Copper Concentrate Sampling, control over final product.

Size: px
Start display at page:

Download "Copper Concentrate Sampling, control over final product."

Transcription

1 Copper Concentrate Sampling, control over final product. Patricio Valenzuela Fuenzalida Codelco-Chile Div. Andina/ Los Andes Chile/ Jefe Unidad Muestreo_Pesaje, , Vicente Esparza González Minerals Sampling/Automation & Electrical Engineering/ FLSmidth, Chile, Business Manager, , ABSTRACT The representativity of the final product which comes out of its facilities is key for Andina division of Codelco Chile, also a great challenge to project a sampling system that delivers certain unusual characteristics due to space conditions, change on the final product s transport, speed of the conveyer belt, and reduced distances. This is why the staff of Codelco Andina s Div. along with FLSmidth s have joined efforts to design a revolutionary DSS (Dual Sampling System), with the great advantage of offering facilities on load cycles over train containers with the final product. Regardless of the circuit where it is being loaded, this will always be sampled by one single primary cutter; then the sample is reduced on a secondary common phase. We must point out that the weighing tables are linked to the equipment s control center in order not to exceed the maximum weight each container can bear. The equipment s philosophy is based in control links and common primary circuit positioning sensors for both load circuits. INTRODUCTION Andina Division of Codelco Chile is the corporation s second most important copper producer. The challenge of the superintendence of processes belonging to the plants management is to control effectively the final product of copper starting from concentrates collected in the plant s filter and warehouse. Our project was based on the replacement of the current materials movement system by an automatic system which allows to quantify the concentrate s weight and grade before its dispatch by railroad to the port of Ventanas. In order to achieve this change; belts 14 and 15 were replaced. We also installed a weight-meter for each conveyer belt an upon its unloads as well as a dual sampling system, which means, a single system which enables to operate the sampling automatically when operating one of the two conveyor belts.

2 Since the copper concentrate is the commercial product of Codelco s Andina Division, the top value for fundamental error is 1%, the maximum weight for each container is 9 tons and in a filling time below 50 s.

3 FLOWSHEET Concentrated Flow (Copper) (930 ton/hr) Primary sample (30 Kg/cutting) Secondary Sample Final Sample (16 Kg/Final lot Sample) Concentrated to Train Wagon (loading less than 50'' per container)

4 Productive process of Codelco s Andina Division Primary Crushing Don Luis Fine Material Belt 4F North Primary Crushing South Primary Crushing Secondary Crushing A6-A7 Belt Pannel Belt 5 Thick Hoppers SAG Grind Feeding Hopper Tertiary Crushing Quaternary Crushing SAG Grinding Unitary Grinding Conventional Grinding Collective Flotation Selective Flotation Los Leones Dam Molybdenum Concentrate Copper Concentrate Ovejería Dam

5 The results were satisfactory and the methodology s development is to be explained next. THEORETICAL BASE The heterogeneity is presented in several sampling errors. Depending on the type of sampling there are errors created by any of the systems. We can distinguish errors created from: Systematic sampling: s 2 ( CE) Sy Z( j) Q Sy Stratified random sampling: Completely random sampling: s 2 ( CE) Ra Z( j) Q Ra The term Z (j) is the error generator term, and each type of sampling has its own calculation formula. The term Q is the number of increments employed to obtain the samples systematically. The utilized formulas were derived by G. Matheron to estimate the variances and the extent of the error of continuous selection. The calculations are based on the exposed by Francis Pitard, in his book Pierre Gy`s Sampling Theory and sampling Practice Francis Pitard. For the case of Systematic Sampling, which is applied in the Dual Sampling System Planta Filtros Saladillo Codelco Div. Andina, The Error Generaror Function Z (j) is calculated: Z( j) 2W ( j / 2) W Sy, j Where W is the first Integral of the Variogram obtained with a systematic interval. Where W` is the second integral of the Variogram obtained according to the indicated above.

6 DESCRIPTION OF THE ACTIVITIES For this particular equipment, the following particular activities were performed: 2 sample collection campaigns, each campaign was obtained continuously, which means, each one of the 60 samples Dual equipment with cuts of the primary on each downloading position were taken at programmed times every one minute during the shift (the campaign consists of the extraction of 60 samples. The time of each increase is every 60 seconds). The collection was done in plastic bags to facilitate their transportation and further repairing. The utilized sampling interval was of 60'' for the short time needed to fill the containers with copper concentrates, which are sent to port. The same procedure was used for each one of the collected samples: 1. Disgregation and weight record on the AND certified scale, model GF12K duly callibrated (Photo 1). Photo 1 2. Hebro rotary divider, model 30V with 6 mats (Photo 3) and subsample collection.

7 Photo 2 Photo 3 3. One of the subsamples was randomly selected and integrally reduced to 100%-100# Tyler in an Essa LM2 Pulverising Mill, (Photo 4). Photo 4 4. Each one of the pulverised subsamples was completely sent to chemical analysis for Volumetric Total Cu. With the results of the analysis for Total Cu a variogram was confectioned via EMPV (Effective Management Process Variability).

8 RESULTS Once the chemical analyses and the physical determinations are obtained, the data was processed with the EMPV (Effective Management Process Variability) Statistic Software. This software allows to perform an analysis and calculation of different statistic parameters such as; variograms, variance in the origin V(0), relative variance for each interval of time j and other statistics parameters, used in the construction of the Maximum Acceptable Total Errors Curve. In the annex, you can find the detailed results of both evaluation campaigns of the cutter s performance. The data display as well as its respective Variograms are indicated next. Variograms Cº1 Mass Campaign 5.5e-005 Rel Variogram: C1 Registro dual Vario 4.4e-005 V_trend 3.3e e-005 V_trend_j 1.1e-005 V(0) X-axis V_cycle_j Vario = Rel Mean = 2.84E+01 V(0) = 2.18E-05 V[process j=1] = 2.14E-06 Begin = 1 Std = 6.46E-03 V(1) = 2.39E-05 V[trend j=1] = 1.07E-06 End = 60 Var = 4.18E-05 V_sill = 5.27E-05 V[Resid] = 1.52E-06

9 Cº2 Mass Campaign Rel Variogram: Registro Dual C2 Dual Record C2 Vario V_trend 8.4e e-005 V_trend_j 2.8e-005 V(0) X-axis V_cycle_j Vario = Rel Mean = 2.82E+01 V(0) = 5.21E-05 V[process j=1] = 2.73E-06 Begin = 1 Std = 9.87E-03 V(1) = 5.48E-05 V[trend j=1] = 1.37E-06 End = 60 Var = 9.74E-05 V_sill = 1.28E-04 V[Resid] = 3.47E-06 Copper Ore Grade Variograms Both variograms behave similarly, where data variability comes almost exclusively from the pip effect measurements. The value is not high and in neither of both cases does it surpass the 1% value of recommended copper ore grade error. We can see that the average ore grade of the concentrate varies during the time used for the measurements. In campaign Nº 1, the average of the 60 determinations was 28,4% Cu. In campaign Nº 2, the average of the 60 determinations was 28,2% Cu. This situation is also seen on relative Variograms, which are calculated to have independence from the chemical composition variation. This way, the calculated error can be expressed as a percentage. Determination of Maximum Acceptable Total Error A graph was elaborated from both campaigns to determine the total error according to the number of increases.

