1 Value Engineering

2 Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design phases, by a multidiscipline team of persons not involved in the project, that is conducted to provide recommendations for: 1.providing the needed functions safely, reliably, efficiently, and at the lowest overall cost; 2.improving the value and quality of the project; and 3.reducing the time to complete the project.

3 More Discussion Value engineering promotes the substitution of materials and methods with less expensive alternatives, without sacrificing functionality or performance. (Cost centric viewpoint) In addition to cost reduction, value can be added to a project by improving performance, safety, and reducing construction time without significantly increasing cost.

4 VE on Transportation Highway Projects This Final Rule modifies Federal regulation, Title 23 Code of Federal Regulation (CFR) part 627, to reflect the revisions made in Federal law (Section 1503(a)(3) of Moving Ahead for Progress in the 21st Century Act, MAP 21). The changes to the regulation are: Increases the project thresholds for required VE analyses to; Projects on the National Highway System (NHS) receiving Federal assistance with an estimated total cost of $50,000,000 or more; and Bridge projects on the NHS receiving Federal assistance with an estimated total cost of $40,000,000 or more; Removes the VE analysis requirement for projects delivered using the design/build method of construction; and Provides VE analysis guidance for projects delivered using the construction manager/general contractor (CM/GC) method of project delivery.

5 Value Engineering Return on Investment

6 What a Formal VE study might entail This first phase requires an assembling a package to distribute information to invitees. Plus oral presentation at beginning of study. Aug. 22, 2007 Americas CF&S Kick Off Meeting 6

7 The fun part Function Analysis Phase The purpose of this phase is to clearly identify the function of the project and to formulate a concept from which new direction can be taken. Speculation Phase The study team embarks on a brainstorming session. Quantity and free wheeling are the goal Criticism is not allowed. The product is ideas. Analysis Phase The analysis phase reduces the speculation list by evaluating each idea A reasonable timeframe would be a few days to complete this. Attendance by project members, engineers and scientists from other similar type projects and folks from industry. Strongly suggest getting an outsider to proctor the process Aug. 22, 2007 Americas CF&S Kick Off Meeting 7

8 Fun s over Development Phase Those feasible ideas that survive the analysis phase are then developed into proposals. Alternate designs are made, depiction of Before and After is generated. Presentation Phase A presentation is made to those who have interest. Real engineering, real work, is required in this phase, no more hand waiving. Impacts on stakeholders, impacts on costs, performance, science all need to be studied. Informally presentations can be made to management, formally would be submittal to change control Aug. 22, 2007 Americas CF&S Kick Off Meeting 8

9 More on Cost

10 Life Cycle Cost Analysis Life cycle cost analysis (LCCA) is a tool to determine the most cost effective option among different competing alternatives to purchase, own, operate, maintain and, finally, dispose of an object or process, when each is equally appropriate to be implemented on technical grounds. For example, for a highway pavement, in addition to the initial construction cost, LCCA takes into account all the user costs, (e.g., reduced capacity at work zones), and agency costs related to future activities, including future periodic maintenance and rehabilitation. All the costs are usually discounted and total to a present day value known as net present value (NPV). This example can be generalized on any type of material, product, or system.

11 VE Example UTA Light Rail Embankments West Valley Line UTA Light Rail Salt Lake City, Utah

12 Light Rail Embankments UTA Light Rail Salt Lake City, Utah

13 Geofoam for Rapid Construction Cost and Schedule Information UTA Trax Project Salt Lake City, Ut

14 Geofoam for Rapid Construction Cost and Schedule Information UTA Trax Project Salt Lake City, Ut

15 Geofoam for Rapid Construction Cost and Schedule Information UTA Trax Project Salt Lake City, Ut

16 Cost for Rapid Construction UTA TRAX ground improvement and embankment cost comparison Cost ($ / cubic yard) Surcharge only Geofoam Prefabricated Drains & Surcharge Soil Mixing Stone Columns Cost and Schedule Information UTA Trax Project Salt Lake City, Ut

17 Schedul for Rapid Construction UTA TRAX ground improvement and embankment schedule comparison Time (months) Surcharge only Geofoam Prefabricated Drains & Surcharge Soil Mixing Stone Columns Cost and Schedule Information UTA Trax Project Salt Lake City, Ut

18 Discussion How might the principles of Value Engineering be applied to the feasibility / alternative study?

Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT. Steven Bartlett, University of Utah

Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT. Steven Bartlett, University of Utah 1 Long-Term Settlement Performance Monitoring, I-15 Reconstruction Project, Salt Lake City, UT Steven Bartlett, University of Utah Roadway Widening (I-15 Project) Salt Lake City Utah, USA 2002 Host of

