UTILITY PRETREATMENT DIVISION

Size: px
Start display at page:

Download "UTILITY PRETREATMENT DIVISION"

Transcription

1 UTILITY PRETREATMENT DIVISION Additional information about the Utility Pretreatment Division may be obtained by contacting Donald Smith, Wastewater Collections Program Manager, at (919) , through at or by visiting the Town s website at Town Priority Based Budgeting Goals and Practices ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the environment ECONOMIC VITALITY and DEVELOPMENT Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its resources and meet the needs of its residents, businesses and visitors RELIABLE, SUSTAINABLE INFRASTRUCTURE Collaboratively plans and develops adequate infrastructures systems that meet the capacity needs of the community's growth Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively manages sewage treatment SAFE COMMUNITY Protects and provides for the physical and environmental health of the built and natural environment of the community Department Goals and Initiatives Supporting each Town Goal and Practice 1,2,3,4,5,10,11 6,7,8 4,8,11 7 1,2,3,10 UTILITY PRETREATMENT GOALS AND INITIATIVES 1. Enforce all utility related ordinances including the Sewer Use Ordinance, Industrial Pretreatment Program, Fats, Oils, and Greases (FOG) Control Ordinance and assist in Inflow and Infiltration Ordinance. 2. Control, manage and oversee permitting, compliance monitoring and enforcement as required by federal and state regulations for discharge activity from industrial and commercial users of the sanitary sewer treatment system. 3. Enforce the Grease Control Ordinance mandated by the State of North Carolina, covering approximately 800 food service establishments (FSE), which targets sanitary sewer overflows by controlling the release of fats and grease into the sanitary sewer system. 4. Monitor waste discharge activity for all identified Significant and Non-Significant industrial users. 5. Perform Sewer Use Education sessions with individuals and groups. 6. Conduct and oversee special projects for the department; inter-jurisdictional agreements, nutrients, modeling, utilities merger and associated FSE identification and mapping. 7. Continue construction plan review and installation inspection of pretreatment devices to ensure compliance with ordinance and ensure that adequate protection measures are in place for wastewater discharges to the sanitary sewer. 8. Establish methods with Durham County to assure rational and representative pollutant characterization. 9. Apply enforcement response plan in consistent manner to noncompliant industrial and other users of sewer system. 10. Maintain databases relative to pretreatment, and fats, oils, and grease control program for the purpose of protecting sanitary sewer collection and treatment systems. 11. ID source of potential pollutants in the collection system through sampling and facility inspection ACCOMPLISHMENTS Continued to provide monitoring, inspections, compliance reviews and enforcement related to the fats, oil, and grease control program (FOG), results from which support reductions in sanitary sewer overflows and restoration of sewer infrastructure capacity. Continued the field inspection program in Town of Cary and Town of Morrisville for proper installation of grease interceptors.

2 Continued to detect and alleviate illegal disposal of liquid wastes into sanitary sewer system through monitoring programs. Continued sewer service agreement with Durham County to accept industrial-based wastewater from Town customers. Conducted all wastewater industrial user permit monitoring in accordance with Town issued wastewater discharge permits. Continued to model nutrient loading from major industrial users for master plan development. Conducted wastewater treatment plant analysis for loading capabilities. Continued comprehensive survey of commercial users in order to identify potential significant wastewater contributions. FOG program continues to be recognized in the state as an innovative and progressive program. Continued to operate real time ph monitoring system per Durham County sewer service agreement. Continued to implement, in conjunction with the Solid Waste Management division, a residential waste cooking oil collection system program for the beneficial reuse of waste cooking oils and to reduce the amount of oil that is disposed in the sanitary sewer. Continued scheduled inspections in coordination with the Inspections and Permits Department for field inspections of pretreatment related construction projects. Continued review of submitted site and building plans for conformance with Sewer Use Ordinance requirements KEY PERFORMANCE OBJECTIVES Inspect 100% of significant industrial wastewater discharge users annually. Achieve 100% compliance with state and federal industrial pretreatment program requirements annually. Ensure that 95% of all food preparation/service organizations have adequate grease interceptor and management controls in place. Ensure that there are no reoccurring sanitary sewer overflows (SSO) annually due to fat, oil or grease accumulation in commercial lines. Follow up all sanitary sewer overflows (SSO) in residential areas due to FOG with educational materials on proper use of sanitary sewer system. KEY PERFORMANCE MEASURES Performance Measure % of significant industrial users (SIU) inspected 100% 100% 100% % SIU compliance with industrial pre-treatment requirements 100% 100% 100% % of FSE sites inspected 88% 91% 98% % of FSE sites with compliant grease control devices 73% 90% 90% % of FSE sites with required management records 90% 85% 85% Number of SSOs on the same commercial line that occurred annually % commitment met with delivering educational materials to residential area that experience a SSO % 100% 100%

3 KEY WORKLOAD INDICATORS Workload Indicator Number of food service facilities inspected Number of potential FSE sites needing initial and follow-up inspection Number of notices of noncompliance, deficiency or violation Number of food service facilities Number of Industrial User Surveys qualifying for mailing Industrial Wastewater Survey forms ACTIVITY HISTORY Fund Number: Budget Activity FY2011 FY2012 Personnel Services $250,015 $240,318 $292,886 $342,566 $334,711 Operations & Maintenance $21,777 $24,713 $25,580 $41,698 $43,496 Capital Outlay - $13, Total $271,792 $278,041 $318,466 $384,264 $378,207 Authorized FTEs SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS FY15 will begin the first full year of monitoring and sampling associated with the start-up of the Western Wake Regional Wastewater Management Facilities. Significant Industrial Users (SIU s) will be permitted in Cary with start-up of Western Wake Water Reclamation Facility. This will include all required sampling and monitoring associated with Pretreatment permits.

4 UTILITY SYSTEMS MANAGEMENT DIVISION Additional information about the Utility Systems Management division can be obtained by contacting Donald Smith, Wastewater Collections Program Manager, at (919) , through at or by visiting the Town s website at Town Priority Based Budgeting Goals and Practices Department Goals and Initiatives Supporting each Town Goal and Practice ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Provides a safe environment that promotes, supports and sustains clean and visually appealing neighborhoods that are welcoming, secure and provide quality housing options that meet the community's needs and reinforce its identity and character 3,6,7,8 Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the 1,2,3 environment ECONOMIC VITALITY and DEVELOPMENT Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its resources and meet the needs of its residents, businesses and visitors RELIABLE, SUSTAINABLE INFRASTRUCTURE Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively manages sewage treatment Plans for responsible growth and community sustainability through energy efficiencies, resource conservation and respect for environmental impacts Provides for critical redundancies and responsive, timely, recovery of its infrastructure systems in the event of natural and man-made emergencies SAFE COMMUNITY Protects and provides for the physical and environmental health of the built and natural environment of the community UTILITY SYSTEMS MANAGEMENT GOALS AND INITIATIVES Operations & Maintenance 1. Provide uninterrupted water and wastewater operations by maintaining forty-five wastewater pumping facilities, seventeen odor control facilities, four drinking water booster stations, one water transfer location, six elevated water storage tanks and one potable ground storage tank. 2. Provide reclaimed water by operating and maintaining three reclaimed water distribution systems. 3. Prevent off-site nuisances (light, noise, and odor). 4. Define Operations and Maintenance needs and respond accordingly, maximizing equipment useful life and most efficiently using financial resources to replace or repair equipment at the appropriate time. 5. Implement energy efficiency equations into bids for new equipment. Customer Service 6. Respond to and resolve collection system odor complaints from pump stations and associated infrastructure. 7. Respond to and resolve collection system noise complaints from pump stations and associated infrastructure. 8. Train all new reclaimed water customers in the proper use of this resource. Meter Reading and Field Services 9. Oversee industrial wastewater meter operation and maintenance. 1,2,9 1,2,4 5 1,2,4 1

