1 REGULATORY USE OF BROWARD COUNTY S FUTURE GROUNDWATER ELEVATION MAP CARLOS ADORISIO, P.E. ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION ENVIRONMENTAL PROTECTION AND GROWTH MANAGEMENT DEPARTMENT
2 Goal To understand which groundwater (water table) maps should be used when applying for a Broward County Surface Water Management License for new or modified projects
3 Overview Understanding the Significance of Groundwater Elevations Old Groundwater Elevation Map vs. New Groundwater Elevation Map Regulatory Requirements for Antecedent Conditions Understanding Code Requirements and Definitions Practical Examples
4 Application Groundwater (water table) elevation affects the design of stormwater management systems: Wet or dry retention areas, stage/storage curve (on-site storage), allowable discharge, etc. Permitting process requires the use of appropriate groundwater elevations
5 Water Management Plate WM 2.1 (Water Table Map) Adopted in 2000 Average Wet Season Water Table Based on groundwater and surface water measurements Limited data (e.g., along coast line) requires use of site-specific measurements of groundwater
6 Rising Historic Groundwater Levels
7 New Challenge - Future Conditions Sea level rise: National Research Council Curve 3 (NRC3)
8 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations)
9 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations) The map represents the expected future average wet season groundwater elevations for Broward County. The average is based on model outputs for the months of May through October over the period of The models used are The Broward County Inundation Model and the Broward County Northern Variable Density model, both developed by the United States Geological Survey (USGS) and MODFLOW based. The future conditions that are modified in the models are both precipitation and sea level rise. The future precipitation pattern is based on the Center for Ocean-Atmospheric Prediction Studies (COAPS) downscaled Community Climate System Model (CCSM) global model and represents an increase of 9.1% rainfall from the base case of (53.4 in/yr to 58.2 in/yr). Sea level rise was based on the United States Army Corps of Engineers (USACE) National Research Council Curve 3 (NRC3) curve which equates to an increase of 26.6 to 33.9 inches to the future period from 1992 levels. Final results are presented in 1988 North American Vertical Datum (NAVD 88).
10 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations) Establishes a Future Conditions Average Wet Season Water Level Map representing conditions predicted in Ensures the resiliency of current and future infrastructure investments by providing the necessary level of flood protection and water quality treatment during their expected useful lifespan (Cannot rely solely upon historic and current environmental conditions as the basis for infrastructure planning, design, and permitting)
11 Plate WM 2.1 vs. Plate WM 2.1-Future Conditions Minor changes in Western Broward More significant increases in tidally influenced Eastern Broward
12 Broward County Code Requirements Chapter 27, Volume V - WATER RESOURCE MANAGEMENT
13 Design Criteria Section (b)(5)a.3.b) Antecedent conditions: Ground water and surface water stages antecedent to a design event shall be the higher of the average wet season water levels or the applicable control elevations. Plate WM 2.1 may be used for determining the average wet season ground water levels for use in calculating a design event for existing projects, except for applications for major redevelopment as defined in Section or for a major modification to a surface water management license. Plate WM Future Conditions shall be used for determining the average wet season ground water levels for use in calculating a design event for new applications for a surface water management license, applications for major redevelopment of existing sites, and applications for major modifications to existing surface water management licenses submitted after June 30, 2017.
14 Design Criteria Section (b)(5)a.3.b) Antecedent conditions: Ground water and surface water stages antecedent to a design event shall be the higher of the average wet season water levels or the applicable control elevations. If the applicable control elevation (CE) is higher than the average wet season ground water elevation shown in Plate WM 2.1 and/or Plate WM 2.1- Future Conditions, then that CE will be used in the design
15 Design Criteria Section (b)(5)a.3.b) Antecedent conditions:... Plate WM 2.1 may be used for determining the average wet season ground water levels for use in calculating a design event for existing projects, except for applications for major redevelopment as defined in Section or for a major modification to a surface water management license. Plate WM Future Conditions shall be used for determining the average wet season ground water levels for use in calculating a design event for new applications for a surface water management license, applications for major redevelopment of existing sites, and applications for major modifications to existing surface water management licenses submitted after June 30, 2017.