More information

Table of Contents Local Agency Guidelines Section B August 2011

Table of Contents Local Agency Guidelines Section B August 2011 Table of Contents SECTION B NON-CERTIFIED AGENCY 2 Chapter 10 Design Approval... 2 A. OVERVIEW... 2 B. DESIGN ACCEPTANCE PACKAGE (30 PERCENT)... 2 1. Traffic Data... 3 2. Right of Way... 3 3. Horizontal-

More information

Quantifying the Benefits of Pavement Management

Quantifying the Benefits of Pavement Management Quantifying the Benefits of Pavement Management Smadi, O Research Scientist Iowa State University Ames, Iowa, USA SYNOPSIS Pavement management systems (PMS) have been in operation since the early 1970s

More information

Continuous Improvement Through Cultural Change. Todd Provost Utah Transit Authority, Light Rail General Manager Salt Lake City, Utah

Continuous Improvement Through Cultural Change. Todd Provost Utah Transit Authority, Light Rail General Manager Salt Lake City, Utah Continuous Improvement Through Cultural Change Todd Provost Utah Transit Authority, Light Rail General Manager Salt Lake City, Utah 1 Key Presentation Take-Aways Principle-based Change - Culture Long Term

More information

Session 11: Strategy Selection 11.1

Session 11: Strategy Selection 11.1 Session 11: Strategy Selection 11.1 Learning Outcomes 1. Describe the treatment selection process 2. List the components of a life-cycle cost analysis 3. List other factors that may enter the selection

More information

Asset Management Plans for the National Highway System

Asset Management Plans for the National Highway System Asset Management Plans for the National Highway System Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA What is Asset Management? From 23 USC 101(a)(2):

More information

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah

Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah Construction and Long Term Performance of Transportation Infrastructure Constructed Using EPS Geofoam on Soft Soil Sites in Salt Lake Valley, Utah Bartlett, Steven 1, Negussey, Dawit 2, Farnsworth, Clifton

More information

A park with a basement Creating green space in an urban environment

A park with a basement Creating green space in an urban environment September 2013 A park with a basement Creating green space in an urban environment From regulatory compliance to sustainability 18 Preparing the firm for internal transition 26 Patenting civil engineering

More information

Issues Associated with Design of Allowable Stress for Free Standing EPS Embankments. S. Bartlett, Ph.D, P.E. March 2013

Issues Associated with Design of Allowable Stress for Free Standing EPS Embankments. S. Bartlett, Ph.D, P.E. March 2013 Issues Associated with Design of Allowable Stress for Free Standing EPS Embankments S. Bartlett, Ph.D, P.E. March 2013 Topics Summary of Design Methods Focus on Allowable Stress to Prevent Long Term Creep

More information

Light Rail on Geofoam

Light Rail on Geofoam Light Rail on Geofoam West Valley UTA TRAX Project Ryan Snow Project Manager Stacy and Witbeck, Inc. 1320 Harbor Bay Parkway, Suite 240 Alameda, California 94502 510-748-1870 Fax 510-748-1205 Email: rsnow@stacywitbeck.com

More information

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION

State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box Lansing, MI POSITION DESCRIPTION CS-214 Rev 11/2013 State of Michigan Civil Service Commission Capitol Commons Center, P.O. Box 30002 Lansing, MI 48909 POSITION DESCRIPTION Position Code 1. STDDADM1M44N This position description serves

More information

Accelerated Bridge Construction Research, Design and Practice

Accelerated Bridge Construction Research, Design and Practice Accelerated Bridge Construction Research, Design and Practice University it of Buffalo April 2011 Presented by: Presented by: Carmen Swanwick, SE UDOT Chief Structural Engineer Presentation Outline Research

More information

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA

Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA Stephen Gaj Leader, Asset Management Team Office of Asset Management, Pavements, and Construction FHWA Asset Management This is how we do business: Manage our assets to minimize their whole life costs.

More information

1 of 5 7/1/2013 1:00 PM

1 of 5 7/1/2013 1:00 PM 1 of 5 7/1/2013 1:00 PM July 01, 2013 Free Magazine Subscription Free Enewsletter Unsubscribe Conferences Online Buyers Guide FEATURES COVER STORIES NEWS PRODUCT SHOWCASE PROJECT ROUNDUP MARKET WATCH RESOURCES

More information

Life Cycle Cost Analysis for Pavements: Background & History

Life Cycle Cost Analysis for Pavements: Background & History Life Cycle Cost Analysis for Pavements: Background & History ACPA LCCA Workshop Knickerbocker Hotel Chicago Illinois June 24, 2014 Leif G. Wathne, P.E. Talking Points What is LCCA? What LCCA is not. History.

