TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGES

Size: px
Start display at page:

Download "TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGES"

Transcription

1 TOLEDO COLLINS PARK WTP 40 MGD PLANT ADDITION DESIGN CONSIDERATIONS AND CHALLENGES Kurt Smith, PE & Jack Kane, PE - ARCADIS Jim Donnell, PE - City of Toledo September 28, 2017

2 Collins Park WTP 40 MGD Plant Addition Purpose: h 20 MGD Redundancy - Allow basin maintenance year round yt 20 MGD Capacity - Address OEPA significant deficiency

3 Collins Park WTP Process Flow Schematic Kurt Smith Project Manager

4 Collins Park WTP 40 MGD Plant Addition DESIGN CONSIDERATIONS Pumped rapid mix Flocculation Sedimentation Effluent troughs Algae skimmers Recarbonation Ozone connection GAC Filters CHALLENGES Tight site constraints Other contractors Utility relocations Security Maintenance of plant operations (MOPO) Interconnections to existing East Plant Preservation of Lagoon E COST SAVINGS MEASURES Sedimentation basin size reduction 3D CAD benefits Design Construction Post Construction Prequalification of contractors Low bids

5 VERTICAL RAPID MIXER ALTERNATIVE RAPID MIX PUMP

6 WATER CHAMP RAPID MIX ALTERNATIVE

7 PUMPED RAPID MIXING SYSTEM Rapid mix pump rated for 2,000 gpm at 37 head with 30 Hp motor 10 DISCHARGE 12 SUCTION East Plant RAPID MIX PUMP

8 PUMPED RAPID MIXING SYSTEM East & West Plant rapid mix channels rated for 80 MGD each OVER BAFFLE UNDER BAFFLE ALUM FEED 8 X 15.5 CHANNEL (TYPICAL)

9 PUMPED RAPID MIXING SYSTEM Mixing energy exceeds 10-States Standards G-value of 750 fps/ft 10 DISCHARGE PIPE ALUM FEED INJECTION DIFFUSER NOZZLE

10 PUMPED RAPID MIXING SYSTEM RAPID MIX PUMP West Plant

11 FLOCCULATION BASINS BASIN 8 FLOC BASIN 10 DISCHARGE PIPE BASIN 7 FLOC DRIVES SODA ASH SPLITTER BOX LIME SLURRY SPLITTER BOX

12 FLOCCULATION BASINS 10 DISCHARGE PIPE ALUM FEED Basins 1 6 Upgrades Equipment interchangeable with Basins 7 & 8 INJECTION DIFFUSER NOZZLE

13 SEDIMENTATION BASINS SLUDGE DRAGS 10 DISCHARGE PIPE Basins 1 6 Upgrades Equipment interchangeable with Basins 7 & 8 SLUDGE CROSS COLLECTOR

14 EFFLUENT LAUNDER BUILDING 10 DISCHARGE PIPE EFFLUENT SUBMERGED ORIFICE INJECTION WEIRS DIFFUSER (TYPICAL) NOZZLE

15 EFFLUENT LAUNDER BUILDING 10 DISCHARGE PIPE FLOATABLES ALGAE SKIMMERS (TYPICAL) INJECTION DIFFUSER NOZZLE

16 RECARBONATION BASINS 10 DISCHARGE PIPE CO2 DIFFUSERS (TYPICAL) INJECTION DIFFUSER NOZZLE

17 OZONE FACILITY CONNECTION 10 DISCHARGE PIPE SETTLED WATER CONDUIT GATES FOR OZONE EFFLUENT CONDUIT KNOCKOUT WALL FOR OZONE INFLUENT CONDUIT

18 Filter Media Pilot 12 Sand Effective size mm 24 GAC Effective size mm GAC Filters Underdrains Leopold XA IMS 200 caps INJECTION DIFFUSER NOZZLE

19 SITE CONSTRAINTS OTHER CONTRACTORS Probable Project Costs Basin 7 $ 37,200,000 Basin 8 $ 33,400,000 TOTAL $ 70,600,000 Schedule Basin 7 & Basin 8 Operational by April 2020

20 SITE CONSTRAINTS OTHER CONTRACTORS Probable Project Costs Basin 7 $ 37,200,000 Basin 8 $ 33,400,000 Other Concurrent Projects CPEU $ 17,000,000 Schedules Basin 7 & Basin 8 Operational by April 2020 CPEU Operational by Sept. 2018

21 SITE CONSTRAINTS OTHER CONTRACTORS Probable Project Costs Basin 7 $ 37,200,000 Basin 8 $ 33,400,000 Other Concurrent Projects CPEU $ 17,000,000 Ozone $ 40,000,000 TOTAL $127,600,000 Schedules CPEU Operational by Sept Basin 7 & Basin 8 Operational by April 2020 Ozone Facility Operational by July 2020

