1 AN INNOVATIVE DEDICATED OUTDOOR AIR APPLICATION FOR A GOVERNMENT OFFICE TOWER MICHAEL HALLENBECK, PE, CEM Southland Industries

2 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 2

3 BRAC 133 OVERVIEW BRAC 133 office towers Base Realignment and Closure (BRAC) Act recommendation #133. Consolidate multiple DOD groups into a one campus located in Alexandria, VA. 1,700,000 sq. ft. total GSF Two Towers (20 Floors) Multiple Outbuildings 3

4 BRAC 133 OVERVIEW Achieved LEED NCv2.2 Gold 43 Credits Total EA Credit % Savings over ASHRAE 90.1 EA Credit 3 Enhanced Commissioning EA Credit 4 - Enhanced Refrigerant Management EQ Credit 1 Outdoor Air Delivery EQ Credit 2 Increased Ventilation DE Credit % Water Use Reduction 4

5 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 5

6 FPIU OVERVIEW 6

7 FPIU OVERVIEW Excellent humidity, temperature, and ventilation control. Reduced architectural footprint. Integration with other DOAS technology Flexibility during tenant fit out. Typical FPIU Installations. 7

8 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 8

9 CENTRAL UTILITY PLANT 42 F Chilled Water Plant (2) 1,250 ton centrifugal VFD chillers BRAC F Centrifugal chillers. 42 F CHWS /58 F CHWR kw/ton NPLV Provides CHW to DOAS and high latent load zone FCU s. Provided with head pressure control. 9

10 CENTRAL UTILITY PLANT 55 F Chilled Water Plant (2) 1,250 tons VFD centrifugal chillers BRAC F centrifugal chiller. 55 F CHWS/65 F CHWR kw/ton NPLV. Provides CHW to FPIU s, data and electrical rooms Provided with head pressure control. 10

11 CENTRAL UTILITY PLANT Mission Critical Chilled Water Plant BRAC 133 air cooled scroll mission critical chillers. 4 Chillers Total 900 Tons total Provides emergency CHW to Data, IT and Electrical Rooms CRAH s provided with Dual Coils 11

12 CENTRAL UTILITY PLANT Heating Hot Water Boilers BRAC 133 heating hot water boilers. (6) 8,000 MBH Input 180 F HWS / 140 F HWR 85% efficient Dual Fuel (gas/ #2 Fuel oil) 12

13 CENTRAL UTILITY PLANT (8) Cooling Towers 4 F approach VFD control (5) CW pumps VFD (soft-start/stop) BRAC 133 cooling tower yard. (1) Free Cooling Heat Exchanger Plate and Frame 3 F design approach 13

14 CENTRAL UTILITY PLANT Water Side Economizer BRAC 133 free cooling plate and frame heat exchanger. Plate and Frame Series configuration to pre-cool chilled water return. CWS < 52F : total free cooling 52F < CWS < 65F: partial free cooling 14

15 CENTRAL UTILITY PLANT BRAC 133 chilled water system overall process flow diagram. 15

16 CENTRAL UTILITY PLANT 6,000 FULL COOLING WATER-SIDE ECONOMIZER AVAILABILITY 5,000 4,000 HOURS 3,000 2,000 1,000 42F SYSTEM 55F SYSTEM 0 16

17 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 17

18 DEDICATED OA SYSTEM OA is dehumidified, cooled, and heated through the DOAS. Total of four Dedicated Outdoor Air Units provided. Roof mounted DOAS unit serving the BRAC 133 West Tower. OA is distributed to terminal units through a medium pressure distribution system. 18

19 DEDICATED OA SYSTEM Supplied with 42 F chilled water and heating hot water plant. Indoor DOAS unit serving the BRAC 133 East Tower. Cooled and heated to 48 F leaving air temperature. Building maintained below 55 F dew point. 19

20 DEDICATED OA SYSTEM Below 48 F ambient, the 42 F chilled water plant can be de-energized. BRAC 133 DOAS OSA intake. High latent load zones served via the 42 F system are provided with additional OA. 20

21 DEDICATED OA SYSTEM Q l =0.68 scfm/person w gr Q l =latent load/person (Btu/hr) w gr =humidity ratio difference (gr/lbm) where: Room design condition: 75F, 50% RH, W=64.9gr/lbm Q l = 200 Btu hr (per person) W for 55F SA DPT, 64.6 Gr/lbm Resulting scfm/person, 980 scfm W for 48F SA DPT, Gr/lbm Resulting scfm/person, ~20 scfm, used for design 21

22 DEDICATED OA SYSTEM DOAS Analysis Results Tower People Occupancy: 17,000 (nondiversified) Building OA Requirement: 340,000 cfm (non-diversified) DOAS Size (4 total): 85,000/unit Average OA rate: 0.22 cfm/s.f. 22