5 ACCOMPLISHMENTS Successfully completed the Reclaimed Water Holiday to ensure system reliability with no customer or commercial business service concerns. Continued to make significant improvements to customer access, regulatory compliance, and awareness of the reclaimed water program. Completed the Harrison Avenue water tank interior structural repair and paint renovation project. Completed the installation of a new screen and grinder at the Aviation and Perimeter Park Pump Stations. Completed the installation of a new screen and odor control improvement project at the Swift Creek Pump Station. Completed design for SCADA at tier 1 pump stations, the Walnut Creek Pump Station Variable Frequency Drive upgrades, and West Cary collection system odor control. Started operation of the new parallel force main for Walnut Creek pump station and the Jones Franklin pump station. Palaver (Copper Leaf II) and Woodlands pump stations were eliminated due to gravity sewer extension associated with Western Wake Regional Water Reclamation Facility. Performed interior cleaning and condition assessment of Carpenter and Plumtree Water Tanks. Completed initial asset inventory in USM Division. KEY PERFORMANCE OBJECTIVES Respond to 100% of trouble alarm warnings at the pump stations within 60 minutes. Visit pump stations daily with average flow rates greater than 0.75 million gallons per day (6 pump stations). Visit pump stations 3 times per week with average flow rates greater than 0.2 million gallons per day (5 pump stations). Visit pump stations 2 times per week with average flow rates less than 0.2 million gallons per day (30 pump stations). Visit pump stations that are off line (in standby) once a month (4 pump stations). Minimize customer related issues related to new or existing reclaimed water service. Minimize customer related issues related to pump stations and force mains and associated odor control equipment. Remain a good neighbor in the communities surrounding utility infrastructure sites. KEY PERFORMANCE MEASURES Performance Measure % of response to trouble alarms within 60 minutes or less Number of after hour trouble responses 100% % % 70 % of odor complaints responded to within 24 hours 93% 97% 97% Cost per completed mechanical preventive maintenance work order $32.73 $38.79 $38.00

6 KEY WORKLOAD INDICATORS Workload Indicator Facilities operated and maintained Wastewater pump stations Water storage tanks Miles of reclaimed water services (miles of pipeline) Reclaimed water total number of work orders completed Reclaimed water customer service related requests (annual) Number of reclaimed meters Number of citizen complaints during Reclaimed Holiday kwh per million gallons of effluent flow per year at the Town s major pump stations Kit Creek Pump Station 1292 kwh / Million Gallons Morris Branch Pump Station Swift Creek Pump Station Walnut Pump Station West Cary Pump Station Preventive maintenance (Total hours per year) 5,087 5,000 5,400 Corrective maintenance (Total hours per year) 6,943 5,.277 5,200 Predictive maintenance (Total hours per year) Maintenance hours for operator duties (Total hours per year) 5,406 5,000 5,100 ACTIVITY HISTORY Fund Number: Budget Activity FY2011 FY2012 Personnel Services $1,240,033 $1,273,863 $1,328,225 $1,625,287 $1,679,804 Operations & Maintenance $1,216,303 $1,501,040 $1,355,398 $1,746,139 $2,081,289 Capital Outlay $25,294 $114,062 $243,143 $142,830 $126,500 Total $2,481,630 $2,888,965 $2,926,766 $3,514,256 $3,887,593 Authorized FTEs SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS Start up of Western Wake Regional Wastewater Management Facility Pump Stations: Beaver Creek Pump Station and Western Cary Pump Station Startup of Green Level Interceptor Odor Control Facilities Start-up of reclaimed trunk line extension to Thomas Brooks Park.

7 NORTH CARY WATER RECLAMATION FACILITY Additional information about North Cary Water Reclamation Facility may be obtained by contacting Paul Ray, Manager, at (919) , or through or by visiting the Town s website at Town Priority Based Budgeting Goals and Practices Department Goals and Initiatives Supporting each Town Goal and Practice ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Provides a safe environment that promotes, supports and sustains clean and visually appealing neighborhoods that are welcoming, secure and provide quality housing options that meet the community's needs and reinforce its identity and character 1, 2, 3, 5 Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the 1, 2, 3 environment ECONOMIC VITALITY and DEVELOPMENT Encourages and supports the attraction, retention and growth of diverse and sustainable businesses that contribute to the community's economy and stimulate job growth Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its resources and meet the needs of its residents, businesses and visitors QUALITY RECREATIONAL, LEISURE and CULTURAL OPPORTUNITIES Invests in its park system including open spaces, greenways, trail systems and recreation areas, ensuring they are safe, convenient, well-maintained, accessible and connected RELIABLE, SUSTAINABLE INFRASTRUCTURE Collaboratively plans and develops adequate infrastructures systems that meet the capacity needs of the community's growth Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively manages sewage treatment Provides for critical redundancies and responsive, timely, recovery of its infrastructure systems in the event of natural and man-made emergencies SAFE COMMUNITY Protects and provides for the physical and environmental health of the built and natural environment of the community Promotes and sustains a clean, well-designed, properly regulated and visually attractive community 1, 2, 6, 9, 10 2, 5, 9 2, 5 1, 2, 4, 8, 9 2, 3 1,2,5,6 2, 5, 6, 9, 10 1, 2, 3, 4, 5, 6, 7, 8, 9, 10 NORTH CARY WATER RECLAMATION FACILITY GOALS AND INITIATIVES Wastewater Treatment 1. Treat up to 12 million gallons of wastewater per day from the collection system (North Cary, Morrisville, and RDU Airport). 2. Provide preventive, predictive and corrective maintenance for the main plant site, one regional pump station, a biosolids processing and aerated holding facility and a reclaimed water system (bulk and distributed flow). 3. Meet or exceed all regulatory requirements in the treatment and discharge of wastewater. 4. Proactively minimize public nuisances from the facility such as odor, noise, lighting and or traffic issues.

8 5. Ensure the safety and availability of Cary s reclaimed water system in the North service area. 6. Foster and maintain good relationships with the surrounding communities through communication and by managing facility aesthetics. Biosolids Management 7. Maintain less than 3% solids in aerated holding tanks to minimize odor risks. Operate the biosolids facility in a mode where less than 750,000 gallons is in inventory at a given time. 8. Transport thickened biosolids to South Cary Water Reclamation Facility biosolids dryer for processing. Reclaimed Water 9. Provide high quality treated effluent for reuse in residential neighborhoods and commercial markets in the Northern service area. 10. Supply commercial contractors and the Town of Cary Public Works Department, with a viable bulk water source for irrigation, street sweeping, compaction, and sewer flushing. ACCOMPLISHMENTS NCWRF met and exceeded NPDES permit requirements for. Recombined the NCWRF with adjacent properties surrounding the facility Staff performed the installation of one new filter compressor (#1). Maintained plant staff certifications and continuing education units. Reclaimed water holiday was carried out without interference. Worked with technical services to locate a communications tower on site. A new bar screen was installed and two replacement compactors will be started up in the spring of The influent pumping station bio-filter was commissioned and is fully operational. Installed energy efficient lighting in building H, along with changing out several exterior fixtures to more energy efficient inductive lighting. Installed a replacement ATS (automatic transfer switch) under project SW 1253 that serves the older plant generator. Tested a solids analyzer in conjunction with the lab to evaluate plant efficiencies and biological activity. Rebuilt one dry pit influent pump incorporating technology to reduce wear and cavitation. Rebuilt 6 of 8 rotor gear boxes on the C basin. (Predictive maintenance) Evaluated a new type of pump for the reactor basin supplemental air system. This is a more energy efficient option available at a lower per unit cost. Replaced a retaining wall at the plant entrance. Participated in a Reclaimed Water Study to evaluate reclaimed water quality for cooling towers. Replaced 9 onsite water valves that were at the end of service life. Conducted facility assessment of critical plant infrastructure. Developed an asset inventory and asset management plan. Inventoried, stored and stocked spare parts for critical plant operating systems. Received draft NPDES permit renewal Submitted application for Reclaimed Water permit renewal. Recognized as an Exceptionally Performing Facility by NCDENR resulting in reductions in permit monitoring requirements.