22 SITE CONSTRAINTS OTHER CONTRACTORS Additional Concurrent Projects CPEU Operational by Sept Basin 7 & Basin 8 Operational by April 2020 Ozone Facility Operational by July 2020 Lagoon E Spent Lime Removal Completion by April 2018 Maintenance Facility Completion by December 2018 Basins 1 6 Upgrades Start Construction Jan. 2020

23 SITE CONSTRAINTS SECURITY & SOLUTIONS

24 SITE CONSTRAINTS SECURITY & SOLUTIONS

25 MAINTENANCE OF PLANT OPERATIONS (MOPO) Kurt Smith Project Manager

26 PRESERVATION OF LAGOON E Kurt Smith Project Manager

27 PRESERVATION OF LAGOON E & UTILITY RELOCATIONS BASIN 8 50 FEET Kurt Smith Project Manager LIMITS OF EXISTING LAGOON E 2:1 SLOPE STRUCTURAL EMBANKMENT

28 PRESERVATION OF LAGOON E Kurt Smith Project Manager EXISTING LAGOON CAPACITY REDUCED FROM 41.8 MG TO 33 MG OR 21% REDUCTION

29 SEDIMENTATION BASIN SIZE REDUCTION Negotiations with OEPA Based on historic plant performance Based on old design text books 4 hours without sludge equipment Based on conservatism of 10- States Standards Kurt Smith Project Manager Cost Savings Benefits Detention time reduced from 4 hours to 3 hours ~ $5.8 M savings Provides space savings for new Ozone Facility SPACE SAVINGS FOR OZONE FACILITY

30 DESIGN PHASE - Excellent 3D visualization - Interactive tool with Owner - Design progress meetings - Freedom Navisworks software (for the novice) - Clash detection to: - Improve quality of bidding documents - Minimize change orders - Bidding Phase - Provide to Contractors 3D CAD BENEFITS Kurt Smith Project Manager

31 3D CAD BENEFITS CONSTRUCTION PHASE (CONTRACTOR) - Quicker orientation of project estimators, managers & trades - More efficient coordination of trade disciplines to resolves conflicts - Decreases errors and corrections in field - Higher reliability of expected field conditions and plan drawings - Allows for more prefabrication offsite with higher quality and lower cost - Reduce RFI s and expedite construction schedule Kurt Smith- Creates a safer workplace Project Manager - Construction sequencing

32 3D CAD BENEFITS POST CONSTRUCTION - Develop 3D views for O&M Manuals - CMMS (computerized maintenance management system) - Add asset information to model for O&M/asset management - Freedom Navisworks software (for the novice) - Interactive tool for operator and safety training Kurt Smith Project Manager

33 PREQUALIFICATION OF CONTRACTORS Prequalification Process - Received 6 proposals - Short listed to 4 Contractors to bid Evaluation Process - Bonding - Verifiable statement confirming financial wherewithal - Planned approach Kurt Smith to the project - ReferencesProject Manager - Construction Experience - Water/wastewater projects - Large excavation - Workforce & Workload - Corporate Health, Safety & Environmental Program Control Quality and Risk Reduction

34 LOW BIDS CONSTRUCTION BID RESULTS BASIN 7 AND BASIN 8 PROJECTS Description Basin 7 Basin 8 Engineer s Estimate $37,740,000 $32,820,000 Average of Bids Kurt Smith $36,337,865 $33,319,259 Project Manager Low Bid $28,387,750 $26,694,200 Cost Below Average of Bids $7,950,115 $6,625,059 % Below Average of Bids 21.9% 19.9%

35 Thank you!

36 3D CAD BENEFITS Kurt Smith Project Manager

37 Collins Park WTP 40 MGD Plant Addition DESIGN CONSIDERATIONS Pumped rapid mix Flocculation Sedimentation Effluent troughs Algae skimmers Recarbonation Ozone connection GAC Filters CHALLENGES Tight site constraints Other contractors Utility relocations Security Maintenance of plant operations Interconnections to existing East Plant Preservation of Lagoon E COST SAVINGS MEASURES Sedimentation basin size reduction 3D CAD benefits Design Construction Post-construction Pre-qualification of contractors Low bids

38 Collins Park WTP 40 MGD Plant Addition DESIGN CONSIDERATIONS Pumped rapid mix Flocculation Sedimentation Effluent troughs Algae skimmers Recarbonation Ozone connection GAC Filters CHALLENGES Tight site constraints Other contractors Utility relocations Security Maintenance of plant operations Interconnections to existing East Plant Preservation of Lagoon E COST SAVINGS MEASURES Sedimentation basin size reduction 3D CAD benefits Design Construction Post-construction Pre-qualification of contractors Low bids

