to environmental protection with proper monitoring and control systems in place. Use of Natural Resources Use environmental resources, including air, land and water in a responsible manner and make every effort to conserve finite natural resources by efficient use and careful planning. Energy Conservation Maintain the ongoing assessment of the efficiency with which energy is generated and used within the station with a view to optimisation. Waste Materials Reduce waste generation as far as possible and ensure supervision of the disposal of waste, to minimise its impact on the environment. Evaluate opportunities to recycle waste materials and implement these where practicable. Environmental Awareness Actively promote environmental awareness among staff through communication and training programmes and take into account the impacts on and concerns of the local community. Suppliers of Goods and on Site Services Ensure that appropriate suppliers of goods and on site services assess the environmental impacts in their dealings with Poolbeg. We will also encourage responsible environmental management and insist that they conform to all relevant legislation. For suppliers of on site services we will advise them of our site specific environmental policy and relevant environmental documentation. Auditing and Reporting Conduct regular internal and external audits to assess the level of performance and compliance with the environmental requirements of the company and regulatory bodies. Report, as appropriate, to staff, regulatory bodies and other interested parties. Review Carry out regular reviews of environmental policies and practices and keep abreast of any changing legislation or technology. Sustainability Embracing ESBs Sustainability Charter and promoting Sustainability in the workplace and at home. Signed Paul Farrell, Plant Manager, March 2012 This policy has Corporate Body endorsement.

6 Figure 1.1 Poolbeg Organisational Structure Plant Manager P Farrell SFO U Clarke Chemist/Env. Coordinator S Moran Maintenance Manager M.McConnon Operations Manager D McCabe Engineering Services Manager A Mahon Shift Team Leaders Maintenance Team Production Team Finance Team Engineering Team Maintenance Team Leaders R McNally, P Cullen Maintenance Planner - P Daly Multidisciplined Maintenance Team Members Production Team Leaders Production Team Members Finance Team Leader J Anderson Finance Team Member Plant/Project Specialists N McGeorge, P Grehan Chem./Safety/Env. Materials Support Technical Support Poolbeg Structure 6

7 2. Emission Reports and Summary Information Emissions to Water ESB Poolbeg IPPCL refers to ten licensed emission points discharging to the Liffey Estuary. SW1 Condenser Cooling Water SW2 Water treatment neutralisation tank Units 1, 2 and 3 SW3 Water treatment neutralisation tank CCGT SW4 Boiler blowdown (Unit 1) SW5 Boiler blowdown (Unit 2) SW6 Boiler blowdown (Unit 3) SW7 Boiler blowdown (CCGT B14) SW8 Boiler blowdown (CCGT B15) SW10 Screen Wash Water SW11 Screen Wash Water Following the closure of Poolbeg Thermal Station on 31 st March 2010 there will be no further discharges from the following emission points SW2, SW4, SW5, SW6 and SW10 and hence monitoring has been ceased at these emission points. Monitoring of the remaining operational emission points SW1, SW3, SW7, SW8 and SW11 is carried out in accordance with Schedule 2(iii) of Poolbegs IPPC license Emission Point Reference Number SW1 - Condenser Cooling Water Temperature Table 2.1 SW1 Monthly average temperature differentials. Month Emission Limit Value Station Average T o C C January 5.6 February 6.8 March 6.8 April May 7.4 ( Until 8 th April only) CW not in service June 5.0 July 4.9 August 3.5 September 3.9 October 5.0 November 4.8 December 5.0 Note: The steam turbine and cooling water (CW) system was not in-service from 8 th April - 6 th June. 7

8 Compliance with Emission Limit Values There was 15 hourly averages greater than 10 o C but less than 11.5 o C this equates to 99.77% of hourly operating values being less than 10 0 C. There was one ELV exceedence for a period of twenty minutes, see Table 2.30 for summary of reportable incidents. Flow The maximum volume to be emitted in any one day of 2,520,000m 3 and maximum rate per hour of 105,000m 3 was not exceeded in this reporting period. The capacity of the CCGT pumps in Poolbeg is such that the maximum flow required to support full station output is 43,200 m3/hour and it is therefore not foreseen that the licence volume would be exceeded under any circumstances. From the individual unit operating records, the volume of cooling water emitted for the reporting period is calculated at 212,766,696 m 3 vs. a licensed volume emission of 919,800,000 m 3. Chlorine The emission limit value of 0.1mg/l has not been exceeded in this reporting period. Table 2.2 SW1 Weekly Chlorine Grab Sample Analysis Date Total Chlorine (mg/l) Date Total Chlorine (mg/l) 10-Jan Aug Jan Aug Jan Aug Feb Aug Feb Aug Feb Sep Feb Sep Mar Sep Mar Sep Mar Sep Mar Sep Apr Oct Apr-11 n/a 17-Oct Apr-11 n/a 24-Oct Apr-11 n/a 01-Nov May-11 n/a 07-Nov May-11 n/a 14-Nov Jun Nov Jun Nov Jun Dec Jun Dec Jul Dec Jul Dec Jul Jan n/a cooling water system out of service 8

9 2.1.2 Emission Point Reference Number SW3 Water Treatment Neutralisation Tank CCGT Monitoring Results Table 2.3 Quarterly Monitoring Results of SW3 Parameter Units Q1 Q2 Q3 Q4 Emission Limit Value Ammonia mg/l ph Suspended Solids mg/l No Limit Iron Note 1 mg/l No Limit Vanadium Note 1 mg/l No Limit Note 1(In licence): Iron and Vanadium is not applicable to SW3. Iron and Vanadium was measured when discharging from the boiler effluent tank through the neutralisation sump in the Thermal station (SW2) CCGT does not have a boiler effluent tank and therefore Iron and Vanadium analysis is not carried out. Compliance with Emission Limits Flow The maximum volume to be emitted in any one day of 200 m³ and the maximum rate per hour of 50 m³ has not been exceeded in this reporting period. ph The ph of the effluent is controlled automatically with the effluent dosed until the ph is within the range 6-9 before discharge. Suspended Solids and Ammonia were not exceeded during the reporting period. 9

10 2.1.3 Emission Point Reference Number SW7 Table 2.4 Boiler Blowdown (CCGT B14) Monitoring Results Date Oils (Monthly) ph Ammonia (mg/l) Suspended Solids (mg/l) Emission Limit Value No Limit January Clean < 0.1 February Clean March Clean April Clean May Boiler not in service. June Clean < 0.1 July Clean August Clean < 0.1 September Clean October Clean November Clean December Clean < 0.1 Compliance with Emission limits The emission limits for ph, Ammonia and Suspended Solids were not exceeded during the reporting period Emission Point Reference Number SW8 Table 2.5 Boiler Blowdown (CCGT B15) Monitoring Results Date Oils (Monthly) ph Ammonia (mg/l) Suspended Solids (mg/l) Emission Limit Value No Limit January Clean < 0.1 February Clean March Clean April Clean June Clean < 0.1 July Clean August Boiler not in service. September Boiler not in service. October Clean < 0.1 November Clean < 0.1 December Clean Compliance with Emission Limits The emission limits for ph, Ammonia and Suspended Solids were not exceeded during the reporting period. 10

11 2.1.5 Emission Point Reference Number SW11 Table 2.6 SW11 Chlorine Monitoring Date Chlorine (mg/l) Emission Limit Value Feb-11 n/d 28-Jun Aug Nov Screen Wash Water (CCGT) The emission limit for chlorine was not exceeded during the reporting period. 11

12 2.2 Summary of Emissions to Water A summary of the monitoring results for mass emissions to water at each of the emission points is presented in the tables below. Note: Reduction in mass emission volumes for 2011 is due to the closure of Poolbeg Thermal Station on 31 st March 2010 and the major outages in SW1 Condenser Cooling Water Table 2.7: SW1 Summary of Emissions to Water Parameter Units Mass Emissions Licensed Mass Emissions Volume Temp. Chlorine Thermal Load 1 m 3 o C Kg MW th 388,131, ,395 Not exceeded 324,347, ,950 2 Not exceeded 377,067, ,442 2 Not exceeded 341,668, ,309 2 Not exceeded 212,766, ,560 Not exceeded 919,800, ,980 1,000 Figure 2.1 SW1 Mass Emissions to Condenser Cooling Water Vol. (m3 * ) Temp C Chlorine (Kg * 1000) ELV 1 Licence does not require monitoring of Thermal load 2 Error in calculation of CW volume and hence incorrect chlorine volume also reported from , flow and chlorine reported in above table still well within licenced mass emission limits. 12

13 2.2.2 SW3 Water Treatment Neutralisation Tank CCGT Table 2.8: SW3 Summary of Emissions to Water Parameter Units Mass Emissions Limits Volume ph 3 m 3 8,340 5,040 2,560 4,040 3,020 73, Sus. solids Kg No ELV Ammonia Iron 4 Vanadium 4 Kg Kg Kg No ELV No ELV 3 The ph of the effluent is controlled automatically with the effluent until the ph is within the range 6-9 before discharge. 4 Iron and Vanadium analysis was only applicable to the Thermal Station from the burning of HFO. Boiler washes are not carried out in the CCGT. 13

14 2.2.3 SW7 Boiler Blowdown (CCGT B14) Table 2.9: SW7 Summary of Emissions to Water Parameter Volume ph Suspended Solids Ammonia Units m 3 Kg Kg Mass Emissions ,860 6, ,027 6,089 4, n/d n/d n/d n/d n/d Licensed Mass Emissions 36, No ELV 36.5 Figure 2.2 Summary of Mass Emissions to SW7 Boiler Blowdown CG14 Mass Emissions Boiler Blowdown CG Vol. (m3 * 1000) ph Sus. Solids Kg Ammonia Kg ELV 5 Decrease in blowdown volume due to condenser and boiler repairs. 14

15 2.2.4 Boiler Blowdown (CCGT B15) Table 2.10: SW8 Summary of Emissions to Water Parameter Volume ph Suspended Solids Ammonia Units m 3 Kg Kg Mass Emissions ,040 6, ,111 5,943 4, n/d n/d n/d n/d n/d Licensed Mass Emissions 36, No ELV 36.5 Figure 2.3 Summary of Mass Emissions to SW8 Boiler Blowdown CG15 Mass Emissions Boiler Blowdown CG Vol. (m3 * 1000) ph Sus. Solids Kg Ammonia Kg ELV 15

16 2.2.5 Screen Wash Water (CCGT) Table 2.11: SW11 Summary of Emissions to Water Parameter Units Mass Emissions Licensed Mass Emissions Volume Chlorine m 3 Kg 56,940* ,940* ,940* ,940* ,940* , * Estimated based on pump usage Table 2.12 Emissions to Water Non-Compliance Summary Non - Compliance Date Details of Exceedence Cause Corrective Action None 16

17 2.3 Emissions to Sewer Schedule 3(i) of Poolbeg s IPPC Licence sets out the requirement to monitor emissions to sewer having regard to Licence conditions 3 and 7. ESB Poolbeg has one licensed emission point to Sewer S1-1, Laboratory Drains. A grab sample is taken quarterly and analysed for the parameters below, results for 2011 are presented below. Table 2.13 Emission Point Reference Number: S1-1 monitoring result Parameter Unit Emission Limit Value Quarter 1, Quarter 2, Quarter 3, Quarter 4, Temperature o C o C 42 o C ph ph unit Chemical Oxygen Demand Biochemical Oxygen Demand mg/l 2,000 mg/l 1, < 7 < Suspended Solids mg/l 1, Total Phosphorus (As PO 4 ) mg/l 50 < < 1 < 1 Detergents mg/l < 0.05 (As MBAS) Oils, Fats & Greases mg/l 100 < 1 < 1 < 1 < 1 Sulphates mg/l (As SO 4 ) 17

