1 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized ISO 9001:0 VIETNAM ELECTRICITY POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 4 Project: T D ÁN TH Y I N TRUNG S N TRUNG SON HYDROPOWER PROJECT THI T K K THU T TECHNICAL DESIGN MÔ HÌNH V N HÀNH H CH A OPERATION MODEL OF RESERVOIR Nha Trang City, July 2010

2 CONTRUTORS No. Full name Task Signature 1 Vuong Anh Dung Preparing chapter 3 2 Nguyen Van De Preparing chapter 1 3 Nguyen Tien Phong Preparing chapter 2 4 Truong Hoai The Tuyen Preparing chapter 4 5 Phung Ngoc Tam Preparing chapter 4 6 Tran Minh Kha Checking Contributor i

3 CONTENTS The document is established in below volume Operation model of reservoir Contents ii

4 TABLE OF CONTENTS CHAPTER 1: ANNUAL FLOW SPECIFIC CALCULATION FLOW CONDITION CALCULATION ON BASIN CALCULATION OF ANNUAL AVERAGE FLOW IN LONG-TERM PERIOD AT TRUNG SON HYDROLOGICAL DESIGN ANNUAL FLOW DISTRUTION AND ANNUAL FREQUENCY DAILY FLOW RANGE TO TRUNG SON HYDROPOWER DAMSITE 11 CHAPTER 2: RESERVOIR ANALYSIS AND SIMULATION PLANNING HYDROPOWER PROJECTS CASCADES ON MA RIVER ADDITIONAL PLANNING HYDROPOWER PROJECTS CASCADES ON MA RIVER MAIN PARAMETERS OF TRUNG SON HYDROPOWER PROJECT TECHNICAL DESIGN STAGE DATA FOR CALCULATION CALCULATION, SIMULATION OF RESERVOIR WITHOUT THANH SON RESERVOIR IN DOWNSTREAM OF TRUNG SON HYDROPOWER PLANT (CASE 1) DOWNSTREAM WITH THANH SON RESERVOIR (CASE 2) 37 CHAPTER 3: WATER SUPPLY DEMAND FOR DOWNSTREAM WATER DEMAND AT DOWNSTREAM ENVIRONMENT FLOW RELEASE MEASURES DISCHARGE OF WATER DURING OPERATION PROCESS DISCHARGE OF MUD AND SAND RESERVOIR DEWATERING CONCLUSION 43 CHAPTER 4: RESERVOIR AND DOWNSTREAM LANDSLIDE POSSILITY FORECAST RESERVOIR BANK LANDSIDE POSSILITY EROSION RIVER BED OF RESERVOIR DOWNSTREAM SLIDING AT BANKS OF DOWNSTREAM 48 APPENDIX Appendix calculation of hydrographical - Location chart of section calculation stability - Appendix calculation of reservoir bank stability - Appendix calculation reservoir downstream stability Table of contents iii

5 Chapter 1: ANNUAL FLOW SPECIFIC CALCULATION 1.1 FLOW CONDITION CALCULATION ON BASIN Trung Son Hydrological station has been built and put into operation since Oct 4, it is located about 400m downstream of Trung Son dam site. It measures all the factors: precipitation, water level, discharge, flood.. The difference between the basin areas of the damsites and Trung Son station is not remarkable, we can consider the flow to Trung Son hydrological station is equal to the flow to the damsite. Thus, the calculation result at the Trung Son hydrological station is equal to the calculation result at the damsites. There are hydrological stations at the upstream of Ma river: Muong Lat (water level, precipitation), Xa La (precipitation, water level, temperature, discharge..); at the downstream of the river, there are hydrological stations such as:hoi Xuan (discharge, , water level, ), Cam Thuy (water level, ; discharge , ) besides, there are other hydrological stations at the tributaries such as Nam Ty, Nam Cong, Cua Dat, Lang Chanh... Due to the non-sychronous data and lack of data continuity observed at those stations, the flow calculation of Trung Son hydrological station mainly depends on the analysis method of flow correlation, co-ordinating with precipitation distribution and flow module analysis. The method is carried out between Trung Son hydrological station and 3 other hydrological stations that measure the discharge namely Cam Thuy, Hoi Xuan, Xa La Recovering the flow data at Cam Thuy Hydrological Station Cam Thuy hydrological station measured the water level and discharge from 1957 to 1976 with the standard of Level 1 hydrological station. From 1977 to 1994, it moved some kilometers downstream and downgraded, only measured water level. From 1995 up until now (8), it moved to the old location and continued observing according to the station of level 1 station. Now, the water level data at Cam Thuy from 1977 to 1994 has been correlatively calculated by Hydro-meteorological General Bureau and brought back to water elevation of the old Cam Thuy hydrological station (it is also the location now) to unify the elevation. The relationship curve Q=F(H) is synthetized at Cam Thuy hydrological station in 1973, 1975, Then the discharge is interpolated from the relation Q=F(H) and daily water level data in Flow data chaining advent barrage calculation 1

6 After the calculation, we have the daily flow at Cam Thuy hydrological station from 1957 to 8, average long-term flow is Q tb =346 m 3 /s. Summarization of monthly observed flow and calculated flow from 1957 to 8 at Cam Thuy hydrological station are shown in Table 1 of the Appendices Recovering data at Hoi Xuan hydrological Station Hoi Xuan hydrological station has been measuring the water level from 1962 up until now (8), it measured the discharge from 1965 to The recovering and addition to this flow data at Hoi Xuan hydrological station is carried out through 3 methods: 1) Calculation according to monthly average discharge in correlation with Cam Thuy hydrological station: The monthly average discharge correlation between Cam Thuy and Hoi Xuan hydrological stations from 1965 to 1970 Flood season: Correlation coefficient =0.989; Correlation equation: Q Hoi Xuan = 0.861*Q Cam Thuy 5.14 (m 3 /s) Dry season: Correlation coefficient =0.984; Correlation equation: Q Hoi Xuan = 0.823*Q Cam Thuy (m 3 /s) From this equation and the monthly average discharge at Cam Thuy hydrological station, we can calculate the data chain at Hoi Xuan hydrological station from , According to that, the average annual discharge in long-term period at Hoi Xuan is 295 m 3 /s. 2) Calculation according to daily average discharge in correlation with Cam Thuy hydrological station: The daily average discharge correlation between Cam Thuy and Hoi Xuan hydrological stations from 1965 to 1970 January: the coefficient of = Correlation equation: Q Hoi Xuan = 0.694*Q Cam Thuy (m 3 /s) February: the coefficient of = Correlation equation: Q Hoi Xuan = 0.625*Q Cam Thuy (m 3 /s) March: the coefficient of = Correlation equation: Q Hoi Xuan = 0.770*Q Cam Thuy (m 3 /s) April: the coefficient of = Correlation equation: Flow data chaining advent barrage calculation 2

7 Q Hoi Xuan = 0.825*Q Cam Thuy May: the coefficient of =0,895. Correlation equation: Q Hoi Xuan = 0.704*Q Cam Thuy June: the coefficient of = Correlation equation: Q Hoi Xuan = 0.819*Q Cam Thuy July: the coefficient of = Correlation equation: Q Hoi Xuan = 0.765*Q Cam Thuy August: the coefficient of =0,965. Correlation equation: Q Hoi Xuan = 0.755*Q Cam Thuy (m 3 /s) (m 3 /s) (m 3 /s) (m 3 /s) (m 3 /s) September: the coefficient of = Correlation equation: Q Hoi Xuan = 0.740*Q Cam Thuy (m 3 /s) October: the coefficient of = Correlation equation: Q Hoi Xuan = 0.646*Q Cam Thuy (m 3 /s) November: the coefficient of = Correlation equation: Q Hoi Xuan = 0.590*Q Cam Thuy (m 3 /s) December: the coefficient of = Correlation equation: Q Hoi Xuan = 0.936*Q Cam Thuy 8.29 (m 3 /s) Based on these equations and the daily average discharge at Cam Thuy hydrological station can calculate data chain at Hoi Xuan hydrological station from , Thence, the long-term average discharge at Hoi Xuan is 289 m 3 /s. 3) Calculation according to water level data and the relation Q=F(H) Water level data at Hoi Xuan hydrological station from was recovered from water level data at Cam Thuy hydrological station by correlation method. Cam Thuy hydrological station measured discharge and level water from After, it s displaced to downstream and measured level water only. In 1995, it s displaced again to return the initial location, and upgraded to measure both discharge and level water. The level water data at Cam Thuy hydrological station from is calculated and converted. Hence, daily average level water in every month in correlation between Cam Thuy hydrological station and Hoi Xuan hydrological station is carried out from Flow data chaining advent barrage calculation 3

8 January: the coefficient of = Correlation equation: H Hoi Xuan = 1.56*H Cam Thuy + 3,386 (cm) February: the coefficient of = Correlation equation: H Hoi Xuan = 1.15*H Cam Thuy (cm) March: the coefficient of = Correlation equation: H Hoi Xuan = 1.55*H Cam Thuy (cm) April: the coefficient of = Correlation equation: H Hoi Xuan = 1.44*H Cam Thuy (cm) May: the coefficient of = Correlation equation: H Hoi Xuan = 1.06*H Cam Thuy (cm) June: the coefficient of = Correlation equation: H Hoi Xuan = 1.08*H Cam Thuy (cm) July: the coefficient of = Correlation equation: H Hoi Xuan = 0.922*H Cam Thuy (cm) August: the coefficient of = Correlation equation: H Hoi Xuan = 0.912*H Cam Thuy (cm) September: the coefficient of = Correlation equation: H Hoi Xuan = 0.936*H Cam Thuy (cm) October: the coefficient of = Correlation equation: H Hoi Xuan = 0.887*H Cam Thuy (cm) November: the coefficient of = Correlation equation: H Hoi Xuan = 1.02*H Cam Thuy (cm) December: the coefficient of =0.8. Correlation equation: H Hoi Xuan = 1.61*H Cam Thuy (cm) Based on these equations and daily average level water at Cam Thuy hydrological station can calculate data chain at Hoi Xuan hydrological station from The relation curve Q=F(H) is synthesized from Hoi Xuan s observed data in Then, the daily flow data chain at Hoi Xuan hydrological station from and is calculated based on the over relation curve Q=F(H) and water level data. Hence, the long-term average discharge at Hoi Xuan is 290 m 3 /s Flow data chaining advent barrage calculation 4

