VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION

Size: px
Start display at page:

Download "VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION"

Transcription

1 2012 Build Ohio Award Winner Industrial/Heavy Category AGC of Ohio AWARD WINNING PROJECT Location Lima, Ohio Civil, Mechanical, Electrical and Architectural Engineering $7.4 million Project Funding Funded 100% through the American Recovery and Reinvestment Act Professional Services 2009 Construction: 2011 Rich Hertzfeld P.E., Project Manager Greg Bieszczad, P.E. Dan Supinski Jeff Yoder P.E., Bridge Engineer Dan Knott P.E., Electrical Engineer VINE STREET GRADE SEPARATION AND STORM WATER PUMP STATION City of Lima PDG was part of the design team hired by the City of Lima to prepare construction plans for the grade elimination of Vine Street and the Norfolk-Southern and CSX Railroads within the City. The project provided a means for emergency and local traffic to underpass these tracks during frequent periods of train stops. The design was completed within an aggressive four-month schedule. PDG was responsible for all approach underpass pavement and all relocated public utilities, including drainage. PDG prepared detailed design plans for a 10,000 GPM storm water pump station and retention basin that outlets into the existing combined sewer system at limited flow rates. All civil, mechanical, electrical and architectural services were provided as required for the pump station and approach work. The project was funded by the American Recovery and Reinvestment Act (stimulus funding), with the ODOT, FHWA, and the City of Lima providing administration and traditional staged reviews. Asphalt pavement removal/replacement Sidewalks Site drainage Construction document preparation, bidding & award support Mr. Kirk Niemeyer, P.E. City of Lima Engineer ext. 5508

2 Location Napoleon, Ohio Mechanical, Electrical, and Structural Engineering $11 million Size 65,000 s.f. Phillip A. Whaley, P.E.,Project Manager John Brock, P.E., Structural Dan Knott, P.E., Electrical AMCOR PET PACKAGING BUILDING BLOW MOLD FACILITY PDG was the lead design consultant for all disciplines for a 65,000-square-foot blow molding plant for beverage bottles. PDG designed all aspects of the project in-house including site, structural, architectural, mechanical, process utilities and electrical. Some of the special systems include a 500-ton chilled and cooling water system which has a free cooling cycle for non-mechanical cooling 50% of all operating hours, custom designed facility management system, 650 PSIG compressed air system, economizer cycle with comparative enthalpy control and building pressurization, high voltage substation and distribution system. Extension of the campus high pressure steam and condensate return systems to the new building for a new 8545 Lb / Hr distribution system for close tolerance climate control including; pipe stress analysis, dual pressure reducing stations, freeze proof steam coils in building pressurization units. Patrick McCrate Amcor PET Packaging Program Manager S. Highway M - 52 Manchester, Michigan patrick.mccrate@amcor.com

3 I was pleased to be working with Poggemeyer on this project from day one, said Mr. Rogers. The staff s communication and teamwork were critical to securing funding and developing the affordable, efficient system we need. Location Mt. Gilead, Ohio Environmental and Electrical Engineering, Construction Administration $7.24 million - Engineer s Estimate $7.5 million - Construction Size MGD Average Daily Design Flow 3.20 MGD Peak Daily Design Flow Completed: 2006 Jack Jones, P.E., Principal-in-Charge Michael Atherine, P.E., Project Manager Steve Wonderly, P.E., Project Engineer Dan Knott, P.E., Electrical Engineer MOUNT GILEAD WASTEWATER TREATMENT PLANT PDG worked with the Village of Mount Gilead to explore affordable options to expand and upgrade its wastewater treatment plant. The main objective was to eliminate EPA violations while optimizing operating costs at the activated sludge facility. Various design alternatives for mixing and aeration of the waste activated sludge were evaluated. PDG compared complete aeration systems with various combinations of aeration and hydraulic mixing methods and helped the Village select an innovative system with an aerobic digester and sludge holding tank design using fine bubble aeration combined with hydraulic mixing. The project also included a 610 KW standby diesel generator system. The new system has an increased digester loading capability to effectively digest thicker solids up to five-percent, thereby minimizing aeration and decreasing the maximum total online horsepower from 270 to 210. The Village has reported a savings of $40,000 per year in operation costs, as well as an additional estimated savings of $128,000 through optimized energy consumption within the digestion process. more... Wastewater Treatment Plant Design Trickling Filter Construction Administration and Inspection Dan Rogers, Village Administrator Village of Mount Gilead 72 West High Street Mount Gilead, Ohio

4 Mount Gilead Wastwater Treatment Plant Expansion and Upgrades The system, which is being considered as a case study in USEPA s forthcoming sludge manual, included two new 62-foot aerobic digester holding tanks and an existing 45-foot diameter digester tank. The aeration and mixing system exceeded design expectations, leaving the second tank available to be used as a standby sludge holding tank with the added benefit of an installed hydraulic jet mixing system. The electrical design involved modifications to the existing 480-volt distribution system to keep the existing plant in operation while the new plant was being built around it. Existing equipment for portions of the plant were incorporated into the new facility and were reconnected to the new electrical distribution system. The design also included site lighting, building lighting, power distribution, a 750KW standby generator and grounding. The existing electrical service was relocated to a new location to serve the facility. PDG was invited to give a presentation on innovative wastewater treatment technology at the Water Environment Federation s Annual Technical Exhibition and Conference held in Chicago.

