1 INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF OPERATIONAL PROGRAMME ENVIRONMENT INDICATIVE ANNUAL WORK PROGRAMME FOR Name Aims grant Type grant according to art. 3 DCM 07/204 Preliminary selection project concepts Total amount grant /BGN/ Eligible applicants Sample Eligible activities Categories eligible costs 2 Maximu m % cinancing Inception date opening 3 Deadline project proposal submittion 4 / part is 5 : 6 Amount project grant /BGN/ 7 State aid 8 De minimis 9 min max Priority axis Water Development methods analysis waters, sediments biota provision additional equipment Executive Environment Agency laboratories Ensuring necessary data National system monitoring environment in line European national legislation requirements no Executive Environm ent Agency (EEA) - Development methods analysis priority specific substances in waters, sediments biota ensuring necessary equipment implementation developed methods; - Purchase supply main auxiliary equipment EEA laboratories sample preparation, testing control. expert analyses, surveys tests; delivery installation equipment furnishing; preparation, organisation inmation communication. N.А It should be filled in with yes no. 2 categories eligible costs indicative. 3 If a preliminary selection project proposals is envisaged, date publication call should be filled in. 4 If a preliminary selection project proposals is envisaged, deadline concept receipt should be filled in. 5 It should be filled in with yes no. 6 In order to ensure compliance OPE priority axes aid regulations, an analysis will be carried out. s granting will be aligned with State relevant requirements guidelines will be placed Guidelines Application. 7 If it is e. 8 According to art. 07 Treaty functioning EU. 9 According to Regulation 407/203 EC from implementation art Treaty functioning EU (ОВ, L 352 от г.).

2 2 3 Supporting regional investment planning WSS sector Support effectiveness, management institutional capacity implementation WSS rem Preparation WWS infrastructure projects in line WSS sector rem goals Support implementation Strategy development management water supply sanitation sector Republic Bulgaria strengning capacity no no Water Supply Sanitatio n ora te regional developm ent public works Water Supply Sanitatio n ora te regional developm - Development adoption regional feasibility studies water supply sewerage systems in line with ToR prepd by JASPERS; - Carrying additional measures achievement compliance European national agreements in drinking water disposal treatment wastewater from agglomerations territory Smolian WSS operator; -Consultant services assistance development, ensuring quality monitoring implementation regional studies; feasibility - Update public water supply assets value territory 28 WSS operators with state participation. services from architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; development regional feasibility studies or analytical documents; expert analyses tests, hydrological geological tests; design; SEA, EIA, appropriate assessment issue permits; preparation, organisation inmation communication. - Strengning administrative capacity, provision trainings material services resources to WSS from architects, associations, WSS operators institutions dealing with WSS policy; - Establishment engineers, economists or experts services related to preparation, conmity assessment / or 00 % Third Third Guideline s applicatio n Guidelin es applicati on N.A N.A

3 stakeholders ent public works specialized inmation systems; -World Bank consultancy services implementation Action Plan to Strategy development management water supply sanitation sector Republic Bulgaria ; - Support preparation statements, analyses, reports proposals amendments legislation WSS sector policy implementation, incl. environmental legislation (management, development, efficiency WSS services provision). implementation operation; development regional feasibility studies or analytical documents; preparation, organisation inmation communication. Guideline s applicatio n Guidelin es applicati on 4 Development regional feasibility study water supply sanitation Sia municipality territory Preparation WWS infrastructure project Sia municipality territory in line WSS sector rem goals no Sia municipal ity Development regional feasibility study water supply sanitation Sia municipality territory services from architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; 00 % N.A development regional feasibility studies or analytical documents; 3

4 expert analyses tests, hydrological geological tests; design; SEA, EIA, appropriate assessment issue permits; preparation, organisation 5 Implementation early WSS projects Implementation WSS projects bee preparation regional feasibility studies, as determined OPE : Projects with meaning Art. 39 Regulation (EC) 083/2006, which have been reviewed by European Commission during programming period ( agglomerations Plovdiv, Asenovgrad, Dobrich, Pleven - Dolna Mitropolia) Projects in 5 agglomerations with over PE, subject to a review positive assessment by JASPERS. Given ir maturity no Municipa lities - Design/construction /rehabilitation/reconstru ction wastewater treatment plants, incl. facilities sludge treatment (in accordance requirements ive concerning urban waste-water treatment conditions discharge permit, incl. ensuring more stringent treatment with nutrients removal from wastewater agglomerations more than PE discharging into sensitive as); -Design/construction /rehabilitation/reconstru ction drinking water networks facilities, incl. DWTP, reservoirs pump stations; - Design/development supporting inmation communication. construction works; services from architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; purchase l, access related charges, when l or right access necessary implementation operation; purchase construction, delivery installation specialized machinery, Accord ing to CBA project s N.A. According to CBA projects 4

5 readiness to start works in 206, amounting in total up to 5% this PA allocation. infrastructure (e.g. power supply, road, water supply), which serves constructed infrastructure. facilities equipment, directly related to implementation operations; supervision; preparation, organisation 6 7 Preparation SEA purposes adoption River Basin Management Plans period Marine Strategy Programme Measures Second phase projects construction WSS infrastructure started under OPE Preparation SEA purposes subsequent submission adoption River Basin Management Plans period by Council Ministers Marine Strategy Achievement objectives indicators WSS projects which implementation has started under OPE no no Water Managem ent ora te environm ent water (MoEW) Municipa lities Preparation SEA 4 RBMPs Marine Strategy - Construction /rehabilitation/reconstru ction wastewater treatment plants, incl. facilities sludge treatment (in accordance requirements ive concerning urban waste-water treatment conditions discharge permit, incl. ensuring more stringent treatment with nutrients removal from wastewater inmation communication. expert analyses research; administrative fees services preparation, organisation inmation communication. construction works; - Unexpected costs construction works - up to 0 % total eligible costs construction works under project; purchase construction, supply Accord ing to CBA project s Guideline s applicatio n Guidelin es applicati on N.A N.A. According to CBA projects state applicabilit y statement 5