18 2. Summary of Emissions to Sewer Table 2.14: S1-1 Summary of Emission to Sewer Parameter Unit Mass Emissions Licensed Mass Emissions Volume m * 5* 1460 Temperature o C ph BOD Kg COD Kg Sus. Solids Kg Total Phosphorus Kg Sulphates Kg O,F,Gs Kg n/d n/d n/d 146 Detergents Kg *Estimate Figure from 2010 onwards significantly reduced following Thermal station closure. Table 2.15 Emission to Sewer Non-compliance Summary Date Non-compliance Cause Corrective Action None Figure 2.4 S1-1 Summary of Mass Emissions to Sewer Mass Emissions to Sewer Vol (m3 * 10) Temp. oc ph BOD Kg COD Kg Sus. Solids Kg PO4 Kg SO4 Kg O,F,Gs Kg Detergents Kg

19 Table 2.16 Summary Table of Total Mass Emissions to Water and Sewer Parameter Units Mass Emissions Licensed Mass Emissions Volume m 3 389,112, ,520,865* 377,709,824* 341,935,478* 212,836, ,232,260 Chlorine Kg 7,408 6,996* 9,824* 9,314* 7,562 92,190 S. Solids Kg 2,973 1,992 2, ,601 Ammonia Kg ,022 Iron Kg n/a n/a No ELV Vanadium Kg n/a n/a No ELV BOD Kg ,095 COD Kg ,190 Phosphorus Kg Sulphates Kg O,F& G s Kg n/d n/d n/a 146 Detergents Kg * Error in calculation of CW volume from volume and chlorine adjusted in above table 19

20 2.5 Emissions to Atmosphere Schedule 1(iii) of Poolbeg s IPPC licence requires the monitoring of emissions to atmosphere at Emission Point Reference Nos. A1-1, A1-2, A1-3, A1-5 and A1-6 having regard to Licence Conditions 3 and 5. Note: Following the closure of Poolbeg Thermal Station on 31 st March 2010 there are no further Emissions to Air from the thermal station units and therefore monitoring at emission points A1-1, A1-2 and A1-3 ceased from that date Exhaust from CT14 HRSG and bypass from CT14 Table 2.17 A1-5 and A1-7 Summary of NOx Emissions CT14 Month CT14 Calendar Monthly Mean Conc. mg/nm 3 NOx (As NO 2 ) corrected to 15% O 2 Gas Limit Oil Limit January February March April May GT offload for overhaul June July August September October November December Gas Oil run for 3 hours in June for test purposes following CT 14 return to service. Compliance with Emission Limits None of the calendar monthly means for NO x exceeded the emission limit value. The was one 48 hourly NOx exceedence in June following the return to service of the Gas Turbine after the major overhaul, the unit was require to run in diffusion mode for a number of hours for testing purposes. We still comply with Condition of the licence Nitrogen Oxides: 95% of all the 48 hourly mean values do not exceed 110% of the emission limit value. 99.3% of 48 hourly mean values based on the operating hours in 2011 are within the ELV. 20

21 2.5.2 Exhaust from CT15 HRSG and bypass from CT15 Table 2.18 A1-6 and A1-8 Summary of the NOx Emissions CT15 Month CT15 Calendar Monthly Mean Conc. mg/nm 3 NOx (As NO 2 ) corrected to 15% O 2 Gas Limit Oil Limit January February March April May June July August GT offload for overhaul September October November December Gas Oil run for 4 hours in September for test purposes following CT 15 return to service. Compliance with Emission Limits None of the calendar monthly means for NO x exceeded the emission limit value. The was one 48 hourly NOx exceedence in October following the return to service of the Gas Turbine after the major overhaul, the unit was require to run in diffusion mode for a number of hours for testing purposes. We still comply with Condition of the licence Nitrogen Oxides: 95% of all the 48 hourly mean values do not exceed 110% of the emission limit value. 99.2% of 48 hourly mean values based on the operating hours in 2011 are within the ELV. 21

22 2.6 Summary of Emissions to Atmosphere A summary of mass emissions to air is presented in the tables below. Note: Reduction in mass emissions for 2011 due to the closure of Poolbeg Thermal Station on 31 st March A1-4 (Auxiliary Boiler) We are not required to monitor emissions from the Auxiliary Boiler. During 2011 the boiler was operated in accordance with manufacturer guidelines and we did not exceed the emission limit value Exhaust from CT14 HRSG and Bypass from CT14 Table 2.19 A1-5 and A1-7 Summary of Emissions to Atmosphere Parameter Mass Emissions (Kg) Licensed Mass Emissions (Kg) Nitrogen oxides (as NO 2 ) 216, , , , ,107 1,634, Exhaust from CT15 HRSG and Bypass from CT15 Table 2.20 A1-6 and A1-8 Summary of Emissions to Atmosphere Parameter Mass Emissions (Kg) Licensed Mass Emissions (Kg) Nitrogen oxides (as NO 2 ) 251, , , , ,061 1,634,826 22

23 Table 2.21 Summary of Total Mass Emissions to Atmosphere Parameter Mass Emissions (Kg) Licensed Mass Emissions (Kg) Nitrogen oxides 776,856 1,102,658 1,197, , ,168 14,295,490 (as NO 2 ) Oxides of sulphur 43,314 32, ,000 3,241-23,749,762 (as SO 2 ) Particulates 17,787 11,000 28,000 6,654-2,794, Emissions to Atmosphere Non-compliance Summary There were two CEMS faults as detailed in Table 2.30 Summary of reportable incidents. During 2011 for CT14 there was 11.5 hours of CEMs data not recorded, we remain within licence compliance as per licence condition It should be noted that during this period the Gas Turbine was operating as normal on natural gas and we would not have exceeded licence limits as the emissions from burning natural gas are predictable on gas turbines. 23

24 2.7. Surface Water Discharge Monitoring Surface water discharges are monitored in accordance with Schedule 5(i) of the IPPC Licence. There is one Surface Water Discharge Monitoring point, SW9. A visual inspection is carried out daily. Quarterly monitoring covers ph, temperature, BOD, and oils, fats and greases. Quarterly monitoring results for SW9 are presented in the following table. Table 2.22 Monitoring Results for Emission Point SW9 Parameter Units Quarter 1 Quarter 2 Quarter 3 Quarter 4 ph Temperature o C BOD mg/l Oils, Fats and Greases mg/l < 1 < 1 < 1 < 1 24

25 2.8 Agency Monitoring and Enforcement Three monitoring visits were carried out by the EPA in Two visits were to take samples from water emission points and one visit for air monitoring. The results of the water sampling analysis and air monitoring are as per the following tables. Samples from water and surface water emission points were collected by the Agency on 26 th January and 30 th June. Table 2.23 Surface Water (SW9) sampling analysis Substance Monitored Units SW9 SW9 Emission Limit 26/01/ /06/2011 Values ph ph Units Biochemical Oxygen Demand mg/l O 2 nr nr No limit Table 2.24 Water Emission points sampling analysis Substance SW7 SW7 Emission Limit Units Monitored 26/01/ /06/2011 Values ph ph Units Suspended Solids mg/l <10 <10 No limit Ammonia(As N) mg/l N Table 2.25 Air Monitoring Results Parameter Date A1-5 A1-6 ELV Nitrogen Oxides as NO 2 23/03/ mg/m mg/m3 80 mg/m3 Compliance All monitoring carried out by the EPA was in compliance with licence emissions limit values. 25

26 2.9 Fuel Use and Energy Input Fuel Use Table 2.26 Run hours on Natural Gas Unit Run hours on Natural Gas Unit 1 2,181 1,835 2,486 1,072 Unit 2 3,478 1,026 2, Unit Thermal station closed in CG14 8,030 7,280 7,374 8,203 6,817 CG15 8,036 7,182 7,562 8,379 6,392 Run hours on Heavy Fuel Oil Following the closure of Poolbeg Thermal Station, HFO stored on site were sold to the oil market and subsequently shipped offsite. All saleable HFO has now been removed from Poolbeg. Table 2.27 Run hours on Gas Oil Unit Run hours on Gas Oil CG14 0.2* * CG * * Test purposes only Energy Input Table 2.28 Energy Consumption Fuel (MWhrs) Natural Gas 6,975,284 6,026,995 5,931,634 5,608,041 3,936,753 Distillate Oil Heavy Fuel Oil 23,774 17, , Fuel changeover test. 26

27 2.9.3 Water Consumption Table 2.29 Water Consumption Water Consumption m 3 356, , , ,681 76, Environmental Incidents and Complaints Complaints No complaints were received in Table 2.30 Complaints Date Description Actions Taken Authorities contacted Incidents Table 2.31 Summary of reportable incidents 3 Notifications submitted to the EPA during 2011 as follows. Date Incident Description Action Taken 21/02/2011 CW Temperature rise exceedence during run up after boiler trip. CW temp greater than C for 20 minutes, highest temperature 13.1 o C. 10/06/2011 NOx readings on GT 15 analyser reading 5 ppm lower than normal due to NO X converter temperature regulator requiring replacement. 19/07/2011 CT14 CEMS sampling pump failed and was not operating for 11.5 hours on 19 th July. Operator intervention to bring the temperature differential back within licence limits immediately by reducing the load generated. NOx converter sent offsite for part replacement. Review of converter parts carried out and full set of converter parts now on site. Previously only manufacturers recommended spare parts on site which didn t include the temperature regulator. However due to delivery lead times a full set of parts now available. Maintenance carried out on pump and CEMs returned to normal operation. Possible dirt from overhaul as CEMs equipment was not covered during the maintenance overhaul. GT15 CEMS equipment covered during overhaul to prevent similar occurrence. Authorities Contacted EPA notified 23/02/2011 EPA notified 10/06/2011 EPA notified 20/07/

28 2.11 Waste Management Report (See PRTR for complete waste details) Non Hazardous Waste Summary European Waste Catalogue Code Description of Waste Hazardo us (Yes/No) Quantity (t/year) Disposal/ Recovery Code Location of Disposal/ Recovery Name of Waste Disposal Recovery Contractor General waste No D1 Ireland Midland Waste Disposal Co. Meath Waste Permit Details and Issuing authority. EPA Waste Permit No Waste Collection Permit No. CP D17/ Mixed Recyclables No 7.62 R3 Ireland Midland Waste Disposal Co. Meath EPA Waste Permit No Waste Collection Permit No. CP D17/ Mixed Metals No R4 Ireland Hegarty Metal Recycling Waste Permit No. WP05 04 Issued by Limerick City Council. Waste Collection Permit No. CP D47/ Timber No R3 Ireland Midland Waste Disposal Co. Meath EPA Waste Permit No Waste Collection Permit No. CP D17/ Sewage sump cleaning Non regulated chemical small No 13 D9 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC No 0.59 R12 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC WEEE No 0.22 R4 Ireland KMK Metals (WEEE Recycle) EPA Waste License No Waste Collection Permit No. WCP-OY Machine Coolant Water with trace quantities of glycol from fire fighting foam. No 0.09 R3 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC No R9 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC

29 CW waste No D9 Ireland Rilta Environmental EPA Waste License No CW waste (Sea water) Waste Collection Permit No. WCP-DC No 9.92 R9 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC

30 Hazardous Waste Summary European Waste Catalogue Code Description of Waste Hazardous (Yes/No) Quantity (t/year) Disposal/ Recovery Code Location of Disposal/ Recovery Name of Waste Disposal/ Recovery Contractor Waste Permit Details and Issuing authority * Oil Contaminated Material * Fluorescent Lighting * Steel drums/tanks/spill trays etc * Plastic Drums/containers Yes 4.3 R1 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC Yes 0.12 R4 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC Yes 2.66 R4 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC Yes 0.27 R3/R1 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Paints Yes 0.34 R1 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Paints Yes 0.08 R12 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Waste oil Yes 5.48 R9 Ireland Enva Environmental EPA Hazardous Waste License No * Oily water from sump cleaning. Waste Collection Permit No. WCP-DC Yes 6.5 R9 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Aerosols Yes 0.1 R4 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Oily water (dirty water) * Various chemical smalls Yes 14 R9 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC Yes 0.17 R1 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Sodium hydroxide Yes R1 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC

31 * Fyrequel Yes 0.76 R1 Ireland Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Various chemical smalls Yes 2.64 R12 Germany Enva Environmental EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Lube oil Yes 13.5 R9 Ireland Rilta Environmental EPA Waste License No Waste Collection Permit No. WCP-DC * Asbestos Yes 0.46 D1 Germany Rilta Environmental EPA Waste License No * Sulphuric Acid tank washings * Caustic tank washings * Sodium Hypochlorite Yes 1 D9 Ireland Enva Environmental (Shannon) Yes 13 D9 Ireland Enva Environmental (Shannon) Yes 3.42 R1 Germany Enva Environmental (Shannon) * Sulphuric Acid Yes R6 Belgium Enva Environmental (Shannon) * Sodium Hydroxide Yes D9 Ireland Enva Environmental (Shannon) Waste Collection Permit No. WCP-DC EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC * Hydrazine Yes 1.55 D9 Ireland Rilta Environmental EPA Waste License No Waste Collection Permit No. WCP-DC

32 Residual Management Plan Waste On 31 st March 2010 Poolbeg Thermal station ceased to operate and the following waste was generated in 2011 as a result of the ongoing thermal plant site clean up. European Waste Catalogue Code Description of Waste Hazardous (Yes/No) Quantity (t/year) Disposal/ Recovery Code Location of Disposal/ Recovery Name of Waste Disposal Recovery Contractor * Lead Acid Batteries Yes R4 Belgium Enva Environmental * Machine coolant Yes 0.77 D10 Germany Rilta Environmental * * Interceptor and drain cleaning. Diesel generator cleaning. Yes R9 Ireland Rilta Environmental Yes R9 Ireland Rilta Environmental * Transformer stones Yes D5 Ireland Rilta Environmental * Boiler Ash Yes 3.78 R5 Germany Rilta Environmental Waste Permit Details and Issuing authority. EPA Hazardous Waste License No Waste Collection Permit No. WCP-DC EPA Waste License No Waste Collection Permit No. WCP-DC EPA Waste License No Waste Collection Permit No. WCP-DC EPA Waste License No Waste Collection Permit No. WCP-DC EPA Waste License No Waste Collection Permit No. WCP-DC EPA Waste License No Waste Collection Permit No. WCP-DC

33 3. Management of the Activity 5 year Environmental Objectives and Targets Ref Objective Target Ensure 100% compliance with IPPCL 2 Identify and implement opportunities for improvements in energy usage 3 Reduce the potential for discharge to surface and ground water. 4 To identify improvements in waste management through ongoing assessment of waste streams and initiatives within the station to improve staff awareness. 5 Water Usage Reduction : Implement and maintain the conditions of IPPCL through our EMS, monitoring, reporting and achieving targets set out in our EMP. 2012: Technical Amendment to be submitted to EPA to remove Networks HV compounds/ GIS area and DCC area for lease from scope of licence. 2012: Consider licence implications if NORA lease HFO and Diesel oil farms. 2012: Complete other submissions to be made to the EPA e.g. in relation to grid code testing, new lab location, SW12 monitoring. 2012: Further Efficiency testing to be carried out in : Continue review of start-up times and starting procedures in CCGT to be carried out. 2012: Continue review in relation to running with one CW pump. 2012: Complete sustainability projects/suggestions as required : An energy audit will be repeated at intervals as required by the Agency. 2012: Biannual borehole monitoring to be carried out and trends reported to the Agency in the AER. 2012: Networks to complete bunding of underground cable oil tanks. 2012: Carry out bunding as per bund test schedule and repairs as necessary. 2012: Consider remote operation of the final sump pump Monitor and set targets for waste recycling on site. 2012: Recycling target 45% as collected. (This includes for General waste, recyclables, timber, glass and WEEE) Waste Policy to be developed to achieve the recycling target : Minimise water use on site. 2012: Reduce towns water usage Continue water monitoring and repair leaks as necessary. 2012: Reduce treated water use. 2012: Towns water use target : Daily rolling average < 150 m3 6 Training 2012: Carry out as per EMP and training plan. 33

34 3.2 Environmental Management Program Report 2011 Ref Objective Target Reason Project Summary Resp. Status Date Due 1.1 To ensure 100% Implement required monitoring/recording. To ensure compliance with Carry out AST and QAL 2 on CCGT CEMS after burner change during overhaul. compliance licence by with IPPCL. implementing required 1.2 measurement and Request annual noise monitoring at reporting of Poolbegs NSLs to be discontinued under emissions. licence Condition 12.5 due to difficulty in obtaining results which reflect actual background noise emitted from station. 1.3 Chlorine meter at outfall to be integrated into DCS. 1.4 Other issues in relation to IPPC Licence Compliance. Technical Amendment to Licence - Networks HV Compounds, GIS and land bank area for future development by Networks to be removed from scope of licence. 1.5 Consider licence implications if NORA lease HFO and Diesel oil farms. T & E SM KP/AM SM DMcC SM Complete. CEMs Software upgraded in 2012, good improvements to trending and QAL 3 reviews. Submission sent to the EPA in February. EPA has agreed cessation of testing at NSLs. Boundary testing will now be carried out every three years. Annual safety tests carried out which will show if any issues with noise on site. Tile available on CC analysis panel and tested ok. Not completed due to overhaul scope. Cabling to be completed when next electrical contractor on site. Carry forward to Site investigation and new IPPCL boundary drawings complete. Technical amendment to be sent to EPA in 2012 to change licence boundary for removal of networks compound area and DDC site for lease for tunnelling works. NORA lease still in negotiations Carry forward to Q4 Q1 Q4 Q2 Q4 1.6 Revised RMP and ELRA to be carried out following Thermal Station closure. SM Carried out by TMS in December. Q4 34

35 Ref Objective Target Reason Project Summary Resp. Status 2.1 Identify areas To optimise Energy To optimise Follow up from Thermal Performance for efficiency of the CCGT. Energy efficiency Efficiency Test. improvement of the CCGT and Follow up measurements before and after in Energy reduce CO2 outage to be carried out by T and E. Efficiency emissions. 2.2 Major outages/maintenance on both GTs to take place in 2011, review plans to ensure all reasonable efficiency gains are programmed. HR3 burners being installed on GT15 and replaced on GT14. This will lower NOx emissions on GT15 and enable a review of GT15 firing temperature. 2.3 Extension to CCGT building to be designed to BREEAM Office standard. 2.4 Sustainability Plan for 2011 to include the following projects ; Review CW pump running and reduce to one pump at low loads if feasible. Review regeneration rinse times to reduce water consumption. Review use of VSDs for CCGT. Review Thermal Station power use and reduction. Continue review of Start ups to ensure they are as efficient as possible. Will be reviewing warm and hot starts when 2 shifting commences. Investigate recycling of sampling station water. AM/T and E MMcC/A M TG/SM AM JB AJ DMcC DD SM TUV presenting findings 25 th Feb. Measurement takens after major outages in 2011 show efficiency improvements. Further measurements to be taken in 2012 due to faulty thermocouples. Routine maintenance on both GTs during major outages will improve efficiency. As above measurements taken after steam turbine returned to service. New burners have achieved lower NOx. (35mg/Nm3 vs 50 at baseload) Building work not going ahead. Link to Sustainability Improvement Plan. Q4 Q4 Q4 Date Due 35

36 Ref Objective Target Reason Project Summary Resp. Status 3.1 Reduce the potential for Bund testing programme discharge to surface and ground water 3.2 Assess Networks oil tanks associated with oil filled cables. 3.3 Biannual borehole monitoring Decommission Thermal Station which ensures minimum impact to the Environment. Chemical storage tank inspection. Remove all potential Environmentally polluting substances from Thermal Station site. To ensure integrity of containment structure and to eliminate risk of leak reaching surface water. To prevent oil contamination of soil To monitor ground water on site. To ensure integrity of bulk chemical storage tanks. Complete Residual Management Program (RMP) as submitted to EPA. Carry out 3 yearly retention tests as per Bund Test Schedule and Carry out repairs to defective bunds as required. Networks bunding of cable oil tanks to be completed. Cable oil associated with T2001/2/3 to be drained. Biannual samples taken at 4 boreholes by external contractor. Trends to be included in AER. Bulk Sulphuric Acid and Caustic tanks to be cleaned and integrity tested during overhauls. As per RMP remove for disposal/recovery, any soils, subsoils, buildings, plant or equipment, or any waste, materials or substances or other matter contained on site that may result in Environmental pollution. AJ/SM T2016 repair work ongoing. Main T2016 bund holding. Decision to line HOT 16 A and B bund upto at least 110% level as due to design of bund it has proved very difficult to locate areas for repair. Networks SM NMcG SM/PG Inchicore tanks to be brought above ground and bunded. Not completed as an outage on inchicore line is required. Biannual sampling completed. Results to be reported in AER. Complete, no significant findings, tanks in good condition Further RMP work completed in Report to be completed on decommissioning activities and submitted to EPA on work carried out to date. Q2 Q2 Q4 Q4 Q4 Due Date 36

37 Ref Objective Target Reason Project Summary Resp. Status Due Date 5.1 Identify improvements in waste management through ongoing assessment of waste To improve current waste practices by ensuring all recyclable materials are segregated and To improve waste management on site by encouraging good waste management by all staff and contractors. Waste management will remain an ongoing item for consideration at Environmental and Sustainability meetings. Monthly review of waste to be carried out. streams and recycled. 5.2 Complete centralised waste area for initiatives within the CCGT. station to improve staff awareness. Waste stream location drawing to be produced. 5.3 Centralised waste area (inside) for recyclables to be set up in CCGT in office/control room area. TG/SM TG/SM Ongoing by waste contractor and Env. Coordinator. Complete. Waste stream map updated. Ongoing Q1 TG/SM Bins in place. Q1 5.4 Non Haz Waste Recycling target 35% (As segregated on site) TG/SM General Waste 64.8 t Recyclables 21.9 t Q4 Metal t Recycled 43% Ensure waste segregation facilities for O/H adequate. MMcC Large quantity of lagging removed and disposed during overhaul. 37

38 Ref Objective Target Reason Project Summary Resp. Status Due Date 6.1 Reduction in water To reduce the amount usage of water used on site. To optimise water usage in the station Water metering in CCGT control room building to be considered as part of BREEAM office assessment. Data logger to be installed at Gate. Ongoing water monitoring and investigations to be carried out to ensure leaks and use are minimised : Target : rolling daily average < 200 m3 ESBI/S M FK PM Building work not going ahead. Data logger installed at gate in May. 76,368 t water consumed in % reduction on 2010 use. 125,681 t consumed in 2010 substantial reduction in 2011 due to thermal station closure. Rolling target just above 200 m3/day. This is attributed to large no. of personnel on site during O/H, high volume of starts ups after O/H, WTP issues and know leaks on site to be repair/blanked in Q To reduce treated water consumption To optimise water and chemical usage in the station Treated water use in CCGT to be monitored by regular drop tests. Resin samples to be taken during overhaul to measure their ongoing effectiveness. Review if regeneration run times can be improved. D.McC/ PTL SM JB Ongoing Resin samples taken and some resins require replacement. Due to some resin capacity loss may not be able to reduce run times. Q 4 Drain Survey being carried out prior to O/H. LP Superheater tubes being replaced during O/H HP drain bypassing repaired. LP Superheater replaced during O/H. 38

