1 MDOT Freeway Lighting Public Private Partnership Design-Build Build-Finance Finance-Operate Operate-Maintain (DBFOM) Project

2 Project Overview Administering - Design and Construction Administering - Operations and Maintenance Challenges and Lessons Learned National Perspective on Lighting Projects Questions

3 FHWA definition of Public-Private Partnerships (P3 s) - contractual agreements formed between a public agency and a private sector entity that allow for greater private sector participation in delivering and financing of project. MDOT benefits for this P3 Contract: Shift and manage specific risks with private sector Private funds to expedite the work Shift and reallocate MDOT resources elsewhere Improve lighting and increase public safety Reduce costs: energy savings and maintenance Promote innovation: save energy, prevent theft Energy Savings Program over $1,200,000

4 General Overview: Payment Structure Milestone 1 -$6,000,000 was paid at 90% operable lighting Milestone 2 - $6,000,000, paid at Subst. Completion After Substantial Completion Operate & Maintain Quarterly Service Payments (estimated =$2.1 w/o power) Plan to use a mix of Federal and State funds Total Cost of P3 contract = $145M (includes energy) Lights operating at 70-73% (current scenario) Expected cost = $142M Based on average costs expended over the last 8 years Lights operating at 100%, using High Pressure Sodium lights Estimated cost = $183M $46.03 $21.86 $77.26 Capital Improvement Costs O&M Costs Power Costs

5 Technical Requirements: Technical Requirements Schedule 16 Design Requirements: Non-Tunnels AASHTO Roadway Lighting Design Guide / IES RP-8 Tunnels AASHTO Roadway Lighting Design Guide (Chap 5) / IES RP-22 Non-Lighting Elements adhere to MDOT Standards, AASHTO, etc. Maintenance Management Information System (MMIS) Project Management Plan Traffic Management Plan Quality Plan Safety Plan Operations and Maintenance Plan

6 Non-Compliance: 31 Non-Compliance Events: Quality, Performance and Administrative $450 per occurrence, $1000 if not remedied If the root cause of the problem is substantially the same Deduction is increased to $1000, indexed Mitigation Period timeframe is dependent on the type of failure Remedy Period timeframe is dependent on the type of failure 10 days -correct a non-operating light 7 days -correct a group of non-operating lights

7 Handback Criteria: A complete condition survey and inspection must be completed within 1 year of handback Supply a 60 day supply of parts and materials quantity based upon a 60 day typical period for repairs documented in the MMIS Handback requirements are variable dependent on the component Luminaires (including ballast/driver) 5 years Posts/Standards before term require inspections, during term 10 yrs& inspection High Mast before term require inspections, during term 15 yrs& inspection

8 MDOT Project Team: Procurement Document Development Team: AECOM KPMG Nossaman Project Company Freeway Lighting Partners (FLP) Finance-Star America Fund GP, LLC D&C Contractor - Aldridge Electric, Inc. Designer -Engineer of Record WSP (a.k.a. PB) O&M Contractor - Engie Services Inc. D&C and O&M Electrical Subcontractor Motor City Electric, Inc. Owner s Representative for D&C and O&M HNTB Michigan, Inc

9 Objective of the Project: design and construct improvements to existing freeway and tunnel lighting in the MDOT Metro Region in 2 years. Operate and maintain the freeway lighting for 15 years including a the 2 year design and construction phase. Project Company Scope of Work: Survey existing conditions (panels, circuits, hand holes, foundations) Replace High Pressure Sodium (HPS) fixtures with LED fixtures Repair or replace existing defective foundations and bolts Install 300 missing poles (new) Repair damaged circuits Respond to lighting utility information and staking requests Replace pole knockdowns and general maintenance of the system Tracking and documenting performance

10 Unique Features: Theft and Vehicle Damage FLP responsibility first $150,000 50/50 share up to $250,000 Department covers all costs over $250,000 Damage to Infrastructure Vehicle damage Department responsible for costs associated with damage caused by errant vehicles Department pursues reclamation from insurance with incident reports Michigan State Police only file incident reports when a vehicle is at the scene 141 pole knockdowns, without reports, roughly $4,000.00/pole to replace

11 Detroit News... NASA astronaut Shane Kimbrough tweeted a stunning picture. Good morning USA! Detroit - Toledo Cleveland

12 Administration of Design and Construction: Aug 15 to Aug 17 Review and verify FLP s design, construction and maintenance activities Review Design Submittals for general compliance Administer responses or respond to Requests For Information Assist with coordination (i.e. utilities, active projects, maintenance work) Daily field inspection and reporting of FLP s work Maintain e-construction project files Luminance testing for conformance and uniformity Track remedying maintenance events

13 Administration of Design and Construction: Aug 15 to Aug 17 Lane closure request coordination with multiple Metro Region TSC s Develop Field Manager project files with Field Builder Field Manager Live Contract writing contract mods and track costs No payment estimates generated on P3 contract Field Manager Shadow Contract : Document construction/maintenance activities Track quantities Track material usage and approvals Review, verify compliance for Milestone Payments

14 Administration of Operations and Maintenance: Aug 15 to Aug 30 Review recurring Service Payments and Project Company reports Recurring bi-annual condition inspections Recurring 5 year residual life inspections Monitor progress, maintenance of traffic and materials Verify Lane Rentals/MOT/Noncompliance Events Maintain Field Manager and project electronic files Develop contract modifications as necessary Monitor the accurate tracking of items on MMIS

15 Maintenance Management Information System (MMIS) Elements Included: Asset Inventory Power Delivery Management Performance Tracking Incident Tracking Field Staking Requests Utility Information Requests Non-Compliance Reporting Maintenance Activities

16 Current ON/OFF Status: Fixture Type ON OFF TOTAL Current % On Mainline & Ramp 7, ,416 99% High mast 2, , % Tunnel 2, , % Underpass % Total 13, ,138 99%

17 Challenges/Lessons Learned Document and Version Control Need for the full team (i.e. legal) on-board early during RFQ development RFQ provide detail on the planned structure of the P3 agreement and expected closing process Risk workshops and periodic updates to the financial model Engineering estimates done often and reflect current risk profile of the contract Updated term sheets should be readily available for management Owners should conduct and develop meeting notes Need for owner internal stakeholder support Mobility management during construction Leverage use of local contractors and consultants Owner establish workflow processes for internal use Support from owner s internal departments

18 Challenges/Lessons Learned Performance specifications promote innovation Avoid specifying brand name products Specify E-construction expectations (i.e. Field Manager, Project Wise, Procore) Project company s timely hiring of key personnel Maintaining traffic and SEMTOC coordination Pole knockdowns liability and MSP incident reporting Energy Savings Actual Energy consumption info availability Power supply inconsistency As-Constructed (as-built) information for freeway lighting Active and Past MDOT project coordination Utility coordination during design of future projects Unknown Existing conditions (i.e. COBO decorative lighting, circuits) System damage reclamation process

19 Challenges and Lessons Learned Ensure damper systems are installed for aluminum poles (video below)

20 COBO Tunnel -before and after

21 Metro Region Freeway Lighting P3 wall repairs

22 special equipment

23 National Perspective: Michigan is the first DOT in the U.S. with P3 freeway lighting contract. Detroit is the first major City to upgrade to LED lighting. Michigan 14,800 Freeway lights Washington D.C. 70,000 City lights, Wi-Fi & Central Light Control Chicago 350,000 City lights, Wi-Fi and 311 Systems, Line Item Contract for 5 years Phoenix Feasibility Study Tunnel and Freeway Boston Feasibility Study - Tunnel State of Virginia Feasibility Study State of Indiana Feasibility Study Cleveland Feasibility Study Missouri, Wisconsin, Illinois, Massachusetts, Arizona International Perspective: Nearly all European Cities have LED Lighting

24 Resources FHWA has a P3 informative website: MDOT s Innovative Contracting website: Freeway Lighting Partner s website: Will Mathies, PE MathiesW@michigan.gov Victor Judnic, PE vjudnic@hntb.com Questions?

MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3

MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3 MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3 P3 Definition FHWA defines Public-Private Partnerships (P3 s) as contractual agreements formed between a public agency and a private

More information

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc.

Active Traffic Management in Michigan. Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management in Michigan Patrick Johnson, P.E. HNTB Michigan Inc. Active Traffic Management (ATM) Active Traffic Management Strategies: Dynamic Lane Use Dynamic Shoulder Use Queue Warning

More information

EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT 7 AREAWIDE LIGHTING DATABASE & ASSESSMENT CONTINUING SERVICES FINANCIAL PROJECT NO.

EXHIBIT A SCOPE OF SERVICES FOR DISTRICT 7 AREAWIDE LIGHTING DATABASE & ASSESSMENT CONTINUING SERVICES FINANCIAL PROJECT NO. EXHIBIT "A" SCOPE OF SERVICES FOR DISTRICT 7 AREAWIDE LIGHTING DATABASE & ASSESSMENT CONTINUING SERVICES FINANCIAL PROJECT NO. 443787 1 72 01 Revised: 07/05/18 06/29/18 TABLE OF CONTENTS PAGE NO. I. PURPOSE...

More information

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. TRNSTCHAB97R This position description serves

More information

ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE

ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE ITE MICHIGAN TECHNICAL SESSION LIVING THE P3 DESIGN DREAM DESIGN BUILD ON STEROIDS PRESENTER: TOM WESTON, PE DECEMBER 3, 2009 1 OVERVIEW MDOT DESIGN BUILD EXPERIENCE P3 OVERVIEW P3 ADVANTAGES P3 PROJECT

More information

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification.

0100 GENERAL. C. The limits for Maintenance Services are set forth in Attachment 3 to this Maintenance Specification. 0100 GENERAL 0101 General requirements A. Maintenance Contractor shall be responsible for and shall carry out Maintenance Services for the Maintained Elements set forth in Exhibit 2, Attachment 2 throughout

More information

Interstate 10 Deck Park Tunnel Lighting Upgrade

Interstate 10 Deck Park Tunnel Lighting Upgrade Interstate 10 Deck Park Tunnel Lighting Upgrade Mark J. Poppe, P.E. Arizona Department of Transportation Transportation Systems Management & Operations Division ITE/IMSA Spring Conference March 2016 Outline

More information

Questionnaire Survey for Current Practices in Roadway Safety Hardware Asset Management at State Transportation Agencies

Questionnaire Survey for Current Practices in Roadway Safety Hardware Asset Management at State Transportation Agencies MRUTC Project 8-7: A Methodology for Integrating Roadway Safety Hardware Management into the Overall Highway Asset Management Program Questionnaire Survey for Current Practices in Roadway Safety Hardware

More information

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Project Delivery Methods Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Construction Management at Risk

More information

0100 GENERAL 0200 PROJECT MANAGEMENT

0100 GENERAL 0200 PROJECT MANAGEMENT TEXAS DEPARTMENT OF TRANSPORTATION 0100 GENERAL 0101 General requirements A. Maintenance Contractor shall be responsible for and shall carry out Maintenance Services for the Maintained Elements set forth

More information

Iowa Department of Transportation Intelligent Work Zone Deployments

Iowa Department of Transportation Intelligent Work Zone Deployments Iowa Department of Transportation Intelligent Work Zone Deployments SMARTER WORK ZONES TECHNOLOGY APPLICATIONS CASE STUDY The Every Day Counts Initiative (EDC-3) aims to accelerate the deployment of identified,

More information

TMC of the Future. Dr. Bob Edelstein, PE, PTOE Senior Vice President

TMC of the Future. Dr. Bob Edelstein, PE, PTOE Senior Vice President TMC of the Future Dr. Bob Edelstein, PE, PTOE Senior Vice President Overview Traffic Operations Centers Transportation Management Centers TMCs are transforming to be more proactive in addressing recurring

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE.

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE. STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1114 LUMINAIRES, SOLID-STATE (LED) APPROVED LIST QUALIFICATION PROCEDURE July 18, 2014 1114.01 Description 1114.02 Approval 1114.03 Removal from the

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES NOVEMBER 2016

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES NOVEMBER 2016 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Role of Procurement / Purchasing Within the Authority

Role of Procurement / Purchasing Within the Authority Role of Procurement / Purchasing Within the Authority What is Purchasing s Role / Why Is Purchasing Important? The Authorized entity within the Water Authority that procures the goods / services required.

More information

US-23 Flex Route First Active Traffic Management (ATM) System in Michigan

US-23 Flex Route First Active Traffic Management (ATM) System in Michigan Jennifer Foley Michigan Department of Transportation, Jackson, Michigan 49201 United States of America Karianne Steffen, P.E. PTOE HNTB Michigan, Inc. 3100 West Road Building 2, Suite 202 East Lansing,

More information

An Ounce of Prevention: Performance-Based Maintenance Contracting

An Ounce of Prevention: Performance-Based Maintenance Contracting An Ounce of Prevention: Performance-Based Maintenance Contracting By Christopher L. Warren, P.E. and Howard Butch Eley You wouldn't buy a new car and drive it 100,000 miles without ever changing the oil.

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0027-12-134 SPECIAL PROVISION 000--2823 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

Federal Highway Administration Cooperative Automated Vehicle (CAV) Update

Federal Highway Administration Cooperative Automated Vehicle (CAV) Update Federal Highway Administration Cooperative Automated Vehicle (CAV) Update AASHTO Committee on Traffic Engineering Kevin Sylvester Office of Transportation Operations Office of Operations Federal Highway

More information

PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE

PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE PACKAGING P3 PROCUREMENTS FOR COMPLEX PROJECTS THE LAX EXPERIENCE BRIAN C. OSTLER Deputy City Attorney City of Los Angeles ROGER JOHNSON Airport Program Executive Jacobs BRANDON J. DAVIS Partner Nossaman

More information

Special Provision No. 199S53 February 2005

Special Provision No. 199S53 February 2005 QUALITY CONTROL COMPLIANCE INCENTIVE Special Provision No. 199S53 February 2005 1.0 SCOPE This special provision covers the financial incentive available to the Contractor for compliance with the quality

More information

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E.

Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Jobs & Transportation Ramping it Up Roadway and Traffic Dan Groh, P.E. Ohio DOT Work Zone Process Review Ohio DOT Work Zone Process Review This review was conducted by the Ohio Department of Transportation

More information

NOCoE Peer Exchange Performance-Based Contracting

NOCoE Peer Exchange Performance-Based Contracting NOCoE Peer Exchange Performance-Based Contracting Detroit, Michigan June 18, 2018 Michael Washburn Florida s Turnpike Incident Management Program Manager Transportation Florida s Turnpike Enterprise System

More information

I-90 Smart Road: Operational Features. October 18th, 2017 Scott Lee, P.E., TIMS Project Manager, Parsons Amarpal Matharu, P.E.

I-90 Smart Road: Operational Features. October 18th, 2017 Scott Lee, P.E., TIMS Project Manager, Parsons Amarpal Matharu, P.E. I-90 Smart Road: Operational Features October 18th, 2017 Scott Lee, P.E., TIMS Project Manager, Parsons Amarpal Matharu, P.E., Illinois Tollway Tollway ITS History Up To 2016 Over 1050 CCTV Cameras 45

More information

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan

Chapter 10. Intelligent Transportation Systems. Ohio Kentucky Indiana Regional Council of Governments Regional Transportation Plan Chapter 10 Intelligent Transportation Systems Ohio Kentucky Indiana Regional Council of Governments 2030 Regional Transportation Plan Chapter 10 Intelligent Transportation Systems INTRODUCTION Intelligent

More information

SASHTO August 26, Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets

SASHTO August 26, Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets SASHTO August 26, 2014 Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets Missing opportunities for revenue generation and cost savings? 1 Opportunities

More information

Arizona DOT Transportation Systems Management and Operations (TSM&O)

Arizona DOT Transportation Systems Management and Operations (TSM&O) Arizona DOT Transportation Systems Management and Operations (TSM&O) Jim Windsor, PE TSM&O Deputy State Engineer Timothy Tait, Ed.D Communications Director Arizona Department of Transportation April 11,

More information

MDOT Connected Vehicle Work Zone Applications

MDOT Connected Vehicle Work Zone Applications MDOT Connected Vehicle Work Zone Applications MDOT Connected Vehicle Work Zone Applications The first stage of connected vehicles Video 1 Can we give up control Video 2 The Future. Presentation Overview

More information

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

Owner's Representative Scope Matrix - D/B Rev 10/28/2013 Ecluded Owner's Representative Scope Matri - D/B Rev 10/28/2013 The following matri is a worksheet to identify required and optional scope for Owner's Representative services. Please identify the scope

More information

State Strategies to Reduce Traffic Congestion. National Conference of State Legislatures November, 2007

State Strategies to Reduce Traffic Congestion. National Conference of State Legislatures November, 2007 State Strategies to Reduce Traffic Congestion National Conference of State Legislatures November, 2007 More People More Freight 40 million more people in last 15 years Highway travel increase 1990-2003,

More information

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract and Sequence of Work 2004 Specifications CSJ 0110-04-181 SPECIAL PROVISION 000--1278 Description of Project, Scope of Contract and Sequence of Work 1. General. The work to be performed on this project consists of furnishing,

More information

RAPID INCIDENT SCENE CLEARANCE (RISC)

RAPID INCIDENT SCENE CLEARANCE (RISC) Approved: Effective: September 18, 2008 Traffic Engineering and Operations Topic No. 750-030-020-a RAPID INCIDENT SCENE CLEARANCE (RISC) PURPOSE: Rapid Incident Scene Clearance (RISC) is a highly innovative

More information

Facilities Controller Job Description

Facilities Controller Job Description Job Title: Employer: Location: Responsible to: Responsible for: Facilities Controller Torus 62 Ltd St Helens and Warrington Compliance & Assurance Manager (Facilities and Energy) Operation and coordination

More information

South Carolina Department of Transportation. Engineering Directive

South Carolina Department of Transportation. Engineering Directive South Carolina Department of Transportation Engineering Directive Directive Number: ED-78 Effective: March 1, 2019 Subject: References: Primary Department: Business Rules for District Traffic Signal Shop

More information

DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO. January 2, 2018 ADDENDUM NO. 1 FOR

DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO. January 2, 2018 ADDENDUM NO. 1 FOR DEPARTMENT OF PROCUREMENT SERVICES CITY OF CHICAGO January 2, 2018 ADDENDUM NO. 1 FOR Median and Boulevard Landscape Maintenance and Services North Region This document contains: Specification No. 220844

More information

AASHTO Manual for Bridge Evaluation: Section 3, Bridge Management Systems A Practical Tour

AASHTO Manual for Bridge Evaluation: Section 3, Bridge Management Systems A Practical Tour 0 0 0 AASHTO Manual for Bridge Evaluation: Section, Bridge Management Systems A Practical Tour Dave Juntunen P.E. Michigan Department of Transportation Bridge Development Engineer Vice-Chair AASHTO SCOBS

More information

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work

SPECIAL PROVISION Description of Project, Scope of Contract, and Sequence of Work 1993 Specifications CSJ 0271-07-223, etc. SPECIAL PROVISION 000--3236 Description of Project, Scope of Contract, and Sequence of Work 1.1 General. The work to be performed on this project consists of furnishing,

More information

Transportation Management Plan

Transportation Management Plan Transportation Management Plan I 80 PE County, MP 51.38 to MP 62.49 One Inch Mill and Two Inch Fill With Open Grade July 2016 Prepared by Lisa Ouellette Nevada Department of Transportation Executive Summary

More information

Memphis MPO Regional ITS Architecture Update. Stakeholder Workshop June 6, 2018

Memphis MPO Regional ITS Architecture Update. Stakeholder Workshop June 6, 2018 Memphis MPO Regional ITS Architecture Update Stakeholder Workshop June 6, 2018 Workshop Overview Welcome and Introductions Overview of the Regional ITS Architecture Review of Regional ITS Needs Review

More information

Dallas/Fort Worth International Airport Asset Management Quality Assurance / Contractor Accountability Program

Dallas/Fort Worth International Airport Asset Management Quality Assurance / Contractor Accountability Program Dallas/Fort Worth International Airport Asset Management Quality Assurance / Contractor Accountability Program April 23, 2010 Asset Management Departmental Division of Responsibilities Manager Infrastructure

More information

WASHINGTON STATE TRANSIT INSURANCE POOL. Strategic Plan AN ORGANIZATIONAL DEVELOPMENT PROCESS

WASHINGTON STATE TRANSIT INSURANCE POOL. Strategic Plan AN ORGANIZATIONAL DEVELOPMENT PROCESS WASHINGTON STATE TRANSIT INSURANCE POOL Strategic Plan AN ORGANIZATIONAL DEVELOPMENT PROCESS Adopted 03/24/2017 DRAFT 3/15/2018 STRATEGIC PLAN Introduction Each year the Washington State Transit Insurance

More information

SHRP2 C19 Expediting Project Delivery VTrans Accelerated Bridge Program

SHRP2 C19 Expediting Project Delivery VTrans Accelerated Bridge Program C19: Expediting Project Delivery SHRP2 C19 Expediting Project Delivery VTrans Accelerated Bridge Program AASHTO Standing Committee on Bridges 2017 June 15, 2017 Wayne B. Symonds, PE VTrans Deputy Chief

More information

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL

DRAFT ITEM GP-100 ITEM GP-100 CONTRACTOR QUALITY CONTROL PROGRAM 1.1 GENERAL 1.1 GENERAL When the specification requires a Contractor Quality Control Program, the Contractor shall establish, provide, and maintain an effective Quality Control Program that details the methods and

More information

Plans, Programs, and Projects Update

Plans, Programs, and Projects Update TES Conference October 2018 IDOT Intelligent Transportation Systems Plans, Programs, and Projects Update IDOT ITS Staff Central Office Bureau of Operations Terry Heffron ITS Unit Manager Kevin Price -

More information

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. Was Previously: TRAENGEA91R This position description

More information

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE

CONTROL OF WORK 1.02 AUTHORITY AND DUTIES OF THE ENGINEER S AUTHORIZED REPRESENTATIVE 1.01 AUTHORITY OF THE ENGINEER CONTROL OF WORK A. The work included in the contract is to be done to the complete satisfaction of the Engineer, and the decision of the Engineer as to the true construction

More information

Reports Issued for Internal Audit Engagements July 1, 2014, through June 30, 2015 As Reported by State Agencies

Reports Issued for Internal Audit Engagements July 1, 2014, through June 30, 2015 As Reported by State Agencies Alabama Reports Issued for Internal Audit Engagements July 1, 2014, through June 30, 2015 As Reported by State Agencies Third Division (presently East 11/1/12- After Hours/Holiday Fuel Issues Central Region)

More information

The first phase of the study involved the execution of the following tasks for signal poles:

The first phase of the study involved the execution of the following tasks for signal poles: Signal Pole, Sign Structure, and High Mast Lighting Structure Design The first phase of the study involved the execution of the following tasks for signal poles: Task 1 Conduct literature review and a

More information

2016 National Tribal Transportation Conference

2016 National Tribal Transportation Conference Alaska Tribal Technical Assistance Program Center 2016 National Tribal Transportation Conference Construction Management Darrel Williams Introductions Introduction to Construction Administration Construction

More information

Transportation Pooled Fund Study TPF-5 (231)

Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Drafmu Transportation Pooled Fund Study TPF-5 (231) Real-Time Integration of Arrow Board Messages into Traveler Information Systems EVALUATION PLAN Prepared by September 2017 Acknowledgements

More information

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue Procedure Work Health and Safety Contractor Management Document number: PRO-00808 This document is the property of Seqwater. It must not be copied or reproduced in any way whatsoever without the authority

More information

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing

Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Project Delivery Methods January 30, 2012 Public Building Commission of Chicago Terms and Tools for Public Capital Development and Financing Terms Capital Project Capital Program Prioritized Capital Plan

More information

PILLAR PAGE 3

PILLAR PAGE 3 www.pillaroma.com 276.223.0500 PILLAR PAGE 3 Maximizing the life of America s roadways PILLAR is a firm comprised of engineers, surveyors, managers, technicians, and safety professionals dedicated to maximizing

More information

FHWA Update 2017 Michigan Bridge Conference March 22, 2017

FHWA Update 2017 Michigan Bridge Conference March 22, 2017 FHWA Update 2017 Michigan Bridge Conference March 22, 2017 Mark Lewis, P.E. Bridge Engineer/Program Development Team Leader Ralph Pauly, P.E. Assistant Structures Engineer Presentation Outline National

More information

Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant

Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant RFP FY2017-BFD-01 Release Date: May 8 th, 2017 Applications Due: June 23 rd, 2017 1. PROGRAM SUMMARY

More information

Intelligent Transportation System Maintenance A Key Component to the Future of an Intelligent Transportation System

Intelligent Transportation System Maintenance A Key Component to the Future of an Intelligent Transportation System White Paper Intelligent Transportation System Maintenance A Key Component to the Future of an Intelligent Transportation System May 2, 2008 Final Version Prepared for: Florida Department of Transportation

More information

Sustaining Traffic Incident Management Programs with State DOT Leadership Steven Cyra, PE, PTOE HNTB Fellow, Associate Vice President

Sustaining Traffic Incident Management Programs with State DOT Leadership Steven Cyra, PE, PTOE HNTB Fellow, Associate Vice President 2014 Annual Meeting November 12-14, 2014 Sustaining Traffic Incident Management Programs with State DOT Leadership Steven Cyra, PE, PTOE HNTB Fellow, Associate Vice President Presentation Why Traffic Incident

More information

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC

STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC STATEMENT OF WORK FOR HOLIDAY DECORATIONS AT WASHINGTON DULLES INTERNATIONAL AIRPORT WASHINGTON, DC PREPARED BY: Metropolitan Washington Airports Authority Washington Dulles International Airport Engineering

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. March 2018

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES. March 2018 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

TxDOT s Compass Project. September 29, 2009

TxDOT s Compass Project. September 29, 2009 TxDOT s Compass Project September 29, 2009 Agenda I. Project Background II. Part 1 Maintenance Management Study III. Part 2 Maintenance Management System Selection IV. Part 3 The Compass Project V. Questions

More information

Office of Freight, Logistics, and Passenger Operations Transit and Intermodal Support Scope of Services

Office of Freight, Logistics, and Passenger Operations Transit and Intermodal Support Scope of Services Purpose The Department requires the assistance of a Consultant for a range of professional engineering, planning, policy, in-house support staff and other technical services to support the Transit Office

More information

P3 OPERATIONS & MAINTENANCE ADVISORS

P3 OPERATIONS & MAINTENANCE ADVISORS P3 OPERATIONS & MAINTENANCE ADVISORS Estimating and planning for long-term concessions. PRACTICAL. EXPERIENCED. RELIABLE. 1 While many aspire to be maintenance managers, each member of our team has accomplished

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM. OFS:CRB 1 of 8 APPR:JJG:LWB: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR STOPPED TRAFFIC ADVISORY SYSTEM OFS:CRB 1 of 8 APPR:JJG:LWB:10-30-13 a. Description. This work consists of providing, installing, operating,

More information

AASHTO Subcommittee on Traffic Engineering. June 19, John Conrad

AASHTO Subcommittee on Traffic Engineering. June 19, John Conrad AASHTO Subcommittee on Traffic Engineering June 19, 2012 John Conrad What is SHRP2? Save lives. Save money. Save time. $218 million, federally funded research program to address critical transportation

More information

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future

Greenhouse Gas Emissions. Climate Change: Taking Action for the Future Greenhouse Gas Emissions Climate Change: Taking Action for the Future The energy industry across the United States is undergoing a major transformation by seeking lower-carbon energy sources while meeting

More information

Route 7 Truck Climbing Lane. RFQ Information Meeting

Route 7 Truck Climbing Lane. RFQ Information Meeting Route 7 Truck Climbing Lane From West Market Street to Route 9 RFQ Information Meeting November 9, 2012 Mark Gibney, PE District Project Manager Ian Millikan, PE APD Project Manager and POC Introduction

More information

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. TRAENGAD16R This position description serves

More information

Special Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply:

Special Provision No. 199S66 March For the purpose of this Special Provision, the following definitions apply: QUALITY CONFORMANCE REQUIREMENTS Special Provision No. 199S66 March 2018 1.0 SCOPE This Special Provision describes the process for the assessment of conformance to the quality requirements and the administrative

More information

ICMI Cyanide Code Transportation Certification Audit Summary Report. Intermodal Cartage Co., Inc. Memphis, Tennessee - USA

ICMI Cyanide Code Transportation Certification Audit Summary Report. Intermodal Cartage Co., Inc. Memphis, Tennessee - USA ICMI Cyanide Code Transportation Certification Audit Summary Report Intermodal Cartage Co., Inc. Memphis, Tennessee - USA Submitted to: The International Cyanide Management Institute 1400 I Street, NW

More information

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO)

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) Statewide Strategic Plan Texas Association of Metropolitan Planning Organization (TEMPO) Meeting March 2, 2018 Today s Speakers Marco Cameron, P.E,

More information

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days

Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota. PMI MN 2009 Professional Development Days Design-Build Reconstruction of I-494 in Plymouth, Minnetonka and Eden Prairie, Minnesota PMI MN 2009 Professional Development Days Agenda Project Overview Best Practices: Knowing the Right Things Doing

More information

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment

Concept of Operations prepared for Minnesota Department of Transportation (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment Concept of Operations prepared for Minnesota Department of (MnDOT) for Rural Intersection Conflict Warning Systems II Deployment December 22, 2014 Table of Contents 1. Introduction and Concept Overview...1

More information

ATTACHMENT 3. Background:

ATTACHMENT 3. Background: Colorado Tolling Enterprise (CTE) or High Performance Transportation Enterprise Additional Information Requirements for Amendment Submittals for the DRCOG Fiscally Constrained RTP Adopted by DRCOG Board

More information

ITN-DOT-15/ PM EXHIBIT A SCOPE OF SERVICES D4 RAPID INCIDENT SCENE CLEARANCE (RISC)

ITN-DOT-15/ PM EXHIBIT A SCOPE OF SERVICES D4 RAPID INCIDENT SCENE CLEARANCE (RISC) EXHIBIT A SCOPE OF SERVICES RAPID INCIDENT SCENE CLEARANCE (RISC) FOR DISTRICT FOUR 1. PROJECT OBJECTIVE 1.1 In an effort to provide the traveling public of the State of Florida a cost effective, high

More information

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities

Table of Contents. 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities 1400 Lunar Drive Wapakoneta, OH 45895 Supplier Manual Table of Contents 1.0 Introduction 1.1 Overview 1.2 Customer Responsibilities 2.0 Supplier Quality Expectations 2.1 Quality System Requirements 2.2

More information

ATTACHMENT D. Open Roads Policy

ATTACHMENT D. Open Roads Policy ATTACHMENT D Open Roads Policy DISTRICTWIDE SEVERE INCIDENT RESPONSE VEHICLE (SIRV) SERVICES Attachment C, Page 1 of 5 State of Florida OPEN ROADS POLICY AGREEMENT (Revised January 2014) Quick Clearance

More information

WISCONSIN TRANSPORTATION TRIBAL CONFERENCE NOVEMBER 7, 2018 WISCONSIN DEPARTMENT OF TRANSPORTATION, P.E.

WISCONSIN TRANSPORTATION TRIBAL CONFERENCE NOVEMBER 7, 2018 WISCONSIN DEPARTMENT OF TRANSPORTATION, P.E. WISCONSIN TRANSPORTATION TRIBAL CONFERENCE NOVEMBER 7, 2018 WISCONSIN DEPARTMENT OF TRANSPORTATION, P.E. I-94 NORTH-SOUTH FREEWAY UNDER 2 YEARS I-94 NORTH-SOUTH FREEWAY OVERVIEW New mainline pavement on

More information

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS

APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS APPENDIX A: SHORT-TERM PROJECT DEPLOYMENTS Page 1 of 15 ST-01: I-95 ITS DEPLOYMENT (DE STATE LINE TO AIRPORT) PROJECT DESCRIPTION AND SCOPE: Project will address gaps in ITS device coverage on I-95 from

More information

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231)

ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) ENTERPRISE Transportation Pooled Fund Study TPF-5 (231) Use and Impacts of Camera Images and Other Displays of Traveler Information EXECUTIVE SUMMARY Prepared by September 2013 Acknowledgements This document

More information

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018

Project Prioritization for Urban and Rural Projects TEAM CONFERENCE March 7, 2018 Project Prioritization for Urban and Rural Projects 2018 TEAM CONFERENCE March 7, 2018 Challenge Limited funding for transportation improvements requires strategic selection of projects to ensure resource

More information

The Essential Elements of a SMARTZONE Contract

The Essential Elements of a SMARTZONE Contract AASHTO (TIG) Workshop St. Louis, MO September 12-13 13 The Essential Elements of a SMARTZONE Contract Steve Kite, PE NCDOT Work Zone Traffic Control Project Engineer How do I start? http://tig.transportation.org

More information

NCHRP 20-7 Guide to Benchmarking Operations Performance Measures Incident Duration - Pilot Test Results

NCHRP 20-7 Guide to Benchmarking Operations Performance Measures Incident Duration - Pilot Test Results NCHRP 20-7 Guide to Benchmarking Operations Performance Measures Incident Duration - Pilot Test Results 4.2 Incident Duration As incident management systems are maturing in many metropolitan areas, incident

More information

Traffic Data Programs at Virginia DOT: 10 plus Years of Innovation

Traffic Data Programs at Virginia DOT: 10 plus Years of Innovation Traffic Data Programs at Virginia DOT: 10 plus Years of Innovation Presented by Digital Traffic Systems Inc. Mr. Peter Keen peter.keen@dtsits.com NATMEC 2012 Dallas, Texas 6/5/2012 Business Partner Perspective

More information

Toward Zero Deaths (TZD): a National Strategy on Highway Safety. Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation

Toward Zero Deaths (TZD): a National Strategy on Highway Safety. Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation Toward Zero Deaths (TZD): a National Strategy on Highway Safety Priscilla Tobias, P.E. State Safety Engineer Illinois Department of Transportation Fatalities 60,000 50,000 40,000 30,000 20,000 10,000 Highway