10 Determination of Maximum Total Error Acceptable Minutes Stratified random Systematic Error 1 0,4777% 0, ,1752E-05 0,466% 2 0,6846% 4,4424E-05 0,667% 3 0,8503% 6,83052E-05 6,8305E-05 0,826% 4 0,9916% 9,4046E-05 0,970% 5 1,1156% 0, ,2091E-04 1,100% 6 1,2277% 1,4960E-04 1,223% 7 1,3312% 0, ,7524E-04 1,324% 8 1,4293% 2,0092E-04 1,417% 9 1,5222% 2,2603E-04 1,503% 10 1,6084% 2,5199E-04 1,587% 11 1,6885% 2,7876E-04 1,670% 12 1,7651% 3,0588E-04 1,749% 13 1,8397% 3,3381E-04 1,827% 14 1,9124% 3,6190E-04 1,902% 15 1,9831% 3,9388E-04 1,985% 16 2,0521% 4,2656E-04 2,065% 17 2,1208% 4,5206E-04 2,126% 18 2,1901% 4,7650E-04 2,183% 19 2,2593% 4,9288E-04 2,220% 20 2,3280% 5,0796E-04 2,254% From the table we have calculated the variograms and the sampling frequency (calculating stratified and systematic random sampling trend). In both cases, taking a top 1% error, there is enough room to modify if so desired, the frequency to longer times. In order to avoid losing changes, which could happen in the process, it is always recommended to set a sampling frequency of about 15 minutes, but since in this case we have a continuous charge it is not modified. In the performed calculation, in both variograms, the frequency to obtain a higher error than 1% is over an hour. Therefore, in the 20-minute frequency, these increments, which correspond to the cutter s normal operation, the total error is 0.18% quite far from the maximum acceptable of 1%. CONCLUSIONS The DUAL cutter operates with a nominal flow of 930 TM/h. For the cutter s normal operation, we take an increase every 30''. In the experiences we took increments approximately every 60'', which was the minimum through the equipment s electronic controls.

11 According to calculations, if we took an increment every 60'', for each lot of 720 TM we would use 8 increments, according to the 930 TM/h flow. With 8 increments per each lot, the error related to the equipment reaches relative 0,18%. With this data, the cutter largely complies with the established error restrictions.(1% error maximum) The improvement achieved depends on having clear and accurate information for the product s departure from the division, along with the assessment of humidity that is later checked when entering the port. It is a help for the independent balance that the mass be calculated on port for having a static weighing system, but the product s quality can be clearly determined upon arrival. The Metallurgic Balance of the Andina Division can be calculated by extending the boundaries to the port of Ventanas. It is particularly important since the product sent to port can be clearly represented, to close ore grades with a probabilistic equipment x- to further compare with the international sales departures in order not to lose product traceability.

12 TABLES DUAL1 MASS RECORD Id Campaign Total weight (g) Cu Grade (%) 1 Dual ,5 27,72 2 Dual ,3 28,24 3 Dual ,9 28,30 4 Dual ,1 28,37 5 Dual ,2 28,22 6 Dual ,3 28,16 7 Dual ,6 28,33 8 Dual ,6 27,98 9 Dual ,9 28,16 10 Dual ,0 28,26 11 Dual ,8 28,24 12 Dual ,9 28,19 13 Dual ,0 28,27 14 Dual ,1 28,14 15 Dual ,0 28,30 16 Dual ,1 28,14 17 Dual ,1 28,34 18 Dual ,9 28,60 19 Dual ,5 28,26 20 Dual ,7 28,33 21 Dual ,4 28,32 22 Dual ,6 28,19 23 Dual ,4 28,20 24 Dual ,2 28,33 25 Dual ,0 28,14 26 Dual ,4 27,94 27 Dual ,1 28,51 28 Dual ,5 28,54 29 Dual ,9 28,53 30 Dual ,8 28,40 31 Dual ,2 28,46 32 Dual ,2 28,20 33 Dual ,6 28,61 34 Dual ,1 28,24 35 Dual ,5 28,30 36 Dual ,2 28,16 37 Dual ,8 28,65 38 Dual ,8 28,50

13 Id Campaign Total weight (g) Cu Grade (%) 39 Dual ,2 28,30 40 Dual ,5 28,45 41 Dual ,6 28,42 42 Dual ,3 28,51 43 Dual ,1 28,59 44 Dual ,3 28,49 45 Dual ,5 28,29 46 Dual ,9 28,52 47 Dual ,5 28,33 48 Dual ,0 28,52 49 Dual ,8 28,53 50 Dual ,2 28,33 51 Dual ,8 28,43 52 Dual ,6 28,55 53 Dual ,7 28,59 54 Dual ,6 28,53 55 Dual ,1 28,50 56 Dual ,7 28,44 57 Dual ,7 28,52 58 Dual ,1 28,59 59 Dual ,1 28,51 60 Dual ,1 28,46 Average 1513,9 28,4

14 DUAL2 MASS RECORD Id Campign Total weight (g) Cu Grade (%) 1 Dual ,8 28,40 2 Dual ,7 28,35 3 Dual ,2 28,01 4 Dual ,4 28,20 5 Dual ,8 28,35 6 Dual ,6 28,20 7 Dual ,2 28,07 8 Dual ,4 28,54 9 Dual ,4 28,13 10 Dual ,4 28,20 11 Dual ,2 28,30 12 Dual ,1 28,10 13 Dual ,1 28,14 14 Dual ,6 27,91 15 Dual ,0 28,12 16 Dual ,8 28,08 17 Dual ,9 28,54 18 Dual ,5 28,14 19 Dual ,0 28,41 20 Dual ,0 28,68 21 Dual ,2 28,21 22 Dual ,8 28,53 23 Dual ,1 28,32 24 Dual ,4 27,93 25 Dual ,9 28,35 26 Dual ,1 28,02 27 Dual ,1 28,70 28 Dual ,1 28,24 29 Dual ,8 28,32 30 Dual ,3 28,18 31 Dual ,3 28,28 32 Dual ,9 28,07 33 Dual ,5 28,48 34 Dual ,6 28,53 35 Dual ,4 28,60 36 Dual ,3 28,32 37 Dual ,2 28,09 38 Dual ,8 28,42 39 Dual ,0 28,98 40 Dual ,7 28,23 41 Dual ,6 28,18 42 Dual ,9 28,02