39 Ref Objective Target Reason Project Summary Resp. Status Training Carry out Environmental Training To ensure that all staff are aware of our IPPCL and Environmental aspects associated with their work on site. Internal audit refresher SM Postponed until 2012 due to major overhaul. Oil/Chemical spill equipment training SM/CM Spill training carried out in December. Weekly CEMS QAL 3 training with Production Team. 7.5 Carry out Environmental Awareness at staff briefings. SM 13 of 18 staff trained to date. The majority of staff now very familiar with procedure. CEMS equipment training T and E Postponed until 2012 due to major overhaul. TG/SM To be carried out quarterly at Safety Briefings. Due Date Q3 Q2 Ongoing July Ongoing Waste Training SM/CM ENVA Postponed until 2012 due to major overhaul and changes in waste policy. Environmental Awareness Training SM Postponed until 2012 due to major overhaul. Fire Fighting Training CM/RM Complete Q1 Q 3 Q2 39

40 3.3 Environmental Management Program Proposal 2012 Ref Objective Target Reason Project Summary Resp. Status 1.1 To ensure Implement required To ensure Carry out AST on CCGT CEMS. T & E Q 4 100% monitoring/recording. compliance with 1.2 compliance licence by Technical Amendment to Licence - SM Site investigation and new Q 2 with IPPCL. implementing Licence boundary to be updated for removal IPPCL boundary drawings required 1.3 of Networks HV Compounds and GIS and complete. Technical amendment measurement and also area to be leased to DCC. to be sent to EPA in reporting of emissions. Date Due 1.4 Consider licence implications if NORA lease HFO and Diesel oil farms. DMcC SM Q Consider any items in relation to noise reduction on site if required. 1.6 Report on RMP to be completed for Thermal site. 1.7 Chlorine meter at outfall to be integrated into DCS. Will consider again if Electrical contractor on site in SM Q 4 DMcC SM KP/AM Tile available on CC analysis panel and tested ok. Q 2 Q 4 40

41 Ref Objective Target Reason Project Summary Resp. Status 2.1 Identify areas To optimise Energy To optimise Energy Follow up from Thermal Performance Efficiency for efficiency of the CCGT. efficiency of the CCGT Testing improvement and reduce CO2 in Energy emissions. 2.2 Efficiency Sustainability Plan for 2012 to include the following projects ; 3.1 Reduce the potential for Bund testing programme discharge to surface and ground water 3.2 Assess Networks oil tanks associated with oil filled cables. 3.3 Biannual borehole monitoring. 3.4 Improve identification of site drainage systems. To ensure integrity of containment structure and to eliminate risk of leak reaching surface water. To prevent oil contamination of soil To monitor ground water on site. To identify site drainage systems. Continue review of CW pump running and reducing to one pump if feasible. Review regeneration rinse times to reduce water consumption. Continue Thermal Station power use and reduction. Continue review of Start ups to ensure they are as efficient as possible. Will be reviewing warm and hot starts when 2 shifting commences. Investigate recycling of sampling station water. Carry out 3 yearly retention tests as per Bund Test Schedule and carry out repairs to defective bunds as required. No.of bunds due to be tested in Bunds to be marked with test mark and further details on the bunds being added to the testing matrix. Networks bunding of cable oil tanks to be completed. Inchicore tanks to be brought above ground and bunded. Outage required on line. Biannual samples taken at 4 boreholes by external contractor. Trends to be included in AER. All manholes, drains, sumps, interceptors etc to be painted and colour coded. New drainage drawings to be prepared. AM/T and E AM/PM JB/KP DMcC DD SM/KP Further testing to be carried out in Further tests carried out February. Date Due Q 4 Q 4 MMcC/PG Q 4 Networks SM. Q 4 MMcC/ DMcC Q 3 41

42 3.5 Oil spill materials Tidy and identify the spill material hut contents. Label/Identify/relocate if necessary the spill materials in the Nurses Hut. MMcC/ DMcC Q Emergency preparedness To enable the final sump pump be switched out from the control room Consider remote operation of the final sump pump. MMcC/ DMcC Q 4 42

43 Ref Objective Target Reason Project Summary Resp. Status 5.1 Identify To improve current To improve waste Waste Recycling target 45% SM/DMcC/ improvements in waste practices by management on site by This target includes for general waste, MMcC waste management ensuring all encouraging good waste recyclables, timber, glass and WEEE. through ongoing recyclable management by all staff and assessment of materials are contractors. Review and track monthly. 5.2 waste streams and segregated and Waste Policy to be developed SM Q 1 initiatives within recycled. 5.3 Waste stream location drawing to be SM Q 1 produced. 5.4 the station to improve staff awareness. 6.1 Reduction in water To reduce the usage amount of water used on site. 6.2 To reduce treated water consumption To optimise water usage in the station To optimise water and chemical usage in the station Ensure GT filters changed during outages go for SRF. Ongoing water monitoring and investigations to be carried out to ensure leaks and use are minimised : Target : rolling daily average < 150 m3 Treated water use in CCGT to be monitored by regular drop tests. Study on sampling station water reuse to be carried out and length of regeneration times. SM Q 4 D.McC/ PM D.McC/ PTL SM/KP Line at Thermal WTP leaks blanked. Leaks at U1/2 now repaired. Due Date Ongoing Q 4 Q 4 43

44 Ref Objective Target Reason Project Summary Resp. Status Due Date Training Carry out To ensure that all staff are 7.1 Environmental aware of our IPPCL and Internal audit refresher Training Environmental aspects 7.2 associated with their work Weekly CEMS QAL 3 familiarisation on site. with Production Team CEMS Training Equipment and Maintenance Environmental Awareness Training SM Moving to process type audits and training will be ongoing during Q 2 SM In progress Weekly T and E Q 2 STL and FLMs 7.6 Waste Training SM. Q Emergency Preparedness RM/DMcC Type to be decided (Exercise/Seveso/BCP) Q 2 Q 4 44

45 4. Licence Specific Reports 4.1 Total Annual Emissions of SO 2, NO x, CO 2 and Particulates. Parameter (Tonnes) SO NO ,103 1, CO 2 1,441,173 1,243,721 1,254,381 1,163, ,263 Particulates /2008 SO 2 and CO 2 were calculated from fuel use. NO 2 and Particulates were calculated from CEMS. 2009/2010 NO 2, SO 2 and Particulates were calculated from CEMS. CO 2 was calculated from fuel use and analysis as per ETS procedures NO 2 is calculated from CEMS. CO 2 was calculated from fuel use and analysis as per ETS procedures. There is no further particulate and SO2 emission measurements following the Thermal station closure. 4.2 List 1/List 2 substances Reports on sodium hypochlorite and ammonia usage have been submitted to the EPA previously. Following the Thermal station closure the quantity of these chemicals used on site has substantially reduced. 4.3 Bund Testing Report See next page 45

46 4.3 Bund Testing Report 2011 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail Comment 6 C1 HFO Thermal Station - Oil Farm Oil 01/01/ /01/2012 Passed 7 C2 HFO Thermal Station - Oil Farm Oil 01/01/ /01/2012 Passed 8 C3 HFO Thermal Station - Oil Farm Oil 01/01/ /01/2012 Passed 9 C4 HFO Thermal Station - Oil Farm Oil 01/01/ /01/2012 Passed 10 C5 HFO Thermal Station - Oil Farm Oil 10/03/ /03/2012 Passed 11 T2003 Thermal Station - Transformer Oil 01/09/ /08/2013 Passed 12 UT3 Thermal Station - Transformer Oil 03/06/ /06/2013 Passed 13 T2002 Thermal Station - Transformer Oil 01/09/ /08/2013 Passed 14 UT2 Thermal Station - Transformer Oil 27/05/ /05/2013 Passed Saleable HFO removed, residual oil/sludge remains. Saleable HFO removed, residual oil/sludge remains. Saleable HFO removed, residual oil/sludge remains. Saleable HFO removed, residual oil/sludge remains. Agreement with EPA that it is inappropriate to carry out water retention test. HFO removed, 500 t unsalable oil remains. Repairs carried out in Certified by Civil Engineer 13th December Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 15 th June Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Repairs carried out in Certified by Civil Engineer 13th December. Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 13th September Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. 46

47 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail 15 T2001 Thermal Station - Transformer Oil 05/05/ /05/2012 Passed 16 UT1 Thermal Station - Transformer Oil 05/05/ /05/2012 Passed 17 ST21 Thermal Station - Transformer Oil 05/05/ /05/2012 Passed 18 TF3 Thermal Station - Transformer Oil 10/06/ /06/2013 Passed 19 TF4 Thermal Station - Transformer Oil 05/05/ /05/2012 Passed 20 TF1 Thermal Station - Transformer Oil 31/05/ /05/2013 Passed 21 ST11 Thermal Station - Transformer Oil 01/05/ /04/2012 Passed 22 ST17 Thermal Station - Transformer Oil 04/02/ /02/2012 Passed 23 ST18 Thermal Station - Transformer Oil 04/02/ /02/2012 Passed Comment Certified by civil engineer 11th June Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by civil engineer 11th June Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 11th June Transformer in use and bund inspected weekly. Repairs completed in Certified by Civil Engineer 15th June Transformer in use and bund inspected weekly. Certified by Civil Engineer 11th June Retested in Jan 2010 and passed. Transformer in use and bund inspected weekly. Repairs carried out in Certified by Civil Engineer 15th June Transformer in use and bund inspected weekly. Certified by Civil Engineer 11th June Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by civil engineer 10th March Transformer in use and bund inspected weekly. Certified by civil engineer 10th March Transformer in use and bund inspected weekly. 47

48 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail 24 ST12 Thermal Station - Transformer Oil 01/05/ /04/2012 Passed 25 Hot 1 Thermal Station - Transformer Oil 04/06/ /06/2013 Passed 26 Hot 2 Thermal Station - Transformer Oil 04/06/ /06/2013 Passed 27 Hot 3 Thermal Station - Transformer Oil 04/06/ /06/2013 Passed 28 Hot 7 Thermal Station - Transformer Oil 04/06/ /06/2013 Passed 29 Hot 8 Thermal Station - Transformer Oil 04/06/ /06/2013 Passed Comment Certified by Civil Engineer 11th June Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 13/ Sept Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 11th June Retested 04/06/2010 and ok. Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 13th September Transformer not operating, currently being stored as a strategic spare for ESB. Bund inspected weekly. Certified by Civil Engineer 13th September Transformer in use and bund inspected weekly. Certified by Civil Engineer 13th September Transformer in use and bund inspected weekly. 32 Hydrochloric Acid Store Container Chem. 04/05/ /05/2010 Passed Empty and no longer in use. 33 Sodium Hypochlorite Store Container Chem. 04/05/ /05/2010 Passed Empty and no longer in use. 34 Fyrquel Store Container Chem. 15/06/ /06/2013 Passed 35 Oil Storage Compound Bunds labelled 1-8 Oil 09/09/ /09/2013 Passed 36 Waste Oil Storage Area beside HFO pump house Emptied, will be used during 2011 CCGT overhaul for chemical storage. 8 bunds labelled and only these will be used following Thermal station closure. Certified by civil engineer September Waste Oil 05/03/ /03/2012 Passed Certified by civil engineer April

