1 Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Novus Reference No Version No. 1.1 (DRAFT) May 1, 2015 NOVUS PROJECT TEAM: Scientist: Specialist: Project Manager: Principal: Kevin Carr, P.Phys. Marcus Li, B.Sc., B.Eng.Sc. Hamish Hains, M.A.Sc., P.Eng. R.L. Scott Penton, P.Eng. Air Quality Sound & Vibration Sustainable Water Wind & Climate Novus Environmental Inc. 150 Research Lane, Suite 105, Guelph, Ontario, Canada N1G 4T2 Novus West Inc Avenue SW, Suite 600, Calgary, Alberta, Canada T2R 1K7

2 This page intentionally left blank for 2-sided printing purposes

3 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Table of Contents 1.0 INTRODUCTION Focus of Report Nature of the Subject Lands Nature of the Surroundings... 1 PART 1: IMPACTS OF THE ENVIRONMENT ON THE DEVELOPMENT Transportation Noise Impacts Transportation Noise Sources Surface Transportation Noise Criteria Ministry of the Environment Publication NPC Traffic Data and Future Projections Roadway Traffic Data Projected Sound Levels Façade Sound Levels Outdoor Amenity Areas Façade Recommendations Ventilation and Warning Clause Requirements Residential Units Outdoor Amenity Areas Stationary Source Noise Impacts Guideline D Compliance with Guideline D-6 Criteria MOE NPC-300 Guidelines for Stationary Noise Sources Stationary Noise Modelling Noise Impact Prediction Required Warning Clauses PART 2: IMPACTS OF THE DEVELOPMENT ON ITSELF Outdoor Noise Impacts From Ventilation Sources Interior Noise Sources Interior Walls and Floors PART 3: IMPACTS OF THE DEVELOPMENT ON THE SURROUNDING AREA Impacts of the Development on Surrounding Properties Novus Environmental i

4 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, CONCLUSIONS AND RECOMMENDATIONS Transportation Noise Industrial Stationary Noise Overall Assessment REFERENCES List of Tables Table 1: NPC-300 Sound Level Criteria for Road and Rail Noise... 3 Table 2: NPC-300 Ventilation and Warning Clause Requirements... 4 Table 3: MOE Publication NPC-300 Building Component Requirements... 5 Table 4: Summary of Road Traffic Data Used in the Transportation Noise Analysis... 6 Table 5: Summary of Worst-case Transportation Sound Levels... 6 Table 6: Guideline D-6 Potential Influence Areas and Recommended Minimum Setback Distances for Industrial Land Uses... 9 Table 7: Guideline D-6 Industrial Categorization Criteria Table 8: Major Industries Within 1000 m of Proposed Development Table 9: NPC-300 Class 4 Steady Sound Noise Requirements Table 10: Summary of Stationary Source Noise Impacts Façade Levels Table 11: Typical Indoor Noise Control Design Criteria List of Figures Figure 1: Figure 2: Figure 3: Figure 4: Figure 5: Figure 6: Figure 7: Site Plan Context Plan Modelled Façade Sound Levels Roadway, Daytime Modelled Façade Sound Levels Roadway, Night-time Surrounding Industry Stationary Noise Source Locations Modelled Façade Sound Levels Stationary, Daytime/Evening Modelled Façade Sound Levels Stationary, Night-time List of Appendices Appendix A: Elevation Drawings Appendix B: Traffic Data Appendix C: Façade Calculations Appendix D: Sound Power Level Data Novus Environmental ii

5 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, INTRODUCTION Novus Environmental Inc. (Novus) was retained by DIAMONDCORP to conduct an Environmental Noise Feasibility Assessment for the proposed mixed-use residential development located at 939 Eglinton Avenue East, in Toronto ON (site). The proposed development is located on the south-east corner of the Eglinton Avenue East and Brentcliffe Road intersection in Toronto, Ontario. 1.1 Focus of Report In keeping with City of Toronto requirements, this report examines the potential for: Impacts of the environment on the proposed development; Impacts of the proposed development on the environment; and Impacts of the proposed development on itself. 1.2 Nature of the Subject Lands The subject property is located on the south-east corner of Eglinton Avenue East and Brentcliffe Road, in Toronto, Ontario. The site is currently a commercial plaza. The proposed development includes three (3) distinct blocks. Along Eglinton Avenue East is the North Block with an 8-storey podium, a 19-storey tower (Tower A) on the west side and a 24-storey tower (Tower B) on the east side. Between the towers is a 2-storey mass with a rooftop outdoor amenity space. The Mid Block consists of a 34-storey building (Tower C) on the west side and a 31-storey tower (Tower D) on the east side. An outdoor amenity space rests atop the 8-storey mass located between these towers. The South Block consists of a 6-storey commercial building (Tower E), located at the southeast corner of the development, and a landscaped public park at the southwest corner. A site plan for the proposed development is shown in Figure 1. Elevation drawings for the development are included in Appendix A. 1.3 Nature of the Surroundings Key features of the area and lands surrounding the proposed development site, relevant to this assessment are: Eglinton Avenue East is north of the site with existing residential lands beyond. To the east of the site lies Brentcliffe Road, and existing commercial/retail/residential lands. Novus Environmental 1

6 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Vanderhoof Avenue and existing industrial/commercial/retail lands are located south of the proposed development. Included with the industrial land uses are an Asphalt Plant and a Ready-Mix facility. A Mercedes-Benz dealership is located to the west, adjacent to the development. Further to the west is commercial/retail lands, with residential lands located on the other side of Laird Drive. A context plan is shown in Figure 2. PART 1: IMPACTS OF THE ENVIRONMENT ON THE DEVELOPMENT In assessing potential impacts of the environment on the proposed development, the focus of this report is to consider: 1) Transportation noise impacts from surrounding roadways; and 2) Stationary noise impacts from industrial sources. The nearest rail line is located approximately 750 m from the proposed development, and is screened by intervening buildings. Therefore, a railway noise assessment is not required. There are no airports in the immediate vicinity of the proposed development, and an assessment of aircraft noise impacts is not required. 2.0 Transportation Noise Impacts 2.1 Transportation Noise Sources Transportation noise sources of interest with the potential to produce noise at the proposed development are: Eglinton Avenue East; Brentcliffe Road; Vanderhoof Avenue; and Laird Road. Sound exposure levels at the development, due to these sources have been predicted, and this information has been used to identify façade, ventilation, and warning clause requirements. Novus Environmental 2

7 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, Surface Transportation Noise Criteria Ministry of the Environment Publication NPC-300 Noise Sensitive Developments Ministry of the Environment (MOE) Publication NPC-300 provides sound level criteria for noise sensitive developments. The applicable portions of NPC-300 are Part C Land Use Planning and the associated definitions outlined in Part A Background. Table 1 to Table 3 below summarize applicable surface transportation (road and rail) criteria limits. Location Specific Criteria Table 1 summarizes criteria in terms of energy equivalent sound exposure (Leq) levels for specific noise-sensitive locations. Both outdoor and indoor locations are identified, with the focus of outdoor areas being amenity spaces. Indoor criteria vary with sensitivity of the space. As a result, sleep areas have more stringent criteria than Living / Dining room space. Table 1: NPC-300 Sound Level Criteria for Road and Rail Noise Type of Space Outdoor Amenity Area Living / Dining Room [3] Sleeping Quarters Notes: Time Period Daytime ( h) Daytime ( h) Nighttime ( h) Daytime ( h) Nighttime ( h) Energy Equivalent Sound Exposure Level L eq [5] (dba) Road Rail [1] Assessment Location Outdoors [2] Indoors [4] Indoors [4] Indoors [4] Indoors [4] [1] Whistle noise is excluded for OLA noise assessments, and included for Living / Dining Room and Sleeping Quarter assessments, where applicable. [2] Road and Rail noise impacts are to be combined for assessment of OLA impacts. [3] Residence area Dens, Hospitals, Nursing Homes, Schools, Daycares are also included. During the nighttime period, Schools and Daycares are excluded. [4] An assessment of indoor noise levels is required only if the criteria in Table 3 are exceeded. [5] L eq the energy equivalent sound exposure level, integrated over the time period shown. Novus Environmental 3