39 Title Text DESIGN PHASE

40 Title Text

41 Title Text

42 Title Text COST SAVINGS SDFD SDFDSF SDFSDF DSFSDF

43 SITE CONSTRAINTS OTHER CONTRACTORS Probable Project Costs Basin 7 $ 37,200,000 Basin 8 $ 33,400,000 Other Concurrent Projects CPEU $ 17,000,000 Ozone $ 40,000,000 TOTAL $127,600,000 Schedules CPEU Operational by Sept Basin 7 & Basin 8 Operational by April 2020

44 SITE CONSTRAINTS OTHER CONTRACTORS Probable Project Costs Ozone Facility $37,200,000 Schedule Ozone Facility Operational by July 2020

45 Title Text

46 Title Text

47 Kurt Smith Project Manager

48 Kurt Smith Project Manager Probable Project Costs Basin 7 $48,700,000 Basin 8 $43,400,000 TOTAL $92,100,000

49 Logo protection zone Template Layout Tips Paragraph level First level bullet Second level bullet Third level bullet To turn the guides on and off: right click > grids and guides > guides or Alt + F9. To get bullets use Increase list level or Shift + Alt + The grid is laid out in six columns and is designed to provide a flexible layout while still allowing for breathing room and white space. Text and images should not extend past blue lines. (Full size images would be an exception)

50 Guidance Always ensure that if you are presented with an Enable Content and / or Enable Editing option/s on opening a document, that you DO enable the content and / or editing by clicking on the buttons presented There are sixteen layouts in each master (one with logo, and another without) to choose from to suit your needs and help keep your presentation consistent Incorporating slides from another presentation: Click on New Slide on the Slides ribbon group, under the Home ribbon tab and scroll down and choose the layout you want to use Copy your slides (Ctrl + C) and insert a new blank slide layout in your new presentation and paste your slides (Ctrl + V) into your new presentation (not behind any of the other layouts, especially not behind the title or divider layouts) The small Paste clipboard icon will appear at the bottom of the slides you have copied in, click on the arrow on the icon and choose use destination theme, this will ensure that your slides will use the correct colour pallet throughout the document You may need to correct some colour combinations, any other anomalies, and choose the layout design you require for each slide i.e., Title and Content, Title only, Blank etc and a certain amount of tidying will normally be required You can also use the Keep Source Formatting option but ensure that you change the colour palette for the slides you have copied in to our Arcadis Brand palette. If you are still having problems try opening a blank new PowerPoint document (Ctrl +N) and paste your slides into this before pasting it into the new template Alternatively, you may need to copy each of the elements of the design into the new template individually using the Paste Special / Unformatted Text option and reapply formatting in the new template this may be long winded, but can often be safer and ensures more consistent application of the branding Kickers / takeaways should be short, sharp and to the point, the text size is set and should not be made smaller if you do not need to use a kicker, please just delete the text box

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant City of Columbus Division of Water: Matt Steele CH2M HILL: Enoch Nicholson DRWP Source Water and Treatment DRWP Overview Current

More information

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only

More information

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014 Process Treatment Selection and Design for the City of Piqua s New WTP Jeff Macomber, P.E. One Water Conference August 28, 2014 Agenda Project Background Water Treatment Goals Process Treatment Alternative

More information

Right click on the influent element and select name. Type Influent in the box. This should change the name of your element to influent.

Right click on the influent element and select name. Type Influent in the box. This should change the name of your element to influent. CE 521 WASTEWATER ENGINEERING - BIOWIN DESIGN PROJECT IN CLASS ASSIGNMENT TUTORIAL (adapted from assignments by Professor Chris Schmit SDSU http://learn.sdstate.edu/christopher%5fschmit/) Start BioWin

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information

EchoWater Project. Contractor Open House. January 14, Vick Kyotani Program Manager. Sacramento Regional County Sanitation District

EchoWater Project. Contractor Open House. January 14, Vick Kyotani Program Manager. Sacramento Regional County Sanitation District EchoWater Project Contractor Open House January 14, 2014 Vick Kyotani Program Manager Agenda Welcome, Introductions and Purpose of the Meeting (Ruben) Overview of EchoWater Project (Vick) Project Details

More information

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael

More information

Expanding Capacity and Treatment. Treatment Plant

Expanding Capacity and Treatment. Treatment Plant Dublin Road Water Plant Treatment Capacity Increase Project Expanding Capacity and Treatment at an 80 MGD Surface Water Treatment Plant Enoch Nicholson, P.E. S. Dean Ramsey, P.E. CH2M HILL Mark Eppich,

More information

Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson

Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson Ready, Set, and Go: Deer Valley WTP East Basins Performance Testing, Start-Up, and Commissioning Toby Teegerstrom Brian Watson January 25, 2011 Presentation Outline Background Process Overview Start-Up

More information

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand

Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand Government Center Water Treatment Plant Kamphaeng Phet Province, Thailand 1. Background information Kamphaeng Phet is a province in the lower north of Thailand. The Ping River (main tributary of the Chao

More information

Green River Filtration Facility Plant Overview

Green River Filtration Facility Plant Overview Green River Filtration Facility Plant Overview PNWS-AWWA Conference Bellevue, WA Gary Fox & Hilary Lorenz April 29, 2015 2 IN THE BEGINNING 3 PILOT PLANT OWNED AND OPERATED BY TACOMA WATER STAFF ALL THAT

More information

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit)

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit) 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Tiffin Water Treatment Plant Comprehensive Facility Plan (Audit) May 2016 Jim Welty Aqua Ohio Jill Marie P.E. Rich Atoulikian P.E.