49 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail Comment UGD CC - H 2SO 4 Chem. 19/06/ /06/2012 Passed UGD CC - NAOH Chem. 29/06/ /06/2012 Passed UGD CC - Brine Chem. 06/07/ /07/2012 Passed UPQ CC - Electrochl HCl unloading Chem. 30/08/ /08/2012 Passed UPQ CC - Hypochlorite storage tank bund Chem. 14/02/ /02/2013 Passed 42 14UHA CC - Ammonia Chem. 11/06/ /06/2012 Passed 43 14UHA CC - Hydrazine Chem. 11/06/ /06/2012 Passed 44 14UMB CC - Lube Oil Skid Oil 28/08/ /08/2012 Passed 45 Distillate Bund CC - Distillate Oil 01/06/ /05/2012 Passed 46 Aux Boiler CC - Diesel Day Tank Oil 14/02/ /02/2013 Passed 47 T2014 CC - Holding Tank Oil 10/06/ /06/2012 Passed 48 UT14 Combined Cycle Oil 10/06/ /06/2012 Passed 49 T2015 CC - Holding Tank Oil 10/06/ /06/2012 Passed Certified by Civil Engineer 31st August Certified by Civil Engineer 31st August Certified by Civil Engineer 31st August Certified by Civil Engineer 14th September Cert. issued by Civil Engineer 22nd Feb 2010 Certified by Civil Engineer 13th August Certified by Civil Engineer 13th August Certified by Civil Engineer 14th September Fill carried out in Agreed with EPA that fill testing is an inappropriate waste of water. Bund Inspected in 2006 and work/repairs completed in Bund work completed and civil engineer satisfied with repairs. Cert. issued by Civil Engineer 22nd Feb 2010 Certified by Civil Engineer 13th August Certified by Civil Engineer 13th August Certified by Civil Engineer 13th August

50 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail Comment 50 UT15 Combined Cycle Oil 10/06/ /06/2012 Passed Certified by Civil Engineer 13th August T2016 CC - Main Trafo Sump Oil 23/09/2011 Passed HOT 16 A and B drain to T Hot 16A Combined Cycle - T2016 Oil 30/11/ Hot 16B Combined Cycle - T2016 Oil 30/11/2011 Repairs in progress Repairs in progress 54 Hot 16C Combined Cycle - Chlorine room Oil 14/02/ /02/2013 Passed 55 Hot 16D Combined Cycle - Chlorine room Oil 14/02/ /02/2013 Passed 56 ST13 Combined Cycle Oil 25/07/ /07/2013 Passed 57 Hot 17 Combined Cycle Oil 25/07/ /07/2013 Passed UHA CC - Dosing Room Chem 10/06/ /06/2012 Passed UMB CC - Wash Water Sump Chem 20/11/ /11/2013 Passed UMB CC - Fuel Oil Pump Skid Oil 08/09/ /09/2013 Passed UMB CC - Lube Oil Skid Oil 28/08/ /08/2012 Passed UMB CC - Fuel Oil Pump Skid Oil 28/08/ /08/2012 Passed UMB CC - Wash Water Sump Chem 16/06/ /06/2013 Passed Failed Failed Due to design of bund, leaks have proved very difficult to find. Decision to line entire bund area of HOT16A and HOT16B in Same collection chamber as T2016, main T2016 bund holding. Due to design of bund, leaks have proved very difficult to find. Decision to line entire bund area of HOT16A and HOT16B in Same collection chamber as T2016, main T2016 bund holding. Cert. issued by Civil Engineer 22nd Feb 2010 Cert. issued by Civil Engineer 22nd Feb 2010 Certified by Civil Engineer 13th September 2010 Certified by Civil Engineer 13th September 2010 Certified by Civil Engineer 13th August 2009 Certified by civil Engineer 18th November. Certified by Civil Engineer 13th September 2010 Certified by Civil Engineer 14th September Certified by Civil Engineer 14th September Certified by Civil Engineer 13/09/

51 ID Bund Location Type Test/Cert Date Next Due Pass/ Fail Comment URB/MPR CC - Holding Tank Oil 10/06/ /06/2012 Passed 65 14URB CC - Phase 2 Fin Fan Cooler Chem 14/02/ /02/2013 Passed UPQ CC - Electrochl HCl tank bund Chem 30/08/ /08/2012 Passed Chem gas and oil storage compound no 1. Chem gas and oil storage compound no 2. On stones opposite CCGT WTP Chem 18/07/ /07/2013 Passed On stones opposite CCGT WTP Chem 18/07/ /07/2013 Passed 69 Chemstore Unit Waste oil storage bund Chem/oil 17/12/ /12/2011 Passed Drained to tank beside storage oil tank for T2014/5. Tank underground. 'Certified by Civil Engineer 13th August 2009 Certified by Civil Engineer 22nd Feb 2010 Certified by Civil Engineer 14th September 2009 Certified by Civil Engineer 13th Sept 2010 Certified by Civil Engineer 13th Sept 2011 Certified by Civil Engineer 3 rd April

52 4.5 Residual Management Plan update A report is currently being prepared in relation to the ongoing RMP for the Thermal station site. This will be forwarded to the Agency in the coming weeks. 4.6 Ground Water Monitoring - See next page 52

53 Parameter Units MW2 Results 2010/2011 Feb- Jul- Feb- Jul- MDL IGV GW Regs TPH >C5-C6 ALI ug/l 5 nv nv TPH >C6-C8 ALI ug/l 5 nv nv TPH >C8-C10 ALI ug/l 5 nv nv TPH >C10-C12 ALI ug/l 10 nv nv TPH >C12-C16 ALI ug/l 10 nv nv TPH >C16-C21 AL ug/l 10 nv nv TPH >C21-C35 ALI ug/l 10 nv nv TPH >C5-C35 ALI ug/l 10 nv nv TPH >C5-C7 AROM ug/l 5 nv nv TPH >C7-C8 AROM ug/l 5 nv nv TPH >C8-C10 AROM ug/l 5 nv nv TPH >C10-C12 AROM ug/l 10 nv nv TPH >C12-C16 AROM ug/l 10 nv nv TPH >C16-C21 AROM ug/l 10 nv nv TPH >C21-C35 AROM ug/l 10 nv nv TPH >C5-C35 AROM ug/l 10 nv nv TPH C5-C35 ALI + AROM ug/l Benzene ug/l Toluene ug/l Ethylene ug/l Xylenes ug/l MTBE ug/l Acenaphthene ug/l 0.1 nv nv Acenaphthylene ug/l 0.08 nv nv Anthracene ug/l Benzo(a)anthracene ug/l 0.09 nv nv Benzo(ghi)perylene* ug/l Benzo(a)pyrene ug/l Benzo(b)+Benzo(k) fluoranthene* ug/l Chrysene ug/l 0.1 nv nv Coronene ug/l 0.01 nv nv Dibenzo(ah)anthracene ug/l 0.01 nv nv Fluoranthene ug/l Fluorene ug/l 0.07 nv nv ndeno(123cd)pyrene* ug/l Naphthalene ug/l Phenanthrene ug/l 0.07 nv nv Pyrene ug/l 0.12 nv nv Total 4 PAHs ug/l nv Total 17 PAHs ug/l nv nv BOD mg/l 1 nv COD mg/l 7 nv Faecal Coliforms counts/ 100 ml Total Coliforms counts/ 100 ml MDL- Method Detection Limit IGV Interim Guideline Values GW Regs Groundwater Regulations

54 MW2 Results 2010/2011 Parameter Units MDL IGV GW Regs Feb- Aug- Feb- Jul TPH >C5-C6 ALI ug/l 5 nv nv TPH >C6-C8 ALI ug/l 5 nv nv TPH >C8-C10 ALI ug/l 5 nv nv TPH >C10-C12 ALI ug/l 10 nv nv TPH >C12-C16 ALI ug/l 10 nv nv TPH >C16-C21 AL ug/l 10 nv nv TPH >C21-C35 ALI ug/l 10 nv nv TPH >C5-C35 ALI ug/l 10 nv nv TPH >C5-C7 AROM ug/l 5 nv nv TPH >C7-C8 AROM ug/l 5 nv nv TPH >C8-C10 AROM ug/l 5 nv nv TPH >C10-C12 AROM ug/l 10 nv nv TPH >C12-C16 AROM ug/l 10 nv nv TPH >C16-C21 AROM ug/l 10 nv nv TPH >C21-C35 AROM ug/l 10 nv nv TPH >C5-C35 AROM ug/l 10 nv nv TPH C5-C35 ALI + AROM ug/l Benzene ug/l Toluene ug/l Ethylene ug/l Xylenes ug/l MTBE ug/l Acenaphthene ug/l 0.1 nv nv Acenaphthylene ug/l 0.08 nv nv Anthracene ug/l Benzo(a)anthracene ug/l 0.09 nv nv Benzo(ghi)perylene* ug/l Benzo(a)pyrene ug/l Benzo(b)+Benzo(k) fluoranthene* ug/l Chrysene ug/l 0.1 nv nv Coronene ug/l 0.01 nv nv Dibenzo(ah)anthracene ug/l 0.01 nv nv Fluoranthene ug/l Fluorene ug/l 0.07 nv nv Indeno(123cd)pyrene* ug/l Naphthalene ug/l Phenanthrene ug/l 0.07 nv nv Pyrene ug/l 0.12 nv nv Total 4 PAHs ug/l nv Total 17 PAHs ug/l 1.61 nv BOD mg/l 1 nv COD mg/l 7 nv Faecal Coliforms counts/100 ml Total Coliforms counts/100 ml MDL- Method Detection Limit IGV Interim Guideline Values GW Regs Groundwater Regulations

55 MW3 Results 2010/2011 Parameter Units MDL IGV GW Regs Feb- Jul- Feb- Jul TPH >C5-C6 ALI ug/l 5 nv nv TPH >C6-C8 ALI ug/l 5 nv nv TPH >C8-C10 ALI ug/l 5 nv nv TPH >C10-C12 ALI ug/l 10 nv nv TPH >C12-C16 ALI ug/l 10 nv nv TPH >C16-C21 AL ug/l 10 nv nv TPH >C21-C35 ALI ug/l 10 nv nv TPH >C5-C35 ALI ug/l 10 nv nv TPH >C5-C7 AROM ug/l 5 nv nv TPH >C7-C8 AROM ug/l 5 nv nv TPH >C8-C10 AROM ug/l 5 nv nv TPH >C10-C12 AROM ug/l 10 nv nv TPH >C12-C16 AROM ug/l 10 nv nv TPH >C16-C21 AROM ug/l 10 nv nv TPH >C21-C35 AROM ug/l 10 nv nv TPH >C5-C35 AROM ug/l 10 nv nv TPH C5-C35 ALI + AROM ug/l Benzene ug/l Toluene ug/l Ethylene ug/l Xylenes ug/l MTBE ug/l Acenaphthene ug/l 0.1 nv nv Acenaphthylene ug/l 0.08 nv nv Anthracene ug/l Benzo(a)anthracene ug/l 0.09 nv nv Benzo(ghi)perylene* ug/l Benzo(a)pyrene ug/l Benzo(b)+Benzo(k) fluoranthene* ug/l Chrysene ug/l 0.1 nv nv Coronene ug/l 0.01 nv nv Dibenzo(ah)anthracene ug/l 0.01 nv nv Fluoranthene ug/l Fluorene ug/l 0.07 nv nv ndeno(123cd)pyrene* ug/l Naphthalene ug/l Phenanthrene ug/l 0.07 nv nv Pyrene ug/l 0.12 nv nv Total 4 PAHs ug/l nv Total 17 PAHs ug/l nv nv BOD mg/l 1 nv COD mg/l 7 nv Faecal Coliforms counts/ 100 ml Total Coliforms counts/ 100 ml MDL- Method Detection Limit IGV Interim Guideline Values GW Regs Groundwater Regulations