23 DEDICATED OA SYSTEM What happens if they load the building unevenly with open plan cubicles? (1,284,000 sf)/ (64 sf person) 4 DOAS 20cfm/person 100,000 cfm per DOAS unit Total DOAS capability of 400,000 cfm to allow for the flexible loading of the office tower and podium. 23

24 DEDICATED OA SYSTEM Though the use of extensive DCV, the design team expects the DOAS to operate at diversified OA flow of 230,000 cfm when fully occupied. 55 F and 42 F chilled water systems optimally sized for the expected occupant load of 6,400 people in the tower plus the podium occupant load. 24

25 DEDICATED OA SYSTEM BRAC 133 DOAS airflow trend. 25

26 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 26

27 ENERGY RECOVERY Total Energy Recovery (Sensible + Latent) 12 ft. diameter ERU wheel 4A media Sized to match general exhaust system. Two ERU s - one 35,000 cfm unit per tower. Enthalpy Wheel 27

28 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL CONCLUSION 28

29 DESIGN CONSIDERATIONS When providing 48 F OA to the building, the cool air reduces the 55 F chilled water system load. When DCV is implemented, the zone and building wide 55 F chilled water plant load may increase due to the reduction of OA. The zone level cooling coils and 55 F chilled water plant should be sized accordingly. 29

30 BRAC 133 OVERVIEW PROJECT OVERVIEW FAN POWERED INDUCTION UNIT CENTRAL UTILITY PLANT DEDICATED OUTDOOR AIR SYSTEM ENERGY RECOVERY DESIGN CONSIDERATIONS ENERGY MODEL 30

31 ENERGY MODEL ASHRAE Baseline Model Water Cooled Centrifugal - (2) equally sized chillers. Hydronic Heating - (2) equally sized boilers. Variable Air Volume with Re-heat Constant Volume Single Zone with DX cooling and gas heating 31

32 ENERGY MODEL Proposed Model Energy Conservation Measures Demand Control Ventilation Water Side Economizer Energy Recovery Unit High Efficiency Chillers High Efficiency Lighting 32

33 ENERGY MODEL BRAC 133 EPACT 2005 PROPOSED BASELINE ENERGY CONSUMPTION Heating - Gas 49.9% Savings 48.6% Process - Gas 2.8% Fans - Electricity 12.7% Cooling - Electricity 17.9% Heating - Electricity Heat Rejection 0.8% - Electricity Lighting 1.5% - Electricity Pumps 10.1% - Electricity 2.7% Process - Gas 2.8% Cooling - Electricity 6.0% Fans - Heating Electricity - Gas 13.5% 18.7% Lighting - Electricity Pumps - Electricity 6.7% 3.2% Heating - Electricity 0.3% Heat Rejection - Electricity 1.7% 33

34 ENERGY MODEL BRAC 133 LEED PROPOSED BASELINE ENERGY COST Annual Gas Cost 13.9% Annual Savings 24.7% Annual Gas Cost 5.7% Annual Electricity Cost 69.6% 86.1% 34

35 CONCLUSION Utilization of a Dedicated Outdoor Air system in conjunction with a multiple chilled water plants and a Fan Powered Induction Unit system can provide an energy efficient, flexible HVAC system for a modern office tower. The FPIU system should be considered along with other DOAS terminal unit technology when selecting a building HVAC system. 35

36 Thank You Question? Michael Hallenbeck, PE, CEM 36

Depth: Mechanical Redesign

Depth: Mechanical Redesign Depth: Mechanical Redesign Redesign Objectives The most important objective of the mechanical redesign is to provide Greenbriar East with ventilation that meets the requirements of ASHRAE Standard 62-2001.

More information

The Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option

The Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option The Milton S. Hershey Medical Center Academic Support Building AE Senior Thesis Kari Anne Donovan Mechanical Option Presentation Outline Existing Conditions Distributed Chilled Water Feasibility Study

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Three: Mechanical Systems Existing Conditions Evaluation Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date:

More information

Grunenwald Science and Technology Building

Grunenwald Science and Technology Building Grunenwald Science and Technology Building Clarion University- Clarion, PA AE 482 Mechanical Project Proposal: Proposal for Alternative Designs Shane Helm The Pennsylvania State University Architectural

More information

nycaspelegislative@gmail.com newsletter@asseny.org PS62R NYC s First Net Zero Energy School (and one of the first in the World) What is Net Zero? Our Definition : The building will produce (on site) as

More information

AE 481W Thesis Proposal

AE 481W Thesis Proposal AE 481W Thesis Proposal I I Advisor: Dr. Treado UNIVERSITY OF CALIFORNIA SAN DIEGO RADY SCHOOL OF MANAGEMENT LA JOLLA, CA TABLE OF CONTENTS Executive Summary.3 Mechanical System Overview..4 Design Objectives,

More information

Mechanical Project Proposal

Mechanical Project Proposal Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18

More information

SURNA Grow Facility: Systems Comparison - IEA

SURNA Grow Facility: Systems Comparison - IEA SURNA Grow Facility: Systems Comparison - IEA May 2016 SURNA Grow Facility This analysis provides the projected energy and associated cost comparison between the Surna proposed facility in comparison to

More information

Technical Report Three Mechanical Systems Existing Conditions Evaluation

Technical Report Three Mechanical Systems Existing Conditions Evaluation 09 10 Technical Report Three Mechanical Systems Existing Conditions Evaluation WESTINGHOUSE ELECTRIC CO. NUCLEAR ENGINEERING HEADQUARTERS CAMPUS Pittsburgh, PA Daniel P. Aughenbaugh Mechanical Dr. Bahnfleth

More information

Chilled Beams. The new system of choice?