9 KEY PERFORMANCE OBJECTIVES Meet or exceed National Pollutant Discharge Elimination System (NPDES) percentage limits for Coliform, Biological Oxygen Demand (BOD), Ammonia, Suspended Solids, Total Nitrogen and Total Phosphorus. Maintain direct operational budgeted costs at less than $1.50/1,000 gallons of treated wastewater. Provide a safe and beneficially reusable product (reclaimed water) for the residents and businesses in Cary to use for irrigation. Remain a good neighbor in the communities surrounding the facility. Conserve energy by minimizing onsite biosolids storage. KEY PERFORMANCE MEASURES Performance Measure Compliance Levels w/state Pollutant Regs. Fecal Coliform (# colony forming units/100 ml) <2.0 <2.0 <2.0 Carbonaceous BOD (summer) <2.0 mg/l <2.0 mg/l <2.0 mg/l Carbonaceous BOD (winter) <2.0 mg/l <2.0 mg/l <2.0mg/L Ammonia-N (summer) <0.5 mg/l <0.5 mg/l <0.5mg/L Ammonia-N (winter) <1.0 mg/l <1.0 mg/l <1.0mg/L Total percent of Nitrogen removed 96% 96% 96% Total percent of Phosphorous removed 91% 92% 92% Operational costs per 1,000 gallons treated $1.47 $1.50 $1.52 Biosolids hauling costs/dry ton $186 $186 $186 * column represents annual average KEY WORKLOAD INDICATORS Workload Indicator Biosolids produced (dry tons) 1,593 1,625 1,660 Million gallons of wastewater treated per year 2,454 2,500 2,590 Average daily influent flow (million gallons per day) Peak day influent flow (million gallons) Reclaimed water peak day demand (gallons) 958, , ,000 Total kilowatt-hours (kwh) consumed per year 10,044,700 10,159,747 10,420,909 kwh per million gallons of wastewater treated per year 4, Preventive maintenance (Total hours per year) 2,033 2,100 2,100 Corrective maintenance (Total hours per year) 2,817 2,600 2,600 Predictive maintenance (Total hours per year) Maintenance hours for operations assistance (Total hours per year) 1,496 1,600 1,600

10 ACTIVITY HISTORY Fund Number: Budget Activity FY2011 FY2012 Personnel Services $1,360,985 $1,389,652 $1,279,681 $1,404,868 $1,408,297 Operations & Maintenance $5,666,814 $5,313,467 $5,480,972 $7,195,897 $4,742,515 Capital Outlay $36,207 $55,183 $79,545 $122,451 $147,000 Total $7,064,006 $6,758,302 $6,840,198 $8,723,216 $6,297,812 Authorized FTEs *The NCWRF s budget includes funding for Durham County service in western Cary. SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS funding request includes equipment and processes for additional sampling within the wastewater treatment process to continue quality, effective treatment processes and overall improved system management. Continue improvements in odor, noise and light issues. Potential increases in overall facility maintenance costs due to asset management of aging infrastructure.

11 SOUTH CARY WATER RECLAMATION FACILITY Additional information about the South Cary Water Reclamation Facility may be obtained by contacting Andy Russell, Manager at (919) , through at or by visiting the Town s website at Town Priority Based Budgeting Goals and Practices ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Department Goals and Initiatives Supporting each Town Goal and Practice Provides a safe environment that promotes, supports and sustains clean and visually appealing neighborhoods that are welcoming, secure and provide quality housing options that meet the community's needs and reinforce its identity and character 1, 2, 3, 5 Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the 1, 2, 3 environment ECONOMIC VITALITY and DEVELOPMENT Encourages and supports the attraction, retention and growth of diverse and sustainable businesses that contribute to the community's economy and stimulate job growth Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its resources and meet the needs of its residents, businesses and visitors QUALITY RECREATIONAL, LEISURE and CULTURAL OPPORTUNITIES Invests in its park system including open spaces, greenways, trail systems and recreation areas, ensuring they are safe, convenient, well-maintained, accessible and connected RELIABLE, SUSTAINABLE INFRASTRUCTURE Collaboratively plans and develops adequate infrastructures systems that meet the capacity needs of the community's growth Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively manages sewage treatment Provides for critical redundancies and responsive, timely, recovery of its infrastructure systems in the event of natural and man-made emergencies SAFE COMMUNITY Protects and provides for the physical and environmental health of the built and natural environment of the community Promotes and sustains a clean, well-designed, properly regulated and visually attractive community 1, 2, 6, 9, 10, 11 2, 5, 10 2,5 1, 2, 4, 7, 8 2, 3 1, 2, 5, 6, 9 2, 5, 6, 9, 10, SOUTH CARY WATER RECLAMATION FACILITY GOALS AND INITIATIVES Wastewater Treatment 1. Treat up to 12.8 million gallons of wastewater per day from the collection system in the South side of Cary. 2. Provide preventive, corrective and predictive maintenance for the main plant, a biosolids processing facility and related facilities and grounds. 3. Meet and exceed all regulatory requirements in the treatment and discharge of wastewater. 4. Proactively minimize public nuisances from the facility such as odor, noise, lighting and traffic issues. 5. Ensure the safety and availability of Cary s reclaimed water system. 6. Foster and maintain good relationships with the surrounding community through communication and by managing facility aesthetics.

12 Biosolids Management 7. Manage the operation of the biosolids dryer in order to produce a quality product that is cost-effective and environmentally friendly. 8. Process biosolids from South Cary WRF, North Cary WRF and Middle Creek WRF (Town of Apex). Maintain adequate storage for the thickened wastewater biosolids. 9. Ensure that the facility achieves the goal of producing a Class A, Exceptional Quality end product. Reclaimed Water 10. Provide exceptional quality treated effluent for reuse in the community without loss of utility service. 11. Supply commercial contractors and the Town of Cary Public Works Department with a viable bulk water source for irrigation, street sweeping, compaction and other uses approved in our reclaimed water permits. ACCOMPLISHMENTS Installed a more efficient perforated plate influent screening system that has significantly reduced untreatable materials passing into the biological treatment system. Completed a full restoration of the older belt screening system to provide a reliable and efficient back-up to the perforated plate unit. Basin #3 was placed in service to optimize treatment efficiency after installing new mixers, mixed liquor pumps, recycle pump, seed pump, and other ancillary equipment. Completed similar restoration of Basin #2. Completed first planned multi-week maintenance operation requiring a full shutdown of the facility since it began operating in 2006 to repair critical equipment and restore dewatering and drying performance. Repairs included reinforcement of the outer wall of the drum, replacing worn implements in a critical granulation process, replacing primary ductwork components worn by abrasive pellets, and improvement of the wet material bin and dewatered cake pump. Operated a reclaimed water distribution facility with 500,000 gallon storage capacity to provide for onsite utilization and for residential and public school irrigation facilities. The annual planned Reclaimed Water Holiday was used to make repairs to chemical disinfectant feed systems to improve reliability. NPDES, Reclaimed Water, and Biosolids permit renewal applications were submitted to North Carolina Departments of Water Resources (NCDWR) as required every 5 years. Air Quality permit renewal application was submitted to the NCDENR Division of Air Quality as required every 5 years. Submitted annual biosolids report to EPA and NCDWR. Continued the successful partnership with FLS Energy to employ a solar panel farm on property of plant. The solar farm went into operation in December Continued to add additional landscaping to improve plant appearance. Met and outperformed all permit requirements for FY13. Consistently performed as a leader in overall nutrient reduction in the Lower Neuse Basin Association. Maintained all staff certifications and associated continuing education units. KEY PERFORMANCE OBJECTIVES Meet or perform better than National Pollutant Discharge Elimination System (NPDES) limits for coliform, biological oxygen demand (BOD), ammonia, suspended solids, total nitrogen and total phosphorous. Maintain operational direct budgeted costs at less than $2.00/1,000 gallons for wastewater treatment. Provide reliable and consistent reclaimed water for residents and businesses in Cary to use for irrigation. Remain a good neighbor in the communities surrounding the facility.