6 agglomerations more installation than PE special machinery, discharging into facilities sensitive as); equipment, stocks, directly related to implementation project activities; - Construction /rehabilitation/reconstru ction or replacement collecting systems facilities to or from WWTP in order to provide environmental friendly cost effective operation WSS systems in accordance country's commitments under ive urban treatment; concerning wastewater - Construction /rehabilitation/reconstru ction drinking water treatment plants or if it is more cost-effective construction new water supply facilities; - Construction /rehabilitation/reconstru ction drinking water supply networks facilities aimed at increasing efficiency water use reduction water losses in water supply networks in accordance with ive 98/83/EC; acquisition l / or acquisition limited legal rights, including charges accompanying purchase, such as notary fees or costs, costs expert legal advice; services provided architects, engineers, economists or specialists, directly related to preparation, assessment compliance project implementation; /or construction supervision; designer supervision. - Construction adjoining infrastructure (e.g. power supply, road, water supply), which serves constructed plants (e.g. 6

7 WWTP, DWTP, tanks pumping stations); - Supply equipment, facilities machinery required operation constructed infrastructure; - Construction designer supervision. Priority axis 2 Waste 8 Design construction composting installations separately collected green /or biodegradable waste, incl. provision necessary equipment, facilities machinery separate waste collection green biodegradable waste Reducing amount lfilled municipal waste by ensuring additional capacity separate municipal waste collection recycling green /or biodegradable waste Open call proposals no Municipa lities - Design construction composting installations separately collected green /or biodegradable waste, incl. inlet infrastructure; - Provision necessary equipment, facilities machinery separate waste collection green biodegradable waste architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; preparation feasibility studies or analytical documents, analyses, assessments research; design; construction works; construction supervision; 00 % or differe nt amount accordi ng to project CBA after analysi s Third 2 months after opening call proposals Guideline s applicatio n Guidelin es applicati on Accord ing to CBA projects According to CBA projects according to type capacity installation s designer supervision purchase 7

8 l or acquisition or limited real rights; delivery installation equipment, facilities machinery furnishing; preparation, organisation inmation communication. 9 Design construction composting installations separately collected green /or biodegradable waste design construction installations preliminary treatment municipal waste, incl. provision necessary equipment, facilities machinery separate waste collection green biodegradable waste Reducing amount lfilled municipal waste by ensuring additional capacity preliminary treatment separate municipal waste collection recycling green /or biodegradable waste Open call proposals no Municipa lities - Design construction composting installations separately collected green /or biodegradable waste construction installations preliminary treatment municipal waste; - Construction inlet infrastructure; - Provision necessary equipment, facilities machinery separate waste collection green biodegradable waste. architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; preparation feasibility studies or analytical documents, analyses, assessments research; design; construction works; construction supervision; 00 % or differe nt amount accordi ng to project CBA after analysi s 0 months after opening call proposals Accord ing to CBA projects According to CBA projects according to type capacity installation s designer supervision purchase 8

9 Priority axis 3 Natura 2000 biodiversity l or acquisition or limited real rights; delivery installation equipment, facilities machinery furnishing; preparation, organisation inmation communication. 0 Development management approach Natura 2000 network management National Prioritized Action Framework Identifying complementing establishment marine Natura 2000 sites Nationally approved approaches Natura 2000 network National Prioritized Action Framework (NPAF) management Completion Natura 2000 network establishment no no National Service Nature protectio n ora te at MoEW National Service Nature protectio n ora te MoEW - Development analyses carrying research justifying choice management approach Natura 2000 network, NPAF management structure Natura 2000 sites management plans; - Development a concept Natura 2000 management carrying stakeholder consultations approval approach, etc. Mapping assessment conservation status species habitats in marine Natura 2000 sites analyses research; organisation carrying stakeholder consultations; organisation management, incl. using external contractors project documentation preparation; inmation communication. research studies marine territory Republic Bulgaria preparation Second 206 Guideline s applicatio n Guidelin es applicati on N.A N.A

10 database; development/update implementation methodologies mapping conservation status assessment species habitats; development/update national assessments reference value species habitats conservation status development monitoring schemes; development documentation pursuant to art. 8 Biodiversity Act with proposals new Natura 2000 sites or amending existing Natura 2000 sites; -Costs upgrade update existing inmation system Natura 2000 sites, incl. entering inmation into system; analysis proposals synchronization optimization processes data collection reporting under Birds ive, Habitats ive, WFD MSFD; 0

11 consultancy services eligible activities; research preparation analytical documents related to project preparation /or implementation; EIA, appropriate assessment issue permits; external services related to documents preparation, legal notary services, technical financial expertise; organisation management, incl. using external contractors project documentation preparation; inmation communication. 2 Analyses research species habitats, subject to reporting under art.7 Habitats ive art. 2 Birds ive Ensuring provision inmation reporting under art.7 Habitats ive art. 2 Birds ive no Executive Environm ent Agency Implementation activities necessary reporting under Habitats ive Birds ive. development/update methodologies monitoring assessment conservation status species habitats; analyses terrain research species habitats; Second 206 N.A

12 processing summarizing results research; development/update national assessments reference value species habitats conservation status; assessment terrain research results; consultancy services eligible activities; research preparation analytical documents related to project preparation /or implementation; organisation management, incl. using external contractors project documentation preparation; 3 Measures improvement Natura 2000 species habitats conservation status Improved conservation status Natura 2000 species habitats Open call proposals no Structure s MoEW Agricultu re Food, NGOs, municipal ities, - Restoration improvement conservation status species habitats; - Construction maintenance infrastructure, necessary restoration natural habitats species. inmation communication. implementation direct conservation activities species habitats; construction/reconstru Second 206 N.A. According to measures envisaged projects assessment by OPE MA 2

13 institutes science ction/rehabilitation infrastructure necessary restoration maintenance habitats species habitats; consultation services related to project activities implementation; purchase, delivery installation specialized machines, facilities equipment, species, etc; purchase/ acquisition l; organisation management, incl. using external contractors project documentation preparation; inmation communication. Priority axis 4 Flood lslides risk prevention management 4 Pilot project establishment National real time water management system (NRTWMS) Iskar river Development a concept common water management in real time avoiding possibility multiplying deficiencies while establishing System on country s territory no Water Managem ent directorat e at MoEW - Review, analysis evaluation, upgrade / or optimization existing water monitoring networks systems in Iskar river basin; - Design pilot module NRTWMS; external contractors preparation project documentation needed establishment National water First 206 N.A