Chilled Beams. The new system of choice? Chilled Beams The new system of choice? Presented By: Kevin M. Pope P.E. Jason Leffingwell Hammel Green And Abrahamson, Inc. and Ken Bauer, P.E., LEED AP Butters-Fetting Co., Inc. History of Chilled Beams

More information

Georgetown University New Science Center

Georgetown University New Science Center Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical

More information

Applying Geothermal Technology for Large Scale Projects

Applying Geothermal Technology for Large Scale Projects Jeff Urlaub, PE MEP Associates, LLC jeffu@mepassociats.com 715.832.5680 Engineering Future Focused Solutions Applying Geothermal Technology for Large Scale Projects Breakout Session Category (e.g. Residential)

More information

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM

INCENTIVE ESTIMATOR HVAC USER GUIDE CONTENTS FLORIDA CUSTOM INCENTIVE PROGRAM INCENTIVE ESTIMATOR HVAC USER GUIDE FLORIDA CUSTOM INCENTIVE PROGRAM CONTENTS 1. Getting Started... 2 2. Measure Tool Description... 3 2.1. Appropriate Use of the Tool... 3 2.2. Applicable Types of Air

More information

A Paradigm Shift in ERV Technology. Paul Ehrlich, PE President Building Intelligence Group PLLC

A Paradigm Shift in ERV Technology. Paul Ehrlich, PE President Building Intelligence Group PLLC A Paradigm Shift in ERV Technology Paul Ehrlich, PE President Building Intelligence Group PLLC August 9, 2013 Existing Buildings and Energy Existing buildings: Floor space: Floor space per building: Energy

More information

WESTINGHOUSE ELECTRIC NUCLEAR

WESTINGHOUSE ELECTRIC NUCLEAR WESTINGHOUSE ELECTRIC NUCLEAR ENGINEERING HEADQUARTERS DANIEL AUGHENBAUGH - MECHANICAL OPTION Daniel Aughenbaugh Mechanical Option PRESENTATION OUTLINE INTRODUCTION EXISTING MECHANICAL SYSTEM MY DESIGN

More information

Project Proposal Proposal for Investigation of Alternative Systems

Project Proposal Proposal for Investigation of Alternative Systems Project Proposal Proposal for Investigation of Alternative Systems 01.15.2010 Defense Media Activity Building Fort George G. Meade Penn State University Architectural Engineering Faculty Advisor: Dr. Treado

More information

South Jefferson High School Huyett Road Charles Town, WV 25414

South Jefferson High School Huyett Road Charles Town, WV 25414 Thesis Proposal Mechanical System Redesign Report Charles Town, WV 25414 Prepared for Dr. Jelena Srebric The Pennsylvania State University By Jonathon Gridley Friday, December 15, 2006 1.0 Table of Contents

More information

Characteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate

Characteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 216 Characteristics of Energy Consumption by building type of a U.S. Navy Installation

More information

Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By KlasC. Haglid, P.E., R.A., CEM

Implementing Demand Controlled Ventilation to Meet ASHRAE Standard By KlasC. Haglid, P.E., R.A., CEM Implementing Demand Controlled Ventilation to Meet ASHRAE Standard 62.1-2010 By KlasC. Haglid, P.E., R.A., CEM 1 Klas C. Haglid, P.E., R.A., CEM - Bio ASHRAE Distinguished Service Award 2011 ASHRAE Handbook,

More information

1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction

1 Project Information. 2 Building Type. 3 Trade Ally/Contractor Information. HVAC Rebate Worksheet. Retrofit New Construction HVAC Rebate Worksheet Before you start Instructions: Complete all relevant information for your project. Include with complete application package. The HVAC Worksheet should be completed for new construction

More information

Central Chiller Plants

Central Chiller Plants Central Chiller Plants Institute for Facilities Management New Orleans, LA January 18,2016 Course 319 Presenter: John Vucci Associate Director HVAC Systems University of Maryland College Park, Maryland

More information

University of Minnesota Duluth Civil Engineering Building

University of Minnesota Duluth Civil Engineering Building Energy Data Attachment University of Minnesota Duluth Civil Engineering Building LEED Energy Modeling The energy modeling for LEED NC 2.2 was performed against ASHRAE 9.1-24 Appendix using equest version