56 MW 4 Results 2010/2011 Parameter Units MDL IGV GW Regs Feb- Jul- Feb- Jul TPH >C5-C6 ALI ug/l 5 nv nv TPH >C6-C8 ALI ug/l 5 nv nv TPH >C8-C10 ALI ug/l 5 nv nv TPH >C10-C12 ALI ug/l 10 nv nv TPH >C12-C16 ALI ug/l 10 nv nv TPH >C16-C21 AL ug/l 10 nv nv TPH >C21-C35 ALI ug/l 10 nv nv TPH >C5-C35 ALI ug/l 10 nv nv TPH >C5-C7 AROM ug/l 5 nv nv TPH >C7-C8 AROM ug/l 5 nv nv TPH >C8-C10 AROM ug/l 5 nv nv TPH >C10-C12 AROM ug/l 10 nv nv TPH >C12-C16 AROM ug/l 10 nv nv TPH >C16-C21 AROM ug/l 10 nv nv TPH >C21-C35 AROM ug/l 10 nv nv TPH >C5-C35 AROM ug/l 10 nv nv TPH C5-C35 ALI + AROM ug/l Benzene ug/l Toluene ug/l Ethylene ug/l Xylenes ug/l MTBE ug/l Acenaphthene ug/l 0.1 nv nv Acenaphthylene ug/l 0.08 nv nv Anthracene ug/l Benzo(a)anthracene ug/l 0.09 nv nv Benzo(ghi)perylene* ug/l Benzo(a)pyrene ug/l Benzo(b)+Benzo(k) fluoranthene* ug/l Chrysene ug/l 0.1 nv nv Coronene ug/l 0.01 nv nv Dibenzo(ah)anthracene ug/l 0.01 nv nv Fluoranthene ug/l Fluorene ug/l 0.07 nv nv Indeno(123cd)pyrene* ug/l Naphthalene ug/l Phenanthrene ug/l 0.07 nv nv Pyrene ug/l 0.12 nv nv Total 4 PAHs ug/l nv Total 17 PAHs ug/l nv nv BOD mg/l 1 nv COD mg/l 7 nv Faecal Coliforms counts/ 100 ml Total Coliforms counts/ 100 ml

57 Comments on Ground Water Results from 2011 Results have been screened against the Groundwater Regulation Threshold Values (2010) and EPA Interim Guideline Values (IGVs) for groundwater. Results from the two sampling rounds indicate that: February 2011 Similar to previous rounds the concentrations of TPH, BTEX and MTBE were not detected above the method detection limit (MDL); PAH concentrations have increased in MW2. Concentrations of Benzo(a)pyrene, Total 4 PAHs and Total 17 PAHs exceeded the IGVs; PAH concentrations have decreased in MW4. However, concentrations of Benzo(a)pyrene, exceeded IGVs. Total coliform concentrations exceeded the IGVs in samples collected from BH1, MW2, MW3, and MW4, the impact is considered to be minor. (Refer also to report submitted 25/01/2011) July 2011 Similar to previous rounds the concentrations of TPH, BTEX and MTBE were not detected above the method detection limit (MDL); PAH concentrations were relatively low in all four samples collected with reported concentrations below MDL or appropriate IGV. This is broadly consistent with previous monitoring rounds; Benzo(a)pyrene concentrations have decreased in MW4 and MW2 since February 2011 when they exceeded the IGV. Total coliform numbers exceeded the IGV in samples collected from BH1, MW02, MW03, and MW04 with a slight increase in numbers of coliforms noted since February However, overall, the impact is considered to be minor. (Refer also to report submitted 25/01/201) 57

58 APPENDIX I AER RETURNS WORKBOOK - PRTR

59 PRTR# : P0577 Facility Name : Electricity Supply Board (Poolbeg) Filename : AER North Wall 2011.xls Return Year : /03/ :19 REFERENCE YEAR 2011 Guidance to completing the PRTR workbook AER Returns Workbook 1. FACILITY IDENTIFICATION Parent Company Name Electricity Supply Board (Poolbeg) Facility Name Electricity Supply Board (Poolbeg) PRTR Identification Number P0577 Licence Number P Version Waste or IPPC Classes of Activity No. class_name The operation of combustion installations with a rated thermal input 2.1 equal to or greater than 50MW Address 1 ESB Poolbeg Generating Station Address 2 Pigeon House Road Address 3 Ringsend Address 4 Dublin 4 Dublin Country Ireland Coordinates of Location River Basin District IEEA NACE Code 3511 Main Economic Activity Production of electricity AER Returns Contact Name Suzanne Moran AER Returns Contact Address suzanne.moran@esb.ie AER Returns Contact Position Environmental Coordinator AER Returns Contact Telephone Number AER Returns Contact Mobile Phone Number AER Returns Contact Fax Number Production Volume Production Volume Units GWhrs Number of Installations 1 Number of Operating Hours in Year 8760 Number of Employees 45 User Feedback/Comments Web Address 2. PRTR CLASS ACTIVITIES Activity Number 1(c) Activity Name Thermal power stations and other combustion installations 3. SOLVENTS REGULATIONS (S.I. No. 543 of 2002) Is it applicable? Have you been granted an exemption? If applicable which activity class applies (as per Schedule 2 of the regulations)? Is the reduction scheme compliance route being used?

Tarbert Generating Station

Tarbert Generating Station Tarbert Generating Station IPPC Licence Reg. No. PO607-02 Annual Environmental Report For the period of 1 st January to 31 st December 2008 Table of Contents Page No. Section 1: Introduction 3 1.1 IPC

More information

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork

The operation of combustion installations with a rated thermal input greater than 50MW at Whitegate (Corkbeg and Glanagow Townlands), County Cork WHITEGATE POWER STATION ANNUAL ENVIRONMENTAL REPORT 2011 1 Contents 1 INTRODUCTION... 3 1.1 Name and Location of the Site... 3 1.2 IPPC Licence Registration Number... 3 1.3 Brief Description of Activities

More information

Doherty Brothers Timber Company Limited

Doherty Brothers Timber Company Limited Annual Environmental Report 2008 Doherty Brothers Timber Company Limited Licence Number: P0354-01 Report Date: 14 th September 2009 Report Number: 1010-09-01 Version 0 40 Coolraine Heights, Old Cratloe

More information

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford

IPC Licence P AER Report Waterford Crystal Springmount Dungarvan Co. Waterford IPC Licence P0156-01 AER Report 2008 Waterford Crystal Springmount Dungarvan Co. Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 3 1.1 Brief Description of Site Activities 1.2

More information

IPC Licence P AER Report Waterford Crystal Kilbarry Cork Road Waterford

IPC Licence P AER Report Waterford Crystal Kilbarry Cork Road Waterford IPC Licence P0157-02 AER Report 2008 Waterford Crystal Kilbarry Cork Road Waterford 31 st March 2009-1 - Table of Contents Page No. 1.0 Introduction 4 1.1 Brief Description of Site Activities 1.2 Environmental

More information

ANNUAL ENVIRONMENTAL REPORT

ANNUAL ENVIRONMENTAL REPORT ANNUAL ENVIRONMENTAL REPORT JANUARY 2017 TO DECEMBER 2017 Licence Registration Number: PO357-01 Licensee: Cross Vetpharm Group Ltd Location of Activity: Attention: Airton Close, Tallaght Dublin 24. Office

More information

Rhode Peaking Power Plant. Annual Environmental Report 2008

Rhode Peaking Power Plant. Annual Environmental Report 2008 Rhode Peaking Power Plant Annual Environmental Report 2008 Table of Contents Subject Page Introduction 1 Summary Information Plant Operation Data 1 Emissions to Air 1 Emissions to Water 2 Waste 2 Energy

More information

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008

Essidev SA Trading as Organic Lens Manufacturing IPPC License P Annual Environmental Report 2008 ESSIDEV SA T/A ORGANIC LENS MANUFACTURING IPPC Licence P-0061-03 Essidev SA Trading as Organic Lens Manufacturing IPPC License P0061-03 Annual Environmental Report 2008 2 Contents Section 1 INTRODUCTION

More information

INSPECTORS REPORT ON A LICENCE APPLICATION

INSPECTORS REPORT ON A LICENCE APPLICATION OFFICE OF LICENSING & GUIDANCE INSPECTORS REPORT ON A LICENCE APPLICATION To: Directors From: Aoife Loughnane - Licensing Unit th Date: 20 July 2006 RE: Application for an IPPC Licence Review from Huntstown

More information

Loy Yang B Environment Improvement Plan

Loy Yang B Environment Improvement Plan Loy Yang B Environment Improvement Plan 2017 Table of Contents 1 Endorsement 1 2 Environment Policy 2 3 Operating Arrangements 3 4 Site Management and Business Systems 4 5 Environmental Impacts and Risks

More information

Annual Environmental Report 2013

Annual Environmental Report 2013 Annual Environmental Report 2013 For Woodland Products Ltd., Drumully, Emyvale, Co. Monaghan IPPC Reg. No. P0198-01 By QED Engineering Ltd., M-TEK Building 1 Armagh Road Monaghan July 2014 Table of Contents

More information

ESB Lough Ree Power IPPCL Review - Clarifications

ESB Lough Ree Power IPPCL Review - Clarifications ESB Lough Ree Power IPPCL Review - Clarifications For the purposes of EC Environmental Objectives (Landfill Directive) Regulations 1999/31/EC CONTENTS 1.ADDRESS...2 2.MAPS...3 3.TABLE B1(II).3 4.AL-SW1-ADF...5

More information

Facility Information Summary AER Reporting Year

Facility Information Summary AER Reporting Year 1 Facility Information Summary AER Reporting Year 2016 Licence Register Number P0690-02 Name of site C&F Automotive Ltd T/A Iralco Site Location Collinstown, Mullingar, Co Westmeath NACE Code 2561 Class/Classes

More information

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P

Clogrennane Lime Ltd. Toonagh Lime Works AER Licence # P Clogrennane Lime Ltd Toonagh Lime Works AER 2010 Licence # P0 771-01 Section 1 Overview. 3 1.0 Introduction 1.1 Description of Activities 1.2 Responsibility for Environmental Management 1.3 Environmental

More information

Annual Environmental Report for Glennon Bros. Cork Ltd.

Annual Environmental Report for Glennon Bros. Cork Ltd. Annual Environmental Report for Glennon Bros. Cork Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Cork Ltd. License no. P0344-01 Date: 31/03/2010

More information

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012

Annual Environmental Report ANNUAL ENVIRONMENTAL REPORT 2012 ANNUAL ENVIRONMENTAL REPORT 2012 Contents 1.0 Introduction...3 1.1 Site Activities... 3 1.2 Company Environmental Policy... 3 1.3 Organisation chart for Environmental Management... 3 2.0 Summary Information...4

More information

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites

Result data last updated. 10 July Map of Norske Skog Albury Paper Mills Environmental Protection Licence compliance monitoring sites A full copy of our license can be found on the EPA website under the following address http://www.epa.nsw.gov.au/prpoeoapp/viewpoeolicence.aspx?docid=32757&sysuid=1&licid=1272 Result data last updated

More information

Annual Environmental Report for Glennon Bros. Timber Ltd.

Annual Environmental Report for Glennon Bros. Timber Ltd. Annual Environmental Report for Glennon Bros. Timber Ltd. Period: January 2009 to December 2009 To: The Environmental Protection Agency From: Glennon Bros. Timber Ltd. License no. P0327-01 Date: 31/03/2010.

More information

Dublin Bay Power Plant. EPA Annual Environmental Report epa.ann.2012

Dublin Bay Power Plant. EPA Annual Environmental Report epa.ann.2012 Dublin Bay Power Plant IPPCL no. P0486-02 EPA Annual Environmental Report epa.ann.2012 Reporting period: 1 January to 31 December 2012. 1 Contents Page Introduction Licence register number..3 Name and

More information

Kepak Clonee. IPPC No P Annual Environmental Report

Kepak Clonee. IPPC No P Annual Environmental Report IPPC No P0167-02 2011 ANNUAL ENVIRONMENTAL REPORT SIGNOFF SHEET Declaration: All the data and information presented in this report has been checked and certified as being accurate. The quality of the information

More information

Attachment C Management of the Installation

Attachment C Management of the Installation Table of Contents Attachment C Management of the Installation C1.1 Organisational Chart C1.2 Quality, Safety and Environmental (QSE) Policy Statement C1.3 Roles & Responsibilities of Key Environmental

More information

Irish Country Meats Camolin

Irish Country Meats Camolin Irish Country Meats Camolin Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Water 4.2 Surface Water 4.3 Boiler Emissions

More information

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities.