5 Location Wood County, Ohio Electrical, Environmental, Finance, Construction Administration 204,000 Professional Services: 2007 Construction: 2008 PDG Denise Plummer, P.E., Environmental Engineer Daniel Knott, Electrical Engineer N EAST BROADWAY PUMP STATION BACKUP POWER SUPPLY NORTHWESTERN WATER AND SEWER DISTRICT The Northwestern Water and Sewer District worked with PDG to replace its backup power source to one of the main water pump stations between the City of Toledo and the District. The pump station serves approximately 10,000 industrial, commercial and residential users in highly developed areas of Wood County and the Cities of Rossford and Perrysburg. PDG designed a new system that automatically transfers power to a 450 KW diesel engine generator and provides for the system to run during instances of power failure. The new system also included an Automatic Transfer Switch connection, electrical service, equipment modifications and a new SCADA (telemetry) system for remote monitoring of the station. The new 450KW diesel engine electric generator significantly improves the water distribution system s reliability to provide adequate flow during power outages at this pump station, and therefore meets the recommendations of the Ohio EPA. PDG also helped obtain Ohio Public Works Commission Capital Improvement Funds to assist with the project cost. Replacement of emergency generators Sound attenuation Construction administration Jerry Greiner Northwestern Water and Sewer District P.O. Box 348 Bowling Green, Ohio

DELTA WASTEWATER TREATMENT PLANT UPGRADES

DELTA WASTEWATER TREATMENT PLANT UPGRADES Delta, Ohio Environmental and Electrical Engineering, Grant Administration Cost $2.6 million $3.2 million OWDA Loan 1,100 SF Admin Building Addition 0.725 MGD Average Daily Flow 1.5 MGD Peak Capacity Professional

More information

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY

ONTARIO ROCK ROAD LIFT STATION EQUALIZATION FACILITY City of Ontario, Ohio Environmental Engineering Plans and Specifications, Construction Administration Cost $1.78 milliion 1.2 MG Professional Services: 2012 2013 PDG Project Manager Michael Atherine, P.E.

More information

AEP CARLTON HOUSE SERVICE UPGRADE

AEP CARLTON HOUSE SERVICE UPGRADE Location Lima, Ohio Electrical Engineering Inspection Construction Administration $333,047 Size Replaced 12,470 volt service with indoor 15 KV oil filled switches to 480 volt service Replaced 12.47-240/120

More information

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS

NELSONVILLE WATER TREATMENT PLANT IMPROVEMENTS Location City of Nelsonville, Ohio Environmental Engineering, Design and Bidding, Construction Administration and Observation, Start-up Services Cost $4.25 million Size 1,000 gallon per minute Professional

More information

HVAC SCHEMATIC DESIGN REPLACEMENT SYSTEMS

HVAC SCHEMATIC DESIGN REPLACEMENT SYSTEMS Napoleon, Ohio Structural, Mechanical, Electrical Engineering $950,000 2013 2014 PDG Project Team Gregory P. Wright, P.E., Project Manager, Mechanical Engineer Daniel L. Knott, P.E., Electrical Engineer

More information

GLENWOOD ROAD BRIDGE REPLACEMENT

GLENWOOD ROAD BRIDGE REPLACEMENT Wood County, Ohio, Construction Administration and Observation Project Cost $.92 million Professional Services 2014 Construction: 2015 GLENWOOD ROAD BRIDGE REPLACEMENT PDG was hired by the Wood County

More information

HURON RIVER BOAT RAMP & PARKING LOT

HURON RIVER BOAT RAMP & PARKING LOT 2010 National Award as Best Large Boating Access Facility States Organization for Boating Access (SOBA) 2010 Quality Asphalt Paving Awards Flexible Pavements of Ohio AWARD WINNING PROJECT Location Huron,

More information

Backup Generators Bacon Road Water Treatment Plant Case Study

Backup Generators Bacon Road Water Treatment Plant Case Study Backup Generators Bacon Road Water Treatment Plant Case Study Joe Borzyn, PE, LC - AECOM Timothy McCann, PE - AECOM 1 Agenda Bacon Road WTP Background Project Background Generator Alternatives Final Selection

