REGULATORY USE OF BROWARD COUNTY S FUTURE GROUNDWATER ELEVATION MAP

Size: px
Start display at page:

Download "REGULATORY USE OF BROWARD COUNTY S FUTURE GROUNDWATER ELEVATION MAP"

Transcription

1 REGULATORY USE OF BROWARD COUNTY S FUTURE GROUNDWATER ELEVATION MAP CARLOS ADORISIO, P.E. ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION ENVIRONMENTAL PROTECTION AND GROWTH MANAGEMENT DEPARTMENT

2 Goal To understand which groundwater (water table) maps should be used when applying for a Broward County Surface Water Management License for new or modified projects

3 Overview Understanding the Significance of Groundwater Elevations Old Groundwater Elevation Map vs. New Groundwater Elevation Map Regulatory Requirements for Antecedent Conditions Understanding Code Requirements and Definitions Practical Examples

4 Application Groundwater (water table) elevation affects the design of stormwater management systems: Wet or dry retention areas, stage/storage curve (on-site storage), allowable discharge, etc. Permitting process requires the use of appropriate groundwater elevations

5 Water Management Plate WM 2.1 (Water Table Map) Adopted in 2000 Average Wet Season Water Table Based on groundwater and surface water measurements Limited data (e.g., along coast line) requires use of site-specific measurements of groundwater

6 Rising Historic Groundwater Levels

7 New Challenge - Future Conditions Sea level rise: National Research Council Curve 3 (NRC3)

8 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations)

9 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations) The map represents the expected future average wet season groundwater elevations for Broward County. The average is based on model outputs for the months of May through October over the period of The models used are The Broward County Inundation Model and the Broward County Northern Variable Density model, both developed by the United States Geological Survey (USGS) and MODFLOW based. The future conditions that are modified in the models are both precipitation and sea level rise. The future precipitation pattern is based on the Center for Ocean-Atmospheric Prediction Studies (COAPS) downscaled Community Climate System Model (CCSM) global model and represents an increase of 9.1% rainfall from the base case of (53.4 in/yr to 58.2 in/yr). Sea level rise was based on the United States Army Corps of Engineers (USACE) National Research Council Curve 3 (NRC3) curve which equates to an increase of 26.6 to 33.9 inches to the future period from 1992 levels. Final results are presented in 1988 North American Vertical Datum (NAVD 88).

10 Water Management Plate WM 2.1-Future Conditions (Future Conditions Average Wet Season Groundwater Elevations) Establishes a Future Conditions Average Wet Season Water Level Map representing conditions predicted in Ensures the resiliency of current and future infrastructure investments by providing the necessary level of flood protection and water quality treatment during their expected useful lifespan (Cannot rely solely upon historic and current environmental conditions as the basis for infrastructure planning, design, and permitting)

11 Plate WM 2.1 vs. Plate WM 2.1-Future Conditions Minor changes in Western Broward More significant increases in tidally influenced Eastern Broward

12 Broward County Code Requirements Chapter 27, Volume V - WATER RESOURCE MANAGEMENT

13 Design Criteria Section (b)(5)a.3.b) Antecedent conditions: Ground water and surface water stages antecedent to a design event shall be the higher of the average wet season water levels or the applicable control elevations. Plate WM 2.1 may be used for determining the average wet season ground water levels for use in calculating a design event for existing projects, except for applications for major redevelopment as defined in Section or for a major modification to a surface water management license. Plate WM Future Conditions shall be used for determining the average wet season ground water levels for use in calculating a design event for new applications for a surface water management license, applications for major redevelopment of existing sites, and applications for major modifications to existing surface water management licenses submitted after June 30, 2017.

14 Design Criteria Section (b)(5)a.3.b) Antecedent conditions: Ground water and surface water stages antecedent to a design event shall be the higher of the average wet season water levels or the applicable control elevations. If the applicable control elevation (CE) is higher than the average wet season ground water elevation shown in Plate WM 2.1 and/or Plate WM 2.1- Future Conditions, then that CE will be used in the design

15 Design Criteria Section (b)(5)a.3.b) Antecedent conditions:... Plate WM 2.1 may be used for determining the average wet season ground water levels for use in calculating a design event for existing projects, except for applications for major redevelopment as defined in Section or for a major modification to a surface water management license. Plate WM Future Conditions shall be used for determining the average wet season ground water levels for use in calculating a design event for new applications for a surface water management license, applications for major redevelopment of existing sites, and applications for major modifications to existing surface water management licenses submitted after June 30, 2017.

