2 ABC Oil and Gas August 15th, 2016 Report No: SMP-0003 ABC Wellsite Chemical Injection Addition Powered by Solaris-MCI

3 Contents Executive Summary Assumptions Napkin Assumptions Client Discussed Assumptions Ogee Assumptions Scope of Assessment Results Assessment Configuration Estimate Estimate Basis Future Considerations Additional Requirements 8 Appendix A: Client Supplied Ogee Napkin 10 Appendix B: Ogee Marked-up Drawing 13 Powered by Solaris-MCI Page 2

4 Executive Summary The two wells located at the ABC wellsite have been experiencing operational issues due to wax build-up downhole. The build-up of wax in the wellbore can result in partial or complete loss of production for a well. The installation of a new chemical injection system will help remove existing wax buildup and can help prevent future build-ups. The chemical injection system consists of two pneumatic injection pumps, one double walled plastic chemical storage tank and associated stainless steel tubing, valves and fittings. Ogee has provided a Total Installed Cost estimate of $72,500 (-20%/+40%) for a proposed configuration based on the process conditions and drawings submitted for the ABC Wellsite. Ogee has also identified future considerations, including engineering requirements, to progress this scope to the next phase. 1.0 Assumptions 1.1 Napkin Assumptions As per your information submitted through the Ogee napkin on August 10 th, 2016: Assessment Type: Location: Commodity: Sweet/Sour: Wellsite ABC Wellsite Natural Gas Sour Conditions: Two wells at have been experiencing issues with wax build up. The wax issues have required the wells to be shut-in, which has resulted in a loss of production. A chemical injection system is required to deal with the production issues with these wells. Powered by Solaris-MCI Page 3

5 A copy of the submitted Ogee Napkin is included in Appendix A. 1.2 Client Discussed Assumptions As per the Ogee kick-off call on August 19th, 2016, the following are the assumptions discussed with the client: Operating pressure: 2,100 kpag, Operating temperature: 25 o C, Wellhead shut-in pressure: 25,000 kpag, Wellhead flow rate: 25 e 3 m 3 /d, Up to 40 liters per day of chemical injection needed, Fuel gas source is available for pump. 1.3 Ogee Assumptions The following are assumptions Ogee has made to complete this report: Plot space is available for the addition tank, Space is available in the existing heater/meter building, Piling is not required for the tubing, An injection point is available at the wellhead. 2.0 Scope of Assessment Ogee has reviewed the option of adding chemical pumps to the existing line heater/meter building. The chemical injection pumps will pump wax dispersant at a high pressure into the wellhead and will aid with the removal and prevention of wax build-up. In addition to the chemical pumps, the chemical injection system will also need stainless steel tubing, fittings and valves, as well as a level gauge and chemical storage tank with piles. Powered by Solaris-MCI Page 4

6 This option was chosen due to the following: Low cost option when comparted to well servicing operations, Operations able to adjust pump rates as required to minimize chemical consumption, Ability to service pump/tanks while the wellsite is operational for short duration without chemical injection capabilities. 3.0 Results 3.1 Assessment Pump Selection: Ogee has reviewed the design and operating conditions provided and has selected a Williams CP250V225 plunger pump. The Williams plunger pump comes with 316SS internals, stoke adjustability, dual sealing and is powered instrument gas. The CP250V225 model has the capability of injecting 2.16 liters per hour at a pressure up to 49,600 kpag. An instrument gas pressure range of 30 to 100 psig is required. The suction and discharge tubing should be made from stainless steel tubing. A liquid PSV will be required on the pump discharge for over pressure protection. For greater flexibility, one pump per wellhead should be used. Storage Tank Selection: A double walled polyethylene storage tank with 110% secondary containment is recommended since this type of tank is ideal for storing chemicals. A storage capacity of 1,000 gallons (3,785 liters) will allow for up to 36 days of operation when two pumps are operating at maximum flow conditions. The storage tank will come equipped with a level gauge, truck-in fill connection and grounding cable. Powered by Solaris-MCI Page 5

7 Tie-Ins: The chemical injection system will require the following tie-ins: Instrument gas, Produced gas (at wellheads). 3.2 Configuration The two pumps for the chemical injection system should be installed in the existing line heater/meter skid. If there is not enough room in the skid, a small enclosure can be used to house the pumps, but this has not been taken into consideration with the estimate provided. Instrument gas will be required to power the pumps. Tubing will need to be routed to the power end of the pump from the instrument gas tie-in. Tubing will need to be routed from the tank outlet to the suction side of the pump. Refer to vendor requirements for the elevation difference between the tank outlet and suction inlet. Tubing from the pump discharge to the injection point at the wellhead should be routed with the existing piping or cable tray to/from the wellhead. Vent tubing shall be routed from the pump to a location that will allow for safe venting. It is recommended that vent tubing is extended above the building eave, in accordance with area classification per the Canadian Electrical Code. A muffler can be installed on the tubing vent to reduce the noise associated with venting. The chemical tank should be installed next to the existing tank for trucking access for fill-ups. See Appendix B for Ogee marked-up drawings of a proposed configuration on the client-supplied PFD. Powered by Solaris-MCI Page 6

8 3.3 Estimate The estimate for the configuration is provided in Table 1 below. Table 1: Estimate of Recommendation ITEM QUANTITY UNIT TOTAL COST Equipment 1 Chemical Pump 2 Each $8,000 2 Storage Tank w/ Top fill, Hose, Sight glass 1 Each $4,500 3 Stainless Steel Tubing 75 $/m $700 4 Piles and Structural Steel 1 Lot $7,000 5 Total Equipment $20,700 6 Construction Labour Costs $25,300 7 Total Indirect Costs $15,000 Subtotal $61,000 7 Transportation Allowance 1 Lot $600 8 Contingency 15 % $10,900 TOTAL INSTALLED COST (TIC) $72,500 ESTIMATE RANGE (-20% to +40%) $58,000 to $101, Estimate Basis The Total Equipment Cost Estimate (Line Item 5 of Table 1) is based on the purchase of equipment by Solaris-MCI for projects of similar scope. The Total Construction Labour Cost Estimate (Line Item 6 of Table 1) is based on the experience of Solaris-MCI with this type of installation and includes estimates for piling, earthworks, installation materials, programming/commissioning, engineering and professional services. Powered by Solaris-MCI Page 7

9 3.5 Future Considerations The following items will need to be addressed in future phases: Process Requirements: During the detailed design phase, the following will need to be addressed and designed: Instrument gas take-off, Suction pressure requirements based vendor data, Suction and discharge tubing sizing. Mechanical Requirements: During the detailed design phase, the following will need to be addressed and designed: Tubing routing, Tubing material and wall thickness selection. Civil / Structural Requirements: During the detailed design phase, the following will need to be addressed and designed: Piling and support design. Regulatory Requirements: As required by governing bodies. 3.6 Additional Requirements In the event that you require this project to be carried to the detailed engineering phase, Ogee will connect you with Solaris-MCI, our fully-integrated, multi-discipline engineering firm, to discuss options. Powered by Solaris-MCI Page 8

10 Note: This document is not an engineering or design document. This document is provided for general information purposes only and does not replace the requirements and details in the acts, regulations, standards and other applicable documentation, including any amendments, updates, revisions, etc. The user is still responsible for ensuring that the facility or pipeline complies with all requirements, irrespective of the information provided in this document. Powered by Solaris-MCI Page 9

11 Appendix A: Client Supplied Ogee Napkin Powered by Solaris-MCI Page 10

12 Powered by Solaris-MCI Page 11

13 Powered by Solaris-MCI Page 12

14 Appendix B: Ogee Marked-up Drawing Not For Construction Powered by Solaris-MCI Page 13

ABC Oil and Gas. Aug 19 th, Report No: SMP-0002 Budgetary Plant Estimate. Powered by Solaris-MCI

ABC Oil and Gas. Aug 19 th, Report No: SMP-0002 Budgetary Plant Estimate. Powered by Solaris-MCI ABC Oil and Gas Aug 19 th, 2016 Report No: SMP-0002 Budgetary Plant Estimate Powered by Solaris-MCI Contents Executive Summary 3 1.0 Assumptions 3 1.1. Napkin Assumptions 3 1.2. Client Discussed Assumptions

More information

System & Equipment Checkout Procedure Client Name Plant Location

System & Equipment Checkout Procedure Client Name Plant Location System & Equipment Checkout Procedure Client Name Plant Location Procedure Title: Boiler Feed Water System Prepared By: Applied Performance Strategies 1 of 7 Approved By: Date: 01/11/08 Date: Purpose:

More information

Plunger pumps are used in a wide variety of

Plunger pumps are used in a wide variety of Kelly Eberle and Cajetan Ijeomah, Wood Group, Canada, outline a case study of vibration-induced cracks in a plunger pump piping system. Plunger pumps are used in a wide variety of applications, such as

More information

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer.

.1 All equipment, controls and accessories to be compatible with system design, and matched to the steam boiler(s) by the boiler Manufacturer. Construction of Sodium Hypochlorite and Chemical Storage Buildings Page 1 of 7 1. GENERAL 1.1 Scope.1 Boiler feed tank and pumps..2 Blowdown tanks..3 Water Softener System 1.2 Quality Assurance.1 All equipment,

More information

TCO Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum

TCO Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum TCO Future Growth Project - Wellhead Pressure Management Project Construction Contractors Forum FGP-WPMP Major Construction Scope Overview Jorge Calvo 30 January 2017 Atyrau, Kazakhstan Tengizchevroil

More information

SECTION HVAC WATER TREATMENT

SECTION HVAC WATER TREATMENT PART 1 - GENERAL 1.1 DESCRIPTION SECTION 23 25 00 SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between //-----// if not applicable to project. Also delete any other item or paragraph

More information

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014

Measurement Schematics & Facility Delineation Requirements Required by September 11, 2014 Alberta Energy Regulator (AER) Directive 017 - Measurement Requirements for Oil and Gas Operations Version - September 2012 Measurement Schematics & Facility Delineation Requirements Required by September

More information

Custom Systems Built to Exacting Client Specification

Custom Systems Built to Exacting Client Specification Custom Systems Built to Exacting Client Specification Laboratory Reactor Systems Parr Instrument Company is pleased to work with customers in the design and assembly of complete laboratory or pilot plant

More information

SECTION PACKAGE BOOSTER PUMP STATIONS

SECTION PACKAGE BOOSTER PUMP STATIONS SECTION 331223 PACKAGE BOOSTER PUMP STATIONS Scope: The Contractor shall install a pump station at two locations to be determined by the Owner. These pump stations shall be designed to deliver flow to

More information

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM

DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM DANGEROUS GOODS PETRO INDUSTRIAL TANK COMPLIANCE CHECKLIST FORM Tank Manufacturer : Consultant Ref No. File No. PETRO Industrial Pty Ltd Kelvin Cooper - Accreditation Number 6IM055 KGC 150213 Proposed

More information

Modular Oil & Gas Equipment Onshore & Offshore

Modular Oil & Gas Equipment Onshore & Offshore Modular Oil & Gas Equipment Onshore & Offshore Separators & Desalters AI Energy Solutions onshore and offshore oil process solutions offer innovative technologies packaged with global project management

More information

CONSTRUCTION DRAWINGS

CONSTRUCTION DRAWINGS CONSTRUCTION DRAWINGS LANDFILL GAS COLLECTION AND CONTROL SYSTEM (GCCS) CONSTRUCTION REQUEST FOR BID NO. 18-0197 ORTH WILMINGTON, NORTH CAROLINA 28401 (704) 504-3107 TITLE SHEET SCS JOB NO. MARCH 2018

More information

Adam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False

Adam Sweet 2KGAL DW AST DUAL FUEL STORAGE TANK FOR A GENERATOR - NO DRAWINGS 5/9/2017 False Above Ground Concrete Encased Fuel Storage Tank System Category: Tanks Project ID #: 1004373561 Street Address: To Be Announced Woodstock CT Staff Estimate Value $60,000.00 06281 County: Windham Stage:

More information

SHREE DUJA SPRAY EQUIPMENTS

SHREE DUJA SPRAY EQUIPMENTS ELECTRIC DRILL INJECTION PISTON PUMP - SD 04 SD-04 is one-component grouting injector which is used to inject epoxy or polyurethane filling materials to water-leaking cracks. SD-04 is a professional Injection

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 11241 - Chlorination System (On-site Sodium Hypochlorite Generation System) C O N T E N T S PART 1 - GENERAL... 1 1.01 Scope... 1 1.02 Scope of Work... 1 1.03

More information

Appendix 13 - South Pierson Unit No 3 Planned Corrosion Control Program

Appendix 13 - South Pierson Unit No 3 Planned Corrosion Control Program Appendix 13 - South Pierson Unit No 3 Planned Corrosion Control Progra Injection Wells Fiberglass tubing throughout the wellbore Wetted surfaces coated downhole packer Corrosion inhibited water in the

More information

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD

EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD EL DORADO COUNTY REGIONAL FIRE PROTECTION STANDARD Fire Water Supply without a Purveyor Residential & Commercial STANDARD #D-003 EFFECTIVE 01-04-2016 1. PURPOSE 1.1. The California Fire Code (CFC) requires

More information

FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS

FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS FreezeFree TM Automated Anti-Icing System GENERAL SPECIFICATIONS I. GENERAL All FreezeFree Automated Anti-Icing Systems shall be designed and manufactured by Energy Absorption Systems, Incorporated, of

More information

AMENDMENTS TO OPSS 910 (NOV 88) CONSTRUCTION SPECIFICATION FOR PRESTRESSED CONCRETE CAST-IN-PLACE 1

AMENDMENTS TO OPSS 910 (NOV 88) CONSTRUCTION SPECIFICATION FOR PRESTRESSED CONCRETE CAST-IN-PLACE 1 Works and Emergency Services CITY OF TORONTO TS 910 TRANSPORTATION SERVICES STNADARD CONSTRUCTION SPECIFICATIONS June 2001 AMENDMENTS TO OPSS 910 (NOV 88) CONSTRUCTION SPECIFICATION FOR PRESTRESSED CONCRETE

More information

SECTION CHEMICAL FEED SYSTEM

SECTION CHEMICAL FEED SYSTEM SECTION 11800 PART 1 GENERAL 1.1 SUMMARY A. This section includes the requirements for the chemical feed system shall be a complete turnkey system inclusive of all necessary fluid handling and ancillary

More information

LABORATORY & DEIONIZED WATER SYSTEMS DESIGN AND CONSTRUCTION STANDARD

LABORATORY & DEIONIZED WATER SYSTEMS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL 1.01 Purpose A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Captor Containment DOUBLE WALL TANK SYSTEMS.