14 - Securing functioning (planning, design equipment) NRTWMS s pilot module, incl. purchase supply necessary machinery equipment; - Development necessary public procurement documentation or necessary documents next phase NRTWMS establishment. management system Iskar river experts documents, reviews, analyses, assessments, concept, conceptual technical design, technical assignments documentation selection a contractor NRTWMS whole territory country, etc.; external contractors implementation project activities; purchase, delivery, installation machinery equipment (if necessary), furnishing stw ( hydrometric stations ensuring functioning NRTWMS, incl. ICT) construction works related to construction/optimisati on hydrometric stations inlet infrastructure; construction supervision; purchase/ acquisition/alienation l; environmental 4

15 assessments; organisation 5 Establishment six centers to increase population prepdness an adequate response to floods subsequent crises - Improvement population protection through its prepdness an adequate reaction to floods subsequent crises - Establishment six centers to ensure population prepdness an adequate response to floods in order to strengn population reliability on responsible authorities enhance disaster protection attainments at all levels - governmental society. no Chief ora te Fire Safety And Civil Protectio n at Interior - Design studies, investment planning, supervision, etc.; - Rehabilitation/ modernization/ optimization 6 centers increasing population readiness adequate response to floods subsequent crises; - Alignment existing training polygons 6 centers specific needs related to flood response; - Supply necessary equipment, machinery, vehicles materials needs centers; - Design/update, presentation application methodologies increasing population prepdness an adequate flood response. inmation communication. design studies, investment planning, supervision, etc.; rehabilitation/ modernization/ optimization 6 centers; alignment existing training polygons specific needs related to flood response; delivery ( installation where e) necessary equipment, machinery, vehicles materials needs centers; design/preparation / update, presentation application methodologies increasing population prepdness an adequate flood response; Guideline s applicatio n Guidelin es applicati on N.A

16 administrative fees services, including se related to environmental legislation (incl. preparation necessary documentation); purchase/ acquisition l or issuance a building permit, establishment right construction or limited real rights l; - Consultancy costs in relation to implementation key project activities; organisation 6 Lslide prevention resilience in order to reduce lslide risks (incl. on national road network) - Lslide processes risk prevention - Planning designing infrastructural geoprotection activities in lslides as reducing lslides occurrence risk aiming at protection human health life, environment infrastructure - Planning, design implementation infrastructure geoprotection activities on national road no Structure s Regional Develop ment Public Works; Municipa lities - Design studies (feasibility studies, pre-feasibility studies, geotechnical, hydrogeological or studies, investment design); - Project conmity assessment essential requirements construction works; - Implementation infrastructure geoprotection measures activities reducing lslides, erosion, inmation communication. external contractors services related to preparation /or to implementation activities; investment planning spatial planning; expert analyses, studies geological or studies; First 206 N.A

17 networks abrasion processes prevention accidents damages; - Establishment / or reestablishment control measuring systems in lslides. construction works; purchase, delivery installation equipment machinery directly related to implementation project activities; construction supersvision; purchase/ acquisition l, incl. change agricultural ests l use or issuance a building permit, with establishment right construction or limited real rights l; -Costs administrative fees services; preparation EIA, SEA, appropriate assessment issuance permits; -Costs establishment / or reestablishment control measuring systems; organisation 7

18 management, incl. hiring external contractors preparation project documentation; inmation communication. Priority axis 5 Improvement ambient air quality 9/204., incl.: purchase, delivery installation equipment, facilities machinery; 7 Establishment inmation system reporting ambient air quality data Assisting EEA reporting data on ambient air quality to European Environment Agency European Commission in line European national legislation no EEA to MoEW - Establishment inmation system reporting ambient air quality data to European Environment Agency; - Ensuring maintaining inmation selection placement monitoring stations ambient air quality. staff trainings related with implementation outcome from execution operation; purchase/delivery, development testing stw; services from architects, engineers, economists or experts services related to preparation, conmity assessment / or implementation operation; N.A preparation, organisation inmation communication. 8

19 9

INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF

INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF INDICATIVE ANNUAL WORK PROGRAMME FOR PROVISION OF GRANTS UNDER THE PROGRAMMES CO-FINANCED BY THE ERDF, ESF, CF AND EMF OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020 INDICATIVE ANNUAL WORK PROGRAMME FOR Name

More information

Sample Eligible activities. Categories eligible costs 3. Priority axis 1 Water

Sample Eligible activities. Categories eligible costs 3. Priority axis 1 Water INDICATIVE ANNUAL WORK PROGRAMME FOR OPERATIONAL PROGRAMME ENVIRONMENT 2014 2020 1 Name Aims grant Type grant according to Art. 2 Decree 162/ Prelimi nary selectio n ct concept s 2 Total amount grant (BGN)

More information

An Introduction to the EU legislation on water. Title

An Introduction to the EU legislation on water. Title An Introduction to the EU legislation on water Subtitle Title Daniel Fernández Gómez Environmental Implementation Unit - E2 DG Environment, European Commission ASSOCIATION OF EUROPEAN ADMINISTRATIVE JUDGES

More information

EF.DEL/39/07 21 May 2007

EF.DEL/39/07 21 May 2007 Organization for Security and Co-operation in Europe Secretariat EF.DEL/39/07 21 May 2007 ENGLISH only Conference Services Fifteenth OSCE Economic and Environmental Forum - Part 2: Key challenges to ensure

More information

Implementation of the water Directives in Romania

Implementation of the water Directives in Romania National Administration "Apele Române" 6, Edgar Quinet Street, District 1, code 0100180, Bucharest, Romania Tel: 0213151301; 0213110146; Fax: 0213122174; 0213103526 http://www.rowater.ro Implementation

More information

Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment

Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment Council Directive 91/271/EEC The National Programme for Municipal Waste Water Treatment Regional Water Management Board Council Directive 91/271/EEC of 21 May 1991 concerning urban waste-water treatment