15 Id Campign Total weight (g) Cu Grade (%) 43 Dual ,5 27,88 44 Dual ,0 28,22 45 Dual ,5 28,14 46 Dual ,8 28,00 47 Dual ,2 28,03 48 Dual ,7 27,94 49 Dual ,4 28,08 50 Dual ,4 28,13 51 Dual ,7 28,19 52 Dual ,1 27,98 53 Dual ,2 28,05 54 Dual ,4 27,94 55 Dual ,7 27,84 56 Dual ,1 27,68 57 Dual ,73 58 Dual ,3 27,21 59 Dual ,6 27,85 60 Dual ,2 27,91 Average 1514,3 28,2 REFERENCES G. Matheron, The regionalized variables, theory and its applications, Center of Mathematical Morphology. Ecole Nationale Superieure des Mines de Paris. Textbook#5, pages 66, 72 y 73. Francis Pitard Pierre Gy`s Sampling theory and Sampling Practice, CRC press 1993, Second Edition.

16 APPENDIX Photo # 5, Hopper of conveyor # 14 (left side) and hopper of conveyor # 15 (right side)

17 Photo # 6, Loading process to stacker #15

18 Photo # 7, Primary Cutter, bottom dump design

Evolution of the estimation of the metallurgical balance

Evolution of the estimation of the metallurgical balance Paper 9:text 10/7/09 1:30 PM Page 53 WILKE, A.V., CARRASCO, P.C. and CORTES, M.G. Evolution of the estimation of the metallurgical balance. Fourth World Conference on Sampling & Blending, The Southern

More information

Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery

Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery Paper 02:text 10/7/09 1:33 PM Page 73 TELLO, A. Variography applied as a tool to monitor metallurgy. EMPV software application to gold and silver recovery. Fourth World Conference on Sampling & Blending,

More information

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood

Evaluation of Grade Engineering using Enterprise Optimization. Michael Scott, Nick Redwood Evaluation of Grade Engineering using Enterprise Optimization Michael Scott, Nick Redwood Who we are Not for Profit Research Organization Site implementation of stepchange innovation Grade Engineering

More information

Waste Liberation: Improving mill feed from a miner s perspective. Bob McCarthy, SRK Consulting Dr. Bern Klein, University of British Columbia

Waste Liberation: Improving mill feed from a miner s perspective. Bob McCarthy, SRK Consulting Dr. Bern Klein, University of British Columbia Waste Liberation: Improving mill feed from a miner s perspective Bob McCarthy, SRK Consulting Dr. Bern Klein, University of British Columbia Outline Introduction Ore Deposit Heterogeneity Impacts of Mining

More information

Draw management system

Draw management system 5th International Conference and Exhibition on Mass Mining, Luleå Sweden 9-11 June 2008 Draw management system A. Susaeta IAL LTDA, Chile G. Valenzuela Codelco Andina, Chile G. País Universidad de Chile,

More information

Mine to metal: a practical balance for a large platinum producer

Mine to metal: a practical balance for a large platinum producer Mine to metal: a practical balance for a large platinum producer by H.E. Bartlett* and M.J. Liebenberg Synopsis This paper deals with the sampling and mass measurement for ore delivered from a shaft to

More information

Minera San Cristobal S.A. utilizes Thermo Fisher SampleManager LIMS Software for laboratory integration and automation

Minera San Cristobal S.A. utilizes Thermo Fisher SampleManager LIMS Software for laboratory integration and automation Laboratory Data Management Solutions CASE STUDY Thermo Fisher SampleManager LIMS Software Minera San Cristobal S.A. utilizes Thermo Fisher SampleManager LIMS Software for laboratory integration and automation

More information

Practise of large scale hematite ore beneficiation

Practise of large scale hematite ore beneficiation Practise of large scale hematite ore beneficiation Shandong Province Metallurgical Engineering Co., Ltd. E-mail: realzhf@163.com Abstract Shandong Province Metallurgical Engineering Co., Ltd. (hereinafter

More information

QUALITY ASSURANCE IN THE PROCESS FROM ROCKS TO CATHODES.

QUALITY ASSURANCE IN THE PROCESS FROM ROCKS TO CATHODES. QUALITY ASSURANCE IN THE PROCESS FROM ROCKS TO CATHODES. Gerencia Funcional Ingeniería y Procesos Vicepresidencia de Proyectos Magali Campos B. INTRODUCTION ALONG THE VALUE CHAIN OF THE MINING BUSINESS,

More information

Sampling of Mineral Commodities Where Everything Begins

Sampling of Mineral Commodities Where Everything Begins Sampling of Mineral Commodities Where Everything Begins Minerals Down Under Ralph Holmes CSIRO Minerals Down Under Flagship Chair ISO/TC 102/SC 1 Sampling Iron Ore Chair ISO/TC 27/SC 4 Sampling Coal and

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES www.elb.co.za Bulk Materials Handling ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to

More information

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE

Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Sustainable Mining through Continuous Operational Cost Control and Decrease of It Over the Mine Life Saso Kitanoski Director Sales and Service CEE Making the big difference to our customers Mining Industry

More information

Variographic Assessment of Total Process Measurement System Performance for a Complete Ore-to-Shipping Value Chain

Variographic Assessment of Total Process Measurement System Performance for a Complete Ore-to-Shipping Value Chain minerals Article Variographic Assessment of Total Process Measurement System Performance for a Complete Ore-to-Shipping Value Chain Karin Engström 1,2, *, ID and Kim H. Esbensen 2,3,4,5 1 Luossavaara-Kiirunavaara

More information

The Value of Good Sampling

The Value of Good Sampling The Value of Good Sampling 1 Introduction Topics To Cover 2 Review of Sampler Design How is sampling inaccurate bias / random Detrimental effect to operations Effect on Mass Balancing (example) Combined

More information

The allocation of gold production from multiple shafts feeding a common treatment plant using run-of-mine sampling of ore deliveries

The allocation of gold production from multiple shafts feeding a common treatment plant using run-of-mine sampling of ore deliveries The allocation of gold production from multiple shafts feeding a common treatment plant using run-of-mine sampling of ore deliveries by H.E. Bartlett*, L. Korff, and R.C.A. Minnitt Synopsis Previously,