More information

6.2.1 Intermediate Pumping Overview

6.2.1 Intermediate Pumping Overview 6.2.1 Intermediate Pumping Overview The intermediate pumps are the feed pumps to the MBR system. The pumps take flow from the primary effluent channel and pump it to the channel in front of the fine screens.

More information

LEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES

LEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES LEARNING RESOURCE CENTRE AYRSHIRE COLLEGE MICROSOFT WORD USEFUL ESSAY FEATURES LEARNING RESOURCE CENTRE July 2015 Table of Contents -----------------------------------------------------------------------------------------------------------------------------------

More information

MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives

MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives TECHNICAL MEMORANDUM NO. 8 MWMC Eugene-Springfield WPCF Facility Plan Secondary Clarifier Enhancement Alternatives PREPARED FOR: COPIES FOR: PREPARED BY: SUBMITTED BY: DATE: Troy McAllister/MWMC Project

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Public Utilities Department City of Bossier City, Louisiana

Public Utilities Department City of Bossier City, Louisiana Public Utilities Department City of Bossier City, Louisiana Water System Improvement Plan April 16, 2008 Contents Section 1 Project Definition, Purpose and Scope 1.1 Project Definitions...1-1 1.2 Planning

More information

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc. Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community Richard Stratton, PE HDR Engineering, Inc. Main Points of this Presentation Membranes can provide 4 times the

More information

Minneapolis Fridley Filter Plant Split

Minneapolis Fridley Filter Plant Split Minneapolis Fridley Filter Plant Split Surface Water Treatment Workshop April 29 May 1, 2014 Fargo, ND Today s Presentation Fridley Filter Plant (FFP) History & Overview Why FFP split project? Project

More information

The city of Venice hired Camp

The city of Venice hired Camp Concentrate Post-Treatment For Hydrogen Sulfide And Dissolved Oxygen Vipin Pangasa, Laura Andrews, and William Green The city of Venice hired Camp Dresser & McKee, Inc., to design an effective concentrate

More information

High Performance. Uniform Distribution

High Performance. Uniform Distribution Water Technologies Peripheral Feed - Peripheral Take-Off Clarifier Middle East Project was able to reduce the number of clarifier units from ten to six, providing a significant savings in capital cost.

More information

WATER INTAKE & DISTRIBUTION MM1

WATER INTAKE & DISTRIBUTION MM1 TOLEDO WATER Andy McClure Manager, Water Treatment Department of Public Utilities City of Toledo Department of Public Utilities TMACOG Lake Erie Algae Sources and Solutions 1.22.15 Information Compiled

More information

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR

Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR Optimizing the Ballasted Sedimentation Process at the Anacortes Water Treatment Plant Jeff Marrs Plant Manager Greg Pierson - HDR 2014 HDR, Inc., all rights reserved. Presentation Overview Project drivers

More information

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE

NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE NEW CLOTH MEDIA FILTER SYSTEM REPLACES 4 MGD TRAVELING BRIDGE FILTERS WITH 12 MGD CAPACITY IN EXISTING TANKAGE Keith C. Dayton Department of Utilities Stafford County, Virginia P. O. Box 339 Stafford,

More information

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc.

Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation. J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Algae Removal from a Facultative Lagoon System Using Dissolved Air Flotation J. Patrick Pierce, P.E. Environmental Treatment Systems, Inc. Facultative Lagoon System Designed for 1.5 MGD Discharging 1.15-1.35

More information

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E.

Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants. Lawrence H. Hentz Jr., P.E. Lessons Learned from CM-at-Risk and Design Build Projects at Water and Wastewater Treatment Plants Lawrence H. Hentz Jr., P.E., BCEE Presentation Outline Background of Two >$110 M Projects Improvements

More information

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011

Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Dipti Shah, Town of Gilbert Tuesday, January 25, 2011 Background Treatment Plant Water Treatment Process Filter types Experiments Results Review Historical BAF /Non- BAF data Conclusion Recommendation

More information

City of Enderby Water Treatment Plant

City of Enderby Water Treatment Plant City of Enderby Water Treatment Plant The City of Enderby is located in the beautiful NorthOkanagan with a population of 3200 residents. The central location between Vernon and Salmon Arm allows easy access

More information

FAST TRACK PROJECT IMPLEMENTATION CHARLOTTE WATER IDLEWILD BOOSTER PUMP STATION PIPING IMPROVEMENTS

FAST TRACK PROJECT IMPLEMENTATION CHARLOTTE WATER IDLEWILD BOOSTER PUMP STATION PIPING IMPROVEMENTS NC AWWA-WEA 95 TH ANNUAL CONFERENCE FAST TRACK PROJECT IMPLEMENTATION CHARLOTTE WATER IDLEWILD BOOSTER PUMP STATION PIPING IMPROVEMENTS Chuck Bliss, P.E. Charlotte Water Kyle Massey, P.E. Black & Veatch

More information

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation

City of Gardiner, Maine Wastewater Committee Meeting. CSO Storage Tank & Screening Evaluation City of Gardiner, Maine Wastewater Committee Meeting CSO Storage Tank & Screening Evaluation December 11, 2013 Introduction - Update on field work - Flow monitoring - Survey - GIS - Borings - Assessment

More information

CONTRAFAST. High-Rate Thickening Clarifier

CONTRAFAST. High-Rate Thickening Clarifier CONTRAFAST High-Rate Thickening Clarifier CONTRAFAST High-Rate Thickening Clarifier The CONTRAFAST high-rate thickening clarifier utilizes a combination of internal and external solids recirculation and

More information

THIS POLICY DOES NOT HAVE THE FORCE OF LAW

THIS POLICY DOES NOT HAVE THE FORCE OF LAW THIS POLICY DOES NOT HAVE THE FORCE OF LAW GUIDELINES FOR TREATMENT PROCESS Division: DDAGW RATINGS AT PRECIPITATIVE (e.g.,lime) Number: ENG-02-001 SOFTENING GROUND WATER Category: Final TREATMENT PLANTS

More information

Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study

Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study Rinconada Water Treatment Plant Reliability Improvement Project (RIP) Filter Pilot Study AWWA 2014 Fall Conference Lei Hong, Ph.D., P.E. Lale Guven, Environmental Engineer October 23, 2014 Presentation

More information

SETTLING REVIEW CHECKLIST

SETTLING REVIEW CHECKLIST SETTLING REVIEW CHECKLIST Water Quality Wastewater Technical Review and Guidance FACILITY NAME CONSULTING ENGINEER DATE Water/Wastewater/#5.73, May 2001 SITE INSPECTION (DATE & INSPECTOR) PLANNING OR DESIGN

More information

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand

Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand Nakhon Sawan Water Treatment Plant Nakhon Sawan, Thailand 1. Background Information Nakhon Sawan is located about 250 km north of Bangkok and marks the point of confluence of two of major Thai rivers,

More information

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION Alex Yavich, Ph.D., P.E. Optimization Solutions Environmental, LLC WATERCON 2012 Optimization Solutions Environmental, LLC Water Treatment

More information

Innovative Approach to Expanding the Olentangy WTP

Innovative Approach to Expanding the Olentangy WTP Innovative Approach to Expanding the Olentangy WTP September 28, 2017 Spencer Sheldon, WTP Superintendent Bret M. Casey, P.E., BCEE Who is Del-Co Water? Member owned 501-(c) Non-Profit Corporation Governed

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation

Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion with Wet Weather Accommodation Presented by: Jim

More information

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology

Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology OWEA Annual Conference Mason, OH June 19, 2013, Operations, 11:00-11:45AM Wet Weather and Advanced Treatment: Procurement Strategies to Secure the Right Technology Bill Meinert, PE, O Brien & Gere Often

More information

MRI Wastewater Inclined Plate Settlers Performance Advantages

MRI Wastewater Inclined Plate Settlers Performance Advantages MRI Wastewater Inclined Plate Settlers Performance Advantages Suitable for municipal or industrial applications, performance advantages include: Smaller basin footprint than open clarifiers Significantly

More information

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka

Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka Greater Kegalle Water Treatment Plant Kegalle, Sri Lanka 1. Background information of the water treatment plant Kegalle is located about 80 Km East of Colombo and the Greater Kegalle water treatment plant

More information

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater

Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater OWEA State Conference June 20, 2012 Full Scale Testing to Demonstrate Anaerobic Selector Effect for Low Strength Wastewater Presenters Bill Donohue NEORSD Bob Hrusovsky MWH Don Esping BC Easterly Plant

More information

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14

Project Name: Central WWTP Capacity Improvements and CSO Reduction Project. MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 Project Name: Central WWTP Capacity Improvements and CSO Reduction Project MWS Project Number: 14-SC-0153 Last Updated: 12/19/14 BACKGROUND / PURPOSE Metro Water Services (MWS), in order to comply with