More information

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet WHY IS THE CITY OF OREGON DOING THIS PROJECT? Along with other communities across the country,

More information

HENRY COUNTY WATER AND SEWER MASTER PLAN

HENRY COUNTY WATER AND SEWER MASTER PLAN Location Henry County, Ohio Services Provided Environmental Engineering Project Funding $80,000 Local Government Services Collaboration Grant Schedule Professional Services 2008 Project Team Richard Heyman,

More information

YMCA BUCYRUS BOILER REPLACEMENT DESIGN

YMCA BUCYRUS BOILER REPLACEMENT DESIGN Bucyrus, Ohio Mechanical Engineering $130,000 Professional Services 2014 Project Team Gregory P. Wright, P.E., Mechanical Engineer Steven Bond, Technician YMCA BUCYRUS BOILER REPLACEMENT DESIGN PDG was

More information

GOOD HOPE SANITARY SEWER & WWTP IMPROVEMENTS

GOOD HOPE SANITARY SEWER & WWTP IMPROVEMENTS Location Good Hope, Ohio Services Provided Environmental and Electrical Engineering $2 Million Size 47,910 sq.ft Schedule Completed: October 2012 Project Team Michael Atherine, Project Manager Denise M.

More information

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN

HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN HOW TO SAVE COSTS AND IMPROVE SUSTAINABILITY WHILE REDUCING EFFLUENT NITROGEN Introduction Donna Kaluzniak, CEP, Utility Director, City of Atlantic Beach, Florida John E. Collins, Jr., P.E., J. Collins

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

MILLBURY PARK MASTER PLAN AND VETERANS MEMORIAL

MILLBURY PARK MASTER PLAN AND VETERANS MEMORIAL Location Milbury, Ohio Planning, Site Engineering, Grantwriting and Surveying Project Cost $250,000 2010 2013 PDG Project Team David E. Saneholtz, Project Manager, P.E. MILLBURY PARK MASTER PLAN AND VETERANS

More information

2015 HDR, Inc., all rights reserved.

2015 HDR, Inc., all rights reserved. 2015 HDR, Inc., all rights reserved. Hastings Utilities Water Pollution Control Facility Improvements Brian Bakke, HDR ASCE Environmental Conference 4/6/2017 Review Existing Facilities Need for the Project

More information

Microturbine Combined Heat and Power Systems. September 14, 2017: AEE Northern Ohio Chapter. Presenter: Glenn Powers Operations Manager, GEM Energy

Microturbine Combined Heat and Power Systems. September 14, 2017: AEE Northern Ohio Chapter. Presenter: Glenn Powers Operations Manager, GEM Energy Microturbine Combined Heat and Power Systems September 14, 2017: AEE Northern Ohio Chapter Presenter: Glenn Powers Operations Manager, GEM Energy 2017 CCHP Concept Fuel Combined Cooling, Heat, and Power

More information

Aeration System Improvements with a 5-Year Payback. Scott Phipps

Aeration System Improvements with a 5-Year Payback. Scott Phipps Aeration System Improvements with a 5-Year Payback Scott Phipps Wastewater Treatment Aeration Timeline 1970 s Major infrastructure investment Quick and cheap solutions Coarse bubble diffusers & PD/MS blowers

More information

Oxnard Wastewater Treatment Plant

Oxnard Wastewater Treatment Plant December 12, 2015 & December 16, 2015 Oxnard Wastewater Treatment Plant 6001 SOUTH PERKINS ROAD OXNARD, CALIFORNIA Overview: Oxnard Wastewater Treatment Plant: The City of Oxnard (City) Wastewater Treatment

More information

Introduction. Purpose

Introduction. Purpose Introduction This Master Plan update includes updating the text of the Utilities Section of the current Master Plan and adding a report concerning telecommunications. Each element examines the existing

More information

Areawide Water Quality Management Plan 2018 Update

Areawide Water Quality Management Plan 2018 Update Areawide Water Quality Management Plan 2018 Update INTRODUCTION The Areawide Water Quality Management Plan, called the 208 Plan from that section of the Clean Water Act, is a major TMACOG policy document

More information

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations

CHAPTER 8 UTILITIES WATER SYSTEM. Summary & Recommendations CHAPTER 8 UTILITIES WATER SYSTEM Summary & Recommendations The Waldoboro Water Company is a small water utility serving the downtown area of Waldoboro. The Water Company has 299 residential, 57 industrial

More information

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities

Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Energy Efficiency / Conservation Case Studies in Waste Water Treatment Facilities Prepared for: Energy Saving Opportunities for Wastewater Treatment Facilities: Energy Efficiency and CHP Workshop May 19