8 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Ventilation and Warning Clauses Table 2 summarizes requirements for ventilation where windows potentially would have to remain closed as a means of noise control and apply where the sound exposure levels found in Table 2 exceed the guideline limits in Table 1 for indoors spaces. Despite the implementation of ventilation measures where required, some occupants may choose not to use the ventilation means provided, and as such, warning clauses advising future occupants of the potential excess over the Table 1 guideline limits are required. Warning clauses also apply to the OLA where an excess of up to 5 dba over the 55 dba OLA limit is often acceptable to many, particularly in the context of an urban environment. Warning clauses are discussed further in Section 2.6. Table 2: NPC-300 Ventilation and Warning Clause Requirements Assessment Location Time Period Energy Equivalent Sound Exposure Level L eq (dba) Road Rail [1] Ventilation and Warning Claus Requirements [2] Outdoor Amenity Area Daytime ( h) 56 to 60 incl. Type A Warning Clause 55 None Plane of Window Daytime ( h) Nighttime ( h) 56 to 65 incl. > to 60 incl. > 60 Forced Air Heating with provision to add air conditioning + Type C Warning Clause Central Air Conditioning + Type D Warning Clause Forced Air Heating with provision to add air conditioning + Type C Warning Clause Central Air Conditioning + Type D Warning Clause Notes: [1] Whistle noise is excluded. [2] Road and Rail noise is combined for determining Ventilation and Warning Clause requirements. Novus Environmental 4

9 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Building Shell Requirements Table 1 provides Leq thresholds which if exceeded, require the building shell and components (i.e., wall, windows) to be designed and selected accordingly to ensure that the Table 1 indoor location criteria are met. Table 3: MOE Publication NPC-300 Building Component Requirements Assessment Location Time Period Energy Equivalent Sound Exposure Level L eq (dba) Road Rail [1] Component Requirements Plane of Window Daytime ( h) Nighttime ( h) > 65 > 60 > 60 > 55 Designed/ Selected to Meet Indoor Requirements [2] Notes: [1] Including whistle noise. [2] Building component requirements are assessed separately for Road and Railway noise. The resultant sound isolation parameter is required to be combined to determine and overall acoustic parameter. In summary, roadway noise impacts are to be predicted at the plane-of-window for the proposed development. Providing the plane-of-window sound levels exceed the daytime and nighttime sound levels indicated in Table 3, the determination of the building façade components is required for meeting the indoor sound level criteria outlined in Table 1. In addition, the ventilation requirements and warning clauses were determined, as outlined in Table 2, based on the plane-of-window noise levels. 2.3 Traffic Data and Future Projections Roadway Traffic Data Road traffic volume data were obtained from BA Group, the transportation consultant on the project. A growth rate of 1 % per year was applied to determine the 10-yr future horizon traffic volumes. Commercial traffic percentages and day/night splits were assumed based on City of Toronto averages on file at Novus. Table 4 summarizes the road traffic volumes used in the analysis. Copies of all traffic data used and calculations can be found in Appendix B. Novus Environmental 5

10 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Table 4: Summary of Road Traffic Data Used in the Transportation Noise Analysis Roadway Link 2025 Traffic Levels (AADT) Daytime Day / Night Volume Split Nighttime Commercial Traffic Breakdown % Medium Trucks % Heavy Trucks Vehicle Speed (km/h) Elginton Ave E 55, Brentcliffe Rd 14, Vanderhoof Ave 4, Laird Dr 26, Road traffic sound levels at the proposed development were predicted using Cadna/A, a commercially available noise propagation modelling software. Roadways were modelled as line sources of sound, with sound emission rates calculated using the ORNAMENT algorithms, the road traffic noise model of the MOE. These predictions were validated and are equivalent to those made using the MOE s ORNAMENT or STAMSON v5.04 road traffic noise models. 2.4 Projected Sound Levels Façade Sound Levels Sound levels were predicted along the facades of the residential towers and the podium levels using the building evaluation feature of Cadna/A. This feature allows for noise levels to be predicted across the entire façade of a structure. The worst-case façade sound level is presented for each residential tower and podium level in Table 5. The sound levels are also compared to the limit requiring an assessment of indoor sound levels. Figure 3 and Figure 4 show the sound levels along each tower and podium façade for the daytime and night-time periods, respectively. Table 5: Summary of Worst-case Transportation Sound Levels Roadway Building In Room Assessment Building Sound Level [1] Component Criteria Required? Day Night Day Night Day Night (dba) (dba) (dba) (dba) (Yes/No) (Yes/No) Tower A Yes No Tower B Yes No Tower C No No Tower D No No Podium North Block Yes Yes Podium Mid Block No No Notes: [1] The sound levels presented are for the worst-case exposed facade. Novus Environmental 6

11 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Based on the above results, an assessment of in-room noise levels is required for Tower A, Tower B, and the North Block Podium Outdoor Amenity Areas The Outdoor Amenity Areas considered in this assessment are as follows, as indicated in Figure 1: Landscaped Roof Deck, on the North Block Podium, between Tower A and Tower B; The rooftop amenity space, located on the Mid Block Podium, between Tower C and Tower D; and A Landscaped Public Park, located on the south-west corner of the development. The above rooftop terraces have the potential to be impacted by transportation noise. An assessment of transportation noise impacts on the amenity space were predicted to be below 55 dba for both terraces and the landscaped public park. Therefore, no additional mitigation measures are required for these amenity spaces. The private balconies for each residential unit have been excluded from the assessment, assuming the MOE minimum depth requirement of 4 m is not met. 2.5 Façade Recommendations Indoor sound levels and required Façade Sound Transmission Classes (STCs) were estimated using the procedures outlined in National Research Council Building Practice Note BPN-56. Detailed floor plans were not available at the time of the assessment. For the analysis, generic bedrooms and living rooms have been considered. A 60% glazing-to-floor-area was assumed, and assessed with an STC 41 rating for the non-glazing component of the façade. Additional detail associated with the Façade Calculations are shown in Appendix C. The in-room noise level assessment was completed for the north façade of the North Block Podium, as the façade levels were found to be the highest for the development. The minimum structural requirements of the Ontario Building Code (OBC) are predicted to be adequate for living room and bedroom spaces along the north façade of the North Block Podium. Therefore, no upgraded glazing is predicted to be required for the residential units on Tower B or the North Block Podium. It should be noted that if a unit has two (2) exposed sides to Eglinton Avenue, an increase in 3 STC points may be necessary for the glazing. Once detailed floor plans and façade plans are finalized, the requirements for the glazing should be reviewed by an Acoustical Consultant. Novus Environmental 7

12 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, Ventilation and Warning Clause Requirements The requirement to include Warning Clauses is summarized in Table 2. Where required, the warning clauses must be included in all agreements of purchase and sale or lease and all rental agreements Residential Units Based on the predicted façade noise levels, air conditioning will be required for residential units on Tower B and the North Block Podium. All other residential units will require the provisions for future air conditioning. A Type D noise warning clause is required for the Tower B and North Block Podium residential units. The remaining residential units will require a Type C noise warning clause. The Type C and D Warning Clauses are summarized below: Type C Warning Clause This dwelling unit has been designed with the provision for adding central air conditioning at the occupant s discretion. Installation of central air conditioning by the occupant in low and medium density developments will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the sound level limits of the Municipality and the Ministry of the Environment. Type D Warning Clause This dwelling unit has been or will be fitted with a central air conditioning system which will enable occupants to keep windows closed if road and or air traffic noise interferes with the indoor activities Outdoor Amenity Areas Noise impacts were predicted to be below 55 dba for both rooftop terraces and the public park. Therefore, no warning clauses are required for these amenity areas. Novus Environmental 8

13 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, Stationary Source Noise Impacts A review has been conducted for the potential impacts on the development from stationary noise, since there are a number of commercial and industrial buildings adjacent to the proposed site. 3.1 Guideline D-6 The D-series of guidelines were developed by the Ontario Ministry of the Environment (MOE) in 1995 as a means to assess recommended separation distances between industrial facilities and surrounding land uses which could be affected by industrial emissions. In addition to separation distances, the D-series guidelines suggest control measures for land use planning proposals in an effort to prevent or minimize adverse effects from the encroachment of incompatible land uses where a facility either exists or is proposed. The guideline specifically addresses issues of odour, dust, noise and litter. To minimize the potential to cause an adverse effect, areas of influence and recommended minimum setback distances were included within the guidelines. Guideline D-6 Compatibility Between Industrial Facilities and Sensitive Land Uses is specific to industrial uses in proximity to more sensitive land uses such as the proposed residential and commercial development. The areas of influence and recommended separation distances from the guidelines are provided in Table 6. The industrial categorization criteria are supplied in Guideline D-6-2, and are shown in Table 7. Table 6: Guideline D-6 Potential Influence Areas and Recommended Minimum Setback Distances for Industrial Land Uses Industry Classification Area of Influence Recommended Minimum Setback Distance Class I Light Industrial 70 m 20 m Class II Medium Industrial 300 m 70 m Class III Heavy Industrial 1000 m 300 m The separation distances from the above table, relative to the proposed development, are shown in Figure 2. Novus Environmental 9

