1 Noise Feasibility Study Proposed 6-srey Seniors Condominium 7480 Derry Road West Miln, Ontario Prepared for: FGL Derry Inc Yonge Street, Suite 300 Toron, Ontario M2N 5R5 Prepared by Vicr Garcia, PEng Reviewed by Sheeba Paul, MEng, PEng August 30, 2017

2 Table of Contents 1 Introduction & Summary Site Description & Noise Sources Noise Level Criteria Traffic Noise Predictions Road Traffic Road Traffic Noise Predictions Traffic Noise Recommendations Outdoor Living Areas Indoor Living Areas and Ventilation Requirements Building Facade Constructions Warning Clauses Impact of the Development on Itself Impact of the Development on the Environment Road Traffic Noise Reflections Summary of Recommendations Implementation Figure 1 Figure 2 Figure 3 Key Plan Proposed Site Plan Showing Prediction Locations Predicted overall A-weighted daytime road traffic sound levels without planned building at 7480 Derry Road Figure 4 Predicted overall A-weighted daytime road traffic sound levels with planned building at 7480 Derry Road Appendix A Supporting Information Appendix B Road Traffic Information Appendix C Sample STAMSON 5.04 Output

3 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Introduction & Summary HGC Engineering was retained by FGL Derry Inc. conduct a noise feasibility study for a proposed 6-srey seniors condominium located at 7480 Derry Road West in the Town of Miln, Ontario. Lands surrounding the subject site are a mixture of existing residential lands, some existing institutional lands and future commercial uses. The study is required by the Municipality as part of the planning and approvals process. The primary noise source impacting the site is road traffic on Derry Road West. A Canadian National (CN) railway is located more than 500 m the west of the site and has not been considered further in this study. Road traffic data was obtained from the Region of Haln and was used predict future traffic sound levels at the locations of the proposed building façades. The predicted sound levels were compared the guidelines of the Ministry of Environment and Climate Change (MOECC) and the Municipality. The sound level predictions indicate that the future road traffic sound levels will exceed MOECC guidelines at the building façades with exposure Derry Road. Central air-conditioning systems will be required for the building. Upgraded building constructions will be required for the dwelling units closest Derry Road. Associated acoustical requirements are specified in this report. Warning clauses are recommended inform future residents of the road traffic noise impacts, address the proximity of the existing institutional lands, future commercial uses and that sounds may at times be audible.

4 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Site Description & Noise Sources The proposed residential development is located at 7480 Derry Road West in the Town of Miln, Ontario. Figure 1 shows a key plan of the site. A proposed site plan prepared by KNYMH Architecture Solutions dated August 23, 2017 is shown in Figure 2. Figure 2 also indicates prediction locations and a project north for reference purposes. The proposed development will consist of one 6-srey seniors condominium building, shielded landscape courtyard and associated parking spaces the west and south of the proposed building. Appendix A includes preliminary floor plans. HGC Engineering personnel visited the site in July The acoustical environment surrounding the site is urban in nature. The primary sources of sound impacting the site is vehicular traffic on Derry Road which is currently four lanes (two lanes in each direction). The site is dominated by road traffic noise from Derry Road. The surrounding area the north, south and west are existing residential lands. The Miln District Hospital is located approximately 400 m west of the site. To the northeast of the site is Our Lady of Vicry Catholic School and on the east side of Santa Maria Boulevard is the Miln Sports Centre. The lands the east of the subject site are proposed include commercial uses. A site plan is attached in Appendix A for reference. HGC Engineering has reviewed a draft noise report (found on the Town of Miln website) entitled, Noise Impact Assessment, Feasibility Study, Miln Sports Centre Plaza, S/W Corner of Derry Road West and Santa Maria Blvd., Miln, Ontario prepared by J.E. Coulter Associates Limited dated April 20, Immediately the east of the subject site, a Tim Horn s restaurant with a double lane drive-through is proposed. The April 20, 2016 draft report did not assess the proposed 6-srey seniors building or the existing church on the property. Specific recommendations for review of roofp mechanical units on the roof of the Tim Horn s and detailed review of the other buildings were recommended in the April 20, 2016 noise report. As the report is in draft, there is an opportunity assess the sound levels from the drive-through at the proposed 6-srey senior s building and provide appropriate noise control recommendations such as a property line acoustic barrier of sufficient height shield the ground floor residential units. There may be sufficient background sound levels from road traffic on Derry Road which may provide elevated criteria at the upper floor of the senior s

5 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, 2017 building. It is recommended that at the detailed stage of the commercial plaza planning review process, the proposed senior s building also be included in the analysis recommend appropriate noise mitigation measures. Nonetheless, a warning clause is included in Section 5.4 inform occupants of the proposed building on the subject site of the surrounding institutional uses and future commercial uses. 3 Noise Level Criteria Guidelines for acceptable levels of road traffic noise impacting residential developments are given in the MOECC publication NPC-300, Environmental Noise Guideline Stationary and Transportation Sources Approval and Planning, Part C release date Ocber 21, 2013 and are listed in Table 1 below. The values in Table 1 are energy equivalent (average) sound levels [LEQ] in units of A weighted decibels [dba]. Table 1: Road Traffic Noise Criteria Space Daytime L EQ(16 hour) Road Nighttime L EQ(8 hour) Road Outdoor Living Areas 55 dba -- Inside Living/Dining Rooms 45 dba 45 dba Inside Bedrooms 45 dba 40 dba Daytime refers the period between 07:00 and 23:00, while nighttime refers the period between 23:00 and 07:00. The term "Outdoor Living Area" (OLA) is used in reference an outdoor patio, a backyard, a terrace or other area where passive recreation is expected occur. Balconies that are less than 4 m in depth are not considered be outdoor living areas under MOECC guidelines. The guidelines in the MOECC publication allow the sound level in an OLA be exceeded by up 5 dba, without mitigation, if warning clauses are placed in the purchase and rental agreements the property. Where OLA sound levels exceed 60 dba, physical mitigation is required reduce the OLA sound level below 60 dba and as close 55 dba as technically, economically and administratively feasible. The Town of Miln has a maximum fence height of 2.4 m along major

6 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, 2017 roadways and a maximum fence height of 3.0 m along railway lines. The remainder of the required barrier height can be made up with an earth berm. A central air conditioning system as an alternative means of ventilation open windows is required for dwellings where nighttime sound levels outside bedroom windows exceed 60 dba or daytime sound levels outside living room windows exceed 65 dba. Forced-air ventilation with ducts sized accommodate the future installation of air conditioning is required when nighttime sound levels at bedroom windows are in the range of dba or when daytime sound levels at living/dining room windows are in the range of dba. Building components such as walls, windows and doors must be designed achieve indoor sound level criteria when the plane of bedroom window sound level is greater than 60 dba or the daytime sound level is greater than 65 dba due road traffic noise. 4 Traffic Noise Predictions 4.1 Road Traffic Road traffic data for Derry Road West was obtained from the Region of Haln in the form of ultimate Average Annual Daily Traffic (AADT) and is provided in Appendix B. An ultimate AADT of vehicles per day was applied along with a speed limit of 60 km/h. A commercial vehicle percentage of 8.5% was used in the analysis and was further split in 3.5% medium trucks and 5% and heavy trucks. Table 2 summarized the traffic data used in this study Table 2: Ultimate Road Traffic Data Road Name Cars Medium Trucks Heavy Trucks Total Derry Road West Daytime Nighttime Total

