1 x Environmental Impact Statement Development Application SSD 5251 September 2013 Prepared by: R.W. CORKERY & CO. PTY. LIMITED

2 Photo 1* Photo 2* Photo 3* Photo 4 # Photo 5* Photo 6* Source: Description of Photos (DZP) Demonstration Pilot Plant at ANSTO Minerals, Lucas Heights. Wambangalang Creek and railway bridge. Electromagnetic survey of soils. Toongi Hall and tennis courts. Toongi ore body bulk sample operation. Toongi Valley rural scene. * Australian Zirconia Ltd # R.W. Corkery & Co. Pty Limited Ref: E545B_002

3 Environmental Impact Statement Prepared for: Australian Zirconia Ltd ACN: Burswood Road BURSWOOD WA 6100 PO Box 4384 VICTORIA PARK WA 6979 Telephone: (08) Facsimile: (08) Prepared by: R.W. Corkery & Co. Pty. Limited Geological & Environmental Consultants ABN: Brooklyn Office: 1st Floor, 12 Dangar Road PO Box 239 BROOKLYN NSW 2083 Telephone: (02) Facsimile: (02) Website: Orange Office: 62 Hill Street ORANGE NSW 2800 Telephone: (02) Facsimile: (02) Brisbane Office: Suite 5, Building 3, Pine Rivers Office Park 205 Leitchs Road BRENDALE QLD 4500 Telephone: (07) Ref No. 545/04 September 2013

4 AUSTRALIAN ZIRCONIA LTD ENVIRONMENTAL IMPACT STATEMENT Copyright This Copyright is included for the protection of this document COPYRIGHT R.W. Corkery & Co. Pty Limited 2013 and Australian Zirconia Ltd 2013 All intellectual property and copyright reserved. Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright Act, 1968, no part of this report may be reproduced, transmitted, stored in a retrieval system or adapted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without written permission. Enquiries should be addressed to R.W. Corkery & Co. Pty Limited. ii

5 ENVIRONMENTAL IMPACT STATEMENT Author s Certification AUSTRALIAN ZIRCONIA LTD Author s Certification for the submission of an Environmental Impact Statement prepared in accordance with Schedule 2, Part 3 of the Environmental Planning and Assessment Regulation 2000 and the Environmental Planning and Assessment Act (a) EA prepared by: name: qualifications: address: Alex Luke Irwin B.Sc. (Hons) 62 Hill Street ORANGE NSW 2800 (b) Development application by: applicant name: applicant address: (c) Application Number: SSD 5251 Australian Zirconia Limited 65 Burswood Road BURSWOOD WA 6100 (d) Address/land details: Area of Activities DZP Site Macquarie River Water Pipeline Land Title Reference Part Lot 311 DP595631, Lot 271 DP593668, Part Lot 35 DP753220, Part Lot 1 DP133581, Part Lot 18 DP753252, Lot A & B DP439352, Lot 19 DP , Part Lot A DP391069, Lot 55 DP , Lot B DP , Lot X DP , Lot 211 DP595631, Lot 1 DP818802, Lot 50 DP , Lot 7300 DP (Licensed for grazing), Unformed Paper Road (Crown Land) separating Lot 311 DP55631 and Lots A & B DP439352, Unformed Paper Road (Dubbo City Council) separating Lot 1 DP and Lot 7300 DP Lot 311 DP595631, Lot 27 DP753220, Lot DP753220, Lot 30 DP753220, Lot 1-4 DP753226, Various public road reserves (e) Project Outline: The would comprise a small scale open cut mine supplying ore containing rare metals and rare earth elements to a processing plant near the village of Toongi, approximately 25km south of Dubbo. The location of the proposed open cut, processing plant and associated facilities for the management of waste generated by these activities is collectively referred to as the DZP Site and comprises an area of 2 507ha. Total disturbance associated with the proposal is approximately 808ha, only 71ha of which (<8%) occurs on remnant native vegetation (a further 414ha occurs over derived grasslands which are rotationally cropped). An area of 1 021ha has been set-aside for the establishment of a Biodiversity Offset Area to compensate for the disturbance to remnant vegetation and threatened biota. Annual ore production would be approximately one million tonnes per year which would generate approximately t of products for a period of 20 years. iii

6 AUSTRALIAN ZIRCONIA LTD ENVIRONMENTAL IMPACT STATEMENT Author s Certification (f) Assessment of Environmental Impact: The proposal would also involve establishment of infrastructure external to the DZP Site in the form of a water pipeline to the Macquarie River, rail line upgrade between Toongi and Dubbo, gas pipeline installation within the rail corridor and road upgrades of Obley and Toongi Roads (between the DZP Site and the Newell Highway). The assessment of environmental impacts of this project includes the matters referred to in the Director-General s Requirements provided to the Applicant on 4 May 2012, and supplementary Director-General s Requirements provided to the Applicant on 1 March 2013, under Schedule 2, Part 2 of the Environmental Planning and Assessment Regulation (g) Declaration: I, Alex Luke Irwin, hereby declare that I have overseen the preparation of the contents of this assessment and to the best of my knowledge: it has addressed the Director-General s Requirements as provided by the Department on 4 May 2012 and 1 March 2013; the assessment contains all available information that is relevant to the environmental assessment of the project; and the information contained in this document is neither false nor misleading. iv

7 ENVIRONMENTAL IMPACT STATEMENT EXECUTIVE SUMMARY... ES-1 SECTION 1 INTRODUCTION SCOPE FORMAT OF THE ENVIRONMENTAL IMPACT STATEMENT THE APPLICANT AND THE APPLICATION AREA The Applicant The Application Area Existing Mineral Authorities BACKGROUND TO THE PROPOSAL GEOLOGICAL SETTING Regional Setting DZP Site Geology Resources PRODUCTS AND THE NEED FOR THE PROPOSAL MANAGEMENT OF INVESTIGATIONS SECTION 2 DESCRIPTION OF THE PROPOSAL INTRODUCTION Project Objectives Project Overview Component Areas DZP Site Toongi-Dubbo Rail and Natural Gas Pipeline Corridor Macquarie River Water Pipeline Corridor Public Road Network Approvals Required Geurie Limestone Quarry DZP SITE AND EXTERNAL INFRASTRUCTURE ESTABLISHMENT Introduction Macquarie River Water Pipeline Water Supply Pipeline Pumping Infrastructure Natural Gas Pipeline Toongi-Dubbo Rail Line and Rail Infrastructure Introduction Rail Line Classification, Design and Construction Rail Bridges Level Crossings Rail Signalling / Interface AUSTRALIAN ZIRCONIA LTD Public Road Network Introduction Obley Road Toongi Road DZP Site Entrance and Access Road Electricity Transmission Line Infrastructure Site Establishment and Development Sequence DZP SITE PREPARATION Introduction Vegetation Clearing Vegetation Type Larger Vegetation (Timber) Clearing and Management Groundcover Clearing and Management Soil Stripping Introduction Soil Units, Stripping Depths and Inventory Soil Stripping Procedures Soil Stockpile Management Pink-tailed Worm-lizard Habitat Management MINING OPERATIONS Introduction Open Cut Design Mining Method Introduction Grade Control Drilling Drill and Blast Operations Load and Haul Operations Mining Rate and Sequence Mining Equipment WASTE ROCK MANAGEMENT Introduction Waste Rock Characteristics Composition Acid Rock Drainage Waste Rock Emplacement Design Waste Rock Emplacement Procedures PROCESSING OPERATIONS Introduction Processing Plant and DZP Site Administration Area Layout Process Description Overview v

8 AUSTRALIAN ZIRCONIA LTD 2.7 REAGENT AND PRODUCT MANAGEMENT Introduction Sulphur Sulphuric Acid Limestone Quick Lime Caustic Soda Soda Ash Hydrochloric Acid Salt Anhydrous Ammonia Aluminium Powder Other Export Products WATER REQUIREMENTS, SUPPLY AND SECURITY Water Requirements Water Supply and Security RESIDUE MANAGEMENT Introduction Solid Residue Management Sources Solid Residue Characteristics and Volume Solid Residue Neutralisation and Disposal Design of the Solid Residue Storage Facility Site Selection (Hydrological and Geotechnical Considerations) Construction of the Solid Residue Facility Operation of the Solid Residue Storage Facility Liquid Residue Management Sources, Characteristics and Volume Liquid Residue Storage Facility Design and Construction Construction of the Liquid Residue Storage Facility Operation of the Liquid Residue Storage Facility ENVIRONMENTAL IMPACT STATEMENT Monitoring Liquid Residue Storage Facility Operations Closure of the Liquid Residue Storage Facility Accumulated Salt Management Characteristics and Volume Salt Encapsulation Cell Design Construction of the Salt Encapsulation Cell Operation of the Salt Encapsulation Cell Management of Water Salt Encapsulation Cell Closure AIR EMISSIONS MANAGEMENT Introduction Categories of Emissions Point Source Emission and Management Fugitive Emission Sources and Management Radiation Emissions WASTE MANAGEMENT Production Waste Other Waste TRANSPORTATION Overview Internal Transportation Site Access Haul Road Network Light Vehicle Road Network Separation of Mine and Non-Mine Traffic Rail Transportation Overview Rail Movements Unloading/Loading Operations Infrastructure Maintenance Road Transportation Site Access Proposed Upgrade to Public Roads Traffic Types and Levels FACILITIES AND SERVICES Facilities Services Electricity Supply Communications vi

