1 Backup Generators Bacon Road Water Treatment Plant Case Study Joe Borzyn, PE, LC - AECOM Timothy McCann, PE - AECOM 1

2 Agenda Bacon Road WTP Background Project Background Generator Alternatives Final Selection & Construction 2

3 Bacon Road Water Treatment Plant History Plant Operational in 1982 Located in Painesville Township Provides Water to: - Perry Village - North Perry Village - Perry Township - Madison Township - Madison Village - Sections of Painesville Township Average 3 MGD Original Capacity 6 MGD High Rate Upgrade in Capacity 9 MGD 3

4 Bacon Road WTP General Location Ashtabula County Raw Water Pump Sta. Lake County Geauga County Bacon Road WTP Lake Road Bacon Road Main Plant 4

5 Bacon Road WTP Background Raw Pumping Chemical Addition - Activated Carbon - Alum/Polymer - Chlorine - Fluoride - Phosphate - Polymer - Potassium Permanganate Rapid Mix Flocculation Sedimentation Filters Chlorination Clear Wells High Service Pumping 5

6 Bacon Road WTP Raw Water Pump Station On Lake Erie Shore Approximately 1/2 Mile from Plant Serves WTP and Industrial Facility Capacity 9-10 MGD 48-inch Intake Pipe - 4,000 Feet into Lake Erie Two Envirex Traveling Screens Potassium Permanganate Feed System Vertical Turbine Pumps Army Corps of Engineers Designing a Shoreline Protection System Project 6

7 Bacon Road WTP Process Diagram Lake Erie Raw Water Pump Station Rapid Mix (2) Flocculation Basins (2) Sedimentation Basins (2) Settled Effluent Channel Sludge Lagoons (2) Sludge Thickeners (2) Sludge Holding Sludge Finished Water Well Clearwell Filters (4) 7

8 88

9 Backup Power Ten States Standards and Ohio EPA Ten States Standards Section Dedicated standby power shall be required by the reviewing authority so that water may be treated and/or pumped to the distribution system during power outages to meet the average day demand. Alternatives to dedicated standby power may be considered by the reviewing authority with proper justification. Ohio EPA System Depressurization - Any disruption of a water distribution system that results in a loss of continuous positive pressure of at least twenty pounds per square inch gauge at ground level at any point in the distribution system may allow contaminants to enter the system. 9

10 Backup Power Alternatives Separate Utility Substations Engine Driven Pumps Portable Roll-up Generators Permanent Stand-by Generators - Diesel - Natural Gas - Propane Exterior vs Interior Generators - Space within Existing Building - Interior Intake and Exhaust - Sound Attenuation Enclosure What to Power? - Entire Plant - Certain Equipment, Pumps, etc. 10

11 Two Services First Energy & Painesville Municipal Power Main Plant Raw Building 11

12 Electrical Service Outage at the Plant in kW Generator at Main First Outage - About 10 hours - Utilized a County Generator to Pump from Clearwell Second Outage - One Week Later - Utilize Generator Again Maintained System Pressure - During Each Outage - Ran Pump at Slow Speed - No Violations Realization that change was needed - Within a month, two generators were rented 200kW Generator at Raw 12

13 Lake Country decides to create a project, hires AECOM The Project would include: Designing permanent back-up generator(s) for the Main and Raw Buildings Consultation with plant personnel. Review of existing drawings. Survey of existing conditions Determination of existing Main and Raw Building electrical loads. A Memo/Report describing the existing conditions, proposed solutions and line item cost summaries. Presentation to the County Sanitary Engineer to determine what scope would be included in the Construction Documents. Develop Construction Drawings and Specifications. Review all submitted Bids, offer recommendation. Submittal review On site inspection services throughout construction. Punch lists 13

14 The Bacon Road Treatment Plant Emergency Back up Power Project, The Memo/Report Description of existing conditions Assumptions, Clarifications, Comments Four Generator Alternatives Replacement of the 30+ year old Main Electrical Service Panels at both buildings. Other Items included in Memo: - Replacement of direct buried service cables from Main to Raw building - Adding a low voltage duct bank from Main To Raw building Life Safety System analysis Cost summary Main Plant MDP Raw Building MDP 14

15 The Four (4) Generator Alternatives Alternative #1: One Generator at the Main Building for both the Main and Raw Buildings Alternative #2: One Generator at Main Building, One Generator at Raw Building Alternative #3: Multiple Generators at Main Building for both the Main and Raw Buildings Alternative #4: Multiple Generators at Both Buildings 15

16 Generator Alternative #1 Alternative #1: One Generator at the Main Building for both the Main and Raw Buildings - Not recommended due to reliance on the direct buried service feeders. - A 750kW generator is almost twice the cost of a 500kW. Raw Water Pump Station Main Plant 16