More information

PRIORITY AXIS 1: A well connected region

PRIORITY AXIS 1: A well connected region PRIORITY AXIS 1: A well connected region Corresponds to Thematic objective 7- promoting sustainable transport and removing bottlenecks in key network infrastructures All data presented is published for

More information

European Strategy for the Danube Region

European Strategy for the Danube Region European Strategy for the Danube Region Priority area 4 To restore and maintain the quality of waters Andrea Vranovská PAC 4 assistant European Strategy for the Danube Region (EUSDR) EUSDR is a macro-regional

More information

LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" , PRIORITY AXIS 5 IMPROVEMENT OF AMBIENT AIR QUALITY

LIST OF OPERATIONS OPERATIONAL PROGRAMME ENVIRONMENT , PRIORITY AXIS 5 IMPROVEMENT OF AMBIENT AIR QUALITY LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020, PRIORITY AXIS 5 IMPROVEMENT OF AMBIENT AIR QUALITY Beneficiary name Operation name Operation summary Operation start date and operation

More information

Introduction to Environmental Investment Centre. Lauri Tammiste Member of the Management Board

Introduction to Environmental Investment Centre. Lauri Tammiste Member of the Management Board Introduction to Environmental Investment Centre Lauri Tammiste Member of the Management Board 14 years of EIC More than17 000 projects More than 1 bln EUR into environmental friendly activities Invested

More information

The environmental dimension in the proposed Cohesion Regulations

The environmental dimension in the proposed Cohesion Regulations The environmental dimension in the proposed Cohesion Regulations 2014-2020 CPR ERDF CF ETC ESF PSCI EGAF EGTC Georges Kremlis HoU Unit A3. Cohesion Policy and Environmental Assessments, DG Environment,

More information

Chapter 6 Objective: Protect and Enhance the Environment

Chapter 6 Objective: Protect and Enhance the Environment Chapter 6 Objective: Protect and Enhance the Environment 55 Irish Water Water Services Strategic Plan - October 2015 Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner

More information

Chapter 6 Objective: Protect and Enhance the Environment

Chapter 6 Objective: Protect and Enhance the Environment Chapter 6 Objective: Protect and Enhance the Environment 49 Irish Water Water Services Strategic Plan Our Strategic Aims Ensure that Irish Water services are delivered in a sustainable manner which contributes

More information

The Blueprint and Council Conclusions:

The Blueprint and Council Conclusions: The Blueprint and Council Conclusions: Essential to address the challenges that threaten the water ecosystems and their services on which society depends Proposed solutions include assessment of the costs

More information

NON-TECHNICAL SUMMARY

NON-TECHNICAL SUMMARY Investing in your future! This document is elaborated with the financial support of the European Regional Development Fund of the European Union through Operational Programme Environment 2007 2013 under

More information

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin

Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Guiding Principles on Sustainable Hydropower Development in the Danube River Basin Lead Countries : Austria, Romania, Slovenia in the frame of the International Commission for the Danube River Protection

More information

Requirements of the Habitats Directive 92/43/EEC

Requirements of the Habitats Directive 92/43/EEC Requirements of the Habitats Directive 92/43/EEC Natura 2000 appropriate assessments in the context of major projects JASPERS Networking Platform Brussels, 31 January 2018 Natura 2000 backbone of EU biodiversity

More information

Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER

Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER Republic of Bulgaria Ministry of Regional Development DG Territorial Cooperation Management EX-ANTE EVALUATION AND SEA OF THE BULGARIA THE FORMER YUGOSLAV REPUBLIC OF MACEDONIA IPA CBC PROGRAMME 2014-2020

More information

LIFE Integrated Projects

LIFE Integrated Projects The new LIFE Programme 2014-2020 LIFE Integrated Projects Writers' Workshop Prague, 14 August 2014 Angelo Salsi Head of Unit, LFE Nature, DG Environment Tools: Integrated projects (IPs) "projects implementing

More information

Public Procurement Monitoring. June 2016

Public Procurement Monitoring. June 2016 Public Procurement Monitoring June 2016 Public Procurement Monitoring Conditions affecting negatively the competition in public procurement, Construction Sector Trends in public procurement Construction

More information

RIVER BASIN MANAGEMENT PLANS I. General Information about River Basin Management Plans (RBMPs) 1. Legal Basis River Basin Management Plans

RIVER BASIN MANAGEMENT PLANS I. General Information about River Basin Management Plans (RBMPs) 1. Legal Basis River Basin Management Plans RIVER BASIN MANAGEMENT PLANS 2016-2021 I. General Information about River Basin Management Plans (RBMPs) 1. Legal Basis River Basin Management Plans are elaborated by the Director of the relevant River

More information

Specific issues and challenges regarding the development of RBMP s in the EU: Example from the Netherlands

Specific issues and challenges regarding the development of RBMP s in the EU: Example from the Netherlands Specific issues and challenges regarding the development of RBMP s in the EU: Example from the Netherlands Steven Visser, M.Sc. VISSER water management Programme Manager WFD Rhine-West sub basin The Netherlands

More information

INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS

INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS Adriana Nacheva, Attorney-at-law - Partner The intention of an investor

More information

OPERATIONAL PROGRAMME ENVIRONMENT

OPERATIONAL PROGRAMME ENVIRONMENT DRAFT VERSION_MAY 2006 OPERATIONAL PROGRAMME ENVIRONMENT 2007 2013 SOFIA, 2006 2 TABLE OF CONTENT: A. Introduction...5 B. Conclusions of the Ex-ante Evaluation...6 C. Analysis of the Current Situation...7

More information

RURAL DEVELOPMENT PROGRAMME (RDP) OF THE REPUBLIC OF BULGARIA. Integration of Environmental and Climate Policy into the RDP

RURAL DEVELOPMENT PROGRAMME (RDP) OF THE REPUBLIC OF BULGARIA. Integration of Environmental and Climate Policy into the RDP Rural Development Programme (2007-2013) Ministry of Agriculture and Food European Agricultural Fund for Rural Development: Europe Investing in Rural Areas 2014-2020 RURAL DEVELOPMENT PROGRAMME (RDP) OF