9 ENVIRONMENTAL IMPACT STATEMENT Hydrocarbons Potable Water Operational Water Sewage and Waste Water HOURS OF OPERATION AND PROJECT LIFE Hours of Operation and Workforce Rosters Project Life (This Application) Future Project Life EMPLOYMENT AND ECONOMIC CONTRIBUTION Site Establishment and Construction Operations Economic Contributions SAFETY AND SECURITY Public and Employee Safety (DZP Site) Public Safety (Toongi-Dubbo Rail Line) Explosive Storage SITE DECOMMISSIONING, REHABILITATION AND LAND USE MANAGEMENT Introduction Rehabilitation Objectives Strategic Rehabilitation Management Rehabilitation Domains Rehabilitation Hierarchy Strategic Rehabilitation Completion Criteria, Associated Performance Indicators and Monitoring Strategy Final Landform Final Land Use Rehabilitation Methods and Procedures Introduction Decommissioning Activities Domain 2 Surface Water Management Structures Domain 3 Waste Rock Emplacement Domain 4 Liquid Residue Storage Facility AUSTRALIAN ZIRCONIA LTD Domain 5 Solid Residue Storage Facilities Domain 6 Final Void Area Indicative DZP Site Revegetation Strategy Rehabilitation Management and Monitoring Biodiversity Offset Strategy Introduction Biodiversity Offset Requirements Summary of Impacts Proposed Biodiversity Offset Integrated Land Management Strategies SECTION 3 CONSULTATION, ISSUE IDENTIFICATION AND PRIORITISATION INTRODUCTION CONSULTATION Community Consultation Introduction Community Information Session November Community Information Session May Community Information Session July Community Newsletters Targeted Community Consultation Aboriginal Community Consultation Government Agency Consultation Introduction Conceptual Project Development Plan Meeting and Other Agencies Briefing Planning Focus Meeting Commonwealth Department of Sustainability, Environment, Water, Population and Communities Other Government Consultation vii

10 AUSTRALIAN ZIRCONIA LTD 3.3 REVIEW OF PLANNING LEGISLATION AND ENVIRONMENTAL GUIDELINES Introduction State Planning Instruments State Environmental Planning Policy (State and Regional Development) State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) State Environmental Planning Policy (Infrastructure) State Environmental Planning Policy (Rural Lands) State Environmental Planning Policy No. 33 Hazardous and Offensive Development State Environmental Planning Policy No. 44 Koala Habitat Protection State Environmental Planning Policy No. 55 Remediation of Land Regional Planning Instruments and Strategies Strategic Regional Land Use Policy Central West Catchment Management Authority Catchment Action Plan Draft NSW Freight and Ports Strategy Local Planning Instruments and Strategies Local Environment Plan Dubbo Economic Development Strategy Environmental Guidelines IDENTIFICATION OF ENVIRONMENTAL ISSUES ANALYSIS OF ENVIRONMENTAL RISK AND ISSUE PRIORITISATION Introduction Analysis of Environmental Risk Issue Prioritisation ENVIRONMENTAL IMPACT STATEMENT SECTION 4 ASSESSMENT AND MANAGEMENT OF KEY ENVIRONMENTAL ISSUES BACKGROUND Introduction Topography and Drainage Regional Topography and Drainage Local Topography and Drainage DZP Site Topography and Drainage Climate Introduction and Data Sources Temperature and Humidity Rainfall Evaporation Wind Speed and Direction Temperature Inversions Surrounding Land Ownership and Residences Land Ownership Residences and Sensitive Receptors Land Use and Local Setting NOISE AND VIBRATION Introduction Existing Environment Introduction Unattended Noise Monitoring Attended Noise Monitoring Rating Noise Background Level Potential Noise and Vibration Impacts Assessment Criteria Introduction Operational Noise Assessment Criteria Low Frequency Noise Criteria Sleep Disturbance Criteria Construction Noise Criteria Road Traffic Noise Assessment Criteria Rail Noise Assessment Criteria Blasting Criteria Vibration Criteria viii

11 ENVIRONMENTAL IMPACT STATEMENT Assessment Methodology Introduction Operational Noise Modelling Construction Noise Emissions Road Traffic Noise Emissions Rail Noise and Vibration Emissions Blasting Emissions Management and Mitigation Measures Introduction Construction Noise Mitigation Operational Noise Mitigation Maximum Noise Level (Sleep Disturbance) Mitigation Measures Blasting and Vibration Mitigation Measures Management Plans Blasting and Vibration Assessment of Impacts Construction Noise Operational Noise Low Frequency Noise Sleep Disturbance Noise Road Traffic Noise Rail Noise and Vibration Blasting Emissions Taronga Western Plains Zoo Monitoring AIR QUALITY Introduction Potential Sources of Air Contaminants Particulate Matter and Dust Deposition Oxides of Nitrogen, Sulphur Dioxide and Hydrogen Chloride Radon Greenhouse Gas Emissions Odour Existing Environment Introduction Deposited Dust Particulate Matter Other Air Quality Parameters Summary of Air Quality Parameters Greenhouse Gases AUSTRALIAN ZIRCONIA LTD Assessment Criteria Particulate Matter and Dust Deposition Gaseous Air Quality Parameters Assessment Criteria Odour Assessment Methodology Modelling Methodology Particulate Matter Emissions Radon Other Air Quality Parameters Odour Emissions Greenhouse Gas Emissions Management and Mitigation Measures Introduction Dust Management Site Establishment Stage Dust Management - Operations Processing Plant Controls Greenhouse Gas Assessment of Impacts Introduction Annual Average TSP, PM 10, PM 2.5 and Dust Deposition Incremental 24-hour Average PM 10 and PM Cumulative 24-hour Average PM SO 2 Emissions NO 2 Emissions HCl Emissions Radon Odour Greenhouse Gas Emissions Monitoring RADIATION Introduction Background to Radiation Existing Environment Background Radiation Monitoring Gamma Radiation Radionuclide Levels in Airborne Dust Radionuclide Concentrations in Water ix

12 AUSTRALIAN ZIRCONIA LTD Potential Impacts Assessment Criteria Assessment Methodology Overview Occupational Doses Public and Environmental Radiological Impacts Management and Mitigation Measures Assessment of Impacts Introduction Occupational Doses Public Dose Assessment Non-Human Biota Exposure Public Dose Following Closure Summary Monitoring SURFACE WATER Introduction Existing Environment Introduction Existing Flooding Regime Surface Water Quality Surrounding Water Users and Availability Potential Surface Water Impacts Management and Mitigation Measures Introduction Surface Water Management Plan Harvestable Rights Site Water Balance Decommissioning and Final Landform Water Management Additional Management Measures Assessment of Impacts Introduction Surface Water Flow Volumes Surface Water Flow Rate Water Quality Sediment and Erosion Control Downstream Water Users Flooding Waste Water Management ENVIRONMENTAL IMPACT STATEMENT Monitoring and Contingency Management Surface Water Quality Monitoring Contingency Management GROUNDWATER Introduction Existing Environment Local Hydrogeological Setting DZP Conceptual Site Model Assessment Methodology Potential Impacts on Groundwater and Proposed Management and Mitigation Measures Introduction Potential Physical Impacts During Operations and Post Closure Potential Chemical Impacts during Operations and Post Closure Potential Impacts on Groundwater Availability Potential Impacts on Groundwater Dependent Ecosystems Potential Impacts on Dryland Salinity Assessment of Impacts Risk-based Assessment of Impacts Low or Moderate Risk Sources High Risk Sources Altered Groundwater Flows due to Enhanced Recharge via the Open Cut Land Salinization Conclusion Groundwater Management Plan Aims Groundwater Management Groundwater Monitoring Program TERRESTRIAL ECOLOGY Introduction Regional Setting Central West Catchment Local Setting x

13 ENVIRONMENTAL IMPACT STATEMENT Assessment Methodology Desktop Survey Field Survey Identified Flora and Fauna Flora Fauna Subject Species and Communities Management and Mitigations Measures Introduction Avoidance of Impacts Minimisation of Impacts Mitigation of Impacts Offsetting of Impacts Assessment of Residual Impacts Introduction Biodiversity Offset Strategy Clearing of Native Vegetation Impacts on Habitat Corridors Key Threatening Processes Critical Habitat Impacts on Threatened Species, Populations and Communities Other Indirect Impacts on Biodiversity AQUATIC ECOLOGY Introduction Local Setting Aquatic Ecology Survey Introduction Literature Review and Consultation Classification of Watercourses Preliminary Assessment and Site Selection Field Survey Survey Results Desktop Survey Strahler Stream Order and Waterway Classification Aquatic Habitat Aquatic Fauna Potential Impacts on Aquatic Ecology, Mitigation and Management Introduction Alteration of Natural Surface Flows AUSTRALIAN ZIRCONIA LTD Obstruction of Fish Passage due to Instream Structures Removal and Disturbance of Riparian Vegetation Mobilisation of Sediment During Construction Changes in Water Quality Water Extraction Disturbance of Freshwater Eel-tailed Catfish Habitat at Toongi Removal and Disturbance to an Endangered Ecological Community Assessment of Residual Impacts Introduction General Impact Assessment Aquatic Ecology of Conservation Significance Monitoring ABORIGINAL HERITAGE Introduction Aboriginal Heritage Study Area Assessment Methodology Consultation and Community Involvement Consultation Aboriginal Community Involvement Background Research and Literature Review Regional Archaeological Context Local Archaeological Context Local Archaeological Record Predictive Model Field Survey Methodology and Results Methodology Survey Results Potential Impacts Management and Mitigation Measures Introduction Avoid Impact Minimise Impact Mitigate / Manage Impacts xi