9 Over results (calculated by three methods) are not different much. The daily average discharge correlation method with Cam Thuy hydrological station (Method 2) reflects the reality of the river flow, having high coefficient, giving values close to values calculated by water level and the relation curve Q=F(H) method, and reducing the errors due to the changes of river bed through many years. Thus, it is chosen. Hence, the long-term average flow at Hoi Xuan hydrological station is 289 m 3 /s. The synthesized results of monthly flow data chain at Hoi Xuan hydrological station is in Table 2 in the appendices. 1.2 CALCULATION OF ANNUAL AVERAGE FLOW IN LONG-TERM PERIOD AT TRUNG SON HYDROLOGICAL Daily average water level data recovery method Create the correlation relationship of daily average water level between Trung Son and Hoi Xuan hydrological stations from 01 January 5 to 31 December 8, the achieved correlation coefficient is =0,949 and correlation equation is as follows: H Trung Son = 0.707*H Hoi Xuan (cm) February: the coefficient of = Correlation equation: H Trung Son = 0.328*H Hoi Xuan (cm) June: the coefficient of = Correlation equation: H Trung Son = 0.637*H Hoi Xuan (cm) July: the coefficient of = Correlation equation: H Trung Son = 0.820*H Hoi Xuan (cm) August: the coefficient of = Correlation equation: H Trung Son = 0.934*H Hoi Xuan (cm) September: the coefficient of = Correlation equation: H Trung Son = 0.883*H Hoi Xuan (cm) October: the coefficient of = Correlation equation: H Trung Son = 0.634*H Hoi Xuan (cm) November: the coefficient of = Correlation equation: H Trung Son = 0.565*H Hoi Xuan (cm) December: the coefficient of = Correlation equation: H Trung Son = 0.534*H Hoi Xuan (cm) Flow data chaining advent barrage calculation 5

10 The coefficient of Jan, Mar, Apr, May months is smaller than 0.8. Thus, correlation equation of this are taken general correlation equation: H Trung Son = 0.707*H Hoi Xuan (cm) With these equations and the water level data at Hoi Xuan can recover the water level data at Trung Son in the period of The correlation curve Q=F(H) at Trung Son station is synthetized from observed data in the period 5 8. Then, calculating the daily flow data chain at Trung Son station in the period of from the water level data and the synthetized relationship Q=F(H). Hence, the long-term average discharge is 216 m 3 /s Flow correlation method with Cam Thuy hydrological station - Creating the monthly average discharge correlation between Cam Thuy and Trung Son stations from January 5 to December 8 Flood season: Correlation coefficient is = Correlation equation: Q Trung Son = 0.636*Q Cam Thuy - 3,27 (m 3 /s) Dry season: Correlation coefficient is = Correlation equation: Q Trung Son = 0.506*Q Cam Thuy + 20,45 (m 3 /s) With these equations and discharge at Cam Thuy hydrological station can calculate the flow data chain at Trung Son station from Hence, the average discharge in long-term period (1957-8) is 218 m 3 /s. - Creating the daily average discharge correlation between Cam Thuy and Trung Son stations from January 5 to December 8 Average calculation result from 01 January 5 to 31 December 8, correlation coefficient is =0,922. Correlation equation is as below: Q Trung Son = 0.545*Q Cam Thuy (m 3 /s) January: the coefficient of = Correlation equation: Q Trung Son = 0.654*Q Cam Thuy 1.04 (m 3 /s) February: the coefficient of = Correlation equation: Q Trung Son = 0.745*Q Cam Thuy (m 3 /s) March: the coefficient of = Correlation equation: Q Trung Son = 0.651*Q Cam Thuy 2.43 (m 3 /s) Flow data chaining advent barrage calculation 6

11 April: The coefficient of April is smaller than 0.8. Thus, the correlation equation of this is taken genera correlation equation: Q Trung Son = 0.545*Q Cam Thuy (m 3 /s) May: The coefficient of May is smaller than 0.8. Thus, the correlation equation of this is taken genera correlation equation: Q Trung Son = 0.545*Q Cam Thuy (m 3 /s) June: the coefficient of = Correlation equation: Q Trung Son = 0.674*Q Cam Thuy (m 3 /s) July: the coefficient of = Correlation equation: Q Trung Son = 0.661*Q Cam Thuy 7.65 (m 3 /s) August: the coefficient of = Correlation equation: Q Trung Son = 0.622*Q Cam Thuy (m 3 /s) September: the coefficient of = Correlation equation: Q Trung Son = 0.512*Q Cam Thuy (m 3 /s) October: the coefficient of = Correlation equation: Q Trung Son = 0.387*Q Cam Thuy (m 3 /s) November: the coefficient of = Correlation equation: Q Trung Son = 0.341*Q Cam Thuy (m 3 /s) December: the coefficient of = Correlation equation: Q Trung Son = 0.756*Q Cam Thuy (m 3 /s) Calculate the daily discharge data chain at Trung Son station in the period of based on these correlation equations and daily average discharge at Cam Thuy hydrological station. Hence, average annual discharge in long-term period is 229 m 3 /s Flow correlation method with Xa La station Creating the monthly average discharge correlation between Xa La and Trung Son station from January 5 to December 8 In flood season, the coefficient is = It is too small to calculate and recover flow data at Trung Son station. So, data in flood months is recovered and calculated by correlation relation among months in the whole year. The synthesized coefficient of Flow data chaining advent barrage calculation 7

12 months from 5 to 8 between Xa La and Trung Son stations is = The correlation equation is as below: Q Trung Son = 1.638*Q Xa La (m 3 /s) In dry season, the coefficient = The correlation equation: Q Trung Son = 1.75*Q Xa La (m 3 /s) Based on these equations and discharge at Xa La station can calculate flow data chain at Trung Son station from Hence, average annual discharge in longterm period at Trung Son is 235 m 3 /s Flow correlation method with Hoi Xuan hydrological station Creating the monthly average discharge in correlation between Hoi Xuan and Trung Son station from I/5 to XII/8. In flood season, the coefficient = The correlation equation: Q Trung Son = 0.836*Q Hoi Xuan (m 3 /s) In dry season, the coefficient ( =0.692) is too small to correspond with calculating and recovering flow data at Trung Son station. So, data in dry months is recovered by correlative relation among months in the whole year. The synthesized coefficient of months from 5 to 8 between Hoi Xuan and Trung Son is = The correlation equation: Q Trung Son = 0.1*Q Hoi Xuan (m 3 /s) From these equations and discharge at Hoi Xuan hydrological station, we can flow data chain at Trung Son station from 1957 to 4. According to that, average annual discharge in long-term period at Trung Son is 213 m 3 /s Flow module analysis method The flow module distribution on Ma river is as follows: Table 1.1: The flow module at some stations in Ma river basin Station Area (km 2 ) Period Q aver (m 3 /s) M (l/s/km 2 ) Cam Thuy 18, Hoi Xuan 16, Xa La 6, Flow data chaining advent barrage calculation 8

13 Trung Son station is located between Hoi Xuan and Xa La stations, the flow module of Trung Son station is M= 17.5 l/s/km 2, calculated by interpolation method. Thus, can calculate the annual average discharge at Trung Son station Q= 257 m 3 /s. The flow data at Hoi Xuan hydrological station is recovered mainly; data at Cam Thuy and Xa La stations is more adequate. Use interpolation method to calculate flow module to Trung Son station from relation between area and flow module of Cam Thuy and Xa La stations. According to this method, the flow module to Trung Son station will be M= 18.4 l/s/km 2. Thus, the long-term average discharge at Trung Son station can calculated Q= 270 m 3 /s. The analysis of precipitation changes in the mid-areas from Cam Thuy to Hoi Xuan and from Hoi Xuan to Trung Son shows that the average annual rainfall in longterm period from Cam Thuy to Hoi Xuan is about 1850 mm; from Hoi Xuan to Trung Son is about 0 mm. The application of area rate method plus basin average rainfall rate method due to mid-basin from Cam Thuy to Hoi Xuan. The average annual discharge at Trung Son will be equal to the average annual discharge in long-term period at Hoi Xuan minus the mid-area. Q Trung Son = 236 m 3 /s Analyse, choose the results of flow calculation to Trung Son dam site Table 1.2: Synthesized results of annual average flow in long-term period at Trung Son station according to different methods Method Q 0 M 0 1. Interpolating Water data and the relationship Q=F(H) Monthly average discharge correlation with Cam Thuy hydrological station Daily average discharge correlation with Cam Thuy hydrological station Discharge correlation with Xa La station Discharge correlation with Hoi Xuan hydrological station Interpolating flow module Hoi Xuan Xa La Interpolating flow module Cam Thuy Xa La Mid-area discharge deduction from Hoi Xuan to Trung Average Due to the complexity of the precipitation and flow distribution on Ma river the part on Laos territory has less rainfall than on Vietnam, so the calculation results by the different methods will be different as well. Each method has its own advantages and disadvantages. The water level data retrieval method at Trung Son station from Flow data chaining advent barrage calculation 9

14 Hoi Xuan hydrological station is easy to cause errors because the parallel measured water level data chain is short, the water level in serious flood years isn t measured sufficiently and the cross sections are changed after years. The data chain from at Cam Thuy hydrological station is achieved through calculation and recovery from the water level and relationship Q=F(H), the parallel measured data chain between Cam Thuy and Trung Son is still short, thus the monthly average flow correlation method between Trung Son and Cam Thuy is not fully trusted. It is similar to above mention, the correlation method between Trung Son and Xa La also have a short parallel observed data chain; their correlation coefficient is not much great; Ma river, after flowing cross Laos territory where rainfall is small, flow amplitude changes a little bit, thus results achieved by this method isn t completely trusted. The method considering flow module progress based on the measured data at the hydrological stations on Ma river basin, considering the effect of rainfall distribution on the basin, can determine quite exactly the long-term average flow but determining exactly the average annual precipitation in the basin is difficult, so it is difficult to determine exactly the annual flow. The average flow value achieved from these above methods are Q Trung Son = 234 m 3 /s, M Trung Son = 16,0 l/s/km 2, these values are equal to the discharge depreation method at mid-area with the mean rain fall (Q Trung S n = 236 m 3 /s), nearly the same with the result of discharge correlation with Xa La station method (Q Trung S n = 235 m 3 /s). As change a number of calculating years, the average annual runoff value at Trung Son station fluctuates around at 235 m 3 /s, recommend to choose this result Q 0 Trung Son = 235 m 3 /s 1.3 DESIGN ANNUAL FLOW DISTRUTION AND ANNUAL FREQUENCY Monthy average flow range To achieve a nearly correct flow distribution at Trung Son station, the flow distribution following the daily average flow correlation wih Cam Thuy hydrological station has been used, with the modification according to the chosen average flow in the long-term period. The results are as in table 3, Appendixes Seasonal flow rate Based on the observed and calculated flow data at Trung Son station (1957 7) carry out the seasonal flow classification according to the over-average standard, the results achieved are: flood season starts from June, ends in October; dry Flow data chaining advent barrage calculation 10

15 season starts from November, ends in next May. The results are in table 4 in the appendices. 1.4 DAILY FLOW RANGE TO TRUNG SON HYDROPOWER DAMSITE By correlation relation analysis, the flow correlation in Ma river at Trung Son with Hoi Xuan and Cam Thuy is better than with Xa La. This difference shows that the natural condition in Ma river is: heavy rain in the upstream, small rain in Laos territory and gradually heavier from Trung Son to Cam Thuy, the area difference between Trung Son and Hoi Xuan, Cam Thuy is smaller than between Trung Son and Xa La. Hoi Xuan hydrological station has an short observed daily discharge data chain ( ), the data of the remaining years ( , ) are achieved by recovering calculation, the old relation Q=F(H) (synthetized from ) is not measured to check the changes in the following years, thus it is easily to cause errors. Cam Thuy hydrological station has a longer observed data chain ( , ), the calculated recovering flow data chain ( ) has a close base, the relation Q= F(H) is synthetized according to the years before 1977 and after Thus, flow distribution reflects the reality, can trust well, and choose to calculate flow distribution at Trung Son hydrological station. The daily discharge chain (1957-4) at Trung Son station is chosen according to daily average discharge correlation calculation results with Cam Thuy hydrological station, in which: using separate correlation equations for each month and calculating is in the adjustment to get average annual discharge at Trung Son, Q aver =235 m 3 /s. The synthetized results of daily average discharge at Trung Son station are summarized in the report of Reservoir operation process. Flow data chaining advent barrage calculation 11

16 Chapter 2: RESERVOIR ANALYSIS AND SIMULATION 2.1 PLANNING HYDROPOWER PROJECTS CASCADES ON MA RIVER On March 31, 5, Ministry of Industry (presently called as Ministry of Industry and Trade) issued decision No.1195/Q -NLDK, concerning approval on planning of hydropower cascades on Ma river, main contents as below: - Exploiting scheme of hydropower cascades projects and main task of hydropower projects on Ma river: + On Ma river tributary, there are 05 multi-purposes hydropower reservoirs projects Pa Ma hydropower project, with normal water level at 455m, installed capacity of MW; main tasks are water supply and flood control; combined with electric power generation. Huoi Tao hydropower project: normal water level at 3m, installed capacity of MW; main task are water supply and flood control; combined with electric power generation. Trung Son hydropower project: normal water level at m, installed capacity of 2MW; main task are electric power generation and flood control. Hoi Xuan hydropower project: normal water level at m, installed capacity of 92MW; main task are electric power generation and water supply. Cam Ngoc hydropower project: normal water level at 50m, installed capacity of 145MW; main tasks are water supply, combined with electric power generation. + In Chu River tributary, there are 02 hydropower projects Hua Na hydropower project, normal water level at 240m, installed capacity of MW; main tasks are electric power generation and flood control. Cua Dat hydropower project, normal water level at 119m, installed capacity of 97MW. This project is under operation. Main tasks are water supply and flood control, combined with electric power generation. - Flood control storage capacity at respective reservoirs + Total flood control storage capacity on Ma River is estimated approximately 700 million m 3 respectively at Pa Ma reservoir (about million m 3 ), Huoi Tao (about 300 million m 3 ), Trung Son reservoir (maximum million m 3 ). It is required to substantiate presisely in details the distribution flood control storage capacity between cascades in Ma River when establishing Feasibility Study, with consideration of all actual topographical, geological condition of the project as well as in the downstream area, proposed other Analysis and simulation of reservoir 12

17 reservoirs in Ma River construction time according to water resource development program, to ensure economical and technical requirements. + Total flood control storage capacity on Chu River is estimated approximately at 400 million m 3, respectively at Cua Dat hydropower reservoir at 300 million m 3 and Hua Na hydropower reservoir at million m 3 - Priority sequence construction of projects: + Hydropower projects to be constructed in the first stage: Cua Dat and Hua Na projects on Chu River, Trung Son project in Ma River + Hydropower projects to be studied as multipurpose: Hoi Xuan, Cam Ngoc, Pa Ma, Huoi Tao projects on Ma river (detail at appendix: attachment legal documents) 2.2 ADDITIONAL PLANNING HYDROPOWER PROJECTS CASCADES ON MA RIVER On April 18, 8, Ministry of Industry and Trade issued decision No.2383/Q -BCT converning approval on additional planning hydropower project cascades on Ma River, with main contents, as below: - Additional planning Thanh Son hydropower project on Ma river cascades was approved by Ministry of Industry (presently called as Ministry of Industry and Trade) at decision No. 1195/Q -NLDK dated on March 31, 5 with main contents, as below: + Construction site: On the main stream of Ma river at the Thanh Son and Trung Thanh communes, Quan Hoa district, Thanh Hoa Province, with coordinates (VN-0 system): X= and Y= Task and exploiting scheme of project: Project has main task is power generation. The hyro energy exploiting scheme consisting of main dam and spillway with dam-toe hydropower plant type. + Main parameters of project: Catchment basin area calculated to damsite Flv = Km 2, annual average discharge Q 0 = 246 m 3 /s, normal water level = 89m, tailrace water level MNHL min = 78.5m, rated water head H tt = 8.8m and installed capacity N lm = 37MW - Investment of Thanh Son hydropower project must be complied with socioeconomic development plans, land and water resource use plans, electric power development plan in the Thanh Hoa province; synchronously with power load development situation as well as investment of electric power transmission network in region as planned by Vietnam Electricity. - In feasibility study stage of Thanh Son hydropower project, Thanh Hoa Provincial People s Committee shall be responsible to give directives, inspection and consideration of below issues: + Additional investigation, survey on natural conditions (topographical, geological, hydrological conditions, etc,..) for project area, precisely Analysis and simulation of reservoir 13

18 calculate relation curve between water level and discharge at tailrace of powerhouse. + Precisely calculate normal water level of hydropower reservoir based on calculation of surge water level to the end of reservoir caused by flood, to ensure no influence on electric energy efficiency and safety operation of Trung Son hydropower plant at upstream. + The spillway of Thanh Son hydropower project shall be designed in such a manner to ensure release safely checked flood discharge from Trung Son hydropower project in accordance with regulation specified in design standards and codes.. + Updating parameters such as upstream and downstream water level and power generation discharge of Trung Son and Hoi Xuan hydropower cascade projects (downstream side). Analysis, comparison to make accuracy of main parameters of project, especially installed capacity to ensure effective exploitation of project as well as electric power transmission network + Investigate, survey and establish compensation and resettlement plan for project, to ensure compliance with current relevant State regulation. 2.3 MAIN PARAMETERS OF TRUNG SON HYDROPOWER PROJECT TECHNICAL DESIGN STAGE In the technical design stage, the main tasks of project are defined as below: - With regards of electric power generation, installed capacity is Nlm = 260MW, annual electric energy Eo= million kwh. - In terms of flood control, the reservoir flood control storage capacity is 150 million m 3 in which regular flood control storage capacity of 112 million m 3. Flood control period is 02 consecutive months of main flood season from 15 th July to 15 th September annually. Table 2-1: Main parameters of Trung Son hydropower project No. Description Unit Value I Basin characteristics 1 Catchment area Km Average long-term rainfalls X 0 mm Average long-term flow (Qo) m 3 /s Total annual flow Wo 10 6 m II Reservoir 1 Normal water level (NWL) m 2 Dead water level m Water level before flood m Flood storage volume Wpl 10 6 m Reservoir storage volume corresponding to normal 10 6 m Analysis and simulation of reservoir 14

19 No. Description Unit Value water level Wbt 6 Effective storage volume, flood storage volume Wpl 10 6 m Dead storage volume Wc 10 6 m Reservoir surface area corresponding to normal water level km Flood peak discharge corresponding to frequencies - P= 0.1 % m 3 /s P= 0.5 % m 3 /s P= 1 % m 3 /s 9 - P= 5 % m 3 /s 6 III RCC dam 1 Dam crest elevation m Dam crest length (L ) m Max. dam height m Dam crest width (b) m 8 5 Upstream slope (m) Downstream slope (m) 0.65 IV Spillway 1 Spillway sill elevation m Number of spillway cells 6 3 Spillway span BxH m 14x15 4 Orifice dimension of radial gate BxH m 14x Design flood released discharge P=0.5% m 3 /s Checked flood released discharge P=0.1% m 3 /s Dissipation structure Flip bucket V Waterway A Power intake gate 1 Power intake gate sill elevation m Orifice dimension of trash rack nxbxh m 8x5.5x11 3 Orifice dimension of maintenance stop logs nxbxh m 1x5.5x5.5 4 Orifice dimension of operation gate nxbxh m 4x5.5x5.5 B Penstock 1 Penstock diameter m Total length of one penstock m Gradient slope of penstock % 13.95; Penstock shell thickness mm C Powerhouse characteristics 1 Turbine type Francis 2 Number of units 4 3 Installed capacity N lm MW Firmed capacity N b MW Max. head H max m Analysis and simulation of reservoir 15

20 No. Description Unit Value 6 Min. head H min m Average head H tb m Rated head H tt m Max. discharge Q max through turbine m 3 /s Average annual generated electricity E KWh Number of power generated hours at installed capacity hour 3918 D Tailrace channel 1 Bottom width (b) m Slope factor (m) Gradient slope of channel bottom (i) Tailrace channel length (L) m 2.4 DATA FOR CALCULATION - Reservoir regulation curve: Coordinate on regulation curves of Trung Son hydropower project are shown in below table: Table 2-2: Water level on regulation curves of Trung Son hydropower project No. Month NWL(m) CXT PPH HCCN MWL(m) 1 June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May Remark: + NWL: Normal water level. + CXT: Redundant discharge control regulation curve + PPH: Critical reservoir water level regulation curve + HCCN: Limit water supply regulation curve + MNC: Minimum water level hours average flow to damsite of Trung Son hydropower project: see in chapter 1 Analysis and simulation of reservoir 16

21 - Reservoir characteristic curve: reservoir characteristic curve is set up on the map of 1/10,000 scale, established in 3 by Power Engineering Consulting Joint Stock Company 4 with aerial photograph method. The results are as below: Table 2-3: Reservoir characteristic curve of Trung Son hydropower project No. Elevation Z (m) Area F (km 2 ) Storage volume V (10 6 m 3 ) Remarks MWL NWL Relation curve between discharge and tailrace water level of Trung Son hydropower plant was set up based on hydraulic calculation formulas and river cross section, river bed longitudinal profile, investigation historical flood, The results are as below: No. Table 2-4:Relation curve between discharge and tailrace water level of Trung Son hydropower plant Discharge Q (m 3 /s) Water level Z (m) No. Discharge Q (m 3 /s) Water level Z (m) Analysis and simulation of reservoir 17

22 No. Discharge Q (m 3 /s) Water level Z (m) No. Discharge Q (m 3 /s) Water level Z (m) Efficiency of hydropower plant: Efficiency of unit at the calculation time depends on rated water head and discharge through turbine. In the calculation of daily hydro-energy operation of reservoir simulation, average efficiency of powerhouse is selected at CALCULATION, SIMULATION OF RESERVOIR The process of reservoir simulation calculation is executed according hydrological years, with hydrological calculation data obtaned in 50 years starting from June 1, 1975 to May 31, 7. On the basic of the data calculation as mentioned above, calculating hydroenergy simulation in two cases: - Without Thanh Son reservoir in downstream of Trung Son hydropower plant - With Thanh Son reservoir in downstream of Trung Son hydropower plant 2.6 WITHOUT THANH SON RESERVOIR IN DOWNSTREAM OF TRUNG SON HYDROPOWER PLANT (CASE 1) Electric energy (Case 1) - The results of hydro energy calculation shown that the Energy difference between daily flow and monthy flow for calculation is about -4.6%. The results of calculation reflected variation in simulation operation of reservoir according to average daily flow and average monthy flow. Trung Son reservoir has small regulation coefficient = Furthermore, the reservoir uses 2 months period as flood control for lowlands (from 15 th July to 15 th September annualy, reservoir water level at 150.0m elevation) hence regulation capacity of the reservoir in such period is not well enough. During flood control period, when natural inflow to reservoir is greater than maximum discharge for power generation, the redundant discharge will be released through the spillway (such Analysis and simulation of reservoir 18

23 redundant discharge shall not be considered as reservoir storage volume). The monthy average flow covers the average flow of incoming floods to reservoir, so, the redundant discharge through spillway of about 9% was calculated in reservoir discharge simulation. The daily average flow shown the incoming floods to the reservoir, so, the redundant discharge through spillway of 14% was calculated in reservoir discharge simulation. (greater than simulation of monthy average flow). According evaluation made by Design Consultant, the hydro energy simulation calculation results by daily average flow are more reliable than the hydro energy simulation calculation results by monthy average flow. Table 2-5: Results of hydro-energy calculation of Trung Son HPP using daily flow data, without Thanh Son reservoir in downstream of powerhouse No Qs Qtbin Qx Htt N E Analysis and simulation of reservoir 19

24 TT NWL MWL Vtb Vc Vhi Vplu Q0 Qtbin Qxa Qdb Qmax Hmax TT Hmin Htb Nlm Ndb Ntb E0 Elu Eki Emua Ekho Hsd Beta In which: - Q s : Incoming discharge to Trung Son dam site (m 3 /s) - Q tbin : Discharge through turbine (m 3 /s) - Q x : Redundant discharge through spillway (m 3 /s) - H tt : Water head (m) - N: Capacity (MW) - E: Electric energy (million kwh) - NWL: Normal water level (m) - MWL: Minimum water level (m) - V tb : Total storage volume (million m 3 ) - V c : Dead storage (million m 3 ) - Q 0 : Annual average discharge to dam site (m 3 /s) - Q db : Firm discharge (m 3 /s) - Q max : Design discharge through turbine (m 3 /s) - H max : Maximum water head (m) - H min : Minimum water head(m) - H tb : Average water head (m) - N lm : Installed capacity (MW) - N b : Firm capacity (MW) - E 0 : Long-term average electric energy (million kwh) - E flood season : Long-term average electric energy in flood season (million kwh) - E dry flow season : Long-term average electric energy in dry flow season (million kwh) - E wet season : Long-term average electric energy in raining season (million kwh) - E dry season : Long-term average electric energy in dry season (million kwh) Trung Son hydropower plant tailrace water level (case 1) - During the dry season days, the powerhouse is always operated with one turbine to ensure the release discharge to downstream to avoid great fluctuation in water level at downstream. The process of fluctuation in water level at downstream is considered as the most dangerous case when the power plant increases from 40% 50% capacity of one unit to installed capacity (N lm = 260MW), equivalent to discharge increasing from minimum discharge of one unit (about 63m 3 /s) to powerhouse design discharge of 522m 3 /s. During the operating process, it is not permitted to increase discharge to level which is greater than natural increase discharge before existence of reservoir. The maximum natural increased discharge taken place in range of < 700m 3 /s in period from 1957 to 7 as shown in below statistical table: Analysis and simulation of reservoir 20

25 Table 2-6: Process of maximum natural increased discharge (<700 m 3 /s) in period from 1957 to 7 Time Qday & night (m 3 /s) Q (m 3 Discharge increased /s) time (hour) Nov 13, Nov 14, Nov 15, Note Oct 16, Oct 17, Oct 18, Sept 14, Sept 15, Sept 16, July 23, July 24, July 25, Oct 3, Oct 4, Oct 5, Sept 20, Sept 21, Sept 22, Oct 24, Oct 25, Oct 26, Nov 8, Nov 9, Nov 10, Oct 12, Oct 13, Oct 14, July 20, July 21, July 22, Average The table above shown that the hourly average natural increased discharge was about 40 m 3. So, in order to increase operating discharge from 63m 3 /s (50% maximum discharge of one unit) to 522 m 3 /s (design discharge of powerhouse), it is required at least 11 hours Analysis and simulation of reservoir 21

26 Specific characteristics of flow at power plant tailrace in daily period The plant tailrace daily average water level, natural daily average water level at river across section in powerhouse area, daily average discharge at tailrace of power plant, natural daily average discharge at river cross-section in powerhouse area are shown in below figures: Analysis and simulation of reservoir 22

27 Feasibility Study Average water level and natural water level at Trung Son hydropower plant (Plant tailrace without Thanh Son reservoir) Water level (m) Time (day) Plant tailrace water level Natural tailrace water level Analysis and simulation of reservoir 23

28 Feasibility Study Water level in little water year with frequency P=90% and natural water level at Trung Son hydropower plant (plant tailrace without Thanh Son reservoir) Water level(m) Time (day) Plant tailrace water level Natural water level Analysis and simulation of reservoir 24

29 Feasibility Study Water level in much water year with frequency P=10% and natural water level at Trung Son hydropower plant (In case plant tailrace without Thanh Son reservoir) Water level (m) Time (day) Plant tailrace water level Natural water level Analysis and simulation of reservoir 25

30 Feasibility Study Average discharge and natural discharge at Trung Son plant tailrace (In case Plant tailrace without Thanh Son reservoir) Discharge (m 3 /s) Time (day) Discharge at plant tailrace Natural discharge at plant tailrace Analysis and simulation of reservoir 26

31 Feasibility Study Discharge in little water year with frequency P=90% and natural discharge at Trung Son plant tailrace (In case plant tailrace without Thanh Son reservoir) Discharge (m 3 /s) Time (day) Discharge at plant tailrace Natural discharge at plant tailrace Analysis and simulation of reservoir 27

32 Feasibility Study 0 Discharge in much water year with P=10% and natural discharge at Trung Son hydropower plant tailrace (In case plant tailrace without Thanh Son reservoir) Discharge (m 3 /s) Time(day) Discharge at plant tailrace Natural discharge at plant tailrace Analysis and simulation of reservoir 28

33 Feasibility Study Specific characteristics of flow at power plant tailrace in hourly period For estimation of flow specific characteristics fluctuation level (water level, discharge) in hourly period at river cross-section at powerhouse area, the Design Consultant calculated some operation cases, particularly as below: Table 2-7:Operation of Trung Son hydropower plant in case daily average discharge of 234 m 3 /s released to downstream Discharge(m 3 /s) Hour Unit 1 Unit 2 Unit 3 Unit 4 Total Increasing Average Analysis and simulation of reservoir 29

34 Feasibility Study Table 2-8: Operation of Trung Son hydropower plant in case daily average discharge of m 3 /s released to downstream Discharge(m 3 /s) Hour Unit 1 Unit 2 Unit 3 Unit 4 Total Increasing Average Analysis and simulation of reservoir 30

35 Feasibility Study Table 2-9: Operation of Trung Son hydropower plant in case daily average discharge of 155 m 3 /s released to downstream Discharge(m 3 /s) Hour Unit 1 Unit 2 Unit 3 Unit 4 Total Increasing Average Analysis and simulation of reservoir 31

36 Feasibility Study Table 2-10: Operation of Trung Son hydropower plant in case daily average discharge of 102 m 3 /s released to downstream Discharge(m 3 /s) Hour Unit 1 Unit 2 Unit 3 Unit 4 Total Increasing Average Analysis and simulation of reservoir 32

37 Trung Son hydropower reservoir water level fluctuation (case1) Feasibility Study - Regulation on maximum water level of reservoir: from 15 th July to 15 th September annually, maximum water level of reservoir is regulated at minimum water level of 150.0m to control flood for lowlands (according regulation on water level of reservoir specified in Trung Son hydropower reservoir operation rules which was approved by Ministry of Industry and Trade). According stability calculation of the reservoir banks (in some areas with possibility of reservoir banks collapse and sliding), it is shown that the requirement on process of draining water level in reservoir should not be greater than 0.7m/day and night, therefore in the hydro energy calculation, the time requested for draining water level in reservoir from NWL=.0m down MWL=150.0m should be over 15 days. In the actual reservoir operation process, depending on incoming flow discharge in initial flood season, reservoir draining to lower water level should be made suitably, to ensure minimum redundant discharge and increase electricity generation output. The actual process of draining reservoir water level can be twenty days to drain water level from.0m down to water level at 150.0m. - The generation discharge include natural incoming discharge to reservoir and discharge supplied from reservoir. The reservoir discharge supply potential is shown in below table: Table 2-11: Discharge supply potential from Trung Son hydropower reservoir No. Elevation Z (m) Surface area of reservoir F (km 2 ) Storage capacity of reservoir V (10 6 m 3 ) Discharge supply from the reservoir Q câp (m 3 /s) Remarks - The process of reservoir impounding shall begin from 15 th September annually. The reservoir impounding is allowable to full water level from time to time as possible because the erosion to reservoir banks shall not be taken place during process of impounding water Analysis and simulation of reservoir 33

