Urban Hydrology Characteristics and their Influence on Urban Stream Restoration Technology. Presented by:
|
|
- Willa Bryan
- 6 years ago
- Views:
Transcription
1 Urban Hydrology Characteristics and their Influence on Urban Stream Restoration Technology Presented by: Michael Clar Ecosite, Inc. James Gracie Brightwater, Inc.
2 BACKGROUND Many streams in urban areas have been significantly impaired and are often perceived as candidate sites for urban stream restoration Much of the technology used for stream restoration is based on hydrologic regime conditions for rural watersheds For the most part this technology has not been adapted or verified for use in urban watersheds
3
4
5
6 BACKGROUND Urban land use practices, especially the creation of impervious surfaces, can result in significant alterations to the hydrologic regime of urban watersheds These hydrologic regime alterations can exert significant influence on a number of fundamental concepts currently in use in natural channel restoration technology, including: Bankfull discharge Regional curves of bankfull discharge and channel geometry Rosgen and Schumm stream classification systems Use of reference stream characteristics
7 LANE S STABLE CHANNEL BALANCE SCR Page 1-14
8 Land Development, Sediment & Discharge Urban watersheds can have a dramatic impact on both the sediment loads and stream discharge These impacts are not being addressed in current instruction programs for urban stream restoration Failure to consider these impacts can lead to incorrect assumptions and ill-conceived restoration designs
9 Land Development, Sediment & Discharge (Cont d) Site clearing and mass grading operations can generate high sediment loads While many jurisdictions require sediment control practices during construction, the effectiveness of these programs is inconsistent and estimated to be in the range of 50 to 60% removal of sediment. The accelerated sediment discharge is only temporary for a given site, but the development of an entire watershed can subject a stream to these loads again and again over long periods of time. The classic example of death by a thousand blows
10 Land Development, Sediment & Discharge (Cont d) The construction process can also generate large increases in surface runoff from exposed and compacted soils Most sediment control devices do not provide for stormwater management Once a watershed has been urbanized the sediment supply from the watershed can be dramatically reduced and lead to discharge of of sediment free or hungry waters Restoration of streams in this state is problematic due to tendency of these streams to continue removing sediment from their channels
11 Post Construction Land Use and Urban Runoff The land development process can greatly alter the hydrologic regime of developed watersheds The regime alterations include: Runoff volume Peak discharge Discharge frequency and duration Base flow conditions These hydrologic modifications are superimposed on construction impacts and can accelerate channel adjustment processes that are poorly understood and often not addressed in urban stream restoration
12 Effect of Urbanization on Mean Annual Flood
13 Effect of Urbanization on Increasing Frequency of Overbank Flows
14 Use of BMPs to Mitigate Urban Runoff Impacts Many urban watersheds were developed before the advent of SWM programs Growing recognition that many of the SWM programs used to date, particularly peak discharge control of the 2- and 10- year storm events have not been effective in addressing stream channel degradation Primary reason for failure of the peak discharge approach is the failure to effectively address the increase in the volume of runoff
15 Urban Hydrology and Bankfull Discharge Natural channel design is closely tied to the concept of bankfull discharge The bankfull, dominant or effective discharge is the primary design storm for stream restoration Bankfull discharge is frequently associated with a recurrence interval of 1.5 years as determined using a flood frequency analysis
16 The Bankfull Discharge Concept
17 Urban Hydrology and Bankfull Discharge (Cont d) Generally assumed that urban runoff results in a decrease in the return period of the bankfull event such that return periods approaching 1 year could occur. Also generally accepted that the peak discharge value of the bankfull discharge will increase. However, to date, very little documentation has been provided to support these assumptions
18 Urban Hydrology and Bankfull Discharge (Contd) Detailed procedures for field identification of bankfull discharge conditions have been provided and hands on training for this activity is available While these procedures are generally reliable for rural watersheds, they are at best difficult to apply and interpret on urban streams
19 Regional Relationships Regional bankfull relationships can be used in natural channel design to obtain a first approximation of field bankfull conditions. These relationships are developed for rural watersheds with 10% or less impervious cover Have limited application to urban watersheds Some attempts are being made to develop regional curves for urban watersheds Applications limited due to variances in TIA and DCIA, and lack of gauging stations for small urban watersheds