14 AUSTRALIAN ZIRCONIA LTD Cultural Heritage Management General Assessment of Residual Impacts Assessment of Study Area Impacts Impact Assessment in a Regional Context Conclusion HISTORIC HERITAGE Introduction Assessment Methodology Historic Context and Background Research Historic Heritage Study Area Regional Context Local Context Background Research Field Survey Methodology and Results Survey Methodology Survey Results and Significance Assessment Management and Mitigation Measures Assessment of Residual Impacts Residual Impacts Significance of Identified Historic Sites and Items Assessment of Regional Historical Context Assessment of Local Historical Context Conclusion SOILS AND LAND CAPABILITY Introduction Existing Environment Regional Soil Environment Assessment Methodology Survey Area Soils Soil Stripping Suitability Land and Soil Capability Management and Mitigation Measures Assessment of Impacts Soils Land and Soil Capability Agricultural Suitability ENVIRONMENTAL IMPACT STATEMENT 4.12 TRAFFIC AND TRANSPORTATION Introduction Existing Environment Introduction Local Roads Intersections Railway Level Crossings Traffic Levels Accident Statistics Changes to Traffic Levels Resultant from the Proposal Construction Traffic Operational Traffic Mitigation and Management Measures Impact Assessment SIDRA Analysis Obley Road Toongi Road Newell Highway Yarrandale Road Boothenba Road Rail Level Crossings Other Road Users VISUAL AMENITY Introduction Existing Visual Amenity Management and Mitigation Measures Assessment of Impacts DZP Site Macquarie River Water Pipeline Route Toongi-Dubbo Rail Line HAZARDS Introduction Reagent and Product Management Potential Hazards Safeguards and Controls Assessment of Impact Bush Fire Hazard Introduction Bush Fire Management Objectives Existing Bush Fire Hazard Bush Fire Classification Safeguards and Controls Assessment of Impacts xii

15 ENVIRONMENTAL IMPACT STATEMENT Traffic Incident Potential Incident(s) Safeguards and Hazard Reduction Strategies Assessment of Impacts Land Contamination Introduction Methodology Results SOCIO-ECONOMIC SETTING Introduction Existing Socio Economic Setting Overview Dubbo Toongi (Obley District) The DZP Site Management and Mitigation Measures Assessment of Economic Impacts Introduction Employment Regional Value of Output Impact on Adjacent Activities Public Sector Revenues Adverse Economic Impacts Assessment of Social Impacts Introduction Transport Demand for Infrastructure Demand for Services Amenity Values Land Use Cumulative Impacts Conclusion SECTION 5 DRAFT STATEMENT OF COMMITMENTS SECTION 6 PROPOSAL EVALUATION AND CONCLUSIONS ALTERNATIVES CONSIDERED Introduction Processing Operations and Production Level Water Use Alternative Open Cut Design and Sequence Disposal of Salt Surface Infrastructure Locations and Design Transport Operations AUSTRALIAN ZIRCONIA LTD 6.2 EVALUATION OF THE PROPOSAL Residual Environmental Risk and Impacts Ecologically Sustainable Development Introduction The Precautionary Principle Social Equity Conservation of Biological Diversity and Ecological Integrity Improved Valuation and Pricing of Environmental resources Conclusion JUSTIFICATION OF THE PROPOSAL Introduction Biophysical Considerations Introduction Noise Air Quality and Radiation Surface Water Resources Groundwater Resources Biodiversity Cultural Heritage Transport Socio-Economic Considerations Planning Considerations Introduction Permissibility State Environmental Planning Policy (State and Regional Development) State Environmental Planning Policy (Mining, Petroleum Production and Extractive Industries) State Environmental Planning Policy (Infrastructure) State Environmental Planning Policy No. 33 Hazardous and Offensive Development (SEPP 33) State Environmental Planning Policy No. 44 Koala Habitat Protection (SEPP 44) State Environmental Planning Policy No. 55 Remediation of Land xiii

16 AUSTRALIAN ZIRCONIA LTD Consequences of not Proceeding with the Proposal CONCLUSION SECTION 7 GLOSSARY OF TERMS, ACRONYMS AND SYMBOLS SECTION 8 REFERENCES APPENDICES (Separate Volume) Appendix 1 Appendix 2 Appendix 3 Appendix 4 Appendix 5 Appendix 6 Appendix 7 Appendix 8 State Significant Development Application... A1-1 Director-General s Requirements Issued 4 May 2012 and Supplementary Director-General s Requirements Issued 1 March A2-1 Coverage of Director-General s Requirements and Additional Matters for Consideration in the EIS... A3-1 Preliminary Hazard Analysis (including a SEPP 33 Risk Screening)... A4-1 Water Pipeline Report Darling Irrigation... A5-1 Solid and Liquid Residue Management Concept Design Report... A6-1 Report on Water Availability, Purchasing and Potential Impacts... A7-1 Review of Groundwater Supply Prospects... A8-1 Appendix 9 Agricultural Impact Statement... A9-1 Appendix 10 Contamination Assessment... A10-1 Appendix 11 Material Safety Data Sheets for Products of the DZP... A11-1 FIGURES Figure 1.1 Locality Plan Figure 1.2 DZP Site and Macquarie River Water Pipeline Land Titles Figure 1.3 Existing Mineral Authorities Figure 1.4 DZP Site Bedrock Geology Figure 1.5 Figure 1.6 Exploration Over the Toongi Ore Body Cross-Sectional Illustration of the Toongi Ore Body Figure 2.1 Indicative DZP Site Layout Figure 2.2 Figure 2.3 Figure 2.4 Figure 2.5 ENVIRONMENTAL IMPACT STATEMENT Toongi Dubbo Rail Line and Gas Pipeline Corridor Macquarie River Water Pipeline and Pump Station Public Road Network and Proposed Roadworks DZP Site Electricity Transmission Line Options and Infrastructure Figure 2.6 Soil Landscape Units Figure 2.7 Indicative Mining Sequence Figure 2.8 Schematic Mining Method Figure 2.9 Figure 2.10 Processing Plant and DZP Site Administration Area Reagent Storage And Processing Plant Surfaces Figure 2.11 Process Flow Path Figure 2.12 Figure 2.13 Figure 2.14 Conceptual Design for the Solid Residue Storage Facility Cross-Sectional Design of the Liquid Residue Storage Facility Salt Encapsulation Cells (Conceptual Layout) and Cross- Section Figure 2.15 Transport Routes Figure 2.16 Conceptual Final Landform Figure 2.17 Final Landform Sections Figure 2.18 Conceptual Final Landform Processing Plant Area and DZP Site Administration Area Figure 2.19 Conceptual Final Landform Open Cut Waste Rock Emplacement, Solid Residue Storage Facility and Salt Encapsulation Cells Figure 2.20 Conceptual Final Landform Liquid Residue Storage Facility: Area Figure 2.21 Indicative Final Land Use Figure 2.22 Rehabilitation of the Waste Rock Emplacement Figure 2.23 Rehabilitation of the LRSF Figure 2.24 Rehabilitation of the SRSF Figure 2.25 Rehabilitation of the Salt Encapsulation Cells Figure 2.26 Biodiversity Offset Strategy - Vegetation Communities Figure 3.1 Local Electricity Infrastructure Figure 3.2 Strategic Agricultural Land Flowchart Process Figure 3.3 Land Zoning xiv

17 ENVIRONMENTAL IMPACT STATEMENT Figure 4.1 Figure 4.2 Figure 4.3 Regional Topography and Drainage Local Topography and Drainage DZP Site Topography and Drainage Figure 4.4 Rolling 5-Year Rainfall Totals Figure 4.5 Figure 4.6 Annual and Seasonal Wind Roses for Toongi Meteorological Station (2008) Surrounding Land Ownership and Residences Figure 4.7 Local Setting and Land Uses Figure 4.8 DZP Site Setting and Land Uses Figure 4.9 Noise Sources Year Figure 4.10 Noise Sources Year Figure 4.11 Noise Sources Year Figure 4.12 Noise Contours Year Figure 4.13 Noise Contours Year Figure 4.14 Noise Contours Year Figure 4.15 Air Quality Monitoring Locations Figure 4.16 Figure 4.17 Figure 4.18 OEH 24-Hour PM 10 Monitoring Data Cumulative Annual Average Particulate Concentrations Year Maximum Incremental 24 hour Average Concentrations Year Figure 4.19 Cumulative 24-Hr PM 10 Concentration: Monte Carlo Simulation (Year 15) Figure 4.20 Cumulative SO 2 Concentrations Year Figure 4.21 Existing Flood Regime Figure 4.22 Figure 4.23 Figure 4.24 Figure 4.25 Indicative Surface Water Controls Indicative Processing Area Surface Water Controls Indicative Operation Area Surface Water Controls Liquid Residue Storage Facility Performance Figure 4.26 DZP Site Water Balance Figure 4.27 Surface Water Monitoring Locations Figure 4.28 Regional Groundwater Bores Figure 4.29 Figure 4.30 DZP Site Groundwater Monitoring Network Measured Monitoring Bore Standing Water Levels Figure 4.31 Figure 4.32 Figure 4.33 Figure 4.34 Figure 4.35 Figure 4.36 Figure 4.37 Figure 4.38 Figure 4.39 Figure 4.40 Figure 4.41 Figure 4.42 Figure 4.43 Figure 4.44 AUSTRALIAN ZIRCONIA LTD Interpolated Groundwater Level Contours Threatened Flora and Fauna Records DZP Site - Vegetation Communities Threatened Ecological Communities within the DZP Site Pink-tailed Worm-lizard Records and Habitat Recorded Threatened Fauna Species Aquatic Ecology Study Area and Survey Sites Previously Recorded Aboriginal Heritage Sites Recorded Aboriginal Heritage Sites of the DZP Site Recorded Aboriginal Heritage Sites of the Macquarie River Pipeline Recorded Aboriginal Heritage Sites of the Toongi-Dubbo Rail Line and Obley Road Recorded Historic Heritage Sites and Finds Soil Survey Area and Landscape Units Land Capability Mapping of the DZP Mine Site Figure 4.45 Existing Road Network Figure 4.46 Visibility Section Residence R22 220R Obley Road Figure 4.47 Indicative Visibility Section Residence R23 218R Obley Road Figure 4.48 Figure 4.49 Visibility Section Obley Road North of Residence R Visibility Section View from Obley Road South of Wambangalang Creek Crossing Figure 4.50 Individual Fatality Risk Figure 4.51 Toxic Injury Risk Figure 4.52 Toxic Irritation Risk Figure 4.53 Bush Fire Categories Figure 4.54 Vegetation Bush Fire Classification Figure 4.55 Local Setting Figure 4.56 Economic Structure of Dubbo Figure 4.57 Unemployment in Dubbo and the Surrounding Orana Region xv

18 AUSTRALIAN ZIRCONIA LTD Figure 4.58 Figure 4.59 TABLES Economic Structure Comparison (2006), Toongi and Obley Local Population Age Composition Table 1.1 Application Area Land Titles Table 1.2 Mineral Authorities Table 1.3 Regional Stratigraphy Table 1.4 DZP Resources Table 1.5 DZP Products and Uses Table 2.1 Indicative Topsoil Inventory Table 2.2 Indicative Subsoil Inventory Table 2.3 Indicative Blast Design Parameters Table 2.4 Indicative Mining Rate Table 2.5 Indicative Mining Fleet Table 2.6 Waste Rock Materials Table 2.7 Indicative Waste Rock Emplacement Design Features Table 2.8 Water Supply Strategy Table 2.9 Table 2.10 Table 2.11 Table 2.12 Table 2.13 Table 2.14 Table 2.15 Table 2.16 Table 2.17 Solid Residue Chemical Composition Radionuclide Activity in Process Streams Overall Deportment of Radionuclides from Ore Liquid Residue Chemical Composition Liquid Residue Storage Facility Areas Chemical Composition of the Residual Salt Predicted Point Source Emissions Obley Road Daily Truck Movements Estimated Daily Traffic Movements Table 2.18 Diesel Consumption Table 2.19 Proposed Hours of Operation Table 2.20 Table 2.21 Table 2.22 Table 2.23 Strategic Rehabilitation Completion Criteria, Associated Performance Indicators and Monitoring Strategy Indicative Rehabilitation Native Species List Summary Table - Existing Vegetation Ecosystem Credits Summary Table - Biodiversity Offset Area Ecosystem Credits Table 3.1 Table 3.2 Table 3.3 Table 3.4 Table 3.5 Table 3.6 ENVIRONMENTAL IMPACT STATEMENT November 2011 Community Information Session Key Issues Raised Toongi Agricultural Property Owners Consultation Issues Raised July 2012 Community Information Session Issues Raised Issues Raised by the Little River Landcare Group Application of SEPP (Mining, Petroleum Production and Extractive Industries) Qualitative Consequence Rating Table 3.7 Qualitative Likelihood Rating Table 3.8 Risk Rating Matrix Table 3.9 Table 3.10 Risk Sources and Potential Environmental Impacts Risk Sources and Potential Environmental Impacts Table 4.1 Climate Statistics Table 4.2 Table 4.3 Table 4.4 Historic Unattended Ambient Noise Environment Operator-attended Ambient Noise Survey Results Adopted Rating Background Levels Table 4.5 Amenity Criteria Table 4.6 Table 4.7 Proposal specific Noise Levels (PSNL) Criteria for Traffic Noise at Roadside Residences Table 4.8 Rail Noise Assessment Criteria Table 4.9 Table 4.10 Table 4.11 Table 4.12 Table 4.13 Table 4.14 Table 4.15 Table 4.16 Prevailing Meteorological Conditions Project-related Noise Levels for Scenario 1 (Year 1) Construction Noise Modelling Results Project-related Noise Levels for Scenario 1 (Year 1) Project-related Noise Levels for Scenario 2 (Year 5) Project-related Noise Levels for Scenario 3 (Year 15) Increased Lmax Noise Levels at Privately-owned Residences Existing and Potential Noise Increases Relating to DZP Rail Movements Newcastle to Dubbo xvi

19 ENVIRONMENTAL IMPACT STATEMENT Table 4.17 Table 4.18 Table 4.19 Potential Noise Levels Relating to DZP Rail Movements Toongi to Dubbo Predicted Air Blast Overpressure and Vibration Levels at Privately-Owned Receptors TSP Monitoring Results for March 2001to February Table 4.20 Annual Average PM 10 Concentration for Rural NSW Table hour maximum SO 2 concentrations for Bargo Table 4.22 Table 4.23 Table 4.24 Table 4.25 Table 4.26 Table 4.27 Annual Average and 1-hour maximum NO 2 concentrations for Bargo Adopted Background Contributions Air Quality Standards/Criteria for Particulate Matter Concentrations EPA Criteria for Dust (Insoluble Solids) Deposition Air Quality Criteria for Gaseous Air Quality Parameters Odour Performance Criteria for the Assessment of Odour Table 4.28 Odour Testing Results Table 4.29 Annual Average TSP, PM 10, PM 2.5 and Dust Deposition Concentration Year 5 and Table 4.30 Table 4.31 Maximum 24-hour PM 2.5 and PM 10 concentrations Year 5 and Year Predicted Incremental and Cumulative SO 2 Emissions Table 4.32 Predicted NO 2 Emissions Table 4.33 Predicted Odour Impact Table 4.34 Summary of GHG Emissions Table 4.35 Radiation Exposures (in Addition to Natural Background Levels) Table 4.36 Background Gamma Monitoring Table 4.37 Table 4.38 High Volume Dust Sampling Results Radionuclides in Surface Water and Groundwater Table 4.39 Occupational Dose Estimates Table 4.40 Processing Plant Work Area Doses Table 4.41 Predicted Public Dose Table 4.42 Summary of Radiation Impacts for the Proposal Table 4.43 Table 4.44 Table 4.45 Table 4.46 Table 4.47 Table 4.48 AUSTRALIAN ZIRCONIA LTD Dose Assessment Monitoring Program (Indicative Only) Environmental Radiation Monitoring Program Proposed Sediment Basin Volumes Anticipated Time to Achieve Maximum Capacity Reduction in Annual Surface Water Flows During the Life of the Proposal Surface Water Quality Monitoring Frequency Table 4.49 Surface Water Trigger Values Table 4.50 Table 4.51 Registered Groundwater Bores within the DZP Site Risk Associated with Potential Impacts Table 4.52 Biological Database Searches Table 4.53 Biological Database Searches Table 4.54 Fish Habitat Classification in NSW Waterways Table 4.55 Fauna Survey Techniques Table 4.56 Table 4.57 Aquatic Biota and Other Features of Conservation Significance of the Central West CMA Strahler Stream Order and Waterway Classification for the Aquatic Ecology Study Area Table 4.58 Aquatic Habitat RCE Scores Table 4.59 Recorded Aquatic Fauna Table 4.60 Table 4.61 Estimated Loss of Surface Water Runoff Aboriginal Community Involvement in Field Surveys Table 4.62 Registered AHIMS Sites Table 4.63 Table 4.64 Table 4.65 Table 4.66 Table 4.67 Table 4.68 Recorded Aboriginal Heritage Sites Re-recorded AHIMS Registered Sites Potential Impacts and Significance of Aboriginal Sites Heritage Significance of Historic Sites and Items Summary of Soil Landscapes in the Soil Survey Area Land and Soil Capability Classes Table 4.69 Soil Stripping Suitability Table 4.70 Land Capability of the DZP Site to be Disturbed xvii