7 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Road Traffic Noise Predictions To assess the levels of traffic noise which will impact the site in the future, predictions were made using STAMSON version 5.04, a computer algorithm developed by the MOECC. Sample STAMSON output is included in Appendix C. Prediction locations were chosen around the proposed residential building, as shown in Figure 2, obtain a good representation of the future sound levels at various facades with exposure the roadway. The results of these predictions are summarized in Table 3. The acoustic requirements may be subject modifications if the site plan is changed significantly. Prediction Location Table 3: Predicted Sound Levels, Without Mitigation, [dba] Description Daytime at the Façade L EQ-16 hr Night-time at the Facade L EQ-8 hr [A] North façade of 6-srey building [B] East façade of 6-srey building Traffic Noise Recommendations With no mitigation, there will be sound level excesses at some of the façades of the proposed building. The following discussion outlines recommendations for ventilation, upgraded building façade constructions and warning clauses achieve the noise criteria stated in Table Outdoor Living Areas The dwelling units in the residential building have balconies that are less than 4 m in depth. These balconies are not considered be outdoor living areas under MOECC guidelines, and therefore are exempt from traffic noise assessment. There is a landscape courtyard on the shielded side of the building away from road traffic. The predicted sound level in courtyard will be less than 55 dba and physical mitigation is not required. There are no other common outdoor amenity areas indicated on the site plan.

8 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Indoor Living Areas and Ventilation Requirements Central Air Conditioning The predicted future nighttime sound levels outside the plane of the bedroom windows of the proposed building are greater than 60 dba and greater than 65 dba during the daytime hours at some of the façades. Central air conditioning systems are required so that windows may remain closed. The location, installation and sound ratings of the outdoor air conditioning devices should minimize noise impacts and comply with criteria of MOECC publication NPC-300, as applicable. 5.3 Building Facade Constructions Future sound levels at the facades of the dwellings with exposure Derry Road (locations A and B) will exceed 65 and 60 dba during daytime and nighttime hours. MOECC guidelines recommend that the windows, walls and doors be designed so that the indoor sound levels comply with MOECC noise criteria. The required building components are selected based on the Acoustical Insulation Facr (AIF) value for road traffic. To do so, calculations were performed determine the acoustical insulation facrs maintain indoor sound levels within MOECC guidelines. The calculation methods were developed by the National Research Council (NRC). They are based on the predicted future sound levels at the building facades, and the area ratios of the facade components (windows and walls) and the floor area of the adjacent room. The preliminary floor plans prepared by KNYMH Architecture Solutions were reviewed. The minimum necessary specification for the north façade is Acoustical Insulation Facr, AIF-30 for living/dining/family rooms and AIF-28 for bedrooms along the north façade, based on the possibility of sound entering the buildings through the windows and walls. Living rooms have window floor area ratios up 15% and bedrooms have window floor area ratios up 31%. As a general guideline, a glazing construction with two panes of 3 mm glass and a 20 mm airspace (STC32) will be sufficient for the dwelling units with exposure Derry Road. If patio doors are be used in the dwellings, they must be included in the window area.

9 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, 2017 The exterior wall is proposed include masonry with stucco areas. These exterior walls are expected provide sufficient acoustical insulation for the indoor spaces. Any insulated metal exterior door meeting OBC requirements will be sufficient provide noise insulation. If sliding patio doors are be used in the dwellings, they must be included in the window area. If the floor plans and building elevations are changed significantly, especially for those dwelling units with exposure Derry Road (prediction locations [A] and [B]), a detailed noise study should be performed specify wall and window requirements with sufficient acoustical insulation for the dwelling units based on actual window floor area ratios. The remaining façades of the building will have daytime and nighttime sound levels at the p srey façade that are less than 65 and 60 dba respectively. For these units, any exterior wall, and double glazed window construction meeting the minimum requirements of the Ontario Building Code (OBC) will provide adequate sound insulation for the dwelling units. 5.4 Warning Clauses The MOECC guidelines recommend that warning clauses be included in the property and tenancy agreements for all dwelling units with anticipated traffic sound level excesses. The following noise warning clauses are required for specific units as indicated in Table 4. Suggested wording for future dwellings with sound level excesses of the MOECC criteria but do not require physical mitigation measures is given below. Type A: Purchasers/tenants are advised that sound levels due increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the sound level limits of the Municipality and the Ministry of the Environment and Climate Change. Suggested wording for future dwellings requiring central air conditioning systems is given below. Type B: This dwelling unit has been supplied with a central air conditioning system which will allow windows and exterior doors remain closed, thereby ensuring that the indoor sound

10 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, 2017 levels are within the sound level limits of the Municipality and the Ministry of Environment and Climate Change. Suggested wording for future dwelling units adjacent the institutional buildings is given below. Type C: Purchasers are advised that due proximity of the existing institutional facilities, and future commercial uses including a drive-through, sound levels from the facilities may be at times be audible. These sample clauses are provided by the MOECC as examples and can be modified by the Municipality as required. 6 Impact of the Development on Itself Section of the Ontario Building Code (OBC) specifies the minimum required sound insulation characteristics for demising partitions, in terms of Sound Transmission Class (STC) values. In order maintain adequate acoustical privacy between separate suites in a multi-tenant building, inter-suite walls should meet or exceed STC-50. Walls separating a suite from a noisy space such as a refuse chute, or elevar shaft, should meet or exceed STC-55. In addition, it is recommended that the floor/ceiling constructions separating suites from any amenity or commercial spaces also meet or exceed STC-55. Tables 1 and 2 in Section SB-3 of the Supplementary Guideline the OBC provide a comprehensive list of constructions that will meet the above requirements. Tarion s Builder Bulletin B19R requires the internal design of condominium projects integrate suitable acoustic features insulate the suites from noise from each other and amenities in accordance with the OBC, and limit the potential intrusions of mechanical and electrical services of the buildings on its residents. If B19R certification is needed, an acoustical consultant is required review the mechanical and electrical drawings and details of demising constructions and mechanical/electrical equipment, when available, help ensure that the noise impact of the development on itself is maintained within acceptable levels.