More information

Coppin State University Physical Education Complex - Technical Report 2

Coppin State University Physical Education Complex - Technical Report 2 Coppin State University Physical Education Complex - Technical Report 2 Building and Plant Energy Analysis Report Kaylee M Damico Advisor: Dr. Jelena Srebric Location: Baltimore, MD Table of Contents Contents

More information

Technical Assignment 2 Building and Plant Energy Analysis

Technical Assignment 2 Building and Plant Energy Analysis Technical Assignment 2 Building and Plant Energy Analysis Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards Advisor: James Freihaut October 4, 2010 Table of Contents Executive

More information

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion

Mechanical Systems Redesign Proposal. Thesis Proposal. Morton Hospital Expansion Mechanical Systems Redesign Proposal Thesis Proposal Morton Hospital Expansion Taunton, MA Courtney Millett Mechanical Option Advisor: Dr. Bahnfleth December 12, 2014 Revised: January 16, 2015 Revised:

More information

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4

SHIYUN CHEN ADVISOR: DR. BAHNFLETH. 1 Executive Summary Building Summary 3. 3 Existing Mechanical System. 4 Table of Contents 1 Executive Summary... 1 2 Building Summary 3 3 Existing Mechanical System. 4 4 Mechanical Design Objectives..... 4 5 Mechanical System Evaluation. 5 5.1 Air Distribution System Evaluation....

More information

Designing for 100% OA In Hospitals. Southland Industries

Designing for 100% OA In Hospitals. Southland Industries Designing for 100% OA In Hospitals Southland Industries Designing for 100% OA In Hospitals Chris Skoug, PE March 31, 2016 2 Why Choose 100% OA for Hospitals? Designing for 100% OA In Hospitals Key Objectives

More information

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load.

2-Pipe fan coil terminal units were selected as the parallel system to handle the remaining sensible cooling load. Redesign Introduction This report is an in depth analysis of the mechanical systems of the Outreach Innovation Building located in University Park, PA and the impact these changes had on other systems

More information

LEED Energy Performance Summary Report

LEED Energy Performance Summary Report Section 1.1 - General Information Simulation Program: Principle Source: Energy Code Used: Weather File: Climate Zone: New Construction Percent: Existing Renovation Percent: Quantity of Floors: Proposed:

More information

Ceiling Radiant Cooling Panels

Ceiling Radiant Cooling Panels Copyright 2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc This posting is by permission from ASHE Journal This article may not be copied nor distributed in either paper

More information

Ceiling Radiant Cooling Panels

Ceiling Radiant Cooling Panels 2006, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc (wwwashraeorg) Published in ASHE Journal Vol 48, Oct 2006 For personal use only Additional reproduction, distribution,

More information

Building Load and Energy Estimates Analysis. Instructor: Dr. Mumma. October 28, Thesis Building Sponsor s: INOVA Fairfax Hospital

Building Load and Energy Estimates Analysis. Instructor: Dr. Mumma. October 28, Thesis Building Sponsor s: INOVA Fairfax Hospital David Peterson Penn State AE, Mechanical INOVA Fairfax Hospital The INOVA Heart Institute David J. Peterson Mechanical Option Mechanical Technical Report #2b The INOVA HEART INSTITUTE AT INOVA Fairfax

More information

Mechanical Systems Project Proposal

Mechanical Systems Project Proposal Mechanical Systems Project Proposal December 15, 2006 Table of Contents 1.0 Executive Summary... 2 2.0 Building Background... 3 3.0 Proposal Objectives... 5 4.0 Initial Considerations... 6 5.0 Proposed

More information

30% Surplus OA. Does It Use More Energy? The Building Sciences column Why Green Can Be Wash in the November

30% Surplus OA. Does It Use More Energy? The Building Sciences column Why Green Can Be Wash in the November This article was published in ASHRAE Journal, Vol. 51, June 2009. Copyright 2009 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Reprinted by permission at http://doas-radiant.psu.edu.

More information

IDEA Synopsis Submission

IDEA Synopsis Submission IDEA Synopsis Submission University of Minnesota 2017 IDEA Annual Energy Conference Abstract Topic: District Cooling: A Heating Highway Submitted by: Scott McCord, PE, University of Minnesota Abstract

More information

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, Project: North Carolina A&T State University New Student Health Center SCO #: 08-08109-01A 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The

More information

EnergyPro Building Energy Analysis. Single-story School Building

EnergyPro Building Energy Analysis. Single-story School Building EnergyPro Building Energy Analysis Single-story School Building EnergyPro Building Energy Analysis for a single-story school bulding Project Scope The purpose of the EnergyPro energy model was to evaluate

More information

Energy Efficiency Baselines for LABORATORIES. PG&E s Customized New Construction and Customized Retrofit Incentive Programs.