20 AUSTRALIAN ZIRCONIA LTD Table 4.71 Table 4.72 Table 4.73 Table 4.74 Table 4.75 Table 4.76 Land and Soil Capability Class of the Rehabilitated Final Landform Range of Land and Soil Capability Classes over the Life of the Proposal Existing Pavement Obley Road Traffic Volumes (Newell Highway) Current and Forecast Traffic Volumes: Obley Road, Toongi Road, Boothenba Road and Yarrandale Road Traffic Volumes at Rail Crossings Table 4.77 Crash Data Table 4.78 Table 4.79 Table 4.80 Table 4.81 Worst Case Heavy Vehicle Scenario Based on Reagent Transport Options Forecast Background and Combined Traffic Volumes Modelled Future Traffic Conditions Peak Operation Predicted Queue Lengths at Rail Crossings Table 4.82 Hazardous Materials Table 4.83 Reagent Storage Table 4.84 Bush Fire Hazard Assessment Table 4.85 Table 5.1 Estimated Effects of Land Use Changes Draft Statement of Commitments Table 6.1 Risk Rating Matrix Table 6.2 Table 6.3 PLATES Risk Sources and Potential Environmental Impacts Summary of Radiation Impacts for the Proposal Plate 2.1 Dubbo East Junction Plate 2.2 Plate 2.3 Wingewarra Street Level Crossing Cobra Street (Mitchell Highway) Level Crossing Plate 2.4 Boundary Road Level Crossing Plate 2.5 Plate 2.6 Plate 2.7 Macquarie Street Level Crossing Cumboogle (Obley Road) Level Crossing Glengerra (Obley Road) Level Crossing ENVIRONMENTAL IMPACT STATEMENT Plate 2.8 Toongi Road Level Crossing Plate 2.9 Plate 2.10 Plate 2.11 Plate 2.12 Plate 4.1 Plate 4.2 Plate 4.3 Plate 4.4 Plate 4.5 Plate 4.6 Plate 4.7 Plate 4.8 Plate 4.9 Plate 4.10 Plate 4.11 Plate 4.12 Plate 4.13 Plate 4.14 Plate 4.15 Plate 4.16 Plate 4.17 Revegetated slopes of Peak Hill Gold Mine Waste Rock Emplacement Revegetated upper surface of Peak Hill Gold Mine Waste Rock Emplacement Vegetation regrowth on the Peak Hill Gold Mine ROM Pad with revegetated Heap Leach in the background Revegetation of the Peak Hill Gold Mine Waste Rock Emplacement Toongi Road from the Obley Road Intersection Toongi Road Alignment and Condition (beyond the Springs Road Intersection) Causeway crossing of Wambangalang Creek Obley Road Typical Alignment and Condition Newell Highway - Obley Road Intersection (Looking South) Newell Highway - Obley Road Intersection (Looking North) Obley Road - Toongi Road Intersection (Looking South) Obley Road - Toongi Road Intersection (Looking North) Fletcher International Rail Terminal Access - Yarrandale Road Intersection Looking South along Yarrandale Road from the Intersection with Boothenba Road Newell Highway - Boothenba Road Intersection (Looking South) Newell Highway - Boothenba Road Intersection (Looking North) Looking East on Wingewarra Street from the Rail Crossing Looking West on Cobra Street from the Rail Crossing Looking West on Boundary Street from the Rail Crossing Looking West on Macquarie Street from the Rail Crossing Looking North on Obley Road from Rail Crossing xviii

21 ENVIRONMENTAL IMPACT STATEMENT Plate 4.18 Plate 4.19 Plate 4.20 Plate 4.21 Plate 4.22 Plate 4.23 Plate 4.24 Plate 4.25 Plate 4.26 Plate 4.27 Plate 4.28 Plate 4.29 CHARTS Chart 2.1 Looking South on Obley Road from Rail Crossing Looking East on Cumboogle Road at the Rail Crossing Looking West on Bellevue Road at the Rail Crossing Looking East on Toongi Road at the Rail Crossing View of Toongi Valley from Obley Road (Property 34) View towards the DZP Site and Dowds Hill from 200R Obley Road (R27) View towards the DZP Site from 215R Obley Road (R25) View over Toongi Valley from 216R Obley Road (R24) View towards the DZP Site from 218R Obley Road (R23) View towards the DZP Site from driveway of 218R Obley Road (R23) View towards the DZP Site from Obley Road (South of Wambangalang Creek crossing View towards the DZP Site from Strathgled (R18) Indicative Construction, Development and DZP Commencement Sequence AUSTRALIAN ZIRCONIA LTD SPECIALIST CONSULTANT STUDIES COMPENDIUM (Accompanying this Volume) Volume 1: Part 1: Noise and Vibration Impact Assessment EMGA Mitchell McLennan Part 2: Air Quality and Greenhouse Gas Assessment Pacific Environment Limited Part 3: Radiation Assessment JRHC Enterprises Pty Ltd Part 4: Surface Water Assessment Strategic Environmental and Engineering Consulting Pty Ltd Part 5: Groundwater Assessment Environmental Earth Sciences Volume 2: Part 6: Terrestrial Ecology Assessment Ozark Environmental and Heritage Management Pty Ltd Part 7: Aquatic Ecology Assessment Alison Hunt and Associates Pty Ltd Volume 3: Part 8: Aboriginal Heritage Assessment Ozark Environmental and Heritage Management Pty Ltd Part 9: Historic Heritage Assessment Ozark Environmental and Heritage Management Pty Ltd Part 10 Soils and Land Capability Assessment Sustainable Soils Management Pty Ltd Part 11: Traffic Impact Assessment Constructive Solutions Pty Ltd Part 12: Socio-Economic Impact Assessment Diana Gibbs and Partners xix

Environmental Impact Statement. Avoca Tank Project

Environmental Impact Statement. Avoca Tank Project ABN 88 100 095 494 Environmental Impact Statement for the Avoca Tank Project Prepared by: R.W. CORKERY & CO. PTY. LIMITED July 2014 This page has intentionally been left blank ABN 88 100 095 494 Environmental

More information

EIS TABLE OF CONTENTS

EIS TABLE OF CONTENTS EIS TABLE OF CONTENTS GLOSSARY OF TERMS... GL-1 Glossary and Abbreviations... GL-1 Units... GL-14 EXECUTIVE SUMMARY... ES-1 INTRODUCTION... ES-1 PROJECT PROPONENTS... ES-1 LOCATION... ES-1 PROJECT DESCRIPTION...

More information

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement

TABLE OF CONTENTS. Atlas-Campaspe Mineral Sands Project Environmental Impact Statement TABLE OF CONTENTS 1 INTRODUCTION 1-1 1.1 PROJECT OVERVIEW 1-1 1.1.1 Purpose of this Report 1-1 1.1.2 Project Summary 1-1 1.1.3 Land Tenure, Development Application Area, Tenements and Zoning 1-7 1.1.4

More information

Environmental Risk Analysis

Environmental Risk Analysis Appendix 10 11 12 13 14 15 16 17 18 191 Groundwater Controlled UHSA Air Agricultural Historic EIS Preliminary Environmental Blasting Quality Surface Secretary s Noise Statement Aboriginal Economic Action

More information

1 Introduction 1-1. Project Need and Objectives

1 Introduction 1-1. Project Need and Objectives Introduction 1 CONTENTS 1 Introduction 1-1 1.1 1.1 Introduction Introduction 1-1 1-1 1.2 1.2 Project Overview Project Overview 1-1 1-1 1.3 1.3 Project Site Project Site 1-1 1-1 1.4 1.4 The Proponent The

More information

(No. of pages excluding this page = 10)

(No. of pages excluding this page = 10) SPECIALIST CONSULTANT STUDIES 3-65 BIG ISLAND MINING PTY LTD (No. of pages excluding this page = 10) Ltd BIG ISLAND MINING PTY LTD 3-66 SPECIALIST CONSULTANT STUDIES This page has intentionally been left

More information

Hunter Valley Operations South

Hunter Valley Operations South Hunter Valley Operations South This booklet outlines a modification proposal being prepared for Coal & Allied s Hunter Valley Operations (HVO) South mining activities. In this booklet you will find an

More information

Executive Summary INTRODUCTION THE APPLICANT

Executive Summary INTRODUCTION THE APPLICANT ENVIRONMENTAL IMPACT STATEMENT EMC METALS AUSTRALIA PTY LTD INTRODUCTION This Environmental Impact Statement (EIS) has been prepared by R.W. Corkery & Co. Pty. Limited on behalf of EMC Metals Australia

More information

Balranald Mineral Sands Project

Balranald Mineral Sands Project Balranald Mineral Sands Project NSW Environmental Impact Statement Prepared for Iluka Resources Limited May 2015 Volume 2 Appendix A - Secretary's Environmental Impact Assessment Requirements Appendix

More information

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment

TABLE OF CONTENTS LIST OF FIGURES. Mt Arthur Coal Open Cut Modification Environmental Assessment Executive Summary TABLE OF CONTENTS ES1 BACKGROUND ES-1 ES2 EXISTING OPERATIONS ES-1 ES3 MODIFICATION OVERVIEW ES-1 ES4 CONSULTATION ES-1 ES5 COMMUNITY INITIATIVES AND INVOLVEMENT ES-3 ES6 ENVIRONMENTAL

More information

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK PROVINCE OF NEW BRUNSWICK DEPARTMENT OF ENERGY AND RESOURCE DEVELOPMENT Minerals and Petroleum Development Branch GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK Guide to the

More information

Section 3 - Consultation and Issue Identification

Section 3 - Consultation and Issue Identification ENVIRONMENTAL ASSESSMENT 3-1 MUDGEE STONE COMPANY PTY LTD 3Section 3 Consultation and Issue Identification P R E A M B L E This section describes how the environmental issues assessed in the Environmental