14 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Table 7: Guideline D-6 Industrial Categorization Criteria Category Outputs Scale Process Class 1 Industry Class 2 Industry Noise: Sound not audible off property Dust: Infrequent and not intense Odour: Infrequent and not intense Vibration: No groundborne vibration on plant property Noise: Sound occasionally heard offproperty Dust: Frequent and occasionally intense Odour: Frequent and occasionally intense Vibration: Possible ground borne vibration, but cannot be perceived off property No outside storage Small scale plant or scale is irrelevant in relation to all other criteria for this Class Outside storage permitted Medium level of production allowed Self contained plant or building which produces/ stores a packaged product Low probability of fugitive emissions Open process Periodic outputs of minor annoyance Low probability of fugitive emissions Operations / Intensity Daytime operations only Infrequent movement of products and/ or heavy trucks Shift operations permitted Frequent movements of products and/ or heavy trucks with the majority of movements during daytime hours Possible Examples Electronics manufacturing and repair Furniture repair and refinishing Beverage bottling Auto parts supply Packaging and crafting services Distribution of dairy products Laundry and linen supply Magazine printing Paint spray booths Metal command Electrical production Manufacturing of dairy products Dry cleaning services Feed packing plants Class 3 Industry Noise: Sound frequently audible off property Dust: Persistent and/ or intense Odour: Persistent and/ or intense Vibration: Ground borne vibration can frequently be perceived offproperty Outside storage of raw and finished products Large production levels Open process Frequent outputs of major annoyances High probability of fugitive emissions Continuous movement of products and employees Daily shift operations permitted Paint and varnish manufacturing Organic chemical manufacturing Breweries Solvent recovery plants Soaps and detergent manufacturing Metal refining and manufacturing Compliance with Guideline D-6 Criteria A site visit to lands within the study area was conducted to identify local industries and to understand the potential for noise impact. Table 8 lists the larger scale Class 2 and Class 3 industries in the area. Novus Environmental 10

15 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Table 8: Major Industries Within 1000 m of Proposed Development Facility CBM 55 Industrial St Clearmount Plastics Ltd 103 Vanderhoof Ave Coco Paving 37 Commercial Rd Type of Operation Ready Mix Concrete Batch Plant Acrylic Embedment Manufacturing Facility Industry Class Class 3 Class 2 Certificate of Approval / Environmental Compliance Approval No. CofA No NPRCG CofA No WTR6H Asphalt Plant Class 3 CofA No PTNFL The surrounding area also includes a number of other Class 1 industries and commercial uses not listed in the above table. These uses include restaurants, retail stores, various storage facilities, car dealerships, and auto-mechanic facilities. The Mercedes Benz Midtown dealership is the only Class 1 industry located within the 70 m Area of Influence with the potential for noise, and was therefore included in the assessment. As no significant noise sources are located on any other Class 1 industries within the 70 m Area of Influence, noise impacts were not assessed. The Clearmount Plastics Limited is considered to be a Class 2 industry and located within the 300 m area of influence. An assessment of noise impacts from this facilities was included. The CBM and Coco Paving facilities are both located within the 1000 m area of influence for the Class 3 industries. Therefore, noise impacts from both these facilities were also included in the assessment. The locations of the above industries are shown in Figure MOE NPC-300 Guidelines for Stationary Noise Sources MOE noise guidelines for stationary source noise impacting residential and certain institutional and commercial developments are given in MOE publication NPC-300. The applicable portions of NPC-300 are Part C Land Use Planning and the associated definitions outlined in Part A Background. The acoustic environment surrounding the proposed development is dominated by the roadway noise and a general urban hum during all periods of the day. Therefore, the proposed development is considered to be located in an urban Class 1 area. In NPC-300, an area (otherwise classified as Class 1 or Class 2) can also be defined with a Class 4 designation based on the following: Intended for development with new noise sensitive land use(s) that are not yet built; Novus Environmental 11

16 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 In proximity to existing, lawfully established stationary source(s); and Has formal conformation as a Class 4 area classification, determined during the land use planning process. For the purposes of this assessment, the proposed development is assumed to be located in a Class 4 area. The City of Toronto planning staff will need to confirm, in accordance with the requirements of NPC-300, that such a designation is acceptable. The sound level limit for steady sound sources are expressed as a 1-hr equivalent sound level (1-hr Leq), and is the higher of the NPC-300 exclusionary limits and the existing background sound level. The NPC-300 stationary source noise requirements are summarized below for steady sound sources for outdoor and plane-of-window receptor locations in a Class 4 area. Table 9: NPC-300 Class 4 Steady Sound Noise Requirements Notes: Receiver Category Outdoor Plane of Window [2] Time Period [1] or minimum hourly L eq of background noise, whichever is higher [2] Applicable for Noise Sensitive Spaces, as defined in NPC-300. Exclusionary Sound Level Limits, 1h L eq (dba) [1] h h h h h h 55 Sound level limits do not apply to emergency equipment operating during emergency situations. However, emergency equipment operating in non-emergency situations, such as testing or maintenance of such equipment, requires assessment under NPC-300. The sound level limits for emergency equipment operating in non-emergency situations are 5 db greater than the sound level limits otherwise applicable to other stationary sources, as described above. Additionally, emergency equipment operating in non-emergency situations is to be assessed independently of all other stationary sources of noise. The ambient sound levels from the surrounding roadways were modelled at the proposed development. The predicted sound levels are not anticipated to exceed the exclusionary limits outlined in Table 9 for the facades exposed to the surrounding stationary noise sources. Therefore, the MOE Class 4 exclusionary limits have been applied for the proposed development. Novus Environmental 12

17 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, Stationary Noise Modelling Inclusion of the surrounding significant noise sources was determined based on a combination of site visit observations by Novus personnel during 2013 and 2014 and a review of aerial photography. The significant noise sources included in the assessment are as follows: CBM Ready Mix Facility Three (3) dust collectors; Pneumatic unloading of cement powder; Cement Truck wash and mix; and One (1) emergency generator. Clearmount Plastics Limited One (1) dust collector; and Rooftop HVAC units. Coco Paving Asphalt plant noise. Mercedes-Benz Midtown Three (3) rooftop air cooled condensers; Three (3) boiler exhaust stacks; One (1) cooling tower; Three (3) general exhaust fans (for cars); and One (1) emergency generator Each of the above facilities is required to meet the MOECC NPC-205 noise guideline limits at existing noise sensitive receptors, as indicated in their respective Certificates of Approval (CofA). Prior to predicting the combined noise impacts on the proposed development, each facility was modelled to meet the NPC-205 guideline limits at the surrounding existing receptors. A summary of the sound power levels (PWL) and assumptions used in the analysis are included in Appendix D. Figure 5 shows the noise source locations included in the noise modelling. Novus Environmental 13

18 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, Noise Impact Prediction Modelling was performed using Cadna/A, a computerized implementation of the ISO 9613 noise propagation algorithms. The model took into consideration the rough layout of the development, surrounding topography, and the surrounding buildings. As described in ISO , ground factor values that represent the effect of ground absorption on sound levels range between 0 and 1. Based on the specific site conditions, the ground factor values used in the modelling were a ground factor value of 0 for acoustically reflective surfaces, such as asphalt, with localized areas ground factors of 1 drawn in for absorptive areas, such as grass areas. As discussed above, ambient sound exposures were conservatively not included in this assessment. Façade Levels The building evaluation feature of the Cadna/A was used to assess noise impacts on the residential portions of the towers. This feature allows for noise levels to be predicted across the entire façade of a structure. The worst-case noise impacts from the surrounding stationary sources are shown in Table 10. The results shown are for the building façade with the highest impacts. Table 10: Summary of Stationary Source Noise Impacts Façade Levels Applicable Stationary Source Meets Building [1] [2] Impacts Criteria [3] Criteria? Day Night Day Night Day Night (dba) (dba) (dba) (dba) (Yes/No) (Yes/No) Tower A Yes Yes Tower B Yes Yes Tower C Yes Yes Tower D Yes Yes Podium North Block Yes Yes Podium Mid Block Yes Yes Notes: [1] The sound levels presented are for the worst-case exposed facade. [2] Generator testing was excluded. [3] The exclusionary Class 4 guideline limits were applied. The façade noise impacts are shown in Figure 6 and Figure 7 for the daytime and night-time periods, respectively, as a change relative to the guideline limits. As shown in Figure 6 and Figure 7, no excesses of the guideline limits are predicted. Therefore, the stationary noise impacts from the surrounding industries are predicted to meet the Class 4 guideline limits on all facades of the proposed development. Novus Environmental 14

19 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Outdoor Amenity Areas The Outdoor Amenity Areas considered in this assessment include two (2) rooftop terraces identified in Figure 1. These amenity spaces are as follows: Landscaped Roof Deck, on the North Block Podium, between Tower A and Tower B; The rooftop amenity space, located on the Mid Block Podium, between Tower C and Tower D; and A Landscaped Public Park, located on the south-west corner of the development. The above rooftop terraces have the potential to be impacted by transportation noise. An assessment of stationary noise impacts on the amenity space were predicted to be below the 55 dba Class 4 limit for both terraces and the Landscaped Public Park. Therefore, no additional mitigation measures are required for these amenity spaces. The private balconies for each residential unit have been excluded from the assessment, assuming the MOE minimum depth requirement of 4 m is not met. Generator Testing Generator noise impacts have been assessed separately from the other stationary noise sources. The predicted noise impacts are below 50 dba on all facades and within the Outdoor Amenity Spaces, which meets the Class 4 exclusionary limit of 65 dba during the daytime period. These impacts were predicted based on a 1-hour duration for testing, and the simultaneous testing of both the CBM and Mercedes-Benz Midtown generators. 3.4 Required Warning Clauses Since the surrounding stationary noise sources are anticipated to be audible at times, a warning clause should be included in the Agreement of Purchase and Sale or Lease and in the relevant Development Agreements. An MOE NPC-300 Type E warning clause is required. A template Type E Warning Clause is shown below: Type E Warning Clause Purchasers/tenants are advised that due to the proximity of the adjacent industries, noise from the industries may at times be audible. Novus Environmental 15

20 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 PART 2: IMPACTS OF THE DEVELOPMENT ON ITSELF 4.0 Outdoor Noise Impacts From Ventilation Sources The building ventilation and potential emergency systems associated with the development have not been designed at this time. Although no adverse impacts are expected, such equipment has the potential to result in noise impacts on residential spaces within the development. It is therefore recommended that ventilation sources be reviewed by an acoustical professional prior to final selection of equipment. 5.0 Interior Noise Sources Building rooms or spaces next to mechanical equipment areas may be adversely affected by sound transmitted through ducts, opening, or noise induced by mechanical system vibrations into the building structure. The isolation of sound from mechanical equipment can be readily achieved with good design. All supply, return and miscellaneous fans should be provided with adequate vibration isolation to ensure that vibration is not transferred to the building structure and become a source of noise. Duct silencers can be used to ensure that high fan noise levels are not carried by the duct work to residential and other noise sensitive rooms throughout the building. Fans should be connected to ducting with flexible connectors. Duct work should be hung on vibration isolating hangers. All chillers, compressor and similar items of equipment should be provided with adequate vibration isolation and mounted on concrete inertia bases. The chiller room may need a floating floor or other alternate acoustically equivalent "room to room" construction to ensure that the high sound levels associated with a chiller are not transmitted to the residential units. All piping runs within the building are potential sources of noise. For example, plumbing can be a source of noise particularly if the source is not in the same suite as the listener. Pipes that pass through walls, floors and ceiling should be treated to reduce potential noise and vibration impacts. For example, pipes should be hung on vibration isolating hangers, and risers should not be rigidly connected to the floors or other supporting members at anchor locations. Pumps should be provided with adequate vibration isolation and mounted on concrete inertia bases where required. Transformers and other vibration noise producing electrical components should be provided with adequate vibration isolation. Novus Environmental 16

21 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 The following table indicates accepted guidelines to limit interior sound levels from continuous building services (i.e., pumps, air handling units, etc.). These guidelines are in the form of Noise Criteria (NC) curves, which indicate the maximum desirable sound level at the receptor in different frequency bands depending on the use of the space. Table 11: Typical Indoor Noise Control Design Criteria Type of Space Range of Sound Levels (dba) Range of NC Criteria Residence Apartments Private / Executive Office General/Open Office Conference Room Restaurants / Lounges Interior Walls and Floors Walls and floors separating mechanical rooms, fan rooms, electrical rooms, elevators shafts and rooms, garbage chutes, retail spaces etc. from residential spaces in the building should have adequate sound transmission loss. The Building Code requires a minimum Sound Transmission Class (STC) of 55 for such floors and walls. Interior walls between adjacent residential units should have a sufficient sound transmission loss. A minimum STC of 50 to 55 is recommended between adjacent units, STC-50 being specified by the Ontario Building Code. Adequate sound isolation can only be achieved if pertinent details for design and construction are followed. For example, closure of all cracks by caulking or equivalent, and the sealing of all wall penetrations, including electrical outlets. Electrical outlets serving different suites should not be within the same stud space or masonry cavity. Attention should also be paid to the effect of party rooms and other recreational and utility areas located adjacent to, or in close proximity to, residential units and office spaces. Noise and vibration impacts due to these areas should be investigated, and noise and/or vibration control measures included as necessary. An important aspect not addressed by the Building Code is impact sound. The floor/ceiling systems can be designed to minimize the transmission of impact sounds. The use of carpet or resilient underlayments to meet Impact Insulation Class (IIC) ratings of IIC would be appropriate for stacking residential suites. Novus Environmental 17

22 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 PART 3: IMPACTS OF THE DEVELOPMENT ON THE SURROUNDING AREA 6.0 Impacts of the Development on Surrounding Properties In terms of the noise environment of the area, it is expected that the project will have a negligible effect on the neighbouring properties. The traffic related to the proposed development will be small in relation to the traffic volumes within the area, and is not of concern with respect to noise impact. Other possible sources of noise associated with the development, with potentially adverse noise impacts on the surrounding neighbourhood, are emergency generators and mechanical roof-top equipment for the proposed development. This equipment must meet MOE Publication NPC-300 requirements at the closest off-site noise sensitive receptors. Given the high ambient sound levels in the area, the large separation distances to off-site noise sensitive receptors, and the fact that the systems will be designed to ensure that the applicable noise guideline are met at on-site receptors, off-site impacts are not anticipated. Regardless, potential impacts should be assessed as part of the final building design. The criteria can be met at all surrounding and on-site receptors by the appropriate selection of mechanical equipment, by locating equipment with sufficient setback from noise sensitive locations, and by incorporating control measures (e.g., silencers) into the design. 7.0 CONCLUSIONS AND RECOMMENDATIONS The potential for noise impacts on and from the proposed development have been assessed. Impacts of the environment on the development, the development on itself, and the development on the surrounding area have been considered. Based on the results of our studies, the following conclusions have been reached: 7.1 Transportation Noise An assessment of transportation noise impacts has been completed. Upgrades to façade construction (windows and walls) are not required for the residential units. Noise impacts in the rooftop amenity spaces are predicted to not require any additional noise mitigation measures. Novus Environmental 18

23 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, 2015 Provisions for air conditioning are recommended as outlined in Section 2.6. Type C and Type D warning clauses must be included in all agreements of purchase and sale or lease and all rental agreements, as outlined in Section Industrial Stationary Noise Stationary noise impacts were assessed against the MOE NPC-300 Class 4 Area criteria. The significant stationary sources in the surrounding area include the CBM ready-mix plant, Clearmount Plastics Limited facility, the Coco Paving asphalt plant, and the Mercedes-Benz Midtown dealership. Stationary noise impacts from the surrounding industrial noise are predicted to meet NPC-300 Class 4 requirements at all noise sensitive areas. A Type E noise warning clause should be included in all agreements of purchase and sale or lease and all rental agreements, as outlined in Section Overall Assessment Impacts of the environment on the proposed development can be adequately controlled through the feasible mitigation measures and warning clauses detailed in Part 1 of this report. Impacts of the proposed development on itself can be adequately controlled by following the design guidance outlined in Part 2 of this report. Impacts of the proposed development are predicted to meet the applicable guideline limits, and can be adequately controlled by following the design guidance outlined in Part 3 of this report. Given the early stage of design and the conservative analysis that has been completed, the details of the above assessment should be reviewed by an Acoustical Consultant as part of the future site plan approval application. Novus Environmental 19

24 Environmental Noise Assessment 939 Eglinton Avenue Development May 1, REFERENCES International Organization for Standardization, ISO : Acoustics Attenuation of Sound During Propagation Outdoors Part 2: General Method of Calculation, Geneva, Switzerland, Ontario Ministry of the Environment (MOE), 1989, Ontario Road Noise Analysis Method for Environment and Transportation (ORNAMENT) Ontario Ministry of the Environment, Publication NPC-300: Environmental Noise Guideline, Stationary and Transportation Sources Approval and Planning, Ontario Ministry of the Environment (MOE), 1996, STAMSON v5.03: Road, Rail and Rapid Transit Noise Prediction Model Novus Environmental 20

25 Figures Novus Environmental

26 This page intentionally left blank for 2-sided printing purposes

27 Plan provided by DIAMONDCORP Figure No. 1 Site Plan Scale: Date: N.T.S. 15/04/ Eglinton Avenue East Proposed Development Toronto, Ontario True North File No.: Drawn By: MTL

28 Proposed Development Mercedes Benz Midtown Clearmount Plastics CBM Ready Mix Coco Paving Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 2 Context Plan Scale: Date: 1: 11,000 15/01/ Eglinton Avenue East Proposed Development Toronto, Ontario True North File No.: Drawn By: KAC

