Prepared by: Rummel, Klepper & Kahl
|
|
- Joan Cannon
- 6 years ago
- Views:
Transcription
1 WETLAND DELINEATION REPORT Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, Pennsylvania Prepared for: PennDOT District 6-0 Prepared by: Rummel, Klepper & Kahl March 2007
2 INTRODUCTION... 1 BACKGROUND & EXISTING CONDITIONS... 1 Topography:... 1 Soils:... 1 Wetlands and Waters of the United States:... 4 Floodplains:... 4 Rare, Threatened, and Endangered Species:... 4 METHODOLOGY... 4 METHODS... 4 Hydrophytic Vegetation... 4 Hydrologic Indicators... 5 Hydric Soils... 5 RESULTS... 9 Area WA... 9 Area WB... 9 Area WC... 9 Appendix A: Photographic Log Appendix B: Agency Correspondence Appendix C: Wetland Delineation Sketch
3 Wetland Investigation Report March 2007 Kutztown Road (SR1033) Bridge Replacement INTRODUCTION Wetland Investigation Report Kutztown Road, (SR 1033) Bridge Replacement Montgomery County, PA March 2007 Rummel, Klepper & Kahl, LLP (RK&K) is currently conducting preliminary environmental and engineering studies for a proposed bridge replacement in Upper Hanover Township, Montgomery County, Pennsylvania. The Pennsylvania Department of Transportation (PennDOT) has proposed replacement and resurfacing of the bridge and associated roadway approaches. The bridge is located on Kutztown Road (SR 1033), where Kutztown Road crosses Molasses Creek. The study area for the project encompasses approximately 1100m(ft) along Kutztown Road, extending east and west from the existing bridge structure (Figure 1). BACKGROUND & EXISTING CONDITIONS Prior to field investigations, the Montgomery County Soil Survey and the Montgomery County Hydric Soils List were reviewed to identify hydric soils within the study area. The USGS 7.5 minute Quadrangle map (East Greenville Quad), US Fish and Wildlife Service (USFWS) National Wetland Inventory (NWI) Map, Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM), and aerial photography were reviewed to identify the location, extent, and types of wetlands found within the study area. Topography: The study area, located in the piedmont physiographic province, consists stream valleys, flat areas and gently rolling slopes with elevations ranging from 300 to 380 feet National Geodetic Vertical Datum (NGVD) (Figure 2). Soils: The Montgomery County, Pennsylvania Soil Survey indicates that five (5) soil units are present within the study area. The Hydric Soils List for Montgomery County lists the following soil units as hydric: Bowmansville silt loam and Readington silt loam. The remaining soil units within the study area are nonhydric. Soils in the study area are listed in Table 1.0 (below) and shown in Figure 3. Table 1.0: Soil Units within the Study Area Soil Map Hydric Soil Description Unit Soils List Bp Bowmansville silt loam Yes KsE3 Klinesville very shaly silt loam, % slopes, severely eroded No PeB2 Penn silt loam, 3-8 % slopes, moderately eroded No PkD3 Penn-Klinesville very shaly silt loams, % slopes, severely eroded No ReB2 Readington silt loam, 3-8 % slopes, moderately eroded Yes 1
4 Study Area Figure 1 Project Location Map (not to scale) Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, PA March 2007
5 Study Area Figure 2 USGS Quad Map East Greenville Quad (not to scale) Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, PA March 2007
6 Wetland Investigation Report March 2007 Kutztown Road (SR1033) Bridge Replacement Wetlands and Waters of the United States: The National Wetland Inventory (NWI) indicates the presence of one Waters of the US feature, Molasses Creek within the study area boundaries. No wetlands are indicated within the study area boundaries (Figure 4). Floodplains: A portion of the study area is located within the 100-year floodplain, according to the Federal Emergency Management Agency (FEMA) Flood Insurance Rate Mapping (FIRM, panel number 42091C0018E) (Figure 5). The floodplain area is located along Molasses Creek, which flows into the Green Lane Reservoir. The floodplain is a Zone A floodplain, which FEMA defines as No base flood elevations determined. Rare, Threatened, and Endangered Species: A review of the Pennsylvania Natural Diversity Inventory (PNDI) database indicates that the proposed project has no known potential impacts. In accordance with the PNDI Project Environmental Review Receipt, this project is located in a County, which may require a Bog Turtle Habitat screening (Appendix B). Therefore, a call was placed to the Department of Environmental Protection-Southeastern Regional Office to determine