More information

Implementation of the Urban Wastewater Treatment Directive in France

Implementation of the Urban Wastewater Treatment Directive in France Directive 91/271/CE Implementation of the Urban Wastewater Treatment Directive in France Bruno Rakedjian UWWTD programme manager for the French Ministry of Environment between 2007 and 2013 UWWTD programme

More information

LIFE Programme

LIFE Programme LIFE Programme 2014-2020 Opportunities for Environment & Climate Action Projects Siobhán Nic Thighearnáin, LIFE National Contact Point LIFE 2014-2020 Opportunities for Environment & Climate Action Projects

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: Ukraine Name of the Project: Bortnychi Sewage Treatment Plant Modernization Project Loan Agreement: June 15, 2015 Loan Amount: 108.193 billion yen

More information

EX-ANTE EVALUATION and STRATEGIC ENVIRONMENTAL ASSESSMENT for the HUSKROUA ENI CBC PROGRAMME

EX-ANTE EVALUATION and STRATEGIC ENVIRONMENTAL ASSESSMENT for the HUSKROUA ENI CBC PROGRAMME EX-ANTE EVALUATION and STRATEGIC ENVIRONMENTAL ASSESSMENT for the HUSKROUA ENI CBC PROGRAMME 2014-2020 EXECUTIVE SUMMARY SCOPING REPORT OF SEA FINAL DRAFT 13/03/2015 Name: HitesyBartuczHollaiEurocomsulting

More information

Overview of objectives and planning tools emanating from EU environmental legislation

Overview of objectives and planning tools emanating from EU environmental legislation Overview of objectives and planning tools emanating from EU environmental legislation Unit D1 Land use and management DG Environment European Commission EU Biodiversity Strategy Habitats and Birds Directives

More information

Financing Nature-Based Solutions

Financing Nature-Based Solutions Financing Nature-Based Solutions for long-term water management Evelyn Underwood, 26 September 2018, CEEWeb annual conference Budapest Financing nature-based solutions for longterm water management EU

More information

EU funding in water sector Latvia results, lessons learned, future. B.Gulbe, CEO, Latvian water and wastewater works association

EU funding in water sector Latvia results, lessons learned, future. B.Gulbe, CEO, Latvian water and wastewater works association EU funding in water sector Latvia results, lessons learned, future B.Gulbe, CEO, Latvian water and wastewater works association Facts about association (LWWWWA) Foundedin24thofMayontheyearof1990. One of

More information

EVALUATION PLAN. Cooperation Programme Interreg V-A Slovenia-Austria for the programme period

EVALUATION PLAN. Cooperation Programme Interreg V-A Slovenia-Austria for the programme period EVALUATION PLAN Cooperation Programme Interreg V-A Slovenia-Austria for the programme period 2014-2020 2 June 2016 CONTENT: INTRODUCTION... 1 OBJECTIVES AND COVERAGE... 2 Evaluation objectives... 2 Coverage...

More information

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form Part A - General information Please read the attached guidance before filling in the form Country Macedonia Sector WATER Project submission Date Project title 28 February 2003 Project Code MA-2 WASTEWATER

More information

Public Procurement Monitoring December 2016

Public Procurement Monitoring December 2016 Public Procurement Monitoring December 2016 Public Procurement Monitoring Conditions affecting negatively the competition in public procurement, Construction Sector Public Procurement Trends Construction

More information

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017

Natura 2000 and Hydropower. Hydropower and Fish Workshop Brussels 29 May, 2017 Natura 2000 and Hydropower Hydropower and Fish Workshop Brussels 29 May, 2017 Christina Pantazi European Commission DG Environment, Nature Protection Unit (D3) Hydropower and Natura 2000 Hydropower one

More information

Construction of first wastewater treatment plant in Kosovo: an EU pilot project

Construction of first wastewater treatment plant in Kosovo: an EU pilot project Water Utility Journal 14: 41-46, 2016. 2016 E.W. Publications Construction of first wastewater treatment plant in Kosovo: an EU pilot project B.Sh. Kajtazi European Union Office in Kosovo, Kosovo Street

More information

HISTORY

HISTORY HISTORY Protecting the environment and meeting all requirements of the national and the EU legislation in this area are a major priority and inseparable part of the business strategy of Sofiyska Voda JSC.

More information

UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality

UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality UN ECE Implementation of the pilot SEA of the Orhei Town Master Plan Strategic Environmental Assessment (SEA) of the Master Plan of the Municipality of Orhei SEA Environmental Report (summary) Chisinau-Orhei,

More information

Implementing the Water Framework Directive in the Netherlands Actual discussions

Implementing the Water Framework Directive in the Netherlands Actual discussions Implementing the Water Framework Directive in the Netherlands Actual discussions Comparative conference on the implementation of the WFD April 13, 2011 University of Gothenburg, Sweden Marleen van Rijswick

More information

The EU's Green Infrastructure Strategy

The EU's Green Infrastructure Strategy The EU's Green Infrastructure Strategy Strahil Christov, DG Environment Arad, 29.10.2015 Green Infrastructure: What is it? Green Infrastructure: a strategically planned network of natural and semi-natural

More information

Operational Programme Public version

Operational Programme Public version Operational Programme 2014 2020 Public version 24 th July 2014 1/10 The programme area The following NUTS III regions form the Austrian-Czech border region: in Austria Mostviertel- Eisenwurzen, Sankt Pölten,

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information PROJECT INFORMATION FORM Part A - General information Country Project submission Date Serbia and Montenegro, Republic of Montenegro February 2003 1 (updated June 2005) Sector Project Code (filled by the

More information

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report

Strategic Environment Assessment. For the. New Structure Plan for the Maltese Islands. Scoping Report Strategic Environment Assessment For the New Structure Plan for the Maltese Islands Scoping Report Structure Plan Team December 2004 CONTENTS 1 Introduction...3 1.1 Purpose of the scoping report...3 1.2

More information

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou

The environmental objectives and Programme of Measures of the River Basin Management Plan. The case of Cyprus. Iacovos Papaiacovou The environmental objectives and Programme of Measures of the River Basin Management Plan The case of Cyprus Iacovos Papaiacovou General Manager Sewerage Board of Limassol Amathus www.sbla.com.cy The island