More information

January 31, 2018 Asset Management and Performance Measures for Roads and Bridges Maryland Department of Transportation State Highway Administration

January 31, 2018 Asset Management and Performance Measures for Roads and Bridges Maryland Department of Transportation State Highway Administration January 31, 2018 Asset Management and Performance Measures for Roads and Bridges Maryland Department of Transportation State Highway Administration Amy J. Purves, PE Asset Management and Performance Measures

More information

Design-Build (DB) and Construction Manager / General Contractor (CMGC)

Design-Build (DB) and Construction Manager / General Contractor (CMGC) Design-Build (DB) and Construction Manager / General Contractor (CMGC) IDOT and Industry Preliminary Joint Review for Proposed Legislation December 18, 2012 Welcome Introductions Agenda Purpose Definitions

More information

Pavement Type Selection & Alternate Bidding

Pavement Type Selection & Alternate Bidding Question Pavement Technology Pavement Type Selection & Alternate Bidding Southeastern Asphalt User/Producer Group (SEAUPG) Savannah, GA November 15, 2011 Can FHWA make a new regulation that requires alternate

More information

I-25 South Gap Project

I-25 South Gap Project I-25 South Gap Project Monument to Castle Rock I-25 Gap Coalition Meeting April 26, 2018 EA Schedule/Key Dates EA Release April 27, 2018 EA Comment Period = 30 days, ends May 28, 2018 Media Briefing April

More information

Every Day Counts Faster better smarter

Every Day Counts Faster better smarter Every Day Counts Faster better smarter Michael Arasteh Materials Engineer Atlantic City, NJ February 6, 2014 47 th Annual Mid-Atlantic QAW Feb 4-6, 2014 1 Today s Presentation What is Every Day Counts

More information

I-90 Pavement Rehab VE Study

I-90 Pavement Rehab VE Study I-90 Pavement Rehab VE Study Using Value Analysis to Select Project Delivery Method Ken L. Smith, PE, CVS 360-570-4415 The week may have started with a bang But it ended with a success Do not drink and

More information

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Mack, Sullivan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Word Count

More information

Advanced Fare Payment for Small Agencies. Craig Roberts InComm, Director, Tolling and Transit Salt Lake City, UT

Advanced Fare Payment for Small Agencies. Craig Roberts InComm, Director, Tolling and Transit Salt Lake City, UT Advanced Fare Payment for Small Agencies Craig Roberts InComm, Director, Tolling and Transit Salt Lake City, UT The Prepaid Transit Card Offers an open denomination load limited to a minimum and maximum

More information

Federal Highway Administration s Role in Bridge Preservation. Anwar S. Ahmad 1

Federal Highway Administration s Role in Bridge Preservation. Anwar S. Ahmad 1 Federal Highway Administration s Role in Bridge Preservation Anwar S. Ahmad 1 Abstract The purpose of this paper is to provide a brief overview of the bridge preservation efforts in the United States and

More information

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS

Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS Life Cycle Cost Analysis Pavement Options May 2002 Materials Division / Virginia Transportation Research Council TABLE OF CONTENTS I. INTRODUCTION...1 II. III. Purpose...1 What Is LCCA?...1 History of

More information

Metropolitan Planning Organization Safety Performance Measures Fact Sheet

Metropolitan Planning Organization Safety Performance Measures Fact Sheet Metropolitan Planning Organization Safety Fact Sheet Safety The Safety Performance Management Measures regulation supports the Highway Safety Improvement Program (HSIP) and requires State Departments of

More information

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017

S.P TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017 S.P. 2710-47 TH 65 (3rd Avenue Bridge) Industry Informational Meeting October 31, 2017 Outline o o o o o o o o o o Introductions Disclaimers Ground Rules Project Overview Consultant Contracts CMGC RFP

More information

Pavement Management s Role in an Asset Management World

Pavement Management s Role in an Asset Management World Pavement Management s Role in an Asset Management World Kathryn A. Zimmerman, P.E. (Corresponding Author) Prashant Ram, E.I.T. Applied Pavement Technology, Inc. W. Main Street, Suite 00 Urbana, IL 0 Paper

More information

Preservation on High Traffic Volume Roadways (SHRP 2 Project R26) Kelly Smith and David Peshkin Applied Pavement Technology, Inc.

Preservation on High Traffic Volume Roadways (SHRP 2 Project R26) Kelly Smith and David Peshkin Applied Pavement Technology, Inc. Preservation on High Traffic Volume Roadways (SHRP 2 Project R26) Kelly Smith and David Peshkin Applied Pavement Technology, Inc. Presentation Overview Background Project objectives Work approach Information

More information

Design of Geofoam Embankment for the. Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT

Design of Geofoam Embankment for the. Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT Design of Geofoam Embankment for the I-15 Reconstruction Steven F. Bartlett, Ph.D., P.E. Research Project Manager, UDOT I-15 Reconstruction - Quick Facts Single Largest Highway Contract t in U.S. 17 Miles