16 Definitions Modifications: Major Modification Letter Modification Redevelopment: Major Redevelopment Minor Redevelopment

17 Modifications Section (d)(2)d.1.b Section 198(d)(2)d.1.b allows for modifications to a surface water management license by letter (or Letter Modification) provided the request modification does not: Substantially alter the license authorization, or any license conditions Increase the authorized off-site discharge Adversely impact the environmental features of the project Decrease the required retention/detention Increase the required flood elevations for roads or buildings Decrease pollution removal efficiency All other modifications are deemed Major Modifications

18 Major Redevelopment Section Definition Major redevelopment means construction activities which involve the demolition or removal of the principal structure on a site or of more than fifty percent (50%) of the impervious surface of a developed area on a site. Major redevelopment also means minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site or greater than or equal to two (2) acres over a period of ten (10) years.

19 Major Redevelopment Construction which involve the demolition or removal of the principal structure on a site Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years

20 Major Redevelopment (Example 1) Construction which involve the demolition or removal of the principal structure on a site Site 20 acres: 2.6 ac. of buildings, 10 ac. of parking, and 7.4 ac. of pervious areas. The buildings include a 1-acre principal structure and 8 satellite structures (each 0.2- ac. in area) If the 1.0-ac. principal structure is removed, then the project will be deemed as major redevelopment

21 Construction which involve the demolition or removal of the principal structure on a site Example 1 Site 20 acres: 2.6 ac. of buildings, 10 ac. of parking, and 7.4 ac. of pervious areas. The buildings include a 1-acre principal structure and 8 satellite structures (each 0.2-ac. in area) 1 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 7.4 ac. 10 ac.

22 Construction which involve the demolition or removal of the principal structure on a site Example 1 (cont d) 0.2 ac. 0.2 ac. 1 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 0.2 ac. 7.4 ac. 10 ac.

23 Major Redevelopment (Example 2) Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site A site has a building area and a pavement area. Both areas are impervious. Therefore, the building area is a developed area and the pavement area is also a (another) developed area Site 10 acres: 3 ac. of buildings, 5 ac. of parking, and 2 ac. of pervious areas If the 1.51 ac. of the building area are removed, then the project will be deemed as major redevelopment If the 2.51 ac. of the parking area are removed, then the project will be deemed as major redevelopment

24 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 Site 10 acres: 3 ac. of buildings, 5 ac. of parking, and 2 ac. of pervious areas 3 ac. 2 ac. 5 ac.

25 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 (cont d) 1.51 ac. 3 ac. 2 ac. 5 ac.

26 Construction activities which involve the demolition or removal of more than fifty percent (50%) of the impervious surface of a developed area on a site Example 2 (cont d) 2.51 ac. 3 ac. 2 ac. 5 ac.

27 Major Redevelopment (Example 3) Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Site 20 acres: 6 ac. of buildings, 10 ac. of parking, and 4 ac. of pervious areas If a project in Year 1 involves construction over 5.0 ac. of the site, it will be deemed major redevelopment If a project in Year 1 involves construction over 4.5 ac. of the site and does not include more than 3.0 acres of the existing building, it will be deemed minor redevelopment; Then a project in Year 10 involves construction over 0.5 acres of the site, the project in Year 10 will be deemed major redevelopment

28 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A Site 20 acres: 6 ac. of buildings, 10 ac. of parking, and 4 ac. of pervious area 6 ac. 4 ac. 10 ac.

29 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A (cont d) 5 ac. 6 ac. 4 ac. 10 ac.

30 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3A (cont d) 5 ac. 6 ac. 4 ac. 10 ac.

31 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B 6 ac. 4 ac. 10 ac.

32 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B (cont d) YEAR ac. 6 ac. 4 ac. 10 ac.

33 Minor redevelopment with the cumulative expansion of developed area greater than or equal to twenty-five percent (25%) of the existing developed area of a site over a period of ten (10) years Example 3B (cont d) YEAR ac. YEAR ac. 6 ac. 4 ac. 10 ac.

34 Major Redevelopment (Example 4) Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Site 100 acres: 30 ac. of buildings, 50 ac. of parking, and 20 ac. of pervious areas. If a project in Year 1 involves expanding the site drainage area to ac., it will be deemed major redevelopment If a project in Year 1 involves expanding the site drainage area to ac., it will be deemed minor redevelopment; Then a project in Year 10 involves expanding the site drainage area further by 0.5 acres, the project in Year 10 will be deemed major redevelopment

35 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4A Site 100 acres: 30 ac. of buildings, 50 ac. of parking, and 20 ac. of pervious areas 30 ac. 20 ac. 50 ac.