29 Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 3 Modelled Façade Sound Levels Roadway, Daytime 939 Eglinton Avenue East Proposed Development Toronto, Ontario True North Scale: Date: File No.: Drawn By: 1: 1,000 15/04/ MTL

30 Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 4 Modelled Façade Sound Levels Roadway, Night-time 939 Eglinton Avenue East Proposed Development Toronto, Ontario True North Scale: Date: File No.: Drawn By: 1: 1,000 15/04/ MTL

31 Proposed Development Mercedes Benz Midtown Clearmount Plastics CBM Ready Mix Coco Paving Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 5 Surrounding Industry Stationary Noise Source Locations 939 Eglinton Avenue East Proposed Development Toronto, Ontario True North Scale: Date: File No.: Drawn By: 1: 11,000 15/01/ KAC

32 Stationary Noise Source Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 6 Modelled Façade Sound Levels Stationary, Daytime/Evening 939 Eglinton Avenue East Proposed Development Toronto, Ontario True North Scale: Date: File No.: Drawn By: 1: 1,000 15/05/ MTL

33 Stationary Noise Source Photography: Image 2012 DigitalGlobe, 2012 Google Figure No. 7 Modelled Façade Sound Levels Stationary, Night-time 939 Eglinton Avenue East Proposed Development Toronto, Ontario True North Scale: Date: File No.: Drawn By: 1: 1,000 15/05/ MTL

34 This page intentionally left blank for 2-sided printing purposes

35 Appendix A Novus Environmental

36 This page intentionally left blank for 2-sided printing purposes

37 BRENTCLIFFE ROAD ELEVATION 0.35m ROAD WIDENING PROPOSED 6 ST. RETAIL/ OFFICE BUILDING SCALE 1:300 PROJECT No:33021 MARCH 12, 2015 EAST ELEVATION - BRENTCLIFFE ROAD EGLINTON AVE. EAST & BRENTCLIFFE ROAD EGLINTON AVE EAST CONDO ROAD PUBLIC STREET VANDERHOOF AVE. PROPOSED 31 ST. RESIDENTIAL BUILDING 14

38 BRENTCLIFFE RD. PROPOSED 19 ST. MIXED USE/ RESIDENTIAL BUILDING EGLINTON AVE. EAST ELEVATION SERVICE LANE ±23.0m NORTH ELEVATION - EGLINTON AVE. EAST EGLINTON AVE. EAST & BRENTCLIFFE ROAD SCALE 1:300 PROJECT No:33021 MARCH 12,

39 Appendix B Novus Environmental

40 This page intentionally left blank for 2-sided printing purposes

41 Kevin Carr From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Stephen J. Bahadoor August :14 PM Kevin Carr; Alun S. Lloyd; Caitlin Willcocks Lucy Cameron; Hamish Hains; Mark S. VanderSluis RE: 939 Eglinton Follow up Flagged Hi Kevin, I can provide some info on traffic volumes in the area. Our work typically focusses on the morning and afternoon peak periods, and we do not typically collect AADT or hourly distribution information. We do, however, have some AADT traffic count summaries from the City for Eglinton Avenue, Laird Avenue and Wicksteed. Some of this info is dated, but here's a summary of what's we have on file: Eglinton Avenue 47,396 (from a 2009 City of Toronto count) Laird Drive 22,336 (from a 2009 City of Toronto count) Wicksteed Avenue 8568 (from a 2006 City of Toronto count) * no hourly variation information available For Brentcliffe, Vanderhoof and Research, we do not have any AADT info on file, but I can provide an estimated AADT based on factored peak hour volumes from our study counts: Brentcliffe Road 12,900 Research Road 900 Vanderhoof Avenue 4,000 (sorry no counts available for Industrial Street and Commercial Road) We are in the process of preparing our future estimates, which document peak hour volumes 5 years into the future. This would not forecast AADT outright. I've had a look at the past few AADT counts for Eglinton, and they seem to show a modest growth of about 1% per annum. I believe that would be a fair assumption to forecast future volumes... this would be somewhat conservative, bearing in mind growth trends are based on past data, and do not take into account the effects of the LRT. I will forward you the data we have in a separate . There'll be some information on peak hour truck volumes in there. Cheers, Stephen J. Bahadoor, P.Eng. Transportation Engineer , ext. 136 bahadoor@bagroup.com BA Consulting Group Ltd. 1

42 This page intentionally left blank for 2-sided printing purposes

43 Appendix C Novus Environmental

44 This page intentionally left blank for 2-sided printing purposes

45 Page 1 of 1 BPN 56 Calculation Procedure Required Glazing STC Rating (Fixed Veneer) 939 Eglinton Ave, Receptor ID Source Description Sound Levels Room / Façade Inputs Source Inputs Veneer Component 1 Glazing Component 2 Façade Required Required Veneer Glazing Total Total Veneer % Glazing % Incident Angle Assumed Sound % Total Free field Room Room Frequency Sound Indoor Sound Noise Wall Wall Wall Floor of Floor of Floor Sound Correction Spectrum type: Veneer Component Category: Energy Transmitted Component Category: Correction: Absorption: Correction Correction Level: Level: Reduction: Area Area Area Area Area: Area: Angle: Factor: STC Correction Energy (dba) (dba) (dba) (dba) (m 2 ) (m 2 ) (m 2 ) (m 2 ) (%) (%) (deg) (STC) (%) (%) (STC) POR_N_Day North Façade, worst case Living Room Intermediate D. mixed road traffic, distant aircraft 41 D. sealed thick window, or exterior wall, or roof/ceiling C. sealed thin window, or openable thick window POR_N_Ngt North Façade, worst case Bedroom Intermediate D. mixed road traffic, distant aircraft 41 D. sealed thick window, or exterior wall, or roof/ceiling C. sealed thin window, or openable thick window Room Correction Frequency Correction % Total Transmitted Energy Sound Energy Correction Require Glazing STC BPN56 STC Reqts 939 Eglinton xlsx\BPN56

46 This page intentionally left blank for 2-sided printing purposes

47 Appendix D Novus Environmental

48 This page intentionally left blank for 2-sided printing purposes

49 Page 1 of 1 Table D.1: Summary of Noise Source Sound Power Levels ID Source Description Calculated Sound Power Levels (db) CBM_DC_all CBM Aggregates Ready Mix Plant, dust collectors x sound level data represents 3 units in operation. assumed to operate 24 hours per day. CBM_PneuLoad CBM Aggregates Ready Mix Plant, Pneumatic Unloading (Cement Powder) assumed to occur for a duration of at least 1 hour. assumed to occur during any period of the day. CBM_WashMix CBM Aggregates Ready Mix Plant, Truck Wash and Mix assumed to occur for a duration of at least 1 hour. assumed to occur during any period of the day. CBM_Gen CBM Aggregates Ready Mix Plant, generator a Weather Enclosure sufficient for compliance with NPC 205 limits. daytime testing only for 60 min assumed. sound level data presented is A Weighted. Clearmount_DC Clearmont Plastics generic dust collector assumed to operate 24 hours per day Clearmount_HVAC Clearmount HVAC unit % duty cycle applied during the night time period. Coco_Asphalt Coco Paving Asphalt Plant adjusted for compliance with NPC 205 criteria at existing receptors. assumed to operate 24 hours per day. Mercedes_BD_CarWash Mercedes bay door (car wash noise) PWL is based on pressure washer spray noise PWL adjusted for 20 min/hr of pressure washer noise modelled as daytime only, since service hours are from 7:30 am to 6:30 pm. Mercedes_ACC Mercedes air cooled condenser assumed to operate during daytime and evening only to match with dealership hours of operation. no duty cycling was applied. Mercedes_ACC Mercedes air cooled condenser assumed to operate during daytime and evening only to match with dealership hours of operation. no duty cycling was applied. Mercedes_Boiler Mercedes boiler exhaust stack based on historical measurements Mercedes_CT Mercedes cooling tower (Top) Centrigual Blow Through type of cooling tower. Mercedes cooling tower (Overall Avg) assumed fan speed to cycle down during night time period. Mercedes_EF Mercedes rooftop exhaust fan (for cars) modelled as daytime only, since service hours are from 7:30 am to 6:30 pm. an Acoustic Enclosure is required for compliance with NPC 205 limits. Mercedes_Gen Mercedes generator daytime testing only for 60 min assumed. sound level data presented is A Weighted. Total PWL Notes (dba) AppD PWL summary 939 Eglinton _ xlsx\TD1

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON

Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Environmental Noise Assessment 1020, 1024, 1028, 1032 & 1042 Sixth Line Oakville, ON Novus Reference No. 16-0173 Version No. 1.0 (Final) September 30, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng.