Energy Efficiency Baselines for LABORATORIES. PG&E s Customized New Construction and Customized Retrofit Incentive Programs. Energy Efficiency Baselines for LABORATORIES PG&E s Customized New Construction and Customized Retrofit Incentive Programs October 1, 2010 Funded By: Written By: 427 13 th Street Oakland, CA 94612 510.663.2070

More information

OPTION 1: PERFORMANCE RATING METHOD

OPTION 1: PERFORMANCE RATING METHOD OPTION 1: PERFORMANCE RATING METHOD I confirm that the energy simulation software used for this project has all capabilities described in EITHER section `G2 Simulation General Requirements' in Appendix

More information

Managing. Delta T in Buildings

Managing. Delta T in Buildings dp(ft) 83 dp (ft) 35 dp (ft) 41 105 140 180 188 1,800 GPM Tout(F)= 50 Tin (F)= 40 9000 MBH Managing Tout(F)= 50 1,800 GPM AHU 2 Delta T in Buildings Tout(F)= 50.0 1,800 GPM 192.5 FT 5,400 GPM 77 309 HP

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report One: ASHRAE Standard 62.1 2007 and 90.1 2007 Analysis Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date: 10/05/2009

More information

EMD SERONO RESEARCH CENTER EXISTING

EMD SERONO RESEARCH CENTER EXISTING EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono

More information

Mechanical Depth. Redesign and Analysis

Mechanical Depth. Redesign and Analysis Depth Redesign and Analysis 14 Analysis Scope The scope of my mechanical redesign will include the 2 nd and 3 rd floors of the SW hospital wing which includes Semi-Private, Private and Isolations rooms.

More information

OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION

OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION OUTDOOR AIR, HEAT WHEELS AND JCPENNEY: A NEW APPROACH TO RETAIL VENTILATION Christopher S. Smith, E.I.T. and Thomas A. Bartlett, P.E. JCPenney Company, Inc. Construction Services Mechanical Engineering

More information

A STUDY OF ABSORPTION CHILLER/HEATER APPLICATION IN MARINE ENGINEERING

A STUDY OF ABSORPTION CHILLER/HEATER APPLICATION IN MARINE ENGINEERING A STUDY OF ABSORPTION CHILLER/HEATER APPLICATION IN MARINE ENGINEERING The 4 th Biennial Marine Transportation System (MTS) Research & Development Conference, June 21-23, 2016 Advantages of Applying Absorption

More information

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels

Air-Water Systems. Chilled Ceilings and Beams TROX USA. Principle of Operation. Radiant Effect on Occupants. Early 1980 s. Chilled Ceiling Panels Air-Water Systems and Beams Early 1980 s 1980 1990 2005 Buildings well insulated for heating Advent of personal computers Need to remove heat from space Limited space available TROX USA 1 2 Principle of

More information

ASHRAE 90.1 The evolution continues

ASHRAE 90.1 The evolution continues ASHRAE 90.1 The evolution continues 4 March 2009 Mick Schwedler, PE ASHRAE SSPC 90.1 Chair Manager, Trane Applications Engineering Historical Timeline 90.1-1980 updated 90.1-1999 major rewrite 90.1-2001

More information

Level 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort

Level 1 Modules tdp-101 hvac industry overview tdp-103 concepts of air conditioning tdp-102 abcs of comfort TDP-101 HVAC Industry Overview This TDP provides a general overview of the commercial HVAC industry and provides an awareness of the design process and construction. The documents involved in construction,

More information

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected)

CREDIT COMPLIANCE (Please complete the color coded criteria(s) based on the option path selected) (Responsible Individual) (Company Name) I,, from verify that the information provided below is accurate, to the best of my knowledge. CREDIT COMPLIANCE (Please complete the color coded criteria(s) based

More information

Sample Reports. for. HAP v4.90 Example Problem

Sample Reports. for. HAP v4.90 Example Problem Sample Reports for HAP v4.90 Example Problem December, 2014 Carrier Software Systems Copyright 2014 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using

More information

TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify,

TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, TDP Catalog TDPs provide you with new technical training materials designed to help your contractors, engineers, and designers to effectively design, specify, sell, and apply HVAC equipment in commercial

More information

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Research Office Building (LG Multi V Water IV Heat VRF System) (* Source: http://kr.lgeaircon.com/) Commercial Air-Conditioning Engineering Study ES-MultiVWaterIV_EnergyAnalysis-08-14

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V Water II VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BF-002-US 013A16 Contents Executive Summary...3 Introduction...4

More information

LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS

LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS LOW CARBON HEATING FOR COMMERCIAL BUILDINGS USING GRID SUPPLIED ELECTRCITY DURING-OFF PEAK PERIODS R. Hutcheson, P.Eng. LEED AP, CxA, S. Jorens B.Eng., D. Knapp, PhD., P.Phys., LEED AP Arborus Consulting

More information

ASHRAE s LowDown Showdown

ASHRAE s LowDown Showdown ASHRAE s LowDown Showdown Presented to the Building Energy Simulation Forum 14 February 2018 James Cullin, PhD, PE Overview Project Approach Existing Building Modeling/Calibration Proposed Design Proposed

More information

Building Energy Efficiency Analysis for a High School

Building Energy Efficiency Analysis for a High School Building Energy Efficiency Analysis for a High School (LG Multi V III VRF System) School Building Air-Conditioning Engineering Study VRF-ES-BH-002-US 013A30 Executive Summary Contents Executive Summary...2

More information

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation

Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation Mechanical Technical Report Three Mechanical Systems Existing Conditions Evaluation 2900 Fairview Park Drive, Prepared By: Charles Haack Mechancial Option November 21, 2008 Prepared For: Dr. William P.