17 Generator Alternative #2 Alternative #2: One Generator at Main Building, One Generator at Raw Building - The recommended alternate, was the least costly - Followed, recommended design practice to have standby generator close to load Raw Water Pump Station Main Plant 17

18 Generator Alternative #3 Alternative #3: Multiple Generators at Main Building for both the Main and Raw Buildings - Not recommended due to reliance on the direct buried service feeders. - Level of redundancy more than required by Lake County Raw Water Pump Station Main Plant 18

19 Generator Alternative #4 Alternative #4: Multiple Generators at Both Buildings - Level of redundancy more than required by Lake County Raw Water Pump Station Main Plant 19

20 Creating Construction Documents of Alternate #2 Lake County determined that one generator sized to provide all loads in each of the buildings was sufficient. Updated order of magnitude cost estimate. Phasing of Construction (need for Temporary Switchboards) Replacement Main Service Panels located in same location as existing. New outbuilding needed to house: - Automatic Transfer Switch - Main Service Entrance Switch The project is currently under construction. Lake County has hired AECOM to perform the same work at their Aquarius WTP. 20

21 Construction Photographs 21

22 Construction Photographs 22

23 Construction Photographs 23

24 Construction Photographs 24

25 Questions? Thank You! Tim McCann: Joe Borzyn: Tim and Joe will also be available for questions after the end of today s meeting. 25

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv

Lake County WTP Improvements and Capacity Increase. OTCO 9 th Annual Water and Wastewater Workshop. Nick Pizzi Aqua Serv 1 Lake County WTP Improvements and Capacity Increase OTCO 9 th Annual Water and Wastewater Workshop 7.31.2013 Nick Pizzi Aqua Serv Rick Douglas Lake County Presentation Agenda Some topics we will cover:

More information

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting

Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting Water Treatment Plant Phase 1 Upgrades CMAR Selection Pre-Submittal Meeting October 12, 2017 Water Treatment Plant Phase 1 Upgrades 22 mgd WTP Expand capacity to 32 mgd Upgrades to most processes Only

More information

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014

Process Treatment Selection and. Jeff Macomber, P.E. One Water Conference August 28, 2014 Process Treatment Selection and Design for the City of Piqua s New WTP Jeff Macomber, P.E. One Water Conference August 28, 2014 Agenda Project Background Water Treatment Goals Process Treatment Alternative

More information

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I.

City of Fairfax, Virginia City Council Regular Meeting. Honorable Mayor and Members of Cfy ;ouncil Robert L. Sisson, City Manager /I. City of Fairfax, Virginia City Council Regular Meeting Agenda Item #..,.,C:::o~Or!---!h~--- city Council Meeting q+----4-j/.-...:cx:l..-.>o?...~-/_,_j-=2=; r 1 TO: FROM: SUBJECT: ISSUE(S): SUMMARY: Honorable

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements

Ohio Section AWWA NW District Fall Meeting April 20, City of Delaware Water Plant Improvements April 20, 2016 City of Delaware Water Plant Improvements 1 NW District Fall Meeting April 20, 2016 Delaware Water Plant Project Overview Converted 6.0 MGD Lime Softening Plant to 7.2 MGD Ultrafiltration

More information

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager

Pittsburgh Water Treatment Plant Projects. by Jay R. Lucas, P.E. Senior Project Manager Pittsburgh Water Treatment Plant Projects by Jay R. Lucas, P.E. Senior Project Manager Who Is American Water We are the largest publicly traded water and wastewater utility in the United States Broad national

More information

Facility & Operations Field Division

Facility & Operations Field Division Facility & Operations Field Division Mission Statement: To regularly inspect utility facilities and review plant operating practices to ensure regulated utility service providers deliver safe, reliable

More information

Amesville Water System

Amesville Water System Water system timeline System built in 1960 s Tank telemetry failed 1970 s June 2012 duracho and electric outage May 2013-29 EPA citations (see copy) June 2014 started consultation with Triad Engineering

More information

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings

Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Innovative Improvements to a 53-Year Old Water Plant for HABs, Crypto, and Whatever Else the Maumee River Brings Robert T. Shoaf, P.E., BCEE AECOM (Columbus, Ohio) Scott Hoover, Plant Superintendent Napoleon,

More information

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet WHY IS THE CITY OF OREGON DOING THIS PROJECT? Along with other communities across the country,

More information

RECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507

RECORD DRAWINGS NOTE: alt32 ARCHITECTURE DESIGN 310 OLD VINE STREET, SUITE 300 LEXINGTON, KY 40507 CIVIL MECHANICAL STRUCTURAL CALHOUN, KENTUCKY 2013 EXISTING RAW WATER INTAKE & PUMP STATION ELECTRICAL NEW WATER TREATMENT PLANT CALHOUN, KENTUCKY NEW WATER TREATMENT PLANT McLEAN COUNTY REGIONAL WATER