More information

VALUE ENGINEERING FOR TxDOT PROJECT MANAGERS

VALUE ENGINEERING FOR TxDOT PROJECT MANAGERS VALUE ENGINEERING FOR TxDOT PROJECT MANAGERS DOs and DON Ts October 13, 2015 What is Value Engineering? From the FHWA website (http://www.fhwa.dot.gov/ve/) Value Engineering (VE) is defined as a systematic

More information

or (800)

or (800) WWW.CELL-CRETE.COM or (800) 669-0433 CALIFORNIA (Lic #243404), OREGON, WASHINGTON, NEVADA, UTAH, IDAHO, MONTANA, ARIZONA, HAWAII, ALASKA, WESTERN CANADA Re: Cellular Concrete as Engineered Fill I m pleased

More information

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging

Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging Ground Improvement of Titanium Dioxide Waste Spoils and Compressible Organics with In-Situ Mixing with Portland Cement and Surcharging James J. Serpico (&) Geotechnical Services, Maser Consulting P.A.,

More information

MODOT Alternate Pavement Approach. Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010

MODOT Alternate Pavement Approach. Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010 MODOT Alternate Pavement Approach Dave Ahlvers NCAUPG Conference Overland Park, Kansas February 3, 2010 Cost Control in Missouri implementation - the road to success Past Decade Letting schedules optimized

More information

CONCRETE TILE PAVERS

CONCRETE TILE PAVERS Section 32 14 13 CONCRETE TILE PAVERS (1995 MasterFormat Section 02780) Note: This guide specification for the U.S. is for the installation of concrete tile paving units whose thickness are less than the

More information

2014 International and Western States In-Place Recycling Conference Denver, CO

2014 International and Western States In-Place Recycling Conference Denver, CO 2014 International and Western States In-Place Recycling Conference Denver, CO Butch Wlaschin Director Office of Asset Management, Pavements and Construction August 5, 2014 1 FHWA Updates Policy Direction

More information

I-295 Southbound Rehabilitation Project

I-295 Southbound Rehabilitation Project I-295 Southbound Rehabilitation Project I-295 Southbound Rehabilitation Project Existing Conditions Value Engineering Study Design Pavement Design Alternatives Life Cycle Cost Analysis Safety - Traffic

More information

Behavior of Geosynthetic-Reinforced Earth

Behavior of Geosynthetic-Reinforced Earth Behavior of Geosynthetic-Reinforced Earth Presented by Kousik Deb Assistant Professor Department of Civil Engineering IIT Kharagpur Problems for Foundations on Weak Soils Experience excessive settlement

More information

Accelerated Bridge Construction in New York State

Accelerated Bridge Construction in New York State Welcome to Webinar on Accelerated Bridge Construction Accelerated Bridge Construction in New York State Sponsored by Accelerated Bridge Construction University Transportation Center (ABC-UTC) at Florida

More information

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia

Asset Management Performance Measures for Privatized Highway Concessions in British Columbia Asset Management Performance Measures for Privatized Highway Concessions in British Columbia Travis Gilbertson Geoplan Opus Consultants Inc. Victoria, British Columbia Canada 1 Outline 1. DBFO Projects

More information

DEPARTMENT OF TRANSPORTATION. AGENCY: Federal Highway Administration (FHWA), Department of Transportation

DEPARTMENT OF TRANSPORTATION. AGENCY: Federal Highway Administration (FHWA), Department of Transportation This document is scheduled to be published in the Federal Register on 02/20/2015 and available online at http://federalregister.gov/a/2015-03167, and on FDsys.gov DEPARTMENT OF TRANSPORTATION [4910-22-P]

More information

I-15 Corridor Reconstruction Salt Lake City, Utah. DFW Connector Dallas/Fort Worth, Texas. SH99/Grand Parkway F & G Houston, Texas

I-15 Corridor Reconstruction Salt Lake City, Utah. DFW Connector Dallas/Fort Worth, Texas. SH99/Grand Parkway F & G Houston, Texas Accelerated Roadway Construction I-15 Corridor Reconstruction Salt Lake City, Utah $ 1.4 Billion 1,500 days (16 miles) I-25 T-REX Denver, Colorado $ 1.3 Billion 1,980 days (17 miles) SH130 5/6 Toll Road

More information

Innovative Pavement Construction Contracting Methods

Innovative Pavement Construction Contracting Methods Innovative Pavement Construction Contracting Methods Chris Raymond, PhD, P.Eng. Acting Head, Bituminous Section Canadian User Producer Group for Asphalt November 28, 2010 Presentation Overview PHM Strategic

More information

Update on Federal Transportation Performance Management Rules

Update on Federal Transportation Performance Management Rules Transportation Committee Item #17-9-5 Information August 24, 2017 Update on Federal Transportation Performance Management Rules Issue: SACOG is responsible for participating, in cooperation with Caltrans,

More information

Partnering for Alternative Delivery Projects

Partnering for Alternative Delivery Projects Partnering for Alternative Delivery Projects Presented by: Renee L. Hoekstra, CVS Managing Partner RHA, LLC Julie Kliewer, PhD, P.E. State Construction & Materials Engineer - ADOT Training Objectives Understanding

More information

ARKANSAS. Long Range Intermodal Transportation Plan. LRITP Stakeholder Meetings. June 27-30, 2016

ARKANSAS. Long Range Intermodal Transportation Plan. LRITP Stakeholder Meetings. June 27-30, 2016 ARKANSAS Long Range Intermodal Transportation Plan LRITP Stakeholder Meetings June 27-30, 2016 Agenda Overview of 2040 LRITP Highway Needs Non-Highway Needs Revenue Forecast Funding Gap Alternative Future

More information

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division

Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Presented By: Jeffrey T. Folden, P.E. Chief, Innovative Contracting Division Project Delivery Methods Design-Bid-Build (DBB) Indefinite Delivery/Indefinite Quantity (ID/IQ) Construction Management at Risk

More information

Green River Diversion Rehabilitation

Green River Diversion Rehabilitation USDA Natural Resources Conservation Service-Utah Wallace F. Bennett Federal Building 125 S. State Street Room 4010 Salt Lake City, UT 84138-1100 Green River Diversion Rehabilitation National Environmental

More information

Best Practices for Mitigating Risk on Construction Projects

Best Practices for Mitigating Risk on Construction Projects Best Practices for Mitigating Risk on Construction Projects Steve Jones Senior Director of Industry Insights, Dodge Data & Analytics Bevan Mace, PhD Vice President of National Operations & Lean Balfour

More information

RIPTA Fare Study An Evaluation of Fare Policies, Fare Products & Fare Payment

RIPTA Fare Study An Evaluation of Fare Policies, Fare Products & Fare Payment RIPTA Fare Study 2015 An Evaluation of Fare Policies, Fare Products & Fare Payment July 2015 Study Team Introductions Greg Nordin, Fare Study Project Manager Amy Pettine, Executive Director of Planning

More information

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge

Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge Innovative Bridge Designs in Colorado by Pete Chomsrimake, P.E. ABC Project SME, CDOT Staff Bridge ABC History in Colorado 1. Promote Using Prefabricated Bridge & CBC Members since Early 1990 (Partnership

More information

The Environmental Mitigation & Monitoring Plan (EMMP) GEMS Environmental Compliance-ESDM Training Series USAID/Malawi March 2013

The Environmental Mitigation & Monitoring Plan (EMMP) GEMS Environmental Compliance-ESDM Training Series USAID/Malawi March 2013 The Environmental Mitigation & Monitoring Plan (EMMP) GEMS Environmental Compliance-ESDM Training Series USAID/Malawi March 2013 Session Objectives Understand the USAID requirement for ongoing mitigation

More information

NAS Roundtable on Science and Technology for Sustainability

NAS Roundtable on Science and Technology for Sustainability NAS Roundtable on Science and Technology for Sustainability Examples of Innovative Public Sector Sustainability Indicators and Metrics: FHWA s INVEST Tool November 12, 2015 What is Sustainability? 2 FHWA

More information

Addendum No. TWO Date:

Addendum No. TWO Date: Addendum No. TWO Date: 11.12.2018 Project: HICKORY GROVE RE-PAVING OF DRIVES & PARKING FOR THE JEFFERSON COUNTY HOUSING AUTHORITY, BIRMINGHAM, ALABAMA MCKEE PROJECT NO. 18-229 The following modifications/

More information

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION...

Life Cycle Cost Analysis July 2011 Materials Division Page 1 TABLE OF CONTENTS V. ASPHALT PAVEMENT CONSTRUCTION/RECONSTRUCTION... Materials Division Page 1 TABLE OF CONTENTS EXECUTIVE SUMMARY...2 I. INTRODUCTION...4 II. Purpose...4 What is LCCA?...4 History of LCCA in VDOT...4 ECONOMIC ANALYSIS COMPONENTS...6 Analysis Period...6

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

ASSET MANAGEMENT. Transportation Asset Management: Basics. Stephen Gaj Leader, System Management & Monitoring Team Office of Asset Management FHWA

ASSET MANAGEMENT. Transportation Asset Management: Basics. Stephen Gaj Leader, System Management & Monitoring Team Office of Asset Management FHWA Transportation Asset Management: Basics Stephen Gaj Leader, System Management & Monitoring Team Office of Asset Management FHWA What is Transportation Asset Management? Transportation Asset Management

More information

CDOT s Life Cycle Cost Analysis

CDOT s Life Cycle Cost Analysis CDOT s Life Cycle Cost Analysis 40 th Annual Rocky Mountain Asphalt Conference and Equipment Show February 28 th, 2013 Jay Goldbaum CDOT Pavement Design Program Manager Sunday, March 17, 13 CDOT s Life