More information

H28. Special Purpose Quarry Zone

H28. Special Purpose Quarry Zone H28. Special Purpose Quarry Zone H28.1. Zone description Mineral resources are important to Auckland s economy and development. The Special Purpose Quarry Zone provides for significant mineral extraction

More information

South Landfill Annual Cover Rate Screening Criteria Checklist

South Landfill Annual Cover Rate Screening Criteria Checklist South Landfill Annual Cover Rate Screening Criteria Checklist The following checklist is taken from the Guide to Environmental Assessments for Waste Management Projects, Part B Environmental Screening

More information

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5

Arafura Resouces Ltd. Nolans Environmental Impact Statement. volume one. Risk assessment. Chapter 5 Arafura Resouces Ltd Nolans volume one 05 Risk assessment Chapter 5 5. Risk assessment 5.1 Introduction This chapter provides a description of the whole-of-project risk assessment undertaken for the identification,

More information

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and

Introduction. They can help ensure that all key issues and elements have been considered; They help ensure that the review process is systematic; and Introduction There are many tools that a reviewer of environmental impact assessment documents can use to help determine whether such documents are complete and adequate. Among the powerful tools that

More information

Environmental Risk Assessment

Environmental Risk Assessment 4 Environmental Risk Assessment Section 4 Environmental Risk Assessment CONTENTS 4 Environmental Risk Assessment 4-1 4.1 4.1 Introduction Introduction 4-1 4-1 4.2 4.2 Methodology Methodology 4-1 4-1 4.2.1

More information

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report

APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES. RAINY RIVER PROJECT Final Environmental Assessment Report APPENDIX O COMPREHENSIVE ALTERNATIVES ASSESSMENT TABLES RAINY RIVER PROJECT APPENDIX O: COMPARATIVE ALTERNATIVES ANALYSIS GLOSSARY AND ABBREVIATIONS ARD EA EC DFO GHG HONI MMER MOE MTO NA NLSA NPAG NRSA

More information

ATTACHMENT 2 COMMUNITY INFORMATION

ATTACHMENT 2 COMMUNITY INFORMATION ATTACHMENT 2 COMMUNITY INFORMATION Wilpinjong Coal Wilpinjong s 75W modification November, 2012 The Wilpinjong Coal Mine is located in the developing western coalfields of NSW and produces a high quality

More information

T a b l e o f C o n t e n t s

T a b l e o f C o n t e n t s T a b l e o f C o n t e n t s Executive Summary English Executive Summary French page 1. Introduction and Background... 1-1 1.1 Introduction...1-1 1.2 The Proponent Waste Management of Canada Corporation...1-2

More information

Yeelirrie Uranium Project. Environmental Management

Yeelirrie Uranium Project. Environmental Management Yeelirrie Uranium Project Environmental Management Yeelirrie Uranium Project Yeelirrie is one of Australia s largest undeveloped uranium deposits. The deposit is located approximately 660 km north east

More information

Traffic Management Plan. for the. Dargues Gold Mine

Traffic Management Plan. for the. Dargues Gold Mine for the for the Diversified Minerals Pty Ltd ABN: 22 603 135 584 Level 10, 56 Pitt Street SYDNEY NSW 2000 Telephone: (02) 8272 4100 Email: info@divminerals.com.au Big Island Mining Limited ABN: 12 112

More information

ENVIRONMENTAL MANAGEMENT STRATEGY

ENVIRONMENTAL MANAGEMENT STRATEGY ABN: 82 003 061 890 ENVIRONMENTAL MANAGEMENT STRATEGY for the January 2018 Prepared by: R.W. CORKERY & CO. PTY. LIMITED ABN: 82 003 061 890 ENVIRONMENTAL MANAGEMENT STRATEGY for the Prepared for: Walker

More information

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT

GLNG PROJECT - ENVIRONMENTAL IMPACT STATEMENT 6 J:\Jobs\42626220\07 Deliverables\EIS\FINAL for Public Release\6. Values and Management of Impacts\6-8 Air Quality\06 08 Air Quality (Section 6.8) FINAL PUBLIC track.doc GLNG Project - Environmental Impact

More information

Rolleston Coal Expansion Project

Rolleston Coal Expansion Project Rolleston Coal Expansion Project ÎÑÔÔÛÍÌÑÒ ÑÐÛÒ ÝËÌ ENVIRONMENTAL IMPACT STATEMENT SUMMARY BOOKLET APRIL 2014 Contents Expansion project 2 Development 3-8 of the project Public roads 9 Transport 9 Surface

More information

Contents. Sancrox Quarry Expansion Preliminary Environmental Assessment 2015

Contents. Sancrox Quarry Expansion Preliminary Environmental Assessment 2015 Contents 1 Introduction... 5 1.1 Site Description... 6 1.2 The Proponent... 6 1.3 Purpose of the Document... 6 2 Land Ownership... 8 2.1 Crown Land Purchase Site...10 3 Current Development Consent and

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Collection of Base line data in any season other than Monsoon season in study area of 10 kms radius from Lease Area. Based on the Meteorological data from

More information

Section 75J of the Environmental Planning & Assessment Act 1979

Section 75J of the Environmental Planning & Assessment Act 1979 Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 As delegate of the Minister for Planning and Infrastructure, I approve the project application referred to in schedule 1,

More information

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN Environment Protection Authority, ACT May 2009 ISBN-13: 978-0-642-60494-1 ISBN-10: 0-642-60494-0 Australian Capital Territory,

More information

Chapter 22 Conclusion and recommendations

Chapter 22 Conclusion and recommendations Chapter 22 Conclusion and recommendations November 2013 Table of contents 22. Conclusion and recommendations... 22-1 22.1 Purpose of this chapter... 22-1 22.2 Rationale for NGBR Project... 22-1 22.3 Economic

More information

Section 75J of the Environmental Planning & Assessment Act 1979

Section 75J of the Environmental Planning & Assessment Act 1979 Project Approval Section 75J of the Environmental Planning & Assessment Act 1979 As delegate of the Minister for Planning and Infrastructure, I approve the project application referred to in schedule 1,

More information

Code of Practice for Exploration Operations

Code of Practice for Exploration Operations Code of Practice for Exploration Operations September 2005 Made under the Environmental Protection and Enhancement Act Published by Alberta Queen s Printer Alberta Queen s Printer Suite 700, Park Plaza

More information

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction

Table of Contents. O Devaney Gardens. Page i. Page Number. Section. 1 Introduction Section 1 Introduction Page Number 1.1 Introduction 2 1.2 Screening - Requirement for an EIA 5 1.3 Purpose of this EIA 6 1.4 Objectives of this EIA 6 1.5 Scoping 10 1.6 Format and Structure of this EIS

More information

Comparative Evaluation Option #1 & Option #2

Comparative Evaluation Option #1 & Option #2 Comparative Evaluation Option #1 & Option #2 Option #1 Existing Landfill Approx. 47 metres/14 stories Proposed Layout Approx. 31 metres/9.5 stories Option #2 Existing Landfill Approx. 47 metres/14 stories

More information

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS Beaver Bank Bypass Highway 101 to the Beaver Bank Road Halifax County, NS NOVA SCOTIA DEPARTMENT OF THE ENVIRONMENT

More information

WAMBO COAL PTY LTD ENVIRONMENTAL ASSESSMENT. ATTACHMENT 2 Relevant Environmental Planning Instruments and Government Policies

WAMBO COAL PTY LTD ENVIRONMENTAL ASSESSMENT. ATTACHMENT 2 Relevant Environmental Planning Instruments and Government Policies WAMBO COAL PTY LTD NORTH WAMBO UNDERGROUND MINE LONGWALL 10A MODIFICATION ENVIRONMENTAL ASSESSMENT ATTACHMENT 2 Relevant Environmental Planning Instruments and Government Policies A2 PLANNING FRAMEWORK

More information

DRAFT ENVIRONMENTAL IMPACT STATEMENT

DRAFT ENVIRONMENTAL IMPACT STATEMENT DRAFT ENVIRONMENTAL IMPACT STATEMENT FOR VILLAGE VIEW ESTATES VILLAGE OF WARWICK, ORANGE COUNTY, NEW YORK Garling Associates November 21, 2006 Date of Complete Filing: December 4, 2006 Village View, LLC

More information

Environmental Impact Statement for the Slave Falls Tramway Conversion Project

Environmental Impact Statement for the Slave Falls Tramway Conversion Project Environmental Impact Statement for the Slave Falls Tramway Conversion Project Prepared for Submitted by 41844.101 March 2008 ENVIRONMENTAL IMPACT STATEMENT FOR THE SLAVE FALLS TRAMWAY CONVERSION PROJECT

More information

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited

Shell Quest Carbon Capture and Storage Project. Shell Canada Limited SCREENING SCOPING DOCUMENT For the proposed Shell Quest Carbon Capture and Storage Project Shell Canada Limited Prepared by: Canadian Environmental Assessment Agency Natural Resources Canada Fisheries