the appropriate level of effort necessary to address the Bog Turtle Habitat screening requirements. No bog turtles or appropriate habitat are known to occur within the project study area and no wetlands are being impacted therefore no additional screening effort is necessary. METHODOLOGY METHODS The investigation, conducted in accordance with the U.S. Army Corps of Engineers Wetlands Delineation Manual, Y-87-I (Environmental Laboratory, 1987), supplemental guidance issued by the United States Army Corps of Engineers (COE) and best professional judgment, identified those areas meeting the three-parameter test (hydrophytic vegetation, hydrologic indicators and hydric soils) for delineating wetlands and Waters of the U.S.. Hydrophytic Vegetation Plants were identified using appropriate taxonomic keys and field guides. The wetland indicator status for each species identified was determined from The National List of Plant Species that Occur in Wetlands: Northeast (Region 1), (Reed, 1988). This publication assigns indicator statuses to the approximately 6,000 species of plants that commonly occur in wetlands and uplands in the Northeastern United States. A species assigned an indicator status of UPL (upland) nearly always appears in an upland habitat. A species assigned an indicator status of FACU (facultative upland) typically appears in uplands two thirds of the time and in wetlands one third of the time. A FAC (facultative) indicator status is evidence that the subject plant is equally likely to occur in wetlands or uplands. A species assigned an indicator status of FACW (facultative wetland) will typically be found in wetlands about two thirds of the time, while appearing in uplands about one third of the time. A species assigned an indicator status of OBL (obligate) is almost always found in wetlands. Greater than 50% FAC, FACW, or OBL species must be present for the area to meet the 4
7 Wetland Investigation Report March 2007 Kutztown Road (SR1033) Bridge Replacement hydrophytic vegetation parameters of the Corps of Engineers three-parameter methodology. Hydrologic Indicators Areas with evident characteristics of wetland hydrology are those where the presence of water has an overriding influence on characteristics of vegetation and soils due to anaerobic and reducing conditions. Indicators of wetland hydrology include drainage patterns, drift lines, sediment deposition, watermarks, stream gauge data and flood predictions, historic records, visual observation of saturated soils, and visual observation of inundation. Wetland hydrology indicators observed during field investigations are noted. Hydric Soils Indicators of hydric soils observed in the project area were noted during the field investigation. Common indicators of hydric soil conditions in non-sandy soils include the presence of sulfidic odor, reducing conditions, gleyed or low chroma colors and concretions. The coastal location of the project dictates that sandy soils are likely also present in the project investigation area. Hydric soils conditions in sandy soils were not assessed using soils colors in the Munsell Soil Color Charts. USDA-NRCS technical guidance document Field Indicators of Hydric Soils in the United States, Version 5.01,2003 dictates hydric conditions are present in sandy soils when indicators such as, histisols, histic epipedons, sulfidic odor, aquic or peraquic moisture regimes, streaking of subsurface horizons by organic matter or the presence of organic pans (accumulations of organic material at the approximate depth of the water table) are evidenced. 5
8 Study Area Figure 3 Soil Map (not to scale) Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, PA March 2007
9 Study Area Figure 4 NWI Map (USFWS NWI data) (not to scale) Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, PA March 2007
10 Study Area Figure 5 Floodplain Map (not to scale) Kutztown Road (SR 1033) Resurfacing and Bridge Replacement Upper Hanover Township, Montgomery County, PA March 2007