20 Regional Bankfull Discharge Relationships
21 Regional Hydraulic Geometry Relationships (Leopold, 1994)
22 Urban Regional Discharge Relationships y=(2.32)+(0.71)*x Urban R 2 =0.963 bf (cfs) Log Q y=(1.77)+(0.84)*x Rural R 2 = Log DA (sq mi)
23 Urban Hydrology and Stream Classification Concepts Rosgen (19960 and Schumm (1984) have both presented channel evolution concepts that describe the various stages of channel adjustment These concepts were developed for rural watersheds They project that a channel will enlarge and downcut or widen to increase its channel capacity in response to an increase in sediment load or discharge They project that a disturbed channel will abandon its former floodplain and evolve back to a channel geometry with a new floodplain at a lower elevation that approximates the pre-disturbance channel geometry
24
25 Schumm Channel Evolution Model
26
27
28
29 Urban Hydrology and Stream Classification Concepts (Cont d) These channel evolution concepts appear questionable for urban areas that have experienced a substantial and permanent hydrologic regime alteration While abandonment of the floodplain and channel enlargement is typical, it appears questionable that the channel will return to a channel geometry that approximates the pre-development condition There is little, if any, documentation that this process actually takes place in urban watersheds A more likely scenario is that the stream will remain an F stream type. This stream type is characterized by a wide crosssection, shallow depth and fully entrenched condition
30 Urban Hydrology and Use of Reference Stream Conditions Natural channel design calls for use of a reference reach to establish design parameters based upon a stable stream of the same stream type in the same valley type and physiographic region. The question of whether natural channel parameters from a stable reference reach are appropriate to use for design on a restored channel in a highly urbanized watershed has not been answered satisfactorily Also, geomorphic valley types may not be applicable in urbanized watersheds due to the presence of upstream and downstream culverts and bridges which limit natural adjustment
31 Summary This presentation has provided a discussion of the characteristics of urban stream hydrology as they relate to the following geomorphic concepts: Sediment load and stream discharge Use of BMPs to mitigate urban runoff impacts The bankfull discharge concept Use of regional discharge and channel geometry relationships Use of stream classification concepts Use of reference stream conditions Many of these concepts were developed for rural watershed conditions and have yet to be modified and validated for use in urban streams
32 Conclusions There are a number of issues to be resolved in the application of the natural channel approach to stream restoration design: The concept of bankfull discharge may not have the same significance in urbanized watersheds At best it is difficult to determine when the discharge and the channel have reached a regime condition in which the discharge defines the channel It is also difficult to find stable reference reaches in urbanized watersheds and questionable to use reference reaches from rural watersheds The application of reference reach geometry and geomorphic concepts developed for rural watersheds needs to be validated with long term monitoring results The issue of clear or hungry water has not been satisfactorily addressed in urban environments
3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationImpact of Increased Stormwater Runoff on Urban Drainage Systems
Impact of Increased Stormwater William E. Spearman, III, PE APWA Stormwater Summit San Antonio, TX September 12, 2007 Contact Information: William E. Spearman, III, PE Member, APWA National Water Resources
More informationTWENTY PLUS YEARS SINCE THE RURAL ONTARIO DATA BASE AND RELATIONSHIPS PUBLICATIONS WERE PRODUCED. LOOKING BACK TO LOOK FORWARD
Copyright: W.K. Annable TWENTY PLUS YEARS SINCE THE RURAL ONTARIO DATA BASE AND RELATIONSHIPS PUBLICATIONS WERE PRODUCED. LOOKING BACK TO LOOK FORWARD By W.K. Annable, PhD, PhD, PEng, PGeo. Dept. Civil
More informationThe Beckett s Run Experience. Fort Wayne, Indiana
The Beckett s Run Experience Fort Wayne, Indiana Introductions Charlie Cochran City of Fort Wayne, Wet Weather Storm & Sewer Engineering Jason Durr, PE Christopher B. Burke Engineering, LLC 2 A Little
More informationStormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)
Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans) Allen County Stormwater Plan Submittal Checklist The following items must be provided when applying for an Allen County Stormwater
More informationHydrotechnical Design Guidelines for Stream Crossings
Hydrotechnical Design Guidelines for Stream Crossings Introduction Design of stream crossings and other in-stream highway facilities requires estimation of design highwater elevation and mean channel velocity.
More informationPennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines
Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles
More informationStream Restoration in the Urban Environment Concepts and Considerations
Stream Restoration in the Urban Environment Concepts and Considerations The Restoration of Our Rivers; October 5, 2012 Matthew A. Van Eps, PE & Sandi J. Formica: Watershed Conservation Resource Center
More informationAPPENDIX E APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS
APPENDIX E ESTIMATING RUNOFF FOR SMALL WATERSHEDS March 18, 2003 This page left blank intentionally. March 18, 2003 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method
More informationOld Mill School Stream Restoration
Project Overview This conceptual plan restores and stabilizes two consecutive reaches of a highly incised and unstable stream and reconnects them with the floodplain. The restoration reaches are part of
More informationAPPENDIX E ESTIMATING RUNOFF FROM SMALL WATERSHEDS
ESTIMATING RUNOFF FROM SMALL WATERSHEDS June 2011 THIS PAGE LEFT BLANK INTENTIONALLY. June 2011 TABLES Table E.1 Table E.2 Return Frequencies for Roadway Drainage Design Rational Method Values June 2011
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationPre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015
Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015 Urban Runoff Background How we got here What Problem?? Provenance of the Problem Unified Sizing Criteria What
More informationjmt.com WATER RESOURCES MANAGEMENT Part of a diversified family of solutions
jmt.com WATER RESOURCES MANAGEMENT Part of a diversified family of solutions About Us Johnson, Mirmiran & Thompson (JMT) is a multidisciplined engineering and architectural firm serving clients throughout
More informationPrepared for: City of Jeffersonville. November Prepared by
JEFFERSONVILLE STORMWATER MASTER PLAN HYDRAULICS APPENDIX JEFFERSONVILLE, INDIANA Prepared for: City of Jeffersonville November 2011 Prepared by Christopher B. Burke Engineering, Ltd. 115 W. Washington
More informationA Hydrologic Study of the. Ryerson Creek Watershed
A Hydrologic Study of the Ryerson Creek Watershed Dave Fongers Hydrologic Studies Unit Land and Water Management Division Michigan Department of Environmental Quality May 8, 2002 Table of Contents Summary...2
More informationMiddle Tennessee State University (MTSU) Stormwater Plan Review Checklist
For Middle Tennessee State University (MTSU) projects, the Project Manager or other MTSU designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of MTSU.
More informationDesign, Construction, & Benefits of Integrated Stream & Wetland Stormwater Restoration Projects Presented By: Underwood & Associates / Biohabitats,
Design, Construction, & Benefits of Integrated Stream & Wetland Stormwater Restoration Projects Presented By: Underwood & Associates / Biohabitats, Inc. RELATIONSHIP BETWEEN IMPERVIOUS COVER AND SURFACE
More informationSECTION IV WATERSHED TECHNICAL ANALYSIS
A. Watershed Modeling SECTION IV WATERSHED TECHNICAL ANALYSIS An initial step in the preparation of this stormwater management plan was the selection of a stormwater simulation model to be utilized. It
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationNew Castle County, DE. Floodplain Regulations
New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions
More informationMunicipal Stormwater Management Planning
Municipal Stormwater Management Planning Christopher C. Obropta, Ph.D., P.E. Water Resources Extension Specialist with Rutgers Cooperative Extension Assistant Professor with Department of Environmental
More informationJason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University
Stormwater 101 OKLAHOMA STATE UNIVERSITY Biosystems and Agricultural Engineering Department Jason R. Vogel, Ph.D., P.E. Biosystems and Agricultural Engineering Oklahoma State University Stormwater is excess
More informationStream Restoration Raccoon Creek A Case Study
Stream Restoration Raccoon Creek A Case Study Restoration of a Degraded Stream System Steven Glickauf Presentation Overview Stream Restoration Raccoon Creek Restoration Site Case Study Existing Conditions
More informationILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.
ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975 Source: Hey and Associates, Inc. DEFINITION A bridge or culvert crossing installed across a stream or watercourse for short-term
More informationTOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS
TOWN LINE BROOK URBAN WATERSHED STUDY MODELING INCREMENTAL IMPROVEMENTS Marcus M. Quigley, P.E., Project Engineer, GeoSyntec Consultants Steven P. Roy, Associate, GeoSyntec Consultants Lawrence Gil, North
More informationLAKE COUNTY HYDROLOGY DESIGN STANDARDS
LAKE COUNTY HYDROLOGY DESIGN STANDARDS Lake County Department of Public Works Water Resources Division 255 N. Forbes Street Lakeport, CA 95453 (707)263-2341 Adopted June 22, 1999 These Standards provide
More informationIncorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan
Incorporating Restoration Planning and Transportation Controls into the Valley Creek Watershed Act 167 Stormwater Management Plan Pennsylvania State Section American Water Resources Association Fall 2011
More informationWetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012
DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can
More informationCOTTONWOOD CREEK RECLAMATION PHASE I & II
COTTONWOOD CREEK RECLAMATION PHASE I & II COTTONWOOD CREEK RECLAMATION Stream Stabilization Approach to Urban Runoff Quality Cherry Creek Basin Water Quality Authority The Problem The Cherry Creek Reservoir
More informationSECTION III: WATERSHED TECHNICAL ANALYSIS
Trout Creek Watershed Stormwater Management Plan SECTION III: WATERSHED TECHNICAL ANALYSIS A. Watershed Modeling An initial step this study of the Trout Creek watershed was the selection of a stormwater
More informationItems in this checklist identify the base requirements that are to be provided by the design professional.
The Project Manager or other Owner designee will serve as the Plan Reviewer. This checklist is to be completed by the Plan Reviewer on behalf of the Owner. The Plan Reviewer s role is to review the submitted
More informationRiver Restoration, 2018 Has stormwater management been our Achilles Heel in River Management?
River Restoration, 2018 Has stormwater management been our Achilles Heel in River Management? By Bill Annable, PhD, PhD, PEng, PE, PGeo Department of Civil & Environmental Engineering, University of Waterloo
More informationPre/Post Assessment Rubric for Unit: Urban Storm Hydrograph Modeling with the Rational Method for the Urban Desert Southwest USA
Pre/Post Assessment Rubric for Unit: Urban Storm Hydrograph Modeling with the Rational Method for the Urban Desert Southwest USA 28 September 2012 (revision 3, 16 April 2013) Benjamin L. Ruddell, Arizona
More informationCHAPTER 1 INTRODUCTION. Stream processes are strongly related to the physical conditions of the
1 CHAPTER 1 INTRODUCTION Stream processes are strongly related to the physical conditions of the watershed from which they flow. Alterations to physical conditions of a watershed manifest themselves through
More informationI. Welcome & Introductions WPAC History (Paul Racette, PEC)
Poquessing Creek Watershed ACT 167 STORM WATER MANAGEMENT PLAN Public Hearing July 10, 2012 I. Welcome & Introductions ---------- WPAC History (Paul Racette, PEC) Primary WPAC Members: Bucks County: Bensalem
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW Mississippi Dr Coon Rapids, MN SQ FT Residence on 0.64 Acre Lot
17-082 Van Sloun Residence, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: May 8, 2017 AGENDA NUMBER: 17 FILE NUMBER: 17-082 ITEM: Van Sloun Residence RECOMMENDATION: Approve with
More informationPreliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587
Preliminary Drainage Study: Town of Hillsboro Pedestrian & Traffic Safety Project Traffic Calming Project UPC# 70587 Introduction: The intent of this study was to perform a preliminary drainage study of
More informationSoutheast Policy Area Drainage Study
Southeast Policy Area Drainage Study Prepared for City of Elk Grove January 2014 448-00-12-03 Table of Contents 1.0 Introduction... 1 2.0 Watershed Description... 1 3.0 Drainage Plan Concept... 1 4.0
More informationEngineering Report Preliminary Floodplain Study. Executive Summary
Executive Summary Engineering Report Preliminary Floodplain Study The Federal Emergency Management Agency (FEMA) has updated the Flood Insurance Rate Maps (FIRM) for Finney County, including the City of
More informationChapter Three: Discussion and Conclusion. 3.1 Introduction/Overview. 3.2 Countywide Stream Assessment
3.1 Introduction/Overview The objective of this study was to develop a stream prioritization tool that evaluates stream reaches in terms of the potential water quality improvements that could be achieved
More information12 DRAINAGE General Administrative Requirements Standards
12 DRAINAGE 12.1 General The Design-Builder shall conduct all Work necessary to meet the requirements associated with drainage, including culverts, bridge hydraulics, roadway ditches, and closed storm
More informationRiver Processes River action (fluvial)
River action (fluvial) is probably the single most important geomorphic agent and their influence in geomorphology can hardly be overestimated. 1 To understand the complexity associated with river flow
More informationMunicipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates VNH File No.