More information

BENGALLA Mining Company. Contamination Assessment

BENGALLA Mining Company. Contamination Assessment BENGALLA Mining Company U Contamination Assessment U CONTINUATION OF BENGALLA MINE PRELIMINARY CONTAMINATION ASSESSMENT Prepared by: HANSEN BAILEY 6 / 127 129 John Street SINGLETON NSW 2330 July 2013 For:

More information

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10

22.1 ISSUES OBJECTIVES POLICIES RULES PERFORMANCE STANDARDS 10 22 NETWORK UTILITIES 22.1 ISSUES 3 22.2 OBJECTIVES 4 22.3 POLICIES 4 22.4 RULES 6 22.5 PERFORMANCE STANDARDS 10 Whanganui District Plan (15 January 2018) Chapter 22 Network Utilities 22-1 22 NETWORK UTILITIES

More information

Annex F Scoping Checklist

Annex F Scoping Checklist Scoping Checklist Table F1: Scoping Checklist Table. Questions to be considered in Scoping /? Which Characteristics of the Project 1. Will construction, operation or decommissioning of the Project involve

More information

Advice to decision maker on coal mining project

Advice to decision maker on coal mining project . Advice to decision maker on coal mining project IESC 2015-063: West Muswellbrook Project New Development Requesting agency The New South Wales Mining and Petroleum Gateway Panel Date of request 27 January

More information

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017

Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach. October 2017 Noront Ferrochrome Production Facility (FPF) Environmental Issues and Approach October 2017 (Simulated FPF) INTRODUCTION Noront is proposing to develop a Ferrochrome Production Facility (FPF) in Northern

More information

STATEMENT OF ENVIRONMENTAL EFFECTS

STATEMENT OF ENVIRONMENTAL EFFECTS ABN: 82 003 061 890 STATEMENT OF ENVIRONMENTAL EFFECTS for Proposed Modification No 2 (MOD 2) to DA 344-11-2001 (Wallerawang Quarry) Prepared by: R.W. CORKERY & CO. PTY. LIMITED October 2018 This page

More information

Section 1: Introduction

Section 1: Introduction ENVIRONMENTAL ASSESSMENT 1-1 ALKANE RESOURCES LTD 1Section 1 Introduction PREAMBLE This section introduces the proposed ( the Project ) and includes: an outline of the scope of the Environmental Assessment;

More information

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No.

February Reference Section in Supplemental. Reference Section in Consultants Reports. Reference Section in Application. TOR No. Request i Final Terms of Environmental Impact Assessment Report for Coal Valley Resources Inc. (CVRI) Proposed Robb Trend Project Cross (Concordance) Table to Location in ii PURPOSE OF THE TERMS OF REFERENCE

More information

Section 75J of the Environmental Planning and Assessment Act 1979

Section 75J of the Environmental Planning and Assessment Act 1979 Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 As delegate of the Minister for Planning, the Planning Assessment Commission approves the project application referred

More information

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 1 INTRODUCTION October 2005 Contents 1. 1-1 1.1 Background 1-1 1.1.1 The Applicant 1-1 1.1.2 Growth in Container Trade 1-1 1.1.3

More information

ENVIRONMENTAL ASSESSMENT A3-1 INTEGRA COAL OPERATIONS PTY LTD. Glennies Creek Open Cut Coal Mine Report No. 642/03. Appendix 3

ENVIRONMENTAL ASSESSMENT A3-1 INTEGRA COAL OPERATIONS PTY LTD. Glennies Creek Open Cut Coal Mine Report No. 642/03. Appendix 3 ENVIRONMENTAL ASSESSMENT A3-1 INTEGRA COAL OPERATIONS PTY LTD Glennies Creek Open Cut Coal Mine (No. of pages excluding this page = 15) Consultation Record INTEGRA COAL OPERATIONS PTY LTD A3-2 ENVIRONMENTAL

More information

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and

Preliminary Disclosure; Application for Approval; Operating Permits, Volume 2: Licences and Approvals; and Abandonment Approval and Information required by EUB Guide G-23 1.0 GENERAL INFORMATION 1.1 INTRODUCTION The application should include: a brief project summary, objectives, approvals requested, technical and economic details,

More information

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement.

Santoy 8 Satellite Mine at the Seabee Gold Mine. Technical Review Comments. on the. Environmental Impact Statement. Environmental Impact Assessment Technical Review Comments on the Environmental Impact Statement as submitted by Claude Resources Inc. Saskatchewan Ministry of Environment December, 2009 1. INTRODUCTION

More information

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review

Environmental Management Plan Introduction Environmental Management Objectives Structure, Implementation and Review Environmental Management Plan Introduction This Environmental Management Plan (EMP) has been prepared for SEF Energy Co. Ltd. for the purpose of providing a stand-alone plan for managing the potential

More information

Stratford Extension Project Technical Overview

Stratford Extension Project Technical Overview Stratford Extension Project Technical Overview November 2012 Yancoal Australia Limited Level 11, 68 York Street Sydney NSW 2000 Stratford Coal Pty Ltd 3364 The Bucketts Way Stratford NSW 2422 PO Box 168

More information

Section 3. Legislative Framework and Impact Assessment Process

Section 3. Legislative Framework and Impact Assessment Process Section 3 Legislative Framework and Impact Assessment Process 22 Cameco Australia Pty Ltd 3. Legislative Framework and Impact Assessment Process 3.1 Key Legislative Requirements The Project requires environmental

More information

Environmental Management Plan (EMP)

Environmental Management Plan (EMP) SE DELI GS DRIFT MI E ORA GE RIVER MI ES MI I G ACTIVITIES A D PROPOSED EW I PIT SLIMES DISPOSAL Environmental Management Plan (EMP) Compiled for: Namdeb Diamond Corporation (Pty) Ltd Compiled by: Unit

More information

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra

For PROPOSED IT PARK. By M/s.Balewadi Tech Park Pvt.Ltd. Submitted to State Environment Expert Appraisal Committee III, Maharashtra Draft Terms of References (ToR) (Based on the model TOR given in Environmental Impact Assessment Guidance Manual for building construction projects by MoEF & CC) For PROPOSED IT PARK By M/s.Balewadi Tech

More information

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores

Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores October 2015 Environmental Impact Assessment of Lake Menindee Shallow Aquifer Test Bores WaterNSW on behalf of the NSW Government

More information

Stratford Extension Project

Stratford Extension Project Environmental Impact Statement ATTACHMENT 4 COMMUNITY INFORMATION Community Information NOVEMBER 2011 ABOUT GLOUCESTER COAL Gloucester Coal owns the Stratford Coal Mine and Bowens Road North Open Cut located

More information

Borrow Pit and Quarry Management Procedure Environmental

Borrow Pit and Quarry Management Procedure Environmental 1 Purpose and Scope This procedure specifies the operational environmental requirements relating to borrow pit (BP) and quarry management at the Roy Hill Project. This procedure applies to all personnel

More information

Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report

Inglewood Oil Field Specific Plan Project Draft Environmental Impact Report Draft Environmental Impact Report SCH No. 2015101030 Prepared for: City of Culver City Planning Division 9770 Culver Boulevard Culver City, California 90232 Prepared by: Psomas 225 South Lake Avenue Suite

More information

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions.

This summary and the Report subsequently inform the recommended mitigation contained in Section 28 and will inform the Project conditions. 18. Air The Project Air quality team prepared an Air Quality Assessment Report for the Project, which is included in Volume 3 (Part 1). The Report provides an assessment of air quality effects associated

More information

Appendix General Environmental Risk Analysis

Appendix General Environmental Risk Analysis Proposed Solar Power Station Near Moree, NSW (MOREE SOLAR FARM) Appendix Prepared by BP Solar & Walsh Consulting January 011 Background The body of the identifies all significant environmental risks identified

More information

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED

FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED FINAL TERMS OF REFERENCE ENVIRONMENTAL IMPACT ASSESSMENT REPORT FOR THE PROPOSED UTS ENERGY CORPORATION/TECK COMINCO LIMITED FRONTIER OIL SANDS MINE PROJECT Approximately 60 km from Fort McKay, Alberta

More information

Section 75J of the Environmental Planning and Assessment Act 1979

Section 75J of the Environmental Planning and Assessment Act 1979 Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 As delegate of the Minister for Planning and Infrastructure, the Planning and Assessment Commission of NSW approves the

More information

Environmental Design Criteria for Project Engineering

Environmental Design Criteria for Project Engineering Environmental Design Criteria for Project Engineering Argentina Mining, Salta, September 2018 Simon Catchpole, February 2016 An Environmental Risk Model In the EA phase, the environmental professionals

More information

August 3, The proposed action thus includes Site Plan approval for the Fire Department and Amended Site Plan approval for the Ambulance Corps.

August 3, The proposed action thus includes Site Plan approval for the Fire Department and Amended Site Plan approval for the Ambulance Corps. Scoping Document For Preparation of a Draft Environmental Impact Statement For the Putnam Valley Volunteer Fire Department Site Plan and Putnam Valley Volunteer Ambulance Corps Amended Site Plan Town of

More information

Format and Guideline for the Preparation of an Annual Environmental Management Report: SMALL MINE VERSION

Format and Guideline for the Preparation of an Annual Environmental Management Report: SMALL MINE VERSION Environmental Management Guidelines for Industry Format and Guideline for the Preparation of an Annual Environmental Management Report: SMALL MINE VERSION This form may be used as an alternative to the

More information

Rehabilitation, decommissioning and closure

Rehabilitation, decommissioning and closure Arafura Resouces Ltd Nolans volume one 18 Rehabilitation, decommissioning and closure Chapter 18 18. Rehabilitation, decommissioning and closure 18.1 Introduction This chapter describes the potential impacts

More information

CMPDI. 4.6 Mine Closure Plan

CMPDI. 4.6 Mine Closure Plan 4.6 Mine Closure Plan Post-mining Land Use Planning The mine closure planning with regard to for Lekhapani OCP will broadly involve the following aspects: 1. Technical Aspects 2 Environmental Aspects 2.