11 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Impact of the Development on the Environment Sound levels from noise sources such as roofp air-conditioners, cooling wers, exhaust fans, etc. should not exceed the minimum one-hour LEQ ambient (background) sound level from road traffic, at any potentially impacted residential point of reception. Based on the levels observed during our site visit, the typical minimum ambient sound levels in the area are expected be in the range of 50 dba or more during the day and 45 dba or more at night. Thus, any electro-mechanical equipment associated with this development (e.g. emergency generar testing, fresh-air handling equipment, etc.) should be designed such that they do not result in noise impact beyond these ranges. 7.1 Road Traffic Noise Reflections As requested by the Town of Miln, HGC Engineering has conducted a noise study assess the potential effects of road noise reflections from the planned 6-srey building at 7480 Derry Road. To assess the impact that the development will have on background sound levels from road traffic, predictions were made using a 3-D numerical computer modelling package (Cadna-A version 2017). The model is based on the methods from ISO Standard , Acoustics - Attenuation of Sound During Propagation Outdoors, which accounts for reduction in sound level with distance due geometrical spreading, air absorption, ground attenuation and acoustical shielding by intervening structures. For the purposes of the analysis, the façades of the planned 6-srey building were conservatively assumed be 100% reflective on the opposite side of Derry Road West (i.e., no sound absorption). Derry Road West was included in the model based on recent traffic volumes obtained from Haln Region. Derry Road West as a road traffic noise source was included in the model based on recent traffic volume data obtained from Haln Region. Ultimate road traffic volumes were used for Derry Road West. Predictions made using the conservative model indicate that the planned 6-srey building will result in only minor increases in traffic noise levels at certain shielded façades of some homes across the street (i.e., up 1 db between two houses), and no appreciable sound level increases in the backyards. These results are illustrated in Figures 3 and 4. Generally, sound level increases of

12 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, 2017 less than 3 db are imperceptible the human ear. Thus, it is concluded that reflections from the planned building at 7480 Derry Road will not significantly affect the road traffic noise levels at the homes on the opposite side of Derry Road West. 8 Summary of Recommendations The following list as well as Table 4 summarize the recommendations made in this report. The reader is referred previous sections of the report where these recommendations are applied and discussed in more detail. 1. Central air conditioning is required for the building. 2. Upgraded building constructions are required for the façades with exposure Derry Road. 3. Noise warning clauses inform the occupants of the sound level excesses should be placed in the property and tenancy agreements and offers of purchase and sale. The affected facades and appropriate warning clauses are shown in Table 4. Prediction Location Table 4: Summary of Noise Control Requirements and Warning Clauses Description Acoustic Barrier Ventilation Requirements* Type of Warning Clause Required Glazing STC A North façade with exposure LR/DR: STC A, B, C Derry Rd W BR: AIF-32 B East and west façade with some Central A/C LR/DR: OBC -- A, B, C exposure Derry BR: OBC -- Remaining façades OBC Notes: -- no specific requirement * The location, installation and sound rating of the air conditioning condensers must be compliant with MOECC Guideline NPC-300, as applicable. LR/DR Living Room/Dining Room BR Bedroom OBC Ontario Building Code

13 Noise Feasibility Study, Proposed 6-srey Seniors Condominium Page Derry Road West, Miln, Ontario August 30, Implementation To ensure that the noise control recommendations outlined above are fully implemented, it is recommended that: 1. Prior the issuance of building permits for this development, the Municipality s building inspecr or a Professional Engineer qualified perform acoustical engineering services in the Province of Ontario should certify that the noise control measures have been properly incorporated. 2. Prior assumption of the subdivision, the Municipality s building inspecr or a Professional Engineer qualified perform acoustical engineering services in the Province of Ontario should certify that the noise control measures have been properly incorporated, installed and constructed.

14

15 CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS AND JOB CONDITIONS BEFORE PROCEEDING WITH WORK SITE LOCATION MAP THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FOR ANY CORRECTIONS OR DAMAGES RESULTING FROM HIS OR HER WORK TH OR SUNNYVALE N UE N Project North FIRE ROUTE ALL DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECTS AND MUST BE RETURNED AT THE COMPLETION OF THE WORK CRES. TR DERRY ROAD ALL DRAWINGS MAY BE SUBJECT TO CHANGE DUE TO COMMENTS FROM MUNICIPAL DEPARTMENTS AND OTHER AGENCIES WITH AUTHORITY DRAFTING SYMBOLS KEY TO DETAIL LOCATION No. No. OVERHEAD DOOR X SITE DERRY ROAD MAN DOOR (EXIT) DRAWING SETS ISSUED ISSUED FOR SITE PLAN APPROVAL BF MAN DOOR (BARRIER-FREE ENTRANCE) FARMST PROPOSED BUILDING PROPERTY LINE INTAKE BUILDING SETBACK TRANSFORMER NEW CONCRETE CURB GA SITE ZONING KEY I-B - RLD I-A RMD1 TYP RLD ENTRY DROP-OFF AREA SITE RMD2*137 FD FD FD LANDSCAPED COURTYARD CO I-B RO*236 I-B I-B BUILDING PERMIT NUMBER: RMD1 RMD2*140 NOT FOR CONSTRUCTION WITHOUT PERMIT SITE STATISTICS BF X BF ha (8,774 sm) 191 UNITS 65 UNITS 191 / = Units/ha 2,677 m2 ( 30.5 %) 3,047 m2 ( 34.7 %) 3,050 m2 ( 34.8 %) SITE AREA TOTAL RESIDENTIAL UNITS RESIDENTIAL UNITS ON OR OVER BUILT BOUNDARY DENSITY BUILDING AREA PAVING AREA LANDSCAPE AREA BF ARCHITECTURE SOLUTIONS K N Y M H I N C SKYVIEW DRIVE SUITE 101 BURLINGTON, ONTARIO L7P 0V1 T F BF FD 4 TENANT PARKING 191 UNITS VISITOR PARKING 191 UNITS 20 BUILT BO UNDARY EXHAUST SPACES: SPACES PROVIDED: Spaces 191 Spaces Spaces 48 Spaces 239 Spaces 61 Surface / 178 Underground Spaces TOTAL: BARRIER-FREE (BF) PARKING 3% OF TOTAL SPACES 2 RATIO: REQUIRED: 8 SPACES info@knymh.com PROJECT NORTH X PAD GARBAGE TIMESTAMP: :20:54 PM FILEPATH: Q:\2016\ Fieldgate Properties Ltd Derry Road\4. Drawings\4.03 Schematic Design\ Site Plan dwg PARKING CALCULATION: 6 SPACES PROVIDED: 8 SPACES BUILDING STATISTICS TOTAL AREA 61 SURFACE SPACES COMMON AMENITY SUITE ROOF MECH 230 m2 FLOOR 6 2,814 m2 534 m2 2,280 m2 FLOOR 5 2,814 m2 534 m2 2,280 m2 FLOOR 4 2,814 m2 534 m2 2,280 m2 FLOOR 3 2,814 m2 534 m2 2,280 m2 FLOOR 2 2,621 m2 528 m2 2,093 m2 FLOOR 1 2,677 m2 1,902 m2 677 m2 98 m2 BASEMENT 6,833 m2 TOTAL *16,554 m2 3,341 m2 13,115 m2 98 m2 *Excludes Roof Mech + Underground Parking 29 RMD1 1 BEDROOM 2 BEDROOM 17 SUITES 17 SUITES 17 SUITES 17 SUITES 9 SUITES 7 SUITES 17 SUITES 17 SUITES 17 SUITES 17 SUITES 20 SUITES 19 SUITES 84 SUITES 107 SUITES RESIDENTIAL CONDOMINIUM PROJECT 7480 DERRY ROAD WEST MILTON, ONTARIO DRAWING SHEET TITLE: SITE PLAN RMD2*140 DRAWING SCALE: PROJECT NUMBER: AS NOTED 1 SP1 SITE PLAN 1:250 - T X BY - TR FO UC R TI O N B - DATE No. (DD,MM,YY) NS X REVISIONS TO DRAWING NO TYP 1. ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED 6 STOREY SENIORS CONDOMINIUM 191 UNITS 30 BIKE SPACES RMD2*137 BY McLAUGHLIN AVENUE BUILT BO UNDARY EXTENT OF FLOORS 3 THROUGH 6 ABOVE CURB RAMP DN DATE No. (DD,MM,YY) SERAFINI C RES. MAN DOOR (NO ENTRY) EAD DRIV E E LEGEND ENTRY DRAWING SHEET NUMBER EXISTING ELEVATION MAN DOOR (ENTRANCE) A DETAIL NUMBER Figure 2 - Proposed Site Plan Showing Prediction Locations DRAWN BY: CHECKED BY: WH WH DRAWING VERSION: PLOT DATE: August 24, 2017 DRAWING SHEET NUMBER: SP1