More information

Oxnard Wastewater Treatment Plant

Oxnard Wastewater Treatment Plant December 12, 2015 & December 16, 2015 Oxnard Wastewater Treatment Plant 6001 SOUTH PERKINS ROAD OXNARD, CALIFORNIA Overview: Oxnard Wastewater Treatment Plant: The City of Oxnard (City) Wastewater Treatment

More information

VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION

VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION 2012 Build Ohio Award Winner Industrial/Heavy Category AGC of Ohio AWARD WINNING PROJECT Location Lima, Ohio Civil, Mechanical, Electrical and Architectural Engineering $7.4 million Project Funding Funded

More information

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M

Matt Leach, P.E. CH2M. Mark Eppich, P.E. City of Columbus Division of Water. S. Dean Ramsey, P.E. CH2M Matt Leach, P.E. CH2M Mark Eppich, P.E. City of Columbus Division of Water S. Dean Ramsey, P.E. CH2M 1 Presentation Topics Project Background Project Team Unique Challenges and Opportunities Risk Assessment

More information

Avon Lake Corrosion Control Study and Orthophosphate Implementation. Andrew Skeriotis, Stantec Greg Yuronich, Avon Lake Regional Water

Avon Lake Corrosion Control Study and Orthophosphate Implementation. Andrew Skeriotis, Stantec Greg Yuronich, Avon Lake Regional Water Avon Lake Corrosion Control Study and Orthophosphate Implementation Andrew Skeriotis, Stantec Greg Yuronich, Avon Lake Regional Water Agenda 1 History and Background of Avon Lake 2 Lead and Copper in Water

More information

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant

Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant Integrating Ozone and Ion Exchange into a 40 Year Old Lime Softening Plant City of Columbus Division of Water: Matt Steele CH2M HILL: Enoch Nicholson DRWP Source Water and Treatment DRWP Overview Current

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Paris, Kentucky Project

More information

Utility Partner Data Report

Utility Partner Data Report Utility Partner Data Report Project Title: Studying Distribution System Hydraulics and Flow Dynamics to Improve Water Utility Operational Decision Making Water Distribution System: Nicholasville, Kentucky

More information

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit)

Tiffin Water Treatment Plant. Comprehensive Facility Plan (Audit) 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Tiffin Water Treatment Plant Comprehensive Facility Plan (Audit) May 2016 Jim Welty Aqua Ohio Jill Marie P.E. Rich Atoulikian P.E.

More information

City of Topeka Utilities Department

City of Topeka Utilities Department City of Topeka Utilities Department A Tour of Topeka s Water Treatment Facility The Topeka Water Treatment Facility uses various chemical and mechanical processes to transform raw water from the Kansas

More information

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION

APPENDIX B THE MUNICIPAL AUTHORITY OF THE TOWNSHIP OF ROBINSON DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION APPENDIX B DESCRIPTION OF THE AUTHORITY ' S WATER AND SEWER SYSTEM AND FINANCIAL INFORMATION FOR FISCAL YEAR 2017 DESCRIPTION OF THE AUTHORITY S WATER AND SEWER SYSTEM The existing water distribution system

More information

Waterworks System Assessment Round 3 Standards

Waterworks System Assessment Round 3 Standards Waterworks System Assessment Round 3 Standards The following standards have been developed in accordance with section 35 of The Water Regulations, 2002 (the Regulations). A Waterworks System Assessment

More information

Approved Capacity. March 2010

Approved Capacity. March 2010 March 2010 Approved Capacity Planning and Design Criteria for Establishing Approved Capacity for: 1) Surface Water And Ground Water Supply Sources, 2) Drinking Water Treatment Plants (WTPs), and 3) Source/WTP

More information

SSO Reduction Program. WWTP Effluent Violation Corrective Actions

SSO Reduction Program. WWTP Effluent Violation Corrective Actions SSO Reduction Program WWTP Effluent Violation Corrective Actions Report to United States Environmental Protection Agency: SSO Reduction Program This page intentionally left blank i WWTP Effluent Violation

More information

Sewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282

Sewer Capital Improvement Program Wastewater Treatment Plant No. 3 Generator Banking Sealed Bid No A/E Project No. 2282 CITY OF KENNER WASTEWATER TREATMENT PLANT NO. 3 GENERATOR BANKING IMC#2282 ADDENDUM NO. 1 DATE: September 28, 2017 PROJECT: City of Kenner Sewer Capital Improvement Program Wastewater Treatment Plant No.

More information

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft.