More information

Federal Highway Administration Long-Term Bridge Performance Program. for South East Bridge Preservation Partnership April 13, 2011

Federal Highway Administration Long-Term Bridge Performance Program. for South East Bridge Preservation Partnership April 13, 2011 Federal Highway Administration Long-Term Bridge Performance Program LTBP Program Update for South East Bridge Preservation Partnership April 13, 2011 Michael C. Brown, Ph.D., P.E. Research Scientist Virginia

More information

MAP-21 and Asset Management Best Practices and Innovations. International User Conference

MAP-21 and Asset Management Best Practices and Innovations. International User Conference MAP-21 and Asset Management Best Practices and Innovations International User Conference October 22, 2013 Agenda Who We Are MAP-21 and Transportation Asset Management (TAM) Emerging trends in TAM Plan

More information

MAP-21 National Performance Management Measures. An Overview of Notice of Proposed Rulemakings And TAM Plans

MAP-21 National Performance Management Measures. An Overview of Notice of Proposed Rulemakings And TAM Plans MAP-21 National Performance Management Measures An Overview of Notice of Proposed Rulemakings And TAM Plans Transportation Performance Management Rulemaking Asset Management Transportation Performance

More information

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre

Table 1. Typical Soil Parameters Description Bulk Density, kn/m 3 Liquid Limit, % Plastic limit, % Natural Moisture Content, % Cohesion, kn/m 2 Compre CASE STUDY CONSTRUCTION OF HIGH ROAD EMBANKMENT OVER THICK SOFT SILTY CLAY- A CASE STUDY Radhakrishnan R, Geo-Enviro Engineers P Ltd, Chennai, Tamil Nadu, India, 044-24483522, geoenviro2012@gmail.com.

More information

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 I-64 Peninsula Shoulder Usage Evaluation Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013 Briefing Purpose Evaluation Area / Existing Conditions Code and Policy Engineering Facts

More information

Stewardship of the Built Environment May 27, 2009

Stewardship of the Built Environment May 27, 2009 Preservation as a sustainability strategy STEWARDSHIP OF THE BUILT ENVIRONMENT SUSTAINABILITY Defined by the Brundtland Commission (1988) as: "..development that meets the needs of the present without

More information

AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER

AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER AMERICA RIDES ON US LIFE-CYCLE COST ANALYSIS: A POSITION PAPER LIFE-CYCLE COST ANALYSIS: A POSITION PAPER Introduction Many agencies are turning to life-cycle cost analysis (LCCA) as a means of evaluating

More information

ARRA Semi-Annual Meeting Minneapolis, MN October 16-19, 2017

ARRA Semi-Annual Meeting Minneapolis, MN October 16-19, 2017 Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies Andrew Braham University of Arkansas Motivation in Arkansas for Full Depth Reclamation (FDR)

More information

State of New Jersey Department of Transportation. Change Control Board Procedures

State of New Jersey Department of Transportation. Change Control Board Procedures State of New Jersey Department of Transportation Change Control Board Procedures September, 2017 Prepared by Change Control Board 1.0 Change Requests These procedures are for processing Design Changes

More information

Project # Brown County PCN i40h Replace Section Line Road Culvert

Project # Brown County PCN i40h Replace Section Line Road Culvert Project # 010-151 PCN i40h Replace Section Line Road Culvert R 64 W FREDERICK POP. 199 R 63 W R 62 W R 61 W 6 5 4 3 6 5 4 3 1 Dry 402 AVE 102 ST 387 AVE 12 388 AVE 390 AVE 7 8 9 10 11 12 391 AVE 393 AVE

More information

Congestion Management Process (CMP)

Congestion Management Process (CMP) Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation

More information

AASHTO Mini-Peer Exchange on

AASHTO Mini-Peer Exchange on NCHRP 25-43 AASHTO Mini-Peer Exchange on Navigating NEPA to Advance Multimodal Transportation Projects February 18, 2016 NCHRP 25-43: Navigating Multi-Agency NEPA Processes to Advance Multimodal Transportation

More information

Keep Roads and Bridges in Good Condition. Dennis Heckman, State Bridge Engineer. Tracker. Measures of Departmental Performance

Keep Roads and Bridges in Good Condition. Dennis Heckman, State Bridge Engineer. Tracker. Measures of Departmental Performance Keep Roads and Bridges in Good Condition Dennis Heckman, State Bridge Engineer Tracker Measures of Departmental Performance Missourians have said they want MoDOT to keep roads and bridges in good condition.