16 Definitions Modifications: Major Modification Letter Modification Redevelopment: Major Redevelopment Minor Redevelopment
17 Modifications Section (d)(2)d.1.b Section 198(d)(2)d.1.b allows for modifications to a surface water management license by letter (or Letter Modification) provided the request modification does not: Substantially alter the license authorization, or any license conditions Increase the authorized off-site discharge Adversely impact the environmental features of the project Decrease the required retention/detention Increase the required flood elevations for roads or buildings Decrease pollution removal efficiency All other modifications are deemed Major Modifications
18 Major Redevelopment Section Definition Major redevelopment means construction activities which involve the demolition or removal of the principal structure on a site or of more than fifty percent (50%) of the impervious surface of a developed area on a site. Major redevelopment also means minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site or greater than or equal to two (2) acres over a period of ten (10) years.
19 Major Redevelopment Construction which involve the demolition or removal of the principal structure on a site Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years
20 Major Redevelopment (Example 1) Construction which involve the demolition or removal of the principal structure on a site Site 20 acres: 2.6 ac. of buildings, 10 ac. of parking, and 7.4 ac. of pervious areas. The buildings include a 1-acre principal structure and 8 satellite structures (each 0.2- ac. in area) If the 1.0-ac. principal structure is removed, then the project will be deemed as major redevelopment
21 Construction which involve the demolition or removal of the principal structure on a site Example 1 Site 20 acres: 2.6 ac. of buildings, 10 ac. of parking, and 7.4 ac. of pervious areas. The buildings include a 1-acre principal structure and 8 satellite structures (each 0.2-ac. in area) 1 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 7.4 ac. 10 ac.
22 Construction which involve the demolition or removal of the principal structure on a site Example 1 (cont d) 0.2 ac. 0.2 ac. 1 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 7.4 ac. 10 ac.
23 Major Redevelopment (Example 2) Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site A site has a building area and a pavement area. Both areas are impervious. Therefore, the building area is a developed area and the pavement area is also a (another) developed area Site 10 acres: 3 ac. of buildings, 5 ac. of parking, and 2 ac. of pervious areas If the 1.51 ac. of the building area are removed, then the project will be deemed as major redevelopment If the 2.51 ac. of the parking area are removed, then the project will be deemed as major redevelopment
24 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 Site 10 acres: 3 ac. of buildings, 5 ac. of parking, and 2 ac. of pervious areas 3 ac. 2 ac. 5 ac.
25 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 (cont d) 1.51 ac. 3 ac. 2 ac. 5 ac.
26 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 (cont d) 2.51 ac. 3 ac. 2 ac. 5 ac.
27 Major Redevelopment (Example 3) Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Site 20 acres: 6 ac. of buildings, 10 ac. of parking, and 4 ac. of pervious areas If a project in Year 1 involves construction over 5.0 ac. of the site, it will be deemed major redevelopment If a project in Year 1 involves construction over 4.5 ac. of the site and does not include more than 3.0 acres of the existing building, it will be deemed minor redevelopment; Then a project in Year 10 involves construction over 0.5 acres of the site, the project in Year 10 will be deemed major redevelopment
28 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A Site 20 acres: 6 ac. of buildings, 10 ac. of parking, and 4 ac. of pervious area 6 ac. 4 ac. 10 ac.
29 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A (cont d) 5 ac. 6 ac. 4 ac. 10 ac.
30 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A (cont d) 5 ac. 6 ac. 4 ac. 10 ac.
31 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B 6 ac. 4 ac. 10 ac.
32 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B (cont d) YEAR ac. 6 ac. 4 ac. 10 ac.
33 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B (cont d) YEAR ac. YEAR ac. 6 ac. 4 ac. 10 ac.