Captor Containment DOUBLE WALL TANK SYSTEMS. Captor Containment DOUBLE WALL TANK SYSTEMS Captor Containment System Protects Bulk Storage Profits Without Jeopardizing Safety or the Environment Flanged Outlets and other fitting designs can be securely

More information

GRUNDFOS alldos Data Booklet. Configurable Dosing Tank Stations

GRUNDFOS alldos Data Booklet. Configurable Dosing Tank Stations GRUNDFOS alldos Data Booklet DTS Configurable General / Functional scheme General description Dosing tank stations are designed for storing and dosing liquid chemicals. They can be configured with the

More information

Innovative Multiphase Extraction Design Operating above the Upper Flammability Limit (UFL). Stuart Torr. M.Eng. EIT. October 2005 SYSTEM DESIGN GROUP

Innovative Multiphase Extraction Design Operating above the Upper Flammability Limit (UFL). Stuart Torr. M.Eng. EIT. October 2005 SYSTEM DESIGN GROUP Innovative Multiphase Extraction Design Operating above the Upper Flammability Limit (UFL). Stuart Torr. M.Eng. EIT October 2005 SYSTEM DESIGN GROUP Introduction Background Design Challenges Objectives

More information

Captor Containment. DOUBLE WALL TANK SYsTEMS.

Captor Containment. DOUBLE WALL TANK SYsTEMS. Captor Containment DOUBLE WALL TANK SYsTEMS Captor Containment System Protects Bulk Storage Profits Without Jeopardizing Safety or the Environment Flanged Outlets and other fitting designs can be securely

More information

C. heating turbine exhaust steam above its saturation temperature. D. cooling turbine exhaust steam below its saturation temperature.

C. heating turbine exhaust steam above its saturation temperature. D. cooling turbine exhaust steam below its saturation temperature. P74 (B2277) Condensate depression is the process of... A. removing condensate from turbine exhaust steam. B. spraying condensate into turbine exhaust steam. C. heating turbine exhaust steam above its saturation

More information

Amjad Abdelrahman Amber Helm

Amjad Abdelrahman Amber Helm Amjad Abdelrahman Amber Helm Production Chemicals Optimization Congress June 29-30, 2016 PETROLEUM CORPORATION 1 Outline Area and System Overview Flow Assurance Challenges Chemical Treatments Optimization

More information

FABCO INDUSTRIES, Inc STORMBASIN FILTER CARTRIDGE TEST REPORT: CLEAN FLOW RATE OILS AND GREASE EFFECTIVENESS. Prepared by:

FABCO INDUSTRIES, Inc STORMBASIN FILTER CARTRIDGE TEST REPORT: CLEAN FLOW RATE OILS AND GREASE EFFECTIVENESS. Prepared by: FABCO INDUSTRIES, Inc STORMBASIN FILTER CARTRIDGE TEST REPORT: CLEAN FLOW RATE OILS AND GREASE EFFECTIVENESS Prepared by: Fabco Industries 66 Central Ave Farmingdale, NY 11735 Tel: 631 393 6024 John Peters

More information

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION HVAC PIPES AND TUBES SECTION 23 20 00 - HVAC PIPES AND TUBES PART 1 - GENERAL 1.1 SUMMARY: A. Section includes pipe and pipe fittings for: heating water, chilled water, steam and steam condensate, condenser water, glycol,

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin February 2019 Page 1 of 8 2018 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and bonding Rule 10-102 Grounding electrodes Replacing metal water service lines

More information

of abt. $ 60 million on annual basis. The $ 60 million would then be used to cover salary and maintenance, which is estimated to be around $ 10

of abt. $ 60 million on annual basis. The $ 60 million would then be used to cover salary and maintenance, which is estimated to be around $ 10 SUMMARY The invention relates to cost efficient ways to lift seawater to extreme heights, with the intention to produce electricity. To do so, we will use pressure 1200 meters below the seabed and introduce

More information

Storage and Dispensing Locations

Storage and Dispensing Locations Instructor Manual Module 5 Storage and Dispensing Locations Module Objective Upon completion of this module, participants should be able to discuss common locations for storage and dispensing of ethanol-blended

More information

MCBERNS ZC SERIES ODOUR FILTERS STANDARD SPECIFICATION

MCBERNS ZC SERIES ODOUR FILTERS STANDARD SPECIFICATION MCBERNS ZC SERIES ODOUR FILTERS STANDARD SPECIFICATION 1 INTRODUCTION The McBerns ZC series odour filters are designed for sewage pump stations, trunk sewerage systems, storage tanks, sewer air release

More information

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS

PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS PACKAGED SYSTEMS INSTALLATION INSTRUCTIONS NOTE! To the installer: Please make sure you provide this manual to the owner of the equip ment or to the responsible party who maintains the system. Part #FMF-03-333

More information

DNV GL Gas ready notation

DNV GL Gas ready notation MARITIME DNV GL Gas ready notation ISTEC WG on Alternative Fuels Olav Tveit 12th February 2015 1 DNV GL 2013 12th February 2015 SAFER, SMARTER, GREENER 2 Purpose of a GAS READY notation Preparation of

More information

Homework of Chapter (5)

Homework of Chapter (5) Dead Line: Wednesday (18/04/2018) The Islamic University of Gaza, Instructors: Dr. Khalil M. Al Astal Civil Engineering Department, Hydraulics -Discussion, Second semester, 2018. T.A: Eng. Mohammed AbuRahma

More information

Effluent Decontamination

Effluent Decontamination Effluent Decontamination A LARGE RANGE OF SYSTEMS FOR LABS AND BIO-INDUSTRIES Batch and Continuous Technologies EFFLUENT DECONTAMINATION SYSTEMS FOR LABS AND BIOFACILITIES FROM 3 TO 47,500 GALLONS PER

More information

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems:

A. This Section includes the following sump pumps and accessories, inside the building, for building storm drainage systems: SECTION 221429 - SUMP PUMPS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Pipe Jacking. Japan Sewage Works Association

Pipe Jacking. Japan Sewage Works Association Pipe Jacking Japan Sewage Works Association June, 2013 1 Pipe Jacking Yosuke Matsumiya y.matsumiya@ngsk.or.jp Japan Sewage Works Association Suisui Bldg. 2-10-12 Uchikanda, Chiyodaku Tokyo 101-0047 Japan,

More information

Tentative rules for Gas ready ships

Tentative rules for Gas ready ships RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 35 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Tentative rules for Gas ready ships JANUARY 2015 The electronic pdf version of this document

More information

Natural Gas STAR Methane Challenge Program: Supplementary Technical Information for ONE Future Commitment Option

Natural Gas STAR Methane Challenge Program: Supplementary Technical Information for ONE Future Commitment Option Natural Gas STAR Methane Challenge Program: Supplementary Technical Information for ONE Future Commitment Option 1 Contents Introduction... 4 Methane Challenge Program Reporting... 4 Emission Sources...

More information

Bill of Quantity (BOQ)

Bill of Quantity (BOQ) Bill of Quantity (BOQ) PART-I : FIRE FIGHTING SYSTEM. Sr No Description Qty Unit Rate/Unit Amount 1 Dismantling, loading, shifting and unloading of following Fire Fighting Equipments from Berth No.8 to

More information

SECTION CISTERN SYSTEMS

SECTION CISTERN SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 33 49 23 CISTERN SYSTEMS A. Cistern Tanks (Above Grade and Underground) B. Tank Anchoring Hardware C. Storm Water Cleaning Equipment D. Cistern Pump Stations

More information

RJ Engineering Systems, Inc. Company Profile

RJ Engineering Systems, Inc. Company Profile RJ Engineering Systems, Inc. Company Profile about us Specialists in system design, engineering, procurement & manufacturing RJ Engineering Systems, Inc (RJES) is a manufacturer of custom engineered equipment

More information

Description [in natural gas volume] Emissions estimated from size of breach / pressure / duration calculation

Description [in natural gas volume] Emissions estimated from size of breach / pressure / duration calculation SoCalGas Rulemaking (R.) 15-01-008 to Adopt Rules and Procedures Governing Commission Regulated Natural Gas Pipelines and Facilities to Reduce Natural Gas Leaks Consistent with Senate Bill 1371, Leno.

More information

SODIUM HYPOCHLORITE PORTABLE DOSING UNIT. Max Hadzidimitriou. Yarra Valley Water

SODIUM HYPOCHLORITE PORTABLE DOSING UNIT. Max Hadzidimitriou. Yarra Valley Water SODIUM HYPOCHLORITE PORTABLE DOSING UNIT Paper Presented by: Max Hadzidimitriou Authors: Max Hadzidimitriou, Project Manager, David Younger, Water Quality Engineer, Yarra Valley Water 73 rd Annual Water

More information

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TANK, POLYETHYLENE, HORIZONTAL LEG, MINIMUM 500 GALLON CAPACITY PUBLICATION

TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION TANK, POLYETHYLENE, HORIZONTAL LEG, MINIMUM 500 GALLON CAPACITY PUBLICATION TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION SPECIFICATION NO. DHT NO.: 153743 TANK, POLYETHYLENE, HORIZONTAL LEG, MINIMUM 500 GALLON CAPACITY PUBLICATION This specification is a product

More information

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION SPECIFICATION FOR PIPE CULVERT CONSTRUCTION 1. SCOPE Pipe culverts shall be constructed in accordance with this specification and in conformity with the lines, levels and cross-sections shown on the drawings.

More information

August 31, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

August 31, Via efiling. Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. Northern Natural Gas Company P.O. Box 3330 Omaha, NE 68103-0330 402 398-7200 August 31, 2018 Via efiling Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington,

More information

BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT

BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT 8-25-2016 BID ADDENDUM NO. 3 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT City of Vallejo Solano County, California 94589 Pre-Bid Meeting: 2:00 PM, Thursday,

More information

Figure2-DalySinclairField(01)

Figure2-DalySinclairField(01) Figure2-DalySinclairField(01) 10 anitoba Petroleum Branch Figure No. 2 5 5 5 : 7 7 ' 352326(' 6,1&/$,5 81,7 (%25 81,7 81,7 (:$57 81,7 ' (:$57 8 6,1&/$,5 81,7 7 ' '' 81,7 5 ' ' ' 5 5 : 7 FigureNo.3 Figure

More information

CHEMICAL INJECTION METHODS Pros & Cons

CHEMICAL INJECTION METHODS Pros & Cons CHEMICAL INJECTION METHODS Pros & Cons 1 Chemical injection is an integral component of any pipeline integrity program. The petroleum, chemical, and water treatment industries require chemical treatments