More information

Chapter 7 PERFORMANCE GAPS CHAPTER 7 PERFORMANCE GAPS PAGE 83

Chapter 7 PERFORMANCE GAPS CHAPTER 7 PERFORMANCE GAPS PAGE 83 Chapter 7 PERFORMANCE GAPS CHAPTER 7 PERFORMANCE GAPS PAGE 83 This page intentionally left blank. PAGE 84 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN PERFORMANCE GAPS Overview Asset condition

More information

MAP-21 National Highway Performance Program Asset Management Plan

MAP-21 National Highway Performance Program Asset Management Plan MAP-21 National Highway Performance Program Asset Management Plan Federal Highway Administration March 2015 Webcast MAP-21 FHWA Performance Rulemaking Schedule MAP-21: Asset Management 2 Risk-Based Asset

More information

School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018

School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018 School Construction: Contract Basics OSBA BONDS, BALLOTS AND BUILDINGS CONFERENCE FEBRUARY 09, 2018 Who we are Presenters Rob Wilkinson, Partner, Ball Janik LLP Scott Rogers, CPPB, Senior Project Manager,

More information

7 Disciplines of Engineering at Union Pacific Railroad

7 Disciplines of Engineering at Union Pacific Railroad William W. Hay Railroad Engineering Seminar 7 Disciplines of Engineering at Union Pacific Railroad Eric Gehringer Assistant Vice President of Track Programs, Union Pacific Railroad Sponsored by Date: Friday,

More information

Coal Ash Assessment. State Water Commission. December 4, 2017

Coal Ash Assessment. State Water Commission. December 4, 2017 Coal Ash Assessment State Water Commission December 4, 2017 What does SB 1398 require? SB 1398 Passed by the General Assembly in the 2017 session. Required an assessment of all of the ash ponds in the

More information

Utah Transportation Asset Management Plan

Utah Transportation Asset Management Plan Utah Transportation Asset Management Plan Utah TAMP January 2016 Table of Contents Table of Contents...1 List of Figures...2 List of Tables...2 Introduction...2 Unified Approach... Asset Management Roadmap...3

More information

Accelerated Construction Technology Transfer (ACTT) - A Program Update -

Accelerated Construction Technology Transfer (ACTT) - A Program Update - AASHTO Highway Subcommittee on Construction 2008 Annual Meeting San Antonio, Texas Accelerated Construction Technology Transfer (ACTT) - A Program Update - Chris Schneider FHWA Office of Asset Management

More information

Designing Out Waste In the Civil Engineering Sector Athens Dioni Spiliopoulou MCIWM Bob Hudson MCIWM

Designing Out Waste In the Civil Engineering Sector Athens Dioni Spiliopoulou MCIWM Bob Hudson MCIWM Designing Out Waste In the Civil Engineering Sector Athens 2014 Dioni Spiliopoulou MCIWM Bob Hudson MCIWM Overview Arup who we are Why consider Waste Prevention Resource Efficiency How and what we do Barriers

More information

Why Should Every Day Count For You?

Why Should Every Day Count For You? Why Should Every Day Count For You? Today s Agenda What is Every Day Counts (EDC)? First Round State Transportation Innovation Council Exchanges Round II What is Every Day Counts? EDC was launched in 2010

More information

Michael Lewis Director, Rhode Island Department of Transportation

Michael Lewis Director, Rhode Island Department of Transportation Michael Lewis Director, Rhode Island Department of Transportation AASHTO Subcommittee on Construction August 14, 2013 Today s Session Rhode Island s Engagement in the Implementation Assistance Program

More information

Niagara s Transportation Strategy 1. Introduction:

Niagara s Transportation Strategy 1. Introduction: Niagara s Transportation Strategy May 8, 2002 Niagara s Transportation Strategy 1. Introduction: Transportation is of pivotal importance in the development of Niagara. This, Niagara s first comprehensive

More information

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following:

COMBINED CONCRETE SIDEWALK AND RETAINING WALL. Comply with Division 1 - General Provisions and Covenants, as well as the following: SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9072 - Combined Concrete Sidewalk and Retaining Wall PART 1 - GENERAL 1.01 SECTION INCLUDES COMBINED CONCRETE SIDEWALK AND RETAINING

More information

Alternate Pavement Bidding

Alternate Pavement Bidding Virginia Concrete Conference March 4-5, 2009 Dan Dawood, P.E. The Transtec Group Alternate pavement bidding involves the bidding of two equivalent pavement designs in order to determine the most economical

More information

Moving Ahead for Progress in the 21 st Century Act (MAP-21) And Beyond

Moving Ahead for Progress in the 21 st Century Act (MAP-21) And Beyond Moving Ahead for Progress in the 21 st Century Act (MAP-21) And Beyond Janet Oakley Director of Director of American Association of State Highway and Transportation Officials MAP-21Key highlights Funding

More information

Future of the US Federal Highway Program

Future of the US Federal Highway Program Office of Infrastructure Future of the US Federal Highway Program American Concrete Pavement Association Annual Meeting San Diego, CA Thursday, November 30, 2017 Thomas D. Everett Associate Administrator