To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems NSW s activities. Transit Systems NSW Environmental Management Plan GOAL 1: REDUCE THE GREENHOUSE IMPACT OF ENERGY USE To reduce the consumption of energy and the emission of greenhouse gases associated with Transit Systems

More information

Flavours EMEA Newmarket

Flavours EMEA Newmarket Kerry Ingredients and Flavours EMEA Newmarket Scarteen Lower, Newmarket Co. Cork. Kerry Ingredients & Flavours EMEA Newmarket 2011 Annual Environmental Report for Newmarket Cooperative Creameries (Reg:

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 4 3.2 Surface Water Emissions 5 3.3 Ground Water Sampling 8 3.4 Noise 8 3.5 Inspection of Valves

More information

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use.

ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE DR-0003) Consent of copyright owner required for any other use. ATTACHMENT E.3 EMISSIONS TO SEWER LOCATION OF EMISSION TO SEWER (IE0310818-22-DR-0003) Page 152 of 217 Attachment E.3 Emissions to Sewer It is proposed that trade and foul effluent from the facility will

More information

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21

CONTENTS. 4. ENVIRONMENTAL MANAGEMENT 4.1 Company Organisation Human Resources, Training and Education Objectives and Targets 21 CONTENTS PAGE 1 INTRODUCTION 3 2. GENERAL OVERVIEW OF THE ACTIVITY 4 3 DATA 3.1 Emissions to Atmosphere 5 3.2 Surface Water Emissions 6 3.3 Ground Water Sampling 8 3.4 Noise 10 3.5 Inspection of Valves

More information

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P

ANNUAL ENVIRONMENTAL REPORT. For. McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow. IPPC Licence Number: P ANNUAL ENVIRONMENTAL REPORT 2008 For McGhan Ltd. t/a Allergan Kilbride Industrial Estate, Arklow Co. Wicklow IPPC Licence Number: P0115-04 (Document Number 1120-01 v3.00) Tel: 353 1 276 1428 Fax: 353 1

More information

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE

CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE 31/03/2011 Castletownbere WTS and CA Site Annual Environmental Report 2010 CASTLETOWNBERE WASTE TRANSFER STATION AND CIVIC AMENITY SITE WASTE LICENCE W0160-01 ANNUAL ENVIRONMENTAL REPORT 2010 31 st December

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2008 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

A. Non-technical Summary

A. Non-technical Summary A. Non-technical Summary A non-technical summary of the application is to be included here. The summary should identify all environmental impacts of significance associated with the carrying on of the

More information

DUNBOYNE CIVIC AMENITY AND MATERIALS RECYCLING FACILITY Waste Licence W

DUNBOYNE CIVIC AMENITY AND MATERIALS RECYCLING FACILITY Waste Licence W PADRAIG THORNTON WASTE DISPOSAL LTD DUNBOYNE CIVIC AMENITY AND MATERIALS RECYCLING FACILITY Waste Licence W0206-01 ANNUAL ENVIRONMENTAL REPORT 2017 Submitted February 2018 Prepared by Eimear Reilly Environmental

More information

Technical Guidance Note (Monitoring) Medium Combustion Plant Directive and Generator Controls: monitoring point source emissions

Technical Guidance Note (Monitoring) Medium Combustion Plant Directive and Generator Controls: monitoring point source emissions Technical Guidance Note (Monitoring) M5 Medium Combustion Plant Directive and Generator Controls: monitoring point source emissions Environment Agency XXXX 2018 Version X Draft for consultation Foreword

More information

Heiton Buckley. Builders Merchants. Annual Environmental report for Licence No. PO340-01

Heiton Buckley. Builders Merchants. Annual Environmental report for Licence No. PO340-01 Heiton Buckley Builders Merchants Annual Environmental report for 2010 Licence No. PO340-01 1 The following is a summary of the contents of the 2010 AER. Further details are available in the full report

More information

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System

RE: Annual Report 2016 Wardsville Wastewater Treatment Plant and Collection System 14 th, 217 Tom Clubb 3232 White Oak Road, 3 rd Floor London ON N6E 1L8 Attention: Mr. Clubb RE: Annual Report 216 Wardsville Wastewater Treatment Plant and Collection System The Ontario Clean Water Agency

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare

Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare Green Isle Foods IDA Industrial Estate Monread Road Naas Co Kildare IPPC Licence Reg No. P0805-01 Annual Environmental Report 2008-1 - Contents Section Title Page No. 1.0 Introduction 1.1 Introduction

More information

Environmental Management System

Environmental Management System Environmental Management System Moreton Bay Research Station (MBRS) Water Management Program 1. Program Scope The Water Management Program incorporates all the water used throughout the Moreton Bay Research

More information

Emission Reduction Protocol. Ontario Power Generation - Lennox GS Units 1 to 4 Fuel Switch

Emission Reduction Protocol. Ontario Power Generation - Lennox GS Units 1 to 4 Fuel Switch Emission Reduction Protocol Ontario Power Generation - Lennox GS Units 1 to 4 Fuel Switch 1.0 Introduction In 2000 Lennox completed the conversion at all four units to dual fuel capability (oil and/or

More information

EPA Waste Water Discharge Licence Application

EPA Waste Water Discharge Licence Application Duleek Waste Water Treatment Works EPA Waste Water Discharge Licence Application ARTICLE 16 COMPLIANCE REQUIREMENTS Meath County Council EPA Document Ref: D0133-01 Section A: Non-Technical Summary Update

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT DUDLEY ENERGY FROM WASTE PLANT PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2011 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste throughputs

More information

IPPC Licence P AER Report Zinc Processors Ltd. T/A Shannonside Galvanizing 4 Elms, Drombanna, Co. Limerick.

IPPC Licence P AER Report Zinc Processors Ltd. T/A Shannonside Galvanizing 4 Elms, Drombanna, Co. Limerick. IPPC Licence P0650-02 AER Report 2010 Zinc Processors Ltd. T/A Shannonside Galvanizing 4 Elms, Drombanna, Co. Limerick. 31 st March 2011 Shannonside Galvanizing 2010 AER Report Table of Contents 1 Introduction....

More information

INTEGRATED POLLUTION CONTROL LICENCE

INTEGRATED POLLUTION CONTROL LICENCE This licence was amended on 17 th September 2007 under Section 96(1) of the EPA Acts 1992 and 2003. The details of Amendment A must be read in conjunction with this licence. The amendment document is entitled

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Bantry Licence Register No. D0168-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section 2.

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT

DUDLEY ENERGY FROM WASTE PLANT. PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT DUDLEY ENERGY FROM WASTE PLANT PERMIT No AP3435SD WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2008 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste throughputs

More information

ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W

ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W ANNUAL ENVIRONMENTAL REPORT. Dingle Civic Amenity Site. Licence ref. No W00225 1. 2009 March 2010 1) Reporting Period 01/01/09-31/12/09 2) Details of Activity The principal activities include recycling

More information

Excerpt of Thermal Power Guidelines for New Plants

Excerpt of Thermal Power Guidelines for New Plants Excerpt of Thermal Power Guidelines for New Plants The following is an excerpt of the Thermal Power guidelines for New Plants, a complete version of which is found in the Pollution Prevention and Abatement

More information

Tynagh CCGT Power Station

Tynagh CCGT Power Station Tynagh CCGT Power Station Annual Environmental Report 2008 Reference Number: TYN\ENV\2009/01 Date: 27/03/09 Issue: Rev. 01 Authors: Dermot Logan Eoin O Sullivan Stephanie O Connor Reviewed : Dermot Logan

More information

STOKE ON TRENT ENERGY FROM WASTE PLANT. PERMIT No QP3234SX WASTE INCINERATION DIRECTIVE ANNUAL REPORT

STOKE ON TRENT ENERGY FROM WASTE PLANT. PERMIT No QP3234SX WASTE INCINERATION DIRECTIVE ANNUAL REPORT STOKE ON TRENT ENERGY FROM WASTE PLANT PERMIT No QP3234SX WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2011 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste

More information

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT WOLVERHAMPTON ENERGY FROM WASTE PLANT PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2010 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste

More information

Irish Country Meats Navan

Irish Country Meats Navan Irish Country Meats Navan Annual Environmental Report 2009 Index 1 Introduction 2 Environmental Policy 3 Site Description 4 Summary Information 4.1 Emission to Sewer 4.2 Emissions to Water 4.3 Waste Management

More information

Water Resources Director: Chris Graybeal

Water Resources Director: Chris Graybeal Water Resources Director: Chris Graybeal Our Mission To promote and protect the environment, preserve natural resources, and ensure the health and safety of our customers. Granite Falls Wastewater Treatment

More information

Environment Protection Licence

Environment Protection Licence Licence Details Number: Anniversary Date: 767 01-January Licensee METROPOLITAN COLLIERIES PTY. LTD. PO BOX 402 HELENSBURGH NSW 2508 Premises METROPOLITAN COLLIERY PARKES STREET HELENSBURGH NSW 2508 Scheduled

More information

WESTPORT, CO. MAYO, IRELAND.

WESTPORT, CO. MAYO, IRELAND. - c. ALLERCAN GEE PHARMACEUTICALS IRELAND TELEPHONE: +353-98-25222 TELEFAX: +353-98-25791 WEB SITE: www.allergan.com WESTPORT, CO. MAYO, IRELAND. Office of Climate, Licensing & Resource Use, EPA Headquarters,

More information

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY

VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY VIRIDOR WASTE MANAGEMENT ARDLEY EFW PLANT EP APPLICATION - NON TECHNICAL SUMMARY S1014-0340-0008MPW NTS Rev1.doc Print Date 19 February 2009 ISSUE NUMBER 1 DATE 19/02/09 AUTHOR CHECKED MPW SMO Title Page

More information

Waste Licence W Annual Environmental Report for 2015

Waste Licence W Annual Environmental Report for 2015 Clare County Council Waste Licence W0150-01 Annual Environmental Report for 2015 Name & location of facility: Scarriff Recycling Centre & Transfer Station, Fossa Beg, Feakle Road, Scarriff, Co. Clare.

More information

Delvin Wastewater Treatment Plant

Delvin Wastewater Treatment Plant Delvin Wastewater Treatment Plant WWDL No. D0267-01 ANNUAL ENVIRONMENTAL REPORT 2011 County Buildings Mullingar Co. Westmeath Phone: 04493-32000 Fax: 04493-42330 Delvin Waste Water Discharge Licence (EPA

More information

Guidance Note Environmental Performance Reporting

Guidance Note Environmental Performance Reporting Guidance Note Environmental Performance Reporting REP-533-14-LS October 2014 Definitions: ARWA Advanced Regulatory Wiki Application (produced by SEU) BAT Best Available Technique BRC Beyond Regulatory

More information

SUBJECT: 2017 ANNUAL ENVIROVISTA PROGRESS REPORT

SUBJECT: 2017 ANNUAL ENVIROVISTA PROGRESS REPORT March 9, 2018 Director, Northern Region c/o Monitoring & Evaluation Branch Alberta Environment & Parks 11/Fl., Oxbridge Place, 9820-106 Street Edmonton, Alberta T5K 2J6 SUBJECT: 2017 ANNUAL ENVIROVISTA

More information

INTEGRATED POLLUTION CONTROL LICENCE

INTEGRATED POLLUTION CONTROL LICENCE Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL LICENCE Licence Register Number: 607 Licensee: Location of Activity: Electricity Supply Board Tarbert Generating

More information

Orica Kooragang Island. Community Reference Group. Monthly Briefing Paper #3 January 2012 ISSUED FOR CRG MEETING ON 30 JANUARY 2012

Orica Kooragang Island. Community Reference Group. Monthly Briefing Paper #3 January 2012 ISSUED FOR CRG MEETING ON 30 JANUARY 2012 Orica Kooragang Island Community Reference Group Monthly Briefing Paper #3 January 2012 ISSUED FOR CRG MEETING ON 30 JANUARY 2012 1. Introduction This Briefing Paper focuses on activity and events during

More information

Attachment No C.2. ISO Certificate. EMS Sections. Consent of copyright owner required for any other use. For inspection purposes only.