More information

TEXAS DEPARTMENT OF TRANSPORTATION PROCUREMENT DIVISION TANK, POLYETHYLENE, ELLIPTICAL LEG, MINIMUM 1235 GALLON CAPACITY

TEXAS DEPARTMENT OF TRANSPORTATION PROCUREMENT DIVISION TANK, POLYETHYLENE, ELLIPTICAL LEG, MINIMUM 1235 GALLON CAPACITY TEXAS DEPARTMENT OF TRANSPORTATION PROCUREMENT DIVISION TANK, POLYETHYLENE, ELLIPTICAL LEG, MINIMUM 1235 GALLON CAPACITY PUBLICATION This specification is a product of the Texas Department of Transportation

More information

2 FINDING OF THE POTENTIAL SITES

2 FINDING OF THE POTENTIAL SITES EXECUTIVE SUMMARY 1 Background S-1 2 User of Manual S-1 3 Applicable Range of Micro-hydro power in the Indonesia S-2 4 How to use this Manual S-2 Chapter 1 INTRODUCTION 1-1 1.1 Purpose of the Manual

More information

Oab~ HABD TECHNOLOGY FICO

Oab~ HABD TECHNOLOGY FICO "Our Vision is to become the leading niche of Oil and Gas products and. " services Oab~ HABD TECHNOLOGY FICO Technologv Fzeo Pioneering with WHCP, Testing units and Chemical injection skids Habu Technology

More information

Tank Modifications & Accessories

Tank Modifications & Accessories Tank Modifications & Accessories Proven Customisation Techniques Providing solutions to custom tank requirements, Polymaster Industrial offers its experienced assistance in the application of integrated

More information

COLLECTION AND DISTRIBUTION OF WATER

COLLECTION AND DISTRIBUTION OF WATER COLLECTION AND DISTRIUTION OF WATER Addis Ababa University Addis Ababa Institute of Technology Department of Civil Engineering Collection and Distribution of Water Deals with the transport of water from

More information

Specifications. 304 Stainless Steel Mesh Screen. Specifications

Specifications. 304 Stainless Steel Mesh Screen. Specifications Sample Intelligence SAMPLE CONDITIONING SAMPLE CONDITIONING HEATED SYSTEM SCHS The Welker SCHS properly conditions a flowing gas stream and protects analyzers from free liquids. A proven trio of liquid

More information

The following definitions apply with regard to requirements specified in this document:

The following definitions apply with regard to requirements specified in this document: GUIDELINES FOR INSTALLATION OF TEMPORARY AND PERMANENT ABOVEGROUND DIESEL FUEL TANKS FOR EMERGENCY AND STANDBY POWER SYSTEMS LOCATED OUTSIDE OF BUILDINGS For Use by Unidocs Member Agencies or where approved

More information

Troubleshooting Piping Systems

Troubleshooting Piping Systems Troubleshooting Piping Systems Last of Three Parts by Ray Hardee (Engineered Software, Inc.) Parts 1 and 2 of this series (Pumps & Systems, September and October 2015) discussed the engineering principles

More information

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers

Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Chlorinated Organics Closed Loop Unloading of Solvent Tank Trailers Closed loop unloading systems are designed to minimize solvent vapor emissions during transfer by exchanging the liquid solvent in the

More information

BID ADDENDUM NO. 2 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT

BID ADDENDUM NO. 2 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT 8-16-2016 BID ADDENDUM NO. 2 FOR SOLANO COUNTY TRANSIT OPERATIONS & MAINTENANCE FACILITY COMPRESSED NATURAL GAS PROJECT City of Vallejo Solano County, California 94589 Pre-Bid Meeting: 2:00 PM, Thursday,

More information

HISTORY AND COMMITMENT

HISTORY AND COMMITMENT COMPANY PROFILE HISTORY AND COMMITMENT Since 1989, National Environmental Systems has served the Remediation Professionals responsible for cleaning up our nation s hazardous waste sites. As we approach

More information

ELECTRICAL SAFETY Information Bulletin

ELECTRICAL SAFETY Information Bulletin ELECTRICAL SAFETY Information Bulletin March 2014 CEC-10 [rev-8] Page 1 of 8 CANADIAN ELECTRICAL CODE SUBJECT: Section 10 Grounding and Bonding Rule 10-204 Grounding Connections for Alternating-Current

More information

OBSOLETE. bladder tank assemblies

OBSOLETE. bladder tank assemblies October 9, 2006 Foam 180a 1. DESCRIPTION The Viking consists of an inner tank (bladder) fabricated of aflexible material (Buna-N over nylon) and an outer tank fabricated from carbon steel. A sight gauge

More information

DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS

DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS 5356 Hillside Avenue Indianapolis, IN 46220 P: +1 888-56-Water (569-2837) F: +1 317-255-4727 info@nancrede.com www.nancrede.com DETAILED EQUIPMENT SPECIFICATION MFS SERIES FILTERS 1.0 SCOPE 1.1 Provide

More information

TYPICAL INSTALLATION INSTRUCTIONS

TYPICAL INSTALLATION INSTRUCTIONS TYPICAL INSTALLATION INSTRUCTIONS Environment One Grinder Pump Feature Identification 1. Grinder Pump Basin High density polyethylene (HDPE) 2. Accessway Cover Painted Steel 3. Electrical Quick Disconnect

More information

Presented to the IAPMO Standards Review Committee on December 10, 2018

Presented to the IAPMO Standards Review Committee on December 10, 2018 Summary of Substantive Changes between the 2013 and the 2018 editions of ASME A112.3.4/CSA B45.9 Macerating Toilet Systems and Waste Pumping Systems for Plumbing Fixtures Presented to the IAPMO Standards

More information

Matthew Place, Battelle Ronald Hoeppel, NFESC Tanwir Chaudhry, Intergraph Corp. Sarah McCall, Battelle Travis Williamson, Battelle

Matthew Place, Battelle Ronald Hoeppel, NFESC Tanwir Chaudhry, Intergraph Corp. Sarah McCall, Battelle Travis Williamson, Battelle APPLICATION GUIDE FOR BIOSLURPING PRINCIPLES AND PRACTICES OF BIOSLURPING ADDENDUM : USE OF PRE-PUMP SEPARATION FOR IMPROVED BIOSLURPER SYSTEM OPERATION By Matthew Place, Battelle Ronald Hoeppel, NFESC

More information

SECTION E1 SUMP SYSTEM

SECTION E1 SUMP SYSTEM SUMP SYSTEM SS 182 A, A-aux. & C utilizes a Sump System to contain and send captured liquids back into the Skimmer Tank (ABM-1920). The Sump System consists of three sumps Sump Tank, ABH-1901 is located

More information

LIST OF DRAWINGS PLAN TITLE

LIST OF DRAWINGS PLAN TITLE LANDFILL SITE [CLOSED 00] PLAN.... 5. TITLE LIST OF DRAWINGS EXISTING PROCESS DIAGRAM PROPOSED PROCESS DIAGRAM EXISTING EQUIPMENT LAYOUT PLAN PROPOSED EQUIPMENT LAYOUT PLAN ELEVATION D AND DETAILS TREATMENT

More information

C.A.S.E. Air Carrier Section Policies and Procedures

C.A.S.E. Air Carrier Section Policies and Procedures FUEL STORAGE CHECKLIST Audit Date: Station Code: City: Vendor Name: Address: Primary Contact: Title: Phone: Fax: Auditor: Acceptable: Conditionally Acceptable Not Acceptable Register: (Circle One) Add

More information

PRODUCT CATALOGUE. for. smartphone / website / digital edition / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. smartphone / website / digital edition / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9192 REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed

More information

INTRODUCTION. TXAM also leads the field in manufacturing & marketing of totally solar powered chemical injectors. Our solar pumps produce

INTRODUCTION. TXAM also leads the field in manufacturing & marketing of totally solar powered chemical injectors. Our solar pumps produce COMPANY PROFILE INTRODUCTION Since 1986, TXAM has been an innovator in the manufacturing of safe chemical injectors. With an imaginative eye for the future, TXAM has designed, produced, field tested and

More information

ENBRIDGE GAS DISTRIBUTION METER BOX. Builder Installation Requirements February 2018

ENBRIDGE GAS DISTRIBUTION METER BOX. Builder Installation Requirements February 2018 ENBRIDGE GAS DISTRIBUTION METER BOX Builder Installation Requirements February 2018 Contents Introduction... 1 Contact Information... 2 Scope... 3 Meter Box PVC Configuration... 4 Meter Box Installation...

More information

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series

INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series INDUSTRIAL FILTRATION EQUIPMENT LWS Filter Series (Single, Twin, Triple or Quadruple Demand Systems) 1 P age filtration equipment can be engineered to solve complex commercial and industrial water treatment

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST White Rose Extension Project (WREP) EOI / Prequalification Drilling Utility EOI-101414-113 Mustang Canada, Inc is seeking prequalification responses from interested companies for

More information

Stretching NPSHA vs. NPSHR to the Limit

Stretching NPSHA vs. NPSHR to the Limit Feedwater Systems Reliability Users Group (Jan 2017) Austin, TX Stretching NPSHA vs. NPSHR to the Limit Presenter: Art Washburn P.E. DISCUSSION POINTS Two Rules to Get You Home and Plant Priorities Customer

More information

CHEMICAL WASTE OVERVIEW CONTINUED

CHEMICAL WASTE OVERVIEW CONTINUED CHEMICAL WASTE OVERVIEW CONTINUED Monitoring Systems Many State and local authorities require that the ph level of chemical waste discharged into the sewer is monitored and quite frequently that the results

More information

FLOWBACK & PRODUCTION TESTING SERVICES

FLOWBACK & PRODUCTION TESTING SERVICES FLOWBACK & PRODUCTION TESTING SERVICES PREPARED DEPENDABLE EFFICIENT CATHEDRAL ENERGY SERVICES PROVIDES FLOWBACK AND PRODUCTION TESTING SOLUTIONS TO NORTH AMERICAN ENERGY COMPANIES. FLOWBACK SERVICES SERVICES

More information

Econoclave Integration Features

Econoclave Integration Features Econoclave Integration Features The following photos are offered as comparison between ASC s autoclave and autoclave s from European suppliers (i.e. Scholz, Terruzzi, etc.) ASC s Econoclave features a