13 KEY PERFORMANCE MEASURES Performance Measure Compliance levels with State Pollutant Regulations: Fecal Coliform (# colony forming units/100 ml) BOD (summer) <2.0 mg/l <2.0 mg/l <2.0 mg/l BOD (winter) <2.0 mg/l <2.0 mg/l <2.0 mg/l Ammonia-N (summer) 0.39 mg/l 0.62 mg/l <0.10 Ammonia-N (winter) 0.49 mg/l 0.32 mg/l <0.10 Percent of Nitrogen removed 96% 96% 97% Percent of Phosphorous removed 94% 96% 97% Operational cost per 1,000 gallons treated (no dryer cost) $1.44 $1.86 $1.84 Dryer cost per 1000 gallons of biosolids processed $23.43 $27.54 $24.29 KEY WORKLOAD INDICATORS Workload Indicator Million gallons of wastewater treated per year 1,938 1,922 1,930 Average daily influent flow (million gallons per day) Peak day influent flow (million gallons) Reclaimed water peak day demand (gallons) 580, , ,000 Total kilowatt-hours (kwh) consumed per year* 9,291,651 9,544,000 9,167,500 kwh per million gallons of wastewater treated per year 4,794 4,966 4,750 Biosolids produced at SCWRF (dry tons) 1,717 1,546 1,627 Biosolids dryer pellets processed, in tons (NCWRF, SCWRF, and Apex biosolids) 3,640 3,612 3,250 Biosolids dryer facility total kwh consumed per year 1,903,000 2,152,800 1,699,100 kwh per ton of dryer pellets processed per year Preventive maintenance (Total hours per year) 2,320 2,648 2,500 Corrective maintenance (Total hours per year) 5,296 7,080 5,000 Predictive maintenance (Total hours per year) Maintenance hours for operations assistance (Total hours per year) 2,116 2,474 <2,000 * In order to make kwh comparison to NCWRF operations, calculations do not include biosolids dryer operations

14 ACTIVITY HISTORY Fund Number: Budget Activity FY 2011 FY 2012 Personnel Services $1,558,537 $1,598,393 $1,645,894 $1,722,482 $1,684,549 Operations and Maintenance $1,723,880 $1,798,965 $1,700,917 $2,493,343 $2,511,440 Capital Outlay - $93,149 $178,912 $140,500 $153,250 Total $3,282,417 $3,490,507 $3,525,723 $4,356,325 $4,349,239 Authorized FTEs SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS Complete refurbishment of biological nutrient removal basin #1 with replacement of guide rail systems, retrieval cables, mixers, pumps, and valves to provide optimum treatment facility readiness, performance, and permit compliance. Restoration of the ultraviolet disinfection system wiper and hydraulic components to achieve optimum performance and extend lamp service life thereby reducing repair costs. Perform additional repairs to critical equipment at the biosolids thermal dryer facilities addressing severe and premature wear. These repairs include the internal drum structure, ducting, pre-separator, and conveyors. These repairs will improve the overall reliability and performance of the dryer facilities.

15 WESTERN WAKE REGIONAL WATER RECLAMATION FACILITY Additional information about the Western Wake Regional Water Reclamation Facility may be obtained by contacting Damon Forney, Manager, at (919) , through at or by visiting the Town s website at Town Priority Based Budgeting Goals and Practices Department Goals and Initiatives Supporting each Town Goal and Practice ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Provides a safe environment that promotes, supports and sustains clean and visually appealing neighborhoods that are welcoming, secure and provide quality housing options that meet the community's needs and reinforce its identity and character 6,8,10 Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the 6,7,8 environment ECONOMIC VITALITY and DEVELOPMENT Encourages and supports the attraction, retention and growth of diverse and sustainable businesses that contribute to the community's economy and stimulate 6,7,11 job growth Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its 8,11 resources and meet the needs of its residents, businesses and visitors QUALITY RECREATIONAL, LEISURE and CULTURAL OPPORTUNITIES Invests in its park system including open spaces, greenways, trail systems and recreation areas, ensuring they are safe, convenient, well-maintained, accessible 8,11 and connected RELIABLE, SUSTAINABLE INFRASTRUCTURE Collaboratively plans and develops adequate infrastructures systems that meet the 1,8 capacity needs of the community's growth Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively 1,2,7,10,12 manages sewage treatment Provides for critical redundancies and responsive, timely, recovery of its 7,8,11,13 infrastructure systems in the event of natural and man-made emergencies SAFE COMMUNITY Protects and provides for the physical and environmental health of the built and 8,11,12,13 natural environment of the community Promotes and sustains a clean, well-designed, properly regulated and visually 7,9,10,13 attractive community WESTERN WAKE REGIONAL WATER REACLAMATION FACILITY GOALS AND INITIATIVES Start-up and Operations 1. Finalize start-up plans for water reclamation facility. 2. Recruit, hire, and train operations and maintenance. 3. Coordinate staffing and resource allocations with construction schedule. 4. Ensure preliminary laboratory and plant certifications are acquired. 5. Track equipment warranties, start-up plans and process operations training.

16 Wastewater Treatment 6. Treat up to 18 million gallons of wastewater per day from western Cary, Apex, Morrisville and Research Triangle Park. 7. Provide preventive and corrective maintenance for the main plant, the biosolids processing facility and buildings and grounds. 8. Meet or exceed all regulatory requirements in the treatment and discharge of wastewater. 9. Proactively manage the facility to minimize noticeable nuisance impacts such as odor, noise or light outside the plant perimeter. 10. Ensure the safety and availability of bulk reclaimed water. 11. Foster and maintain good relationships with the surrounding communities through communication and by managing facility aesthetics Biosolids Treatment 12. Manage the operation of biosolids processing to ensure all facilities operate in a cost effective and safe manner. 13. Ensure that facility achieves the goal of producing a Class A, Exceptional Quality end product. ACCOMPLISHMENTS Hired fourteen additional team members increasing the total staff count to seventeen: 1 Senior Electronics Technician, 10 Mechanic/Operators, 1 Laboratory Supervisor, 1 Laboratory Analyst and 1 Adminstrative Assistant. Received the Certificate of Occupancy for the WWRWRF Operation & Maintenance Buildings ( January 8, 2014) Revised and updated the staffing plans and recruiting schedule. Coordinated resource allocations with the construction schedule. Submitted a permit application modifying the existing Biosolids permit to add WWRWRF. Completed the vendor and Operations & Maintenance start-up training for the plant staff. Developed process control Standard Operating Procedures to assist with plant operations. Finalized the WWRWRF equipment water testing plan and the treatment process startup plan. Western Wake Partners continue to mail quarterly newsletters to neighboring properties to keep them informed of construction progress. KEY PERFORMANCE OBJECTIVES Meet or exceed National Pollutant Discharge Elimination System (NPDES) percentage limits for Coliform, Biological Oxygen Demand (BOD), Ammonia, Suspended Solids, Total Nitrogen and Total Phosphorus. Process, treat and reuse biosolids in compliance with EPA's 503 rules and state regulations. Remain a good neighbor in the communities surrounding the facility. KEY PERFORMANCE MEASURES Performance Measure (Plant Operational FY15) Compliance Levels w/state Pollutant Regs. Fecal Coliform (# colony forming units/100 ml mo. avg) - - <200/100mL Carbonaceous BOD (summer mo. avg) - - <5.0 mg/l Carbonaceous BOD (winter mo. avg) - - <10 mg/l Ammonia-N (summer mo.avg) - - <1 mg/l Ammonia-N (winter mo. avg) - - <2 mg/l * column represents annual average

17 KEY WORKLOAD INDICATORS Workload Indicator Biosolids produced (dry tons per day) Million gallons of wastewater treated per year Average daily influent flow (million gallons per day) Peak day influent flow (million gallons) ACTIVITY HISTORY Fund Number: Budget Activity FY2011 FY2012 Personnel Services - $52,657 $185,303 $882,560 $1,437,373 Operations and Maintenance - $6,819 $11,834 $46,432 $1,749,227 Capital Outlay - - $33,443 $7,698 - Reimbursement from Apex $(1,083,444) Total $0 $59,476 $230,580 $936,690 $2,103,156 Authorized FTEs SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS funds provide for the hiring of the 2 staff positions. The Lab Supervisor (1) and Senior Electronics Technician (1) positions are being funded for a full year as compared to where they were funded to begin the first quarter through the year. The Lab Analyst (1), Mechanic/Operator (10) and Administrative Assistant (0.5) positions are being funded for a full year as compared to where they were funded to begin mid-way through the year.