Attachment No C.2. ISO Certificate. EMS Sections. Consent of copyright owner required for any other use. For inspection purposes only. Attachment No C.2 ISO 14001 Certificate EMS Sections EMS 9.2 Procedure for Management of Waste Procedure for Management of Waste Page 1 of 10 EMS 9.2 Version: 9.0 Approved: Jul 14 SMS SOP Review: 3 yearly

More information

Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 2011 IPC Licence Reg. No: P

Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 2011 IPC Licence Reg. No: P Astellas Ireland Co, Ltd (AICL (KP)) Annual Environmental Report (AER) 211 IPC Licence Reg. No: P18-1 March 212 OES Consulting FBD House, Fels Point, Tralee, Co. Kerry p: 66 7128321 w: www.oes.ie AICL

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences

Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Guidance on the preparation and submission of Annual Environmental Reports for waste water discharge licences Environmental Protection Agency An Ghníomhaireacht um Chaomhnú Comhshaoil P.O. Box 3000, Johnstown

More information

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004

RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL ISO 14001:2004 RILTA ENVIRONMENTAL Ltd. ENVIRONMENTAL MANAGEMENT SYSTEM ENVIRONMENTAL MANAGEMENT SYSTEM MANUAL In accordance with ISO 14001:2004 Environmental Management System Manual Page 1 of 29 CONTENTS i ii iii iv

More information

Annual Environmental Report 2008

Annual Environmental Report 2008 Annual Environmental Report 2008 IPPC Licence Register Number P0444-01 Licensee: Bulmers Limited Location of installation Dowds Lane, Clonmel, Co. Tipperary. Bulmers Ltd. IPC Licence Register Number 444

More information

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT

WOLVERHAMPTON ENERGY FROM WASTE PLANT. PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT WOLVERHAMPTON ENERGY FROM WASTE PLANT PERMIT No AP3835SM WASTE INCINERATION DIRECTIVE ANNUAL REPORT 2008 1 CONTENTS Page Introduction 3 Non technical plant description 4 Plant operation 5 Annual waste

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Licence Register No. D0302-01 Dromahane and Environs Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on

More information

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017.

EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. EPA Report on the investigation of the Lime spill incident which occurred at the Dublin Waste to Energy Facility, Poolbeg on 7 th June 2017. Summary Dublin Waste to Energy Limited (hereafter referred to

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION

INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Headquarters, Johnstown Castle Estate, County Wexford, Ireland INTEGRATED POLLUTION CONTROL PROPOSED DETERMINATION Licence Register Number: Applicant: Location of Activity: 564 Arthur P. Dinan Limited

More information

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 April to 30 June 2015

News this quarter. Environment, Safety&Health Quarterly Performance Report. Reporting period: 1 April to 30 June 2015 Environment, Safety&Health Quarterly Performance Report Reporting period: 1 April to 30 June 2015 Welcome to AWE s second quarterly performance report for 2015. This document is designed to inform you

More information

Bracebridge Wastewater Treatment 2017 Summary Report

Bracebridge Wastewater Treatment 2017 Summary Report Bracebridge Wastewater Treatment 2017 Summary Report Environmental Compliance Approval: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District

More information

Surface water run-off from the operational areas has the potential to provide a pathway for contamination to reach the waters of Twofold Bay.

Surface water run-off from the operational areas has the potential to provide a pathway for contamination to reach the waters of Twofold Bay. Page 1 of 9 1. Background Australian Marshalling Services (AMS) operates a chipmill and export facility on behalf of Allied Natural Wood Exports P/L on the shores of Twofold Bay at Eden on the far south

More information

Tynagh CCGT Power Station

Tynagh CCGT Power Station TYNAGH CCGT ANNUAL ENVIRONMENTAL REPORT 2011 Tynagh CCGT Power Station Annual Environmental Report 2011 Reference Number: TYN\ENV\2011\01 Date: 31/03/2012 Issue: Rev. 01 Authors: Donal Fanning, Plant Manager

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Ardfert Licence Register No. D0282-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

Diageo St. James s Gate Brewery. IPPC Licence Register No. P Annual Environmental Report 2010

Diageo St. James s Gate Brewery. IPPC Licence Register No. P Annual Environmental Report 2010 Diageo St. James s Gate Brewery IPPC Licence Register No. P0301-01 Annual Environmental Report 2010 March 2011 Table of Contents 1 INTRODUCTION... 1 1.1 DESCRIPTION OF ACTIVITY... 1 1.1.1 St. James s Gate

More information

Objection To. Proposed Decision. Industrial Emissions Licence Register No P Prepared By. O Callaghan Moran & Associates

Objection To. Proposed Decision. Industrial Emissions Licence Register No P Prepared By. O Callaghan Moran & Associates Unit 15 Melbourne Business Park Model Farm Road Cork T: 021 434 5366 E: info@ocallaghanmoran.com www.ocallaghanmoran.com Objection To Proposed Decision Industrial Emissions Licence Register No P1006-01

More information

Practice Notes For Construction Managers PNCM 5: Environmental Management - First Issue, April 2004 (Index under: Environmental Management)

Practice Notes For Construction Managers PNCM 5: Environmental Management - First Issue, April 2004 (Index under: Environmental Management) Environmental Management (1 st Issue-Apr 2004) Practice Notes For Construction Managers PNCM 5: Environmental Management - First Issue, April 2004 (Index under: Environmental Management) Contents Page

More information

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application

MANAGEMENT OF THE INSTALLATION. Attachment C. Cadbury Ireland Limited, Rathmore Installation Rathmore Installation IPPC Licence Application MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited, Project Ref: OES1061_01 EPA Export 25-07-2013:19:20:35 Cadbury Ireland Limited, July 2006 Site Management and Control Cadbury Ireland Limited manufactures

More information

ESB. Annual Environmental Report 2011

ESB. Annual Environmental Report 2011 ESB Marina Generating Station AER 2011 - IPC License P0578-02 ESB Marina Generating Station Annual Environmental Report 2011 Required under IPPC License P0587-02 for the period 1 st Jan. 2011 to 31st Dec.

More information

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Petroleum Refining Industry Description and Practices The petroleum industry is organized into four broad sectors: exploration and

More information

MANAGEMENT OF THE INSTALLATION

MANAGEMENT OF THE INSTALLATION MANAGEMENT OF THE INSTALLATION Cadbury Ireland Limited Project Ref: OES1061_01 EPA Export 25-07-2013:21:15:11 Site Management and Control Cadbury Ireland Limited manufactures and distributes over 25 products

More information

CHE-E : Lead Chemist PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS

CHE-E : Lead Chemist PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS 104442-CHE-E-2005 Lead Chemist Holds a B. Sc. in Special Chemistry and has about 11 years of work experience in any large water treatment plant process, Chemical, O&G plants or Power Plants. PERSONAL DATA

More information

ACCIDENT PREVENTION & EMERGENCY RESPONSE

ACCIDENT PREVENTION & EMERGENCY RESPONSE Attachment J ACCIDENT PREVENTION & EMERGENCY RESPONSE Cadbury Ireland Limited Project Ref: OES1061_01 Cadbury Ireland Limited February 2007 Attachment J J.1 Accidental Emissions Control Accidental emissions

More information

Chapter 4: Case study Lethabo power station

Chapter 4: Case study Lethabo power station Chapter 4: Case study Lethabo power station The case study presented in this chapter serves to determine what water management procedures and structures are in place in practice at Eskom Business Unit

More information

DOE/PPPO/ &D1 FBP-ER-PRO-WD-RPT-0001 Revision 3 April ENVIRONMENTAL NON-RADIOLOGICAL PROGRAM INFORMATION

DOE/PPPO/ &D1 FBP-ER-PRO-WD-RPT-0001 Revision 3 April ENVIRONMENTAL NON-RADIOLOGICAL PROGRAM INFORMATION 5. ENVIRONMENTAL NON-RADIOLOGICAL PROGRAM INFORMATION 5.1 SUMMARY Non-radiological environmental monitoring at PORTS includes air, water, sediment, and fish. Monitoring of non-radiological parameters is

More information

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report

Stonecrest Estates Sewage Treatment Plant 2017 Annual Report 2017 Stonecrest Estates Sewage Treatment Plant 2017 Annual Report The Corporation of the City of Quinte West 0 Contents Table of Figures... 1 Executive Summary... 3 Summary and Interpretation of Monitoring

More information

Annual Environmental Report. For. Becton Dickinson Insulin Syringe Limited (Irish Branch) and Becton Dickinson Penel Limited (Irish Branch)

Annual Environmental Report. For. Becton Dickinson Insulin Syringe Limited (Irish Branch) and Becton Dickinson Penel Limited (Irish Branch) Annual Environmental Report For Becton Dickinson Insulin Syringe Limited (Irish Branch) and Becton Dickinson Penel Limited (Irish Branch) Licence Register No. P648-1 211 March 212 Licence Register No.P

More information

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT

EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT EGANVILLE SEWAGE SYSTEM 2013 PERFORMANCE REPORT Township of Bonnechere Valley Water and Sewage Department January 2014 Table of Contents Executive Summary... 3 Introduction... 4 Report Availability...

More information

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report

Iroquois Wastewater Treatment Plant 2016 Annual Performance Report Iroquois Wastewater Treatment Plant 2016 Annual Performance Report The Iroquois WWTP is a Class II wastewater treatment facility owned and operated by the Municipality of South Dundas. Raw sewage is conveyed

More information

ATTACHMENT N o A1: NON-TECHNICAL SUMMARY

ATTACHMENT N o A1: NON-TECHNICAL SUMMARY ATTACHMENT N o A1: NON-TECHNICAL SUMMARY A1 INTRODUCTION Dairygold AgriBusiness Ltd is making an application to the Environmental Protection Agency for an Industrial Emissions Licence which relates to

More information

Annual Environmental Report 2017

Annual Environmental Report 2017 Annual Environmental Report 2017 Agglomeration Name: Kanturk Licence Register No. D0203-01 Contents Section 1. Executive Summary and Introduction to the 2017 AER 3 1.1 Summary Report on 2017 3 Section

More information

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS

Mayo Renewable Power IPPC Licence Application. ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS Mayo Renewable Power IPPC Licence Application Attachment No. A ATTACHMENT No. A NON- TECHNICAL SUMMARY TABLE OF CONTENTS A.1. Installation and its Activities... 2 A.2. Raw and Auxilliary Materials... 2

More information

Corporate Information CMP

Corporate Information CMP Corporate Information CMP Corporate Information Compliance Monitoring Program (CMP) Introduction Council s vision for information management is To provide easy access to reliable information anywhere and

More information

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report.

The licensee shall take the actions specified to close out the non-compliances and observations raised in this Site Visit Report. Site Visit Report The site visit process is a sample on a particular day of an installation's compliance with some of its licence conditions. Where non-compliance against a particular condition has not

More information

Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March Issue No 1

Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March Issue No 1 Annual Environmental Report 2008, PDM Ltd, Oldmilltown, Kill, Co. Kildare. 24 th March 2009 Issue No 1 CONTENTS Section Page No 1. INTRODUCTION... 1 1.1. General... 1 1.2. Site & Process Description...

More information