More information

RIJEKA AGGLOMERATION Improvement of Water and Wastewater Infrastructure

RIJEKA AGGLOMERATION Improvement of Water and Wastewater Infrastructure RIJEKA AGGLOMERATION Improvement of Water and Wastewater Infrastructure PROJECT LOCATION RIJEKA THE CITY ON WATER Water supply and wastewater collection system of Rijeka and surrounding area is considered

More information

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form Country FYR Macedonia Sector Water Project submission Date Project title 13.June.2005

More information

Organizational Report Department of Water Resources Management, MoNRE Vietnam

Organizational Report Department of Water Resources Management, MoNRE Vietnam Organizational Report Department of Water Resources Management, MoNRE Vietnam 1. Organisational Structure and Role: Name: Department of Water Resources Management, Ministry of Natural Resources and Environment

More information

Drought management in Spain

Drought management in Spain Drought management in Spain July 8, Zaragoza 2008 Elisa Vargas Directorate General for Water Recent concerns at European level The European Council (ES/PT) expresses importance of water scarcity and droughts

More information

PROJECT INFORMATION FORM Part A - General information

PROJECT INFORMATION FORM Part A - General information Part A - General information Country Serbia and Montenegro, Republic of Montenegro Sector WATER Project submission Date Project title 3 March 2003 Project Code (filled by the REC) MN-8 CONSTRUCTION OF

More information

The Water Framework Directive (2000/60/CE)

The Water Framework Directive (2000/60/CE) The Water Framework Directive (2000/60/CE) Challenges with implementation of river basin management plans in EU-Member Countries and the link to economic growth Paris, November 25, 2016 Yannick Pochon,

More information

Guidelines for Environmental Impact Assessment of Waste Water Treatment plants

Guidelines for Environmental Impact Assessment of Waste Water Treatment plants TACIS Prut River Water management - Guidelines for EIA of WWTPs 1 TACIS Prut River Water Management Project ICWS, The Netherlands Guidelines for Environmental Impact Assessment of Waste Water Treatment

More information

Water Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012

Water Framework Directive and EIA: our experience. Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 Water Framework Directive and EIA: our experience Jo Murphy, MIEMA CEnv MCIM National Environmental Assessment Service (NEAS) 31 May 2012 The plan Me: Aims & objectives of the Water Framework Directive

More information

DIRECTIONS OF DEVELOPMENT IN THE FIELD OF WATER AND ENVIRONMENTAL SANITATION

DIRECTIONS OF DEVELOPMENT IN THE FIELD OF WATER AND ENVIRONMENTAL SANITATION WATER SUPPLY STRATEGIC OBJECTIVE TO PROVIDE ALL CONSUMERS IN THE MUNICIPALITY OF BIHAC WITH ADEQUATE WATER QUALITY AND QUANTITY 1 OPERATIONAL OBJECTIVE A 2 OPERATIONAL OBJECTIVE B 3 OPERATIONAL OBJECTIVE

More information

European Commission - DG Environment Unit B.1: Water, the Marine and Soil EC Perspective on the WFD and Daughter Directive Groundwater

European Commission - DG Environment Unit B.1: Water, the Marine and Soil EC Perspective on the WFD and Daughter Directive Groundwater EC Perspective on the WFD and Daughter Directive Groundwater Andreas SCHEIDLEDER Umweltbundesamt, Austria Philippe QUEVAUVILLER European Commission, DG ENV Contents of the Presentation Objectives of the

More information

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27

This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/ :27 This report has been cleared for submission to Director/Board by Patrick Byrne. Eve O'Sullivan, 22/09/2014 16:27 OFFICE OF CLIMATE, LICENSING & RESOURCE USE. INSPECTORS REPORT ON A WASTE WATER DISCHARGE

More information

From ISPA to Cohesion Fund

From ISPA to Cohesion Fund Opportunities for financial institutions to get involved in co-financing EU Environmental projects From ISPA to Cohesion Fund Adrian Mihailescu Grontmij \ Carl Bro AS Bucharest, 09 October 2007 Pre-accession

More information

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the

COMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION STAFF WORKING DOCUMENT. Annex to the COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 22.3.2007 SEC(2007) 363 COMMISSION STAFF WORKING DOCUMENT Annex to the COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL 'Towards

More information

POLAND- Operational programme : "Infrastructure and Environment"

POLAND- Operational programme : Infrastructure and Environment MEMO/07/574 Brussels, 13 December 2007 POLAND- Operational programme 2007-2013: "Infrastructure and Environment" 1. Name of the programme Infrastructure and Environment Operational Programme for Community

More information

Consulting Services in IFI financed Communal Infrastructure Projects in Tajikistan since 2009

Consulting Services in IFI financed Communal Infrastructure Projects in Tajikistan since 2009 Consulting Services in IFI financed Communal Infrastructure Projects in Tajikistan since 2009 Thomas Derntl Senior Expert thomas.derntl@gwcc.at Vienna, 10 th Nov. 2016 Brief Profile Introduction of Consultant

More information

Financing possibilities in accordance with the WFD and cost recovery for water services in Hungary Judit Rákosi, ÖKO Inc. Budapest

Financing possibilities in accordance with the WFD and cost recovery for water services in Hungary Judit Rákosi, ÖKO Inc. Budapest Financing possibilities in accordance with the WFD and cost recovery for water services in Hungary Judit Rákosi, ÖKO Inc. Budapest Towards Integrated River Basin Management 31.05.2006. Bratislava Table

More information

Key elements of the GMES EC Draft Action Plan Initial Period

Key elements of the GMES EC Draft Action Plan Initial Period Brussels, 27/07/2001 Key elements of the GMES EC Draft Action Plan Initial Period 2001-2003 For information: Michel.Cornaert@cec.eu.int Hugo.De_Groof@cec.eu.int Neil.Hubbard@jrc.it Errol.Levy@cec.eu.int

More information

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized o Date ISDS Prepared/Updated: 19-Jan-2016 INTEGRATED SAFEGUARDS DATA SHEET APPRAISAL