36 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4A (cont d) 2 ac. 30 ac. 20 ac. 50 ac.

37 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B 30 ac. 20 ac. 50 ac.

38 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B (cont d) YEAR ac. 30 ac. 20 ac. 50 ac.

39 Minor redevelopment with the cumulative expansion of developed area greater than or equal to two (2) acres over a period of ten (10) years Example 4B (cont d) YEAR ac. 30 ac. 20 ac. 50 ac.

40 SMW Licensing Exemptions Section (c) Section (c) describes exemptions and other considerations in surface water management licensing Water management works for major redevelopment of land that had originally been developed prior to the requirement of operating licenses or in accordance with operating licenses shall be accomplished utilizing the licensing provisions currently in effect Water management works for minor redevelopment of land that had originally been developed in accordance with operating licenses shall be accomplished utilizing the licensing provisions in effect at the time of original licensing If the existing construction or operation SWM license is expired, or if the approved works are not in compliance with the conditions of the license, minor redevelopment of land shall be accomplished utilizing the licensing provisions currently in effect

41 Design Criteria Section (b)(5)a.3.b) Type of Project New Project 1.- Major Redevelopment: a) Major Modification to existing SWM license b) No prior licensing 2.- Minor Redevelopment: a) Existing construction or operation SWM license is expired b) Approved works are not in compliance with the conditions of the SWM license Minor Redevelopment (Existing construction or operation SWM license is not expired, and approved works are in compliance with the conditions of the SWM license Design Criteria Plate WM 2.1-Future Condition will be used to determine water quality and water quantity requirements. Entire site needs to comply with current code requirements. Plate WM 2.1-Future Condition will be used to determine water quality and water quantity requirements. Plate WM 2.1 will be used to determine water quality and water quantity requirements.

42 Modification to Conceptual Approval (Letter of Conceptual Approval or Master License/Permit) Conceptual license should not be expired Modification request will be reviewed and evaluated based on the degree of information detail and criteria in effect at the time of application and issuance of the initial conceptual approval If the modification request requires information details which were not submitted with the initial application, then that information will be reviewed and evaluated pursuant to the criteria in effect at the time of the subsequent application

43 Conceptual Approval License Duration 2 years from date of issuance May be granted a one-year extension if requested 180 days prior to the expiration date and a reasonable justification is provided Each subsequent construction phase of the project is granted 5 years to finish construction Construction License will become invalid 2 years from date of issuance if work has not begun unless other provisions have been made with EPGMD

44 Substantial Improvement If a project is determined to be a substantial improvements by the Municipality s Building Official, all buildings within the site may need to comply with the current Florida Building Code. If this additional requirement results in additional work that deems the project a major redevelopment, Plate WM 2.1-Future Condition will be used to determine water quality, water quantity, and minimum FFE requirements.

45 Questions?

46 Surface Water Management System Redesign Examples

47 Surface Water Management System Redesign Example 1

48 Surface Water Management System Redesign Example 1

49 Surface Water Management System Redesign Example 1 Impacts to drainage system resulting from 2 increase in groundwater: Exfiltration trench lost 37.5% of capacity (reduced water quality) and drainage well lost 34% of discharge capacity (higher peak 100-yr, 3- day elevation) Drainage system re-design: Increase exfiltration trench from 70 feet to 110 feet and add pump to drainage well

50 Surface Water Management System Redesign Example 2

51 Surface Water Management System Redesign Example 2

52 Surface Water Management System Redesign Example 2 Impacts to drainage system resulting from 2 increase in groundwater: Dry retention areas no longer provide water quality, perimeter berm no longer contains 25-yr, 3-day runoff, and offsite discharge through orifice becomes negligible due to submergence (higher tail water) Drainage system re-design: Provide 85 feet of exfiltration trench, raise perimeter berm, and raise orifice

53 Surface Water Management System Redesign Example 3 AREA DESIGNED LOWER THAN BUILDING AND ADJACENT PROPERTY

54 Surface Water Management System Redesign Example 3 THROUGHOUT

55 Surface Water Management System Redesign Example 3 Impacts to drainage system resulting from 2 increase in groundwater: Exfiltration trench lost 58% of capacity (reduced water quality), higher 100-yr, 3-day peak elevation, parking lot flooded during 5-yr, 1 hour storm event Drainage system re-design: Raise parking lot (stem walls allow for raising) and add drainage well

56 Questions?

BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES

BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES MICHAEL ZYGNERSKI ENVIRONMENTAL PLANNING AND COMMUNITY RESILIENCY DIV. ASCE 2/8/2017 Overview Purpose/Application Current Maps