Municipal Stormwater Management Plan Prepared For The Borough of Cape May Point By Van Note-Harvey Associates 2005 VNH File No. 35317-210-21 Table of Contents Introduction... 3 Goals... 3 Storm water Discussion...
More informationDetention Pond Design Considering Varying Design Storms. Receiving Water Effects of Water Pollutant Discharges
Detention Pond Design Considering Varying Design Storms Land Development Results in Increased Peak Flow Rates and Runoff Volumes Developed area Robert Pitt Department of Civil, Construction and Environmental
More informationSEWRPC Staff Memorandum
SEWRPC Staff Memorandum EVALUATION OF PROPOSED STORMWATER QUANTITY MANAGEMENT FOR THE DES PLAINES RIVER WATERSHED PORTION OF THE PROPOSED FOXCONN DEVELOPMENT IN THE VILLAGE OF MOUNT PLEASANT June, 2018
More informationSanta Margarita Region of Riverside County
Santa Margarita Region of Riverside County Water Quality Management Plan (WQMP), Hydromodification Management Plan (HMP) Program Training Presented by: Daniel Apt, CPSWQ, CPESC Vice President Kevin Villarama
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW
16-054 Woodland Creek Wetland Banking Restoration Project, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 11 FILE NUMBER: 16-054 ITEM: Woodland Creek
More informationGeorgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood
WATER RESOURCES Georgia s Unified Stormwater Sizing Criteria The Old, the New, and the Misunderstood Charles Crowell, PE Stormwater Section Manager October 2016 WATER RESOURCES The Old Traditional Stormwater
More informationDrainage Criteria Manual Review
City of Colorado Springs Stormwater Management Assessment and Standards Development Drainage Criteria Manual Review March 8, 2013 Springsgov.com/City Agencies/Stormwater/Stormwater Engineering/ Stormwater
More informationLearning objectives. Upon successful completion of this lecture, the participants will be able to describe:
Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to describe: The different approaches for estimating peak runoff for urban drainage network
More informationDivision of Watershed Stewardship Drainage Program
Not Your Father s Tax Ditch Enhancing Delaware s Drainage Network Through the Use of Natural Channel Design Techniques Division of Watershed Stewardship Drainage Program Presented at the National Conference
More informationKrista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities
Krista Reininga, PE Hydromodification and What it Means for the Design of Stormwater Facilities Agenda 1. Evolution of Water Quality Facilities 2. Regulatory Response/MS4 Permit Requirements 3. Change
More informationTable D1: WC-R1 to WC-R3 (Wilket Creek Park)
APPENDIX D Table D1: WC-R1 to WC-R3 (Wilket Creek Park) Category of Consideration Criteria Alternative 1 Do Nothing Alternative 2 Local Improvements Alternative 3 Channel Realignment Natural Geomorphic
More informationStormwater Local Design Manual For Houston County, Georgia
Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.
More informationAPPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports
APPENDIX H H.1 Guidance for Preparing and Reviewing CEQA Initial Studies Step 1: Consider the Project Characteristics as Provided by the Project Applicant Review the project application and draft plan
More informationARLINGTON COUNTY, VIRGINIA
ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of April 21, 2007 DATE: April 20, 2007 SUBJECT: Approve the Award of a Contract to Sagres Construction Corp. for the construction of Phase I
More informationIntroduction to stream assessment
Why do stream assessment? Introduction to stream assessment Given the current condition of rivers and the heightened public interest in them, there is a significant need for the ability to determine the
More informationDEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED
DEVELOPMENT OF A HYDRO-GEOMORPHIC MODEL FOR THE LAGUNA CREEK WATERSHED Agenda Background Hydro-Geomorphic Modeling Methodology HEC-HMS Modeling How is the Model Used Background Proposition 50 Grant Funding
More informationWood-Pawcatuck Watershed Flood Resiliency Management Plan
Wood-Pawcatuck Watershed Flood Resiliency Management Plan Project Steering Committee Meeting May 21, 2015 Wood-Pawcatuck Watershed Association Meeting Agenda 10:00 10:05 Welcome and Opening Remarks 10:05
More informationUncertainty in Hydrologic Modelling for PMF Estimation
Uncertainty in Hydrologic Modelling for PMF Estimation Introduction Estimation of the Probable Maximum Flood (PMF) has become a core component of the hydrotechnical design of dam structures 1. There is
More informationNatural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design
Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design January 22, 2013 S. Paige Baker, PE, MLE Presentation Outline
More information4. Present Activities and Roles