38 Feasibility Study The water level curve process with frequency 90% of Trung Son hydropower reservoir ( Downstream without Thanh Son reservoir) Water level (m) Time (day) Analysis and simulation of reservoir 34

39 Feasibility Study The water level curve process with frequency 10% of Trung Son hydropower reservoir ( Downstream without Thanh Son reservoir) Water level (m) Time (day) Analysis and simulation of reservoir 35

40 Feasibility Study The avearge water level curve process of Trung Son hydropower reservoir ( Downstream without Thanh Son reservoir) Water level (m) Time (day) Analysis and simulation of reservoir 36

41 2.7 DOWNSTREAM WITH THANH SON RESERVOIR (CASE 2) Electric energy (case 2) - In case with Thanh Son Hydropower reservoir (Normal Water Level = 89.0m) located downstream of Trung Son hydro powerhouse, the toe of Trung Son hydro powerhouse is submerged. The hydro energy calculation results show that the energy decreases inconsiderable in compared with the case of insubmerged powerhouse toe (0.08 million KWh). See details as below: Table 2-12: Hydro energy calculation results of Trung Son using daily flow data, with Thanh Son reservoir dowstream of Trung Son HPP No Qs Qtbin Qx Htt N E TT NWL MNL Vtb Vc Vhi Vplu Q0 Qtbin Qxa Qdb Qmax Hmax TT Hmin Htb Nlm Ndb Ntb E0 Elu Eki Emua Ekho Hsd Beta Analysis and simulation of reservoir 37

42 In which: - Q s : Discharge coming to dam site of Trung Son (m 3 /s) - Q tbin : Discharge through turbine (m 3 /s) - Q x : Redundant discharge release to spillway(m 3 /s) - H tt : Water head calculation (m) - N: Capacity (MW) - E: Electric energy (million kwh) - NWL: Normal water level (m) - MWL: Minimum water level (m) - V tb : Total storage capacity (million m 3 ) - V c : Dead storage (million m 3 ) - Q 0 : Annual average discharge to dam site(m 3 /s) - Q db : Firm discharge (m 3 /s) - Q max : Design discharge through powerhouse(m 3 /s) - H max : Maximum water head (m) - H min : Minimum water head (m) - H tb : Average water head (m) - N lm : Installed capacity (MW) - N b : Firm capacity(mw) - E 0 : Long-term average electric energy (million kwh) - E flood season : Long-term average electric energy in flood season (million kwh) - E dry flow season : Long-term average electric energy in dry flow season (million kwh) - E wet season : Long-term average electric energy in raining season (million kwh) - E dry season : Long-term average electric energy in dry season (million kwh) Trung Son hydropower Plant tailrace water level (Case 2) - The catchment basin area calculate to damsite of Trung Son HPP is km 2, to damsite of Thanh Son HPP is km 2, middle catchment basin area is km 2 - Downstream of Trung Son hydropower plant is Thanh Son hydropower plant, so Trung Son Hydropower Plant tailrace water level is always higher than minimum water level of Thanh Son hydropower plant. The Thanh Son HPP is design with dam combined with spillway in Ma river and dam toe type powerhouse, so the water level fluctuation in reservoir is at small range. The Thanh Son HPP shall be operated synchronously with Trung Son HPP. As of present time, Thanh Son hydropower project is in feasibility study stage, the reservoir parameters such as NWL; MWL; N lm have not yet been defined presisely. In case the reservoir of Thanh Son HPP has 24 hours regulation storage volume, it is allowable to release discharge from 63m 3 /s up to 522m 3 /s in short time from Trung Son HPP (as allowable condition of equipment of powerhouse) Analysis and simulation of reservoir 38

43 Trung Son HPP reservoir water level fluctuation (case 2) - In case with Thanh Son reservoir downstream of Trung Son HPP reservoir water levels fluctuation shall be same as in case without Thanh Son reservoir. The possibility of reservoir impounding to maximum water level is allowable. The reservoir water level drawn-down allowable condition should not be more than 0.7m/24 hours. In the process of operation, depending on hydrological condition (incoming flow to damsite) water draining capacity shall be calculated in such a manner to ensure minimum discharge released through spillway and maximum electric energy generation output. Analysis and simulation of reservoir 39

44 Chapter 3: WATER SUPPLY DEMAND FOR DOWNSTREAM 3.1 WATER DEMAND AT DOWNSTREAM Scope of water demand Water demand at Ma River downstream was accessed in many previous plans by Ministry of Agriculture and Rural Development (MARD). According to report named General updating Irrigation planning of cascades to develop economy at downstream of Ma river basin which was conducted by Water Resource Planning Institute, under MARD, main purposes of projects on Ma River are electric generation and flood control. Main purposes of projects on Chu River are water supply and flood control. This does not mean downstream of Trung Son project has no water during dry season. Impounding period of Trung Son reservoir will only take place a short time (4 days in flood season). Water demand at downstream, however, of Trung Son project, from P/H to confluence of Ma River and Xia stream (20km) and from Xia stream to confluence of Ma River and Luong tributary (25km), needs to be evaluated. - River reach from P/H to confluence of Ma River and Xia stream (20km: There are villages and local people living along both two banks. Water source for living and irrigation is mainly groundwater and streams. They were not use water from Ma River. For navigation on river: Along river bank, access road was built from Co Luong to dam site. Therefore, environmental flow on this river reach mainly secures flora and fauna such as land cover along banks, buffalo, cow, etc, and aquatic life. Result of monthly flow calculation is shown in Table below: Table 3-1: Average monthly flow within area from dam route to Xia stream. Month Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Q o (m /s) - River reach from Xia stream to confluence of Ma River and Luong tributary (25km): There are many tributaries and large stream which has high flow supply for Ma River s flow such as Xia stream, Luong and Lung tributaries, Chu River. Xia catchment area is 249km2 with 5.21 m3/s of annual flow, 8.07 m3/s of average flood flow, and 6.5 m3/s when diversion culvert is blocked (July). Table 3-2: Average monthly flow of Xia stream. Month Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Q o (m 3 /s) Luong tributary has 970 km 2 of catchment area with 23 m 3 /s of annual flow and 40 m 3 /s of average flood flow. Therefore, abundant water resource can be supplied to this river section. Moreover, National Highway No. 15 (QL15) along river bank was built so transportation does not be affected during reservoir impounding (3-5days on Appendix 40

45 July) and flood season. Environmental flow is always secured on Ma river after Luong tributary. Hence, only environmental flow within river section from downstream of dam route to confluence with Xia stream is considered. Trung Son HPP Xia Catchment Area F=249 km Ma River Xia Stream Interstream Area F=209 km Water demand for Industry and daily uses. Water demand for Industry and daily uses is considered up to According to report named General updating Irrigation planning of cascades to develop economy at downstream of Ma river basin, water demand for these fields as below: Table 3-3: Water demand for Industry and daily uses No Location Demand (m 3 /s) Note 1 Trung S n town Quan Hoá town Bá Th c town C m Th y town 0.10 Total 0.30 Appendix 41

Xayaburi Hydroelectric Power Project

Xayaburi Hydroelectric Power Project The MRC Regional Workshop on Discharge and Sediment Monitoring and Geomorphological Tool for the Lower- Mekong Basin, 21-22 22 October 2008 Xayaburi Hydroelectric Power Project TEAM Consulting Engineering

More information

Annex 5 - Hydropower Model Vakhsh

Annex 5 - Hydropower Model Vakhsh Annex 5 - Hydropower Model Vakhsh 1. The Vakhsh Cascade The construction of dams on the Vakhsh River started in the late 1950s with the construction of the Perepadnaya diversion and power station. Until

More information

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation

Client: Budhi Gandaki Hydroelectric Project Development Committee. General Presentation Client: Budhi Gandaki Hydroelectric Project Development Committee General Presentation 1. Background and objectives 2. Project location 3. Project information/features 4. Project performances 5. Environmental

More information

2.16 NAM POT HYDROPOWER PROJECT

2.16 NAM POT HYDROPOWER PROJECT 2.16 NAM POT HYDROPOWER PROJECT Nam Pot is a hydropower project of around 20 to 25 MW located in Xiangkhouang Province. Due to its size, location and economics, Nam Pot project is best suited to a domestic

More information

Time (hour) Water Level Inflow, Flood 10-yr Qout, total Qout, bottom outlet

Time (hour) Water Level Inflow, Flood 10-yr Qout, total Qout, bottom outlet Initial Water Level:. m Max Water Level: 97. m Spillway Gate Opening Speed: 1.2 m/hour Spillway Width: 84. m Dam Crest E.L.:.3 m Max Qout: 45 m 3 /s Reservoir surface water level(el.m) 6 12 18 24 3 36

More information

Chakachamna Hydro. AEA Geothermal Conference

Chakachamna Hydro. AEA Geothermal Conference Chakachamna Hydro AEA Geothermal Conference August 2007 Chakachamna Hydro 300+ MW hydro opportunity identified Preliminary FERC License application filed in May 2006 Initial scoping/informational meetings

More information

Some aspects of the sediment transit on the Mekong river in relation with hydropower development

Some aspects of the sediment transit on the Mekong river in relation with hydropower development Some aspects of the sediment transit on the Mekong river in relation with hydropower development Daniel Loudière Société Hydrotechnique de France A presentation in three parts - the situation when starting

More information

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project

Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION. 1.1 General. 1.2 Establishment of the Company. 1.3 Special Features of the Project Lower Erkhuwa Hydropower Project (14.15 Mw) 1. INTRODUCTION 1.1 General The Lower Erkhuwa hydropower Project is located in Kulung and Chauki Danda VDCs of Bhojpur District, in East Nepal. It is located

More information

Meeting Vietnam s Energy Demands in a Sustainable Way

Meeting Vietnam s Energy Demands in a Sustainable Way TRUNG SON HYDROPOWER PROJECT Meeting Vietnam s Energy Demands in a Sustainable Way Photo by: World Bank 1 Photo by: Mai Ky/World Bank, 2012 OVERVIEW Trung Son Hydropower Project (TSHPP) is a US$411.57

More information

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct

olumbia River Treaty The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct The Columbia by Steve Oliver, Vice President, Generation Asset Management, Bonneville Power Administration 16 Oct 2006 1 Presentation Outline Geography of the Pacific Northwest Bonneville Power Administration

More information

Relicensing Study 3.8.1

Relicensing Study 3.8.1 Relicensing Study 3.8.1 Evaluate the Impact of Current and Potential Future Modes of Operation on Flow, Water Elevation and Hydropower Generation Study Report Northfield Mountain Pumped Storage Project

More information

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow

CHAPTER FIVE Runoff. Engineering Hydrology (ECIV 4323) Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib. Overland flow interflow Engineering Hydrology (ECIV 4323) CHAPTER FIVE Runoff Instructors: Dr. Yunes Mogheir Dr. Ramadan Al Khatib Overland flow interflow Base flow Saturated overland flow ١ ٢ 5.1 Introduction To Runoff Runoff

More information

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations

Feasibility Report Madian Hydropower Project. Conclusions and Recommendations. 7166P02/Vol. II, Recommendations 13 Conclusions and Recommendations 7166P02/Vol. II, Recommendations Table of Contents 13. Conclusions and Recommendations 13-1 13.1 Conclusions 13-1 13.2 Summary of Results of Feasibility Study 13-2 13.3

More information

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN VIET NAM By Dr. To Trung Nghia Director of Institute of Water Resources Planning Chief of the Red Thai Binh RBO Office E-mail: iwrp.hanoi@hn.vnn.vn INTRODUCTION

More information

Available online at ScienceDirect. Procedia Engineering 154 (2016 )

Available online at   ScienceDirect. Procedia Engineering 154 (2016 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 154 (2016 ) 1319 1323 12th International Conference on Hydroinformatics, HIC 2016 Modeling of floods and flood control water

More information

2.29 XE KONG 5 HYDROPOWER PROJECT

2.29 XE KONG 5 HYDROPOWER PROJECT 2.29 XE KONG 5 HYDROPOWER PROJECT The Xe Kong 5 Hydropower Project is located in Kaleum District, Xe Kong Province on the upper reaches of the Xe Kong, immediately upstream of the proposed Xe Kong 4 Hydropower

More information

CASE STUDY OKUYOSHINO, JAPAN

CASE STUDY OKUYOSHINO, JAPAN SEDIMENT MANAGEMENT CASE STUDY OKUYOSHINO, JAPAN Key project features Name: Okuyoshino Country: Japan Category: bypass channel/tunnel Reservoir volume (original): 15.47 Mm 3 Installed capacity: 1,206 MW

More information

Thailand-5. Mae Nam Wang. Map of River. 18 o o 00

Thailand-5. Mae Nam Wang. Map of River. 18 o o 00 Mae Nam Wang Map of River 18 o 00 99 o 00 256 Table of Basic Data Name: Mae Nam Wang Serial No.: Location: Northern part of Thailand N 17 05 ~17 30 E 98 54 ~ 99 58 Area: 10 791 km 2 Length of main stream:

More information

Water Balance Assessment of the Roseires Reservoir

Water Balance Assessment of the Roseires Reservoir Kamalddin E. Bashar 1 and Mohanad O. Mustafa 2 1 UNESCO-Chair in Water Resources, Khartoum, Sudan 2 Ministry of Irrigation and Water Resources, Sudan Abstract Roseires Reservoir on the Blue Nile River

More information

NAP-GSP REGIONAL TRAINING WORKSHOP FOR ASIA Mainstreaming Climate Change Adaptation into Water Resources Seoul, September 2017

NAP-GSP REGIONAL TRAINING WORKSHOP FOR ASIA Mainstreaming Climate Change Adaptation into Water Resources Seoul, September 2017 NAP-GSP REGIONAL TRAINING WORKSHOP FOR ASIA Mainstreaming Climate Change Adaptation into Water Resources Seoul, 13-16 September 2017 Session 2 Climate and hydrological Information and Services Hydrological

More information

SALINITY INTRUSION TREND IN RIVER AND CANAL SYSTEMS AND SOME PREVENTION METHODS IN BEN TRE PROVINCE

SALINITY INTRUSION TREND IN RIVER AND CANAL SYSTEMS AND SOME PREVENTION METHODS IN BEN TRE PROVINCE Vietnam-Japan Estuary Workshop 2006 August 22 nd -24 th, Hanoi, Vietnam SALINITY INTRUSION TREND IN RIVER AND CANAL SYSTEMS AND SOME PREVENTION METHODS IN BEN TRE PROVINCE TRAN THI XUAN MY 1 AND NGUYEN

More information

Preparatory Study for Development Study (M/P or F/S)

Preparatory Study for Development Study (M/P or F/S) Preparatory Study for Development Study (M/P or F/S) 1. Title of the Cooperation Project and Name of the Project Proponent (1) Title of the Cooperation Project The Study for Groundwater Development in

More information

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology

Level 6 Graduate Diploma in Engineering Hydraulics and hydrology 910-103 Level 6 Graduate Diploma in Engineering Hydraulics and hydrology Sample Paper You should have the following for this examination one answer book ordinary graph paper pen, pencil, ruler Work sheet

More information

Available online at ScienceDirect. Procedia Engineering 125 (2015 )

Available online at   ScienceDirect. Procedia Engineering 125 (2015 ) Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 125 (2015 ) 263 269 The 5th International Conference of Euro Asia Civil Engineering Forum (EACEF-5) Evaluation of drainage channels

More information

NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT

NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT JAPAN INTERNATIONAL COOPERATION AGENCY NEPAL ELECTRICITY AUTHORITY ENGINEERING SERVICES PROJECT DEVELOPMENT DEPARTMENT THE UPGRADING FEASIBILITY STUDY ON THE DEVELOPMENT OF THE KULEKHANI III HYDROPOWER

More information

82 nd Annual meeting of ICOLD Bali, Indonesia, June 2 nd to 6 th, 2014 ICOLD «Ad Hoc Committee on Prospective and Challenges»

82 nd Annual meeting of ICOLD Bali, Indonesia, June 2 nd to 6 th, 2014 ICOLD «Ad Hoc Committee on Prospective and Challenges» 82 nd Annual meeting of ICOLD Bali, Indonesia, June 2 nd to 6 th, 2014 ICOLD «Ad Hoc Committee on Prospective and Challenges» (ICOLD Committee on Emerging Challenges and Solutions) Present and future role

More information

Cao trình đập bê tông trọng lực vị trí I

Cao trình đập bê tông trọng lực vị trí I F-31 Hình S4.3 Cao trình đập bê tông trọng lực vị trí I F-32 Hình S4.4 Mặt cắt điển hình đập bê tông trọng lực vị trí I F-33 Hình S4.5 Bố trí khoan phụt đập bê tông trọng lực vị trí I Description Quantity

More information

2.6 NAM FA HYROPOWER PROJECT

2.6 NAM FA HYROPOWER PROJECT 2.6 NAM FA HYROPOWER PROJECT The Nam Fa Project is located in Bokeo Province on the Nam Fa (Nam Pha). The layout of the Project is shown in the attached plan. The project configuration developed for the

More information

2.32 XESET 2 HYDROPOWER PROJECT

2.32 XESET 2 HYDROPOWER PROJECT 2.32 XESET 2 HYDROPOWER PROJECT The Xeset 2 Hydropower Project is part of the development of the hydropower potential of the Xe Set basin in Saravan Province. It is upstream of the existing 45 MW Xeset

More information

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA

ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA ONE DIMENSIONAL DAM BREAK FLOOD ANALYSIS FOR KAMENG HYDRO ELECTRIC PROJECT, INDIA S. Masood Husain Nitya Nand Rai Director Assistant Director Foundation Engineering & Special Analysis Directorate Central

More information

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER

PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER PRELIMINARY DESIGN OF THE HYDRAULIC STRUCTURES DAM IN THE PISÃO RIVER Margarida Isabel Godinho Sobral Department of Civil Engineering and Architecture, Instituto Superior Técnico - Lisbon, Portugal SUMMARY

More information

Application of MIKE 11 in managing reservoir operation

Application of MIKE 11 in managing reservoir operation International Conference on Reservoir Operation and River Management Guangzhou & Three Gorges, China, September 17-23, 2005 LONG LE NGO Institute of Environment & Resources, Technical University of Denmark,

More information

Draft Application for New License for Major Water Power Project Existing Dam

Draft Application for New License for Major Water Power Project Existing Dam Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project

More information

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation

A Study on Physical Model Test for Cheongpyeong Dam Discharge Recalculation Engineering, 014, 6, 731-74 Published Online October 014 in SciRes. http://www.scirp.org/journal/eng http://dx.doi.org/10.436/eng.014.611071 A Study on Physical Model Test for Cheongpyeong Dam Discharge

More information

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

Elko Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights 7 April 2005 B Elko Project Water Use Plan Revised for Acceptance by the Comptroller of Water Rights Elko Project

More information

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin

Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin Proposal for application of FHM in Lao PDR: Case of Nam Ngum River Basin I. Nam Ngum River and Its Basin Nam Ngum River Basin is of vital importance to the Lao PDR, it is considered as the food house of

More information

July 31, 2012

July 31, 2012 www.knightpiesold.com July 31, 212 Mr. Scott Jones Vice President Engineering Taseko Mines Limited 15th Floor, 14 West Georgia Street Vancouver, BC V6E 4H8 File No.:VA11-266/25-A.1 Cont. No.:VA12-743 Dear

More information

Flood control and safety evaluation of Banqiao reservoir

Flood control and safety evaluation of Banqiao reservoir Available online at www.sciencedirect.com Procedia Engineering 8 (01) 368 375 01 International Conference on Modern Hydraulic Engineering Flood control and safety evaluation of Banqiao reservoir GUAN Tie-sheng

More information

Building software for optimal calculation of electricity system and results of optimal calculation and operation of Vietnam's electricity system

Building software for optimal calculation of electricity system and results of optimal calculation and operation of Vietnam's electricity system IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 08, Issue 9 (September. 2018), V (IV) PP 01-10 www.iosrjen.org Building software for optimal calculation of electricity

More information

2.24 VIENGPHOUKA THERMAL PROJECT

2.24 VIENGPHOUKA THERMAL PROJECT 2.24 VIENGPHOUKA THERMAL PROJECT The Viengphouka Thermal Project is a mine-mouth coal-fired base load power generation project located in Luangnamtha Province. The Consultant has evaluated the Project

More information

Content of Presentation

Content of Presentation Don Sahong Hydropower Project mitigating potential impacts Content of Presentation Summary outline of main scheme features Putting the Don Sahong project in perspective Sdi Sediment Sediment data collection

More information

Reservoir on the Rio Boba

Reservoir on the Rio Boba Reservoir on the Rio Boba Michael J. Burns II Guillermo Bustamante J. James Peterson Executive Summary The National Institute of Water Resources in the Dominican Republic (INDRHI) plans to construct a

More information

Evaluation of the hydrological risk during the construction phase of Kavsakbendi Dam and HEPP

Evaluation of the hydrological risk during the construction phase of Kavsakbendi Dam and HEPP Evaluation of the hydrological risk during the construction phase of Dr.-Ing. Ronald Haselsteiner Björnsen Consulting Engineers, Germany (formerly: EnerjiSA) Stavanger, Norway 15-16 June 2015 MSc. Koray

More information

EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE

EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE EVALUATION OF HYDROLOGIC AND WATER RESOURCES RESPONSE TO METEOROLOGICAL DROUGHT IN THESSALY, GREECE A. LOUKAS*, AND L. VASILIADES Laboratory of Hydrology and Water Systems Analysis,, Volos, Greece *E-mail:

More information

Trung Son Hydropower. Project Overview and Description

Trung Son Hydropower. Project Overview and Description Trung Son Hydropower Project Overview and Description (As of February 2011) Overview and Objective The Trung Son is a $ 411.57 million medium-sized hydropower and development project located in the Hoa

More information

Camp Far West Hydroelectric Project Relicensing

Camp Far West Hydroelectric Project Relicensing Camp Far West Hydroelectric Project Relicensing Water Operations Model FERC Project No. 2997 July 16, 2018 Overview Project and South Sutter Water District overview Operations model Overview Model Updates

More information

Hydropower retrofitted onto existing water infrastructure assets

Hydropower retrofitted onto existing water infrastructure assets Hydropower retrofitted onto existing water infrastructure assets Marco van Dijk Lecturer and Principal Researcher University of Pretoria / Water Research Commission South Africa Presentation Layout How

More information

UPGRADING FEASIBILITY STUDY UPPER SETI (DAMAULI) STORAGE HYDROELECTRIC PROJECT NEPAL FINAL REPORT. Nepal Electricity Authority Nepal.

UPGRADING FEASIBILITY STUDY UPPER SETI (DAMAULI) STORAGE HYDROELECTRIC PROJECT NEPAL FINAL REPORT. Nepal Electricity Authority Nepal. No. Nepal Electricity Authority Nepal UPGRADING FEASIBILITY STUDY ON UPPER SETI (DAMAULI) STORAGE HYDROELECTRIC PROJECT IN NEPAL FINAL REPORT June 2007 JAPAN INTERNATIONAL COOPERATION AGENCY ELECTRIC POWER

More information

Annex C. Hydrological Investigation

Annex C. Hydrological Investigation Annex C Hydrological Investigation Annex C hydrological invesigation Annex C HYDROLOGICAL INVESTIGATION Table of Contents Page C1 C2 C3 C4 Hydrological Investigation Carried out in the Feasibility Study

More information

PAKLAY HYDROPOWER PROJECT

PAKLAY HYDROPOWER PROJECT PAKLAY HYDROPOWER PROJECT 5 th MRC Regional Stakeholder Forum 20 September 2018 1.1 Project Overview Mekong Mainstream Project 4th of the 7 hydropower projects along the Mekong mainstream in Lao PDR Project

More information

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN

FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN FLOOD MANAGEMENT IN THE RED THAI BINH RIVER BASIN 1. INTRODUCTION OF THE RED THAI BINH RIVER BASIN The Red Thai Binh river basin (RRB) is situated at 20 to 30 30 of the north latitude, 100 to 107 10 of

More information

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study

Systematic and Early Development of Hydro Projects in Nepal. Development of Projects in Bheri Basin A Case Study Systematic and Early Development of Hydro Projects in Nepal Development of Projects in Bheri Basin A Case Study 1 RIVER MAP: ORIGIN AND ITS CONFLUENCES Tallo Bheri HEP Thuli Bheri-1HEP NEPAL Bheri-III

More information

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water

Abstract. 1. Main features of the Cua Dat scheme. Hong Giang VNCOLD. Hanoi Vietnam. the Northern Central The reservoir storage purposes: - water The diversion works for the Cua Dat CFRD in Vietnam Michel Ho Ta Khanh, Dinh Sy Quat, Prof Pham Hong Giang VNCOLD No 95/10 Chua Boc Street Dong Da District Hanoi Vietnam Abstract The Cua Dat CFRD is constructed

More information

Application of Hydrological Model to Simulate Rainfall-Runoff into An Khe Reservoir in the Ba River Basin, Vietnam

Application of Hydrological Model to Simulate Rainfall-Runoff into An Khe Reservoir in the Ba River Basin, Vietnam Journal of Environmental Science and Engineering A 7 (2018) 101-107 doi:10.17265/2162-5298/2018.03.001 D DAVID PUBLISHING Application of Hydrological Model to Simulate Rainfall-Runoff into An Khe Reservoir

More information

CE 2031 WATER RESOURCES ENGINEERING L T P C

CE 2031 WATER RESOURCES ENGINEERING L T P C CE 2031 WATER RESOURCES ENGINEERING L T P C 3 0 0 3 QUESTION BANK PART - A UNIT I GENERAL 1. Write short notes on Water Resources Survey. 2. How do you calculate Average Annual Runoff depth? 3. Write short

More information

Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study

Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study Arab J Sci Eng (2013) 38:1359 1367 DOI 10.1007/s13369-013-0590-5 RESEARCH ARTICLE - CIVIL ENGINEERING Feasibility Assessment of Hydroelectric Power Plant in Ungauged River Basin: A Case Study M. Cihat

More information

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014

Study on Economic Partnership Projects in Developing Countries in FY2013. Final Report SUMMARY. February 2014 Study on Economic Partnership Projects in Developing Countries in FY2013 Study on the small hydro power project in the province of Lam Dong in Socialist Republic of Vietnam Final Report SUMMARY February

More information

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit)

Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit) Hydrology Overview of Lake Taupo and the Waikato River as it relates to the Waikato Hydro Scheme (WHS) (Ohakuri Site Visit) Lake Taupo From 1905 to 1941 Lake Taupo was an unmanaged natural Lake. With the

More information

OPTIMISATION OF HYDROPOWER IN A MULTI-OBJECTIVE CONTEXT

OPTIMISATION OF HYDROPOWER IN A MULTI-OBJECTIVE CONTEXT Proc. Int. Conf. on Water Environment, Energy and Society (WEES-2009), (eds. S. K. Jain, V. P. Singh, V. Kumar, OPTIMISATION OF HYDROPOWER IN A MULTI-OBJECTIVE CONTEXT Dan Rosbjerg 1 * Institute of Environment

More information

THE FLOOD RISK IN THE LOWER GIANH RIVER: MODELLING AND FIELD VERIFICATION

THE FLOOD RISK IN THE LOWER GIANH RIVER: MODELLING AND FIELD VERIFICATION THE FLOOD RISK IN THE LOWER GIANH RIVER: MODELLING AND FIELD VERIFICATION NGUYEN H. D. 1, TOUCHART L. 1, ARDILLIER-CARRAS F. 1 ABSTRACT. - The flood risk in the lower Gianh River: modelling and field verification.

More information

Small Hydro based energy generation

Small Hydro based energy generation Workshop on Capacity Development Program for Afghan Women (Clean Energy Access) Small Hydro based energy generation G Anil Head Small Hydro Power Dn., Energy Management Centre, Trivandrum 695017, Kerala,

More information

Xayaburi Hydropower Project

Xayaburi Hydropower Project The 5 th Regional Stakeholder Forum Basin Planning and Environmental Management 20-21 September 2018 Landmark Hotel, Vientiane, Lao PDR Review of the Design Changes made for the Xayaburi Hydropower Project

More information

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown

Introducing the WBG Guidelines for selecting EFlow assessment methods. Cate Brown Introducing the WBG Guidelines for selecting EFlow assessment methods Cate Brown This presentation Factors affected potential impacts Level of detail in EFlows assessments: Magnitude and complexity of

More information

Available online at Nigerian Journal of Basic and Applied Science (December, 2012), 20(4):

Available online at   Nigerian Journal of Basic and Applied Science (December, 2012), 20(4): Available online at http://www.ajol.info/index.php/njbas/index Nigerian Journal of Basic and Applied Science (December, 2012), 20(4): 341-348 ISSN 0794-5698 Analysis of the Water Resources Potential and

More information

Water Supply Reallocation Workshop

Water Supply Reallocation Workshop Water Supply Reallocation Workshop Determining Yield and Storage Requirement June 2, 2009 Tulsa, OK James Hathorn, Jr Redistribution of Water The function of a reservoir system is to redistribute the natural

More information

CASE STUDY JHIMRUK, NEPAL

CASE STUDY JHIMRUK, NEPAL SEDIMENT MANAGEMENT CASE STUDY JHIMRUK, NEPAL Key project features Name: Jhimruk Country: Nepal Category: modifying operating rule (focus or redistribute sediment); adaptive strategies Reservoir volume

More information

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination

Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination CAB/2KTF/EET 1221/1413 Sixth Semester B. E. (R)/ First Semester B. E. (PTDP) Civil Engineering Examination Course Code : CV 312 / CV 507 Course Name : Engineering Hydrology Time : 3 Hours ] [ Max. Marks

More information

Geo-Information analysis of the mini hydropower potential in the Liguria Region

Geo-Information analysis of the mini hydropower potential in the Liguria Region European Water 60: 117-122, 2017. 2017 E.W. Publications Geo-Information analysis of the mini hydropower potential in the Liguria Region A. Palla 1*, I. Gnecco 1, P. La Barbera 1, M. Ivaldi 2 and D. Caviglia

More information

Inundation Calculation of the Coastal Narrow Plain Strip Impacted by Upstream Reservoir Flood Discharge in Rainy and Extreme Flood Conditions

Inundation Calculation of the Coastal Narrow Plain Strip Impacted by Upstream Reservoir Flood Discharge in Rainy and Extreme Flood Conditions Journal of Shipping and Ocean Engineering 6 (2016) 165-178 doi 10.17265/2159-5879/2016.03.005 D DAVID PUBLISHING Inundation Calculation of the Coastal Narrow Plain Strip Impacted by Upstream Reservoir

More information

Sedimentation Processes and Useful Life of Mosul Dam Reservoir, Iraq

Sedimentation Processes and Useful Life of Mosul Dam Reservoir, Iraq Engineering, 2013, 5, 779-784 http://dx.doi.org/10.4236/eng.2013.510094 Published Online October 2013 (http://www.scirp.org/journal/eng) Sedimentation Processes and Useful Life of Mosul Dam Reservoir,

More information

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge

Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Using SWAT Module in the Design of Submerged Weir on narrow rivers having high flood discharge Presented by Er. Narendra Kumar Tiwary, B.Tech IIT Delhi, M.Tech NIT(Pat), Ph.D Scholar IIT Delhi Professor,

More information

Why is the need for finding flood level elevations?