More information

BUY AMERICA Federal Law and FHWA Policy

BUY AMERICA Federal Law and FHWA Policy BUY AMERICA Federal Law and FHWA Policy Presented By: RAFIQ DARJI, M.S.,P.E. FHWA Florida Division LTAP Webinar June 16, 2016 Agenda Overview of US Code & Federal Law Changes to Buy America Under MAP-21

More information

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with:

Design out. Waste Workshop. A guidance document produced by Network Rail in collaboration with: Design out Waste Workshop A guidance document produced by Network Rail in collaboration with: Guidance on Designing out Waste: How to run a Design out Waste Workshop This document provides guidance on

More information

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies

Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies Life Cycle Cost Analysis of Full Depth Reclamation versus Traditional Maintenance and Rehabilitation Strategies Andrew Braham University of Arkansas Rocky Mountain Asphalt Conference Denver, CO February

More information

STATUS REPORT Congestion-Relief Program. Steve Gillen Illinois Asphalt Pavement Association March 12, 2007

STATUS REPORT Congestion-Relief Program. Steve Gillen Illinois Asphalt Pavement Association March 12, 2007 STATUS REPORT Congestion-Relief Program Steve Gillen Illinois Asphalt Pavement Association March 12, 2007 Beginning Year 3 of Congestion-Relief Program Governor s $5.3 billion Congestion-Relief Program

More information

B209 - EMBANKMENTS OVER SWAMPS AND COMPRESSIBLE SOILS - OPSS 209. Excavation method means to remove the swamp material mechanically.

B209 - EMBANKMENTS OVER SWAMPS AND COMPRESSIBLE SOILS - OPSS 209. Excavation method means to remove the swamp material mechanically. B209 - - OPSS 209 209.1 GENERAL Embankments over swamps and compressible soils/soft ground can be designed with one or a combination of the following alternatives: 1. Excavation Method 2. Floatation Method

More information

SASHTO August 26, Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets

SASHTO August 26, Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets SASHTO August 26, 2014 Session: Maximizing Revenue Generation from Transportation Assets Unlocking the Hidden Value in Your Assets Missing opportunities for revenue generation and cost savings? 1 Opportunities

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING Section Number Title 301 GENERAL 302 MATERIALS SPECIFICATIONS 303 CLEARING

More information

Boot Camp - Construction Breakout Session #4. September 20, 2018 Pam Liston Moderator Program Manager Local Assistance Division - VDOT

Boot Camp - Construction Breakout Session #4. September 20, 2018 Pam Liston Moderator Program Manager Local Assistance Division - VDOT Boot Camp - Construction Breakout Session #4 September 20, 2018 Pam Liston Moderator Program Manager Local Assistance Division - VDOT Successful Delivery Marty R. Halloway, PE, CCM VDOT Bristol District

More information

Presentation for Roads Australia Miller Street, Sydney 3 April creating public Pacific Highway delivering value for money

Presentation for Roads Australia Miller Street, Sydney 3 April creating public Pacific Highway delivering value for money Presentation for Roads Australia Miller Street, Sydney 3 April 2014 Legitimacy & Support creating public Pacific Highway delivering value for money Real sustainable development solutions in practice Public

More information

East Development Area Project No

East Development Area Project No Attachment # Client East Development Area Project 5036-00 Matc hett N Line Submission H ig hw ay Issued for Tender Earthwork Package Phase - Stage d oa a ad all Oto y a w High nab May 6, 05 ee R iver Project

More information

Bridge Deck Preservation Treatment Options

Bridge Deck Preservation Treatment Options Western Bridge Preservation Partnership May 17-18, 2016 Salt Lake City, Utah Bridge Deck Preservation Treatment Options Gregg Freeman - Kwikbond Polymers Rob Johnson - Transpo Industries Clay Christiansen

More information

Urban. Initiative. Meeting. Construction. Annual. City of Lynchburg

Urban. Initiative. Meeting. Construction. Annual. City of Lynchburg 2014 Urban Construction Initiative Annual Meeting City of Lynchburg Materials Testing Requirements for Locally Administered Projects Don French, P.E. VDOT Lynchburg District District Materials Engineer

More information

9 Conclusion. 9.1 Introduction

9 Conclusion. 9.1 Introduction 9 Conclusion 9.1 Introduction This final chapter presents a synthesis of the evaluation criteria leading to conclusions and recommendations. Also included is a summary of the current status of the Tappan

More information

Value Management As A Successful Project Intervention Strategy

Value Management As A Successful Project Intervention Strategy White Paper Value Management As A Successful Project Intervention Strategy A D Crossley BSc, MBA, Ceng, MICE, MCIM Managing Director ServQ Ltd. This paper assesses value management as a project intervention

More information