More information

Urban Waste Water Treatment Directive Drinking Water Directive, their relation to the Water Framework Directive, in a context of scarcity

Urban Waste Water Treatment Directive Drinking Water Directive, their relation to the Water Framework Directive, in a context of scarcity Urban Waste Water Treatment Directive Drinking Water Directive, their relation to the Water Framework Directive, in a context of scarcity José RIZO European Commission Directorate General Environment 1

More information

CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC)

CYPRUS EXPERIENCE WITH URBAN WASTEWATER TREATMENT DIRECTIVE (91/271/EEC) WATER DEVELOPMENT DEPARTMENT 1047 NICOSIA REPUBLIC OF CYPRUS MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT AND ENVIRONMENT Water Security in Bulgaria 18 19 September 2017 Sofia Bulgaria CYPRUS EXPERIENCE

More information

Y EA E R A S R O F F EXCE C LL L EN E C N E

Y EA E R A S R O F F EXCE C LL L EN E C N E Infrastructure Dams & Hydropower WATER Levees Kleinfelder understands the importance of water to our clients, communities, and families. We deliver solutions to sustainably manage this vital resource.

More information

TERMS OF REFERENCE (TOR) FOR AFEASIBILITY STUDY AND DETAILED PROJECT REPORT FOR KAMPALA INDUSTRIAL AND BUSINESS PARK, NAMANVE JULY 2017

TERMS OF REFERENCE (TOR) FOR AFEASIBILITY STUDY AND DETAILED PROJECT REPORT FOR KAMPALA INDUSTRIAL AND BUSINESS PARK, NAMANVE JULY 2017 TERMS OF REFERENCE (TOR) FOR AFEASIBILITY STUDY AND DETAILED PROJECT REPORT FOR KAMPALA INDUSTRIAL AND BUSINESS PARK, NAMANVE JULY 2017 1: Introduction: The Government of Uganda has identified Industrial

More information

Comments and suggestions from Norway

Comments and suggestions from Norway Comments and suggestions from Norway (Versjon 2. februar 2018 + supplerende innspill 27. mars og 3. august). Before going into the possible issues for improvements in the Water Framework Directive (WFD)

More information

Management of Water Resources in Cyprus

Management of Water Resources in Cyprus Management of Water Resources in Cyprus CHARLES DEMETRIOU Hydrologist Water Development Department Ministry of Agriculture, Natural Resources & Environment 9 July, 2012 OUTLINE Mission of the Water Development

More information

Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP

Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP 1. Name of the Hot Spot Šiauliai wastewater treatment plant. 2. No. of the Hot Spot 41 3. Location Šiauliai, Lithuania 4. Reason

More information

EIB FUNDING FOR FLOOD RISK MANAGEMENT

EIB FUNDING FOR FLOOD RISK MANAGEMENT EIB FUNDING FOR FLOOD RISK MANAGEMENT Presentation by Christoph Gleitsmann Projects Directorate, European Investment Bank Thematic Workshop on the Implementation of the Directive 2007/60/EC on the Assessment

More information

EU Cohesion and Structural Funds for Financing Natura 2000 in Hungary

EU Cohesion and Structural Funds for Financing Natura 2000 in Hungary EU Cohesion and Structural Funds for Financing Natura 2000 in Hungary Örs Marczin szilar.ors.marczin@fm.gov.hu Ministry of Rural, Department for Nature Conservation The process to date First official submission

More information

High-level political forum on sustainable development

High-level political forum on sustainable development High-level political forum on sustainable development Review of SDG implementation: SDG 6 Ensure availability and sustainable management of water and sanitation for all 9 July 2018, New York Dr Callist

More information

Strategic Environmental Assessment - screening procedure - NON-TECHNICAL SUMMARY OF THE PRELIMINARY REPORT

Strategic Environmental Assessment - screening procedure - NON-TECHNICAL SUMMARY OF THE PRELIMINARY REPORT CROSS-BORDER COOPERATION WITHIN THE EUROPEAN NEIGHBOURHOOD INSTRUMENT (ENI) Mediterranean Sea Basin Programme Strategic Environmental Assessment - screening procedure - NON-TECHNICAL SUMMARY OF THE PRELIMINARY

More information

05/05/2015 European Investment Bank Group 1

05/05/2015 European Investment Bank Group 1 05/05/2015 European Investment Bank Group 1 The Natural Capital Financing Facility (NCFF) & other tools to promote Green Infrastructure Brussels, 5 May 2015 05/05/2015 European Investment Bank Group 2

More information

City of Guelph Transfer of Review Procedures 7 March, 2017

City of Guelph Transfer of Review Procedures 7 March, 2017 Step 1-Determine where the project is located on the City of Guelph Vulnerability Map If the project is found not to be located in a vulnerability area with a vulnerability score of 8 or higher (See Attachment

More information

Streamlining of environmental assessment procedures for energy infrastructure projects of common interest (PCIs) (EIA and SEA Directives)

Streamlining of environmental assessment procedures for energy infrastructure projects of common interest (PCIs) (EIA and SEA Directives) Streamlining of environmental assessment procedures for energy infrastructure projects of common interest (PCIs) (EIA and SEA Directives) Brussels, June 2015 DG ENVIRONMENT Legislative background New TEN-E

More information

UN-GGIM: Europe Work Group A «Core Data» SDG related use cases

UN-GGIM: Europe Work Group A «Core Data» SDG related use cases UN-GGIM: Europe Work Group A «Core Data» SDG related use cases Risk 1.5 Build the resilience of the poor and those in vulnerable situations and reduce their exposure and vulnerability to climate-related

More information

Annex 4 Citizen's summary

Annex 4 Citizen's summary Annex 4 Citizen's summary P a g e 2 The Programme Area The cross-border area of IPA II Cross-border Cooperation Programme Bulgaria Turkey is located in South Eastern Europe, at the Balkan Peninsula and

More information

EU s role in ensuring climate adaptation and a resilient Europe

EU s role in ensuring climate adaptation and a resilient Europe EU s role in ensuring climate adaptation and a resilient Europe Presented by Claus Kondrup, DG Climate Action, Adaptation unit EFCA Conference: Global challenges sustainable solutions and the role of cities,