Rectangular Basin = Volume, gal (Length, ft) x (Width, ft) x (Height, ft) x7.48 gal/cu.ft. Units and Conversion Factors 1 cubic foot of water weighs 62.3832 lb 1 gallon of water weighs 8.34 lb 1 liter of water weighs 1,000 gm 1 mg/l = 1 part per million (ppm) 1% = 10,000 ppm ft 2 = square feet

More information

St. John the Baptist Parish

St. John the Baptist Parish St. John the Baptist Parish Conceptual Engineering of Mississippi River Water Source for LaPlace March 26, 2015 digital engineering 1 Major Water System Components Conceputalized Laplace Water System New

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

Engineering Request for Qualifications (RFQ) BJWSA Project CIP #1366 Purrysburg WTP Expansion to 30 MGD Engineering Contract

Engineering Request for Qualifications (RFQ) BJWSA Project CIP #1366 Purrysburg WTP Expansion to 30 MGD Engineering Contract Engineering Request for Qualifications BJWSA Project CIP #1366 Engineering Contract Project Purpose The Beaufort Jasper Water & Sewer Authority (BJWSA) has decided to pursue the expansion of the existing

More information

A Case Study of Latham Water District s Mohawk View High Lift Pump Station Rehabilitation

A Case Study of Latham Water District s Mohawk View High Lift Pump Station Rehabilitation A Case Study of Latham Water District s Mohawk View High Lift Pump Station Rehabilitation Outline The Mohawk View High Lift Pump Station & Latham Water District Energy Incentive Programs Pump Evaluation

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831)

PERMIT TO OPERATE SILVER CLOUD CT., MONTEREY, CA TELEPHONE (831) FAX (831) FFR MONTEREY BAY UNIFIED AIR POLLUTION CONTROL DISTRICT PERMIT TO OPERATE 24580 SILVER CLOUD CT., MONTEREY, CA 93940 TELEPHONE (831) 647-9411 FAX (831) 647-8501 15018 OPERATION UNDER THIS PERMIT MUST BE

More information

Expanding Capacity and Treatment. Treatment Plant

Expanding Capacity and Treatment. Treatment Plant Dublin Road Water Plant Treatment Capacity Increase Project Expanding Capacity and Treatment at an 80 MGD Surface Water Treatment Plant Enoch Nicholson, P.E. S. Dean Ramsey, P.E. CH2M HILL Mark Eppich,

More information

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013

Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Report Engineering Services Group Capital Investment Plan (CIP) Quarterly Report for the period ending December 2013 Summary This report provides a summary of fiscal year accomplishments, capital expenditures

More information

Reliability in Wastewater Systems

Reliability in Wastewater Systems by Daniel L. Spradling, P.E. Course Outline: Introduction Definitions and Terms RELIABILITY Engineering RELIABILITY Classification Class I Class II Class III Works Design Criteria Piping Requirements Component

More information

WATER INTAKE & DISTRIBUTION MM1

WATER INTAKE & DISTRIBUTION MM1 TOLEDO WATER Andy McClure Manager, Water Treatment Department of Public Utilities City of Toledo Department of Public Utilities TMACOG Lake Erie Algae Sources and Solutions 1.22.15 Information Compiled

More information

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison

Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison OBG PRESENTS: OBG PRESENTS: Side by Side Piloting of Process Alternatives Yields Direct Performance Comparison LORI W. REID, P.E. New York State AWWA Spring Meeting, April 26, 2017 Outline Background Project

More information

Ali Leeds, MWH Austin Peters, MWH

Ali Leeds, MWH Austin Peters, MWH Ali Leeds, MWH Austin Peters, MWH Presented for PNWS-AWWA Bellevue, WA May 1, 2015 Where do Water Treatment Plants Come From? Water Treatment Plant Incubation Background of the Two Plants Key Drivers of

More information

Cyanotoxin Evaluation and Treatment in the New York State Finger Lakes Region Pennsylvania AWWA Annual Conference

Cyanotoxin Evaluation and Treatment in the New York State Finger Lakes Region Pennsylvania AWWA Annual Conference Cyanotoxin Evaluation and Treatment in the New York State Finger Lakes Region Pennsylvania AWWA Annual Conference Stephen Waldvogel, P.E. Teresa Misiti, Ph.D. The Finger Lakes Region Raw Water Supply for

More information

ALBEMARLE COUNTY SERVICE AUTHORITY

ALBEMARLE COUNTY SERVICE AUTHORITY AGENDA TITLE: Rivanna Water & Sewer Authority (RWSA) Monthly Update STAFF CONTACT(S)/PREPARER: Gary O Connell, Executive Director AGENDA DATE: February 16, 2017 CONSENT AGENDA: Informational ATTACHMENTS:

More information

Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water

Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant. Barbara Martin AWWA Mark Petrie Cleveland Water Overcoming Challenges to Achieve Optimization at the Crown Water Treatment Plant Barbara Martin AWWA Mark Petrie Cleveland Water Outline Partnership for Safe Water Background Program Phases Crown Water