Why is the need for finding flood level elevations? Calculation of water surface elevation using HECRAS 4.1.0 for fixing tailrace elevation for powerhouse site in planned 37 MW Kabeli A Hydroelectric Project, Nepal April, 2012 6/25/2012 Surendra Raj Pathak

More information

MIEL I Hydroelectric Power Plant

MIEL I Hydroelectric Power Plant MIEL I Hydroelectric Power Plant The Miel I Power Plant, which is located in the municipality of Norcasia, forms part of the hydro potential in western Caldas. This region comprises the basins of the rivers

More information

Climate-resilient hydropower: Experiences from the EBRD region

Climate-resilient hydropower: Experiences from the EBRD region Climate-resilient hydropower: Experiences from the EBRD region Sandy Ferguson Manager, Knowledge and Policy European Bank for Reconstruction and Development fergusos@erbrd.com Hydropower is a major source

More information

Saluda Hydro Operations. William R. Argentieri, P.E. Fossil & Hydro Technical Services

Saluda Hydro Operations. William R. Argentieri, P.E. Fossil & Hydro Technical Services Saluda Hydro Operations William R. Argentieri, P.E. Fossil & Hydro Technical Services Hydropower Basics Hydroelectric plants convert potential energy of water into kinetic energy to drive a generator.

More information

Pawana Dam Energy Dissipation A Case Study

Pawana Dam Energy Dissipation A Case Study Australian Journal of Basic and Applied Sciences, 4(8): 36-367, 00 ISSN 99-878 Pawana Dam Energy Dissipation A Case Study Hinge G.A. Balkrishna S. 3 Khare K.C Research Scholar and Assistant Professor,

More information

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID

Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID Warm Springs Hydro LLC 5203 South 11 th East Idaho Falls, ID 83404 208-522-8069 ted@tsorenson.net September 26, 2013 Elizabeth A.O. Moats Oregon Department of Fish and Wildlife 107 20 th Street La Grande,

More information

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim US Army Corps of Engineers Hydrologic Engineering Center Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim Phase I and II Final Report December 2007 Approved for

More information

Capacity Identification and Operational Policy of the Proposed Broadlands Mini Hydroelectric Power Plant

Capacity Identification and Operational Policy of the Proposed Broadlands Mini Hydroelectric Power Plant ENGINEER - Vol. LI, No. 03, pp. [1-12], 2018 The Institution of Engineers, Sri Lanka DOI: http://doi.org/10.4038/engineer.v51i3.7300 Capacity Identification and Operational Policy of the Proposed Broadlands

More information

Thailand 4. Mae Nam Yom. Map of River. N 16 o 00. E 100 o 00

Thailand 4. Mae Nam Yom. Map of River. N 16 o 00. E 100 o 00 Mae Nam Yom Map of River N 16 o 00 E 100 o 00 241 Table of Basic Data Name: Mae Nam Yom Location: Northern part of Thailand N 15 45 35 ~ 19 25 24 Area: 23 616 km 2 Length of main stream: 700 km Serial

More information

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855) DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855) A. SUMMARY 1. License Issued: October 4, 2002 2. Expiration: September 30, 2042 3. Waterway: Dead River 4. Capacity: 15.5 MW (megawatts) 5. Licensee:

More information

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016

SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri. September 21, 2016 SMALL HYDRO BIG CHALLENGES Renewable Energy World Asia 2016 Martin P. Bieri September 21, 2016 CONTENT Introduction Potential in Southeast Asia Challenges in Small Hydro Main Design Steps (Bad) Examples

More information

FLOOD CONTROL MEASURES IN THE LOWER DONG NAI - SAI GON RIVER BASIN

FLOOD CONTROL MEASURES IN THE LOWER DONG NAI - SAI GON RIVER BASIN Tuyển tập Hội nghị Khoa học thường niên năm 2015. ISBN: 978-604-82-1710-5 FLOOD CONTROL MEASURES IN THE LOWER DONG NAI - SAI GON RIVER BASIN Nguyen Quang Kim 1, Le Xuan Bao 1, Le Trung Thanh 1, Trieu Anh

More information

From Upstream to Downstream:

From Upstream to Downstream: From Upstream to Downstream: Integrating Climate Change Considerations into Basin Wide Planning for the Mekong River Jeremy Bird Chief Executive Officer Mekong River Commission 1 Outline Basin context

More information

Project progress - Dam operation manual -

Project progress - Dam operation manual - Project progress - Dam operation manual - 6 July, 2015 Phạm Xuân Tiến SHIRAKAWA Nobuyuki Expected output on the project Output 4:Structural measures for flood resilience are strengthened in target 4 provinces

More information

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area

Glenfarg Hydropower Development. Hydro-potential in the Glenfarg area Client: Glenfarg Renewable Energy Association Contract Start Date: May 2014 Report Reference: Contributors: Checked by: MNV/GF001/2011 Dr R C Johnson Rita Day Document Revisions: Status Version Date Final

More information

Geum-gang. Name: Geum-gang Serial No.: Korea 9 Location: Chung Chong Province, Korea Area: km 2

Geum-gang. Name: Geum-gang Serial No.: Korea 9 Location: Chung Chong Province, Korea Area: km 2 Geum-gang Map of River 127 o E 36 o N 36 o N 127 o E Geographical Survey, MOC Korea Table of Basic Data Name: Geum-gang Serial No.: Korea 9 Location: Chung Chong Province, Korea Area: 9 885.80 km 2 N 35

More information

SOUTHEAST TEXAS CONTINUING EDUCATION

SOUTHEAST TEXAS CONTINUING EDUCATION EXAM No. 118 FLOOD - RUNOFF ANALYSIS 1. Information gained from flood - runoff analysis includes which one: A. Stage, discharge, volume. B. Measure depth, volume. C. Velocity, depth, storm occurrence.

More information

Hydropower factoring in climate change

Hydropower factoring in climate change Hydropower factoring in climate change 1. Global Supply & Potential 2. Principles of Power Generation 3. Climate Aspects 4. Sustainability Aspects Richard M. Taylor, FEI CEO, International Hydropower Association

More information

Lam Du Son Vice President of EVN, Vietnam

Lam Du Son Vice President of EVN, Vietnam BRIEF INTRODUCTION TO ELECTRICITY SECTOR IN VIET NAM Lam Du Son Vice President of EVN, Vietnam I. OVERVIEW OF VIETNAM ELECTRICITY SECTOR. A. EVN Electricity of Vietnam Established in 994. Main responsibility

More information

Dam-Breach Modelling of the Staw Starzycki Embankment in Tomaszów Mazowiecki

Dam-Breach Modelling of the Staw Starzycki Embankment in Tomaszów Mazowiecki PUBLS. INST. GEOPHYS. POL. ACAD. S.C., E-6 (390), 2006 Dam-Breach Modelling of the Staw Starzycki Embankment in Tomaszów Mazowiecki Jerzy MACHAJSKI 1 and Dorota OLEARCZYK 2 1 Institute of Geotechnics and

More information

DIVERSION CHANNEL OF BELO MONTE HPP

DIVERSION CHANNEL OF BELO MONTE HPP DIVERSION CHANNEL OF BELO MONTE HPP INTRODUCTION The diversion channel of Belo Monte HPP is an important engineering work which required the engagement of several specialties to be able to address all

More information

Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season

Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season Study on the Dynamic Control of Dam Operating Water Levels of Yayangshan Dam in Flood Season Jenny Bramsäter Kajsa Lundgren Handledare: Hans Bergh MJ153x Examensarbete i Energi och miljö, grundnivå Stockholm

More information

multiconsult.no Hydropower modelling Vientiane January

multiconsult.no Hydropower modelling Vientiane January Hydropower modelling Vientiane January 24. 2018 Head, dh Energy from hydropower Hydropower plants transforms the potential energy in water to electricity. Energy is calculated by the following equation:

More information

Nam Sebangfay. Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o E 105 o Basin Area: km 2

Nam Sebangfay. Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o E 105 o Basin Area: km 2 Nam Sebangfay Map of River Table of Basic Data Name: Sebangfay Serial No.: Lao 5 Location: Khammouane Province N 17 o 29 48 E 105 o 25 42 Basin Area: 8 560 km 2 Length of the main stream: 190 km Origin:

More information

Flood forecasting and reservoir operation software for minimizing environmental impact of Hoabinh Hydropower project, Vietnam

Flood forecasting and reservoir operation software for minimizing environmental impact of Hoabinh Hydropower project, Vietnam Modelling and Management of Sustainable Basin-scale Water Resource Systems (Proceedings of a Boulder Symposium, July 1995). IAHS Publ. no. 31, 1995. 131 Flood forecasting and reservoir operation software

More information

FEASIBILITY STUDY GUIDELINES

FEASIBILITY STUDY GUIDELINES FEASIBILITY STUDY GUIDELINES Pakhtunkhwa Energy Development Organization (PEDO) Energy and Power Department, KP Prepared by Pakhtunkhwa Energy Development Organization Feasibility Study Guidelines Volume

More information

2 Hydrology Studies. 2.1 Introduction

2 Hydrology Studies. 2.1 Introduction 2 Hydrology Studies Report by: C. Cadou, P. Eng. 2.1 Introduction The objective of this analysis was to review the hydrological/hydraulic and energy production components of studies carried out to date

More information

Bridge River Power Development Water Use Plan. Revised for Acceptance for the Comptroller of Water Rights

Bridge River Power Development Water Use Plan. Revised for Acceptance for the Comptroller of Water Rights Bridge River Power Development Water Use Plan Revised for Acceptance for the Comptroller of Water Rights March 17, 2011 Bridge River WUP March 17, 2011 Page i Bridge River Power Development Water Use Plan

More information

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS

THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Ninth International Water Technology Conference, IWTC9 2005, Sharm El-Sheikh, Egypt 355 THE CONSTRUCTION PHASES OF THE NEW NAGA HAMMADI BARRAGE COFFERDAMS Yasser Shawky ( 1), Hala Badawy ( 2) (1) Researcher,