More information

19. ROADS AND TRANSPORT

19. ROADS AND TRANSPORT 19. ROADS AND TRANSPORT This section provides a summary of the road and transport values within and surrounding the project development area and an assessment of the potential for these values to be affected

More information

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary

TABLE OF CONTENTS. Title page Table of contents List of tables List of figures Non- technical summary TABLE OF CONTENTS Title page Table of contents List of tables List of figures Non- technical summary Page i ii vii viii ix CHAPTER 1: INTRODUCTION 1 1.1 Project Background 1 1.2 Aims and Objectives 3 1.3

More information

Victorian Desalination Project

Victorian Desalination Project Victorian Desalination Project D&C Utilities Environmental Management Plan Attachment D List of Technical Reports and Documents (Environmental) DOCUMENT NUMBER TDV 0 EV AT 0012.D 03 ATTACHMENT D LIST OF

More information

JW/docDM AEE for Non-Minimum Impact Activities

JW/docDM AEE for Non-Minimum Impact Activities ASSESSMENT OF ENVIRONMENTAL EFFECTS FOR NON-MINIMUM IMPACT ACTIVITIES UNDER THE CROWN MINERALS ACT 1991 Information Required in Support of an Application Under Section 59 of the Crown Minerals Act 1991

More information

Fact Sheet: Anglesea Power Station and Mine Rehabilitation Overview

Fact Sheet: Anglesea Power Station and Mine Rehabilitation Overview Fact Sheet: Anglesea Power Station and Mine Rehabilitation Overview After 46 years of operation Alcoa s Anglesea Power Station and Coal Mine was permanently shut down on 31 August 2015. The planning for

More information

BLAST MANAGEMENT STRATEGY

BLAST MANAGEMENT STRATEGY BLAST MANAGEMENT STRATEGY For Boggabri Tarrawonga Maules Creek Complex J U L Y 2 0 1 4 Idemitsu Australia Resources Boggabri Coal Pty Ltd Whitehaven Coal Pty Ltd Tarrawonga Coal Pty Ltd, Maules Creek Coal

More information

Environmental Impact Assessment (EIA)

Environmental Impact Assessment (EIA) Environmental Impact Assessment (EIA) as a tool for sustainable mining Cheryl E. Wasserman Associate Director for Policy Analysis Office of Federal Activities Office of Enforcement and Compliance Assurance

More information

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening

Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the. Twin Creeks Landfill Environmental Screening Welcome Waste Management of Canada Corporation (WM) is pleased to welcome you to Public Open House #2 for the Please take a few moments to browse the display material and talk to our staff and consultants.

More information

What is the Terms of Reference?

What is the Terms of Reference? What is the Terms of Reference? Framework for content of the Environmental Assessment Certificate Application Provides the scope of technical studies and consultation processes with the public and First

More information

Appendix G Revised commitments

Appendix G Revised commitments Appendix G Revised commitments April 2014 s The table below provides a summary of all commitments identified in the NGBR Project Environmental Impact Statement (EIS) and Additional information to the Environmental

More information

Australia Pacific LNG Project. Volume 1: Overview Chapter 6: APLNG Commitments

Australia Pacific LNG Project. Volume 1: Overview Chapter 6: APLNG Commitments Australia Pacific LNG Project Contents 6. Australia Pacific LNG commitments... 1 6.1 Commitments gas fields... 1 6.1.1 Stakeholder engagement... 1 6.1.2 Climate... 1 6.1.3 Geology and soils... 1 6.1.4

More information

City of Bishop. Environmental Checklist Form

City of Bishop. Environmental Checklist Form City of Bishop Environmental Checklist Form 1. Project title: Environmental Review / 2007 California Building Codes 2. Lead agency name and address: City of Bishop 377 W. Line Street Bishop, Ca 93514 3.

More information

BACKGROUND INFORMATION DOCUMENT

BACKGROUND INFORMATION DOCUMENT BACKGROUND INFORMATION DOCUMENT Environmental and Social Impact Assessment (ESIA) December 2017 Malingunde Graphite Project, Lilongwe District, Malawi Purpose of this document This document provides information

More information

State Policies, Position Statements, Guidelines and Strategies

State Policies, Position Statements, Guidelines and Strategies State Policies, Position Statements, Guidelines and Strategies Policies EPA DRAFT State Environmental (Ambient Air) Policy (2009b) Department of Water (DoW) state-wide Policy No. 5 Environmental Water

More information

Division 15 Earthworks Code (including Lot Filling)

Division 15 Earthworks Code (including Lot Filling) Division 15 Earthworks Code (including Lot Filling) 12.15.1 Earthworks Code (1) The provisions in this division comprise the (2) They are compliance with the Earthworks Code (Section 12.15.2); overall

More information

CONCLUSIONS 14 CONTENTS

CONCLUSIONS 14 CONTENTS CONTENTS Introduction... 14-1 Traffic... 14-1 Air Quality... 14-1 Noise and Vibration... 14-2 Geology and Hydrology... 14-2 Landscape and Visual... 14-3 Ecology... 14-4 Cultural Heritage... 14-4 Population

More information

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION October 2005 Measures Contents 21. 21-1 21.1 Introduction 21-1 21.2 Construction 21-1

More information

Environmental Impact Assessment Report

Environmental Impact Assessment Report Environmental Impact Assessment Report Volume I (Main Document) Residential Development at Barnhall Leixlip Co. Kildare on behalf of Ardstone Homes Ltd. December 2017 Volume I (Main Document) December

More information

Section 75J of the Environmental Planning and Assessment Act 1979

Section 75J of the Environmental Planning and Assessment Act 1979 Project Approval Section 75J of the Environmental Planning and Assessment Act 1979 I, the Minister for Planning, approve the project referred to in schedule 1, subject to the conditions in schedules 2

More information

Leading Practice and Mine Closure Australian Centre for Sustainable Mining Practices

Leading Practice and Mine Closure Australian Centre for Sustainable Mining Practices Leading Practice and Mine Closure Australian Centre for Sustainable Mining Practices David Laurence Australian Centre for Sustainable Mining Practices With thanks to Graeme McIlveen and Daniel Franks,

More information

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview...

List of Figures... xii. List of Tables... xiii. List of Appendices...xv. Glossary... xvii Project Summary and Facility Overview... BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Blue Creek Wind Farm Amendment Table of Contents Text sections that have been updated for

More information

Murra Warra Wind Farm Project Environmental Management Plan

Murra Warra Wind Farm Project Environmental Management Plan 1. Introduction This (EMP) covers the pre-construction, construction, operation and decommissioning phases for the Murra Warra Wind Farm Project. RES Australia recognises the importance of reducing human

More information

Appendix M. Criteria, Measures and Indicators for Effects Assessment

Appendix M. Criteria, Measures and Indicators for Effects Assessment Appendix M Criteria, Measures and Indicators for Effects Assessment Appendix M. Criteria, Measures and Indicators for Effects Assessment Objective 1: Naturalization Changes to Aquatic Habitat Disruption,

More information

BEFORE THE OHIO POWER SITING BOARD

BEFORE THE OHIO POWER SITING BOARD BEFORE THE OHIO POWER SITING BOARD Application of a Certificate of Environmental Compatibility and Public Need Table of Contents Page No. List of Figures... xii List of Tables... xiii List of Appendices...xv

More information

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover.

Network utilities, subject to compliance with Part 6 (Infrastructure) A.3 Existing vegetation cover. 5.3.2. Rural Zone 5.3.2.1. Permitted Activities 5.3.2.1.1. Residential, recreational, agricultural, exotic forestry or tourist related activities which comply with the standards for permitted activities

More information

Environmental Information Worksheet

Environmental Information Worksheet Environmental Information Worksheet Water System Owner (Attach additional sheets if necessary) Needs and Alternatives Provide a brief narrative that describes: Current drinking water system needs. Project

More information

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS

ELECTRICAL TRANSMISSION LINES & SUBSTATIONS TERMS OF REFERENCE ELECTRICAL TRANSMISSION LINES & SUBSTATIONS Notes for NEPA for Generic Terms of Reference This generic Terms of Reference (TOR) is applicable to development projects involving the construction

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report

Terms of Reference. As Required by the Environment Act For Preparation of an Environmental Assessment Report The public is invited to submit comments on this draft Terms of Reference until : Comments should be submitted to : January 21, 2008 Environmental Assessment Branch Nova Scotia Environment and Labour PO

More information

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories:

5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT. The scope of the EIA falls under three broad categories: 5 SCOPE OF THE ENVIRONMENTAL IMPACT ASSESSMENT 5.1 INTRODUCTION The scope of the EIA falls under three broad categories: technical scope; spatial scope; and temporal scope. The scoping process for the