More information

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,

More information

Separations Overview TDRL Seminar

Separations Overview TDRL Seminar Separations Overview TDRL Seminar Presented by: Infilco Degremont North American Footprint 5 companies 471 employees ANDERSON DUNDAS, ON 60 EMPLOYEES DEGREMONT LTD MONTREAL, QC 27 EMPLOYEES WPT SALT LAKE

More information

Ali Leeds, MWH Austin Peters, MWH

Ali Leeds, MWH Austin Peters, MWH Ali Leeds, MWH Austin Peters, MWH Presented for PNWS-AWWA Bellevue, WA May 1, 2015 Where do Water Treatment Plants Come From? Water Treatment Plant Incubation Background of the Two Plants Key Drivers of

More information

There is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River.

There is no sludge treatment process at NWTP. Sludge generated from sedimentation and backwashing is drained directly to the Khan River. Namkhan Water Treatment Plant Luang Prabang City, Lao PDR 1. Background information Luang Prabang is a touristic city situated in northern part of Lao PDR and was declared a World Heritage City by UNESCO

More information

Lowering The Total Cost Of Operation

Lowering The Total Cost Of Operation Lowering The Total Cost Of Operation The system removes more solids than conventional clarification, so filters can run longer between backwash cycles. Fewer backwash cycles means less backwash water,

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

Innovative Hydraulics 915 Valley View Avenue Pittsburgh, PA (412)

Innovative Hydraulics 915 Valley View Avenue Pittsburgh, PA (412) VISUAL WATER DESIGNER USER MANUAL Version 1.1 Water/Wastewater Design Software 915 Valley View Avenue Pittsburgh, PA 15202 (412) 334-1637 support@innovativehydraulics.net, 2007-2009. All rights reserved.

More information

WASTE WATER TREATMENT SYSTEM

WASTE WATER TREATMENT SYSTEM WASTE WATER TREATMENT SYSTEM Manual Coarse and Mechanical Fine Screens: We manufacture high quality screens that are widely used for removing suspended particles from the waste water. These screens are

More information

Tampa Bay Water (TBW) is a regional

Tampa Bay Water (TBW) is a regional FWRJ Enhanced Residuals Treatment Helps Tampa Bay Water Regional Surface Water Treatment Plant Achieve Total Recycling Tony Pevec and Richard D. Moore Tampa Bay Water (TBW) is a regional water supply authority

More information

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout )

THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout ) THE BOSSIER CITY WATER TREATMENT PLANT (Background and Current Process Layout - 2018) PLANT HISTORY The Bossier City Water Treatment Plant was built in 1958. The original plant had a treatment capacity

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Paris, Kentucky Project

More information

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan

Oak Orchard Wastewater Treatment Plant. Wet Weather Operating Plan Oak Orchard Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy.3 a. Wet Weather Operation

More information

PLAN SHEET INDEX TYPICAL ARCHITECTURAL DETAILS - WINDOW SCHEDULE AND DETAILS

PLAN SHEET INDEX TYPICAL ARCHITECTURAL DETAILS - WINDOW SCHEDULE AND DETAILS PLAN SHEET INDEX DESCRIPTION DESCRIPTION GENERAL S G TITLE SHEET G GENERAL LOCATION MAP AND INDEX 3 G3 GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS 4 G4 PROCESS FLOW SCHEMATIC 5 G5 HYDRAULIC PRILE 64 P-7

More information

rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system

rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system rim-flo secondary Clarifier with Tow-Bro unitube sludge removal system Flow distribution of mixed liquor is uniform around the basin circumference, density flow pattern is away from the effluent weir,

More information

Optimizing Wastewater Upgrade Projects with Improved Hydraulics

Optimizing Wastewater Upgrade Projects with Improved Hydraulics Optimizing Wastewater Upgrade Projects with Improved Hydraulics Alden Webinar Series October 27, 2009 For audio, please dial 1 (866) 809-5996, participant code 6504656 Housekeeping Questions and Audio

More information

Bekaa Valley 10 x 40 miles. Aitanit-Quraoun WWTP 5000m 3 /day Commissioned May Lake Qaraoun

Bekaa Valley 10 x 40 miles. Aitanit-Quraoun WWTP 5000m 3 /day Commissioned May Lake Qaraoun USAID/Lebanon WWTP for Small Communities Design for Lower Cost Operations Construction & Startup John N Crippen, PE Re ad Ghantous Matt Antill September 16, 2009 PNCWA Annual Conference, Boise, Idaho Agenda

More information

Morningstar Direct SM Presentation Studio

Morningstar Direct SM Presentation Studio Presentation Studio is Morningstar Direct s platform for creating custom presentations. With access to Morningstar Direct s databases and flexible charting and reporting capabilities, Presentation Studio