11 Wetland Investigation Report March 2007 Kutztown Road (SR1033) Bridge Replacement RESULTS On September 22, 2005, RK&K environmental scientists conducted a wetland investigation within the study area of SR 1033 (Kutztown Road) Bridge Resurfacing and Replacement project, Montgomery County, Pa. The study area extends along SR 1033 and encompasses a portion of Molasses Creek. Three (3) Waters of the US were delineated within the project area (see Table 3.0). All Waters were identified in the field using pink or orange flagging and were located using a Trimble GeoXT Global Positioning System (GPS). Table 3.0: Delineated Wetlands for the Kutztown Road (SR 1033) Bridge Replacement Project Delineated Map Sheet NWI Area Designation Area Number Mapping Flag Numbers WA WUS-Perennial Stream 1 Yes 1-14 WB WUS-Channel 1 No 1-6 WC WUS-Channel 1 No 1-6 Area WA Area WA is a perennial stream (Molasses Run) which flows east/southeast through the study area. Area WA flows under Kutztown Road (SR 1033) through a bridge and extends outside of the study area. This feature is approximately 8 feet wide with a water depth of 2 to 4 inches. The bottom substrate consists of rocks and gravel. Area WA was identified in the field using flags labeled WA-1 through WA-14. Area WB Area WB is a manmade ephemeral channel, which flows into Area WA north of the Kutztown Road bridge over Molasses Run (Area WA). Area WB contained a small (<1 inch) of standing water near the confluence with Area WA at the time of the field visit. Area WB is approximately 2 to 3 feet wide and has a mud and gravel bottom. This feature was identified in the field using flags labeled WB-1 through WB-6. Area WC Area WC is a manmade ephemeral channel which flows into Area WB north of the Kutztown Road bridge over Molasses Run (Area WA). Area WC any water at the time of the field visit. Area WC is approximately 1 to 2 feet wide and has a grass and mud bottom. This feature was identified in the field using flags labeled WC-1 through WC-6. 9
12
13 APPENDIX A Photographic Log
14 Wetland Investigation Report October 2005 Kutztown Road (SR 1033) Bridge Replacement Area WA- Perennial Stream Area WB- Channel
15 Wetland Investigation Report October 2005 Kutztown Road (SR 1033) Bridge Replacement Area WC- Channel
16 APPENDIX B Agency Correspondence
17
18
19
20
21 APPENDIX C Wetland Delineation Sketch
22 DISTRICT COUNTY ROUTE SECTION SHEET 6-0 MONTGOMERY M OF 6 UPPER HANOVER REVISION NUMBER REVISIONS DATE BY OPERATOR: LSmith FILE NAME: n:\projects\2002\02107_dist6\1033\cadd\plans\roadway\pwp-f000_1033.dgn PLOTTED: Friday, April 04, 2008 AT 04:03 PM LIMITS OF WATERS EXTEND BEYOND THE STUDY AREA 25 FEET 0 25 FEET PREPARED BY: RUMMEL, KLEPPER & KAHL, LLP 2570 BOULEVARD OF THE GENERALS SUITE 215 NORRISTOWN, PA PHONE: (610) REGISTERED COMMONWEA LTH OF PROFESSIONAL DAVID WAYNE WALLACE ENGINEER NO. P E N N S Y L V A N R I A DES: LCS DWG: LCS CHK: JOB: DATE: MARCH 28, 2008 FILE:
WETLAND DELINEATION REPORT
WETLAND DELINEATION REPORT WHITMORE LAKE LOT WASHTENAW COUNTY, MICHIGAN JULY 2015 PREPARED FOR: WASHTENAW COUNTY PARKS AND RECREATION 2230 SOUTH PLATT ROAD ANN ARBOR, MICHIGAN 48104 PREPARED BY: THE MANNIK
More informationENVIRONMENTAL ASSESSMENT FORM (E.A. Form)
3930-PM-WM0017A Rev. 11/2001 COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION and U.S. ARMY CORPS OF ENGINEERS ENVIRONMENTAL ASSESSMENT FORM (E.A. Form) PART 1 - RESOURCE IDENTIFICATION
More informationI THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018
I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018 Definition Regulatory Definition - Those areas that are inundated
More informationPERFORMANCE STANDARDS AND MONITORING PROTOCOL FOR TIDAL WETLAND MITIGATION BANKS. October 28, 2016
PERFORMANCE STANDARDS AND MONITORING PROTOCOL FOR TIDAL WETLAND MITIGATION BANKS October 28, 2016 A. Tidal wetland mitigation banks shall conform to the following performance standards by the end of the
More informationRural Wetland Functions and Protection: A Case Study. by Doug Littauer
Rural Wetland Functions and Protection: A Case Study by Doug Littauer A Thesis Submitted in partial fulfillment of the requirements for the degree Master of Environmental Studies The Evergreen State College
More informationChapter 10 Natural Environment
Chapter 10 Natural Environment Existing Conditions The Natural Environment Element addresses the protection, conservation, preservation, and restoration of the natural resources the Bayview Ridge Subarea,
More informationM E M O R A N D U M Clallam County Public Works Department
M E M O R A N D U M Clallam County Public Works Department TO: TO: Craig Jacobs, Public Works Director Joel Winborn, Division Manager FROM: Dave Lasorsa, Environmental Coordinator SUBJ: Wetland Assessment
More informationDRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA
DRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA Prepared for: ConocoPhillips Alaska, Inc. Anchorage, AK March
More informationWaters of the United States, Including Wetlands. Delineations and USACE Permits. For Harris County Projects