More information

Municipal Solid Waste Update

Municipal Solid Waste Update Municipal Solid Waste Update [BULGARIA] [MINISTRY OF ENVIRONMENT AND WATER OF BULGARIA] GMI Municipal Solid Waste Subcommittee Meeting Vancouver, Canada, 13 March 2013 1 COUNTRY BACKGROUND AND OVERVIEW

More information

The EU and its role in reducing marine litter. Leo de Vrees European Commission DG Environment Marine and Water Industry Unit

The EU and its role in reducing marine litter. Leo de Vrees European Commission DG Environment Marine and Water Industry Unit The EU and its role in reducing marine litter Leo de Vrees European Commission DG Environment Marine and Water Industry Unit Framework Marine Litter Awareness Policy Knowledge Monitoring Measures Funding

More information

Mapping and Assessment of Ecosystems and their Services (MAES): An analytical framework for mapping and assessment of ecosystem condition

Mapping and Assessment of Ecosystems and their Services (MAES): An analytical framework for mapping and assessment of ecosystem condition Mapping and Assessment of Ecosystems and their Services (MAES): An analytical framework for mapping and assessment of ecosystem condition Joachim Maes European Commission, Joint Research Centre, Ispra

More information

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. Basic Information Date prepared/updated: 05/21/2009 INTEGRATED SAFEGUARDS DATASHEET

More information

CRIS Number: 2002/

CRIS Number: 2002/ STANDARD SUMMARY PROJECT FICHE 1. Basic Information CRIS Number: 2002/000-624-03 Title: Sector : Location: Provision of a Waste Water Treatment Plant for Razlog EN Bulgaria South West Region Blagoevgrad

More information

1st Living Lakes Webinar

1st Living Lakes Webinar 1st Living Lakes Webinar 1st April 2014 LIFE+ 2014-2020 Funding opportunities for water related projects What`s new in LIFE+ 2014 2020? Climate action projects (DG Climate) Integrated projects (e.g. with

More information

PEIP - Updated list of priority investment projects - Macedonia November 2008

PEIP - Updated list of priority investment projects - Macedonia November 2008 1 MA-1 WT Waste water management in Skopje and construction of WWTP Project Title Overall progress until 2008 Category A of stakeholder meetings have been held disseminating the approach and the preliinary

More information

Struma Lot 3.2 EIA Development, Working Document

Struma Lot 3.2 EIA Development, Working Document Struma Lot 3.2 EIA Development, Working Document Revision 1, 03 February 2016 1 Introduction 1.1 Background Struma Motorway is one of the most challenging road projects in Bulgaria. The motorway is about

More information

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania

Development of Wind Energy in Lithuania. Vitalijus Auglys Ministry of Environment of Lithuania Development of Wind Energy in Lithuania Vitalijus Auglys Ministry of Environment of Lithuania Demand of Renewable Energy Following the commitments to the EU, LT has to increase the total amount of energy

More information

Republic of Albania. UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference

Republic of Albania. UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference Republic of Albania UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference 1. PROJECT BACKGROUND Ujesjelles Kanalizime Tirane ( UKT, the Company and Client ) is a

More information

Water Issues in Cyprus

Water Issues in Cyprus Water Issues in Cyprus Sofoclis Aletraris Minister of Agriculture, Natural Resources and Environment 7 July, 2012 Water scarcity and droughts in Cyprus Severe water scarcity problem in Cyprus for centuries

More information

Public Procurement Monitoring July 2017

Public Procurement Monitoring July 2017 Public Procurement Monitoring July 2017 Public Procurement Monitoring Conditions affecting negatively the competition in public procurement, Construction Sector Public Procurement Trends Construction sector

More information

Assessment of Transboundary, Rivers, Lakes and Groundwaters in

Assessment of Transboundary, Rivers, Lakes and Groundwaters in MEETING OF THE PARTIES TO THE CONVENTION ON THE PROTECTION AND USE OF TRANSBOUNDARY WATERCOURSES AND INTERNATIONAL LAKES Fifth session Geneva, 10 12 November 2009 Assessment of Transboundary, Rivers, Lakes

More information

Processing systems Waste - Water

Processing systems Waste - Water Processing systems Waste - Water RECORD The CWG company founded for providing best technology in water and waste water processes in growing EU and World market for solving water issues. Being one of the

More information

Legal Basis of Water Management in Austria

Legal Basis of Water Management in Austria Legal Basis of Water Management in Austria Abstract by F. Oberleitner The following text is only a gross outline of the theme concerned. For essential further information see the script (in German only).

More information

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA

LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA Additional Financing of Local Government Enhancement Sector Project (RRP SRI 42759) LOCAL AUTHORITY AND SUBPROJECT SELECTION CRITERIA A. Eligible Local Authority and Subprojects 1. Unless otherwise agreed

More information

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form Country FYR Macedonia Sector Water Project submission Date Project title 15.06.2005 Project

More information

Latvia. Highlights in Climate change and energy

Latvia. Highlights in Climate change and energy 2008 ENVIRONMENT POLICY REVIEW ANNEX 159 Rïga Highlights in 2008 In 2008, the n government launched preparations for a new Environment Policy Strategy 2009-2015. It will include targets and propose actions

More information

Presentation to Engineers Ireland an Riocht 26 th October, Water Framework Directive River Basin Management Plans ( )

Presentation to Engineers Ireland an Riocht 26 th October, Water Framework Directive River Basin Management Plans ( ) Presentation to Engineers Ireland an Riocht 26 th October, 2010 Water Framework Directive River Basin Management Plans (2009-2015) Aims of the Presentation To provide some background to the EU Water Framework

More information

BULGARIA E-government Strategy

BULGARIA E-government Strategy BULGARIA E-government Strategy TABLE OF CONTENTS 1. INTRODUCTION...3 2. REALITIES...3 3. VISION AND STRATEGIC OBJECTIVES...5 4. GOALS...7 5. GENERAL PRINCIPLES...8 6. ORGANISATION AND MANAGEMENT...9 ANNEX

More information