More information

ORDINANCE NO

ORDINANCE NO ORDINANCE NO. 0- AN ORDINANCE OF THE BOARD OF COUNTY COMMISSIONERS OF BROWARD COUNTY, FLORIDA, ESTABLISHING A FUTURE CONDITIONS AVERAGE WET SEASON GROUNDWATER ELEVATION MAP; AMENDING SECTIONS - AND -00

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION

PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION US Army Corps of Engineers Philadelphia District PEARCE CREEK CONFINED DISPOSAL AREA MODIFICATION CECIL COUNTY MARYLAND STORMWATER MANAGEMENT PLAN NARRATIVE INITIAL SUBMISSION JUNE 2014 1 PEARCE CREEK

More information

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017

STORMWATER MANAGEMENT REPORT FOR. Chick-Fil-A S Ferdon Blvd, Crestview FL. February 10 th, 2017 STORMWATER MANAGEMENT REPORT FOR Chick-Fil-A 3000 S Ferdon Blvd, Crestview FL February 10 th, 2017 PROJECT #010014-01-047 954.712.7482 www.bowmanconsulting.com Table of Contents Introduction.1 Project

More information

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management

CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management CHELTENHAM TOWNSHIP Chapter 290: WATERSHED STORMWATER MANAGEMENT Article IV: Stormwater Management Online ECode Available on Cheltenham Township Website at: http://ecode360.com/14477578 For all regulated

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

Drainage Analysis. Appendix E

Drainage Analysis. Appendix E Drainage Analysis Appendix E The existing and proposed storm drainage systems have been modeled with Bentley CivilStorm V8 computer modeling software. The peak stormwater discharge was determined for

More information

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models

APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models APPENDIX J-3 Technical Report on Airport Drainage, Northern Sector Airport and Ordinance Creek Watershed, Airport Creek Hydrologic Models Introduction Technical Report on Airport Drainage Appendix J-3:

More information

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands SOUTH FLORIDA WATER MANAGEMENT DISTRICT Question 13: Wetlands 1. The wetland responses and topographical data provided in the ADA for the 520- acre project site are conceptual in nature. The referenced

More information

New Castle County, DE. Floodplain Regulations

New Castle County, DE. Floodplain Regulations New Castle County, DE Floodplain Regulations John J. Gysling, PE CFM Department of Land Use New Castle County, DE February 26, 2009 Today s Presentation Floodplain Protection and Uses Terms and Definitions

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND 3 (AP-3) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

Everglades Restoration Climate Program

Everglades Restoration Climate Program Sea Level Change and Long Range Water Resources Planning for Florida Everglades Restoration Climate Program Change Application Concerns of USACE and Guidance Draft Sea Level on Sea Rise Level Planning

More information

The remainder of Area C is restricted to 120,535 square feet of office use; and an 894 bed detention facility.

The remainder of Area C is restricted to 120,535 square feet of office use; and an 894 bed detention facility. Page 1 of 18 STAFF REPORT Rowan Replat 013-UP-91 A request to amend the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward County

More information

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads VIRGINIA D.C. MARYLAND CHAPTER Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads Presentation at the APWA Mid-Atlantic Chapter May Regional Conference Virginia Beach, Virginia May

More information

INFRASTRUCTURE ELEMENT

INFRASTRUCTURE ELEMENT Goals, Objectives and Policies INFRASTRUCTURE ELEMENT SANITARY SEWER GOAL 4.A.1.: PROVIDE ADEQUATE CENTRAL SANITARY SEWAGE FACILITIES FOR RESIDENTIAL AND NON-RESIDENTIAL DEVELOPMENT AND REDEVELOPMENT IN

More information

Applying the Water Quality Volume

Applying the Water Quality Volume Applying the Water Quality Volume Justin Reinhart, PE Division of Surface Water Northeast Ohio Stormwater Training Council Cleveland, Ohio & Richfield, Ohio July 12, 2018 July 25, 2018 Post-Construction

More information

ENVIRONMENTAL ENGINEERING LAND SURVEYING

ENVIRONMENTAL ENGINEERING LAND SURVEYING ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Scrubber Solids Pond No. 3 Sherburne County Generating Plant Introduction This report presents documentation and certification

More information

Redevelopment Introduction

Redevelopment Introduction Redevelopment 11 11.1 Introduction Design standards for new development sites have been established in previous chapters of this document. Redevelopment sites, however, often present unique challenges

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

TxDOT Houston District Permit Requirements (Information contained herein is subject to change)