Guidance Document Waters of the United States, Including Wetlands Delineations and USACE Permits For Harris County Projects Harris County Public Infrastructure Department Architecture and Engineering Division
More informationHolly Swartz and Jason Shirey
Chapter 105 General Permits for Stream and Wetland Impacts DEP Ch. 105 CONTACTS FOR BERKS COUNTY: Holly Swartz and Jason Shirey What DEP Regulates Under Chapter 105 Waters of the Commonwealth, which includes
More informationCOON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432
PAN 16-112, Westwood Middle School, Page 1 of 6 COON CREEK WATERSHED DISTRICT PERMIT REVIEW MEETING DATE: August 22, 2016 AGENDA NUMBER: 10 FILE NUMBER: 16-112 ITEM: Westwood Middle School RECOMMENDATION:
More informationConstruction Notice For Buckley Road- Fostoria Central 138 kv Transmission Line Extension Project
Construction Notice For Buckley Road- Fostoria Central 138 kv Transmission Line Extension Project Case No. 17-2076-EL-BNR Submitted to: The Ohio Power Siting Board Pursuant to Ohio Administrative Code
More informationJune 14, 2017, by consultant; September 12, 2017, by USACE staff.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationINSTRUCTIONS FOR USING THE GENERAL PERMIT...i A. GENERAL DESCRIPTION AND FEES
COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS GENERAL PERMIT BWEW-GP-1 FISH HABITAT ENHANCEMENT STRUCTURES TABLE OF CONTENTS PAGE INSTRUCTIONS
More informationA.H. Rossford Holdings, LLC 8079 Wales Road Northwood, Ohio 43619
OHIO ENVIRONMENTAL PROTECTION AGENCY OHIO ISOLATED WETLAND PERMIT, LEVEL 2 REVIEW PROJECT RED WOOD COUNTY, OHIO March 7, 217 Prepared for: A.H. Rossford Holdings, LLC 879 Wales Road Northwood, Ohio 43619
More informationNew Castle County, DE. Floodplain Regulations
New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More information7.6 Wetlands, Riparian and Littoral Habitats
7.6 Wetlands, Riparian and Littoral Habitats 7.6.1 Overview Yuba County Water Agency This section discusses wetland, riparian and littoral habitats in the vicinity 1 of Yuba County Water Agency s (YCWA
More informationSurface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.
Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter 62-340 F.A.C. What are Waters? 373.019 F.S. Definitions (20) Water or waters in the state means any and all
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring
DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection DOCUMENT NUMBER: 363-0300-001 TITLE: Design Criteria - Wetlands Replacement/Monitoring EFFECTIVE DATE: February 11, 1997 AUTHORITY:
More informationHYDRIC SOILS. By Neal Svendsen Resource Soil Scientist Natural Resources Conservation Service Sept 2006
HYDRIC SOILS By Neal Svendsen Resource Soil Scientist Natural Resources Conservation Service Sept 2006 Wetlands and Hydric Soils The term hydric soils proposed by Cowardin in 1979 Classification of Wetlands
More informationFreight Street Development Strategy
Freight Street Development Strategy Appendix B: Naugatuck River Floodplain Analysis Freight Street Development Strategy DECEMBER 2017 Page B-1 1.0 NAUGATUCK RIVER FLOODPLAIN AT FREIGHT STREET 1.1 Watershed
More informationDepartment of the Army Permit Application
Department of the Army Permit Application DA File Number U.S. Army Corps of Engineers Honolulu District Date Received by CEPOH-RO Send Completed Application to: Honolulu District, U.S. Army Corps of Engineers
More informationSchool Way Bridge Replacement Project
Delineation of Waters of the United States February 24, 2010 Prepared for: Mendocino County Department of Transportation Attn: Park Steiner 340 Lake Mendocino Drive Ukiah, CA 95482 Prepared by: North State
More informationAn Introduction to Hydric Soils and Hydric Soil Terminology. Based on deliberations of: The National Technical Committee for Hydric Soils (NTCHS).
An Introduction to Hydric Soils and Hydric Soil Terminology Based on deliberations of: The National Technical Committee for Hydric Soils (NTCHS). A word about the NTCHS The National Technical Committee
More informationAn Introduction to Hydric Soils and Hydric Soil Terminology. A word about the NTCHS. Wetlands
An Introduction to Hydric Soils and Hydric Soil Terminology Based on deliberations of: The National Technical Committee for Hydric Soils (NTCHS). A word about the NTCHS The National Technical Committee
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationNOTE(S): 1. Tongass National Forest LUD mapping from El Capitan GIS Scoping (R. Carstensen 2013).