34 Major Redevelopment (Example 4) Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Site 100 acres: 30 ac. of buildings, 50 ac. of parking, and 20 ac. of pervious areas. If a project in Year 1 involves expanding the site drainage area to ac., it will be deemed major redevelopment If a project in Year 1 involves expanding the site drainage area to ac., it will be deemed minor redevelopment; Then a project in Year 10 involves expanding the site drainage area further by 0.5 acres, the project in Year 10 will be deemed major redevelopment
35 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4A Site 100 acres: 30 ac. of buildings, 50 ac. of parking, and 20 ac. of pervious areas 30 ac. 20 ac. 50 ac.
36 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4A (cont d) 2 ac. 30 ac. 20 ac. 50 ac.
37 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B 30 ac. 20 ac. 50 ac.
38 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B (cont d) YEAR ac. 30 ac. 20 ac. 50 ac.
39 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B (cont d) YEAR ac. 30 ac. 20 ac. 50 ac.
40 SMW Licensing Exemptions Section (c) Section (c) describes exemptions and other considerations in surface water management licensing Water management works for major redevelopment of land that had originally been developed prior to the requirement of operating licenses or in accordance with operating licenses shall be accomplished utilizing the licensing provisions currently in effect Water management works for minor redevelopment of land that had originally been developed in accordance with operating licenses shall be accomplished utilizing the licensing provisions in effect at the time of original licensing If the existing construction or operation SWM license is expired, or if the approved works are not in compliance with the conditions of the license, minor redevelopment of land shall be accomplished utilizing the licensing provisions currently in effect
41 Design Criteria Section (b)(5)a.3.b) Type of Project New Project 1.- Major Redevelopment: a) Major Modification to existing SWM license b) No prior licensing 2.- Minor Redevelopment: a) Existing construction or operation SWM license is expired b) Approved works are not in compliance with the conditions of the SWM license Minor Redevelopment (Existing construction or operation SWM license is not expired, and approved works are in compliance with the conditions of the SWM license Design Criteria Plate WM 2.1-Future Condition will be used to determine water quality and water quantity requirements. Entire site needs to comply with current code requirements. Plate WM 2.1-Future Condition will be used to determine water quality and water quantity requirements. Plate WM 2.1 will be used to determine water quality and water quantity requirements.
42 Modification to Conceptual Approval (Letter of Conceptual Approval or Master License/Permit) Conceptual license should not be expired Modification request will be reviewed and evaluated based on the degree of information detail and criteria in effect at the time of application and issuance of the initial conceptual approval If the modification request requires information details which were not submitted with the initial application, then that information will be reviewed and evaluated pursuant to the criteria in effect at the time of the subsequent application
43 Conceptual Approval License Duration 2 years from date of issuance May be granted a one-year extension if requested 180 days prior to the expiration date and a reasonable justification is provided Each subsequent construction phase of the project is granted 5 years to finish construction Construction License will become invalid 2 years from date of issuance if work has not begun unless other provisions have been made with EPGMD
44 Substantial Improvement If a project is determined to be a substantial improvements by the Municipality s Building Official, all buildings within the site may need to comply with the current Florida Building Code. If this additional requirement results in additional work that deems the project a major redevelopment, Plate WM 2.1-Future Condition will be used to determine water quality, water quantity, and minimum FFE requirements.