16 Figure 3: Predicted overall A-weighted daytime road traffic sound levels without planned building at 7480 Derry Road West

17 Figure 4: Predicted overall A-weighted daytime road traffic sound levels with planned building at 7480 Derry Road West

18 APPENDIX A Supporting Information

19 CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS AND JOB CONDITIONS BEFORE PROCEEDING WITH WORK ALL DRAWINGS MAY BE SUBJECT TO CHANGE DUE TO COMMENTS FROM MUNICIPAL DEPARTMENTS AND OTHER AGENCIES WITH AUTHORITY ALL DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECTS AND MUST BE RETURNED AT THE COMPLETION OF THE WORK THE CONTRACTOR WORKING FROM DRAWINGS NOT SPECIFICALLY MARKED "FOR CONSTRUCTION" MUST ASSUME FULL RESPONSIBILITY AND BEAR COSTS FOR ANY CORRECTIONS OR DAMAGES RESULTING FROM HIS OR HER WORK KEY TO DETAIL LOCATION ENTRY No. No. DETAIL NUMBER DRAWING SHEET NUMBER DRAWING SETS ISSUED DATE No. (DD,MM,YY) BY ELECT ISSUED FOR SITE PLAN APPROVAL GA 19 GARB AMENITY LOCKERS LOCKERS ENTRY AMENITY ALL PREVIOUS ISSUES OF THIS DRAWING ARE SUPERSEDED 1 A GROUND FLOOR 1: A1 2nd FLOOR 1: REVISIONS TO DRAWING DATE No. (DD,MM,YY) BY NOT FOR CONSTRUCTION BUILDING PERMIT NUMBER: NOT FOR CONSTRUCTION WITHOUT PERMIT K N Y M H I N C SKYVIEW DRIVE SUITE 101 BURLINGTON, ONTARIO L7P 0V1 TIMESTAMP: :19:26 PM FILEPATH: Q:\2016\ Fieldgate Properties Ltd Derry Road\4. Drawings\4.03 Schematic Design\ Site Plan dwg 3 A rd-6th FLOOR 1: LOCKERS DRAWING SHEET TITLE: DRAWING SCALE: DRAWN BY: WH DRAWING VERSION: PLOT DATE: PROJECT NORTH 7480 DERRY ROAD WEST MILTON, ONTARIO August 24, 2017 CHECKED BY: PROJECT NUMBER: T F info@knymh.com RESIDENTIAL CONDOMINIUM PROJECT FLOOR PLANS AS NOTED WH DRAWING SHEET NUMBER: A1

20 Point. Architects 522 Mt. Pleasant Road Suite 200 Toron, Ontario M4S 2M3 Tel.: (416) Fax: (416) ONTARIO INC FOURTH LINE MILTON, ON L9T 6P9 MILTON SPORT CENTRE PLAZA DERRY RD. WEST & SANTA MARIA BLVD MILTON, ON SP1

21 APPENDIX B Road Traffic Information

22 1 Sheeba Paul 02/10/2015 1:04 PM Sheeba Paul From: Sent: To: Cc: Subject: Jakaitis, Alicia Ocber :53 AM Krus, Matt Sheeba Paul RE: ultimate traffic volumes for Derry Road (between Thompson Road and Fourth Line) Hi Sheeba, Below is the data for Derry Road: 2031 forecasts AADT: 37,500 Speed: 60km/h Trucks: 3.5%medium 5% Heavy Lanes: 6 Lanes Alicia Jakaitis Acting Senior Transportation Planner Transportation Planning Infrastructure Planning & Policy Public Works, Haln Region (905) ext alicia.jakaitis@haln.ca From: Sheeba Paul [mail:spaul@hgcengineering.com] Sent: Wednesday, September 30, :39 PM To: Jakaitis, Alicia Cc: Krus, Matt Subject: re: ultimate traffic volumes for Derry Road (between Thompson Road and Fourth Line) Derry Road, ultimate 2021 Daytime Nighttime Total Hi Alicia This is the latest ultimate traffic volumes that we have for Derry Road. This was obtained a few years ago. Do you have any forecasts for Derry Road that are more recent? Matt, We received some data for the year 2015 from Haln Road Ops. This data is significantly lower than the ultimate data. Thank you.

