Description of Services Activity W saiig Baseline Surveys and Verification

Size: px
Start display at page:

Download "Description of Services Activity W saiig Baseline Surveys and Verification"

Transcription

1 Description of Services Activity W saiig Baseline Surveys and Verification 1. BACKGROUND The Government of Australia extended the Indonesia Infrastructure Initiative (IndII) facility into phase 2 from July 2011 to June A central component of the IndII facility is the Australia Indonesia Infrastructure Grants for sanitation (saiig) under which IndII provides funding to local governments (LGs) to establish neighbourhood sewerage schemes. Under saiig AUD$40 million will be provided in grants, over a two-year period, to approximately 60 selected LGs for implementing municipal sanitation infrastructure, which will result in improved sanitation for approximately 90,000 households. The saiig program will be delivered to participating LGs using the Government of Indonesia s on-granting regulations and will be disbursed through an output-based modality, upon verification of acceptable sanitation infrastructure outputs and progress with attaining agreed governance targets. The program goal of saiig is to increase the provision of improved sanitation facilities by LGs through investment in the implementation of public sanitation infrastructure and to develop and test new funding mechanisms for the delivery of such investments. The components of municipal sanitation which will be eligible for grants under saiig will be limited to: Neighbourhood sewage collection and treatment systems. Neighbourhood sewerage connected to an existing sewerage system. Intermediate solid waste transfer stations. The neighbourhood sewage collection and treatment systems will be simplified schemes, designed for gravity flow only, of shallow depths (less than 1.5 m), with no manholes or pumping stations but with inspection chambers and cleanouts. Typically each system will serve between 200 and 400 households. Treatment will consist of an appropriate anaerobic process but will not be prescribed. Effluent quality must meet Government of Indonesia Ministry of Environment requirements. The second component will be identical to the neighbourhood schemes above except that in cities with existing collection systems the neighbourhood schemes may connect to the live sewer so that treatment will be provided by the existing facilities where there is spare capacity in the existing systems. Intermediate solid waste transfer stations (stasiun peralihan antara, or SPA) receive solid waste from various sources, aggregate and compact it for haulage to the final disposal site. These facilities may vary in size from 5,000 m2 to more than 10,000 m2. IndII is funding two technical assistance packages to support the participating LGs. These are: Activity W Preparation, appraisal and oversight Activity W Baseline surveys and Verification A schematic representation of how the technical assistance will be applied is presented in Figure 1. Package W is to provide technical support to participating LGs with the preparation, appraisal and oversight of the implementation of their grant projects. The technical assistance Package is divided into two work packages eastern and western regional packages. Package W is to provide technical support to participating LGs with the preparation of baseline and verification surveys, including identification and technical surveys, a socio economic survey and a water quality sampling program in the same LGs. This assignment 1

2 includes an identification and location (technical) survey of approximately 32,000 households (includes ± 10%) in 42 LG areas, a socio economic survey and a water quality sampling program in the same LGs. With reference to the baseline data prepared, this package of work also includes a planned installation of approximately 50,000 household connections in 42 LG areas. The LGs which have expressed interest as well as the target for those unidentified group are included in Annex 2. Figure 1 saiig Program Technical Assistance Support LG proposes program LG Prepare Program [DED, Land, EA] Approved Program Implementation IndII Preparation & Implementation Oversight TA (preparation support) IndII Baseline and Verification Consultant - TA IndII Preparation & Implementation Oversight TA (oversight support) IndII Baseline and Verification Consultant Grant Agreement In addition, to the technical assistance described above, IndII will also provide support with institutional development and capacity building to the service providing entities to enhance sustainability of sanitation services in the LGs. These are included under separate saiig work packages. 2. OBJECTIVES The aim of this technical assistance is to establish a reference level of pre-project conditions for subsequently measuring and verifying that the physical works under the grant project has been completed. This involves undertaking baseline surveys to assess conditions. Following this, consultants will verify all house connections that have been installed, and make sure that the house connections are functioning in accordance with the Project Implementation Manual. 3. DESCRIPTION OF REQUIRED SERVICES 3.1 Approach As part of the procedure for implementing the saiig, LGs will be required to sign an ongranting agreement which will explicitly define the areas of responsibility and authority of the parties and the parameters for implementation as well as the areas where the new neighbourhood sewerage schemes are planned to be installed. Upon notification from IndII/CPMU, the consultant will conduct the baseline surveys within the designated areas, and provide a midterm review. The consultant will also prepare the reports and socialize the results to the LGs, encouraging them to be mindful of the core objective of the saiig Program which is to demonstrate to the communities that neighbourhood sewerage systems are an effective way to solve sanitation needs in urban. Reference for verification activities are appraisal of Detailed Engineering Design (DED), and 2

3 baseline survey data. DEDs appraisal has been conducted by consultants on package W The approved beneficiaries from the baseline survey, will be verified by the CPMU, assisted by consultant verification is as a requirement for payment of grants to LGs. 3.2 Expected Outputs Baseline Survey The primary outputs of the baseline survey will be: A compiled dataset of customers to identify location of the property; A socio-economic and attitude survey of a 5% sample of the new customers to be connected to the system and of an equivalent sample from a non-connected control group. A compiled record of water quality in the aquifers and/or surface water ways in the service areas prior to commissioning of the sewerage systems. Verification The primary output of the work is verification through survey and evaluation: A verification data set on the new service connections which have been installed and have been operating. 3.3 Scope of Activity and Tasks Baseline Surveys It is envisaged that background briefing, review and advice will be provided by specialists from the preparation, appraisal and oversight consultants (Packet A) who have detailed knowledge of the works to be implemented. The baseline consultant shall undertake the tasks detailed below. Task 1 - Mobilisation and Activity Management At the outset of the activity, the consultant will contact and meet with the Provincial Project Management Unit (PPMU) to establish communication channels. Then the consultant will arrange an inaugural meeting in each city (kota) or district (kabupaten) directly with the representatives of the LG to explain the objectives of technical assistance and with expected outputs. The meeting should include senior decision makers and the consultant should ensure that there is equal opportunity for male and female government officers to participate and access the information. The consultant should work closely with the working units and also maintain good coordination and communication with IndII and CPMU throughout the duration of the activity. The working units will assist the consultant with obtaining formal licenses and clearances from all levels of government necessary for conducting its activities under this assignment. While the consultant does not need to be based in the city/district, the consultant will ensure that the activity manager will be contactable and responsive at all times throughout the conduct of the preparation, appraisal and implementation work package. The consultant is encouraged to make use of information technology systems for the surveys which will also enable real time monitoring of implementation progress by IndII and CPMU as well as the consultant. Task 2 Property Identification Survey The consultant will conduct a property identification survey to confirm the designated areas for the sewerage system, including number and locations of proposed household connections and their locations. The house positions and existing nearby roads should be plotted on the 3