1/31/14 BCB Figure 1 ADJACENT LAND USE DESIGNATION MAP LEGEND: Mitigation Bank Site 1. Tongass National Forest LUD mapping from El Capitan GIS Scoping (R. Carstensen 2013). 2/3/2014 10:06 AM S:\Prince
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationDEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations
DEPARTMENT OF ENVIRONMENTAL PROTECTION Office of Field Operations DOCUMENT NUMBER: 021-0200-001 TITLE: Policy for Pennsylvania Natural Diversity Inventory (PNDI) Coordination During Permit Review and Evaluation
More informationPUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)
PUBLIC NOTICE US Army Corps of Engineers Omaha District Application No: NWO-2017-01366-DEN Project: Douglas Lane Tributary Stabilization Project Applicant: Town of Castle Rock Waterway: Douglas Lane Tributary
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationErosion and Sediment Control Plan for a Timber Harvesting Operation
3930-FM-WM0155 Rev. 7/2004 Erosion and Sediment Control Plan for a Timber Harvesting Operation 1. GENERAL INFORMATION A. Location Municipality B. Timber sale area = acres Date County C. Landowner Name
More informationSECTION 3 NATURAL RESOURCES
SECTION 3 NATURAL RESOURCES The natural environment plays a large role in planning for future development. Environmental conditions, such as topography, wetlands, floodplains, and water bodies, can often
More informationMunicipal Stadium Wetland
W A T E R S H E D F A C T S Total watershed area 140 mi 2 Average annual rainfall 38 in Average annual temperature 58 F Elevation Max 1321 ft Min 899 ft C. J. Brown Reservoir controls flow from 83 mi 2
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationFor the property described as: Property Owner: Name. Phone Number. Mailing Address. City. Report Year:
Timber Management Plan For the property described as: Property Owner: Name Phone Number Mailing Address City State Zip Report Year: (This template is provided to assist Cherokee County land owners who
More informationPOLICY FOR NATURAL RESOURCE MANAGEMENT AREAS
POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS I. POLICY STATEMENT Auburn University's (the University's) "Policy for Natural Resource Management Areas" implements the Campus Master Plan Land Use Element
More informationANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY
ANTIQUITIES PERMIT APPLICATION FORM ARCHEOLOGY GENERAL INFORMATION I. PROPERTY TYPE AND LOCATION Project Name (and/or Site Trinomial) East Williamson County Events Center Access Road County (ies) Williamson
More informationVOLUME 1 TABLE OF CONTENTS
Santiago Hills Phase II Planned Community and East Orange Planned Community Area 1 Issue Date: 2, May 20055 VOLUME 1 TABLE OF CONTENTS SECTION 1: INTRODUCTION... 1-1 1.1 PROJECT DESCRIPTION... 1-1 1.2
More informationCharacteristics of Land Resources
Chapter Chapter 1 Characteristics of Land Resources The geology, soils and topography of Woodford County T he geology, soils and topography of an area are important to the community planning process for
More informationFINAL SCOPING DOCUMENT
State Environmental Quality Review Act (SEQR) FINAL SCOPING DOCUMENT HR Ventures Subdivision Town of Shawangunk, Ulster County, NY Draft Environmental Impact Statement SEQR CLASSIFICATION: UNLISTED ACTION
More informationAs we have discussed, our Nationwide Permit 39 is pending with the U.S. Army Corps of Engineers, Forth Worth Branch.