More information

659 VAN METER STREET CINCINNATI, OH Phone: Fax: Website:

659 VAN METER STREET CINCINNATI, OH Phone: Fax: Website: 659 VAN METER STREET CINCINNATI, OH 45202 Phone: 513. 241. 1230 Fax: 513. 241. 1287 Website: www.hixson-inc.com Email: info@hixson-inc.com IN-HOUSE EXPERTISE At Hixson, it is not enough to offer only a

More information

Fairfax County, Noman M. Cole, Jr., Pollution Control Plant Water Reuse Project

Fairfax County, Noman M. Cole, Jr., Pollution Control Plant Water Reuse Project Fairfax County, Noman M. Cole, Jr., Pollution Control Plant Water Reuse Project County of Fairfax, Virginia Department of Public Works and Environmental Services DESIGN BUILD CONSTRUCTION OF $15.2M WATER

More information

~E~RLY AGENDA REPORT. Meeting Date: April 11,2013 Item Number:

~E~RLY AGENDA REPORT. Meeting Date: April 11,2013 Item Number: ~E~RLY Meeting Date: April 11,2013 Item Number: To: From: Subject: F li AGENDA REPORT Honorable Mayor & City Council Anne Garvey-Zaworski, Principal Civil Engineer Kevin Watson, Water Operations Manager

More information

INDUSTRIAL SOLAR MANUFACTURING WWTP DESIGN AND EXPANSION

INDUSTRIAL SOLAR MANUFACTURING WWTP DESIGN AND EXPANSION Location Northwest Ohio Services Provided Engineering, Permitting, Installation of Equipment and Facilities Cost $3 million Size 300 GPM (432,000 GPD) Metal Hydroxide Precipitation WWTP 50 GPM (72,000

More information

Integrating Standby Power and Steam Turbine Chillers for Better Resiliency at UNC Chapel Hill

Integrating Standby Power and Steam Turbine Chillers for Better Resiliency at UNC Chapel Hill Integrating Standby Power and Steam Turbine Chillers for Better Resiliency at UNC Chapel Hill IDEA 28 th Annual Campus Energy Conference Denver, Colorado Philip Barner, P.E. Director of Energy Services

More information

CHILLED WATER DISTRIBUTION SYSTEM

CHILLED WATER DISTRIBUTION SYSTEM Campus-Wide System: A campus-wide central chilled water system has been developed in recent years and is being expanded to serve additional cooling loads as need arises and opportunity affords. This system

More information

Engaging Our Team Investing in Our Infrastructure Employing Best Technology Exceptional Customer Service

Engaging Our Team Investing in Our Infrastructure Employing Best Technology Exceptional Customer Service Engaging Our Team Investing in Our Infrastructure Employing Best Technology Exceptional Customer Service 1 Our Mission We ensure safe and reliable services of water, wastewater and electricity, at an affordable

More information

Progressive Solutions for a Historic Watershed

Progressive Solutions for a Historic Watershed Progressive Solutions for a Historic Watershed Presenters: Clifford A. Shrive, PE, BCEE Brad S. Clark, PE Adam C. Hoff, PE June 20, 2012 Progressive Solutions for a Historic Watershed Overview of Presentation

More information

LA-Z-BOY FURNITURE GALLERIES FRANCHISE PROTOTYPE/RENOVATIONS

LA-Z-BOY FURNITURE GALLERIES FRANCHISE PROTOTYPE/RENOVATIONS Prototype Canton, Michigan Renovations Multiple s Architectural & Interior Design, Structural, Mechanical, Electrical Engineering, Construction Administration $2.5 2.75 million, New Prototype $500,000

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Proposed Construction of Public Water Supply System for the Village of East Williston Presented by Paul J. Granger, P.E.

Proposed Construction of Public Water Supply System for the Village of East Williston Presented by Paul J. Granger, P.E. Proposed Construction of Public Water Supply System for the Village of East Williston Presented by Paul J. Granger, P.E. H2M architects + engineers (H2M) was retained to prepare a report to evaluate the

More information

Areawide Water Quality Management Plan ( 208 Plan) 2017 Update

Areawide Water Quality Management Plan ( 208 Plan) 2017 Update Areawide Water Quality Management Plan ( 208 Plan) 2017 Update INTRODUCTION The Areawide Water Quality Management Plan, called the 208 Plan from that section of the Clean Water Act, is a major TMACOG policy

More information

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011

East Manawa Porous Paving Project Council Bluffs, Iowa. Project Location. Phase 1 Project Location 9/2/2011 East Manawa Porous Paving Project Council Bluffs, Iowa International Public Works Congress & Exposition APWA September 19, 2011 Presented by Scott Renaud, P.E., FOX Engineering Project Location Phase 1

More information

Administration Building Needs Assessment

Administration Building Needs Assessment Town Hall Meeting with the Habersham County Board of Commissioners Administration Building Needs Assessment JUNE 13, 2016 Detailed Evaluation Performed in 2015 Engineering Evaluation Site/Civil Architectural

More information

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant

Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant Massachusetts Water Resources Authority Presentation to MWRA Board of Directors Thermal and Hydro Power Plant Maintenance Deer Island Treatment Plant March 12, 2014 On-Site Thermal/Power Plant Built in

More information

Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth

Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth Contingency Planning for Temporary Pumping of Storm Water & Flooding Presented By: Ryan Booth Why is this important to me? Population Density in Coastal Shoreline Counties & Coastal Watershed Counties

More information

Site Plan: General: Common Omissions-Mistakes on Plans: Ohio EPA Southeast District Office Logan, Ohio November 22, 2005 Bruce Goff, P.E.