More information

Online analyser for heavy minerals grade control

Online analyser for heavy minerals grade control GAGNÉ, A., HORTH, D., RIVERIN, F., and BOURQUE, Y. Online analyser for heavy minerals grade control. The 7th International Heavy Minerals Conference What next, The Southern African Institute of Mining

More information

MICHIGAN TEST METHOD FOR STANDARD PRACTICE OF SAMPLING HMA PAVING MIXTURES

MICHIGAN TEST METHOD FOR STANDARD PRACTICE OF SAMPLING HMA PAVING MIXTURES MICHIGAN TEST METHOD FOR STANDARD PRACTICE OF SAMPLING HMA PAVING MIXTURES 1. Scope 8 This practice covers sampling of HMA paving mixtures at points of manufacture, storage, or delivery. 1.2 The values

More information

6 SAT CODELCO. Sustain.Ability. Rodrigo Toro, José Manuel Ortiz, Iván Yutronic. An Industrial Simulation System for Copper Concentration Plants

6 SAT CODELCO. Sustain.Ability. Rodrigo Toro, José Manuel Ortiz, Iván Yutronic. An Industrial Simulation System for Copper Concentration Plants Sustain.Ability. 6 SAT CODELCO Rodrigo Toro, José Manuel Ortiz, Iván Yutronic An Industrial Simulation System for Copper Concentration Plants 1 Agenda The Challenge Our Solution A Case Study Current State

More information

Development of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic

Development of an Innovative Copper Flowsheet at Phu Kham. M F Young and I Crnkovic Development of an Innovative Copper Flowsheet at Phu Kham M F Young and I Crnkovic Phu Kham Location in Laos Phu Kham Plant Layout Plant Layout showing Primary Grinding Rougher Flotation IsaMill Regrinding

More information

RAW MATERIALS

RAW MATERIALS RAW MATERIALS General The major Raw Materials required for production of Pellets by the Grate chain technology are graded Iron Ore fines and Bentonite. Coke/H.S.D./L.D.O. is being used as a Fuel. IRON

More information

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007

The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007 The Los Bronces Development Project Brian Beamish CEO Anglo Base Metals 28th November 2007 This presentation is being made only to and is directed only at (a) persons who have professional experience in

More information

FLSmidth ABON. Low Speed Sizers, Chain Feeders, & Rollerscreens

FLSmidth ABON. Low Speed Sizers, Chain Feeders, & Rollerscreens FLSmidth ABON Low Speed Sizers, Chain Feeders, & Rollerscreens 2 FLSmidth ABON FLSmidth ABON manufactures Sizers, Feeders, and Rollerscreens that are built for reliability and performance. 3 FLSmidth ABON

More information

Investments & Projects

Investments & Projects We invest more than any other company in Chile. In 2016 we allocated US$ 2.738 billion to our Capex portfolio. For the 2016-2020 period, we have developed a US$18 billion investment plan. Our structural

More information

Determining in-depth plant performance

Determining in-depth plant performance 0 Determining in-depth plant performance The primary tool for optimising your plant process Philip Stewart Plant Analysis Don t try to solve a problem until you know what the problem really is. Find out

More information

David Fisk - Honeywell Grenn Holden - Honeywell

David Fisk - Honeywell Grenn Holden - Honeywell A Few Ideas for Operational Excellence 2013 Honeywell Users Group Americas David Fisk - Honeywell Grenn Holden - Honeywell 1 2 Mining Operations - Goal Mining Operations Reality? GOAL ACTUAL? 3 Safety

More information

The Best Solutions In Material Handling

The Best Solutions In Material Handling D E L I V E R Y P R O G R A M The Best Solutions In Material Handling J-Tec Material Handling creates solutions for storing, handling, dosing and processing dry and liquid ingredients. Solutions can extend

More information

INTRODUCTION TO SAMPLING FOR MINERAL PROCESSING. Part 2 in a series Sampling Basics

INTRODUCTION TO SAMPLING FOR MINERAL PROCESSING. Part 2 in a series Sampling Basics INTRODUCTION TO SAMPLING FOR MINERAL PROCESSING Part 2 in a series Sampling Basics SERIES CONTENTS 1 - Introduction to course and sampling Course objectives Course introduction Objectives for sampling

More information

Variance relationships between the masses, grades and particle sizes for gold ores from the Witwatersrand

Variance relationships between the masses, grades and particle sizes for gold ores from the Witwatersrand Variance relationships between the masses, grades and particle sizes for gold ores from the Witwatersrand by H.E. Bartlett* and R. Viljoen Synopsis A model relating the variance of gold assays in different

More information

Section Belt-Conveyor Scale Systems

Section Belt-Conveyor Scale Systems Handbook 44-2007 2.21. Belt-Conveyor Scale Systems Section 2.21. Belt-Conveyor Scale Systems A. Application A.1. This code applies to belt-conveyor scale systems used for the weighing of bulk materials.

More information

Crushing Screening and conveying In- House Workshop

Crushing Screening and conveying In- House Workshop Crushing Screening and conveying In- House Workshop Intermediate to Senior level for Active Plant Operators and Maintenance Staff Mr Basdew Rooplal Metallurgical and Business Consultant Mr Basdew Rooplal

More information

OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS BENEFITS

OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS BENEFITS OUTOTEC TOMRA SENSOR-BASED ORE SORTING SOLUTIONS Outotec TOMRA sensor-based ore sorting solutions remove waste from the ore feed in your crushing and grinding circuit, increasing productivity and significantly

More information

Up-grades and Optimization of Crushing and Grinding Plants HPGRs for hard rock applications

Up-grades and Optimization of Crushing and Grinding Plants HPGRs for hard rock applications Up-grades and Optimization of Crushing and Grinding Plants HPGRs for hard rock applications AMM 2017 - The 8th Mining and Metallurgy Congress Astana, 25.05.2017 Roman Karl thyssenkrupp Industrial Solutions

More information

Testing for heterogeneity in complex mining environments

Testing for heterogeneity in complex mining environments http://dx.doi.org/10.17159/2411-9717/2016/v116n2a9 Testing for heterogeneity in complex mining environments by J.O. Claassen* Homogeneous populations are required to perform descriptive, probabilistic,

More information

From copper ore to pure copper with the power of TAKRAF and ABB equipment

From copper ore to pure copper with the power of TAKRAF and ABB equipment From copper ore to pure copper with the power of TAKRAF and ABB equipment Dr. Mario Dilefeld Head of Belt Conveyor Systems Stockholm, 2017-05-03 Copper 2 3 Agenda 1. Introduction Copper used in construction