18 CARY/APEX WATER TREATMENT PLANT Additional information about the Cary/Apex Water Treatment Plant may be obtained by contacting Kelvin Creech, Water System Manager, at (919) , via at or by visiting the Town s Web site at Town Priority Based Budgeting Goals and Practices Department Goals and Initiatives Supporting each Town Goal and Practice ATTRACTIVE, WELL-PLANNED and LIVABLE COMMUNITY Provides a safe environment that promotes, supports and sustains clean and visually appealing neighborhoods that are welcoming, secure and provide quality housing options that meet the community's needs and reinforce its identity and character 1,3 Provides for the protection, preservation and renewal of its natural resource through effective waste management, recycling and mitigation of factors impacting the 2 environment ECONOMIC VITALITY and DEVELOPMENT Provides, maintains and enhances its public infrastructure systems to support community expansion, support the effective delivery of services, preserve its resources and meet the needs of its residents, businesses and visitors RELIABLE, SUSTAINABLE INFRASTRUCTURE Collaboratively plans and develops adequate infrastructures systems that meet the capacity needs of the community's growth Designs, builds, and proactively maintains a reliable utility infrastructure that delivers a safe, clean water supply, controls stormwater drainage and effectively manages sewage treatment Ensures town facilities, parks, greenways and public spaces are safe, clean, attractive, structurally sound and well cared for 1, 2, 3,7 CARY/APEX WATER TREATMENT PLANT GOALS AND INITIATIVES Water Treatment 1. Manage, operate and maintain the Cary/Apex Water Treatment Plant and associated facilities which are capable of producing water to meet peak day use of 40 million gallons per day (MGD). 2. Maintain compliance with all state and Environmental Protection Agency (EPA) drinking water regulations. 3. Produce a safe, high quality and aesthetically pleasing supply of drinking water for Cary and Apex water customers. 4. Perform laboratory analyses of treated water for Cary and Apex water customers. 5. Perform preventive and corrective maintenance for the Cary/Apex Water Treatment Plant, Jordan Lake raw water pump station, and two Town of Apex flow transfer vaults. 6. Operate a water treatment pilot plant program, a scaled down version of the plant, as needed to allow for process control optimization, treatment strategy development and testing of various system configurations. 7. Prepare and plan for future capital facilities needs of the Cary/Apex Water Treatment Plant and associated facilities. 8. Foster and maintain good relationships with the surrounding community through communication and by managing facility aesthetics. Residuals Management 9. Manage the processing and recycling of water treatment residuals, a type of sludge or waste product currently being recycled with a local composting facility. ACCOMPLISHMENTS Achieved compliance with all state and EPA drinking water standards and regulatory requirements. Certified for the tenth consecutive year as a Partnership for Safe Water Director s Award facility. 1,3,5,6 7 8

19 Completed the design phase and began construction of the Phase III Expansion Project which will be the next capital facilities expansion at the plant and increase water production capacity to 56 million gallons per day. Completed a plant-wide control system upgrade including upgraded Supervisory Control and Data Acquisition (SCADA) system and upgraded Programmable Logic Controller (PLC) and fiber optic communications networks. This upgrade was the first stage of the Phase III Expansion project. Completed the second distribution of the Town s Annual Water Quality Report to all Utility customers utilizing an electronic distribution format. The change to electronic distribution allows the Town to save approximately $20,000 annually in report distribution costs. Completed an asset inventory of all critical equipment and assets at the water treatment plant and associated facilities. KEY PERFORMANCE OBJECTIVES Adequately meet Town of Cary and Town of Apex water system demands and daily needs of system customers. Achieve 100% compliance rating with all state and EPA standards for drinking water. Achieve a turbidity removal percentage of 99% or greater. Achieve a $350 or less treatment chemical cost per million gallons of water treated. Achieve a cost of $50 or less for residuals processing per million gallons of water treated. KEY PERFORMANCE MEASURES Performance Measure Percentage of state and EPA regulatory compliance 100% 100% 100% Turbidity removal percentage 99.4% 99% 99% Chemical cost/million gallons $331 $350 $370 Residuals processing cost/million gallons $56 $51 $50 KEY WORKLOAD INDICATORS Workload Indicator Number of in-house laboratory analyses performed 49,132 49,000 49,500 Number of in-house laboratory analytical quality control tests performed 23,695 23,700 23,800 Number of contracted lab samples processed Total Average Daily Demand (MGD) Cary Average Daily Demand Apex Average Daily Demand System Maximum Month Average Daily Water Demand (MGD) System Maximum Daily Water Demand (million gallons) System Peak-Hour Water Demand (MGD) Total kilowatt-hours (kwh) consumed per year Total kwh per million gallons of water produced per year 19,655,705 3,315 19,867,000 3,225 20,500,000 3,209 Hourly operations process control tests 166, , ,400 Hourly plant inspection rounds 8,760 8,760 8,760 Number of preventive maintenance work orders completed 2,383 2,300 2,400 Preventive maintenance (Total hours per year) 1,589 1,700 2,000 Corrective maintenance (Total hours per year) 2,911 3,500 2,800 Predictive maintenance (Total hours per year) ,000 Maintenance hours for operations assistance (Total hours per year) 2,390 1,990 2,000

20 ACTIVITY HISTORY Fund Number: Budget Activity FY 2011 FY 2012 Personnel Services $1,724,847 $1,845,958 $1,900,239 $2,009,827 $2,110,415 Operations & Maintenance $4,111,440 $4,413,435 $4,574,830 $5,486,627 $5,299,835 Capital Outlay $5,035 $11,098 - $58,400 $14,750 Reimbursement from Apex $(1,152,844) $(1,292,471) $(1,344,816) $(1,702,614) $(1,382,919) Total $4,688,478 $4,978,020 $5,130,253 $5,852,240 $6,042,081 Authorized FTEs SIGNIFICANT BUDGET AND SERVICE LEVEL CHANGES BEYOND CURRENT LEVELS Increase in total treatment costs due to economic impacts affecting critical supplies and professional service costs. Increases in treatment chemical costs per million gallons treated due to declining source water quality. Increases in overall facility maintenance costs due to asset management of aging infrastructure. funding includes two additional WTP Operations/Maintenance Technician I positions to support upcoming plant expansion construction project and plant operation.

144

144 REVENUES Intergovernmental Grants $1,455,000 239,324 851,345 1,090,669 Investment Earnings 470,412 448,376 72,711 521,087 Wake County Reimbursement 131,760 131,760 --- 131,760 Developer Reimbursements

More information

ENGINEERING DEPARTMENT

ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT Additional information about the Engineering Department may be obtained by calling Tim Bailey, P.E., Director of Engineering, at (919) 469-4030, through email at tim.bailey@townofcary.org

More information

ENGINEERING DEPARTMENT

ENGINEERING DEPARTMENT ENGINEERING DEPARTMENT ADMINISTRATION Engineering Services/ Traffic and Transportation Engineering Services/ Stormwater Engineering Services/ Utilities Engineering Technical Services Engineering Field

More information

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY

VILLAGE OF ALGONQUIN 2014 WASTEWATER FACILITY PLAN UPDATE EXECUTIVE SUMMARY EXECUTIVE SUMMARY EXECUTIVE SUMMARY INTRODUCTION AND BACKGROUND The Village of Algonquin, located along the Fox River in McHenry County, provides wastewater collection and treatment services to the entire

More information

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND Brett T. Messner, PE, Tetra Tech, Inc., 201 E Pine St, Suite 1000, Orlando, FL 32801 Brett.Messner@tetratech.com, Ph: 239-851-1225 Fred

More information

Chapter 2: Description of Treatment Facilities

Chapter 2: Description of Treatment Facilities 2020 Facilities Plan Treatment Report 2.1 Introduction Chapter 2: Description of Treatment Facilities This chapter defines the Milwaukee Metropolitan Sewerage District (MMSD) service area. It also describes

More information

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1

APPENDIX A. 1. Background. 1.1 Existing Facilities. Page 1 APPENDIX A PRELIMINARY TECHNICAL SPECIFICATIONS FOR BIOSOLIDS MANAGEMENT SERVICES JEA Buckman Residuals Management Facility 1. Background JEA is seeking biosolids management services from experienced biosolids

More information

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION

SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION SECTION 2.0 WASTEWATER TREATMENT PLANT AND DISPOSAL SYSTEM DESCRIPTION Analytical Environmental Services 2-1 Jamul Indian Village Wastewater Treatment Plant Analytical Environmental Services 2-2 Jamul

More information

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977

ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 ORANGE WATER AND SEWER AUTHORITY Quality Service Since 1977 Mayor Kevin Foy Town of Chapel Hill 306 North Columbia Street Chapel Hill, NC 27516 Chairman Barry Jacobs Orange County Board of Commissioners

More information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information Facility / System: Town of Farmville Wastewater Collection System and Treatment Facilities Responsible Entity:

More information

2015 Spring Conference

2015 Spring Conference 2015 Spring Conference Meeting Strict Summer Permit Requirements on Day One: Start-up of the Western Wake Regional Water Reclamation Facility Chris White, PE April 13, 2015 Acknowledgements Town of Cary

More information

Section 5: Infrastructure and Utilities

Section 5: Infrastructure and Utilities 5.0 Infrastructure and Utilities 5.1 Introduction The Town of Holly Springs rapid growth provides for challenges with respect to funding, environmental permitting, and installation of infrastructure utilities

More information

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals

City of Elk River Wastewater Treatment Facility Improvements. Achieving Wastewater Treatment Goals City of Elk River Wastewater Treatment Facility Improvements Achieving Wastewater Treatment Goals By Tejpal Bala, P.E. Bolton & Menk, Inc. The City of Elk River received a new NPDES permit and the existing

More information

INSPECTIONS AND PERMITS DEPARTMENT

INSPECTIONS AND PERMITS DEPARTMENT INSPECTIONS AND PERMITS DEPARTMENT Additional information about the Inspections and Permits Department may be obtained by calling Scot Berry, Director of Inspections and Permits, at (919) 469-4047, through

More information

Water Supply and Delivery

Water Supply and Delivery Utilities Water Supply and Delivery Goal U-1 Availability of an adequate, safe, and sustainable water supply and maintenance of an efficient water system for residents and visitors. (Modified Goal 4.B)

More information

2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville 2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville Prepared for: Town of Apex Town of Cary Town of Morrisville RTP South/Wake County Submitted to: North

More information

The operator stated that the rollers in one of the drum filters was recently replaced.