April 18, 2017, 2017 Eun Ju Lee, Ph.D., P.E. Municipal Solid Waste Permit Section Waste Permits Division Texas Commission on Environmental Quality 12100 Park 35 Circle, Building F (MC-124) Austin, Texas
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM US Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook SECTION I:
More informationAssessment of Depressional Wetland Characteristics Influencing On-site and LiDAR Delineation Methods
UNIVERSITY OF FLORIDA Assessment of Depressional Wetland Characteristics Influencing On-site and LiDAR Delineation Methods Sean R. Rochette Spring 2013 Introduction Wetland protection started within the
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationG.B. Sonny Hall, PhD. Veronika Thiebach
G.B. Sonny Hall, PhD Technical Program Manager Veronika Thiebach Senior Assistant General Counsel St. Johns River Water Management District 1 SJRWMD MFLs Method MFLs Method Premises Case studies Lake Hiawassee
More informationFreshwater Wetland Rules and Agriculture NJDEP Freshwater Wetlands Rules N.J.A.C. 7:7A Effective 10/20/03
Freshwater Wetland Rules and Agriculture NJDEP Freshwater Wetlands Rules N.J.A.C. 7:7A Effective 10/20/03 Normally, the NJDEP Freshwater Wetlands Rules (NJAC 7:7A-2.2) regulate any activities in and around
More informationNRI/FSD and FOREST CONSERVATION EXEMPTION SUBMISSION REQUIREMENTS
Detailed description of the submission requirements for the NRI/FSD and forest conservation exemption requests may be found in the MNCPPC Trees Technical Manual. The applicant, applicant s agent, or qualified
More information5th Street Bridge Replacement Project Yuba City, California Location Hydraulic Study Report Bridge No. 18C0012
EA 03-0L2324 Yuba City, California Location Hydraulic Study Report Submitted to: Prepared by: November 2012 Table of Contents Executive Summary... iii Acronyms... v 1 General Description... 1 1.1 Project
More informationJurisdictional Determination Report Knik-Goose Bay Road Reconstruction Project Wasilla, Alaska
Jurisdictional Determination Report Knik-Goose Bay Road Reconstruction Project Wasilla, Alaska Prepared for: Alaska Department of Transportation and Public Facilities Central Region 4111 Aviation Avenue
More informationCrow s Foot Conservation Area Feasibility Study
Crow s Foot Conservation Area Feasibility Study Site Opportunities Presentation Trust For Public Land PRESENTED BY SmithGroup JJR August, 2002 McHenry County Conservation District Boone County Conservation
More informationPractice Plan for Sparta Mountain Wildlife Management Area (WMA) Stand 33: Restore Old Growth
Practice Plan for Sparta Mountain Wildlife Management Area (WMA) Stand 33: Restore Old Growth This practice plan addresses a general activity provided for in year 2017-2018 of the management schedule within
More informationConstructed Wetland Pond T-8
Constructed Wetland Pond T-8 Description A constructed wetlands pond is a shallow retention pond designed to permit the growth of wetland plants such as rushes, willows, and cattails. Constructed wetlands
More informationInformation for File # PRH
Information for File # 2016-02602-PRH Applicant Corps Contact Tom Morley Paul Hauser Address 152 Baker Drive, Redwood Falls, MN 56283 E-Mail Paul.R.Hauser@usace.army.mil Phone 651-290-5357 Primary County
More information5. Name of waterbody(ies) (if applicable & if known) in which work will occur? Harney Flats Canal
SECTION C: SUPPLEMENTAL INFORMATION FOR WORKS OR OTHER ACTIVITIES IN, ON, OR OVER WETLANDS AND/OR OTHER SURFACE WATERS (Note: This section is not required if all the proposed activities are covered in
More informationThe Buzzards Bay National Estuary Program Pocket Guide to Hydric Soils for Wetland Delineations in Massachusetts. Version 2.1
The Buzzards Bay National Estuary Program Pocket Guide to Hydric Soils for Wetland Delineations in Massachusetts Version 2.1 The Buzzards Bay National Estuary Program November, 2014 This document is a
More informationPublic Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:
Public Notice Applicant: Lennar Homes Project No.: SWF-2013-00265 Date: October 29, 2013 The purpose of this public notice is to inform you of a proposal for work in which you might be interested. It is
More informationCESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS
DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DISTRICT, MOBILE DISTRICT P.O. BOX 2288 MOBILE, ALABAMA 36628-0001 CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM-2012-00731-AFM JOINT PUBLIC NOTICE SAM-2012-0731-AFM
More informationUPRR criteria for sizing waterway openings under bridges and through culverts are as follows:
UNION PACIFIC RAILROAD SCOPE OF HYDROLOGIC/HYDRAULIC DESIGN ENGINEERING AND PERMITTING SERVICES FOR SIZING WATERWAY OPENINGS AT NEW AND REPLACEMENT STRICTURES These flood passage criteria were developed
More informationChapter 13: Wildlife and Vegetation
Chapter 13: Wildlife and Vegetation Introduction and Setting Nevada County contains an extremely wide range of plants, animals and habitat types. With topographic elevations ranging from 300 feet in the
More informationClick here to enter a date.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationGUIDELINES FOR THE UNIFORM ENVIRONMENTAL REVIEW PROCESS IN PENNSYLVANIA
GUIDELINES FOR THE UNIFORM ENVIRONMENTAL REVIEW PROCESS IN PENNSYLVANIA PA Department of Environmental Protection PA Department of Community and Economic Development USDA Rural Development, Rural Utilities
More informationGENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION
GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA March 25, 2006 INTRODUCTION This document is intended to provide general guidance for use in conducting
More informationAugust 15, 2006 (Revised) July 3, 2006 Project No A
August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway
More informationThe Clean Water Act Waters of the US Proposed Rule -- What is it and what are the implications for agriculture?