Site Plan: General: Common Omissions-Mistakes on Plans: Ohio EPA Southeast District Office Logan, Ohio November 22, 2005 Bruce Goff, P.E. Common Omissions-Mistakes on Plans: Ohio EPA Southeast District Office Logan, Ohio 43138 November 22, 2005 Bruce Goff, P.E. Site Plan: Inadequate site survey, e.g. no topographic contours Locations of

More information

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement

LIMITED ENVIRONMENTAL REVIEW. Bowling Green Wooster and Main Street Water Main Replacement LIMITED ENVIRONMENTAL REVIEW Project Identification Project: Applicant: Bowling Green Brian O Connell, Director of Utilities City of Bowling Green 304 North Church Street Bowling Green, Ohio 43402 Loan

More information

Request for Proposals for Professional Engineering Services for the Front Street Pump Station Upgrade

Request for Proposals for Professional Engineering Services for the Front Street Pump Station Upgrade Request for Proposals for Professional Engineering Services for the Front Street Pump Station Upgrade May 11, 2015 Capital Region Water Administrative Offices 212 Locust Street, Suite 302 Harrisburg, PA

More information

City of Wentzville. Standard Specifications and Construction Details Amendment List

City of Wentzville. Standard Specifications and Construction Details Amendment List Amendment No. 1 Standard Specifications and Construction Details Amendment List Date: September 21, 2009 Subject: SCD 700.23 - Residential Entrance Layout and drawing revised to more clearly show the location

More information

Wastewater Treatment. Knowledge. Commitment. Excellence.

Wastewater Treatment. Knowledge. Commitment. Excellence. Wastewater Treatment Knowledge. Commitment. Excellence. www.kcepc.com Wastewater Treatment KC s wastewater treatment group has designed, constructed, and helped to operate over 70 facilities. We work with

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX N - Campus Utilities Assessment Findings

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX N - Campus Utilities Assessment Findings LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN APPENDIX N - Campus Utilities Assessment Findings Louisiana State University Campus Master Plan Campus Utilities Introduction Based

More information

Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant

Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant Moving Toward Greater Sustainability: Oklahoma State University Builds a New Central Plant June 21, 2016 Introductions James Rosner, PE, CEM (james.rosner@okstate.edu) - Director of Energy Services, Oklahoma

More information

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l

ATTACHMENT 1 GENERAL FACILITY INFORMATION. BOD5 mg/l mg/l TSS mg/l mg/l NH3-N mg/l mg/l ATTACHMENT 1 GENERAL FACILITY INFORMATION 1. Facility Name: 2. Type of Facility: 3. Population Served: Present: Design: 4. Flow: Average Maximum Peak 5. Water Quality: Present Design Assumed Actual Source:

More information

A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT

A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT A SIMPLE SOLUTION TO BIG SNAIL PROBLEMS - A CASE STUDY AT VSFCD S RYDER STREET WASTEWATER TREATMENT PLANT Timothy R. Tekippe, P.E.,* Robert J. Hoffman, P.E.,* Ronald J. Matheson,** Barry Pomeroy** *Carollo

More information

Air Lift Pumps (Grit Pump) ST-027

Air Lift Pumps (Grit Pump) ST-027 Air Lift Pumps (Grit Pump) ST-027 I. Grit removal facilities at Gilroy/Morgan Hill Plant. a. Aerated grit chambers and appurtenant equipment. 1. 2 grit tanks 2. Effective volume 47,713 Gal each. 3. Aeration

More information

MicroGrids and CHP. September 8, 2016

MicroGrids and CHP. September 8, 2016 MicroGrids and CHP Facilities Operations & Building Services Utilities Operations and Energy Management Chris Tietjen, Central Utility Plant & Cogen Facility Engineer September 8, 2016 UCONN Storrs Campus

More information

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E.

Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Treatment Strategies and Improvements at the Blackhawk WWTP Alex Kuzovkov, P.E. Topics Covered Background Challenges and Priorities UV and Filters High Flows Evaluation Aeration Evaluation Aeration Basins

More information

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering

District Cooling Sustainable Design. Presented by George Berbari CEO of DC PRO Engineering 2016 District Cooling Presented by George Berbari CEO of DC PRO Engineering District Cooling Brief History & Future Central Chilled Water plants existed in the Middle East as early as the 1960 s. Few examples

More information

UC Irvine Energy Efficiency Energy Storage Energy Optimization. Matt Gudorf CEM, LEED AP Assistant Director Energy, Engineering, and Inspection

UC Irvine Energy Efficiency Energy Storage Energy Optimization. Matt Gudorf CEM, LEED AP Assistant Director Energy, Engineering, and Inspection UC Irvine Energy Efficiency Energy Storage Energy Optimization Matt Gudorf CEM, LEED AP Assistant Director Energy, Engineering, and Inspection Quick Facts Established in 1965 Comprehensive Research University

More information

Norwood High Service Pump Replacement

Norwood High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017

More information

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES

WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES WASTEWATER TREATMENT PLANT MASTER PLAN 6. BUSINESS CASE EVALUATION OF ALTERNATIVES A range of potential ammonia limits were identified for alternatives evaluation, as discussed in Section 2.2.5. This chapter

More information

Reducing the Carbon Footprint of the Hyannis WPCF:

Reducing the Carbon Footprint of the Hyannis WPCF: Reducing the Carbon Footprint of the Hyannis WPCF: Through Renewable Energy Production and Energy Efficiency Measures Rip Copithorn PE, BCEE Water Technology Leader Marc Drainville PE, BCEE, LEED AP Senior

More information

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section

COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD. Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section COLLECTION SYSTEM O&M AND ASSET MANAGEMENT AT LACSD Anthony Howard, PE Supervising Engineer Water Reclamation Plants Section April 20, 2015 Sanitation Districts of Los Angeles County Wastewater Collection

More information

Lynn Township Sewer Authority. Corrective Action Plan. March 2007

Lynn Township Sewer Authority. Corrective Action Plan. March 2007 Lynn Township Sewer Authority Corrective Action Plan March 2007 4130.00 Prepared By: ARRO Consulting, Inc. 400 Washington Street, Suite 602 Reading, Pennsylvania 19610 610 374 5285 Corrective Action Plan

More information

Appendix E Public Hearing Information

Appendix E Public Hearing Information Appendix E Public Hearing Information 0 STATE OF MICHIGAN In the Matter of: Clinton-Oakland Sewage Disposal System State Revolving Fund Project Plan Oakland County Water Resources Commissioner / PUBLIC

More information

Page Intentionally Left Blank

Page Intentionally Left Blank Page Intentionally Left Blank Julie Avenue and Hoeschler Drive Lift Stations Evaluation City of Sparta TABLE OF CONTENTS Page CHAPTER 1 GENERAL INFORMATION... 1 1.1 Scope of Lift Station Evaluation...

More information

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage

City of Columbus Wet Weather Management Plan Update. Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus Wet Weather Management Plan Update Dax J. Blake, P.E. Administrator City of Columbus, Ohio Division of Sewerage and Drainage City of Columbus, Ohio Population served ~ 1 Million 22 satellite

More information

Amesville Water System

Amesville Water System Water system timeline System built in 1960 s Tank telemetry failed 1970 s June 2012 duracho and electric outage May 2013-29 EPA citations (see copy) June 2014 started consultation with Triad Engineering

More information

Wilmette - Background

Wilmette - Background Reducing Basement Backups through Intergovernmental Cooperation and Design-Build Presented By Michael N. Young, P.E. Brigitte Ann Berger, P.E. Wilmette - Background North Shore Suburb of Chicago 5 Square

More information

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016

Cleveland Opportunity Corridor Project Section 3. Subcontractor Informational Meeting August 12, 2016 Cleveland Opportunity Corridor Project Section 3 Subcontractor Informational Meeting August 12, 2016 Agenda Welcome and Opening Remarks Project Overview Prequalifications & Work Types Procurement Overview

More information

CUYAHOGA COUNTY ENGINEER

CUYAHOGA COUNTY ENGINEER CUYAHOGA COUNTY ENGINEER DRAINAGE MANUAL Supplement to O.D.O.T. LOCATION and DESIGN MANUAL, Volume 2, Drainage Design, Section 1000 and 1100 May 28, 2010 Revisions to the July 29, 2009 edition are noted

More information

Mark S. Drummond, P.E. President

Mark S. Drummond, P.E. President President Education B.S. Civil Engineering, Florida International University, 1996 (Minor in International Relations) Registration Professional Engineer: Florida (License No: 57428) Professional Engineer:

More information

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant

City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant City of Andover, Kansas Energy Assessment-Wastewater Treatment Plant April 7, 2014 Prepared by Jerry Blain, P.E., Project Associate Environmental Finance Center Funding for this Energy Assessment was provided

More information

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF WATER RESOURCES RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

More information

Any discussions or marketing activities related to this specific project.

Any discussions or marketing activities related to this specific project. 04-11-19 Posting Date South Sandusky Street Widening and Relocation PID No. Not Assigned City of Mount Vernon Response Due Date: 04-24-19 Communications Restrictions Please note the following policy concerning

More information

17.0 INFRASTRUCTURE AND ENERGY

17.0 INFRASTRUCTURE AND ENERGY 17.0 INFRASTRUCTURE AND ENERGY The Project would place demands on the existing infrastructure systems for supplying water, treating sewage, providing energy and disposing of solid waste. The Project would

More information

WATER SUPPLY APPLICATION ENGINEER S REPORT

WATER SUPPLY APPLICATION ENGINEER S REPORT February 2010 WATER SUPPLY APPLICATION ENGINEER S REPORT Burnt Hills Ballston Lake Water District No. 2 Connection to Saratoga County Water Authority East Line Road Metering/Chlorination/ Pump Station

More information

Public Facilities Report October 2014

Public Facilities Report October 2014 Public Facilities Report October 2014 Dunes Community Development District 5000 Palm Coast Parkway, SE Palm Coast, FL 32137 Developed in Accordance with Florida Statutes 189.415 Prepared by: Timothy B.

More information

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 250-RICR-150-10-4 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 150 WATER RESOURCES SUBCHAPTER 10 - WASTEWATER & STORMWATER PART 4 Rules and Regulations for the Operation and Maintenance of

More information

ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS. US Army Corps of Engineers BUILDING STRONG

ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS. US Army Corps of Engineers BUILDING STRONG ORLEANS STORM PROOFING PROJECTS THE SEWERAGE AND WATER BOARD OF NEW ORLEANS US Army Corps of Engineers BUILDING STRONG Sewerage and Water Board of New Orleans Services Provided: Sewage Collection and Treatment

More information

General Rules and Regulations

General Rules and Regulations General Rules and Regulations City of Hamilton, Ohio Sanitary Sewer Collection and Treatment Revised December 23, 2016 Page 1 of 13 To Our Customers, Sanitary Sewer Collection and Treatment Department

More information

Saudi Aramco General Bid Slates (GBS)

Saudi Aramco General Bid Slates (GBS) Saudi Aramco General Bid Slates (GBS) Copyright 2015, Saudi Aramco. All rights reserved. Agenda Saudi Aramco Contracting Strategy Saudi Aramco General Bid Slate (GBS) General Bid Slate Work Types 2 Saudi

More information

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CHAPTER 8 CAPITAL IMPROVEMENT PLAN INTRODUCTION CHAPTER 8 CAPITAL IMPROVEMENT PLAN This chapter presents a 10-year Capital Improvement Plan (CIP). Wastewater capital improvements have been scheduled and prioritized on the basis of growth,

More information

Permits to Install; Procedures for Submittal of Plans for Public Sewage Treatment Systems

Permits to Install; Procedures for Submittal of Plans for Public Sewage Treatment Systems Ohio EPA Policy DSW-0200.001 Removed Permits to Install; Procedures for Submittal of Plans for Public Sewage Treatment Systems Statutory reference: Rule reference: Ohio EPA, Division of Surface Water Revision

More information

The TRA CRWS Master Plan. Past, Present, & Future of CRWS. Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA

The TRA CRWS Master Plan. Past, Present, & Future of CRWS. Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA The TRA CRWS Master Plan Past, Present, & Future of CRWS Kaylee Dusek, EIT, Garver Matt Jalbert, PE, TRA TRA operates the largest water resource recovery facility in Texas CRWS N Dallas CRWS currently

More information

Scoping Report. Montpelier District Energy CHP. Scoping Report

Scoping Report. Montpelier District Energy CHP. Scoping Report Montpelier District Energy CHP Last modified: 12/1/2009 Montpelier District Energy CHP System 1 Introduction... 4 2 Executive Summary... 4 2.1 Existing Capitol District Steam Plant. 2.2 Proposed System

More information

Public Facilities Report October 2015

Public Facilities Report October 2015 Public Facilities Report October 2015 Dunes Community Development District 5000 Palm Coast Parkway, SE Palm Coast, FL 32137 Developed in Accordance with Florida Statutes 189.415 Prepared by: Timothy B.