More information

Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission

Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission Enbridge Site Plan Review Application Summary of Issues for Comstock Township Planning Commission July 25, 2013 Comstock Township Planning Commission Meeting Background EPA Order - March 14, 2013 What

More information

The Town of Groton, CT Looks to the Future:

The Town of Groton, CT Looks to the Future: The Town of Groton, CT Looks to the Future: Upgrades to the WPCF Effluent Pump Station and WPCF Resiliency Presented by: Virgil Lloyd, PE, Fuss & O Neill, Inc. Chris Lund, Town of Groton, CT June 7, 2016

More information

Western Carolina University

Western Carolina University Western Carolina University Steam and Water Master Plan Code 40429 Item 320E1 FINAL November 1, 2006 2310 Langhorne Road Lynchburg, Virginia 24501 Phone: 434.947.1901 www.wileywilson.com Contact: Stevens

More information

Water Treatment Overview. Gabe Sasser December 2016

Water Treatment Overview. Gabe Sasser December 2016 Water Treatment Overview Gabe Sasser December 2016 Topics of Discussion Source Water Information Treatment Plants (History and Capacity) Water Quality Water Treatment Process Distribution System Conservation

More information

Advancing the Design of a New 60 MGD Water Treatment Plant

Advancing the Design of a New 60 MGD Water Treatment Plant Advancing the Design of a New 60 MGD Water Treatment Plant Todd Perimon, PE Program Delivery & Real Estate Manager Willamette Water Supply Program Austin Peters, PE Water Treatment Plant Design Willamette

More information

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director

Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Public Utilities Department April 13, 2017 Delaware Citizens Academy Brad Stanton, Director Utility Fast Facts Average household uses 107,000 gallons of water each year. 1,851 gallons of water to refine

More information

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM

MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM Background MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT SCHEDULE B REPORT MUNICIPALITY OF TRENT HILLS CAMPBELLFORD POTABLE WATER SUPPLY AND DISTRIBUTION SYSTEM - EXECUTIVE SUMMARY - The Municipality of Trent

More information

Comparing Carbons for Disinfection Byproduct Control. Maggie H. Pierce, EI Sara N. Gibson, PE Mark M. Bishop, PE David S.

Comparing Carbons for Disinfection Byproduct Control. Maggie H. Pierce, EI Sara N. Gibson, PE Mark M. Bishop, PE David S. Comparing Carbons for Disinfection Byproduct Control Maggie H. Pierce, EI Sara N. Gibson, PE Mark M. Bishop, PE David S. Briley, PE Water JAM 2010 Overview Introduction Considerations for Granular Activated

More information

Treatment Facility Condition Assessment

Treatment Facility Condition Assessment Treatment Facility Condition Assessment PRESENTED BY: SCOTT COLE, P.E. YANBO LI, P.E. WEAT NORTH TEXAS SECTION SEMINAR FEBRUARY 10, 2011 Acknowledgments Theo Chan, P.E., Freese and Nichols David Sloan,

More information

A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs

A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs A Comprehensive Performance Evaluation (CPE) Approach to Addressing HABs CPE Participants U.S. EPA: Alison Dugan, Tom Waters, Rich Lieberman, Craig Patterson, Val Bosscher Process Applications, Inc.: Larry

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

The next step in ozone purification

The next step in ozone purification The next step in ozone purification An early adopter adds high-capacity pretreatment to remove almost all particles and algae before filtration. By Peter Tunnicliffe, PE Variable-flow software lowers costs

More information

AEP CARLTON HOUSE SERVICE UPGRADE

AEP CARLTON HOUSE SERVICE UPGRADE Location Lima, Ohio Electrical Engineering Inspection Construction Administration $333,047 Size Replaced 12,470 volt service with indoor 15 KV oil filled switches to 480 volt service Replaced 12.47-240/120

More information

Wastewater Treatment. Knowledge. Commitment. Excellence.

Wastewater Treatment. Knowledge. Commitment. Excellence. Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with

More information

Innovative Approach to Expanding the Olentangy WTP

Innovative Approach to Expanding the Olentangy WTP Innovative Approach to Expanding the Olentangy WTP September 28, 2017 Spencer Sheldon, WTP Superintendent Bret M. Casey, P.E., BCEE Who is Del-Co Water? Member owned 501-(c) Non-Profit Corporation Governed

More information

GREEN PROJECT RESERVE BUSINESS CASE CITY OF BROKEN ARROW WATER SUPPLY IMPROVEMENTS PROJECT

GREEN PROJECT RESERVE BUSINESS CASE CITY OF BROKEN ARROW WATER SUPPLY IMPROVEMENTS PROJECT GREEN PROJECT RESERVE BUSINESS CASE CITY OF BROKEN ARROW WATER SUPPLY IMPROVEMENTS PROJECT July, 2011 The Oklahoma Water Resources Board (OWRB) requires a Business Case be made for projects or certain

More information

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc.

Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community. Richard Stratton, PE HDR Engineering, Inc. Submerged Membranes to Replace Media Filters to Increase Capacity 4X for a Small Community Richard Stratton, PE HDR Engineering, Inc. Main Points of this Presentation Membranes can provide 4 times the

More information

Design & Construction of Camanche Water Transmission Pipeline by Float-and-Sink Method PIPELINE USER GROUP JUNE 13, 2017

Design & Construction of Camanche Water Transmission Pipeline by Float-and-Sink Method PIPELINE USER GROUP JUNE 13, 2017 Design & Construction of Camanche Water Transmission Pipeline by Float-and-Sink Method PIPELINE USER GROUP JUNE 13, 2017 OUTLINE I. INTRODUCTION II. DESIGN III. PERMITS IV. CONSTRUCTION V. CONSTRUCTION

More information

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T

National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T National Pollutant Discharge Elimination System (NPDES) Permit Program F A C T S H E E T Regarding a Modification to an NPDES Permit To Discharge to Waters of the State of Ohio for the Elyria Wastewater

More information

Monthly Progress Report. June 2017

Monthly Progress Report. June 2017 Monthly Progress Report June 2017 Program Overview 2 Program Administration 6 Intake and Pump Stations 8 Pipeline 12 Terminal Storage 16 Water Treatment Plant 20 Distribution 24 Environmental 28 1 Program

More information

Bekaa Valley 10 x 40 miles. Aitanit-Quraoun WWTP 5000m 3 /day Commissioned May Lake Qaraoun

Bekaa Valley 10 x 40 miles. Aitanit-Quraoun WWTP 5000m 3 /day Commissioned May Lake Qaraoun USAID/Lebanon WWTP for Small Communities Design for Lower Cost Operations Construction & Startup John N Crippen, PE Re ad Ghantous Matt Antill September 16, 2009 PNCWA Annual Conference, Boise, Idaho Agenda

More information

Zero Liquid Discharge Project Extends Potable Water Supplies

Zero Liquid Discharge Project Extends Potable Water Supplies http://dx.doi.org/10.5991/opf.2014.40.0078 Ryan R. Popko, PE, and Phillip J. Locke, PE, are with McKim & Creed (www.mckimcreed.com), Clearwater, Fla. Fred J. Greiner is with the city of Palm Coast, Fla.

More information

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado

Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado JUST ADD WATER Renovation of the Filters at the Soldier Canyon Filter Plant in Fort Collins, Colorado Thomas M. Getting, P.E., DEE, Filtration Product Manager John Geibel, P.E., Chief Engineer Michael

More information

Santee Sioux Nation and the Village of Niobrara, Nebraska. Municipal, Rural, and Industrial Water Supply System Feasibility Study Status Report

Santee Sioux Nation and the Village of Niobrara, Nebraska. Municipal, Rural, and Industrial Water Supply System Feasibility Study Status Report Municipal, Rural, and Industrial Water Supply System Feasibility Study Status Report Santee Sioux Nation and the Village of Niobrara, Nebraska Status Report Summary May 2008 1 This status report summarizes

More information

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY

EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY EVALUATING NANOFILTRATION, REVERSE OSMOSIS, AND ION EXCHANGE TO MEET CONSUMPTIVE USE CONSTRAINTS AND FINISHED WATER QUALITY GOALS FOR BROWARD COUNTY Frank A. Brinson, P.E., DEE, CDM, Fort Lauderdale, FL

More information

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS

CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS C-44 Reservoir/STA System Discharge Project RFB: 6000000620 Addendum No. 1 March 2014 CLARIFICATIONS TO TECHNICAL SPECIFICATIONS SECTIONS HDR Engineering, Inc. SECTION 02401 DEWATERING, COFFERDAM AND BYPASS

More information

Water Infrastructure Resiliency Planning for the City of Norfolk. Cherryl Barnett, P.E., Engineering Manager, Department of Utilities

Water Infrastructure Resiliency Planning for the City of Norfolk. Cherryl Barnett, P.E., Engineering Manager, Department of Utilities Water Infrastructure Resiliency Planning for the City of Norfolk Cherryl Barnett, P.E., Engineering Manager, Department of Utilities Agenda 1. City of Norfolk Resiliency Efforts 2. Norfolk s Water System

More information

Additional criteria for approval of sanitary landfill facility permit to install applications.