23 Nu-Metrics Traffic Analyzer Study Computer Generated Summary Report City: Town of Miln Street: Farmstead Drive - NB Location: 35 A study of vehicle traffic was conducted with HI-STAR unit number FFFFF59B. The study was done in the NB lane on Farmstead Drive - NB in Town of Miln, ON in btwn Derry Rd & Min Cr county. The study began on at 12:00 AM and concluded on at 12:00 AM, lasting a tal of 24 hours. Data was recorded in 15 minute time periods. The tal recorded volume of traffic showed 2,628 vehicles passed through the location with a peak volume of 83 on at 07:45 AM and a minimum volume of 0 on at 12:15 AM. The AADT Count for this study was 2,628. SPEED Chart 1 lists the values of the speed bins and the tal traffic volume for each bin Chart At least half of the vehicles were traveling in the km/h range or a lower speed. The average speed for all classified vehicles was 56 km/h with 78.2 percent exceeding the posted speed of 50 km/h. The mode speed for this traffic study was 50 km/h and the 85th percentile was km/h. CLASSIFICATION Chart 2 lists the values of the eight classification bins and the tal traffic volume accumulated for each bin > Chart > Most of the vehicles classified during the study were Passenger Cars. The number of Passenger Cars in the study was 2,562 which represents percent of the tal classified vehicles. The number of Small Trucks in the study was 7 which represents 0.30 percent of the tal classified vehicles. The number of Trucks/Buses in the study was 21 which represents 0.80 percent of the tal classified vehicles. The number of Tracr Trailers in the study was 10 which represents 0.40 percent of the tal classified vehicles. HEADWAY During the peak time period, on at 07:45 AM the average headway between the vehicles was seconds. The slowest traffic period was on at 12:15 AM. During this slowest period, the average headway was seconds. WEATHER The roadway surface temperature over the period of the study varied between 13 and 39 degrees Celsius. The HI-STAR determined that the roadway surface was Dry percent of the time Page: 1

24 Nu-Metrics Traffic Analyzer Study Computer Generated Summary Report City: Town of Miln Street: Farmstead Drive - SB Location: 35 A study of vehicle traffic was conducted with HI-STAR unit number 20CFC. The study was done in the SB lane on Farmstead Drive - SB in Town of Miln, ON in btwn Derry Rd & Min Cr county. The study began on at 12:00 AM and concluded on at 12:00 AM, lasting a tal of 24 hours. Data was recorded in 15 minute time periods. The tal recorded volume of traffic showed 2,163 vehicles passed through the location with a peak volume of 64 on at 07:00 PM and a minimum volume of 0 on at 01:45 AM. The AADT Count for this study was 2,163. SPEED Chart 1 lists the values of the speed bins and the tal traffic volume for each bin Chart At least half of the vehicles were traveling in the km/h range or a lower speed. The average speed for all classified vehicles was 49 km/h with 47.1 percent exceeding the posted speed of 50 km/h. The mode speed for this traffic study was 40 km/h and the 85th percentile was km/h. CLASSIFICATION Chart 2 lists the values of the eight classification bins and the tal traffic volume accumulated for each bin > Chart > Most of the vehicles classified during the study were Passenger Cars. The number of Passenger Cars in the study was 2,138 which represents percent of the tal classified vehicles. The number of Small Trucks in the study was 8 which represents 0.40 percent of the tal classified vehicles. The number of Trucks/Buses in the study was 11 which represents 0.50 percent of the tal classified vehicles. The number of Tracr Trailers in the study was 2 which represents 0.10 percent of the tal classified vehicles. HEADWAY During the peak time period, on at 07:00 PM the average headway between the vehicles was seconds. The slowest traffic period was on at 01:45 AM. During this slowest period, the average headway was seconds. WEATHER The roadway surface temperature over the period of the study varied between 13 and 40 degrees Celsius. The HI-STAR determined that the roadway surface was Dry percent of the time Page: 1

25 Nu-Metrics Traffic Analyzer Study Computer Generated Summary Report City: Town of Miln Street: Farmstead Drive - NB+SB Location: 35 A study of vehicle traffic was conducted with HI-STAR unit number FFFFF59B. The study was done in the NB+SB lane on Farmstead Drive - NB+SB in Town of Miln, ON in btwn Derry Rd & Min Cr county. The study began on at 12:00 AM and concluded on at 12:00 AM, lasting a tal of 24 hours. Data was recorded in 15 minute time periods. The tal recorded volume of traffic showed 4,791 vehicles passed through the location with a peak volume of 122 on at 08:15 AM and a minimum volume of 0 on at 02:00 AM. The AADT Count for this study was 4,791. SPEED Chart 1 lists the values of the speed bins and the tal traffic volume for each bin Chart At least half of the vehicles were traveling in the km/h range or a lower speed. The average speed for all classified vehicles was 53 km/h with 64.1 percent exceeding the posted speed of 50 km/h. The mode speed for this traffic study was 50 km/h and the 85th percentile was km/h. CLASSIFICATION Chart 2 lists the values of the eight classification bins and the tal traffic volume accumulated for each bin > Chart > Most of the vehicles classified during the study were Passenger Cars. The number of Passenger Cars in the study was 4,700 which represents percent of the tal classified vehicles. The number of Small Trucks in the study was 15 which represents 0.30 percent of the tal classified vehicles. The number of Trucks/Buses in the study was 32 which represents 0.70 percent of the tal classified vehicles. The number of Tracr Trailers in the study was 12 which represents 0.30 percent of the tal classified vehicles. HEADWAY During the peak time period, on at 08:15 AM the average headway between the vehicles was 7.32 seconds. The slowest traffic period was on at 02:00 AM. During this slowest period, the average headway was seconds. WEATHER The roadway surface temperature over the period of the study varied between 13 and 39 degrees Celsius. The HI-STAR determined that the roadway surface was Dry percent of the time Page: 1

26 APPENDIX C Sample STAMSON 5.04 Output

27 STAMSON 5.0 NORMAL REPORT Date: :53:37 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a.te Time Period: Day/Night 16/8 hours Description: Daytime and nighttime sound levels of North Façade of 6-srey Building, Location [A] Road data, segment # 1: Derry Rd (day/night) Car traffic volume : 15441/1716 veh/timeperiod * Medium truck volume : 591/66 veh/timeperiod * Heavy truck volume : 844/94 veh/timeperiod * Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 3.50 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: Derry Rd (day/night) Angle1 Angle2 : deg deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : / m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Road data, segment # 2: Derry Rd (day/night) Car traffic volume : 15441/1716 veh/timeperiod * Medium truck volume : 591/66 veh/timeperiod * Heavy truck volume : 844/94 veh/timeperiod * Posted speed limit : 60 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 3.50 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 2: Derry Rd (day/night)

28 Angle1 Angle2 : deg deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : / m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Road data, segment # 3: Farmstead (day/night) Car traffic volume : 5441/605 veh/timeperiod * Medium truck volume : 38/4 veh/timeperiod * Heavy truck volume : 16/2 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 0 % Road pavement : 1 (Typical asphalt or concrete) * Refers calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): 5958 Percentage of Annual Growth : 2.50 Number of Years of Growth : 1.00 Medium Truck % of Total Volume : 0.70 Heavy Truck % of Total Volume : 0.30 Day (16 hrs) % of Total Volume : Data for Segment # 3: Farmstead (day/night) Angle1 Angle2 : deg 0.00 deg Wood depth : 0 (No woods.) No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : / m Topography : 1 (Flat/gentle slope; no barrier) Reference angle : 0.00 Results segment # 1: Derry Rd (day) Source height = 1.50 m ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Results segment # 2: Derry Rd (day)