More information

Waterproofing solutions. Sump and Pump Systems

Waterproofing solutions. Sump and Pump Systems Waterproofing solutions Sump and Pump Systems Sump and Pump 1 1 The need for a Sump and Pump Most clients know Delta as leading manufacturers of cavity membrane systems and associated water proofing products,

More information

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)

More information

CEE 371 May 14, 2009 Final Exam

CEE 371 May 14, 2009 Final Exam CEE 371 May 14, 2009 Final Exam Closed Book, two sheets of notes allowed Please answer questions 3, 6 and 7. In addition, answer either question 1 or 2, and answer either question 4 or 5. The total potential

More information

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment

Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment OWEA 2013 Annual Conference June 19, 2013 Fremont Water Pollution Control Center Plant Expansion for Nutrient Removal and Wet Weather Flow Treatment Jeff Lamson, Superintendent, WPCC Robert Hrusovsky,

More information

Town of North Castle, NY Sewer District No. 2 WWTP

Town of North Castle, NY Sewer District No. 2 WWTP Town of North Castle, NY Sewer District No. 2 WWTP Robert Butterworth, PE, BCEE Project Principal Jan Salzman, PE, BCEE Project Manager March 9, 2016 Presentation Overview Purpose and Scope of Study Background

More information

ACCESSORIES ROTOTEC ACCESSORIES

ACCESSORIES ROTOTEC ACCESSORIES ACCESSORIES 136 136 ACCESSORIES ROTOTEC ACCESSORIES ROTOTEC 137 H H ACCESSORIES Ø Cover THREADED EXTENSION Ø H Ø Cover PP30 300 300 210 55.00 PP35 435 300 300 70.00 PP45 535 300 400 90.00 Ø Application:

More information

SERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING

SERVICES DEPUTY CITY MANAGER I ADMINISTRATIVE SERVICES PUBLIC WORKS ClOY ENGINEER DIRECTOR DIRECTOR PROJECT & CONSTRUCTION ENGINEERING Operation and Maintenance This section summarizes key operation and maintenance aspects of the City's sewer system. Included in this section is a description of the wastewater system personnel, instrumentation

More information

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies

Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies Primary Clarifier Odor Control Replacing Nitrates with D.O. Kevin Jacobs, P.E. ECO Oxygen Technologies Presentation Outline Primary Clarifier Odor Challenges Odor Treatment Options Case Study Anson-Madison

More information

NASHUA REDUCES CSOs WITH GREEN INFRASTRUCTURE AND TRENCHLESS TECHNOLOGY. Nicholas Ellis, P.E. Hazen and Sawyer Joe Mendola, P.E.

NASHUA REDUCES CSOs WITH GREEN INFRASTRUCTURE AND TRENCHLESS TECHNOLOGY. Nicholas Ellis, P.E. Hazen and Sawyer Joe Mendola, P.E. NASHUA REDUCES CSOs WITH GREEN INFRASTRUCTURE AND TRENCHLESS TECHNOLOGY Nicholas Ellis, P.E. Hazen and Sawyer Joe Mendola, P.E. City of Nashua January 27, 2016 Presentation Outline 1. Project Background

More information

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011

Village of Winnetka Flood Risk Reduction Assessment. Christopher B. Burke Engineering, Ltd. (CBBEL) October 11, 2011 Village of Winnetka Flood Risk Reduction Assessment October 11, 2011 Christopher B. Burke Engineering, Ltd. (CBBEL) Thomas T. Burke, Jr., PhD, PE David Buckley, PE, CFM Introduction The September 2008

More information

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and LAKEHAVEN WATER AND SEWER DISTRICT King County, Washington Resolution No. 2017-1283 A RESOLUTION of the Board of Commissioners of the Lakehaven Water and Sewer District, King County, Washington, adopting

More information

Building Services / MEPF Scopes

Building Services / MEPF Scopes Building Services / MEPF Scopes Mechanical Air conditioning Refrigerant Plant Compression Chillers Absorption Chillers Heat Pumps (Chilled water and Hot Water) Cooling Towers Chemical Treatment Air Conditioning

More information

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund

The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund City of Lima, Ohio The environment Water pollution Flooding, drainage, combined sewers Aging infrastructure New mandated and unfunded EPA regulations General fund pressures Funding sources Petitioned/Assessed

More information

Here is a description of the City of Delphos collection system in its entirety and provide

Here is a description of the City of Delphos collection system in its entirety and provide CITY OF DELPHOS 24793 Pohlman Rd DELPHOS OH 45833 419-692-0991 PHONE Annual Report The City of Delphos is required to provide an Annual Report to the public in accordance with Ohio Environmental Protection

More information

Hamilton s Incredibly Shrinking Consent Ordered Project

Hamilton s Incredibly Shrinking Consent Ordered Project Hamilton s Incredibly Shrinking Consent Ordered Project Do Court Decisions in Parallel Districts and Regions Affect Your Treatment Plant? Imagine the result 1 Hamilton,OH Best Tasting Water in the World

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017

Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 Ann Arbor Wastewater Treatment Plant Facilities Renovations Project October 2017 The Facilities Master Plan was completed in 2004 and identified the need for improvements to the City of Ann Arbor s Wastewater

More information