More information

Operational Excellence on the plant floor and in the control room: A disciplined approach to understanding the opportunities to maximise the

Operational Excellence on the plant floor and in the control room: A disciplined approach to understanding the opportunities to maximise the Operational Excellence on the plant floor and in the control room: A disciplined approach to understanding the opportunities to maximise the performance of your assets through the use of instrumentation

More information

TECHNICAL SPECIFICATIONS

TECHNICAL SPECIFICATIONS TECHNICAL SPECIFICATIONS ITEM 00520 WEIGHING AND MEASURING EQUIPMENT 520.1 Description. This item shall govern for the weighing and measuring equipment utilized where materials are specified to be measured

More information

Correction of Bond Ball Mill Work Index Test for Closing Mesh Sizes

Correction of Bond Ball Mill Work Index Test for Closing Mesh Sizes Correction of Bond Ball Mill Test for Closing Mesh Sizes Yardin Josefin 1 *, A.G. Doll 2 1. Student /University of British Columbia/ NBK Institute of Mining Engineering, Canada 2. Consultant/ SAGMILLING.com/

More information

Figure 1: Schematic block-diagram of the project test work

Figure 1: Schematic block-diagram of the project test work METHODOLOGY A brief schematic diagram for the project test work is presented in Figure 1 and comprises the following main steps: sample collection, sample preparation, chemical characterization, grinding

More information

T 257. WORKING GROUP CHAIRMAN John Walkinshaw SUBJECT

T 257. WORKING GROUP CHAIRMAN John Walkinshaw SUBJECT NOTICE: This is a DRAFT of a TAPPI Standard in ballot. Although available for public viewing, it is still under TAPPI s copyright and may not be reproduced or distributed without permission of TAPPI. This

More information

THE IMPROVEMENT OF THE EFFICIENCY OF AN ALUMINOSILICATE CRUSHING CIRCUIT

THE IMPROVEMENT OF THE EFFICIENCY OF AN ALUMINOSILICATE CRUSHING CIRCUIT Journal of Mining and Metallurgy, 49 A (1) (2013) 31-36 J o u r n a l o f M i n i n g a n d M e t a l l u r g y THE IMPROVEMENT OF THE EFFICIENCY OF AN ALUMINOSILICATE CRUSHING CIRCUIT Abraham Adewale

More information

HRC : Taking HPGR efficiency to the next level by reducing edge effect

HRC : Taking HPGR efficiency to the next level by reducing edge effect HRC : Taking HPGR efficiency to the next level by reducing edge effect High Pressure Grinding Roll (HPGR) technology has been accepted as an energy efficient alternative to conventional comminution circuits

More information

MILLING CONTROL & OPTIMISATION

MILLING CONTROL & OPTIMISATION MILLING CONTROL & OPTIMISATION MillSTAR OVERVIEW Due to the complex nature of milling circuits, it is often found that conventional control does not address many of the common problems experienced. These

More information

ENGINEERING SERVICES

ENGINEERING SERVICES ENGINEERING SERVICES www.elb.co.za Processing Solutions ABOUT ELB ENGINEERING SERVICES ELB Engineering Services (ELB) is an internationally recognised technology driven holistic solutions provider to the

More information

OPTIMIZING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER 15 YEARS.

OPTIMIZING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER 15 YEARS. MORE THAN 00 YEARS OF EXPERIENCE MORE THAN 200 MINING PROJECTS WORLDWIDE ACTIVE USERS OPTIMIZING THE WORLD'S MOST COMPLEX MINING ASSETS FOR OVER YEARS. Suite, Level - Shore Street West Cleveland, Queensland

More information

Figures. LJS\J:\scopes\06W003\10000\FVD Reports\Air Permit\r-Air use permit app.doc

Figures. LJS\J:\scopes\06W003\10000\FVD Reports\Air Permit\r-Air use permit app.doc Figures LJS\J:\scopes\\10000\FVD Reports\Air Permit\r-Air use permit app.doc Ishpe min g Nega une e Mar que tte Lanse Twp Baraga Powell Twp State of Michigan [ Michigamme Twp Champion Twp Ishpeming Twp

More information

Passionate about fibres. Stabilizing asphalt: TECHNOCEL TOPCEL. Cellulose fibres. Pellets

Passionate about fibres. Stabilizing asphalt: TECHNOCEL TOPCEL. Cellulose fibres. Pellets Passionate about fibres Stabilizing asphalt: TECHNOCEL Cellulose fibres TOPCEL Pellets TECHNOCEL TOPCEL SMA - A Long Life Pavement leads the way Stone Mastic Asphalt (SMA) was developed in Germany 30 years

More information

Design of primary samplers for slurries in concentrators and statistical methods for measuring components of variance in sampling

Design of primary samplers for slurries in concentrators and statistical methods for measuring components of variance in sampling Design of primary samplers for slurries in concentrators and statistical methods for measuring components of variance in sampling by H.E. Bartlett* Synopsis In the operation of some flotation plants treating

More information

BLAKE JAW CRUSHER TECHNICAL SPECIFICATIONS

BLAKE JAW CRUSHER TECHNICAL SPECIFICATIONS BLAKE JAW CRUSHER It is used for reducing run-of-mine ore or coal to a size small enough to be taken by the next crusher in the series during the first stage of crushing. 1. Toggle Type: Single or double

More information

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit

NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit NM-EQ Equipment Description and Notification Form Nonmetallic Mineral Processing General Permit Air Quality Permit Program Instructions on Page 3 1a) AQ Facility ID (permit) No.: 1b) AQD File No.: 2) Facility

More information

For personal use only

For personal use only BALAMA PROJECT UPDATE AS AT MID MARCH 2017 BALAMA GRAPHITE PROJECT (100%) OPERATIONS UPDATE Commissioning remains on schedule for Q2 2017 Capital budget remains unchanged at US$193 million (plus US$7 million

More information

DEVELOPMENT AND APPLICATION OF AN ENERGY BENCHMARKING MODEL FOR MINERAL COMMINUTION. *S. Nadolski, B. Klein, D. Gong, Z. Davaanyam 1 and A.

DEVELOPMENT AND APPLICATION OF AN ENERGY BENCHMARKING MODEL FOR MINERAL COMMINUTION. *S. Nadolski, B. Klein, D. Gong, Z. Davaanyam 1 and A. DEVELOPMENT AND APPLICATION OF AN ENERGY BENCHMARKING MODEL FOR MINERAL COMMINUTION *S. Nadolski, B. Klein, D. Gong, Z. Davaanyam 1 and A. Cooper 2 1 Norman B. Keevil Institute of Mining, University of

More information

MODEL PREDICTIVE CONTROL APPLICATION AT LUMWANA COPPER CONCENTRATOR

MODEL PREDICTIVE CONTROL APPLICATION AT LUMWANA COPPER CONCENTRATOR MODEL PREDICTIVE CONTROL APPLICATION AT LUMWANA COPPER CONCENTRATOR Mick Rogers Process Manager, Lumwana Mining Company, Zambia David G Almond Global Product Manager Minerals Process Control, FLSmidth

More information

Improvements in bi-metal production at the Brunswick plant, Costerfield.

Improvements in bi-metal production at the Brunswick plant, Costerfield. 1 Improvements in bi-metal production at the Brunswick plant, Costerfield. D Buchanan 1, V Cullinan 2 1. MAusIMM, Processing Plant Manager, Mandalay Resources Costerfield Operations, 1024 Heathcote Nagambie

More information

SAG Page 2. Page 1

SAG Page 2. Page 1 Page 1 SAG 2 0 0 6 DEPARTMENT OF MINING ENGINEERING UNIVERSITY OF BRITISH COLUMBIA Vancouver, B. C., Canada CURRENT TRENDS IN SAG AND AG MILL OPERABILITY AND CONTROL By John Karageorgos 1, Paul Genovese

More information

FLSmidth Dorr-Oliver Eimco Flotation Technology. Superior Metallurgy Higher Availability

FLSmidth Dorr-Oliver Eimco Flotation Technology. Superior Metallurgy Higher Availability FLSmidth Dorr-Oliver Eimco Flotation Technology Superior Metallurgy Higher Availability FLSmidth Dorr-Oliver Eimco Flotation Enhance your profits using the combined centuries of technical expertise available

More information

_Survey_Sample_Grinding_Circuits-GMG-ICE-v01-r02 Methods to survey and sample grinding circuits for determining energy efficiency SUBMITTED BY

_Survey_Sample_Grinding_Circuits-GMG-ICE-v01-r02 Methods to survey and sample grinding circuits for determining energy efficiency SUBMITTED BY 20150806_Survey_Sample_Grinding_Circuits-GMG-ICE-v01-r02 Methods to survey and sample grinding circuits for determining energy efficiency SUBMITTED BY The Sampling and Surveying Sub-Committee of the Industrial

More information

Lecture 27. Potash Fertilizers

Lecture 27. Potash Fertilizers Lecture 27 Potash Fertilizers Introduction: The term potash generally refers to potassium chloride, but it is also loosely applied to other potassium compounds that may be differentiated by the words muriate

More information

Variographic Assessment of Total Process Measurement System Performance for a Complete Ore-to-Shipping Value Chain

Variographic Assessment of Total Process Measurement System Performance for a Complete Ore-to-Shipping Value Chain minerals Article Variographic Assessment Total Process Measurement System Permance a Complete Ore-to-Shipping Value Chain Karin Engström 1,2, *, ID Kim H. Esbensen 2,3,4,5 1 Luossavaara-Kiirunavaara AB

More information

Innovation in Control System and Information, Cooper Mining. Experiences at Minera Los Pelambres, Chile

Innovation in Control System and Information, Cooper Mining. Experiences at Minera Los Pelambres, Chile Innovation in Control System and Information, Cooper Mining Experiences at Minera Los Pelambres, Chile Presented by Carlos Collado, Minera Los Pelambres Luis Yacher, CONTAC Ingenieros Introduction,.from

More information

COLLABORATIVE INNOVATION CHALLENGES

COLLABORATIVE INNOVATION CHALLENGES COLLABORATIVE INNOVATION CHALLENGES Characterization of Innovation Challenges for Antofagasta Minerals Edition nº1 Version: March 2018 Invitation to innovate Make innovation a permanent practice foto "We

More information

Outotec OreMet Optimizer

Outotec OreMet Optimizer Outotec OreMet Optimizer 18.5.2017, Luleå, Sweden Outotec Minerals Processing, Antti Remes Vesa-Pekka Takalo Matti Talikka OreMet Optimizer for mining value chain analysis ore to metal Geometallurgical

More information

Bauxite beneficiation modifying factors

Bauxite beneficiation modifying factors Bauxite beneficiation modifying factors Caio van Deursen 1, Roberto Seno Jr. 2, Rodrigo Moreno 3 and Thiago Franco 4 1. Process Engineer 2. Bauxite and Alumina Technology Development Manager 3. Process

More information

SAGwise total process control The key to efficient SAG mill operation

SAGwise total process control The key to efficient SAG mill operation SAGwise total process control The key to efficient SAG mill operation WE DISCOVER POTENTIAL Maximising your SAG mill s performance Low-grade, complex mineral deposits call for intelligent and efficient

More information

STACK SIZER TM. Patented Technology. The highest capacity, most efficient, fine wet screening machine in the world

STACK SIZER TM. Patented Technology. The highest capacity, most efficient, fine wet screening machine in the world STACK SIZER TM Patented Technology The highest capacity, most efficient, fine wet screening machine in the world Patented Derrick Stack Sizer The Derrick Stack Sizer has redefined the concept of efficient,

More information

ME-Trackweigh In-motion Train Weighing Systems

ME-Trackweigh In-motion Train Weighing Systems ME-Trackweigh In-motion Train Weighing Systems & Proposals for Amendments to NIST Handbook 44 About Us Established in 1987 as a consulting company Industrial weighing systems division established 1998

More information

Modelling buyer behaviour - 2 Rate-frequency models

Modelling buyer behaviour - 2 Rate-frequency models Publishing Date: May 1993. 1993. All rights reserved. Copyright rests with the author. No part of this article may be reproduced without written permission from the author. Modelling buyer behaviour -

More information

Estimation of Sampling Uncertainty in Process Analysis beyond the EURACHEM Guide

Estimation of Sampling Uncertainty in Process Analysis beyond the EURACHEM Guide S I R P E K A ANALYSDAGARNA, Uppsala, 11-13 June, 01 Estimation of Sampling Uncertainty in Process Analysis beyond the EURACHEM Guide Pentti Minkkinen Lappeenranta University of Technology and SIRPEKA

More information

SPECIFICATIONS FOR BONDED WEARING COURSE

SPECIFICATIONS FOR BONDED WEARING COURSE SPECIFICATIONS FOR BONDED WEARING COURSE 1.0 DEFINITIONS The term Director [Superintendent, etc.] shall mean the Director of Public Works of the awarding authority. The term Designee shall mean an employee

More information

Optimization of Comminution Circuit Throughput and Product Size Distribution by Simulation and Control