Additional criteria for approval of sanitary landfill facility permit to install applications. 3745-27-07 Additional criteria for approval of sanitary landfill facility permit to install applications. (A) General criteria. The director shall not approve any permit to install application for a sanitary

More information

WESTERN MUNICIPAL WATER DISTRICT ADDENDUM NO. 2

WESTERN MUNICIPAL WATER DISTRICT ADDENDUM NO. 2 WESTERN MUNICIPAL WATER DISTRICT ADDENDUM NO. 2 TO THE BIDDING DOCUMENTS, CONTRACT, PLANS AND SPECIFICATIONS FOR Lake Hills 1860 Pressure Zone Booster Pump Station Emergency Generator Replacement Specification

More information

Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth

Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth Why is this important to me? Population Density in Coastal Shoreline Counties & Coastal Watershed Counties

More information

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form

Reclaimed Water Treatment, Distribution, Pumping and Storage Engineering Report Form Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Reclaimed Water

More information

STATEMENT OF WORK. Troy Armoury Generator System Replacement

STATEMENT OF WORK. Troy Armoury Generator System Replacement STATEMENT OF WORK Troy Armoury Generator System Replacement April 2019 TABLE OF CONTENTS 1. GENERAL... 3 2. SITE DESCRIPTION AND BACKGROUND... 3 3. SCOPE OF WORK... 3 4. REFERENCES... 5 2 1. GENERAL This

More information

Rule R Facility Design and Operation: Miscellaneous Treatment Methods.

Rule R Facility Design and Operation: Miscellaneous Treatment Methods. [Division of Administrative Rules Home] [Utah Administrative Code List of Titles] Download the RTF file Rule R309-535. Facility Design and Operation: Miscellaneous Treatment Methods. As in effect on October

More information

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY

Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment. Village of Bolivar, NY Iron/Manganese Package Plant Pre-Engineered Ground Water Treatment Village of Bolivar, NY Fe/Mn Removal/Village of Bolivar, NY Presentation Outline Fe/Mn Overview Treatment Options Village of Bolivar Challenge

More information

Village of Skaneateles Cyanotoxin Treatment Evaluation. Edwin C. Tifft Jr. Water Supply Symposium Erica Goldin September 20, 2018

Village of Skaneateles Cyanotoxin Treatment Evaluation. Edwin C. Tifft Jr. Water Supply Symposium Erica Goldin September 20, 2018 Village of Skaneateles Cyanotoxin Treatment Evaluation Edwin C. Tifft Jr. Water Supply Symposium Erica Goldin September 20, 2018 Outline 1 2 3 4 5 6 7 Village of Skaneateles Water System Emerging Contaminants

More information

20 Add Hookups for Temporary Generators & Boilers

20 Add Hookups for Temporary Generators & Boilers NEW CODE 20 Add Hookups for Temporary Generators & Boilers I. Summary Issue: Buildings with extended service disruptions can use electricity and heat from temporary emergency generators and boilers. It

More information

Addendum #2 T Lake Major Water Supply Plant New Standby Power System

Addendum #2 T Lake Major Water Supply Plant New Standby Power System Date: May 23, 207 Addendum #2 T22.207 Lake Major Water Supply Plant New Standby Power System To All Bidders of T22.207: Please note: the following addendum applies to T22.207 and shall be taken into consideration

More information

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE. Bloomfield EMS Station

CONTRACT PROPOSAL/CONTRACT ACCEPTANCE. Bloomfield EMS Station CONTRACT PROPOSAL/CONTRACT ACCEPTANCE PROJECT # 2016-NC-002 For Construction of Bloomfield EMS Station located in Bloomfield, Kentucky 02/12/2016 REQUEST FOR BIDS Bloomfield EMS Station Building The City

More information

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION

SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION SYSTEMATIC APPROACH TO WATER TREATMENT PLANT PROCESS OPTIMIZATION Alex Yavich, Ph.D., P.E. Optimization Solutions Environmental, LLC WATERCON 2012 Optimization Solutions Environmental, LLC Water Treatment

More information

Columbiana County Water Treatment Plant Pump House Expansion Project

Columbiana County Water Treatment Plant Pump House Expansion Project Columbiana County Water Treatment Plant Pump House Expansion Project LIMITED ENVIRONMENTAL REVIEW A. Project Identification Project Name: Water Treatment Plant Pump House Expansion WSRLA # FS390326-0012

More information

SOUTH FEATHER WATER AND POWER AGENCY OROVILLE, CALIFORNIA MINERS RANCH WATER TREATMENT PLANT EXPANSION PROJECT SUMMARY REPORT

SOUTH FEATHER WATER AND POWER AGENCY OROVILLE, CALIFORNIA MINERS RANCH WATER TREATMENT PLANT EXPANSION PROJECT SUMMARY REPORT SOUTH FEATHER WATER AND POWER AGENCY OROVILLE, CALIFORNIA MINERS RANCH WATER TREATMENT PLANT EXPANSION PROJECT SUMMARY REPORT DRAFT June 2009 A SACRAMENTO, CA WALNUT CREEK, CA Miners Ranch Water Treatment