More information

Table of Contents... ii 1. Introduction... 1

Table of Contents... ii 1. Introduction... 1 316 Somerset Street East SACL Project #SW18098 April 05, 2018 Page ii Table of Contents Table of Contents... ii 1. Introduction... 1 2. Noise Sources... 1 3. Noise Assessment Criteria... 1 3.1 Surface

More information

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.

More information

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26

More information

1520 Notion Road Air Quality Compatibility Study Toronto, Ontario

1520 Notion Road Air Quality Compatibility Study Toronto, Ontario 1520 Notion Road Air Quality Compatibility Study Toronto, Ontario Novus Reference No. 16-0109 Version No. 1 (Final) NOVUS PROJECT TEAM: Engineer: Project Manager: Jenny Vesely, P.Eng. Nigel Taylor, M.Sc.,

More information

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario

Roadway Traffic Noise Assessment Chapel Street. Ottawa, Ontario Roadway Traffic Noise Assessment 151-153 Chapel Street Ottawa, Ontario REPORT: GWE14-064 Noise Prepared For: Brad Caco Sun Life Financial Center, East Tower 3250 Bloor Street West, Suite 1000 Toronto,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 176 Greenfield Avenue Prepared for: TC United Group Prepared by: Stantec Consulting Ltd. February 8, 2016 NOISE ASSESSMENT REPORT Introduction February 8, 2016 Table of Contents

More information

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario

Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario Noise Feasibility Study EMGO (North Oakville I) Ltd., Town of Oakville, Ontario For Emgo (North Oakville I) Ltd. 2173 Turnberry Road Burlington, ON L7M 4P8 Prepared by Victor Garcia, BASc Reviewed by Sheeba

More information

Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario

Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario Environmental Noise Assessment 80 Thomas Street Mississauga, Ontario Novus Reference No. 16-0219 Version No. 1.0 (Final) October 21, 2016 NOVUS PROJECT TEAM: Scientist: Senior Specialist: Project Manager:

More information

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario

Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Noise Feasibility Study Proposed Hospice 2050 University Avenue East, Waterloo, Ontario Prepared for: Hospice of Waterloo Region 298 Lawrence Avenue Kitchener, ON N2M 1Y4 Prepared by Sheeba Paul, MEng,

More information

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8

3.5.1 Outdoor Living Areas (OLAs) Indoor Sound Levels... 8 RWDI was retained by Manor Park Management to conduct a traffic noise feasibility study as part of the Site Plan Approval (SPA) for the proposed development, to be located at the northwest corner of Vanier

More information

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario

Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Noise Feasibility Study Proposed Residential Building 103 Dundas Street West Oakville, Ontario Prepared for: 103 Dundas Corporation Attn: Zaki Wahbeh 2184 Providence Road Oakville, ON L6H 6Z2 Prepared

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT PROPOSED TOWNHOUSE BLOCKS 273 LIBERTY STREET BLOCKS 197 to 199, INCLUDSIVE REGISTERED PLAN 40M-2332 AND PART OF LOT 10, CONCESSION 2 MUNICIPALITY OF CLARINGTON (BOWMANVILLE)

More information

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario

Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Noise Feasibility Study Stacked Townhouse Development Glenashton Drive (Block 55) Oakville, Ontario Prepared for: Nathan Jamieson, P.Eng Senior Principal, Community Development Stantec Consulting Ltd 300W

More information

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 12 HAMILTON AVENUE NORTH OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 September 15, 2016 16419 1 NOISE IMPACT

More information

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario

Roadway Traffic Noise Assessment Montreal Road. Ottawa, Ontario Roadway Traffic Noise Assessment 807-825 Montreal Road Ottawa, Ontario REPORT: GWE15-086-TRAFFIC NOISE Prepared For: Anthony Nicolini 183 Michael Cowpland Drive Ottawa, Ontario K2M 0M3 Prepared By: Michael

More information

Guelph Curling Club Development Traffic Noise Impact Study

Guelph Curling Club Development Traffic Noise Impact Study Guelph Curling Club Development Traffic Noise Impact Study Development Location Prepared For: Guelph Curling Club Paradigm Transportation Solutions Ltd. 43 Forest Road Cambridge ON N1S 3B4 pgrubb@ptsl.com

More information

Noise Assessment Report Riverside Drive Phase I

Noise Assessment Report Riverside Drive Phase I Noise Assessment Report - 2887 Riverside Drive Phase I Project # 160401333 Prepared for: Youth Services Bureau Prepared by: Stantec Consulting Ltd. Introduction Table of Contents 1.0 INTRODUCTION... 1

More information

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario

Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Noise Feasibility Study Proposed Residential Development, 361 Tanbark Road Niagara-on-the-Lake, Ontario Prepared for: Blythwood Homes Inc. 7058 Ridgewood Crescent Niagara Falls, Ontario L2J 3H1 Prepared

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REVISED with ADDENDUM for ROOFTOP OUTDOOR LIVING AREA REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA,

More information

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario

Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Noise Feasibility Study, McGibbon Condominium 71 Main Street South Georgetown, Ontario Prepared for: Attn: Don Jackson Silvercreek Commercial Builders Inc. 66 Mill Street Georgetown, Ontario L5C 1V8 Prepared

More information

Mann Avenue Development 87 Mann Avenue Noise Control Study

Mann Avenue Development 87 Mann Avenue Noise Control Study Mann Avenue Development 87 Mann Avenue Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 August 13, 2013 Novatech File:

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 2055 BROCK ROAD PROPOSED TOWNHOUSE DEVELOPMENT PART OF LOT 18, CONCESSION 2 CITY OF PICKERING PREPARED FOR: BROCK ROAD DUFFINS FOREST INC. Revised October 2017 December 2014

More information

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario

Traffic Noise Assessment. 333 Montreal Road. Ottawa, Ontario Traffic Noise Assessment 333 Montreal Road Ottawa, Ontario REPORT: GWE17-045 - Traffic Noise Prepared For: Michaela Jones The Salvation Army 2 Overlea Blvd Toronto, ON M4H 1P4 Prepared By: Joshua Foster,

More information

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf

DCR Phoenix. Type of Document 1st Submission. Project Name 256 Rideau Street Ottawa, Ontario. Project Number OTT A0. Prepared By: Nicole Ruyf DCR Phoenix Noise Impact Assessment Study Type of Document 1st Submission Project Name 256 Rideau Street Ottawa, Ontario Project Number OTT-00206641-A0 Prepared By: Nicole Ruyf Reviewed By: Alam Ansari,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. June 5, 2015 NOISE ASSESSMENT REPORT Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE OF

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED RESIDENTIAL DEVELOPMENT 364 ST. PATRICK STREET CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 7 th May 2013

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

Merivale Road Residential Development 1683 Merivale Road Noise Control Study

Merivale Road Residential Development 1683 Merivale Road Noise Control Study Merivale Road Residential Development 1683 Merivale Road Noise Control Study Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 Submitted:

More information

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario

Traffic Noise Assessment. 5 Orchard Drive. Stittsville, Ontario Traffic Noise Assessment 5 Orchard Drive Stittsville, Ontario REPORT: GWE18-014 - Traffic Noise Prepared For: Cody Campanale 1187 Bank Street, Suite 200 Ottawa, Ontario K1S 3X7 Prepared By: Joshua Foster,

More information

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018

DRAFT REPORT. Boyne East Catholic Secondary School #3CSS. Noise Impact Study. Louis St. Laurent Avenue, Milton. SACL #SW18060A0 December 11, 2018 DRAFT REPORT Boyne East Catholic Secondary School #3CSS Louis St. Laurent Avenue, Milton Noise Impact Study SACL #SW18060A0 Submitted to: Jeff Kenny Partner Strategy 4 Inc. 2620 Bristol Circle, Unit 100

More information

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No:

Prepared for: Gapatas Inc Sherwoodtowne Boulevard, Unit 106 Mississauga, ON L4Z 1Y5. Our File No: YARMOUTH HEIGHTS ESTATES PHASE IV PARTS 1,2,4,5 & 6 Plan 11R Being Part of Lot 9 Concession 8 Geographical Township of Yarmouth City of St. Thomas Prepared for: Gapatas Inc. 4255 Sherwoodtowne Boulevard,

More information

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON.

NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. NOISE IMPACT ASSESSMENT FOR SITE PLAN APPROVAL 47 HAVELOCK STREET OTTAWA, ON. REPORT PREPARED FOR SURFACE DEVELOPMENTS 61 FOREST HILL AVE. OTTAWA, ON, K2C 1P7 March 25, 2015 15078 1 NOISE IMPACT ASSESSMENT

More information

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario Stationary Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17-002 - Stationary Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared

More information

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario

Stationary Noise Feasibility Assessment. 315 Chapel Street Ottawa, Ontario Stationary Noise Feasibility Assessment 315 Chapel Street Ottawa, Ontario REPORT: GWE17 002 Stationary Noise Prepared For: Leanne Moussa Allsaints 10 Blackburn Avenue K1N 6P8 Ottawa, Ontario Prepared By:

More information

Noise Control Study. Proposed Mixed-use Development. 112 Montreal Road City of Ottawa. Prepared for: DCR Phoenix Developments

Noise Control Study. Proposed Mixed-use Development. 112 Montreal Road City of Ottawa. Prepared for: DCR Phoenix Developments Noise Control Study Proposed Mixed-use Development 112 Montreal Road City of Ottawa Prepared for: DCR Phoenix Developments August 2014 10-13081-001-N01 August 28, 2014 10-13081-001-N01 Michael Boucher

More information

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario

Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Traffic and Stationary Noise Feasibility Study Proposed Lakeside Village Plaza 5353 Lakeshore Road Burlington, Ontario Prepared for: United Burlington Retail Portfolio Inc. 986 St. Clair Ave. W. Toronto,

More information

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE

ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE Ottawa, Ontario ASSESSMENT OF THE TRAFFIC NOISE IMPACTS AT THE PROPOSED HOLIDAY INN DEVELOPMENT LOCATED AT 235 KING EDWARD AVENUE CITY OF OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc.

More information

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo

Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Noise Feasibility Study Proposed 4 Storey Apartment Building 226 Woolwich Street South Breslau, Regional Municipality of Waterloo Prepared for: RHH Rental Properties Inc. 6783 Wellington Road 34, RR22

More information

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment

Avalon Encore Stage Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Avalon Encore Stage 6 2336 Tenth Line Road Infusion Terrace, Block 233 City of Ottawa Environmental Noise Impact Assessment Prepared For: Minto Communities Inc. Prepared By: Robinson Land Development Our

More information

Fayez & Patrizia Ghadban

Fayez & Patrizia Ghadban Noise Impact Assessment Study 826 Pinecrest Road Type of Document Site Plan Submission Project Name 826 Pinecrest Road, Ottawa Project Number Prepared By: 100-2650 Queensview Drive Ottawa, ON K2B 8H6 Canada

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA

More information

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by:

More information

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE

TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE Ottawa, Ontario, Canada TRAFFIC NOISE IMPACT ASSESSMENT FOR THE PROPOSED MULTI-UNIT RESIDENTIAL DEVELOPMENT AT 20 MARK AVENUE CITY OF OTTAWA Prepared for Prepared by Freefield Ltd. Issued: Postal Address:

More information

TABLE OF CONTENTS LIST OF TABLES

TABLE OF CONTENTS LIST OF TABLES TABLE OF CONTENTS INTRODUCTION... NOISE CRITERIA... Transportation Noise Sources... NOISE SOURCES... Transportation Sources... Stationary Noise Sources... PROJECTED SOUND LEVELS... VENTILATION AND WARNING

More information

Traffic Noise Assessment Baseline Road Ottawa, Ontario

Traffic Noise Assessment Baseline Road Ottawa, Ontario Traffic Noise Assessment 2140 Baseline Road Ottawa, Ontario REPORT: GWE18-047 Traffic Noise Prepared For: Joey Theberge 905 Lady Ellen Place Ottawa, Ontario K1Z 5L5 Canada Prepared By: Omar Daher, B.Eng.,

More information

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Assessment Report Main Street, Residential Site Cambridge, ON Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:

More information

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5

ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 REPORT PROJECT: 115496-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT THE MEADOWS IN HALF MOON BAY PHASE 5 Prepared for TAMARACK HOMES by IBI GROUP APRIL 2018 IBI GROUP ENVIRONMENTAL NOISE IMPACT ASSESSMENT

More information

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii

Table of Contents. 174 Forward Avenue SACL Project #B7-170 Feb 22, Page ii Page ii Table of Contents 1. Introduction... 1 2. Noise Assessment Criteria... 1 2.1. Surface Transportation Noise Assessment Criteria... 1 2.2. Neighbouring Stationary Source Noise Assessment Criteria...

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT 3171 LAKESHORE ROAD WEST PROPOSED RESIDENTIAL DEVELOPMENT PART OF LOT 32, CONCESSION 4 SOUTH OF DUNDAS STREET AND BLOCK 79 REGISTERED PLAN M-257 TOWN OF OAKVILLE PREPARED

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD

ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD REPORT 109575-5.2.2.1 ENVIRONMENTAL NOISE IMPACT ASSESSMENT 1208 OLD MONTREAL ROAD CITY OF OTTAWA Prepared for DCR/PHOENIX HOMES by IBI Group February 9, 2018 IBI GROUP REPORT ENVIRONMENTAL NOISE IMPACT

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA

ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS BANK STREET LEITRIM DEVELOPMENT AREA REPORT Project: 105202-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT MCGANN 9a LANDS - 4747 BANK STREET LEITRIM DEVELOPMENT AREA Prepared for Claridge Homes by IBI GROUP NOVEMBER 2017 IBI GROUP REPORT ENVIRONMENTAL

More information

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited

671 Victoria Road North City of Guelph Traffic Noise Study. Paradigm Transportation Solutions Limited 671 Victoria Road North City of Guelph Traffic Noise Study Paradigm Transportation Solutions Limited February 2016 Project Summary Project Number 152315 February 2016 Client 1830334 Ontario Limited Client

More information

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21

REP Fotenn Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 REP Fotenn 890-900 Bank Phase 1 Feasibility Noise Study with Building Component AmendmentPage 1 of 21 2018-02-28 Emilie Coyle, M.Pl Planner Fotenn Planning + Design 223 McLeod St, Ottawa, ON K2P 0Z8 Office:

More information

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario

Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Noise Control Feasibility Study 173 / 175 / 177 Preston Street Ottawa, Ontario Type of Document Site Plan Application Client 1536 Prince of Wales Drive, Ottawa, Ontario K2C 1P1 Project Number Prepared

More information

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario

Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario Noise Feasibility Study 2120 Hurontario Street and Grange Drive City of Mississauga, Ontario For Gordon Woods Developments Limited c/o Edenshaw development Limited 260 Brunel Road Mississuaga, Ontairo

More information

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario

Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario Noise Assessment & Control Transportation Noise Assessment 303 Lebreton Street South, 460 St. Laurent Boulevard Ottawa, Ontario Ottawa, Ontario REPORT: GmE 13-051 - Traffic Noise - Final Prepared For:

More information

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING

DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING DRAFT Part 1: ENVIRONMENTAL NOISE CONTROL GUIDELINES FOR LAND USE PLANNING For further information please contact: Robin van de Lande, Planner Planning and Growth Management 110 Laurier Avenue West, 4th

More information

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND...

NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION BACKGROUND... NOISE CONTROL STUDY PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 NOISE CONTROL STUDY FOR PHOENIX HOMES 3654 & 3658 JOCKVALE ROAD APRIL 28, 2011 REV 1 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario

Transportation Noise & Vibration Assessment Scott Street. Ottawa, Ontario Transportation Noise & Vibration Assessment 1946 Scott Street Ottawa, Ontario REPORT: GWE17 136 Noise & Vibration Prepared For: Michael Martin Construction Manager 88 Spadina Avenue Ottawa, ON K1Y 2C1

More information

Place Vanier Édifice AEFO

Place Vanier Édifice AEFO Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,

More information

NOISE IMPACT ASSESSMENT STUDY

NOISE IMPACT ASSESSMENT STUDY NOISE IMPACT ASSESSMENT STUDY Development Address: 765 Montreal Road Ottawa, Ontario City of Ottawa File Number: D07-12-18-0059 Client: Shepherds of Good Hope c/o: CSV Architects 402-1066 Somerset Street

More information

Stationary Noise Feasibility Study. The Shops of Tenth Line. Ottawa, Ontario

Stationary Noise Feasibility Study. The Shops of Tenth Line. Ottawa, Ontario Stationary Noise Feasibility Study The Shops of Tenth Line Ottawa, Ontario REPORT: GWE13-040 Stationary Noise Prepared For: Jeff Parks 225 Metcalfe Street Ottawa, Ontario K2P 1P9 Prepared By: Thomas Couper,

More information

Noise Assessment Report

Noise Assessment Report Noise Assessment Report 19 & 23 Bachman Terrace Prepared for: Tega Homes Prepared by: Stantec Consulting Ltd. March 24, 2014 Draft Mar 7 2014 Final Mar 24, 2014 NOISE ASSESSMENT REPORT Table of Contents

More information

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario

Roadway Traffic Noise Feasibility Assessment. Ironwood Subdivision. Ottawa, Ontario Ironwood Subdivision Ottawa, Ontario REPORT: GWE16-085 - Traffic Noise Prepared For: 2356349 Ontario Inc. 301 Moodie Drive, Suite 100 Ottawa, Ontario K2H 9C4 Prepared By: Joshua Foster, P.Eng., Partner