45 Questions?
46 Surface Water Management System Redesign Examples
47 Surface Water Management System Redesign Example 1
48 Surface Water Management System Redesign Example 1
49 Surface Water Management System Redesign Example 1 Impacts to drainage system resulting from 2 increase in groundwater: Exfiltration trench lost 37.5% of capacity (reduced water quality) and drainage well lost 34% of discharge capacity (higher peak 100-yr, 3- day elevation) Drainage system re-design: Increase exfiltration trench from 70 feet to 110 feet and add pump to drainage well
50 Surface Water Management System Redesign Example 2
51 Surface Water Management System Redesign Example 2
52 Surface Water Management System Redesign Example 2 Impacts to drainage system resulting from 2 increase in groundwater: Dry retention areas no longer provide water quality, perimeter berm no longer contains 25-yr, 3-day runoff, and offsite discharge through orifice becomes negligible due to submergence (higher tail water) Drainage system re-design: Provide 85 feet of exfiltration trench, raise perimeter berm, and raise orifice
53 Surface Water Management System Redesign Example 3 AREA DESIGNED LOWER THAN BUILDING AND ADJACENT PROPERTY
54 Surface Water Management System Redesign Example 3 THROUGHOUT
55 Surface Water Management System Redesign Example 3 Impacts to drainage system resulting from 2 increase in groundwater: Exfiltration trench lost 58% of capacity (reduced water quality), higher 100-yr, 3-day peak elevation, parking lot flooded during 5-yr, 1 hour storm event Drainage system re-design: Raise parking lot (stem walls allow for raising) and add drainage well
56 Questions?
BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES
BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES MICHAEL ZYGNERSKI ENVIRONMENTAL PLANNING AND COMMUNITY RESILIENCY DIV. ASCE 2/8/2017 Overview Purpose/Application Current Maps
More informationORDINANCE NO
ORDINANCE NO. 0- AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF BROWARD COUNTY, FLORIDA, ESTABLISHING A FUTURE CONDITIONS AVERAGE WET SEASON GROUNDWATER ELEVATION MAP; AMENDING SECTIONS - AND -00
More informationDRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT
Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect
More informationPEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION
US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK
More informationSTORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017
STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project
More informationCHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management
CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated
More informationThe newly updated and comprehensive SWMP shall:
RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive
More informationDrainage Analysis. Appendix E
Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for
More informationAPPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models
APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:
More informationSOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands
SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced
More informationNew Castle County, DE. Floodplain Regulations
New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions
More informationSOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationEverglades Restoration Climate Program
Sea Level Change and Long Range Water Resources Planning for Florida Everglades Restoration Climate Program Change Application Concerns of USACE and Guidance Draft Sea Level on Sea Rise Level Planning
More informationThe remainder of Area C is restricted to 120,535 square feet of office use; and an 894 bed detention facility.
Page 1 of 18 STAFF REPORT Rowan Replat 013-UP-91 A request to amend the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward County
More informationSea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads
VIRGINIA D.C. MARYLAND CHAPTER Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads Presentation at the APWA Mid-Atlantic Chapter May Regional Conference Virginia Beach, Virginia May
More informationINFRASTRUCTURE ELEMENT
Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN
More informationApplying the Water Quality Volume
Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction
More informationENVIRONMENTAL ENGINEERING LAND SURVEYING
ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Scrubber Solids Pond No. 3 Sherburne County Generating Plant Introduction This report presents documentation and certification
More informationRedevelopment Introduction
Redevelopment 11 11.1 Introduction Design standards for new development sites have been established in previous chapters of this document. Redevelopment sites, however, often present unique challenges
More informationInflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company
Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationTxDOT Houston District Permit Requirements (Information contained herein is subject to change)
Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three
More informationSOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II
SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY
More informationModeling Infiltration BMPs
Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume
More informationRUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY
RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40
More informationLAKE LABELLE ENGINEERING REPORT
154 N. Bridge Street, LaBelle, Florida 33935 -Tel: (863) 612-0011 Fax: (863) 612-0014 - email: rock@rockhendry.com LAKE LABELLE ENGINEERING REPORT PREPARED FOR Lake LaBelle, LLC March 2014 PREPARED BY:
More informationCCSD#1 Stormwater Standards
SECTION 5 STORMWATER MANAGEMENT PLAN This Section of the Stormwater Management Design Standards describes the methods and criteria necessary to integrate infiltration, water quality, and flow control stormwater
More informationDesign Example Residential Subdivision
Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site
More informationWatersheds, Hydrology and Flooding
Watersheds, Hydrology and Flooding Greg Karlovits, P.E., CFM Hydrologist US Army Corps of Engineers Rock Island District US Army Corps of Engineers Outline of Topics Before lunch: Watersheds and basics
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part
More informationRainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area
Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural
More informationThis plat is restricted to 20,400 square feet of Boys and Girls Club.