4 base maps provided by the detailed engineering consultants. Key Elements of the Identification Survey The survey will focus on identification of proposed new household connections in the targeted area. The survey will collect information of: name of house owner and occupier, address of property, willingness to connect to the saiig program. Identification survey will identify the location of targeted Households using a proprietary hand held geographical positioning system (GPS) technology and software to produce geographical co-ordinates and visual identification of the targeted house/beneficiary using digital imagery. The database should integrate geographical positioning data, digital imagery, and locality on a (google map) or similar. The final outputs of the database of the Technical survey will be: (i) Number of households in each city complete with GPS location, unique identifying code, visual image, and map location; (ii) Numbers of respondents willing and unwilling to connect. The Consultant will provide the data and database with visual user interface software to interrogate and access household data, and to readily indicate location of households. The target number of connections in the designated areas for each participating LG is tabulated in Annex 2. While the overall target of approximately 65,000 property connections and the number of LGs is fixed, the information on the number of connections in each LG is tentative and subject to confirmation by the LGs once their grant project plans are completed. The identified LGs have been grouped into two categories: confirmed and interested. The baseline survey consultant is requested to assume that overall 65,000 connections will be built in the identified LGs but the actual number of connections in each LG is subject to variation. It is noted that the interim solid waste transfer stations are not included in this task. The collected information is to be compiled and catalogued into a database for each city/district and also presented on the base maps mentioned above. The use of preferred. Alternatively, the consultant may prepare other types of base maps in digital format such as licensed Google maps professional marked with the GPS coordinates that allow re-tracing of the household positions for the purpose of future verification or re-identification. Task 3 Socio-economic and Attitude Survey The consultant will conduct a socio-economic survey of a sample of the customers in each city/district. The information will be used as reference indicators for future monitoring and evaluation of the benefits of the grant program. The attitude profiles will also be used to evaluate the LGs responsiveness to gender and disability issues in the implementation of the saiig Program. The profiling will be based on socio-economic and attitude surveys of a randomly selected sample of customers within the designated service areas. The number of households to be surveyed in each participating LG area is also presented in Annex 2. approximately, 5,000 households are to be surveyed as part of the target group under this assignment. In addition, the consultant will conduct the same socio-economic survey on a control group which will be selected from a community with similar conditions as the target group comparable socio-economic level, state of environment and water needs. The control group sample size will be the same as that of the combined target groups within the LGs; 5,000 households for this assignment. The consultant will be responsible for quality control of the data collection. This will include the management and supervision of the interviewers. The field supervisors should check randomly whether the interviews are done properly and verify the results by revisiting at least 4

5 five percent(5%) of respondents. Gender and disability inclusiveness training should be included when conducting training for the interviewers to ensure that they comprehend poverty, gender and disability problems regarding access to water services. On completion of the interviews, the consultant will ensure that data from the field is entered into a standard format data packages and the data should be checked for consistency. The consultant will need to develop a database suite to store and analyse all the data from the field. The data compilation should be in such a way as to enable evaluations and conclusions to be performed aggregated for all customers combined or separately on a gender basis. The databases should be created with commonly available software used in the social-engineering sectors and must be flexible as they will be employed for monitoring, evaluation and verification of the Water Hibah Program. The cross-cutting data may be needed to support the analyses of the program. The technical proposal should include an outline of the database that the consultant intends to use. Task 4 Water Quality Sampling and Testing The consultant will conduct water quality sampling and testing program comprising surface and/or groundwater water quality parameters (BOD and E.coli) which will be used as indicators for monitoring and evaluation of the benefits of the schemes. The survey will comprise four episodes (3- monthly) of daily measures over a 4-day period which will be repeated four times in a 12-month period to form an annual benchmark level. The number of episodes may be reduced when commissioning of the sewerage systems is within 12 months of commencement. The locations for the water quality survey will be determined by provided by the preparation, appraisal and oversight consultants (Activity W254.01). These will typically be located upstream and downstream of the service area. For budgeting purposes it has been assumed an overall target of 1,500 samples for budgeting purposes. It is noted that any interim solid waste transfer stations are also included in this task. The consultant shall review and interpret the findings of the water quality testing program and shall present the findings in a compiled report at the completion of the program. Task 5 Reporting The consultant shall prepare the reports listed in Section 4. All reports should be submitted to IndII as drafts for review before finalization. The consultant may also requested by IndII to make a presentation of the drafts before finalization. Verification The following description of the scope of activities is for one package and applies equally to both. The location of the LGs is the only difference. The consultant shall undertake the tasks detailed below. Task 1 - Mobilisation and Activity Management From outset, the consultant will contact and meet with the Provincial Project Management Unit (PPMU) to establish communication channels. Then arrange an inaugural meeting in each city (kota) or district (kabupaten) directly with the representatives of the LG explaining the objectives of technical assistance and expected outputs. The consultant should invite senior decision makers ensuring equal opportunity for male and female government officers to participate and access information. The consultant will liaise with Bappeda and the LG to establish a key unit for liaison with local agencies throughout the activity. The working unit should assist the consultant with obtaining formal licenses and clearances from all levels of government necessary for conducting its activities under this assignment. 5

6 The consultant should work closely with the working units and also maintain good coordination and communication with IndII and CPMU. While the consultant will not necessarily be based in the city/district, they will ensure that the activity manager will be in contact and responsive at all times throughout the preparation, appraisal and implementation work package. Task 2 Governance Development and Target Setting The consultant will review the current institutional framework and plans for change to support the management of sanitation. Guidance will be provided to each LG in relation to required improvements in governance arrangements and assist the LG in preparing the nominated organisation for the start of operations. In addition, the consultant will help the LG to establish governance targets which will be used for compliance monitoring during the verification stage. The support requirements are detailed below. a) Institutional framework development The following points to be noted. Confirm that a dedicated organisation for the management and operation of sanitation services been set up by the LG and the type of organisation proposed (UPTD, BLUD or PD or a clearly defined division of the PDAM) should be clearly identified. Has an implementation schedule been drawn up and budget allocated for the necessary preparatory work including drafting of the necessary documentation for the establishment of the legal entity or unit and the associated policies and regulations including those pertaining to the connection of households/properties to the sewerage system? Is a tariff study planned and if so is there a schedule for its implementation? b) Organisational preparedness and operations start up The following points to be noted. Develop position descriptions and schedules for key management and operational staff recruitment. Prepare, allocate and monitor an operational budget during the period of the grant project. Identify the preferred mode of operation for the sewerage system and establishment articulated in an action plan and schedule. Some options may include the operation of inhouse staff or outsourcing to contractors. Identify organisational improvements through the development of plans and schedules for implementation. These may include staff motivation and incentive plans, enhanced customer service, innovative culture, skill development, enhanced transparency, e- procurement and equal gender opportunities. Ensure that the planned grant project is consistent with the City Sanitation Strategy and align with the saiig funded project directions. c) Governance target setting The consultant will assist the LG to set its achievement targets for parts (a) and (b) above which the LG will have to meet by the end of the grant project period. Two year grant projects or two-year schedule projects require intermediate progress targets. The consultant will need to communicate with LG that meeting such intermediate and final targets is critical to ensuring payment in full for completed works under the grant. Task 3 Verification The Consultant is required to recommend the number of connections that are eligible for saiig payments. The consultant tasks are: 6

7 Coordinate with PIU/PPMU on the available data of house connections planned to be financed through a grant program (refer to the Baseline Survey for list of potential house connections in each city/district kota/kabupaten). During coordination with PIU/PPMU, the Consultant will also monitor and evaluate the progress of household connections installed in each kota/kabupaten. Also to maintain and update the database of all new household connections to contain relevant information and data. Assess promotion strategy by LG to attract new customers to connect and conduct a Customer Satisfactory Survey using a sampling method. Confirm every household for which the LG has claimed a new connection. The Consultant should also confirm directly with the householder that: (i). saiig connection has been installed and working satisfactorily; (ii) the connection has been operating; (iii) all new connections installed have met the technical criteria as set out in the Project Implementation Manual (PMM). Task 4 Reporting The consultant shall prepare the reports listed in Section 4. All reports should be submitted to IndII as drafts for review before finalisation. The consultant may also requested by IndII to make a presentation of the drafts before finalization. 4. REQUIRED DELIVERABLES The consultant shall submit to IndII the following deliverables: Inception Report This report should be brief covering the work plan, survey methodology, current status of implementation, description of the approach strategy, recommendations for improving implementation, and resourcing and staffing arrangements and activity schedule. It should also review the results of the FY2012 appraisal to inform the progress and learning from the project. The report should be submitted to IndII and CPMU within four weeks after project commencement. The consultant will make a brief presentation of the report to IndII and CPMU. Property Identification Survey Reports A baseline report of the customers surveyed is to be prepared for each LG. The report should cover the methodology for the survey, the data and information collected under Baseline Surveys,Task 2 and commentary on the findings and any issues that arose during the survey. These reports will need to be disseminated to the respective LGs, as well as the CPMU and IndII for review. Social-Economic Baseline Survey Reports A baseline report on the findings of the socioeconomic and attitude survey is to be prepared for each LG. The report should cover the methodology for the survey, the data and information collected under Baseline Surveys Task 3, analysis and interpretation of the data including commentary on on any implementation issues that arose during the survey so that they may be used to improve such surveys in the future, and any cross cutting issues, such as gender impacts, should be highlighted. These reports will also need to be disseminated to the respective LGs, as well as the CPMU and IndII for review. Water Quality Baseline Reports Report on the findings under Task 4, including the compiled data and analysis of the water quality in each service area. As with the baseline reports, these reports will also need to be disseminated to the respective LGs as well as the CPMU and IndII for review. Monthly Management Reports brief monthly reports summarizing work progress, issues and remedial actions taken or suggested. These shall be submitted to IndII. 7