More information

Engineering Request for Qualifications (RFQ) BJWSA Project CIP #1366 Purrysburg WTP Expansion to 30 MGD Engineering Contract

Engineering Request for Qualifications (RFQ) BJWSA Project CIP #1366 Purrysburg WTP Expansion to 30 MGD Engineering Contract Engineering Request for Qualifications BJWSA Project CIP #1366 Engineering Contract Project Purpose The Beaufort Jasper Water & Sewer Authority (BJWSA) has decided to pursue the expansion of the existing

More information

Fridley Filter Plant Rehabilitation

Fridley Filter Plant Rehabilitation CITY OF MINNEAPOLIS Fridley Filter Plant Rehabilitation MINNEAPOLIS WATER WORKS Public Works Department Water Treatment & Distribution Services Division Overview Minneapolis Water Fridley Filter Plant

More information

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE

Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Long Point Water Treatment Plant Process Evaluation and Design Upgrades for Performance Enhancement; Dover, DE Christopher Walker, PE Christopher Curran, PE Mark Prouty, PE May 12, 2016 Long Point Water

More information

WinSLAMM v Program Modifications Final, 3/16/19

WinSLAMM v Program Modifications Final, 3/16/19 WinSLAMM v 10.4.1 Program Modifications Final, 3/16/19 1. Printing Set up a printing option for.pdf files for input data and output summary data. 2. Added the Pipe input data to the printing input data

More information

Product: ODTView. Subject: Basic Overview of Delivery and Orders Tab. Version: December 6, Distribution: Customer

Product: ODTView. Subject: Basic Overview of Delivery and Orders Tab. Version: December 6, Distribution: Customer Product: ODTView Subject: Basic Overview of Delivery and Orders Tab Version: December 6, 2016 Distribution: Customer Setting Up Delivery and Orders Tab Log into ODT Viewer with an Admin user Navigate to

More information

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M Matt Leach, P.E. CH2M Mark Eppich, P.E. City of Columbus Division of Water S. Dean Ramsey, P.E. CH2M 1 Presentation Topics Project Background Project Team Unique Challenges and Opportunities Risk Assessment

More information

~~~~ WWTP Master Plan Project

~~~~ WWTP Master Plan Project ~~~~ WWTP Master Plan Project City Council - April 7, 2014 WWTP History and Issues Constructed in 1994 Aging mechanical equipment - Frequent equipment failures - Resulted in TCEQ permit violations - High

More information

Managing Schedules in ADP Time & Attendance

Managing Schedules in ADP Time & Attendance Managing Schedules in ADP Time & Attendance Adding or Editing a Schedule Template Add or Edit a Schedule Template to configure a recurring schedule. Assigning a Schedule Template to an Employee Assign

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM

FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM FilterWorx Performance Filters EFFICIENCY AND INNOVATION BUILT INTO EVERY COMPLETE SYSTEM Water filtration is more than the sum of its parts. And no one knows more about filtration than Leopold, the leader

More information

Technical Memorandum. 1 Summary Findings and Conclusions. 2 Existing Primary Treatment Facilities

Technical Memorandum. 1 Summary Findings and Conclusions. 2 Existing Primary Treatment Facilities Technical Memorandum SMCSD Headworks, Primary and Secondary Treatment Pre-Design Water andenvironment Subject: Prepared For: Prepared by: Reviewed by: SMCSD Mark Takemoto Steve Clary, Dennis Gellerman

More information

Request for Proposals

Request for Proposals Request for Proposals Aeration Basin Improvement Predesign and Design Project Project Number WD1401 You are hereby invited to submit a proposal for consulting services necessary to provide the City of

More information

Wastewater Plant Tour. There Is Gold In Them There Plants

Wastewater Plant Tour. There Is Gold In Them There Plants Wastewater Plant Tour There Is Gold In Them There Plants Why Should I Be Interested In Wastewater Treatment? Every municipality has at least one treatment facility. Many manufactures will have treatment

More information

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment.

I am writing in response to your request for a Revenue Legal Opinion addressing the Sales Tax on the Wastewater Treatment equipment. STATE OF ARKANSAS REVENUE LEGAL COUNSEL Department of Finance Post Office Box 1272, Room 2380 Little Rock, Arkansas 72203-1272 and Administration Phone: (501) 682-7030 Fax: (501) 682-7599 http://dfa.arkansas.gov

More information

Please acknowledge receipt of both Addendum No. 0 1 (issued

Please acknowledge receipt of both Addendum No. 0 1 (issued Bids for the construction of Water Supply Well PW-14 (), will be received by the City of Westerville, Ohio until the revised closing date and time indicated in this Addendum No. 02 and will be publicly