The operator stated that the rollers in one of the drum filters was recently replaced. vember 30, 2017 Hon. Carolyn Price, Supervisor Town of Windsor 124 Main Street Windsor, NY 13865 Re: West Windsor Sewer District Dear Supervisor Price: On vember 17, 2017, Department staff inspected the

More information

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER:

Lathrop, CA. FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: MBR MANUFACTURER: FACILITY: City of Lathrop Water Recycling Plant No. 1 LOCATION: Lathrop, CA GEO. AREA: Northern California STATUS 07/14: Operational CONSTRUCTION: ENGINEERING: MBR MANUFACTURER: Unknown OPERATED BY: FUNDED

More information

Executive Summary. ES-1 Water Resources Infrastructure for Apex, Cary, Morrisville, and RTP South

Executive Summary. ES-1 Water Resources Infrastructure for Apex, Cary, Morrisville, and RTP South Executive Summary Since the mid-1990s the Towns of Apex, Cary, and Morrisville, and Wake County have worked to develop and manage a flexible portfolio of water resources options. This approach is preferable

More information

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E.

Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Wastewater Treatment Plant Energy Optimized Resource Recovery Project Presented By: Curtis Czarnecki, P.E. Kenosha Water Utility March 22, 2016 WWTP Service Area Overview Population: 110,000 Service

More information

Advanced Wastewater Treatment Plant Plant Profile

Advanced Wastewater Treatment Plant Plant Profile Advanced Wastewater Treatment Plant Plant Profile 2008 Brief History Wastewater treatment started in Penticton in 1948 with a Package Primary / Secondary plant at what is now the Alberni Lift Station.

More information

Wastewater Treatment Systems, Wastewater Issues and Permits

Wastewater Treatment Systems, Wastewater Issues and Permits Wastewater Treatment Systems, Wastewater Issues and Permits Lucas Gregory Texas Water Resources Institute November 29, 2017 Debbie Magin Guadalupe Blanco River Authority Ryan Gerlich Texas A&M AgriLife

More information

2017 Annual Performance Report

2017 Annual Performance Report 2017 Annual Performance Report Thornbury Wastewater Treatment Plant and Associated Collection System Prepared by: Wastewater Operations Staff Reporting Period: January 1 December 31, 2017 1 P age Executive

More information

City of Leadwood Wastewater System Engineering Report

City of Leadwood Wastewater System Engineering Report City of Leadwood Wastewater System Engineering Report DRAFT H2O C Engneering www.h2oc.com 877-22-WATER Background The purpose of this report is to describe the City of Leadwood s wastewater system (System

More information

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT

TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT 250-RICR-150-10-4 TITLE 250 DEPARTMENT OF ENVIRONMENTAL MANAGEMENT CHAPTER 150 WATER RESOURCES SUBCHAPTER 10 - WASTEWATER & STORMWATER PART 4 Rules and Regulations for the Operation and Maintenance of

More information

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT

MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT MACTIER WASTEWATER TREATMENT 2016 SUMMARY REPORT CERTIFICATE OF APPROVAL: # 7599-7PCKPU INTRODUCTION The Conger Marsh Water Pollution Control Plant (WPCP), which services the community of MacTier, is owned

More information

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions

Sewer Facilities 102. Hampstead Sewer Service Area. Carroll County Water & Sewer Master Plan. Current Conditions Sewer Facilities 102 Hampstead Sewer Service Area Current Conditions Carroll County owns and operates the public sewer system that serves both the Town of Hampstead and adjoining areas in the county. The

More information

Volume 1 Executive Summary

Volume 1 Executive Summary 2013 Cheyenne Water and Wastewater Master Plans Final November 27, 2013 Prepared for: City of Cheyenne Board of Public Utilities 2416 Snyder Ave. Cheyenne, WY 82001 Prepared by: HDR Engineering AMEC Earth

More information

PLANNING FOR REUSE IN NORTH CAROLINA

PLANNING FOR REUSE IN NORTH CAROLINA PLANNING FOR REUSE IN NORTH CAROLINA Tim Woody City of Raleigh Public Utilities Department P.O. Box 590 Raleigh, NC 27602 Michael B. Shafer, PE Black & Veatch International Company P. O. Box 33396, Raleigh,

More information

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS CENTRAL ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage

More information

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION

CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION CHAPTER 1 - WASTEWATER SYSTEM DESCRIPTION 1.1 Introduction The GWA provides wastewater services for Guam s general population and for Andersen Air Force Base. The wastewater system is made up of seven

More information

Section 4 Existing Reclaimed Water Demands

Section 4 Existing Reclaimed Water Demands Section 4 Existing Reclaimed Water Demands Historical reclaimed water billing and pumping records and individual customer metering data were analyzed to determine current demands on the reclaimed water

More information

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts:

WASTEWATER DEPARTMENT. Bentonville Wastewater Treatment Plant Facts: Mission: The mission of the Bentonville Wastewater Treatment Utility and staff is to protect public health and the environment through the effective treatment of wastewater. Effective wastewater treatment

More information

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF WATER RESOURCES RULES AND REGULATIONS FOR THE OPERATION AND MAINTENANCE OF WASTEWATER TREATMENT FACILITIES

More information

Public Utilities Director. Public Utilities Assistant Director. Administrative Analyst. Laboratory. Laboratory Manager. Sr. Utilities.

Public Utilities Director. Public Utilities Assistant Director. Administrative Analyst. Laboratory. Laboratory Manager. Sr. Utilities. Director Administrative Support Manager Assistant Director Controller Senior Staff Assistant Personnel/ Payroll Technician (2) Administrative Analyst Accountant Storeskeeper Accounting Tech Infrastructure

More information

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities

Agenda Item IV A-1 (TAHOE) Meeting Date: Douglas County Sewer Improvement District #1. Wastewater Reclamation Facilities Agenda Item IV A-1 (TAHOE) Meeting Date: 11-04-16 Douglas County Sewer Improvement District #1 Wastewater Reclamation Facilities Douglas County Sewer Improvement District No. 1 Wastewater Reclamation Plant

More information

Current Treatment Approaches and Planning for the Future A Panel Discussion

Current Treatment Approaches and Planning for the Future A Panel Discussion Wastewater Facilities in Salt Lake County: Current Treatment Approaches and Planning for the Future A Panel Discussion Salt Lake County Watershed Symposium 2012 Panel Members: Central Valley Water Reclamation

More information

Operations Report. September 10, 2015

Operations Report. September 10, 2015 Operations Report September 1, 215 Plant Loading and Operations Summary August 215 Biochemical Oxygen Demand, 5-Day (Avg. 2,151 lb./day) Total Suspended Solids (Avg. 33,197 lb./day) Average Daily Flow

More information

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY IN THE MATTER OF THE DECISION ON THE NEED FOR AN ENVIRONMENTAL IMPACT STATEMENT FOR THE PROPOSED LONSDALE WASTEWATER TREATMENT FACILITY EXPANSION,

More information

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP

TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP ABSTRACT TAMING TIGERS AND WRESTLING ANACONDAS: PENDER COUNTY COMMERCE PARK WWTP Tim Baldwin, PE, Senior Vice President McKim & Creed, Inc. Pender County s Commerce Park was created as a vehicle to attract

More information

Presenter: Peter C. Gorham, P.E. Director of Engineering

Presenter: Peter C. Gorham, P.E. Director of Engineering Presenter: Peter C. Gorham, P.E. Director of Engineering Project Management Group 3 Engineers 5 Construction Inspectors 1 Environmental Compliance Specialist 1 Regulatory Compliance Specialist 1 Engineering

More information

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY

CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY CITY OF FORT MYERS SOUTH ADVANCED WASTEWATER TREATMENT FACILITY RAW SEWAGE Raw sewage is the water that flows into a wastewater treatment facility. It is made up of waste from toilets, sinks, garbage disposals,

More information

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works

This document can be made available in other accessible formats as soon as practicable and upon request. Staff Report. Infrastructure & Public Works This document can be made available in other accessible formats as soon as practicable and upon request Staff Report Infrastructure & Public Works Report To: Committee of the Whole Meeting Date: March

More information

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT

MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT MUNICIPALITY OF WEST ELGIN RODNEY WASTEWATER TREATMENT PLANT 214 ANNUAL REPORT uary 1 to ember 31, 214 Environmental Compliance Approval # 3-871-88-949 Prepared by: Table of Contents Section 1: Overview...