8 Activity Completion Report a report comprising two parts; activity completion document which complies with the IndII M&E Framework IndII Gender Strategy and IndII Risk Management Plan by providing evidence of defined outputs and indicators; and an abridged document providing, in brief, an overview of the activity including the overall assignment, findings, the relevance and implications for future project implementation using this saiig approach, and follow up actions for each participating LG. The Activity completion Report should also include a discussion of the national level perspectives and significance of what has been found. It shall be submitted initially in draft format two months prior to assignment completion. The format and structure of this report shall be in accordance with IndII requirements. The abridged document should be not more than 6,000 words in length should be written so that it is understandable by a wide range of expert and non-expert readers and it should be suitable for uploading to the IndII website. The consultant will also prepare a PowerPoint presentation for use by the consultants, IndII and DFAT. All reports will be provided in electronic copy format. However, the consultant will provide hard copies of the draft reports if requested by IndII. The language for the reports will be English. In addition, the consultant will provide translations of the final reports and PowerPoint presentation into Indonesian. The monthly management reports and the activity completion reports are to be prepared in the standard IndII format 1, but may be adapted to suit the activity. The consultant will provide five printed copies of all of the final reports. Final versions of maps will be provided in editable digital formats as well as hard copy. 5. ESTIMATED INPUTS AND TIMING 5.1 Resourcing The consultant is to submit details of the proposed resourcing in the tender technical proposal. It is envisaged that the consultant will propose a core team of specialists and several field teams mobilised on a regional basis. Indicative specialist skills that may be required are included in Section 6.1 below. 5.2 Timing The duration of the full assignment is expected to be 13 months, commencing in January As the confirmation and identification of all of the LGs is still in progress, the availability of the final data including number of connections from the LGs and cannot be precisely provided. The consultant will therefore need to have a flexible schedule for mobilising field teams. It is important that the consultant prioritise those LGs not confirmed to date. To achieve project targets within timeframe the consultant must have sufficient personnel and resources to place more than two teams in the field simultaneously. 6. KEY PERSONNEL AND ORGANISATIONAL ARRANGEMENTS 6.1 Personnel It is envisaged that the consultant team will require, at a minimum, the following expertise: Team Leadership 1 IndII Monitoring and Evaluation Plan Final June 2009 ( 8

9 Socio-econmic survey design and implementation Water quality sampling and evaluation Statistical and/or database analyses Social and gender inclusivity Municipal Sanitation engineering (collection and treatment) International Experts to be at ARF C3 or B3 level. Team Leadership: this person could be any of member of the team. He/she should have at least 10 years relevant international experience in similar works, and with necessary qualifications to serve as a Team Leader. He/she must have experience in project management of teams comprising several work groups and should also have worked in Indonesia or at least the region. Monitoring and evaluation experience would also be valuable. Socio-economic survey implementation: this person should have at least 5-7 years of experience in planning and conducting socio-economic and attitude surveys for sanitation or water supply projects, including management and quality control of field teams. Typically, the field teams to be managed by the specialist should include, but should not be limited to, field coordinators, interviewers and data entry and processing persons. Water quality sampling and evaluation: this person should have at least seven years relevant experience in of the planning, design and implementation of field sampling for water quality testing and should be capable of supervision or overseeing the field teams and interpret the results. Statistical and/or database analyses: the person should have at least five years experience in developing databases, managing, compiling and analysing results of socio- economic field surveys. He/she should have a capability of data processing and analyses by using appropriate application software. Social and Gender Inclusivity: the nominated person should have at least seven years relevant experience in preparing, evaluating and assessing gender and social inclusivity for water supply and/or sanitation projects (preferably), or at least infrastructure projects in general. Preference will be given to candidates with experience on projects in Indonesia. Municipal Sanitation Engineering: A professional engineer/s with at least 10 years relevant international experience in similar work. S/he should have proven technical experience in wastewater projects, including planning, design and implementation of small-scale distribution and treatment systems. Monitoring and evaluation experience would also be valuable. This list is indicative only. It is the consultant s responsibility to propose a team with specialist skills to respond to the particular planned approach and achieve the required deliverables successfully and on schedule. The consultant will need to plan for and provide personnel with relevant expertise and experience in meeting directly with heads of LGs and confident in supporting LGs to implement the project. All specialist consultants engaged should be fluent in written and spoken English. 6.2 Organisational Arrangements The proposed organisational arrangements and locations of field offices will be up to the consultant, but should take into account the effectiveness and efficiency of performing the tasks. The consultant is to nominate its team and resourcing schedule to meet its proposed approach and methodology for achieving the outputs and outcomes of the project/activity and meeting on the target schedule. 6.3 Coordination and Control The consultant, in implementing the contract, will be responsible directly to the Technical 9

10 Director of Water and Sanitation IndII, or to an officer designated by the Technical Director, for the performance of the services. The consultant will nominate one person to be the contact person for the duration of the contract implementation period. The consultant will also be required to co-ordinate with the CPMU, PPMU, LGs through the Project Implementation Units, and the LGs throughout the implementation period. The arrangements and procedures for coordination will be clarified during contract negotiations. 7. GENERAL ISSUES 7.1 Language Official correspondence shall be in either English or Indonesian as appropriate. 7.2 Task Completion Approval The acknowledged acceptance by the Technical Director Water and Sanitation, of an electronic file copy of all reports will be considered an appropriate completion of the tasks or deliverables. 7.3 Gender and Disability Inclusive Approaches The consultant will need to be fully aware of gender and disability matters 2 when undertaking consultations, preparing designs and implementing the baseline surveys. Legislation has recently been enacted in Indonesia to protect the rights of women and support the country s move towards an increasingly democratic and civil society. The Technical Guideline of INPRES 9/2000 is considered to be the key reference document for the implementation of gender mainstreaming in national development. Indonesia has also signed the United Nations Convention on the Rights of Persons with Disability on 31 March DFAT s Country Program Strategy 3 also identifies a number of cross-cutting issues that need to be addressed as part of the implementation of all DFAT activities in Indonesia. Among these is gender in development issues and development for all principles which will be verified through data collected from the meeting records and community socialization sessions. In the spirit of DFAT s policy, the consultant will embrace gender and social inclusivity in the design of the socialization sessions. The consultant should also ensure equal opportunity between men and women for participation in such sessions. 2 Reference to DFAT Gender Guidelines: Water Supply and Sanitation Supplement to the Guide to Gender and Development March 2011, updated April 2005, and IndII s Gender Strategy and Plan ( 3 Country Program Strategy 10

11 ANNEX 1 ACRONYMS USED Acronym Description AMDAL Analisis dampak lingkungan (environmental impact assessment process) BAPPEDA Badan Perencanaan Pembangunan Daerah (Regional Development Planning Agency) BPPSPAM Badan Pendukung Pengembangan Sistem Penyediaan Air Minum CBO Community based organisation CPMU Central Project Management Unit DAK Dana Alokasi Khusus (Special Allocation Fund) DGHS Directorate General of Human Settlements (Ditjen Cipta Karya) EOI Expression of interest FY Fiscal year GDP Gross domestic product GoA Government of Australia GoI Government of Indonesia IndII Indonesia infrastructure initiative LG Local government M&E Monitoring and Evaluation MBR Masyrakat Berhasilan Rendah ( Poor Households) MoF Ministry of Finance MPW Ministry of Public Works NGO Non government organisation NAP National action plan O&M Operational and maintenance PDAM Perusahaan Daerah Air Minum (Local government-owned water company) PDPAL Perusahaan Daerah Pengelola Air Limbah (Local government-owned waste water company) PPH On-granting Agreement (Perjanjian Penerusan Hibah) PPMU Provincial Project Management Unit RFT Request for tender RPJMN National Medium Term Development Plan TD Technical Director (IndII) TOR Terms of reference USAID United States of America Agency for International Development Water Water supply and sanitation WSI Water and sanitation initiative 11

12 Attachment 1 Description of Services for W saiig Baseline Survey and Verification ANNEX 2 LIST OF PARTICIPATING LOCAL GOVERNMENTS Identified confirmed and interested additional LGs and the balance to the target number of LGs and house connections are tabulated below. No. Province District/Town (Kabupaten/Kota) Property Identification & Verification Surveys Confirmed Local Governments 1 Sumatera Utara Kota Medan 3,000 2 Sumatera Utara Kota Tebing Tinggi Sumatera Utara Kota Tanjung Balai Sumatera Barat Kota Pariaman Sumatera Barat Kota Sawahlunto Jambi Kota Sungai Penuh Bengkulu Kab Rejang Lebong Sumatera Selatan Kab Musi Banyuasin 3,000 9 Sumatera Selatan Kab. Muara Enim Sumatera Selatan Kota Palembang 2, Bangka Belitung Kab Bangka Tengah Bangka Belitung Kota Pangkal Pinang Banten Kab Serang 2, DKI Jakarta Kab Admin Kep Seribu 1, Jawa Barat Kota Cimahi 5, Jawa Barat Kab Sumedang 1, Jawa Tengah Kota Tegal Jawa Tengah Kab Kebumen Jawa Tengah Kab Sukoharjo Jawa Tengah Kota Surakarta 1, DI Jogjakarta Kota Jogjakarta 3, Jawa Timur Kab. Ngawi 3, Jawa Timur Kab. Bojonegoro 1, Jawa Timur Kab. Gresik 3, Jawa Timur Kab. Probolinggo Kalimantan Timur Kota Balikpapan 1, Kalimantan Timur Kota Bontang 1, Kalimantan Timur Kota Tarakan 2, Kalimantan Selatan Kota Banjarmasin 1, Kalimantan Selatan Kab. Banjar Kalimantan Selatan Kab. Hulu Sungai Selatan 1, Sulawesi Utara Kota Bolaang Mongondow Utara 1, Sulawesi Utara Kota Kotamobagu 1, Sulawesi Utara Kota Manado 2, Sulawesi Utara Kota Minahasa Utara 2, Sulawesi Barat Kab. Polewali Mandar 1, Sulawesi Selatan Kota Makassar 1, Sulawesi Selatan Kab Maros 1, Sulawesi Selatan Kab. Kepulauan Selayar 2, Maluku Kota Ambon Bali Kab. Karangasem NTB Kota Sumbawa barat 200 Sub Total 62,076 Socio Economic Survey Sample size & Control Group Interested Additional Local Governments 43 Jawa Barat Kota Bandung 1, DI Jogjakarta Kab Bantul 1, DI Jogjakarta Kab Sleman 1,200 12

DESCRIPTION OF SERVICES

DESCRIPTION OF SERVICES DESCRIPTION OF SERVICES Preparation, Appraisal and Oversight (PAO) Consultant for the Australia Indonesia Infrastructure Grants for Municipal Sanitation (saiig) and Sanitation Hibah CONTENTS 1. BACKGROUND...

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation Name: Third

More information

THE IMPLEMENTATION OF DRINKING WATER SUPPLY SYSTEM IN REGIONAL AUTONOMY ERA

THE IMPLEMENTATION OF DRINKING WATER SUPPLY SYSTEM IN REGIONAL AUTONOMY ERA PROCEEDING The 3rd International Conference on Economics, Business, and Accounting Studies (ICEBAST) 2017 Social Cohesion, Public Policy Reformation, and Market Integration towards Inclusive Global Economy

More information

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375)

Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Indonesia Third Water Supply and Sanitation for Low Income Communities Project (P085375) Operation

More information

CAPACITY DEVELOPMENT FOR METROPOLITAN SANITATION MANAGEMENT AND HEALTH I. INTRODUCTION

CAPACITY DEVELOPMENT FOR METROPOLITAN SANITATION MANAGEMENT AND HEALTH I. INTRODUCTION Metropolitan Sanitation Management and Health Project (RRP INO 9071-01) CAPACITY DEVELOPMENT FOR METROPOLITAN SANITATION MANAGEMENT AND HEALTH I. INTRODUCTION 1. The Government of Indonesia (the Government)

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: International Consultant SC-DRR II Final Evaluation and Concept Note Writing Project Name : Safer Communities through Disaster Risk Reduction (SC-DRR) II Reports

More information

WATER SUPPLY OF JAKARTA

WATER SUPPLY OF JAKARTA WATER SUPPLY OF JAKARTA Prof.Dr. Djoko M. Hartono Environmental Engineering Study Program. Civil Engineering Department, Faculty of Engineering University of Indonesia SMART ENGINEERING TOKYO 2018 UNITED

More information

Terms of Reference Project Board The Project Board will:

Terms of Reference Project Board The Project Board will: Annex 12: Terms of References for Project Governance, Management Arrangements, and Key Project Staff Terms of Reference Project Board The Project Board will: Ensure that there is coherent project organization

More information

The Comparative Analysis of Accessibility Index Value of Government Internet Financial Reporting In Indonesia

The Comparative Analysis of Accessibility Index Value of Government Internet Financial Reporting In Indonesia Applied Finance and Accounting Vol. 2, No. 2, August 2016 ISSN 2374-2410 E-ISSN 2374-2429 Published by Redfame Publishing URL: http://afa.redfame.com The Comparative Analysis of Accessibility Index Value

More information

Terms of Reference (TOR)

Terms of Reference (TOR) CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support

More information

Terms of Reference. Succession Planning Short Course

Terms of Reference. Succession Planning Short Course Terms of Reference Succession Planning Short Course December 2018 1 Background Terms of Reference The Australia Awards and Alumni Engagement Program Philippines (AAAEP-P) is a four-year program of the

More information

AFGHANISTAN RING ROAD PROJECT Financed under Grant 0081: Road Network Development - Project 1, and Grant 0012: Qaisar-Bala Murghab Road Project

AFGHANISTAN RING ROAD PROJECT Financed under Grant 0081: Road Network Development - Project 1, and Grant 0012: Qaisar-Bala Murghab Road Project A. Introduction AFGHANISTAN RING ROAD PROJECT Financed under Grant 0081: Road Network Development - Project 1, and Grant 0012: Qaisar-Bala Murghab Road Project TERMS OF REFERENCE FOR PROJECT MANAGEMENT

More information

The letter of expression of interest (EOI) should provide information of the company s technical qualifications and experience in the Annex B.

The letter of expression of interest (EOI) should provide information of the company s technical qualifications and experience in the Annex B. Request for Expression of Interest of Initial, Intermediate and Final Technical Review Support Missions/ Technical Audit for the Project of Gujarat Rural Roads Funding source: Sector: Asian Infrastructure

More information

The IDHS obtained data from representative samples of ever-married women and currently married men to:

The IDHS obtained data from representative samples of ever-married women and currently married men to: SURVEY DESIGN Appendix B B.1 INTRODUCTION The 2002-2003 IDHS obtained data from representative samples of ever-married women 15-49 and currently married men 15-54 to: estimate demographic rates, particularly

More information

RE-ADVERTISEMENT S/N NAME OF POST GRADE NO. OF POSTS P Senior Legal Officer P3 1 3 Senior Human Resource and Administration Officer

RE-ADVERTISEMENT S/N NAME OF POST GRADE NO. OF POSTS P Senior Legal Officer P3 1 3 Senior Human Resource and Administration Officer Common Market for Eastern and Southern Africa RE-ADVERTISEMENT CALL FOR APPLICATIONS FOR THE POSTS OF SENIOR CONSUMER WELFARE OFFICER (P3); SENIOR LEGAL OFFICER (P3) AND SENIOR HUMAN RESOURCES AND ADMINISTRATION

More information

Program Overview Laos Australia Institute is managed by Coffey, a Tetra Tech company, on behalf of the Australian Government.

Program Overview Laos Australia Institute is managed by Coffey, a Tetra Tech company, on behalf of the Australian Government. Position Description Position Title Project Reports to Duration of Assignment Location Human Resource Development (HRD) Program Advisor (Alumni, GEDSI, Government) Laos Australia Institute Institute Director

More information

UNICEF/EAPRO, Bangkok

UNICEF/EAPRO, Bangkok UNICEF/EAPRO, Bangkok TERMS OF REFERENCE - LONG TERM ARRANGEMENT ********************************************************************************** 1. Background As a joint contribution towards the achievement

More information

Baseline Survey WASH Telethon Project

Baseline Survey WASH Telethon Project Terms of Reference Baseline Survey WASH Telethon Project Name of Organization: Norwegian Church Aid (NCA) Introduction Norwegian Church Aid (NCA) is an independent humanitarian organization working for

More information

GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT

GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT GOVERNMENT OF GRENADA GEOTHERMAL RESOURCE DEVELOPMENT PROJECT TERMS OF REFERENCE GEOTHERMAL ENERGY PROJECT COORDINATOR 1 P a g e 1. BACKGROUND The Government of Grenada wishes to progress the development

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Name of Consultant: Description of Assignment: Period of Assignment (Start / Finish): Level of Effort (LOE): Gross Daily Rate Location of work: TOR Activity Request for Proposal (RFP) Evaluation Specialist

More information

TERMS OF REFERENCE National Consultant

TERMS OF REFERENCE National Consultant TERMS OF REFERENCE National Consultant Job Title : Legal and Advocacy Specialist Duty Station : KIAT Guru Program Office, Jakarta; with frequent field travel Type of Contract : Individual Consultant Expected

More information

Decision Making Structure For the Health Sector in Indonesia

Decision Making Structure For the Health Sector in Indonesia Decision Making Structure For the Health Sector in Indonesia Laksono Trisnantoro Center for Health Service Management Gadjah Mada University Medical School Content 1. Decentralization Policy and Health

More information

038-05/GOV Administrative and Finance Assistant

038-05/GOV Administrative and Finance Assistant Post Code: Post Title: Recruitment: Location/Duty Station: Duration of Assignment: Starting Date: Direct Supervisor: 038-05/GOV Administrative and Finance Assistant Indonesian National Jakarta-based in

More information

HEALTH AND POPULATION b) Water Supply and Sanitation

HEALTH AND POPULATION b) Water Supply and Sanitation HEALTH AND POPULATION b) Water Supply and Sanitation Demand driven approaches Project quality and sustainability are improved by including men and women Water Supply and Sanitation projects are increasingly

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT VACANCY ANNOUNCEMENT Date: 22 July 2016 Announcement No. LAO/GS/01(2016) E Post Title: National Rural Employment Officer Department/Unit: National rural employment strategy in Lao PDR towards increasing

More information

Terms of Reference (ToR) Monitoring & Evaluation (M&E) Specialist

Terms of Reference (ToR) Monitoring & Evaluation (M&E) Specialist I. Position Information Post Title: Level: Project: Supervisor: Duty Station: Duration: Individual Consultant/Contract (IC) Capacity Strengthening of NRA for Resilient Reconstruction Policy, Monitoring

More information

PROJECT PARTICIPATION PLAN

PROJECT PARTICIPATION PLAN Provincial Water Supply and Sanitation Project (RRP CAM 48158) PROJECT PARTICIPATION PLAN A. Introduction. 1. The Participation plan covers the key stakeholders and how and when they will participate in

More information

Definition of a Long-Term Adviser (LTA); Overview of the compensation and benefits associated with LTA roles;

Definition of a Long-Term Adviser (LTA); Overview of the compensation and benefits associated with LTA roles; Information for Applicants Long Term Adviser Position Title: ARF Professional Discipline Category: ARF Job Level: 4 ARF Monthly Rate Band: Position Location: Contract Duration: Director of Performance

More information

CALL FOR APPLICATIONS FOR THE POSTS OF SENIOR LEGAL OFFICER P3 AND SENIOR HUMAN RESOURCES AND ADMINISTRATION OFFICER P3

CALL FOR APPLICATIONS FOR THE POSTS OF SENIOR LEGAL OFFICER P3 AND SENIOR HUMAN RESOURCES AND ADMINISTRATION OFFICER P3 Common Market for Eastern and Southern Africa CALL FOR APPLICATIONS FOR THE POSTS OF SENIOR LEGAL OFFICER P3 AND SENIOR HUMAN RESOURCES AND ADMINISTRATION OFFICER P3 The COMESA Competition Commission ("the

More information

TERMS OF REFERENCE International Consultant to Design and Conduct Baseline for Intervention to Prevent Genderbased Violence in Indonesia

TERMS OF REFERENCE International Consultant to Design and Conduct Baseline for Intervention to Prevent Genderbased Violence in Indonesia TERMS OF REFERENCE International Consultant to Design and Conduct Baseline for Intervention to Prevent Genderbased Violence in Indonesia Duty Station: Jakarta, Indonesia Application Deadline: 14 August

More information

Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III

Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III Terms of Reference Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III UNICEF Cambodia 1. Background The Capacity Development Partnership

More information

Terms of Reference for Individual Consultant

Terms of Reference for Individual Consultant Terms of Reference for Individual Consultant Position Title: Consultant to support Multiple Indicator Cluster Survey 5 (MICS5) in 3 counties in Kenya Category & Grade: P4 Fee: (Fee MUST be determined by

More information

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program

Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program Initial Poverty and Social Analysis Project Number: 43220 May 2016 Proposed Results-Based Loan Republic of Indonesia: Integrated Participatory Development and Management of Irrigation Program The views

More information

IUWASH PLUS Penyehatan Lingkungan Untuk Semua

IUWASH PLUS Penyehatan Lingkungan Untuk Semua SCOPE OF WORK Technical Service Provider to Support Septic Tank Upgrading Program In Medan & Deli Serdang, North Sumatera November 2017 February 2019 Background The USAID Indonesia Urban Water, Sanitation