More information

Smart Mobility Advancing Operations

Smart Mobility Advancing Operations Smart Mobility Advancing Operations What is TSM&O presented to 2016 Ohio Planning Conference presented by Mark Geib, Michigan DOT July 27, 2016 TSM&O Transportation Systems Management and Operations (TSM&O)

More information

Special Provision No. 199S53 January 2018

Special Provision No. 199S53 January 2018 PERFORMANCE REQUIREMENT - QUALITY PROCESSES Special Provision No. 199S53 January 2018 1.0 SCOPE This Special Provision describes the performance requirements for quality processes, assessment of conformance

More information

JANUARY 2018 NCHRP PRACTICE-READY SOLUTIONS FOR NCHRP. Roadway Tunnels NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS

JANUARY 2018 NCHRP PRACTICE-READY SOLUTIONS FOR NCHRP. Roadway Tunnels NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS JANUARY 2018 NCHRP PRACTICE-READY SOLUTIONS FOR Roadway Tunnels NCHRP NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM RESEARCH TOPIC HIGHLIGHTS INTRODUCTION Roadway Tunnels: NCHRP Shines a Light on Underground

More information

I. Development, Submittal, and Acceptance of a Quality Management System

I. Development, Submittal, and Acceptance of a Quality Management System I. Development, Submittal, and Acceptance of a Quality Management System 1. Scope Under the Contract, quality assurance and quality control management are the responsibility of the Contractor. The Contractor

More information

Innovations in establishing priorities for roadway maintenance & capital projects April 16, Presented by: Chris McConn

Innovations in establishing priorities for roadway maintenance & capital projects April 16, Presented by: Chris McConn Innovations in establishing priorities for roadway maintenance & capital projects April 16, 2012 Presented by: Chris McConn Identifying a need Our client is one of the top 5 largest cities in the country

More information

Converting to LED Street Lights: Getting Started

Converting to LED Street Lights: Getting Started Chapter 6 Converting to LED Street Lights: Getting Started While the benefits of LED street lighting are substantial from a financial, environmental, and community perspective, communities whose lights

More information

South Carolina Department of Transportation Engineering Directive Memorandum

South Carolina Department of Transportation Engineering Directive Memorandum South Carolina Department of Transportation Engineering Directive Memorandum Number: 33 Primary Department: Traffic Engineering Referrals: None Subject: SCDOT Mast Arm Standards This directive provides

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES APRIL 2017

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES APRIL 2017 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Design -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects;

Design -- geometric and structural design of roadways and bridges, and preparation of detailed plans and specifications for individual projects; WELCOME Welcome to the Estimates Chapter One Lesson. This Final Estimates training course covers the preparation of final estimates by field personnel. In this first chapter, you will become familiar with

More information

Digital Asset Inspections

Digital Asset Inspections Digital Asset Inspections Roads Operations Nov 1, 2017 Presentation City of Hamilton Facts City Incorporation 1846 Amalgamation 2001 Land Area 1117 sq km Population 520,000 (2011 census) Main Assets Roads

More information

Florida Department of Transportation District 4. To Design, Build, Finance, Operate and Maintain. The I-595 Corridor Roadway Improvements Project

Florida Department of Transportation District 4. To Design, Build, Finance, Operate and Maintain. The I-595 Corridor Roadway Improvements Project I-595 RFP Volume II - Technical Requirements Division II, Section 4, Operations & Maintenance Requirements Florida Department of Transportation District 4 To Design, Build, Finance, Operate and Maintain

More information

Highway Maintenance Engineering Discipline Working Group Meeting. October 11, 2017

Highway Maintenance Engineering Discipline Working Group Meeting. October 11, 2017 Highway Maintenance Engineering Discipline Working Group Meeting October 11, 2017 Agenda Welcome and Introductions Meeting Outcomes Updates Competency Model Wisconsin Highway Maintenance Survey http://bit.ly/2fdfn3b

More information

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016

395 Express Lanes Project Design-Build Procurement Industry Outreach. March 23, 2016 395 Express Lanes Project Design-Build Procurement Industry Outreach March 23, 2016 INTRODUCTIONS Karl Rohrer, Head of Delivery, Transurban Susan Shaw, Regional Transportation Program Director, VDOT Sean

More information

Section 1 PS General Information

Section 1 PS General Information Global Workplace Safety Performance Standard SAFETY CONTRACT MANAGEMENT Authorized By: Rick O Donell UAW Assistant Director & Ken Glass GM Assistant Director Revision 3.0 Effective Date: July 1 st 2017

More information

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018

MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER PERFORMANCE MEASURES JANUARY 2018 MACOMB COUNTY DEPARTMENT OF ROADS TRAFFIC OPERATIONS CENTER To provide and maintain a reliable real time traffic operations system, in coordination with county stakeholders, that enables a safe, efficient,

More information

Precast Concrete Pavement (R05)

Precast Concrete Pavement (R05) Precast Concrete Pavement (R05) 1 Agenda SHRP2 Overview What is SHRP2? Focus Areas Implementation Assistance Technical Product Description Product Implementation Implementation Timeline Questions Source:

More information