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 13 CITY OF OTTAWA February 2014 (Revised October 2014) (Revised December 2015) Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa,

More information

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY

MINTO COMMUNITIES INC GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. 3311 GREENBANK ROAD NOISE CONTROL FEASIBILITY STUDY June 2017 Prepared for: MINTO COMMUNITIES INC. 180 Kent Street, Suite 200 Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS &

More information

TABLE OF CONTENTS 1.0 INTRODUCTION SITE AND AREA DESCRIPTION...1

TABLE OF CONTENTS 1.0 INTRODUCTION SITE AND AREA DESCRIPTION...1 VALCOUSTICS CANADA LTD. File: 12-286-211 Milton Heights Neighbourhood Royal Park South/Milton Noise Feasibility TABLE OF CONTENTS 1. INTRODUCTION...1 1.1 SITE AND AREA DESCRIPTION....1 2. ENVIRONMENTAL

More information

Stationary Noise Assessment. Car Dealership Strandherd Drive. Ottawa, Ontario

Stationary Noise Assessment. Car Dealership Strandherd Drive. Ottawa, Ontario Stationary Noise Assessment Car Dealership Strandherd Drive Ottawa, Ontario REPORT: GWE14-114 - Noise Prepared For: Lewis Treimstra 1805 Woodward Drive Ottawa, Ontario K2C 0P9 Prepared By: Michael Lafortune,

More information

SS WILSON ASSOCIATES Consulting Engineers

SS WILSON ASSOCIATES Consulting Engineers SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT

More information

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1

Noise Control Study. for. Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 REP N45 Avalon School Traffic Noise Study - R1 Noise Control Study for Avalon Public School Portobello Boulevard at Stormwind Avenue in Ottawa, Ontario. Revision 1 Prepared for: N45 Architecture Inc. Prepared

More information

Stationary Noise Study. Stonebridge Golf and Country Club. Ottawa, Ontario

Stationary Noise Study. Stonebridge Golf and Country Club. Ottawa, Ontario Stationary Noise Study Stonebridge Golf and Country Club Ottawa, Ontario REPORT: GmE 09-042 Noise Prepared For: Kris Haynes 3584 Jockvale Road Ottawa, Ontario K2C 3H2 Prepared By: Thomas Couper, B.Eng.,

More information

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA

NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA NOISE IMPACT ASSESSMENT RIVERSIDE SOUTH PHASE 9-4 CITY OF OTTAWA November 2013 Prepared for: RIVERSIDE SOUTH DEVELOPMENT CORPORATION 2193 Arch Street Ottawa, Ontario K1G 2H5 Prepared by: J.L. RICHARDS

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc.

DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Ontario Inc. Ottawa, Ontario, Canada DETAILED NOISE CONTROL STUDY OF PROPOSED PHASE 2 CONDOMINIUMS AT 655 & 755 ANAND PRIVATE OTTAWA Prepared for Prepared by Hugh Williamson Associates Inc. 13 August 2015 Postal Address:

More information

Stationary Noise Assessment. 70 Richmond Road. Ottawa, Ontario

Stationary Noise Assessment. 70 Richmond Road. Ottawa, Ontario Stationary Noise Assessment 70 Richmond Road Ottawa, Ontario REPORT: GWE16 013 Stationary Noise Prepared For: Stephen Job 109 Atlantic Avenue, Suite 302B Toronto, Ontario M6K 1X4 Prepared By: Michael Lafortune,

More information

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA

NOISE CONTROL FEASIBILITY STUDY. MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA March 2016 Prepared for: Minto Communities Inc. 200-180 Kent Street Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS

More information

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6

Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence 190 Richmond Road Ottawa, ON K1Z 6W6 PRELIMINARY ENVIRONMENTAL NOISE REPORT Project:. Proposed Residential/Institutional Development Independent and Assisted Care Senior s Residence Richmond Road Ottawa, ON KZ W Prepared for: Choice Properties

More information

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

More information

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST

ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST CLIENT LOGO REPORT PROJECT: 105205-5.2.2 ENVIRONMENTAL NOISE IMPACT ASSESSMENT CLARIDGE HOMES MAPLE GROVE LANDS 1981 MAPLE GROVE ROAD KANATA WEST Prepared for CLARIDGE HOMES by IBI GROUP FEBRUARY 2018

More information

Roadway Traffic Noise and Vibration Assessment. The Bridge Wesleyan Church Addition. Ottawa, Ontario

Roadway Traffic Noise and Vibration Assessment. The Bridge Wesleyan Church Addition. Ottawa, Ontario Roadway Traffic Noise and Vibration Assessment The Bridge Wesleyan Church Addition Ottawa, Ontario REPORT: GWE14-103 Traffic Noise and Vibration Prepared For: Alan McCafferty The Bridge Kanata Wesleyan

More information

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario

Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Noise Feasibility Study Proposed Stacked Townhouse Development, 3060 and 3072 Sixth Line, Town of Oakville, Ontario Prepared for: 2457667 Ontario Inc. 3219 Yonge Street, Suite 365 Toronto, Ontario M4N

More information

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0

Brigil Homes. Noise Impact Assessment. Type of Document Site Plan Submission. Project Name Petrie s Landing, Phase 2. Project Number OTT A0 Brigil Homes Noise Impact Assessment Type of Document Site Plan Submission Project Name Petrie s Landing, Phase 2 Project Number Prepared By: exp Services Inc. 100-2650 Queensview Drive Ottawa, ON K2B

More information

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26

REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 REP Atelier 292 OCH Phase 2 Noise Study Page 1 of 26 2016-10-13 Robert Matta Project Manager Atelier 292 Architect Inc. 292 Main Street, Ottawa, Ontario K1S 1E1 Tel: +1 (613) 231-2245 x154 Fax: +1 (613)

More information

Environmental Noise Assessment Montreal Road. Ottawa, Ontario

Environmental Noise Assessment Montreal Road. Ottawa, Ontario Environmental Noise Assessment 1795 Montreal Road Ottawa, Ontario REPORT: GWE18-037 Environmental Noise Prepared For: Samantha Schneider Christopher Simmonds Architect Inc. 45 Eccles Street, The Annex

More information

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

2.0 April 18, 2017 Final - Issued to Client for Use

2.0 April 18, 2017 Final - Issued to Client for Use VALCOUSTICS CANADA LTD. File: 116-17 Villalago Residences/Bolton Environmental Noise Document Version Index: Version Date Description of Changes 2. April 18, 217 Final - Issued to Client for Use 3 Wertheim

More information

Noise Abatement Guidelines. Regional Official Plan Guidelines

Noise Abatement Guidelines. Regional Official Plan Guidelines Noise Abatement Guidelines Regional Official Plan Guidelines Halton Region Official Plan Guidelines The Regional Official Plan (ROP) is Halton s guiding document for land use planning. It contains policies

More information

Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario

Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario Noise Feasibility Study, Proposed Hotel Development, Living Waters Resort Collingwood, Ontario Prepared for: Law Cranberry Resort Limited 85 Scarsdale Road, Suite 306 Toronto, Ontario M3R 2R2 Prepared

More information

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330

More information

ASSESSMENT OF HVAC NOISE IMPACTS FROM HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL

ASSESSMENT OF HVAC NOISE IMPACTS FROM HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL Ottawa, Ontario, Canada ASSESSMENT OF HVAC NOISE IMPACTS FROM HALF MOON BAY CATHOLIC ELEMENTARY SCHOOL Prepared for Prepared by Hugh Williamson Associates Inc. Postal Address: PO Box 74056, RPO Beechwood,

More information

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng Noise and Vibration Compatibility Feasibility Assessment Residential Component Proposed RMOW Transit Hub King Street West and Victoria Street North, Kitchener, ON For The Regional Municipality of Waterloo

More information

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,

More information

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL Ottawa Ontario Canada ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL CITY OF OTTAWA Prepared for Bryden Martel Architects Inc. Prepared by Hugh Williamson

More information

Stationary Noise Assessment. Orléans Gardens. Ottawa, Ontario

Stationary Noise Assessment. Orléans Gardens. Ottawa, Ontario Stationary Noise Assessment Orléans Gardens Ottawa, Ontario REPORT: GWE15-053 Stationary Noise Prepared For: Prepared By: Michael Lafortune, Environmental Technologist Joshua Foster, P.Eng., Associate

More information

Transportation Noise & Vibration Assessment. Medical Council of Canada. Ottawa, Ontario

Transportation Noise & Vibration Assessment. Medical Council of Canada. Ottawa, Ontario Transportation Noise & Vibration Assessment Medical Council of Canada Ottawa, Ontario REPORT: GWE13-115 - Traffic Noise & Vibrations Prepared For: Derek Hardy 47 Clarence Street Ottawa, Ontario K1N 9K1

More information