More information

Technical Note Integrating Gender in WFP Evaluations

Technical Note Integrating Gender in WFP Evaluations Technical Note Integrating Gender in WFP Evaluations Version September 2017 1. Purpose of this Technical Note 1. This technical note shows how gender equality and empowerment of women (GEEW), hereafter

More information

Development of the Roadmap for Women s Economic Empowerment (WEE) in the Pacific

Development of the Roadmap for Women s Economic Empowerment (WEE) in the Pacific Development of the Roadmap for Women s Economic Empowerment (WEE) in the Pacific Reports to: Location: Team Leader Regional Duration: Up to 70 Days, commencing February / March 2016 ARF Classification:

More information

DURATION : 30 working days over the period 20 September November 2016

DURATION : 30 working days over the period 20 September November 2016 Terms of Reference for the recruitment of a national consultant for the formulation of a Project Document on Inclusive Development and Public Sector Efficiency under the Pillar 1 of the UNDP Country Programme

More information

Terms of Reference - Procurement and Contract Implementation Support

Terms of Reference - Procurement and Contract Implementation Support Terms of Reference - Procurement and Contract Implementation Support 1. BACKGROUND The Port of Brcko (the Port) is located in the north-eastern part of Bosnia and Herzegovina (BiH), on the right side of

More information

TERMS OF REFERENCE. For INTERNATIONAL LEADERSHIP DEVELOPMENT PROGRAMME (ILDP)

TERMS OF REFERENCE. For INTERNATIONAL LEADERSHIP DEVELOPMENT PROGRAMME (ILDP) TERMS OF REFERENCE For INTERNATIONAL LEADERSHIP DEVELOPMENT PROGRAMME (ILDP) 2014 1 1. BACKGROUND TO W&RSETA The Wholesale and Retail Sector Education and Training Authority (W&RSETA) was established as

More information

Application type: External vacancy International/Regional/ National Expert on. Environment and Biodiversity Finance

Application type: External vacancy International/Regional/ National Expert on. Environment and Biodiversity Finance Terms of Reference for the Recruitment of an International/National Expert on Biodiversity Expenditure Review The Biodiversity Finance Initiative BIOFIN - Rwanda Application type: External vacancy Job

More information

POSITION PROFILE POSITION PROFILE MANAGER FINANCE ADMIN. & HR. Country Representative, Islamabad, Pakistan Date prepared: May 5th 2016

POSITION PROFILE POSITION PROFILE MANAGER FINANCE ADMIN. & HR. Country Representative, Islamabad, Pakistan Date prepared: May 5th 2016 POSITION PROFILE MANAGER FINANCE ADMIN. & HR 1. Identification Position Title: Manager Finance Admin. & HR Reports to/position Title: Country Representative, Islamabad, Pakistan Date prepared: May 5th

More information

Positions required: A team of consultancy with one Lead Consultant and one Qualitative Research Assistant

Positions required: A team of consultancy with one Lead Consultant and one Qualitative Research Assistant Terms of Reference for Gender Transformative and Responsible Agribusiness Investments in South East Asia II (GRAISEA 2) Baseline Study in Vietnam: Farmer Survey and Focus Group Discussion Positions required:

More information

TERMS OF REFERNCE FOR CONSULTANTS

TERMS OF REFERNCE FOR CONSULTANTS Preparing the Advanced Knowledge and Skills for Sustainable Growth Project (TRTA INO 50395) TERMS OF REFERNCE FOR CONSULTANTS 1. Four consultants will be recruited individually using single source and

More information

TERMS OF REFERENCE. For. The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation

TERMS OF REFERENCE. For. The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation TERMS OF REFERENCE For The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation Contracting Authority The Deutsche Gesellschaft fuer Internationale Zusammenarbeit

More information

Jobholder: Location: Prepared by: LHA Date: April 2015

Jobholder: Location: Prepared by: LHA Date: April 2015 Job Descript ion 1. Job Identification Senior Technical Officer Job Tit le: Asset Management Department: Jobholder: Location: Aberdeen Permanent/ Fixed-Term Permanent Weekly Hours: 35 Hours Prepared by:

More information

STAFF VACANCIES Ref. 1811SNE01

STAFF VACANCIES Ref. 1811SNE01 10 August 2018 STAFF VACANCIES Ref. 1811SNE01 The European Insurance and Occupational Pensions Authority (EIOPA) is an independent advisory body to the European Parliament, the Council of the European

More information

STAFF VACANCIES Ref. 1811SNE01

STAFF VACANCIES Ref. 1811SNE01 10 August 2018 STAFF VACANCIES Ref. 1811SNE01 The European Insurance and Occupational Pensions Authority (EIOPA) is an independent advisory body to the European Parliament, the Council of the European

More information

EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS

EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS / / / 1) Motivation for this evaluation According to the founding Regulation (168/2007) of the Fundamental

More information

Lowongan Kerja NGO OXFAM Indonesia Project Manager (AIP PRISMA project Better Value Market for Crude Coconut Oil) Ende Flores

Lowongan Kerja NGO OXFAM Indonesia Project Manager (AIP PRISMA project Better Value Market for Crude Coconut Oil) Ende Flores Lowongan Kerja NGO OXFAM Indonesia Project Manager (AIP PRISMA project Better Value Market for Crude Coconut Oil) Ende Flores OXFAM Vacancy Project Manager in AIP PRISMA project - Better value market for

More information

Project Identification Form (PIF) Development: Waste to Energy and Resources (National Consultant) Project Name:

Project Identification Form (PIF) Development: Waste to Energy and Resources (National Consultant) Project Name: Terms of Reference GENERAL INFORMATION Title: Project Identification Form (PIF) Development: Waste to Energy and Resources (National Consultant) Project Name: Protection of Environment and Climate Change

More information

TERMS OF REFERENCE MINISTRY OF THE ENVIRONMENT AND HOUSING JUNE, 2017

TERMS OF REFERENCE MINISTRY OF THE ENVIRONMENT AND HOUSING JUNE, 2017 TERMS OF REFERENCE GCF Readiness Preparation Support Project for the Enhancement of the Bahamas Capacity to Access and Deliver International Climate Finance through Targeted Institutional Strengthening

More information

Request for Proposal (RFP)

Request for Proposal (RFP) TOR Activity Request for Proposal (RFP) Name of Consultant: Description of Assignment: Period of Assignment (Start / Finish): Level of Effort (LOE): Gross Daily Rate Location of work: Requesting Manager:

More information

JOB OFFER Country Director The type of contract will depend on the country and the profile Open Start date of the contract ASAP CONTEXTE

JOB OFFER Country Director The type of contract will depend on the country and the profile Open Start date of the contract ASAP CONTEXTE CONTEXTE JOB OFFER Country Director Country Office of CARE France The type of contract will depend on the country and the profile Deadline of application: Open Start date of the contract: ASAP CARE is

More information

Human Rights and Digitalization Project in Tanzania. Baseline Survey. Terms of Reference. August, 2017

Human Rights and Digitalization Project in Tanzania. Baseline Survey. Terms of Reference. August, 2017 Human Rights and Digitalization Project in Tanzania Baseline Survey Terms of Reference August, 2017 Introduction Oxfam Country Strategy, 2015 2019, has a vision of an inclusive, equitable and just Tanzanian

More information

Republic of Albania. UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference

Republic of Albania. UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference Republic of Albania UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference 1. PROJECT BACKGROUND Ujesjelles Kanalizime Tirane ( UKT, the Company and Client ) is a

More information

PNPM Rural Supervision and Monitoring

PNPM Rural Supervision and Monitoring PNPM Rural Supervision and Monitoring Quarterly Progress Report: January to March 2014 Summary Information Status Active Activity Number TF092138 Task Team Leader Sonya Woo (swoo1@worldbank.org) Executing