The Clean Water Act Waters of the US Proposed Rule -- What is it and what are the implications for agriculture? August 1, 2014 1 Acronyms and Terms Agencies CWA WOTUS Rule FEMA USGS Environmental Protection
More informationA Short Presentation by David Melvin, PLS, CFM
A Short Presentation by David Melvin, PLS, CFM Based on Florida Statutory Definition recorded in Chapter 381.0065(2)(i) and (k) F.S. with excepts from Florida Department of Health, Interoffice Memorandum,
More informationStream Watch Visual Survey Instructions
Stream Watch Visual Survey Instructions The Stream Watch Visual Survey is based on assessment parameters from the EPA's Rapid Bioassessment Protocol Habitat Assessment, Georgia Adopt a Stream Visual Survey,
More informationChapter III Affected Environment and Impacts of the Proposed Action
Flintlock Road I-35 Overpass Draft Environmental Assessment III-1 Chapter III Affected Environment and Impacts of the Proposed Action In this section, the Proposed Action refers to Build Alternative C,
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationInstructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):
This PCN integrates the requirements of the U.S. Army Corps of Engineers (Corps) Nationwide Permit Program within the South Pacific Division (SPD), including the Albuquerque, Los Angeles, San Francisco,
More informationThe History and Use of Field Indicators of Hydric Soils in the United States
The History and Use of Field Indicators of Hydric Soils in the United States Lenore Matula Vasilas Soil Scientist USDA NRCS Beltsville, MD 1970s Soil Taxonomy incorporates wet soils into the classification
More informationAugust, 2010 A-1, FSD 1 Page 1 STANDARD FSD NOTES. General Notes to include on all FSDs with all blanks filled in:
STANDARD FSD NOTES General Notes to include on all FSDs with all blanks filled in: 1. This site is zoned (insert zone) and is located in the (Rural/ Developing/ Developed) Tier as defined in the Approved
More informationEstimating the Seasonal High Water Table: A Mix of Art & Science
Estimating the Seasonal High Water Table: A Mix of Art & Science PONDS WORKSHOP - SJRWMD Devo Seereeram, Ph.D., P.E. This paper was originally written over 4 years ago & generated a lot of interest. The
More informationLower Bois d Arc Creek Reservoir
U.S. Army Corps of Engineers Tulsa District Revised Draft Environmental Impact Statement Lower Bois d Arc Creek Reservoir APPENDIX H: APPROVED JURISDICTIONAL DETERMINATIONS FOR PROPOSED LOWER BOIS D ARC
More informationAPPENDIX A. NEPA Assessment Checklist
APPENDI A NEPA Assessment Checklist NEPA CHECKLIST DATE: January 12, 2009 PREPARER: Frederick Wells, RLA PIN and Project Title: Surplus Property Request Wilder Balter Partners Marketplace Town of Newburgh,
More informationDRAFT PROJECT PROSPECTUS Part 3 Project Environmental Classification
DRAFT PROJECT PROSPECTUS Part 3 Project Environmental Classification Project Classification Class 1 DEIS FEIS X Class 2 Categorical Exclusion Programmatic Categ. Exclusion Class 3 EA Revised EA Key Number:
More informationStream Reaches and Hydrologic Units
Chapter United States 6 Department of Agriculture Natural Resources Conservation Service Chapter 6 Stream Reaches and Hydrologic Units Rain clouds Cloud formation Precipitation Surface runoff Evaporation
More informationHilary: Let me know, if you have any questions about this report. Thanks:
From: To: Subject: Date: Attachments: Becker, Jennifer - NRCS, Belvidere, IL Hilary Arther NRI #1518, Special Use at 56 & 100 U.S. Route 20 Rockford, IL 61007 Thursday, March 23, 2017 4:29:06 PM NRI #1518
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose
STANDARD FOR GRASSED WATERWAYS Definition A natural or constructed watercourse shaped or graded in earth materials and stabilized with suitable vegetation for the safe conveyance of runoff water. Purpose
More informationPROSPECTUS FOR THE BAYOU DE LOUTRE MITIGATION SITE UNION COUNTY, ARKANSAS ARKNASAS STATE HIGHWAY AND TRANSPORTAITON DEPARTMENT
PROSPECTUS FOR THE BAYOU DE LOUTRE MITIGATION SITE UNION COUNTY, ARKANSAS ARKNASAS STATE HIGHWAY AND TRANSPORTAITON DEPARTMENT FEBRUARY 2012 The Arkansas State Highway and Transportation Department (AHTD)
More informationEnvironmental Information Worksheet
Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project
More informationStandards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition
STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm
More informationSection 2: Watershed Characteristics and Runoff
Section 2: Watershed Characteristics and Runoff The hydrology of the Wissahickon Creek and its tributaries varies greatly from place to place within the larger watershed. Stormwater management planning
More informationPOND SITING REPORT TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY SECTION 1.0 INTRODUCTION SECTION 2.0 PROJECT DESCRIPTION
November, 2014 TABLE OF CONTENTS LIST OF TABLES LIST OF FIGURES EXECUTIVE SUMMARY POND SITING REPORT Summary of section 1.0 & 2.0. Specify datum used in the design calculations and the construction plans.