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

Lessons Learned from Walla Walla: Eastern WA s Largest GC/CM Water Project

Lessons Learned from Walla Walla: Eastern WA s Largest GC/CM Water Project Lessons Learned from Walla Walla: Eastern WA s Largest GC/CM Water Project Pierre Kwan, PE HDR Frank Nicholson, PE City of Walla Walla Amy Jenne Apollo, Inc. 2017 PNWS-AWWA Conference Background GC/CM

More information

Advancing the Design of a New 60 MGD Water Treatment Plant

Advancing the Design of a New 60 MGD Water Treatment Plant Advancing the Design of a New 60 MGD Water Treatment Plant Todd Perimon, PE Program Delivery & Real Estate Manager Willamette Water Supply Program Austin Peters, PE Water Treatment Plant Design Willamette

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

DRINKING WATER CONSTRUCTION PERMIT APPLICATON

DRINKING WATER CONSTRUCTION PERMIT APPLICATON DRINKING WATER CONSTRUCTION PERMIT APPLICATON Addition to existing water system New drinking water system Facilities to be added Surface Plant (new or expansion) New Well or Spring Source Booster Pump

More information

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology

Environmental Improvements Associated with Springfield WWTP EHRT. Using the Compressed Media Filter Technology Environmental Improvements Associated with Springfield WWTP EHRT Tuesday, June 23 9:30 am Using the Compressed Media Filter Technology WWETCO WWETCO FlexFilter ENGINEERS CLUB OF ST. LOUIS Performance Testing

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Self-Cleaning Trench-Type Wet Well Design

Self-Cleaning Trench-Type Wet Well Design Self-Cleaning Trench-Type Wet Well Design *Trooper Smith, P.E., Freese and Nichols, Inc. *10814 Jollyville Rd. Building 4, Suite 100 Austin, TX, 78759 PH: (512) 617-3100 Email: tws@freese.com ABSTRACT

More information

WinSLAMM v Program Modifications Final, 12/12/17

WinSLAMM v Program Modifications Final, 12/12/17 WinSLAMM v 10.3.4 Program Modifications Final, 12/12/17 1. Corrected an error in the Biofilter caused by an improperly defined variable that caused an overflow during very long model runs. 2. Corrected

More information

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan

Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant. Wet Weather Operating Plan Meadowbrook-Limestone (MBLS) Wastewater Treatment Plant Wet Weather Operating Plan July 2014 TABLE OF CONTENTS Section 1 Introduction and Overview. 1 Section 2 Wet Weather Operational Strategy....2 a.

More information

The High-Capacity. Inclined Plate. Settler System

The High-Capacity. Inclined Plate. Settler System The High-Capacity Inclined Plate Settler System P a M R I P L A T E S E T T L E R S The Golden Water Treatment Plant, Colorado This facility in scenic Golden handles several million gallons more per day

More information

Strength Development Plan

Strength Development Plan Strength Development Plan The Strength Development Plan is an automated tool that will connect competencies or organizational development statements to the top talent of an individual based on their structured

More information

Reducing THM via Aeration: A Case Study August 28, 2014

Reducing THM via Aeration: A Case Study August 28, 2014 1 Reducing THM via Aeration: A Case Study August 28, 2014 by Gary Williams, P.E. Jones & Henry Engineers WEA-AWWA 2014 Technical Conference & Expo Agenda 2 Location History Pilot Implementation Take Away

More information

Backup Generators Bacon Road Water Treatment Plant Case Study

Backup Generators Bacon Road Water Treatment Plant Case Study Backup Generators Bacon Road Water Treatment Plant Case Study Joe Borzyn, PE, LC - AECOM Timothy McCann, PE - AECOM 1 Agenda Bacon Road WTP Background Project Background Generator Alternatives Final Selection

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP

PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP PRIMARY DRINKING WATER FROM WASTEWATER EFFLUENT: PILOT TEST EXPERIENCE AT THE MIAMI DADE SOUTH DISTRICT WWTP Paul J. Vinci, P.E. 1, Richard Cisterna, P.E. 1, Robert Harris 1, John Chorlog, P.E. 2, Joseph

More information

Water Treatment Plant Improvements Study

Water Treatment Plant Improvements Study Water Treatment Plant Improvements Study Prepared for City of Pittsburg, CA July 22, 2011 Prepared by: Erik Zalkin, P.E., Browv and Caldwell California LicensNo. C75392 Reviewed by: Williai K. Faisst,

More information

Approaches to Filter Condition Assessment and Optimization

Approaches to Filter Condition Assessment and Optimization 2014 NC AWWA-WEA Conference Winston Salem, NC Approaches to Filter Condition Assessment and Optimization Vinod Korategere, P.E. Principal Engineer, Brown and Caldwell Barry Parsons Water Supply Division

More information

Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways

Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways Evaluation of Cost and Benefits of CSO Treatment and Supplemental Aeration to Improve Water Quality in the Chicago Area Waterways Metropolitan Water Reclamation District of Greater Chicago Research and

More information