More information

IUWASH PLUS Penyehatan Lingkungan Untuk Semua

IUWASH PLUS Penyehatan Lingkungan Untuk Semua a IUWASH PLUS Penyehatan Lingkungan Untuk Semua Scope of Work Septage Management Support for Kopsyah BMI, Kab. Tangerang Background The USAID Indonesia Urban Water, Sanitation and Hygiene, Penyehatan Lingkungan

More information

TERMS OF REFERENCE (ToR)

TERMS OF REFERENCE (ToR) TERMS OF REFERENCE (ToR) INTERNATIONAL INDIVIDUAL CONSULTANCY Development of Knowledge management products on inclusive Rural Community development in Rwanda Application Type: External Vacancy Job Title:

More information

PROJECT DESCRIPTIONS 2016

PROJECT DESCRIPTIONS 2016 PROJECT DESCRIPTIONS 2016 Contact us: KOMPAK Jln Diponegoro No. 72, Jakarta 10320 Indonesia T: +62 21 8067 5000 F: +62 21 3190 3090 E: info@kompak.or.id www.kompak.or.id KOMPAK is supported by the Australian

More information

Terms of Reference for a Gender Analysis

Terms of Reference for a Gender Analysis Terms of Reference for a Gender Analysis 1. BACKGROUND The European Commission defines a gender analysis as the study of differences in the conditions, needs, participation rates, access to resources and

More information

EUROPEAN COMMISSION Job Description Form Job description version1 (Active) JOB ID Job no in NEAR.DGA2.B.1.DEL.Lebanon.

EUROPEAN COMMISSION Job Description Form Job description version1 (Active) JOB ID Job no in NEAR.DGA2.B.1.DEL.Lebanon. Ref. Ares(2019)2313370-01/04/2019 EUROPEAN COMMISSION Job Description Form Job description version1 (Active) JOB ID 194724 Job no. 90034 in NEAR.DGA2.B.1.DEL.Lebanon.003 Job Description valid from: valid

More information

TECHNICAL ASSISTANCE RELATED TO THE SUSTAINABLE AND INCLUSIVE ENERGY PROGRAM, SUBPROGRAM 2

TECHNICAL ASSISTANCE RELATED TO THE SUSTAINABLE AND INCLUSIVE ENERGY PROGRAM, SUBPROGRAM 2 Sustainable and Inclusive Energy Program (Subprogram 2) (RRP INO 49043-002) TECHNICAL ASSISTANCE RELATED TO THE SUSTAINABLE AND INCLUSIVE ENERGY PROGRAM, SUBPROGRAM 2 Pillar 1: Fiscal sustainability and

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE Title of Individual Consultant: Policy Specialist - Development Finance and Cooperation Project title: Aid Effectiveness (00092193) Duration

More information

JOB PROFILE. A. Post Information. Salary. Contract Type and Duration Permanent (level 8) Job Profile Verification. Date Verified: 30 January 2017

JOB PROFILE. A. Post Information. Salary. Contract Type and Duration Permanent (level 8) Job Profile Verification. Date Verified: 30 January 2017 JOB PROFILE A. Post Information Post Title Component Location Post Reports To Human Rights Officer Operations Provincial Office Advocacy and Research Officer Salary Contract Type and Duration Permanent

More information

SOLID WASTE MANAGEMENT IN INDONESIA

SOLID WASTE MANAGEMENT IN INDONESIA SOLID WASTE MANAGEMENT IN INDONESIA OPPORTUNITIES AND CHALLENGES FOR RECYCLING AND WASTE REDUCTION Jakarta, Indonesia October 25, 2018 1 STRUCTURE OF PRESENTATION 1. Integrated Solid Waste Management in

More information

TERMS OF REFERENCE Public Financial Management Consultant

TERMS OF REFERENCE Public Financial Management Consultant TERMS OF REFERENCE Public Financial Management Consultant Description of the assignment: Type of contract Duty Station Post Level Category Languages required Period of assignment/services: Provide technical

More information

Analysis Of Micro And Small Industry Development In Indonesia

Analysis Of Micro And Small Industry Development In Indonesia Analysis Of Micro And Small Industry Development In Indonesia Azwar Harahap Abstract: The purpose of this research is to know the development of production activity and the absorption of labor of micro

More information

STAFF VACANCIES Ref. 1714SNE02

STAFF VACANCIES Ref. 1714SNE02 06 October 2017 STAFF VACANCIES Ref. 1714SNE02 The European Insurance and Occupational Pensions Authority (EIOPA) is an independent advisory body to the European Parliament, the Council of the European

More information

Position Technical Advisor-BCC, Bangladesh Grade D2. & Location Activity, Plan International Based in Dhaka, Bangladesh

Position Technical Advisor-BCC, Bangladesh Grade D2. & Location Activity, Plan International Based in Dhaka, Bangladesh Job Description Position Technical Advisor-BCC, Bangladesh Grade D2 Department Programme: Advancing Adolescent Health (A2H) Date 25 February & Location Activity, Plan International Based in Dhaka, Bangladesh

More information

CONSULTANT SUPPORT ADVISORY SERVICES TO THE INDONESIA INFRASTRUCTURE FINANCING DEVELOPMENT TRUST FUND PROJECT MANAGEMENT UNIT

CONSULTANT SUPPORT ADVISORY SERVICES TO THE INDONESIA INFRASTRUCTURE FINANCING DEVELOPMENT TRUST FUND PROJECT MANAGEMENT UNIT CONSULTANT SUPPORT ADVISORY SERVICES TO THE INDONESIA INFRASTRUCTURE FINANCING DEVELOPMENT TRUST FUND PROJECT MANAGEMENT UNIT I. Background COMMUNICATION SPECIALIST Terms of Reference The Ministry of Finance

More information

TERMS OF REFERENCE Study to identify constraints to female participation in skills training and labor market in India

TERMS OF REFERENCE Study to identify constraints to female participation in skills training and labor market in India TERMS OF REFERENCE Study to identify constraints to female participation in skills training and labor market in India 1. Background The Government of India (GoI) introduced its National Policy for Skill

More information

REPUBLIC OF KENYA MINISTRY OF INDUSTRY, TRADE AND COOPERATIVES STATE DEPARTMENT FOR INDUSTRIALIZATION

REPUBLIC OF KENYA MINISTRY OF INDUSTRY, TRADE AND COOPERATIVES STATE DEPARTMENT FOR INDUSTRIALIZATION Annex 1b REPUBLIC OF KENYA MINISTRY OF INDUSTRY, TRADE AND COOPERATIVES STATE DEPARTMENT FOR INDUSTRIALIZATION REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRM SELECTION) Project Name: Project

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Engineering Procurement Specialist Project Name: Sulawesi / Lombok Programme for Earthquake and Tsunami Infrastructure Reconstruction Assistance (PETRA) Reports

More information

Terms of Reference (TOR) Project Manager. Annex

Terms of Reference (TOR) Project Manager. Annex Terms of Reference (TOR) Project Manager Annex A. Project Title: Achieving Kuwait 2035 Vision Towards Persons with Disability Project This assignment is under the framework of the Project: Achieving Kuwait

More information

Terms of Reference for a Terminal Evaluation of UNDP-Uganda Country Programme Action Plan (CPAP): ( /15)

Terms of Reference for a Terminal Evaluation of UNDP-Uganda Country Programme Action Plan (CPAP): ( /15) Annex A: Terms of Reference Country Programme Action Plan (CPAP): (2010-2014/15) 1.0 Background: The United Nations Development Programme (UNDP) in Uganda is supporting implementation of the Government

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 12 Jun 2017 Country: Bangkok, Thailand Description of the assignment: Policy Specialist - Development Finance and Cooperation Duty Station: Bangkok, Thailand