More information

From manual to automatic at Spring Creek

From manual to automatic at Spring Creek When upgrading its water resource recovery facility on Spring Creek, the Springfield (Ill.) Metro Sanitary District designed with operations in mind. By bringing together operators and designers, the district

More information

BRACEBRIDGE WASTEWATER TREATMENT

BRACEBRIDGE WASTEWATER TREATMENT 2014 BRACEBRIDGE WASTEWATER TREATMENT ENVIRONMENTAL COMPLIANCE APPROVAL: #6801-7VKNAQ INTRODUCTION The Lagoon Lane Wastewater Treatment Plant is owned and operated by the District Municipality of Muskoka.

More information

REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM

REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM REHABILITATION OF THE ROCKAWAY BEACH MISSOURI WASTEWATER TREATMENT PLANT TURNING AROUND A CHRONICALLY FAILED SYSTEM THE PROBLEMS POOR EFFLUENT QUALITY BOD 5 87 MG/L TSS 105 MG/L E.COLI - > 2420 MPN TOTAL

More information

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and LAKEHAVEN WATER AND SEWER DISTRICT King County, Washington Resolution No. 2017-1283 A RESOLUTION of the Board of Commissioners of the Lakehaven Water and Sewer District, King County, Washington, adopting

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Shawn Wilson DATE: June 30, 2017 RE: Water Renewal Fund Capital Projects MAJOR PROJECTS, INITIATIVES, CURENT ISSUES Clean Water: Major Projects

More information

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System

EXECUTIVE SUMMARY A. INTRODUCTION B. FINDINGS AND CONCLUSIONS. 1. Conveyance System EXECUTIVE SUMMARY A. INTRODUCTION NACA has committed to planning, designing and constructing regional wastewater conveyance and treatment facilities to serve several municipalities in Northwest Arkansas.

More information

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans

Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility Plans Maine State Library Maine State Documents Land and Water Quality Documents Environmental Protection 9-1-1994 Maine Department of Environmental Protection Program Guidance on Combined Sewer Overflow Facility

More information

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be:

Assuming 100 gallons per capita per day, and 3 people per REU, design flows for the development are proposed to be: Andelina Farms Wastewater Treatment Plant Preliminary Basis of Design May 2018 Andelina Farms is a proposed Planned Unit Development in Saline Township located along US-12 just west of the City of Saline.

More information

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility

2017 Performance Report for Bobcaygeon Waste Water Treatment Facility 2017 Performance Report for Bobcaygeon Waste Water Treatment Facility Amended Environmental Certificate of Approval (ECA) #3028-AEUKDQ Section 11(4) requires the Performance Reports to contain the following:

More information

Sulaibiya world s largest membrane water reuse project

Sulaibiya world s largest membrane water reuse project Water Technologies & Solutions technical paper Sulaibiya world s largest membrane water reuse project background In May 2001, a consortium including Mohammed Abdulmohsin Al-Kharafi and Sons (The Kharafi

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

CITY OF LOS ANGELES. Sewer System Management Plan (SSMP) Biennial Self-Audit Report

CITY OF LOS ANGELES. Sewer System Management Plan (SSMP) Biennial Self-Audit Report CITY OF LOS ANGELES Sewer System Management Plan (SSMP) Biennial Self-Audit Report Pursuant to the State General Waste Discharge Requirements (WDRs) Order No. SSS WDRs 2006-0003 February 2017 City of Los

More information

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT

BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT BRACEBRIDGE WASTEWATER TREATMENT 2016 SUMMARY REPORT ENVIRONMENTAL COMPLIANCE APPROVAL: 6801-7VKNAQ ENVIRONMENTAL COMPLIANCE APPROVAL: 6222-AFGSNY (Dec 16 2016) INTRODUCTION The Lagoon Lane Wastewater

More information

Technical Director s Report. June 19, 2013

Technical Director s Report. June 19, 2013 Technical Director s Report June 19, 213 Plant Loading and Operations Summary May 213 Biochemical Oxygen Demand, 5-Day (Avg. 26,44 lb./day) Total Suspended Solids (Avg. 52,88 lb./day) Average Daily Flow

More information

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION Department of Environmental Quality Western Region-Salem Office PERMITTEE: City of Aumsville P.O. Box 227 Aumsville, OR 97325 File Number: 4475

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W

W O C H H O L Z R E G I O N A L W A T E R R E C L A M A T I O N F A C I L I T Y O V E R V I E W Facility Overview The recently upgraded and expanded Henry N. Wochholz Regional Water Reclamation Facility (WRWRF) treats domestic wastewater generated from the Yucaipa-Calimesa service area. The WRWRF

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.1 Introduction The Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan

Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan Massachusetts Water Resources Authority Update on 2018 Water and Wastewater Master Plan February 12, 2019 Background 33 Years of MWRA Capital Investment FY86 18 $8.3 Billion Capital Spending 70% on Wastewater

More information

ES.1 Solids Master Planning Background and Goals

ES.1 Solids Master Planning Background and Goals Executive Summary The Arlington County Water Pollution Control Plant (WPCP) treats incoming wastewater flows for residents, businesses, and government agencies in the Arlington County sewer service area

More information

PUBLIC WORKS AND UTILITIES DEPARTMENT DIRECTOR

PUBLIC WORKS AND UTILITIES DEPARTMENT DIRECTOR PUBLIC WORKS AND UTILITIES DEPARTMENT DIRECTOR Administration Public Works Director Utilities Director Operations Facilities Management North Cary Water Reclamation Facility South Cary Water Reclamation

More information

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati

Taylor Creek Treatment Plant. Metropolitan Sewer District of Greater Cincinnati Taylor Creek Treatment Plant Metropolitan Sewer District of Greater Cincinnati Who is this guy and what is he talking about? Brad Blankenship Taylor Creek Operator 3.5 years MSD Operator 5.5 years (total)

More information

SANITARY SEWER ELEMENT GOALS, OBJECTIVES, AND POLICIES

SANITARY SEWER ELEMENT GOALS, OBJECTIVES, AND POLICIES SANITARY SEWER ELEMENT GOALS, OBJECTIVES, AND POLICIES GOAL 1: To provide for the adequate collection, treatment, and disposal of sewage to meet the needs of the customers of North Port with a specific

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2012 PREPARED: January 2013 2012 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal:

Healthy Environment. Expenditure and Funding Source Summary Solid Waste Disposal: Healthy Environment Expenditure and Funding Source Summary... 53 Solid Waste Disposal: Hanes Mill Road Landfill Development and Upgrades... 54 Hanes Mill Road Landfill EVO Property Development... 55 Hanes

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

EXECUTIVE SUMMARY. Background

EXECUTIVE SUMMARY. Background EXECUTIVE SUMMARY Background The previous master plan for the Town of Cary s wastewater collection system was completed in 2003 by Hazen and Sawyer, P.C. Subsequently, several significant changes, which

More information

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY REASON FOR INVESTIGATION The 2003-2004 Grand Jury investigated the status of wastewater treatment in unincorporated Nevada County. This year,

More information

BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C.

BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C. BIOSOLIDS Pasteurization: A NEW APPROACH IN CHERAW, S.C. Guy E. Slagle, Jr., P. E. Hayes, Seay, Mattern & Mattern, Inc. 181 East Evans St. Florence, South Carolina, 29506 J. Ted Morris Public Utility Director

More information

Wastewater Systems. By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas

Wastewater Systems. By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas MBR Technology for Onn-site Wastewater Systems By Reza Shams-Khorzani, Ph.D. VP - Bio-Microbics, Inc. 9 th KWEA/KsAWWA Annual Joint Conference August 29, 2017 Wichita, Kansas Decentralized Wastewater Systems

More information

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP

Providing Infrastructure Redundancy at the Rocky River WWTP. Timothy McCann AECOM Keith Bovard Rocky River WWTP Timothy McCann AECOM Keith Bovard Rocky River WWTP WWTP Infrastructure Redundancy Redundancy As NASA Would Say: A Backup Plan for the Backup Plan Nuclear Power Plant Wastewater Treatment Plant Page 3 Infrastructure

More information

City of Clinton: Wastewater Systems Annual Performance Report

City of Clinton: Wastewater Systems Annual Performance Report City of Clinton: Wastewater Systems Annual Performance Report January 2016 through December 2016 I. General Information Facility/System Name: City of Clinton Collection System and Norman H. Larkins Wastewater

More information

ENVIRONMENTAL ASSESSMENT

ENVIRONMENTAL ASSESSMENT ENVIRONMENTAL ASSESSMENT Project Identification Name: Piqua Wastewater Plant Expansion NRD WPCLF#: CS390755-0009, AIMS #5945 Contact: Gary Huff, City Manager City of Piqua 201 Water Street Piqua, OH 45356

More information

Goals, Objectives, and Policies Infrastructure Element Introduction

Goals, Objectives, and Policies Infrastructure Element Introduction Goals, Objectives, and Policies Infrastructure Element Introduction Pursuant to Section 163.3177 (6) (c), FS and Sections 9J-5.011 (2)(b) and (c), FAC, the following represents the Potable Water, Sanitary

More information

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM

RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER PRIORITY RANKING SYSTEM RULES OF THE TENNESSEE DEPARTMENT OF ENVIRONMENT AND CONSERVATION WATER RESOURCES DIVISION CHAPTER 0400-46-01 PRIORITY RANKING SYSTEM TABLE OF CONTENTS 0400-46-01-.01 Priority Ranking System: General 0400-46-01-.03

More information

CHAPTER SEVEN: UTILITIES

CHAPTER SEVEN: UTILITIES CHAPTER SEVEN: UTILITIES 7.0 Introduction T he Water Works Board of the City of Auburn (AWWB) is the primary potable water service provider for the City of Auburn (City) and Auburn University. There are

More information

Potable Water Supply, Wastewater & Reuse Element

Potable Water Supply, Wastewater & Reuse Element Potable Water Supply, Wastewater & Reuse Element GOAL ONE: HIGH QUALITY AND AFFORDABLE POTABLE WATER WILL BE AVAILABLE TO MEET THE EXISTING AND PROJECTED DEMANDS OF PINELLAS COUNTY UTILITY CUSTOMERS. 1.1.

More information

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of

North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of North Side WRP Master Plan Research and Development Department 2006 Seminar Series October 27, 2006 Metropolitan Water Reclamation District of Greater Chicago Today s Goals Discuss project background Provide

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2018 PREPARED: January 2019 2018 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Irvine Ranch Water District SCAP Energy Committee Meeting IRWD Biosolids Project Update. August 26, 2015

Irvine Ranch Water District SCAP Energy Committee Meeting IRWD Biosolids Project Update. August 26, 2015 Irvine Ranch Water District SCAP Energy Committee Meeting IRWD Biosolids Project Update August 26, 2015 1 Presentation Agenda Introduction to IRWD IRWD s Biosolids Project Construction Update 2 Introduction

More information

Chapter Nine, Potable Water Subelement City of St. Petersburg Comprehensive Plan

Chapter Nine, Potable Water Subelement City of St. Petersburg Comprehensive Plan POTABLE WATER SUBELEMENT Chapter Nine, Potable Water Subelement Sections: 9.1.1 INTRODUCTION 9.1.2 GOAL, OBJECTIVES AND POLICIES ISSUE: Rehab/Upgrade of Potable Water Facilities ISSUE: Extension of Potable

More information

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014

CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 CITY OF OXFORD WASTEWATER TREATMENT FACILITY ANNUAL PERFORMANCE REPORT FOR THE CALENDAR YEAR OF 2014 PREPARED: January 2015 2014 ANNUAL PERFORMANCE REPORT FOR THE CITY OF OXFORD WASTEWATER TREATMENT FICILITY

More information

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014

Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Comprehensive Plan Update - Sanitary Sewer Section Planning Commission Workshop: November 10, 2014 Application type Agency Review Comments Applicable Plan Sections Staff Planner Staff Recommendation Publicly

More information

Water / Wastewater Fund

Water / Wastewater Fund WATER/WASTEWATER FUND The Water/Wastewater Fund is used to account for the provision of water and wastewater services to residents of the City. All activities necessary to provide water/ wastewater services

More information

SEWER SYSTEM MANAGEMENT PLAN (SSMP)

SEWER SYSTEM MANAGEMENT PLAN (SSMP) SEWER SYSTEM MANAGEMENT PLAN (SSMP) August 2010 TABLE OF CONTENTS SYSTEM OVERVIEW... 1 1.0 GOALS... 2 2.0 ORGANIZATION... 3 3.0 OVERFLOW AND EMERGENCY RESPONSE PLAN... 4 4.0 FATS, OILS AND GREASE (FOG)

More information

Need-to-Know Criteria Wastewater Treatment Operator Class III

Need-to-Know Criteria Wastewater Treatment Operator Class III 2017 Need-to-Know Criteria Wastewater Treatment Operator Class III A Need-to-Know Guide when preparing for the ABC Wastewater Treatment Operator Class III Certification Exam Before You Dive In What is

More information

OKLAHOMA CITY: FIRST YEAR ACCOMPLISHMENTS

OKLAHOMA CITY: FIRST YEAR ACCOMPLISHMENTS CASE STUDY OKLAHOMA CITY: FIRST YEAR ACCOMPLISHMENTS BACKGROUND After outsourcing the management, operation and maintenance of its wastewater facilities for over 30 years, Oklahoma City opted not to exercise

More information

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest

Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Best practice in monitoring process, operation and maintenance of wastewater treatment plants 12 September 2011, Bucharest Steve Russell WRc PLC Swindon UK Steve.russell@wrcplc.co.uk WRc plc 2011 Plan

More information

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE

QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE. Page 1 INFLUENT MONTHLY AVERAGE EFFLUENT MONTHLY AVERAGE QUARTERLY OPERATIONS REPORT 4 th Quarter, April June 2018 WASTEWATER PERMIT COMPLIANCE INFLUENT MONTHLY AVERAGE Month Flow MGD CBOD mg/l TSS mg/l July 26.7 350 320 August 29.1 370 340 September 27.3 380

More information

WATER RESOURCES COORDINATOR

WATER RESOURCES COORDINATOR File: Water Resources Coordinator Job Code: 456 FLSA: Non-exempt Unit: Public Services Operating Engineers Local 3 Revised: 2/2001 WATER RESOURCES COORDINATOR DEFINITION Under general supervision, plans,

More information

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet

City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet City of Oregon Wastewater Treatment Plant (WWTP) Secondary Treatment Improvement Project Phases 1 & 2 FAQ Sheet WHY IS THE CITY OF OREGON DOING THIS PROJECT? Along with other communities across the country,

More information

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012

City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 City of Crosby, ND Municipal Infrastructure Needs Assessment September 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and

More information

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Paul Zimmerman DATE: April 5, 2017 RE: Water Renewal Fund Capital Projects

TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Paul Zimmerman DATE: April 5, 2017 RE: Water Renewal Fund Capital Projects TO: Public Works Commission FROM: Robyn Mattison, Jim Pardy, and Paul Zimmerman DATE: April 5, 2017 RE: Water Renewal Fund Capital Projects MAJOR PROJECTS, INITIATIVES, CURENT ISSUES Clean Water: Major

More information

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS

CHAPTER 4 WASTEWATER CHARACTERISTICS WASTEWATER FLOWS CHAPTER 4 WASTEWATER CHARACTERISTICS Wastewater collection, treatment, and disposal facilities are designed to handle specific hydraulic and pollutant loads for 20 or more years after they are constructed.

More information