More information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information

BETA OPTION 1: PERFORMANCE RATING METHOD. Section General Information LEED-CS 2. Certification Submittal Template OPTION 1: PERFORMANCE RATING METHOD I confirm that the energy simulation software used for this project has all capabilities described in EITHER section `G2

More information

LOGO. Trivium Level II Energy Audit

LOGO. Trivium Level II Energy Audit LOGO Trivium Level II Energy Audit Submission Date: 9/16/2016 Table of Contents 1.0 EXECUTIVE SUMMARY 3 2.0 SITE ENERGY CONSUMPTION 5 3.0 BACKGROUND INFORMATION 6 3.1 Description of the Client 6 3.2 Description

More information

What s My Baseline? ASHRAE

What s My Baseline? ASHRAE 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116,part 2). For personal use only. Additional reproduction,

More information

Proposal: Mechanical System Redesign

Proposal: Mechanical System Redesign Proposal: Mechanical System Redesign The 959 Eighth Avenue 10019 Faculty Advisor: Dr. James Freihaut December 12, 2005 Table of Contents 1.0 Executive Summary 2.0 3.0 Proposal Obectives 4.0 Preliminary

More information

Energy Recovery Ventilation & ERV Basics The New Custom Express Tool

Energy Recovery Ventilation & ERV Basics The New Custom Express Tool Energy Recovery Ventilation & ERV Basics The New Custom Express Tool Presented by: Dinesh Patel dinesh.patel@nationalgrid.com David Gaudet david.gaudet2@nationalgrid.com 1 What is and Why ERV? The recovery

More information

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE Reducing Hospital Energy Use and Maintaining Savings Glen Anderson, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing

More information

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies.

Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs. Valent is a business of Unison Comfort Technologies. Valent Packaged Rooftop Units A Fresh Choice for High-Percentage Outdoor Air Designs Valent is a business of Unison Comfort Technologies. When your HVAC system design calls for high-percentage or 100%

More information

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal The following documentation provides an example submittal for the LEED-NC v2.1 Energy & Atmosphere Credit 1 (EAc1). This sample EAc1 submittal

More information

how to read an energy model

how to read an energy model how to read an energy model Kohler Ronan, LLC is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported

More information

Integration of Mechanical System Redesign. The New Learning Center Lutheran Theological Seminary at Philadelphia

Integration of Mechanical System Redesign. The New Learning Center Lutheran Theological Seminary at Philadelphia Integration of Mechanical System Redesign Geothermal Heat Pump Redesign The New Learning Center Lutheran Theological Seminary at Philadelphia Wesley S. Lawson Architectural Engineering Mechanical Option

More information

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma LEED Green Building Certification The purpose of the LEED Green Building Rating is to provide a national standard that aims to improve environmental, health and economic performance of buildings using

More information

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario

The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario The Impact of VISIONWALL High Performance Windows on the Northern Telecom Building in Ottawa, Ontario Visionwall Technologies Inc. 14904-123 Avenue Edmonton, Alberta, Canada T5V 1B4 Tel: 403 451 4000 Fax:

More information

EnergyPro Building Energy Analysis. Nine-story Office Building

EnergyPro Building Energy Analysis. Nine-story Office Building EnergyPro Building Energy Analysis Nine-story Office Building EnergyPro Building Energy Analysis for an office building Project Scope The purpose of the EnergyPro energy model was to evaluate the energy

More information

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013

Deep Energy Retrofit Modeling and Cost Effectiveness Study: A Technical Policy Brief. January 2013 Deep Energy Retrofit Modeling and Effectiveness Study: A Technical Policy Brief January 2013 Table of Contents EXECUTIVE SUMMARY... 3 INTRODUCTION... 4 BUILDING 1... 7 BUILDING 2... 9 BUILDING 3... 11

More information

Energy Recovery Process Cooling Example. Presentation - Overview. Air Change Australia Pty Ltd. Air Change Energy Recovery Range

Energy Recovery Process Cooling Example. Presentation - Overview. Air Change Australia Pty Ltd. Air Change Energy Recovery Range 2 Presentation - Overview Energy Recovery Range + Designing Plant Rooms for Energy Efficiency The Company and the Technology Energy Recovery Product Range Product Range Pre-conditioners vs ERV-AHU s Energy