More information

Lagoon Pumping and Irrigating Equipment

Lagoon Pumping and Irrigating Equipment University of Missouri Extension G117, Reviewed October 1993 Lagoon Pumping and Irrigating Equipment Charles D. Fulhage Department of Agricultural Engineering Lagoons are an important part of many Missouri

More information

DW Module 11: Administration Answer Key

DW Module 11: Administration Answer Key DW Module 11: Administration Answer Key What is an example of the use of a grab sample to cross calibrate a continuous sample? One example might be that the continuous chlorine residual analyzer should

More information

Summary of Flint s Implementation of Veolia s Recommendations

Summary of Flint s Implementation of Veolia s Recommendations Summary of Flint s Implementation of Veolia s Recommendations A comparison between Veolia s Technical Recommendations vs. EPA Findings On March 12, 2015, Veolia delivered its final report to Emergency

More information

CLARENCE COLLIERY WATER TREATMENT

CLARENCE COLLIERY WATER TREATMENT CLARENCE COLLIERY WATER TREATMENT Ken Buckby, Plant Operator, Environmental Group (Operations) Pty Ltd. ABSTRACT Clarence Colliery is a coal mine that is located in the Blue Mountains North West of Sydney.

More information

Successful Regulatory (Ohio EPA) Permitting of Alternative Delivery Municipal Water and Wastewater Projects

Successful Regulatory (Ohio EPA) Permitting of Alternative Delivery Municipal Water and Wastewater Projects Successful Regulatory (Ohio EPA) Permitting of Alternative Delivery Municipal Water and Wastewater Projects Justin Arnold, P.E. Kokosing Construction Company, Inc. Ohio WEA-AWWA One Water August 29, 2014

More information

CHAPTER 4 CAPITAL IMPROVEMENT PROGRAM

CHAPTER 4 CAPITAL IMPROVEMENT PROGRAM CHAPTER 4 CAPITAL IMPROVEMENT PROGRAM Various improvement projects were identified in Chapter 3. A brief description of each project selected for the 6-year and 20-year planning horizons is presented in

More information

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard

SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard SUGGESTED SPECIFICATION for Low Voltage (600V) Generator Paralleling Switchboard PART 1 GENERAL 1.1 Scope A. The intent of this specification is to provide power control for the parallel operation of generator

More information

DRINKING WATER WORKS PERMIT

DRINKING WATER WORKS PERMIT DRINKING WATER WORKS PERMIT Permit Number: 171-201 Issue Number: 2 Pursuant to the Safe Drinking Water Act, 2002, S.O. 2002, c. 32, and the regulations made thereunder and subject to the limitations thereof,

More information

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Monthly Utility Bill in $ 100 Combined Average Utility Bill for 2015-2020 5/8 Meter with

More information

biologically active filtration

biologically active filtration biologically active filtration FOR TASTE AND ODOR CONTROL AT LAKE MANATEE WATER TREATMENT PLANT BY MIKE NIXON, EI, ENGINEER INTERN, MCKIM & CREED PHIL LOCKE, PE, SENIOR PROJECT MANAGER, MCKIM & CREED KATIE

More information

APWA PROJECT OF THE YEAR APPLICATION. Chambers Creek Regional Wastewater Treatment Plant Expansion

APWA PROJECT OF THE YEAR APPLICATION. Chambers Creek Regional Wastewater Treatment Plant Expansion APWA PROJECT OF THE YEAR APPLICATION 2018 Chambers Creek Regional Wastewater Treatment Plant Expansion Overview The expansion of the Chambers Creek Regional Wastewater Treatment Plant (CCRWWTP) was a $342

More information

City and Borough of Sitka

City and Borough of Sitka City and Borough of Sitka 100 Lincoln Street Sitka, Alaska 99835 Coast Guard City, USA City and Borough of Sitka: Blue Lake Penstock System Infrastructure Fact Sheet The City and Borough of Sitka (CBS)

More information

City of Greenfield Water Treatment Plant/System

City of Greenfield Water Treatment Plant/System City of Greenfield Water Treatment Plant/System General Information County: Highland Counties Served: Highland Type of System: Public: X 6119: Private: Year Established: 1893 Year of Upgrades: 1972, 1977,

More information

Messiah College Natural Gas and Combined Cooling, Heat and Power Plant

Messiah College Natural Gas and Combined Cooling, Heat and Power Plant Messiah College Natural Gas and Combined Cooling, Heat and Power Plant For the past decade, Messiah College wanted to bring natural gas to its campus, eliminating the use of propane and associated maintenance

More information

Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility

Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility SOUTH GRANVILLE WATER & SEWER AUTHORITY Disinfection By-Products Reduction and SCADA Evaluation and WTP Sludge Removal System and Dewatering Facility Presentation to the SGWASA Board October 10, 2017 TTHM

More information