Page 1 of 14 STAFF REPORT Boys and Girls Club Plat 090-MP-97 A request to revise the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the
More informationStormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.
Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,
More informationEXHIBIT # ATTACHMENT #
EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00
More informationEXHIBIT # ATTACHMENT #
EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH, AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00
More informationENVIRONMENTAL ENGINEERING LAND SURVEYING
ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Bottom Ash Pond Sherburne County Generating Plant Introduction This report presents documentation and certification of the
More information15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES
1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion
More informationPonds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.
POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made
More informationSTORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW
SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission
More informationContinuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2
Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 PRESENTED AT THE SFWMD WORKSHOP PRE-DEVELOPMENT VERSUS POST DEVELOPMENT RUNOFF VOLUME ANALYSIS
More informationENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria)
ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria) FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Volume II (including Appendices
More informationPost-Development Stormwater Runoff Performance Standards
Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final
More informationTechnical Memorandum
Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:
More informationG. HYDROLOGY Existing Conditions
G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached
More informationPART 3 STORM WATER TECHNICAL MANUAL
PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for
More informationAPPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)
APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr
More informationCoal Combustion Residuals Inflow Design Flood Control System Plan
gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment
More informationOrdinance No Lot Surface Drainage
Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section
More informationVOLUME CONTROL using Inter-Event Dry Periods. Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA
VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA O u t l i n e Why? Basic Principles Specifications and Regulations Watershed Abstractions The VIV
More informationThe current note, which was approved by the county Commission on March 20, 2018, restricts the plat as follows:
Page 1 of 13 STAFF REPORT BW Cypress & Powerline 043-MP-15 A request to amend the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward
More informationSTORMWATER MANAGEMENT REPORT FOR TAVARES EAST DISTRIBUTION SUBSTATION
STORMWATER MANAGEMENT REPORT FOR TAVARES EAST DISTRIBUTION SUBSTATION (Lake County, Florida, Section 29, Township 19S, Range 26E) Prepared by: Duke Energy Florida, Inc. 3300 Exchange Place NP3A Lake Mary,
More information3.3 Acceptable Downstream Conditions
iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and
More informationINFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY
INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.
More informationSTAFF REPORT F.P. & L. Welleby Substation 059-MP-83
Page 1 of 11 STAFF REPORT F.P. & L. Welleby Substation 059-MP-83 A request to amend the note on the plat has been filed with the Planning and Development Management Division. The plat was approved by the
More informationSouthwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District
Southwest Florida Water Management District PART B PART B Basis of Review Environmental Resource Permit Applications within the Southwest Florida Water Management District MANAGEMENT AND STORAGE OF SURFACE
More information6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff
October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design
More informationCONSTRUCTION PLAN CHECKLIST
CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted
More informationPreliminary Drainage Analysis
Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue
More informationADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN
LGCP/EAR-2008 Section One: Summary of SubElement Comprehensive Plan Amendments. The following table summarizes additions and deletions made to the Comprehensive Plan as a result of processing the EAR-
More information3.0 Planning and Submittal Requirements
October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)
More informationPennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines
Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles
More informationPUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT
COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County
More informationRUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION
RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern
More informationRhode Island Stormwater Design and Installations Standards Manual
Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How
More informationAPPENDIX III Hydrologic and Hydraulic Evaluations
APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia
More informationAppendix B Stormwater Site Plan Submittal Requirements Checklist
Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following
More informationCITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM
CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM Contents: Storm Water Management Plan Application Dry Weather Storm Sewer Visual Inspection Form Rainfall Depths for Design
More informationDry Creek Flood Control Improvement Project
Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)
More informationINFRASTRUCTURE ELEMENT Goal, Objectives and Policies
INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April
More informationHydrologic Study Report for Single Lot Detention Basin Analysis
Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page
More informationOrdinance No. 1178: DRAINAGE AND GRADING
Ordinance No. 1178: DRAINAGE AND GRADING 150.440 PURPOSE The regulation of drainage and grading in this subchapter is intended to accomplish the following benefits: (D) (E) Protect and enhance the quality
More informationENVIRONMENTAL RESOURCE PERMIT APPLICATION
ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION
More informationEvaluation of Current Stormwater Design Criteria within the State of Florida
Evaluation of Current Stormwater Design Criteria within the State of Florida Final Report Prepared for: FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FDEP Contract No. SO108 June 2007 Prepared By: Harvey
More informationNEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL
NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by
More informationPREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software
PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software PRESENTATION TO: SOUTH FLORIDA WATER MANAGEMENT DISTRICT RFP No. C-8501
More informationSpartanburg County. Storm Water Management Design Manual
Spartanburg County TABLE OF CONTENTS Section Title Page No. Table of Contents... i List of Tables......iii Chapter 1 Introduction... 1 1.1 Purpose of the Manual... 1 1.2 Description and Use of the Manual...
More informationPlanning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.
Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions
More informationNew Orleans Stormwater Regulations and Green Infrastructure Toolkit
New Orleans Stormwater Regulations and Green Infrastructure Toolkit City of New Orleans Tulane Engineering Forum Urban Green Infrastructure April 20, 2018 Drivers Planning Modify zoning and subdivision
More informationChapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall
6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures
More informationTechnical Memorandum Mine Plan of Operations Stormwater Assessment
Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum Mine Plan of Operations Stormwater Assessment To: Kathy Arnold From: David R.
More informationSTAFF REPORT Dania Pointe 035-MP-15
Page 1 of 14 STAFF REPORT Dania Pointe 035-MP-15 A request to revise the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward County
More informationMARION COUNTY COMPREHENSIVE PLAN 2035
GOALS, OBJECTIVES AND POLICIES GOAL 1: To provide adequate stormwater management, afford reasonable protection from flooding, and protect the quality of surface water and groundwater in Marion County.
More informationStormwater Management Studies PDS Engineering Services Division ES Policy # 3-01
Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development
More informationAPPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary
APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationHydromodification Management Measures
Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in
More informationWetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012
DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can
More informationRun-on and Run-off Control System Plan
Run-on and Run-off Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR 257.81) Pawnee Station CCR Landfill Public Service Company of Colorado Denver, Colorado October 17,
More informationWELSH POWER PLANT ASH LANDFILL. Run-on and Run-off Control System Plan
WELSH POWER PLANT ASH LANDFILL Run-on and Run-off Control System Plan SEPTEMBER 27, 2016 PREPARED BY: MTG TEXAS FIRM REGISTRATION NUMBER: 354 MTG PROJECT NUMBER: 167003 WELSH POWER PLANT - ASH LANDFILL
More informationHMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation
HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager EOA, Inc. GeoSyntec Consultants Presentation
More information3F. Hydrology and Water Quality
This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts
More informationORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements
ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General
More informationHYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:
HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA 90731 (310) 241-2992 FOR THE PROJECT: PERRIS VALLEY COMMERCE CENTER BUILDING PERRIS, CALIFORNIA PROJECT NUMBER:
More informationChapter CONSTRUCTION SITE EROSION CONTROL
Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for
More informationBMP Crediting Review. MIDS Work Group November 16, resourceful. naturally.
BMP Crediting Review MIDS Work Group November 16, 2012 Outline Background Overview of Credit Approaches Examples Bioretention and Biofiltration Pervious Pavement Turf Photo: John Hanson Background Performance
More informationLOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:
LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates
More informationDesign of Stormwater Wetlands
Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak
More informationVirginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study
1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and