29 Source height = 1.50 m ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Results segment # 3: Farmstead (day) Source height = 0.73 m ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Total Leq All Segments: dba Results segment # 1: Derry Rd (night) Source height = 1.50 m ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Results segment # 2: Derry Rd (night) Source height = 1.50 m ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Results segment # 3: Farmstead (night) Source height = 0.76 m

30 ROAD ( ) = dba Angle1 Angle2 Alpha RefLeq P.Adj D.Adj F.Adj W.Adj H.Adj B.Adj SubLeq Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 63.39

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,

More information

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Assessment Report Main Street, Residential Site Cambridge, ON Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:

More information

Place Vanier Édifice AEFO

Place Vanier Édifice AEFO Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26

More information

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

More information

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared

More information

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng Noise and Vibration Compatibility Feasibility Assessment Residential Component Proposed RMOW Transit Hub King Street West and Victoria Street North, Kitchener, ON For The Regional Municipality of Waterloo

More information

SS WILSON ASSOCIATES Consulting Engineers

SS WILSON ASSOCIATES Consulting Engineers SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT

More information

Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario

Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario For Granite Holdings Ontario Limited 160 Southgate Drive Guelph, Ontario N1G

More information

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.

More information

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Policy for the Assessment and Mitigation of Traffic Noise on County Roads Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H

More information

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330

More information

Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development

Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Novus Reference No. 12-0253 Version No. 1.1 (DRAFT) May 1, 2015 NOVUS PROJECT TEAM: Scientist: Specialist: Project

More information

Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario

Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario Type of Document: Site Plan Submission Client: Theberge Homes Project Number: OTT-00245003-A0 Prepared By: M. Ghadban, EIT. Reviewed By: B.

More information

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES NOISE ELEMENT OBJECTIVES AND POLICIES Noise Standards N1. To protect the citizens of Arroyo Grande from the harmful and annoying effects of exposure to excessive noise. Policy N1-1 The noise standards

More information

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 Prepared for; B.C. Ministry of Transportation

More information

ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary

ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary January 2016 Visit us: Ottawa.ca/planning Contents Introduction 1 Implementation and Interpretation 1 Structure of the Environmental Noise

More information

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE Technical Report Prepared For Ardstone Capital Ltd. 48 Fitzwilliam Square Dublin Technical Report

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

Compatible Use Odour, Dust, and Noise Assessment

Compatible Use Odour, Dust, and Noise Assessment Compatible Use Odour, Dust, and Noise Assessment Northridge Property Management Inc. 1101 2nd Avenue East, Suite 200 P.O. Box 325, Owen Sound, Ontario, N4K 5P5 3195 East Bayshore Road, Owen Sound, Ontario

More information

Attachment E2 Noise Technical Memorandum SR 520

Attachment E2 Noise Technical Memorandum SR 520 Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

3.1 Noise Overlay District

3.1 Noise Overlay District 3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

Noise Impact Study for Hyatt House in Davis, California

Noise Impact Study for Hyatt House in Davis, California Noise Impact Study for Hyatt House in Davis, California Prepared for The HR Group Architects 2277 Fair Oaks Boulevard, Studio 220 Sacramento, CA 95825 Prepared by Brian R. Smith, Principal INCE Board Certified

More information

COMPONENTS OF THE NOISE ELEMENT

COMPONENTS OF THE NOISE ELEMENT COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated

More information

Noise measurement and mitigation for urban building foundation excavation

Noise measurement and mitigation for urban building foundation excavation PROCEEDINGS of the 22 nd International Congress on Acoustics Challenges and Solutions in Acoustical Measurement and Design: Paper ICA2016-552 Noise measurement and mitigation for urban building foundation

More information

H3. Residential Single House Zone

H3. Residential Single House Zone H3. Residential Single House Zone H3.1. Zone description The purpose of the Residential Single House Zone is to maintain and enhance the amenity values of established residential neighbourhoods in number

More information

Stage 6 & 7 Design Guidelines

Stage 6 & 7 Design Guidelines Stage 6 & 7 Design Guidelines DESIRED CHARACTER/VISION The new release at Emerald Park Private Estate presents the opportunity to create a high quality and contemporary living environment. These Design

More information

RS-1 District Schedule

RS-1 District Schedule District Schedule 1 Intent The intent of this Schedule is generally to maintain the single-family residential character of the District, but also to permit conditionally one-family dwellings with secondary

More information

Peak noise levels during any time period can be characterized with statistical terms.

Peak noise levels during any time period can be characterized with statistical terms. 3.11 NOISE Introduction This Noise section provides a discussion of applicable noise policies and standards, the results of ambient noise measurements, an evaluation of the projects compatibility with

More information

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING

More information

H3 Residential Single House Zone

H3 Residential Single House Zone H3. Residential Single House Zone [ENV-2016-AKL-000243: K Vernon] Addition sought [CIV-2016-404-002333: Franco Belgiorno-Nettis]-Note: The properties affected by this appeal are identified on the Auckland

More information

1569 West 6th Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law)

1569 West 6th Avenue By-law No (Being a By-law to Amend By-law 3575, being the Zoning and Development By-law) Zoning and Development By-law Community Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7000 fax 604.873.7060 planning@vancouver.ca CD-1 (508) 1569 West 6th Avenue By-law No. 10308 (Being a By-law

More information

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES A bit about your speaker Presentation Overview 1. Some Case Studies 2. Mystery 3. Drama 4. Danger Environmental Noise Impact an Overview

More information

Noise Study Bristol Park Redevelopment Area

Noise Study Bristol Park Redevelopment Area Noise Study Bristol Park Redevelopment Area Distribution No. of Copies Sent To 3 Ms. Susan K. Jones Environmental Coordinator City of Champaign 102 N. Neil Street Champaign, IL 61820 X:\CH\IE\2013\13C018.00\10000

More information

H2. Residential Rural and Coastal Settlement Zone

H2. Residential Rural and Coastal Settlement Zone H2. Residential Rural and Coastal Settlement Zone H2.1. Zone description The Residential Rural and Coastal Settlement Zone applies to rural and coastal settlements in a variety of environments including

More information

Condominium Project Profile and General Review Form

Condominium Project Profile and General Review Form Condominium Project Profile and General Review Form This form must be completed, signed and returned to Tarion by a vendor/builder proposing to sell and/or build a condominium project. All references to

More information

APPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL

APPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL JUNE 2 016 A7.1 APPENDIX 7 AIRPORT NOISE AND DEVELOPMENT CONTROLS A7.1 INTRODUCTION The Rotorua Airport is an important resource for the Rotorua district and wider Bay of Plenty, East Coast and Central

More information

Australian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS

Australian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS AS 3671 1989 Australian Standard Acoustics Road traffic noise intrusion Building siting and construction This Australian Standard was prepared by Committee AV/5, Acoustics Community Noise. It was approved

More information

Commercial Medical Marijuana Operation Design Guidelines

Commercial Medical Marijuana Operation Design Guidelines City of Coalinga Community Development Department Commercial Medical Marijuana Operation Design Guidelines The provisions set forth in this document identify the desired level of design quality for all

More information

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations

Neighborhood Suburban Single-Family District Regulations City of St. Petersburg City Code Chapter 16, Land Development Regulations Section 16.20.020 - Neighborhood Suburban Single-Family Districts ( NS ) Sections: Typical Block in a Neighborhood Suburban District 16.20.020.1 History and Composition of Suburban Neighborhoods 16.20.020.2

More information

Buffer distances for surface roads and elevated highways correlated with pre-existing ambient noise

Buffer distances for surface roads and elevated highways correlated with pre-existing ambient noise Buffer distances for surface s and elevated highways correlated with pre-existing ambient noise Jiping ZHANG 1 ;MarcBURET 2 ; Shuoxian WU 3 ;Yuezhe ZHAO 3 ; Saiyan SHEN 1 ;Xin ZHANG 1 1 Zhejiang Research

More information

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092

More information

Stage 10 Design & Building Guidelines

Stage 10 Design & Building Guidelines Stage 10 Design & Building Guidelines DESIRED CHARACTER/VISION The development of The Rivergums presents the opportunity to create a high quality and more sustainable living environment by providing an

More information

MCKENZIE INTERCHANGE PROJECT

MCKENZIE INTERCHANGE PROJECT BKL CONSULTANTS LTD acoustics noise vibration MCKENZIE INTERCHANGE PROJECT PREPARED FOR: MAY 2016 REVISION 1 NOTICE BKL Consultants Ltd. (BKL) has prepared this report for the sole and exclusive benefit

More information

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers

Appendix H. Millennium Hollywood Project Trip Cap and Mitigation Triggers Appendix H Millennium Hollywood Project Trip Cap and Mitigation Triggers MILLENNIUM HOLLYWOOD PROJECT TRIP CAP AND MITIGATION TRIGGERS Crain and Associates Introduction The Millennium Hollywood Project

More information

11 NOISE INTRODUCTION NOISE FUNDAMENTALS AND TERMINOLOGY

11 NOISE INTRODUCTION NOISE FUNDAMENTALS AND TERMINOLOGY 11 NOISE INTRODUCTION This chapter addresses impacts related to noise and vibration, both noise generated by project construction and operation, as well as external noise sources impacts on future residents

More information

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1 TRANSPORTATION IMPACT STUDY (TIS) GUIDELINES FOR DEVELOPMENT APPLICATIONS Transportation and Works Department The Regional Municipality of York 17250 Yonge Street Newmarket, Ontario L3Y 6Z1 August, 2007

More information

ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES

ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES Presented at Inter-Noise 99 The 1999 Congress and Exposition on Noise Control Engineering December 8, 1999, Fort Lauderdale, Florida ENVIRONMENTAL NOISE CONTROL FOR SEMICONDUCTOR MANUFACTURING FACILITIES

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical

More information

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit: TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION 355-7575 Ext. 395 Needed to Obtain Permit: 1. Building Permit Application, and/or residential plumbing permit application, as applicable, to be

More information

Noise Impact Study for UMore Park Sand and Gravel Resources

Noise Impact Study for UMore Park Sand and Gravel Resources Noise Impact Study for UMore Park Sand and Gravel Resources University of Minnesota Rosemount and Empire Township, Minnesota SEH No. UOFMN 103496 October 2010 Table of Contents Title Page Table of Contents

More information

7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H

7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H 7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H (HERITAGE) ZONES 7.1 ZONE STATEMENTS 7.1.1 BUSINESS 1 AND 1A ZONES - (INNER COMMERCIAL) The Business 1 and 1A Zones represent the inner commercial area of Oamaru

More information

TORONTO GREEN STANDARD VERSION 2.0

TORONTO GREEN STANDARD VERSION 2.0 For New Mid to High Rise Residential and all New Non-Residential The Toronto Green Standard (TGS) is a two-tier set of performance measures, with supporting guidelines for new development. Its purpose

More information

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL

PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL FIRE DEPARTMENT 10573 E Stockton Blvd. Elk Grove, CA 95624 (916) 405-7100 Fax (916) 685-6622 www.yourcsd.com PLAN SUBMITTAL REQUIREMENTS - ARCHITECTURAL I Purpose To advise architects, engineers and contractors

More information

MCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises

MCS 020. MCS Planning Standards. For permitted development installations of wind turbines and air source heat pumps on domestic premises MCS 020 MCS Planning Standards For permitted development installations of wind turbines and air source heat pumps on domestic premises This Standard is the property of Department of Energy and Climate

More information

Basement Renovation Guide For Residential Dwellings

Basement Renovation Guide For Residential Dwellings 1 Development Services Department Building Permit & Inspection Services Basement Renovation Guide For Residential Dwellings This document is a guide for home owners and does not cover all possible conditions.

More information

APPENDIX C. Environmental Noise Assessment

APPENDIX C. Environmental Noise Assessment APPENDIX C Environmental Noise Assessment This page intentionally left blank. Environmental Noise Assessment San Joaquin Valley Christian School Merced County, California BAC Job # 2015-085 Prepared For:

More information

Appendix D Environmental Noise Assessment

Appendix D Environmental Noise Assessment Appendix D Environmental Noise Assessment AREAS 3 AND 4 SPECIFIC PLAN EIR NOISE AND VIBRATION ASSESSMENT NEWARK, CALIFORNIA January 30, 2009 Prepared for: Julie Mier David J. Powers and Associates, Inc.

More information

PRESCRIPTIVE COMPLIANCE METHOD

PRESCRIPTIVE COMPLIANCE METHOD CHAPTER PRESCRIPTIVE COMPLIANCE METHOD 3 SECTION 301 GENERAL 301.2 Building materials. Building materials shall comply with the requirements of this section. 301.2.1 Existing materials. Materials already

More information

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17) Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17) Plan Check #: Permit App. #: Job Address: Zone: Maximum Allowed RFA: Plan Check Engineer: Phone: Fax: (E-mail: firstname.lastname@lacity.org)

More information

Practice Note FOR THE. Small Lot Housing Code

Practice Note FOR THE. Small Lot Housing Code Practice Note FOR THE Small Lot Housing Code AUGUST 2014 SMALL LOT HOUSING CODE PRACTICE NOTE Level 29, 35 Collins Street Melbourne Victoria 3000 Telephone: 03 9651 9600 Facsimile: 03 9651 9623 Email:

More information

511. S.F.U. NEIGHBOURHOOD DISTRICT (P11) (2) Multiple-family dwellings or groups of multiple-family dwellings.

511. S.F.U. NEIGHBOURHOOD DISTRICT (P11) (2) Multiple-family dwellings or groups of multiple-family dwellings. 511. S.F.U. NEIGHBOURHOOD DISTRICT (P11) This District provides for development of multi-family market residential neighbourhoods with parks, schools and commercial support facilities, as an alternative

More information

NIGHTTIME ILLUMINATION

NIGHTTIME ILLUMINATION IV.A.3 NIGHTTIME ILLUMINATION 1. INTRODUCTION This section analyzes and discusses the extent to which the proposed project s artificial lighting would affect the visual environment of the project site

More information

9. NOISE AND VIBRATION

9. NOISE AND VIBRATION 9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial

More information

Content Copy Of Original

Content Copy Of Original Content Copy Of Original Ministry of the Environment and Climate Change Ministère de l Environnement et de l Action en matière de changement climatique T.C.M. Investments Limited 77 Ferguson Avenue South

More information

A homeowners/applicants guide to understanding and making application for a building permit.