TxDOT Houston District Permit Requirements (Information contained herein is subject to change) Houston District Permit Requirements (Information contained herein is subject to change) Access Driveway for Commercial / Industrial Developments; or Street Tie-In / Drainage-Only 1) Complete the three

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II DESIGN REQUIREMENTS FOR STORMWATER TREATMENT AND MANAGEMENT SYSTEMS WATER QUALITY AND WATER QUANTITY

More information

Modeling Infiltration BMPs

Modeling Infiltration BMPs Modeling Infiltration BMPs CAHILL ASSOCIATES Environmental Consultants West Chester, PA (610) 696-4150 www.thcahill.com Design Goals for Calculations 1. Mitigate Peak Rates 2-Year to 100-Year 2. No Volume

More information

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY

RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT DANIEL NORTH ASH MANAGEMENT UNIT MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40

More information

LAKE LABELLE ENGINEERING REPORT

LAKE LABELLE ENGINEERING REPORT 154 N. Bridge Street, LaBelle, Florida 33935 -Tel: (863) 612-0011 Fax: (863) 612-0014 - email: rock@rockhendry.com LAKE LABELLE ENGINEERING REPORT PREPARED FOR Lake LaBelle, LLC March 2014 PREPARED BY:

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 5 STORMWATER MANAGEMENT PLAN This Section of the Stormwater Management Design Standards describes the methods and criteria necessary to integrate infiltration, water quality, and flow control stormwater

More information

Design Example Residential Subdivision

Design Example Residential Subdivision Design Example Residential Subdivision Rhode Island Stormwater Design and Installation Standards Manual December 2010 Public Training March 22, 2010 Richard Claytor, P.E. 508-833-6600 Appendix D: Site

More information

Watersheds, Hydrology and Flooding

Watersheds, Hydrology and Flooding Watersheds, Hydrology and Flooding Greg Karlovits, P.E., CFM Hydrologist US Army Corps of Engineers Rock Island District US Army Corps of Engineers Outline of Topics Before lunch: Watersheds and basics

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area

Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Rainfall, Runoff and Peak Flows: Calibration of Hydrologic Design Methods for the Kansas City Area Bruce McEnroe, Bryan Young, Ricardo Gamarra and Ryan Pohl Department of Civil, Environmental, and Architectural

More information

This plat is restricted to 20,400 square feet of Boys and Girls Club.

This plat is restricted to 20,400 square feet of Boys and Girls Club. Page 1 of 14 STAFF REPORT Boys and Girls Club Plat 090-MP-97 A request to revise the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the

More information

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E.

Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1. Geoffrey A. Cerrelli 1, P.E. Stormwater Management Impacts Resulting from the Volumetric Abstraction of Runoff from Frequent Storms per PADEP CG-1 Geoffrey A. Cerrelli 1, P.E. 1 Hydraulic Engineer USDA/NRCS, One Credit Union Place,

More information

EXHIBIT # ATTACHMENT #

EXHIBIT # ATTACHMENT # EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00

More information

EXHIBIT # ATTACHMENT #

EXHIBIT # ATTACHMENT # EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH, AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00

More information

ENVIRONMENTAL ENGINEERING LAND SURVEYING

ENVIRONMENTAL ENGINEERING LAND SURVEYING ENVIRONMENTAL ENGINEERING LAND SURVEYING Inflow Design Flood Control System Plan Bottom Ash Pond Sherburne County Generating Plant Introduction This report presents documentation and certification of the

More information

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES 1 1 1 1 1 1 1 1 0 1 0 1 1A NCAC 0H.0 STORMWATER REQUIREMENTS: COASTAL COUNTIES (a) The following definitions are applicable to this rule: (1) Built upon area as defined in Session Law 00- means that portion

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW SUBCHAPTER 8 STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW 7:45-8.1 Purpose and scope of review Except for those projects expressly exempted by this chapter or waived by the Commission, the Commission

More information

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2

Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 Continuous Simulation Modeling of Stormwater Ponds, Lakes, & Wetlands: A BUILT-IN APPLICATION OF PONDS 3.2 PRESENTED AT THE SFWMD WORKSHOP PRE-DEVELOPMENT VERSUS POST DEVELOPMENT RUNOFF VOLUME ANALYSIS

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria)

ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria) ENVIRONMENTAL RESOURCE PERMIT APPLICANT S HANDBOOK VOLUME II (Design and Performance Standards Including Basin Design and Criteria) FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION Volume II (including Appendices