More information

percent hours of the year heat rejected to loop percent hour building load on loop, Btuh percent hour building load on loop, Btuh

percent hours of the year heat rejected to loop percent hour building load on loop, Btuh percent hour building load on loop, Btuh HOBOKEN RESIDENTIAL C- Ground Loop Pump Calculations Central Geothermal System building load on loop, Btuh Bin - 5 5 25 35 45 55 hours of the year Count 3 35 48 64 79 89 96 96 3 32 3 6 5 7 274 292 86 46

More information

Walter Reed National Military Medical Center Bethesda, MD

Walter Reed National Military Medical Center Bethesda, MD Walter Reed National Military Medical Center Bethesda, MD Technical Report Two: Building and Central Plant Energy Analysis Prepared For: Dr. James D. Freihaut Prepared By: Justin Herzing Date: 10/28/09

More information

Oklahoma University Children s Medical Office Building

Oklahoma University Children s Medical Office Building Oklahoma University Children s Medical Office Building Oklahoma City, O.K., BAE Advisor: Laura Miller Presentation Outline VRF System Dedicated Outdoor Air System Evaluation VRF Indoor Units Design Criteria

More information

ENERGY CONSERVATION STRATEGIES FOR HVAC SYSTEMS

ENERGY CONSERVATION STRATEGIES FOR HVAC SYSTEMS ENERGY CONSERVATION STRATEGIES FOR HVAC SYSTEMS Heating ventilation and airconditioning systems consumes nearly 50 to 60% of the total power consumption in any building and thus, offers huge potential

More information

Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code

Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code Developing Exhaust Air Energy Recovery Credits for the Florida Energy Code FSEC-CR-2003-15 Final Report May 27, 2015 Submitted to Department of Business and Professional Regulation Office of Codes and

More information

New Technologies to Improve HVAC Energy Performance. NEEECE Session 1-1 June 15, 2016

New Technologies to Improve HVAC Energy Performance. NEEECE Session 1-1 June 15, 2016 New Technologies to Improve HVAC Energy Performance NEEECE Session 1-1 June 15, 2016 Why focus on HVAC? Computers 4% Office equipment 2% Referigerati on 9% Lighting 8% Cooking 5% Water heating 4% Building

More information

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE Changes to the Minnesota Commercial Energy Code Presented by: Andy Thielen, PE Warning! The following is an outline of proposed code changes. There is no guarantee that the final code adopted by the State

More information

Optimizing Central Chilled Water Systems

Optimizing Central Chilled Water Systems Optimizing Central Chilled Water Systems OPTIMIZING CENTRAL CHILLED WATER SYSTEMS kent.peterson@p2seng.com 1 O P T I M I Z I N G C E N T R A L C H I L L E D W A T E R S Y S T E M S Kent W. Peterson, PE,

More information

Evaluation of Underfloor Air Distribution

Evaluation of Underfloor Air Distribution McCarran International Airport Terminal 3 L as Vegas, NV Evaluation of Underfloor Air Distribution and Displacement Ventilation Systems The Pennsylvania State University AESenior ThesisPresentation, Spring

More information

UCSF Mission Bay Campus Arthur and Toni Rembe Rock Hall th Street San Francisco, California

UCSF Mission Bay Campus Arthur and Toni Rembe Rock Hall th Street San Francisco, California UCSF Mission Bay Campus Arthur and Toni Rembe Rock Hall 1550 4th Street San Francisco, California Monitoring Based Recommissioning Project Project Implementation: June 2005 to December 2005 Funded by a

More information

Large University Central Chiller Plant Design Considerations

Large University Central Chiller Plant Design Considerations Carrier Engineering Newsletter Volume 5, Issue 3 Large University Central Chiller Plant Design Considerations Large campus chilled water plants have unique constraints and need careful evaluation for successful

More information

GATES-HILLMAN CENTERS

GATES-HILLMAN CENTERS GATES-HILLMAN CENTERS CARNEGIE MELLON UNIVERSITY CASE STUDY ENERGY EFFICIENCY CARNEGIE MELLON UNIVERSITY Carnegie Mellon University looked to SEMCO to provide solutions for their energy efficiency goals.

More information

CARRIER PRODUCTS AND LEED CERTIFICATION

CARRIER PRODUCTS AND LEED CERTIFICATION CARRIER PRODUCTS AND LEED CERTIFICATION Carrier Cpation Syracuse, New Yk August 2007 TABLE OF CONTENTS INTRODUCTION... 3 LEED RATING SYSTEM OVERVIEW... 4 LEED FOR NEW CONSTRUCTION... 4,5 ENERGY & ATMOSPHERE

More information

Planning for Biomed Facility Puts Energy Efficiency Under Microscope

Planning for Biomed Facility Puts Energy Efficiency Under Microscope Planning for Biomed Facility Puts Energy Efficiency Under Microscope Chilled beams, runaround-loop ERV system included May 19, 2014 By DAN VASTYAN, Common Ground, Manheim, Pa. HPAC Engineering Constructing