More information

Handling Fluid Fertilizers Selecting the Right Equipment Components

Handling Fluid Fertilizers Selecting the Right Equipment Components Handling Fluid Fertilizers Selecting the Right Equipment Components 9/2/2010 1 Considerations Systematic approach Compatible components Short term vs. long term Plan ahead for future expansion 9/2/2010

More information

Installation of CSST Gas Piping Systems

Installation of CSST Gas Piping Systems (What Inspectors Need To Know) May 2016 Conventional Arc-Resistant CSST Product Standard National Standard ANSI LC-1 Performance-based standard Listed system installed in accordance with manufacturer s

More information

Ridgidrain NBS Specification

Ridgidrain NBS Specification Ridgidrain NBS Specification July 2014 R12 DRAINAGE BELOW GROUND Polypipe Civils, Charnwood Business Park, North Road, Loughborough, Leicestershire, LE11 1LE. Tel: +44 (0)1509 615 100. Fax: 01509 610 215.

More information

SECTION COOLING TOWER

SECTION COOLING TOWER PART 1 GENERAL 1.1 SECTION INCLUDES A. Mechanical induced draft Cooling Tower B. Controls C. Ladder and handrails 1.2 REFERENCES SECTION 23 65 00 COOLING TOWER A. ANSI/AFBMA 9 - Load Rating and Fatigue

More information

Design study of ship LNG storage and engine feeding system. Gerasimos Theotokatos NAOME, University of Strathclyde

Design study of ship LNG storage and engine feeding system. Gerasimos Theotokatos NAOME, University of Strathclyde Design study of ship LNG storage and engine feeding system Gerasimos Theotokatos NAOME, University of Strathclyde Introduction This study focuses on the design of the LNG storage and feeding system of

More information

ASSE International Product (Seal) Listing Program. ASSE Outdoor Enclosures for Fluid Conveying Components

ASSE International Product (Seal) Listing Program. ASSE Outdoor Enclosures for Fluid Conveying Components ASSE International Product (Seal) Listing Program ASSE 1060-2017 Outdoor Enclosures for Fluid Conveying Components Manufacturer: Contact Person: E-mail: Address: Laboratory: Laboratory File Number: Model

More information

Case Study: Long Term Abandoned Mine Methane Recovery Operation in the U.S.

Case Study: Long Term Abandoned Mine Methane Recovery Operation in the U.S. Case Study: Long Term Abandoned Mine Methane Recovery Operation in the U.S. Methane to Markets Partnership-wide and Steering Committee Meeting, Monterrey, Mexico January 28, 2009 Presented by: Ronald C.

More information

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS

BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS BHS-FILTRATION INC. BHS VACUUM BELT FILTER, CANDLE & PRESSURE PLATE FILTER TECHNOLOGIES FOR BIO-ENERGY APPLICATIONS 1. Crop Feedstocks for Bio-Ethanol 2. Cellulose Feedstocks for Bio-Ethanol 3. Wood Feedstocks

More information

Calculate the Costs of Piping System Elements

Calculate the Costs of Piping System Elements Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure

More information

QUALITY ASSURANCE PROTOCOL (QAP)

QUALITY ASSURANCE PROTOCOL (QAP) PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this

More information

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS

GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS GUIDELINES FOR INSTALLATION OF ABOVEGROUND DIESEL FUEL TANKS Revised 1/1/17 Authority cited: California Fire Code; National Fire Protection Association 30 (NFPA) Flammable and Combustible Liquids Code

More information

TABLE OF CONTENTS DIVISION 22 - MECHANICAL

TABLE OF CONTENTS DIVISION 22 - MECHANICAL TABLE OF CONTENTS DIVISION 22 - MECHANICAL 22 00 00 PLUMBING WORK... 1 22 00 01 GENERAL... 1 22 00 02 REFERENCES, REGULATORY REQUIREMENTS... 1 22 00 03 RELATED SECTIONS of the SPECIFICATIONS... 1 22 00

More information

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED

Read Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Q45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park

Q45WQ. Water Quality Monitoring System. 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park Q45WQ Water Quality Monitoring System Home Office European Office Analytical Technology, Inc. ATI (UK) Limited 6 Iron Bridge Drive Unit 1 & 2 Gatehead Business Park Collegeville, PA 19426 Delph New Road,

More information

DESIGN PACKAGE. COMMONS PARK Twin Falls, Idaho

DESIGN PACKAGE. COMMONS PARK Twin Falls, Idaho DESIGN PACKAGE A WATER FEATURE HYDRAULIC DESIGN FOR COMMONS PARK Twin Falls, Idaho P16375-R5 6-16-17 Prepared by FOUNTAIN PEOPLE P.O. Box 807 4600 Highway 123 San Marcos, Texas 78666 SPECIAL DESIGN CONSIDERATIONS

More information

GPL Odorant Injection

GPL Odorant Injection GPL Odorant Injection Natural Gas Propane Biogas Accurate Advanced Technology Cost-Effective Planet Friendly Reliable Safe Advanced Technology, Cost-Effective, and Planet Friendly It just makes scents!

More information

Assessment Schedule - TS.5

Assessment Schedule - TS.5 The Assessor shall determine the business s commitment and support to good and safe working practices; also that it has a positive culture in all aspects of its work. In particular, the assessor shall

More information