More informationSW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN
SW-74 SERENOVA PRESERVE SITES 2, 3, 4, 8 MITIGATION PLAN BACKGROUND INFORMATION Project SWIM? Aquatic Control? Exotic Control? Mitigation Bank? Type No No No No Mitigation Restoration and enhancement Type
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S.
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationHighlands Environmental Resource Inventory for the Town of Phillipsburg
Formatted: Tab stops: 2.29", Left PRELIMINARY DRAFT SUBJECT TO MODIFICATINS AND REVISIONS Formatted: Font: 18 pt Formatted: Centered, Tab stops: 2.29", Left Formatted: Font: 14 pt Formatted: Tab stops:
More informationPublic Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017
SPONSOR: Gary Pestorious Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017 REFER TO: 2012-01634-DAS SECTION:404 - Clean Water Act 1. WETLAND COMPENSATORY MITIGATION BANK PROPOSAL: Pickerel Lake
More informationThe Buzzards Bay National Estuary Program Pocket Guide to Hydric Soils for Wetland Delineations in Massachusetts
The Buzzards Bay National Estuary Program Pocket Guide to Hydric Soils for Wetland Delineations in Massachusetts The Buzzards Bay National Estuary Program September, 2013 This document is largely taken
More informationALABAMA S BEST MANAGEMENT PRACTICES. Protection of Water Quality During Timber Harvesting
ALABAMA S BEST MANAGEMENT PRACTICES Protection of Water Quality During Timber Harvesting Water Quality Responsibility Landowners and/or involved professional forestry practitioners such as: Forest resource
More informationSaturated Buffer. Subsurface Drainage PURPOSE N REDUCTION LOCATION COST BARRIERS
Saturated Buffer To intercept tile drainage prior to discharging to surface waters and redistribute the water laterally in the soil profile of the streamside buffer. Subsurface drainage, also known as
More informationAPPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers
APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION
More informationChapter 18 Natural Resources PHYSICAL LOCATION STREAMS AND WATERSHEDS FLOODPLAINS
Chapter 18 Natural Resources PHYSICAL LOCATION Shippensburg Borough and Shippensburg Township are located in the heart of Cumberland Valley, within the Ridge and Valley Province. Blue Mountain is situated
More informationU.S. Army Corps of Engineers Mobile District
U.S. Army Corps of Engineers Mobile District General Permit for Living Shorelines in Alabama Sandy P. Gibson Regulatory Specialist, Coastal Alabama Regulatory Division, Mobile District US Army Corps of
More informationAPPENDIX E. LESA Models
APPENDIX E LESA Models LESA ASSESSMENT CALEXICO SOLAR FARM I PHASE A PROJECT AREA CALEXICO SOLAR FARM I PHASE A PROJECT (SW/4 Section 13, S/2 Section 14, S/2 NE/4 Section 15, NW/4 Section 15, T17S, R13E,
More informationWETLAND LOCATION MAP ALLEGHENY ACCESS (Mogadore-Vanport) USACE BUFFALO DISTRICT
0 50 100 Feet SCALE:1 " = 100 ' Delineated Stream Delineated Wetland Delineated Wetland Boundary Right-Of-Way (ROW) - [Existing] Right-Of-Way (ROW) - [Proposed] Temporary Workspace (TWS) WETLAD LOCATIO
More information