More information

LAHU Heat Recovery System Optimal Operation and Control Schedules

LAHU Heat Recovery System Optimal Operation and Control Schedules Yujie Cui Nexant, Inc., 44 South Broadway, 5th Floor, White Plains, NY 10601 e-mail: ycui@nexant.com Mingsheng Liu Architectural Engineering, University of Nebraska Lincoln, 206C, PKI, 1110 S. 67th St.,

More information

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas

You Can t Afford Discomfort. Dan Int-Hout Chief Engineer, Krueger Richardson, Texas You Can t Afford Discomfort Dan Int-Hout Chief Engineer, Krueger Richardson, Texas Where We Are Today: So You Want To Save Money? Things to consider: 1. First Cost 2. Energy cost 3. Occupant Salary costs

More information

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel Mechanical Option

EADQUARTERS. Thesis Revised Proposal. Stephanie Kunkel  Mechanical Option EADQUARTERS 707 N. Calvert St. Mechanical System Renovation Construction Management & Lighting/Electrical Breadths Stephanie Kunkel www.engr.psu.edu/ae/thesis/portfolios/2011/slk5061 Mechanical Option

More information

EBCx of the Connecticut Convention Center Complex

EBCx of the Connecticut Convention Center Complex EBCx of the Connecticut Convention Center Complex Presentation and Panel Discussion David Vallerie, Principal, Strategic Building Solutions May 20, 2014 AIA Quality Assurance The Building Commissioning

More information

The Regional Learning Alliance at Cranberry Woods

The Regional Learning Alliance at Cranberry Woods MECHANICAL TECHNICAL ASSIGNMENT 3 Mechanical System Existing Conditions Evaluation The Regional Learning Alliance at Cranberry Woods 850 Cranberry Woods Drive. 16066 PREPARED FOR: PREPARED BY: November

More information

Sample Reports. for. HAP v4.80 Example Problem

Sample Reports. for. HAP v4.80 Example Problem Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the

More information

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System)

Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Building Energy Analysis for a Multi-Family Residential Building (Multi V III VRF Heat-Pump System) Residential-Building Energy-Modeling Engineering Study VRF-ES-BH-001-US 012E03 Executive Summary Contents

More information

TECHNICAL REPORT 3 JESSUP, MARYLAND. Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED

TECHNICAL REPORT 3 JESSUP, MARYLAND. Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED ENVIROCENTER PHASE II JESSUP, MARYLAND TECHNICAL REPORT 3 Mechanical System Existing Conditions Evaluation BY CHRISTOPHER LORENZ MECHANICAL, FOR DR. BAHNFLETH SUBMITTED NOVEMBER 16 2011 TABLE OF CONTENTS

More information

Intelligent System Design

Intelligent System Design Intelligent System Design Justin Wieman Chiller Systems Engineer Trane, A Division of Ingersoll-Rand Member AHRI Systems Committes ASHRAE Member since 2000 When you buy a HVAC System would you rather buy:

More information

MGA Campus Building Greenhouse Gas Emissions Summary

MGA Campus Building Greenhouse Gas Emissions Summary MGA Campus Building Greenhouse Gas Emissions Summary Prepared for MGA Entertainment Date 4/16/214 Prepared by CONTENTS 1. Executive Summary... 3 2. Greenhouse Gas Emissions Assumptions... 4 3. Summary

More information

Whole Building Energy Performance Evaluation through. Similar Control Strategies

Whole Building Energy Performance Evaluation through. Similar Control Strategies Whole Building Energy Performance Evaluation through Similar Control Strategies S.H. Cheon 1, Y.H. Kwak 1, C.Y. Jang 2, and J.H. Huh 1* 1 Department of Architectural Engineering, University of Seoul, Seoul

More information

Getting to 50: 50% Advanced Energy Design Guide for Small and Medium Office Buildings. WSP Flack + Kurtz

Getting to 50: 50% Advanced Energy Design Guide for Small and Medium Office Buildings. WSP Flack + Kurtz Getting to 50: 50% Advanced Energy Design Guide for Small and Medium Office Buildings Daniel H. Nall, FAIA, PE, LEED Fellow, BEMP, HBDP WSP Flack + Kurtz February 7, 2012 D D d d AIA Learning Objectives

More information

Building Control Strategies That Work to Improve Your Energy Bottom Line

Building Control Strategies That Work to Improve Your Energy Bottom Line Building Control Strategies That Work to Improve Your Energy Bottom Line William D. (Skip) Milton MBA, CEM, CEA Assistant Director of Facilities Operations Texas Children s Hospital Objective: Learn how

More information

VANZELM E N G I N E E R S

VANZELM E N G I N E E R S Building Energy Needs and Supplying Energy to David W. Madigan E N G I N E E R S Presentation Overview Energy use in Buildings Air Systems Heat recovery Underfloor air distribution (UFAD) Dedicated outside

More information