A homeowners/applicants guide to understanding and making application for a building permit. Building Standards Department Administration Centre 10 Wellington St. E. Alliston, ON L9R 1A1 Web Address: www.newtecumseth.ca Email: building@newtecumseth.ca Phone: 705-435-3900 or 905-729-0057 Fax: 705-435-1689

More information

Corporate Environments

Corporate Environments Acoustics and the Impact on Corporate Environments falconproducts.com Achieving High-Quality Acoustics in Corporate Settings Knowledge is power. Here s what you need to know about sound, noise and creating

More information

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10 Section 7-10.1 Off Street Parking. Off-street parking spaces, with proper access from a street, alley or driveway shall be provided in all districts

More information

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies... Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance

More information

PART 7 - NOISE, SIGNS AND ARTIFICIAL LIGHTING

PART 7 - NOISE, SIGNS AND ARTIFICIAL LIGHTING CONTENTS... PAGE NOISE...3 7.1 RESOURCE MANAGEMENT ISSUES...3 7.2 RESOURCE MANAGEMENT OBJECTIVES AND POLICIES...3 7.3 RESOURCE MANAGEMENT STRATEGY...4 7.4 ANTICIPATED ENVIRONMENTAL RESULTS...5 7.5 PLAN

More information

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS

FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS FEDERAL BOULEVARD (5 TH AVENUE TO HOWARD PLACE) PLANNING ENVIRONMENTAL LINKAGE STUDY TRAFFIC NOISE IMPACT ANALYSIS Prepared for: City and County of Denver 201 West Colfax Avenue, Department 509 Denver,

More information

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request

RE: Letter of Intent Land Use Application for Plan Commission and UDC Initial/ Final Approval Request TO: City of Madison Planning Division 126 S. Hamilton Street Madison, WI 53701 Jessica Vaughn Department of Planning & Development City of Madison 126 S. Hamilton Street Madison, WI 53701 RE: Letter of

More information

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee

More information

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment DR-15-11/LLA-15-01 Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment Existing Zoning and Land Uses Enter footer information 2 Office Business Center (OBC)

More information

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT

COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT COUNTY OF SACRAMENTO CALIFORNIA ZONING ADMINISTRATOR REPORT Control No.: PLNP2007-00622 Type: UPZ DRS TO: FROM: ZONING ADMINISTRATOR DEPARTMENT OF COMMUNITY DEVELOPMENT CONTACT: Carol Gregory, Planner

More information

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING # 17 ) UN-101-14 DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING STAFF REPORT To: Planning Commission Meeting date: December 9, 2015 Item: UN-101-14 Prepared by: Robert Eastman GENERAL

More information

SECTION 7: INDUSTRIAL ZONE RULES

SECTION 7: INDUSTRIAL ZONE RULES SECTION 7: INDUSTRIAL ZONE RULES 7.1 CATEGORIES OF ACTIVITIES 7.1.1 PERMITTED ACTIVITIES The following activities are permitted activities in the Industrial Zone, provided activities comply with all relevant

More information

Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design

Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design Evaluating Appropriate Residential Ventilation Strategies in Dense Urban Environments and the Challenges for Passive Design Ashley Bateson CEng CEnv MCIBSE MEI Partner, Hoare Lea Chair, CIBSE Homes for

More information

Noise Mitigation Plan

Noise Mitigation Plan Noise Mitigation Plan CONTENTS 1. INTRODUCTION... 1 2. PLAN OBJECTIVES... 1 3. RELEVANT STATUTORY DOCUMENTS AND REGULATIONS... 1 4. MITIGATION SUMMARY... 2 5. THE PORT NOISE LIAISON COMMITTEE... 2 6. MITIGATION

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND STATE UNIVERSITY CONSTRUCTION FUND The following checklist show the general items required by the Agreement and the Program Directives. Unless included in the lump sum fee or the Schedule B of the Consultant

More information

CITY OF TORONTO. BY-LAW No (OMB)

CITY OF TORONTO. BY-LAW No (OMB) CITY OF TORONTO BY-LAW No. 364-2010(OMB) To amend the General Zoning By-law No. 438-86 of the former City of Toronto with respect to the lands municipally known as 1201 Dundas Street East. WHEREAS the

More information

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions: SECTION 46-53.1 B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT A. PURPOSE The B-2 Community Commercial Business District is oriented toward retail, service businesses and multi-family residential development.

More information

Commercial Tax Abatement

Commercial Tax Abatement A confirmation letter is issued by the City upon receipt of this application. This application is not effective and not considered filed until the confirmation letter has been issued. Filing does not assure

More information

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r N e w A l b a n y, O h i o r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r D e s i g n G u i d e l i n e s & R e q u i r e m e n t s s e c t i o n 5 I. Overview This section applies to all

More information

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328

NOISE IMPACT ASSESSMENT PROTOCOL. Number Three Wind Farm Lewis County, New York. Case 16-F-0328 NOISE IMPACT ASSESSMENT PROTOCOL Number Three Wind Farm Lewis County, New York Case 16-F-0328 October 2016 CONTENTS 1 Background... 3 2 Noise-Sensitive Receptors... 4 3 Ambient Noise Assessment... 5 3.1

More information

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls

More information

1. Introduction Noise Analysis Results Figures. List of Tables

1. Introduction Noise Analysis Results Figures. List of Tables Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions

More information

US 53 Noise Mitigation

US 53 Noise Mitigation US 53 Noise Mitigation 1 Meeting Agenda Introductions Brief Project Overview Terminology Agencies Involved Rules/Regulations Noise Characteristics Project Approach Mitigation Possible Noise Mitigation

More information

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING

ONLY ONLY BUILDING AND PARKING ENVELOPE RAMP STAIRS NEW SURFACE PARKING PROPOSED HOTEL PROPOSED TWO STORY PARKING STRUCTURE NEW SURFACE PARKING LOCATION MAP SITE DEVELOPMENT DATA: --ACREAGE: ± 5. ACRES -- ZONING: MUDD-O -- USES: UP TO TWO () HOTELS WITH UP TO 70 ROOMS (APPROXIMATELY 00 ROOMS IN THE EXISTING HOTEL ON THE SITE, AND UP TO 70 ROOMS

More information