More information

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment Technical Assistance Report Project Number: 50005-001 Policy and Advisory Technical Assistance (PATA) October 2016 People s Republic of China: Research on Innovative Mechanism for Open Agricultural Investment

More information

Terms of Reference (ToR) Livelihood and Economic Recovery Specialist

Terms of Reference (ToR) Livelihood and Economic Recovery Specialist I. Position Information Post Title: Level: Project: Supervisor: Duty Station: Duration: Individual Consultant/Contract (IC) Capacity Strengthening of NRA for Resilient Reconstruction Income Generation

More information

Sustainable urban sanitation and hygiene

Sustainable urban sanitation and hygiene Sustainable urban sanitation and hygiene Imagine if Improving access to sanitation In Indonesia s small cities progress in sanitation is limited. Fecal sludge management, where there is safe emptying and

More information

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia Individual Consultancy: Coordinator for Education Sector Working Group and Global Partnership for Education 2018 Terms of Reference 1. Background

More information

ANNEX I LRPS LOT 1 - WASH STBM ENDLINE EVALUATION SURVEY TERMS OF REFERENCE

ANNEX I LRPS LOT 1 - WASH STBM ENDLINE EVALUATION SURVEY TERMS OF REFERENCE ANNEX I LRPS-2017-9130571 LOT 1 - WASH STBM ENDLINE EVALUATION SURVEY TERMS OF REFERENCE 1. Title of the assignment: WASH STBM endline evaluation survey. This survey is part of the UNICEF support to the

More information

Keywords: Indonesia; Infrastructure; Provincial capitals; Rank; Transportation

Keywords: Indonesia; Infrastructure; Provincial capitals; Rank; Transportation International Journal of Technology (2016) 4: 544-552 ISSN 2086-9614 IJTech 2016 MAPPING PRIORITIES FOR THE DEVELOPMENT OF THE TRANSPORTATION INFRASTRUCTURE IN THE PROVINCIAL CAPITALS OF INDONESIA Yusuf

More information

Plan International, Kenya Job Description Country Logistics and Administration Manager

Plan International, Kenya Job Description Country Logistics and Administration Manager JOB SUMMARY Plan International, Kenya Job Description Country Logistics and Administration Manager Position Country Logistics and Administration Manager Grade D2 Department Program Support Services Date

More information

Recruitment Process. Creation of assignment. Advertisement

Recruitment Process. Creation of assignment. Advertisement Recruitment Process The recruitment process outlined here spans the range of activities that are required to place a volunteer with a partner organisation. These start with the creation of an assignment

More information

TACKLING REGIONAL DISPARITY THROUGH LOCAL INITIATIVES

TACKLING REGIONAL DISPARITY THROUGH LOCAL INITIATIVES Keynote Speech: TACKLING REGIONAL DISPARITY THROUGH LOCAL INITIATIVES Minister of National Development Planning/ Head of National Development Planning Agency IRSA International Conference Surakarta, 23

More information

1. Background of the Programme

1. Background of the Programme Terms of Reference Contracting a full time individual consultant to conduct Gender & Nutrition activities of the Smallholder Agribusiness Partnerships Programme (SAPP) 1. Background of the Programme The

More information

Organisation for Joint Armament Co-operation Executive Administration VACANCY NOTICE

Organisation for Joint Armament Co-operation Executive Administration VACANCY NOTICE OCCAR Organisation for Joint Armament Co-operation Executive Administration VACANCY NOTICE Post Grade Division Section AF09 Commercial and Contract Section Leader A5 European MALE RPAS Programme Division

More information

Terms of Reference (TOR)

Terms of Reference (TOR) Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified

More information

NSW DEPARTMENT OF EDUCATION AND COMMUNITIES

NSW DEPARTMENT OF EDUCATION AND COMMUNITIES NSW DEPARTMENT OF EDUCATION AND COMMUNITIES Position Description POSITION DETAILS Position Title: Reports to: Manager, Asset Management Unit (Various locations) Manager, Delivery Date: April 2010 PRIMARY

More information

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia United Nations Children s Fund (UNICEF) Individual Consultant Technical Adviser to support the implementation of Cambodia PROTECT: A Communication Strategy to End Violence against Children and Unnecessary

More information

THABA CHWEU LOCAL MUNICIPALITY

THABA CHWEU LOCAL MUNICIPALITY ABLE OF CONTENT 1. INTRODUCTION 02 2. LEGISLATIVE FRAMEWORK 03 3. ORGANISATIONAL IDP STRUCTURES & AND BUDGET KEY ROLE PLAYERS FOR THE IDP PROCESS 03 3.1. IDP Manager 03 3.2. IDP Managers Forum 04 3.3.

More information

Context: Position Title : International Consultant - Diaspora Strategy

Context: Position Title : International Consultant - Diaspora Strategy Position Title : International Consultant - Diaspora Strategy Duty Station : Sarajevo, Bosnia-Herz. Classification : Consultant, Grade OTHE Type of Appointment : Consultant, Forty-nine days* Estimated

More information

TERMS OF REFERENCE INTERNATIONAL CONSULTANT TO CONDUCT CAREER DEVELOPMENT, STRESS AND RELATIONSHIP MANAGEMENT FOR UNDP STAFF

TERMS OF REFERENCE INTERNATIONAL CONSULTANT TO CONDUCT CAREER DEVELOPMENT, STRESS AND RELATIONSHIP MANAGEMENT FOR UNDP STAFF 1 TERMS OF REFERENCE INTERNATIONAL CONSULTANT TO CONDUCT CAREER DEVELOPMENT, STRESS AND RELATIONSHIP MANAGEMENT FOR UNDP STAFF Job Title: Category: Duty Station: Type of contract: Expected starting date:

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Senior Specialist for Participatory Governance Assessment Project Name : 84870 (Participatory Governance Assessment) Reports to: Technical Adviser PGA Duty

More information

JOB AND PERSON SPECIFICATION

JOB AND PERSON SPECIFICATION JOB AND PERSON SPECIFICATION Position Title: Human Resources Manager Reports Directly to: General Manager, Operational Services Responsible for: Human Resources, WHS, Payroll, Volunteer Services Member

More information

Contractor Representative / Project Director The Kiribati Facility - Short Term Adviser

Contractor Representative / Project Director The Kiribati Facility - Short Term Adviser Contractor Representative / Project Director The Kiribati Facility - Short Term Adviser Appointment: International (ARF D4) Location: Reporting to: Australia and Tarawa, Kiribati Chief Operations Officer

More information

NSW Government Capability Framework - Benchmark Job Evaluations. NSW Department of Premier and Cabinet

NSW Government Capability Framework - Benchmark Job Evaluations. NSW Department of Premier and Cabinet NSW Government Capability Framework - Benchmark Job Evaluations NSW Department of Premier and Cabinet Contents 1. Work Value Assessments...1 Human Resources...1 Engineering...1 Finance...1 Legal...2 Project

More information

REQUIRED DOCUMENT FROM HIRING UNIT

REQUIRED DOCUMENT FROM HIRING UNIT Terms of reference GENERAL INFORMATION Title: Provincial Field Dinamisator (Jambi) Project Name: Support Facility for BRG (Badan Restorasi Gambut) Institutional Set-Up Reports to: Deputy III of BRG and

More information

Terms of Reference (ToR)

Terms of Reference (ToR) Consultancy Assignment for Impact Evaluation of Increasing the income of poor farmers, landless, youth, single women, People with Disabilities, and People Living with HIV, by creating employment opportunities

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Service Delivery Manager (People HERA Grade: 8 Management Systems) Responsible to: Assistant Director (Business Services) Accountable for: Day to day leadership of team members

More information