More information

Post-Development Stormwater Runoff Performance Standards

Post-Development Stormwater Runoff Performance Standards Post-Development Stormwater Runoff Performance Standards December 9, 2014 Topics Why performance standards? What practices/requirements are in effect in other States? The Workgroup s preliminary and final

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Kathy Arnold From: Greg Hemmen, P.E. Company: Rosemont Copper Company Date:

More information

G. HYDROLOGY Existing Conditions

G. HYDROLOGY Existing Conditions G. HYDROLOGY Existing Conditions Surface Water Runoff This section is based on the hydrology and drainage analysis for the proposed Project, which was prepared by KPFF Consulting Engineers and is attached

More information

PART 3 STORM WATER TECHNICAL MANUAL

PART 3 STORM WATER TECHNICAL MANUAL PART 3 STORM WATER TECHNICAL MANUAL A. INTRODUCTION The Storm Water Technical Manual contains requirements for land development and construction activities, as well as design criteria and guidelines for

More information

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY) Hydromodification design criteria for the North Orange County permit area are based on the 2- yr, 24-hr

More information

Coal Combustion Residuals Inflow Design Flood Control System Plan

Coal Combustion Residuals Inflow Design Flood Control System Plan gaiconsultants.com I transforming ideas into reality., Coal Combustion Residuals Inflow Design Flood Control System Plan Virginia Electric and Power Company Possum Point Power Station Surface Impoundment

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

VOLUME CONTROL using Inter-Event Dry Periods. Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA

VOLUME CONTROL using Inter-Event Dry Periods. Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA VOLUME CONTROL using Inter-Event Dry Periods Stormwater Management Academy UNIVERSITY OF CENTRAL FLORIDA O u t l i n e Why? Basic Principles Specifications and Regulations Watershed Abstractions The VIV

More information

The current note, which was approved by the county Commission on March 20, 2018, restricts the plat as follows:

The current note, which was approved by the county Commission on March 20, 2018, restricts the plat as follows: Page 1 of 13 STAFF REPORT BW Cypress & Powerline 043-MP-15 A request to amend the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward

More information

STORMWATER MANAGEMENT REPORT FOR TAVARES EAST DISTRIBUTION SUBSTATION

STORMWATER MANAGEMENT REPORT FOR TAVARES EAST DISTRIBUTION SUBSTATION STORMWATER MANAGEMENT REPORT FOR TAVARES EAST DISTRIBUTION SUBSTATION (Lake County, Florida, Section 29, Township 19S, Range 26E) Prepared by: Duke Energy Florida, Inc. 3300 Exchange Place NP3A Lake Mary,

More information

3.3 Acceptable Downstream Conditions

3.3 Acceptable Downstream Conditions iswm TM Criteria Manual - = Not typically used or able to meet design criterion. 1 = The application and performance of proprietary commercial devices and systems must be provided by the manufacturer and

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

STAFF REPORT F.P. & L. Welleby Substation 059-MP-83

STAFF REPORT F.P. & L. Welleby Substation 059-MP-83 Page 1 of 11 STAFF REPORT F.P. & L. Welleby Substation 059-MP-83 A request to amend the note on the plat has been filed with the Planning and Development Management Division. The plat was approved by the

More information

Southwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District

Southwest Florida Water Management District. Environmental Resource Permit Applications within the Southwest Florida Water Management District Southwest Florida Water Management District PART B PART B Basis of Review Environmental Resource Permit Applications within the Southwest Florida Water Management District MANAGEMENT AND STORAGE OF SURFACE

More information

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff October 2003, Revised February 2005 Chapter 6.0, Runoff Page 1 6.1 Introduction 6.0 Runoff The timing, peak rates of discharge, and volume of stormwater runoff are the primary considerations in the design

More information

CONSTRUCTION PLAN CHECKLIST

CONSTRUCTION PLAN CHECKLIST CONSTRUCTION PLAN CHECKLIST The design engineer is responsible for ensuring that plans submitted for city review are in accordance with this checklist. It is requested that the executed checklist be submitted

More information

Preliminary Drainage Analysis

Preliminary Drainage Analysis Preliminary Drainage Analysis Tanimura and Antle Employee Housing Town of Spreckels County of Monterey, California LIB150205 May 29, 2015 Prepared For: Tanimura and Antle Produce Prepared By: 9699 Blue

More information

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN

ADDITIONS & DELETIONS TO THE COMPREHENSIVE PLAN LGCP/EAR-2008 Section One: Summary of SubElement Comprehensive Plan Amendments. The following table summarizes additions and deletions made to the Comprehensive Plan as a result of processing the EAR-