Optimization of Comminution Circuit Throughput and Product Size Distribution by Simulation and Control Optimization of Comminution Circuit Throughput and Product Size Distribution by Simulation and Control Quarterly Technical Process Report Report Period Start Date: October 01, 2002 Report Period End Date:

More information

Blast Hole Sampling validation at Mantoverde. Antoni Magri, Eduardo Magri and Cristian Neira

Blast Hole Sampling validation at Mantoverde. Antoni Magri, Eduardo Magri and Cristian Neira Blast Hole Sampling validation at Mantoverde Antoni Magri, Eduardo Magri and Cristian Neira Mantoverde Mantoverde is an iron ore, copper and gold deposit. It produces 62,000 tons of fine copper a year

More information

Resource Efficient Mining Processes of Tomorrow

Resource Efficient Mining Processes of Tomorrow Metso Process Technology & Innovation (PTI) Resource Efficient Mining Processes of Tomorrow R&D Project Authors: K Duffy W Valery A Jankovic P Holtham www.metso.com General PTI presentation 2014 2015 A

More information

ANALYSIS OF A BANANA SCREEN USING EDEM AND ANSYS. José Cleber Rodrigues da Silva, VALE Daniel Schiochet Nasato, ESSS

ANALYSIS OF A BANANA SCREEN USING EDEM AND ANSYS. José Cleber Rodrigues da Silva, VALE Daniel Schiochet Nasato, ESSS ANALYSIS OF A BANANA SCREEN USING EDEM AND ANSYS José Cleber Rodrigues da Silva, VALE Daniel Schiochet Nasato, ESSS SUMMARY Overview Vale Introduction Objectives Material flow and forces analysis Conclusion

More information

JME Journal of Mining & Environment, Vol.2, No.1, 2011,

JME Journal of Mining & Environment, Vol.2, No.1, 2011, JME Journal of Mining & Environment, Vol.2, No.1, 2011, 27-40. Application of SPI for Modeling energy consumption in Sarcheshmeh SAG and ball mills M. Jahani 1, M. Noaparast 2*, A. Farzanegan 3, G. Langarizadeh

More information

PROTECTING THE FUTURE TODAY MINING & INDUSTRIAL

PROTECTING THE FUTURE TODAY MINING & INDUSTRIAL Oak Ridge PROTECTING THE FUTURE TODAY MINING & INDUSTRIAL Coating of rail hopper dump cars for Wheeling Lake Erie Railroad with Blue OR7K. Thickness is 1.0 mm (.040") on side walls and 3.0 to 4.0 mm (.125"

More information

Minto Mine. Mill Operations Plan

Minto Mine. Mill Operations Plan Minto Mine Mill Operations Plan 2018-01 Prepared by: Minto Explorations Ltd. Minto Mine January 2018 Minto Explorations Ltd. Minto Mine 2018 Mill Operations Plan Table of Contents 1 Introduction...1 1.1

More information

Metallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden

Metallurgium TM. Lessons Learned from the Copper Industry Applied to Gold Extraction. John O. Marsden Metallurgium TM Lessons Learned from the Copper Industry Applied to Gold Extraction John O. Marsden Keynote Presentation at World Gold 2009 Conference, Johannesburg, South Africa, October 30 th, 2009 Overview

More information

Grit (Rubble less than 10mm) is the byproduct of stone industries which can be economically converted as artificial sand.

Grit (Rubble less than 10mm) is the byproduct of stone industries which can be economically converted as artificial sand. Sand Making Machine The said machines are used to manufacture artificial sand. The artificial sand is the alternative for river sand and the river sand should be protected for nature balance. Grit (Rubble

More information

[ ] Your goods are better off.

[ ] Your goods are better off. Bulk material technology made-to-measure engineering QUALITY from austria / EU Your [ ] wood pellets, pellets / wooden materials, biomass grain, animal feed and foodstuffs / metal, mineral, building materials

More information

SAG Mill Control at Northparkes Mines (Not So Hard After All)

SAG Mill Control at Northparkes Mines (Not So Hard After All) Mines (Not So Hard After All) A. J. Thornton, Principal Process Control Engineer 1 Tom Pethybridge, Production Superintendent OPD 2 Tom Rivett, Process Control Engineer 2 Richard Dunn, Metallurgical Superintendent

More information

THE IMPACT OF CRUSHED ORE AGEING ON METALLURGICAL PERFORMANCE *D. LASCELLES 1, O. PETERS 1, R. CALDWELL 1 - SGS

THE IMPACT OF CRUSHED ORE AGEING ON METALLURGICAL PERFORMANCE *D. LASCELLES 1, O. PETERS 1, R. CALDWELL 1 - SGS SGS MINERALS SERVICES TECHNICAL PAPER 2009-07 2009 THE IMPACT OF CRUSHED ORE AGEING ON METALLURGICAL PERFORMANCE *D. LASCELLES 1, O. PETERS 1, R. CALDWELL 1 - SGS ABSTRACT Ageing tests on a crushed Cu-porphyry

More information

TECHNICAL FACT SHEET September 24, 2018

TECHNICAL FACT SHEET September 24, 2018 Copperwood Resources, Inc. Page 1 Purpose and Summary TECHNICAL FACT SHEET September 24, 2018 The Michigan Department of Environmental Quality (MDEQ), Air Quality Division (AQD), is proposing to act on

More information

Mycotoxin Sampling in Food Commodities

Mycotoxin Sampling in Food Commodities Mycotoxin Sampling in Food Commodities Andrew Slate USDA-ARS (Retired) North Carolina State University FAO 1 Challenge? Seller Buyer Mycotoxin Concentration? 2 Mycotoxin Distribution Among Kernels (Rare

More information

Australian Standard. Guide to the sampling of particulate materials. Part 1: Sampling procedures AS

Australian Standard. Guide to the sampling of particulate materials. Part 1: Sampling procedures AS AS 4433.1 1997 Australian Standard Guide to the sampling of particulate materials Part 1: Sampling procedures This Australian Standard was prepared by Committee MN/10, Sampling of Minerals. It was approved

More information

KOCH Transporttechnik. Bernie H. Loyer, VP Minerals Technology, FFE Minerals

KOCH Transporttechnik. Bernie H. Loyer, VP Minerals Technology, FFE Minerals KOCH Transporttechnik Bernie H. Loyer, VP Minerals Technology, FFE Minerals FLSmidth & Co. Capital Markets Day, 26 January 2007 AGENDA How Materials Handling Fits the FFE Minerals Business Model Acquisition