4. Present Activities and Roles The present missions, authorities, activities and roles of the various agencies involved with flood protection, floodplain management and flood-damage reduction are identified
More informationPajaro River Watershed Flood Prevention Authority. Phase 3 and 4a. Pajaro River Watershed Study
Pajaro River Watershed Flood Prevention Authority Phase 3 and 4a FEBRUARY 2005 Funding for this project has been provided in full or in part through a contract with the SWRCB pursuant to the Costa-Machado
More informationSurface Water. Solutions for a better world
1 Surface Water Solutions for a better world Our Surface Water Services Expertise Growing worldwide awareness of water scarcity has encouraged water preservation programs, better irrigation techniques
More informationFunctional Uplift Based Stream Assessment & Restoration Design
Functional Uplift Based Stream Assessment & Restoration Design Darcy K.L. Turner Senior Environmental Scientist, Biohabitats, Inc. (dturner@biohabitats.com) Christopher A. Streb, PE Ecological Engineer,
More informationSECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION
SECTION 7.0 PROJECT FEASIBILITY, ENGINEER S RECOMMENDATION AND DESIGN ISSUES NEEDING RESOLUTION 7.1 PROJECT FEASIBILITY The determination of project feasibility is based upon several criteria established
More informationSection 1 - Introduction
VERSION 1.0 Stormwater Solutions for Residential Sites Section 1 - Introduction Prepared for EcoWater Solutions A Department of Waitakere City Council 113 Central Park Drive Henderson WAITAKERE CITY November
More informationStep-Pool Creation to Restore Fish Passage and Riparian Health
Step-Pool Creation to Restore Fish Passage and Riparian Health Jenny Kindig Water Resources Engineer Denny Mengel, Senior Environmental Scientist Steve Miller, Water Resources Engineer Gloria Beattie,
More informationAlternatives for Willow Creek Flood Mitigation Study
Alternatives for Willow Creek Flood Mitigation Study Presented by: Anil Tangirala, PE, CFM, ENV SP ms consultants, inc. June 22, 2016 Presentation Overview Introduction Project Background Willow Creek
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW th Ave NE Ham Lake, MN 55304
18-151 Meyer Garage, Page 1 of 5 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: January 28, 2019 AGENDA NUMBER: 9 FILE NUMBER: 18-151 ITEM: Meyer Garage RECOMMENDATION: Approve with 2 Stipulations
More informationSTORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW
SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission
More informationEcoStream Getting Our Feet Wet at Every Stage: Optimizing the Restoration of Urban Streams August 16, 2018
EcoStream 2018 Getting Our Feet Wet at Every Stage: Optimizing the Restoration of Urban Streams August 16, 2018 Presentation Outline Planning/Design challenges, approaches, optimization Public Outreach/Stakeholder
More informationClimate and Land Use Consequences to 100-Year Flooding
Climate and Land Use Consequences to 100-Year Flooding Robert Roseen D.WRE, PE, PhD, Ann Scholz, PE, CPSWQ, Thomas Ballestero, PhD, PE, PH, UNH Stormwater Center Nebraska Post- Construction Stormwater
More informationBMP Design Aids. w w w. t r a n s p o r t a t i o n. o h i o. g o v. Equations / Programs
BMP Design Aids 1 Equations / Programs Outlet Discharge Equations Hydrograph and Pond Routing Programs USGS StreamStats 2 Ohio Department of Transportation 1 Training Intent Introduction and overview of
More informationAdjusted Flood Prone Acres
Adjusted Flood Prone Acres The flood prone area is defined as the area adjacent to the stream that is innundated or saturated when the elevation of the water is at twice the maximum depth at bankfull stage
More informationPublic Information Centre # 2 Flood Mitigation Opportunities Study Fourteen Mile Creek & M c Craney Creek Systems Town of Oakville
Public Information Centre # 2 Flood Mitigation Opportunities Study Fourteen Mile Creek & M c Craney Creek Systems Town of Oakville Municipal Class Environmental Assessment Study Area The limits of the
More informationWater Resources Management Plan
P L Y M O U T H M I N N E S O T A Appendix D: The developed a to analyze and minimize the impact of existing and future development on the City s natural resources. It is important to the City to have
More informationHYDROLOGIC CONSIDERATIONS. 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY
LOW IMPACT DEVELOPMENT HYDROLOGIC CONSIDERATIONS 22 nd Annual Nonpoint Source Pollution Conference Saratoga Springs, NY May 18, 2011 PRESENTATION AGENDA Introduction Definitions Discuss Impacts to Hydrologic
More informationDesign of Stormwater Wetlands
Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak
More informationAPPENDIX F RATIONAL METHOD
7-F-1 APPENDIX F RATIONAL METHOD 1.0 Introduction One of the most commonly used procedures for calculating peak flows from small drainages less than 200 acres is the Rational Method. This method is most
More informationStormwater: Too Simple?