More information

3.0 Planning and Submittal Requirements

3.0 Planning and Submittal Requirements October 2003, Revised February 2005 Chapter 3.0, Planning and Submittal Requirements Page 1 3.0 Planning and Submittal Requirements 3.1 Drainage Studies and Drawings The City of Greenwood Village (Village)

More information

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines Pennsylvania Stormwater Best Management Practices Manual Chapter 3 Stormwater Management Principles and Recommended Control Guidelines 363-0300-002 / December 30, 2006 Chapter 3 Stormwater Management Principles

More information

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT COMPREHENSIVE PLAN EXHIBIT DD D. Infrastructure Element (Sanitary Sewer, Potable Water, Solid Waste, Drainage and Natural Groundwater Aquifer Recharge) Goals, Objectives and Policies GOAL D.1: Putnam County

More information

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION

RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION RUBONIA SUBDIVISION DRAINAGE AND ROADWAY IMPROVMENTS PREPARED BY: MANATEE COUNTY PUBLIC WORKS ENGINEERING SERVICES DIVISION OCTOBER 7, 2016 1 INTRODUCTION Rubonia Neighborhood (Rubonia) is located in northern

More information

Rhode Island Stormwater Design and Installations Standards Manual

Rhode Island Stormwater Design and Installations Standards Manual Rhode Island Stormwater Design and Installations Standards Manual Public Workshop Required Management Volume Calculations and Redevelopment Considerations March 22, 2011 Presentation Outline Recap of How

More information

APPENDIX III Hydrologic and Hydraulic Evaluations

APPENDIX III Hydrologic and Hydraulic Evaluations APPENDI III Hydrologic and Hydraulic Evaluations Hydrologic and Hydraulic Analysis Related to Compliance Requirements South Fly Ash Pond, Boiler Slag Pond and Clearwater Pond Kyger Creek Power Plant, Gallia

More information

Appendix B Stormwater Site Plan Submittal Requirements Checklist

Appendix B Stormwater Site Plan Submittal Requirements Checklist Stormwater Site Plan Submittal Requirements Checklist The Submittal Requirements Checklist is intended to aid the design engineer in preparing a Stormwater Site Plan. All items included in the following

More information

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM

CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM CITY OF BROOKFIELD STORMWATER MANAGEMENT PLAN APPLICATION PACKAGE STANDARD FORM Contents: Storm Water Management Plan Application Dry Weather Storm Sewer Visual Inspection Form Rainfall Depths for Design

More information

Dry Creek Flood Control Improvement Project

Dry Creek Flood Control Improvement Project Dry Creek Flood Control Improvement Project The following is a brief overview of the planned IRWM Stormwater Flood Management Grant Application from the Fresno Metropolitan Flood Control District (FMFCD)

More information

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies

INFRASTRUCTURE ELEMENT Goal, Objectives and Policies INFRASTRUCTURE ELEMENT Goal, Objectives and Policies City of Bartow Comprehensive Plan Adopted August 5, 1991 Amended August 2, 1993, Amended 1996 & 1999 Adopted Changes January 16, 2001, Amended April

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Ordinance No. 1178: DRAINAGE AND GRADING

Ordinance No. 1178: DRAINAGE AND GRADING Ordinance No. 1178: DRAINAGE AND GRADING 150.440 PURPOSE The regulation of drainage and grading in this subchapter is intended to accomplish the following benefits: (D) (E) Protect and enhance the quality

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

Evaluation of Current Stormwater Design Criteria within the State of Florida

Evaluation of Current Stormwater Design Criteria within the State of Florida Evaluation of Current Stormwater Design Criteria within the State of Florida Final Report Prepared for: FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION FDEP Contract No. SO108 June 2007 Prepared By: Harvey

More information

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL NEW CASTLE CONSERVATION DISTRICT through (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL Office use only: Received by Municipality: Received by

More information

PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software

PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software PREDEVELOPMENT VERSUS POSTDEVELOPMENT VOLUME ANALYSIS: An Application of Continuous Simulation Modeling using PONDS Version 3 Software PRESENTATION TO: SOUTH FLORIDA WATER MANAGEMENT DISTRICT RFP No. C-8501

More information

Spartanburg County. Storm Water Management Design Manual

Spartanburg County. Storm Water Management Design Manual Spartanburg County TABLE OF CONTENTS Section Title Page No. Table of Contents... i List of Tables......iii Chapter 1 Introduction... 1 1.1 Purpose of the Manual... 1 1.2 Description and Use of the Manual...

More information

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013. Planning Considerations for Stormwater Management in Alberta R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013 Photo Optional Purpose The purpose of urban stormwater management is to provide solutions

More information

New Orleans Stormwater Regulations and Green Infrastructure Toolkit

New Orleans Stormwater Regulations and Green Infrastructure Toolkit New Orleans Stormwater Regulations and Green Infrastructure Toolkit City of New Orleans Tulane Engineering Forum Urban Green Infrastructure April 20, 2018 Drivers Planning Modify zoning and subdivision

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Technical Memorandum Mine Plan of Operations Stormwater Assessment

Technical Memorandum Mine Plan of Operations Stormwater Assessment Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum Mine Plan of Operations Stormwater Assessment To: Kathy Arnold From: David R.

More information

STAFF REPORT Dania Pointe 035-MP-15

STAFF REPORT Dania Pointe 035-MP-15 Page 1 of 14 STAFF REPORT Dania Pointe 035-MP-15 A request to revise the note on the plat has been filed with the Planning and Development Management Division. This plat was approved by the Broward County

More information

MARION COUNTY COMPREHENSIVE PLAN 2035

MARION COUNTY COMPREHENSIVE PLAN 2035 GOALS, OBJECTIVES AND POLICIES GOAL 1: To provide adequate stormwater management, afford reasonable protection from flooding, and protect the quality of surface water and groundwater in Marion County.

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012

Wetlands. DuPage County Stormwater Ordinance Update- Wetlands and Buffers. Is a Stormwater Permit Required? 7/13/2012 DuPage County Stormwater Ordinance Update- Wetlands and Buffers PRESENTED BY: MARY BETH FALSEY WETLAND SPECIALIST Wetlands Section 15-18.A.1.a: If a Stormwater Administrator has the expertise, he/she can

More information

Run-on and Run-off Control System Plan

Run-on and Run-off Control System Plan Run-on and Run-off Control System Plan For Compliance with the Coal Combustion Residuals Rule (40 CFR 257.81) Pawnee Station CCR Landfill Public Service Company of Colorado Denver, Colorado October 17,

More information

WELSH POWER PLANT ASH LANDFILL. Run-on and Run-off Control System Plan

WELSH POWER PLANT ASH LANDFILL. Run-on and Run-off Control System Plan WELSH POWER PLANT ASH LANDFILL Run-on and Run-off Control System Plan SEPTEMBER 27, 2016 PREPARED BY: MTG TEXAS FIRM REGISTRATION NUMBER: 354 MTG PROJECT NUMBER: 167003 WELSH POWER PLANT - ASH LANDFILL

More information

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation

HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation HMP 101 Hydromodification Management Plan for Santa Clara Valley Guidance for Local Implementation Jill C. Bicknell, P.E., EOA, Inc. Assistant Program Manager EOA, Inc. GeoSyntec Consultants Presentation

More information

3F. Hydrology and Water Quality

3F. Hydrology and Water Quality This section provides an analysis of potential hydrological and water quality impacts associated with implementation of the proposed project. The section also evaluates and describes the potential impacts

More information

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements ORDINANCE # 854 Stormwater Management / Operation and Maintenance Requirements Section 1. Purpose and Authority In accordance with the provisions of Chapters 98, 124, 126, 440, 444, and 446h of the General

More information

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT:

HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA (310) FOR THE PROJECT: HYDROLOGY STUDY PREPARED FOR: MARKHAM PERRIS LLC 302 WEST FIFTH STREET, SUITE 103 SAN PEDRO, CA 90731 (310) 241-2992 FOR THE PROJECT: PERRIS VALLEY COMMERCE CENTER BUILDING PERRIS, CALIFORNIA PROJECT NUMBER:

More information

Chapter CONSTRUCTION SITE EROSION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for

More information

BMP Crediting Review. MIDS Work Group November 16, resourceful. naturally.

BMP Crediting Review. MIDS Work Group November 16, resourceful. naturally. BMP Crediting Review MIDS Work Group November 16, 2012 Outline Background Overview of Credit Approaches Examples Bioretention and Biofiltration Pervious Pavement Turf Photo: John Hanson Background Performance

More information

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007: LOT GRADING DEFINITION Lot grading is the reshaping or sloping of the land in such a way that surface drainage from rain runoff is directed away from the buildings and is controlled in a manner that eliminates

More information

Design of Stormwater Wetlands

Design of Stormwater Wetlands Hydraulic & Hydrologic Stormwater Engineering Design of Stormwater Wetlands Jon Hathaway, EI Extension Associate NCSU Bio. And Ag. Engineering 6 Step Process 1. Watershed Analysis (Runoff Volume and Peak

More information

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study 1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and

More information