More information

MINERAL PROCESsINCI PLANT DESIGN AND COST EsTIMATES

MINERAL PROCESsINCI PLANT DESIGN AND COST EsTIMATES MINERAL PROCESsINCI PLANT DESIGN AND COST EsTIMATES L.PRASAD * v../ Design of wineral processili; plants is a function of - (a) process flowsbeet - which has been firmed up after considerable laboratory

More information

FW: CuMo Mine Objection thompsoncreekmolybdenumminearialview.pdf; Thompson_Creek_mine.jpg; Mo_processing_flow.gif

FW: CuMo Mine Objection thompsoncreekmolybdenumminearialview.pdf; Thompson_Creek_mine.jpg; Mo_processing_flow.gif Hayman, Randy -FS Subject: Attachments: FW: CuMo Mine Objection thompsoncreekmolybdenumminearialview.pdf; Thompson_Creek_mine.jpg; Mo_processing_flow.gif From: Mary Heyn [mailto:maryheyn1823@gmail.com]

More information

MINING PROJECT EXECUTIVE SUMMARY "SEA AND SKY"

MINING PROJECT EXECUTIVE SUMMARY SEA AND SKY MINING PROJECT EXECUTIVE SUMMARY "SEA AND SKY" Dr.Cs. Antonio Vilches Vera Mining Engineer National Service of Geology and Mining of Chile 1 EXECUTIVE SUMMARY The Sea and Sky Mining project aims exploitation

More information

20 June Pat Turner, President FLSmidth Krebs. Pumps and Cyclones. Capital Market Day 2017

20 June Pat Turner, President FLSmidth Krebs. Pumps and Cyclones. Capital Market Day 2017 20 June 2017 Pat Turner, President FLSmidth Krebs Pumps and Cyclones Pumps and Cyclones in a nutshell World leader in cyclones, strong player in slurry pumps Critical equipment for productivity in minerals

More information

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course

SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1993 Specifications SPECIAL SPECIFICATION 3157 Cold Processed - Recycled Paving Material (RPM) for Use as Aggregate Base Course 1. Description. This Item, Cold Processed - Recycled Paving Material (RPM),

More information

HAVER Mining HAVER & BOECKER HAVER & BOECKER

HAVER Mining HAVER & BOECKER HAVER & BOECKER HAVER Mining HAVER GROUP 2 HAVER GROUP Our Success Headquarters Subsidiaries Employees Sales HAVER & BOECKER, Germany 50 Locations 2.900 470 Mio 3 HAVER GROUP Our Passion 4 HAVER GROUP We focus on Premium

More information

Index. STP523-EB/Jul Magnitudes (see Reliability and Reproducibility under Inplace, Maximum, Minimum, and Relative density) Types, 75, 77, 488

Index. STP523-EB/Jul Magnitudes (see Reliability and Reproducibility under Inplace, Maximum, Minimum, and Relative density) Types, 75, 77, 488 STP523-EB/Jul. 1973 Index A Allowable fines, 6, 349, 350, 355, 359 Angularity (see Roundness criteria) C Coarse aggregate correction, 221, 224-231, 431 Compressibility Plate load, 277, 395 Sensitivity,

More information

Increasing Grinding Circuit Robustness with Advanced Process Control

Increasing Grinding Circuit Robustness with Advanced Process Control Increasing Grinding Circuit Robustness with Advanced Process Control A.Rantala, P.Blanz, K.Aberkrom, O.Haavisto MetPlant 2015, 7-8 September, Perth Outline Introduction Basic control of grinding Key measurements

More information

The brief introduction of Iron ore

The brief introduction of Iron ore In the development of human society, the invention of the steel plays a very big role. Even now, the production of steel is still a very important figure to measure one country's industrial development

More information

A CLOSER LOOK AT INCREASING HPGR EFFICIENCY VIA REDUCTIONS IN EDGE EFFECT

A CLOSER LOOK AT INCREASING HPGR EFFICIENCY VIA REDUCTIONS IN EDGE EFFECT A CLOSER LOOK AT INCREASING HPGR EFFICIENCY VIA REDUCTIONS IN EDGE EFFECT Brian Knorr, Metso, York, PA Victoria Herman, Metso, York, PA Devon Whalen, Freeport-McMoRan Inc., Phoenix, AZ Abstract Edge effect

More information

SAG Page 1. Page 2

SAG Page 1. Page 2 Page 1 Page 2 SAG 2 0 0 6 DEPARTMENT OF MINING ENGINEERING UNIVERSITY OF BRITISH COLUMBIA Vancouver, B. C., Canada grade Cannington resource is classified at 42 million tonnes, 551ppm silver, 12.1% lead

More information

The Cardiac Arrest of Hot Mix Asphalt Pavements. Timothy R. Murphy, P.E., M. ASCE President

The Cardiac Arrest of Hot Mix Asphalt Pavements. Timothy R. Murphy, P.E., M. ASCE President The Cardiac Arrest of Hot Mix Asphalt Pavements Timothy R. Murphy, P.E., M. ASCE President Our Job is to Evaluate Risk LCCA Durability Process Control Rugged review of practices with numerous agencies

More information

Recovery of Asphalt from Solution Using the Rotary Evaporator. Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing

Recovery of Asphalt from Solution Using the Rotary Evaporator. Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing Recommend Approval: Assistant Division Chief Date Division Chief Date Approved: Director Date SCOPE: Maryland Department of Transportation State Highway Administration Office of Materials Technology MARYLAND

More information

Total technology solutions for mining and bulk materials handling

Total technology solutions for mining and bulk materials handling Total technology solutions for mining and bulk materials handling Tenova is a worldwide supplier of advanced technologies, products and engineering services for the mining and metals industries. PRODUCTS

More information

. HEAVY MINERALStONCENTRATION AND GLASS-GRADE. SILICA PRODUCTION BY FROTH FLOTATIO~

. HEAVY MINERALStONCENTRATION AND GLASS-GRADE. SILICA PRODUCTION BY FROTH FLOTATIO~ . '. I 74-VIII-P. HEAVY MINERALStONCENTRATION AND GLASS-GRADE. SILICA PRODUCTION BY FROTH FLOTATIO by Robert M. Lewis Mineral Dressing Engineer MINERALS RESEARCH LABORATORY NORTH CAROLINA STATE UNlVERSITY

More information

Morrison Copper/Gold/Moly (Silver) Project

Morrison Copper/Gold/Moly (Silver) Project Pacific Booker Minerals Inc. Morrison Copper/Gold/Moly (Silver) Project Mr. ERIK TORNQUIST, Executive VP & COO November 2008 Forward Looking Statement This presentation may include forward-looking statements

More information