Stormwater: Too Simple? Getting Closer to Advertised Level of Service Brandon Klenzendorf, Ph.D., P.E. 13 December 2017 - CWEA Fall Seminar Introduction Traditional approaches to solving stormwater problems
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationSCRCA SECTION 28 WETLAND POLICY
April 21, 2016 SCRCA SECTION 28 WETLAND POLICY SCRCA Policies and Procedures of Administration of Section 28 Regulations Wetland Policies Definitions section (Source: Section 28 CA Act) Development means:
More informationQuittapahilla Creek Watershed Implementation Plan
Quittapahilla Creek Watershed Implementation Plan Introduction Founded in 1997, the Quittapahilla Creek Watershed Association has been working with landowners, private organizations and public agencies
More informationCommunity Resilience and Mitigation Assessment
As part of the application process for the Alberta (ACRP), applicants are required to submit a. Only one Community Resilience & Mitigation Assessment is required for each municipality Disasters occur at
More informationOFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES
OFFICE OF STRUCTURES MANUAL ON HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 3 POLICY AND PROCEDURES April 28, 2016 Table of Contents 3.1 Introduction... 2 3.1.1 Purpose of Chapter 3... 2 3.1.2 Policy vs. Design
More informationImplementing Stormwater Management through Split-Flow Drainage Design
Implementing Stormwater Management through Split-Flow Drainage Design Stuart Patton Echols PhD, ASLA, RLA Assistant Professor - Department of Landscape Architecture 210 Engineering Unit D Center for Watershed
More informationBMP 5.4.2: Protect /Conserve/Enhance Riparian Areas
BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,
More informationE. STORMWATER MANAGEMENT
E. STORMWATER MANAGEMENT 1. Existing Conditions The Project Site is located within the Lower Hudson Watershed. According to the New York State Department of Environmental Conservation (NYSDEC), Lower Hudson
More information2. Potential Extreme Peak Discharge in Texas
2. Potential Extreme Peak Discharge in Texas This part of the work is focused on using GIS to apply the latest USGS peak discharge equations to create a 500m grid that stores the potential peak discharge
More informationSite Selection and Design for Stream Mitigation
Site Selection and Design for Stream Mitigation Will Harman, PG Stream Mechanics The Association of State Wetland Managers State/Tribal/Federal Coordination Meeting March 19-21, 2013 NCTC Our Relationship
More informationWill County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW
Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every
More informationADDENDUM #1 RFP WOLFTRAP CREEK STREAM RESTORATION
ADDENDUM #1 February 6, 2015 RFP 15-03 WOLFTRAP CREEK STREAM RESTORATION ******ATTENTION BIDDERS****** (To be completed and returned with bid response) A request was made that the Stormwater Local Assistance
More informationOctober 2015 Utilizing a County-Owned Golf Course for Watershed Restoration in Gwinnett County, GA
October 2015 Utilizing a County-Owned Golf Course for Watershed Restoration in Gwinnett County, GA Arvind Narayanan, P.E.*, CFM, Water Resources Engineer Overview Project Identification Project Implementation:
More informationPhase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)
Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17
More informationStream Mitigation Considerations. CESAS-RD / 25Sep2014
The following is a living document subject to change at any time. For the most up to date version: http://www.sas.usace.army.mil/missions/regulatory/mitigation.aspx Action ID: SAS- Project Name: County:
More informationSHORELINE INVENTORY AND RESTORATION PLANNING
CHAPTER 3 SHORELINE INVENTORY AND RESTORATION PLANNING A. PURPOSE OF THE SHORELINE INVENTORY AND CHARACTERIZATION A first step in the comprehensive Master Program update process is development of a shoreline
More informationFreight Street Development Strategy
Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed