1 NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA March 2016 Prepared for: Minto Communities Inc Kent Street Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS & ASSOCIATES LIMITED Consulting Engineers, Architects & Planners 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2 JLR 24051
2 NOISE CONTROL FEASIBILITY STUDY Minto Communities Inc. Clarke Lands CITY OF OTTAWA - TABLE OF CONTENTS - PAGE 1.0 INTRODUCTION PROJECT DESCRIPTION TRANSPORTATION NOISE SOURCE Transportation Sound Level Criteria Transportation Noise Attenuation Requirements Prediction of Noise Levels (Transportation) Road Traffic Data Rapid Transit Corridor Data Noise Level Calculations (Transportation) Summary of Findings (Transportation) CONCLUSION AND RECOMMENDATIONS LIST OF TABLES - TABLE 1 - Outdoor Living Area... 3 TABLE 2 - Plane of Living/Dining Room Window... 4 TABLE 3 - Plane of Sleeping Quarters Window... 4 TABLE 4 - Road Traffic Data to Predict Noise Levels... 5 TABLE 5 - Bus Rapid Transit Corridor Traffic Data to Predict Noise Levels... 6 TABLE 6 - Predicted Freefield Noise Contours (Transportation)... 7 JLR i- J.L. Richards & Associates Limited March 2016
3 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment - LIST OF FIGURES AND DRAWINGS - FIGURE 1 - Site Location Plan Draft Plan of Subdivision DRAWING N1 - Freefield Outdoor Daytime Noise Contours DRAWING N2 - Freefield Indoor Daytime Noise Contours DRAWING N3 - Freefield Indoor Nighttime Noise Contours DRAWING N4 - Potential Noise Wall Locations - LIST OF APPENDICES - APPENDIX A - APPENDIX B - Drawings Transportation Noise Source Predictions - Bus Rapid Transit Corridor Data to Predict Noise Levels - Detailed Predicted Freefield Noise Level Calculations - Transportation Source Predictions JLR ii- J.L. Richards & Associates Limited March 2016
4 NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. CLARKE LANDS CITY OF OTTAWA 1.0 INTRODUCTION This Feasibility Study has been prepared on behalf of Minto Communities Inc. (Minto) in order to assess the potential environmental noise impact on the proposed residential development Clarke Lands, due to vehicular traffic on Strandherd Drive, Cedarview Road, Chapman Mills Drive, and the proposed Rapid Transit Corridor (RTC). The Study assesses noise levels generated in order to determine noise attenuation measures required to satisfy the Part 4 Phase 1 criteria of the City of Ottawa Environmental Noise Control Guidelines (approved by City Council January 2016). 2.0 PROJECT DESCRIPTION The lands subject of this Study, which are shown on Figure 1, are described as the Clarke Lands, bounded by Strandherd Drive to the north, Cedarview Road to the west, vacant land to the south, and the existing Kennedy-Burnett Stormwater Management Facility to the east. The Clarke Lands have an area of approximately 34 ha and will include singles, townhouses, and walk up condos, commercial blocks and a school block. Blocks identified for development have been assessed from a preliminary perspective. Lands identified as the Mion Parcel, on Drawings N1 to N4, are not included in the scope of this study. Similarly, existing Residential Land Owned by Others at the west portion of the parcel are not included in the study. Blocks 110, 118, 119, and 120 are proposed to be commercial blocks. These have not been included in the study except to identify noise levels predicted for the site. Block 121 is proposed to be a future school. The need for a separate noise impact study will be required at the time of site plan application. Appendix A includes the Draft Plan of Subdivision. 3.0 TRANSPORTATION NOISE SOURCE The transportation noise sources include Strandherd Drive, Cedarview Road, Chapman Mills Drive, and the proposed RTC. Drawings N1 to N4 show the location of the existing and proposed roadways in relation to the proposed development. 3.1 Transportation Sound Level Criteria For the purpose of determining the predicted noise levels, and based on the sound level criteria established by the City of Ottawa Environmental Noise Control Guidelines JLR J.L. Richards & Associates Limited March 2016
5 CEDARVIEW ROAD TARTAN DRIVE JOCKVALE ROAD CEDARVIEW ROAD EXISTING FRASER FIELDS SUBDIVISION STRANDHERD DRIVE CLARKE LANDS EXISTING RESIDENTIAL (MATTAMY HOMES LTD.) MION EXISTING KENNEDY-BURNETT SWMF BRAOVAC-PAVIC FRASER-CLARKE WATERCOURSE File Location: P:\24000\24051 LD Minto Clarke\24051 C LOCATION PLAN.DWG PROJECT: DRAWING: BURNETT JOCK RIVER MINTO COMMUNITIES INC. CLARKE LANDS 4005 STRANDHERD DRIVE LOCATION PLAN This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: JLR NO: DRAWING NO.: FIGURE 1
6 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment (ENCG), the following will be used as the maximum acceptable sound levels (Leq) for residential development and other land uses, such as nursing homes, schools and daycare centres: Receiver Location Criteria Time Period Outdoor living area: 55 dba Daytime ( hrs) Indoor living/dining rooms (inside): 45 dba Daytime ( hrs) General Office, Reception Area (inside): 50 dba Daytime ( hrs) Sleeping Quarters (inside): 40 dba Nighttime ( hrs) Outdoor Living Areas (OLA) are defined as that portion of the outdoor amenity area of a dwelling for the quiet enjoyment of the outdoor environment during the daytime period. Typically, the point of assessment in an OLA is 3.0 m from the building façade and 1.5 m above the ground within the designated OLA for each individual unit and for the townhouse type units with an area greater than 37 m 2. The personal amenity area excludes balconies as per the City of Ottawa Environmental Noise Control Guidelines. Where standard building construction is used that complies with Part 4 of the Ontario Building Code, the indoor noise level should be at least 20 dba below the outdoor level when the windows are closed, and 10 dba below the outdoor level with the windows open. If the daytime sound levels at the outside walls are no more than 65 dba and the nighttime sound levels at the outside walls containing sleeping quarter windows are no more than 60 dba, then all the indoor requirements could normally be met by constructing the units in accordance with the standards established by the Ontario Building Code. 3.2 Transportation Noise Attenuation Requirements When the sound levels are equal to or less than the specified criteria, no noise attenuation (control) measures are required. When the excess above the recommended sound level limit is between 1 dba and 5 dba for the outdoor sound level criterion, the proposed development can be completed with no noise control measures incorporated into the site, but prospective occupants of the land should be made aware by suitable Warning Clauses. JLR J.L. Richards & Associates Limited March 2016
7 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Noise attenuation measures may include any or all of the following: noise attenuation barrier (wall or berm or a berm/wall combination); forced air heating system with provisions for the installation of central air conditioning; central air conditioning; and architectural components designed to provide additional acoustic insulation. In addition to the implementation of noise attenuation features, if required, and depending on the severity of the noise problem, Warning Clauses may be recommended to advise the prospective purchasers/tenants of affected units of the potential environmental noise problem. These Warning Clauses should be included in the Site Plan and Subdivision Agreements, in the Offers of Purchase and Sale, and must be registered on Title. A building component review is required in cases where the noise levels at the building face exceed 65 dba daytime and/or 60 dba nighttime. The Acoustic Insulation Factor Method is to be used in the review, as per the Road and Rail Noise: Effects on Housing manual published by the Canada Mortgage and Housing Corporation. The following tables outline the noise attenuation requirements for the Exterior Walls Containing Sleeping Quarters and/or Living Rooms for the daytime and nighttime periods. Leq (16 hr) (dba) Table 1: Outdoor Living Area (OLA) Daytime ( ) and Nighttime ( ) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements Leq 16 hr 55 dba N/A None required None required 55 dba < Leq 60 dba N/A Control measures (barriers) not required but should be considered Leq > 60 dba N/A Control measures (barriers) required to reduce Leq to below 60 dba and as close to 55 dba as technically, economically and administratively possible Required if resulting Leq exceeds 55 dba Type A Required if resulting Leq exceeds 55 dba Type B JLR J.L. Richards & Associates Limited March 2016
8 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Table 2: Plane of Living/Dining Room Window Daytime ( ) and Nighttime ( ) Leq (16 hr) (dba) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements Leq 16 hr 55 dba None required N/A None required 55 dba < Leq 16 hr 65 dba Forced air heating with provision for air conditioning N/A Required Type C Leq 16 hr > 65 dba* Central air conditioning N/A Required Type D * In cases where sound levels exceed 65 dba, building components must be designed to achieve indoor sound level criteria. Table 3: Plane of Sleeping Quarters Window Daytime ( ) and Nighttime ( ) Leq (8 hr) (dba) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements 50 dba < Leq 8 hr 60 dba Forced air heating with provision for central air conditioning N/A Required Type C 60 dba < Leq 8 hr* Central air conditioning N/A Required Type D * In cases where sound levels exceed 60 dba, building components must be designed to achieve indoor sound level criteria. The wording of the notices to be placed on Title and included in the Site Plan Agreement, as well as the Offers of Purchase and Sale, are provided below: Type A "Purchasers/tenants are advised that noise levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the City s and Ministry of the Environment s noise criteria. Type B "Purchasers/tenants are advised that despite the inclusion of noise control features in the development and within the building units, sound levels due to increasing road traffic may on occasions interfere with some activities of the dwelling occupants as the sound level exceeds the City s and the Ministry of the Environment s noise criteria. JLR J.L. Richards & Associates Limited March 2016
9 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Type C "This unit has been fitted with a forced air heating system and the ducting, etc. was sized to accommodate central air conditioning. Installation of central air conditioning by the occupant will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment s noise criteria. Note: The location and installation of the outdoor air conditioning device should be done so as to comply with noise criteria of MOE Publication NPC-216, Residential Air Conditioning Devices and thus minimize the noise impacts both on and in the immediate vicinity of the subject property. Type D "This unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment s noise criteria. 3.3 Prediction of Noise Levels (Transportation) Road Traffic Data The following traffic data was used to predict noise levels: Table 4: Road Traffic Data to Predict Noise Levels Strandherd Drive Cedarview Road Chapman Mills Drive Total Traffic Volume (AADT) 35,000 35,000 12,000 Day/Night Split (%) 92/8 92/8 92/8 Medium Trucks (%) Heavy Trucks (%) Posted Speed (km/hr) 70/ Road Gradient (%) Schedule E and Annex 1 of the City of Ottawa Official Plan (May 2003) were utilized to determine the correct road classification and protected right-of-way. These road classifications were compared to Map 6 of the City of Ottawa Transportation Master Plan (Road Network Urban). All findings were then compared to Table B1 (Part 4, Appendix B ) of the City of Ottawa Environmental Noise Control Guidelines in order to determine an appropriate AADT value. JLR J.L. Richards & Associates Limited March 2016
10 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Rapid Transit Corridor Data Figure 1 shows the location of the Rapid Transit Corridor in relation to the proposed residential development. The City has classified this corridor as a Bus Rapid Transit Corridor. The following data was used to predict noise levels: Table 5: Bus Rapid Transit Corridor Data to Predict Noise Levels Bus Rapid Transit Corridor Total Traffic Volume (AADT) 258 Day/Night Split (%) 74/26 Medium Trucks (%) 100 Heavy Trucks (%) 0 Posted Speed (km/hr) 80 Road Gradient (%) 1 Appendix B includes a summary of the information provided by the City specific to the Bus Rapid Transit Corridor, including how the AADT value and the day/night split was calculated. The computer program Stamson is used to predict noise levels associated with the bus rapid transit corridor. According to the City of Ottawa Noise Control Guidelines bus traffic on dedicated bus transitways is to be entered into the Stamson program using the Road Template. The Custom Source category Rapid Transit Corridor in the Stamson model was not used for the purposes of this Report as it utilizes a pre-defined sound emission level (i.e., maximum pass-by sound level measured at a distance of 15 m from the centre of the vehicle path). Based on the fact that Stamson does not permit an AADT value with a corresponding vehicle per hour count of less than 40, the AADT value inputted for the bus rapid transit corridor was increased by an appropriate factor. The noise level prediction output was then reduced by 3 dba per doubling. As a result of having to undertake this adjustment, the noise level predictions were undertaken separately for the road traffic and for the bus rapid transit corridor. The nomograph method to add decibel levels was then used to determine a representative total decibel level at the various receivers. These adjustments have been summarized in Appendix B. JLR J.L. Richards & Associates Limited March 2016
11 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Noise Level Calculations (Transportation) Noise contours for the daytime and nighttime periods were calculated using the MOE Road Traffic Noise Computer program STAMSON, Version The resulting noise contours, clause ranges, and potential noise attenuation barrier locations are shown on Drawings N1 to N4. Computer printouts are included in Appendix B. Table 6: Predicted Freefield Noise Contours (Transportation) Roads Contour (dba) and File Name Outdoor Living Areas (Freefield) Distance (m) Indoor Living Areas (Freefield) Distance (m) Daytime Daytime Nighttime 4 Lane Urban Arterial Divided 70 km/h / 80 km/h (Strandherd Drive, Cedarview Road) 50 n/a n/a 158.9/ / / 241 n/a / 115 n/a 37 / / / 59 n/a 2 Lane Major Collector Chapman Mills Drive/ Combined Chapman Mills & Proposed RTC 50 n/a n/a 53.0/71.0* / / 78 n/a / 38 n/a 15 / / 19 n/a **Note: Refer to Detailed Predicted Freefield Noise Level Calculations summary sheet in Appendix B for more information. 3.4 Summary of Findings (Transportation) Required Warning Clauses and noise contours are shown on Drawings N1 to N3. The units identified will require notices to be registered on Title, advising the occupants of the environmental noise problems and/or of the noise attenuation measures being JLR J.L. Richards & Associates Limited March 2016
12
13 A P P E N D I X A DRAWINGS
14 SUBJECT TO THE CONDITIONS, IF ANY, SET FORTH IN OUR LETTER DATED _. THIS DRAFT PLAN IS APPROVED BY THE CITY OF OTTAWA UNDER SECTION 51 OF THE PLANNING ACT. THIS DAY OF _. FELICE PETTI, P. ENG., MANAGER DEVELOPMENT REVIEW, SUBURBAN SERVICES PLANNING AND GROWTH MANAGEMENT DEPARTMENT PLANNING AND INFRASTRUCTURE PORTFOLIO CITY OF OTTAWA KEY MAP NOT TO SCALE DRAFT PLAN OF SUBDIVISION OF PART OF LOTS 14 And 15 CONCESSION 3 ( RIDEAU FRONT ) Geographic Township of Nepean CITY OF OTTAWA Prepared by Annis, O'Sullivan, Vollebekk Ltd. Scale 1 : Metres Metric DISTANCES SHOWN ON THIS PLAN ARE IN METRES AND CAN BE CONVERTED TO FEET BY DIVIDING BY SURVEYOR'S CERTIFICATE I CERTIFY THAT : The boundaries of the lands to be subdivided and their relationship to adjoining lands have been accurately and correctly shown. Date V. Andrew Shelp ONTARIO LAND SURVEYOR OWNER'S CERTIFICATE This is to certify that I am the owner / agent of the lands to be subdivided and that this plan was prepared in accordance with my instructions. Date Minto Communities Inc. I have the authority to bind the corporation ADDITIONAL INFORMATION REQUIRED UNDER SECTION OF THE PLANNING ACT (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) see plan see plan see plan single family,multi-family residential housing, commercial, open space, park land and institutional see plan see plan see plan City of Ottawa see soils report see plan sanitary, storm sewers, municipal water, bell, hydro, cable and gas to be available see plan REVISION SCHEDULE No. 4 Revision revised transit corridor and adjacent blocks Date BY March 10, 2016 N 3 contours added March 8, 2016 N 2 lot revisions(15-23,48-58) February 25, 2016 N 1 plan for discussion February 23, 2016 N 14 Concourse Gate, Suite 500 Nepean, Ont. K2E 7S6 Phone: (613) / Fax: (613) Nepean@aovltd.com
15 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE 65 dba CONTOUR CEDARVIEW ROAD 55 dba CONTOUR 65 dba CONTOUR 60 dba CONTOUR 55 dba CONTOUR FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) 60 dba CONTOUR MION PARCEL File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'A' REQUIRED ON TITLE WARNING CLAUSE 'B' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD OUTDOOR DAYTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N1 PLOT DATE: March 8, :24:08 PM
16 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE 65 dba CONTOUR CEDARVIEW ROAD 55 dba CONTOUR 65 dba CONTOUR 55 dba CONTOUR MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'C' REQUIRED ON TITLE WARNING CLAUSE 'D' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD INDOOR DAYTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N2 PLOT DATE: March 8, :25:02 PM
17 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h 60 dba CONTOUR STRANDHERD DRIVE CEDARVIEW ROAD 60 dba CONTOUR 50 dba CONTOUR 50 dba CONTOUR MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'C' REQUIRED ON TITLE WARNING CLAUSE 'D' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD INDOOR NIGHTTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N3 PLOT DATE: March 8, :25:56 PM
18 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE CEDARVIEW ROAD MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) CHAPMAN MILLS DRIVE File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 POTENTIAL PERMANENT NOISE WALL STUDY AREA PROJECT: DRAWING: MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO POTENTIAL NOISE WALL LOCATIONS This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 DESIGN: DRAWN: CHECKED: TB TB LJ JLR NO: DRAWING NO.: N4 PLOT DATE: March 8, :26:27 PM
19 A P P E N D I X B TRANSPORTATION NOISE SOURCE PREDICTIONS
20 STAMSON 5.0 NORMAL REPORT Date: :57:54 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a55d70k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 55dBA at 70km/hr Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba
21 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :03:06 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a55d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 55dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba
22 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :01:33 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a60d70k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 60dBA at 70 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)
23 Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :42:02 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a60d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 60dBA at 80km/hr Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00
24 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :07:57 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a65d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod *
25 Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 57.92
26 STAMSON 5.0 NORMAL REPORT Date: :07:57 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a65d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba
27 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :50:46 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a50d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila night 50dBA at 80km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba
28 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :48:19 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d70ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 70km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)
29 Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :49:42 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 80km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00
30 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :49:42 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 80km/h Road data, segment # 1: 4-UAD (day/night)
31 Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 60.00
32 (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :30:20 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a65d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night)
33 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :09:19 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc50di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila night 50dBA at 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba
34 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :38:53 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc55di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 55dBA at 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0
35 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :00:06 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc55do.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ola 55dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete)
36 * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 48.15
37 STAMSON 5.0 NORMAL REPORT Date: :04:51 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc60dio.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila day & night 60dBA 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba
38 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :58:27 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc60do.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ola 60dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba
39 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :02:08 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc65di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 65dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)
40 Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :31:54 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: mcbrt55i.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 55dBA with BRT Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00
Noise Assessment Report Main Street, Residential Site Cambridge, ON
Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:
More informationNoise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario
Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,
More informationNOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6
RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6
More informationUAL URBAN AERODYNAMICS LTD
UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background
More informationENVIRONMENTAL NOISE ASSESSMENT
ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA
More informationNoise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario
Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by:
More informationPlace Vanier Édifice AEFO
Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,
More informationSS WILSON ASSOCIATES Consulting Engineers
SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT
More informationAppendix K. Environmental Noise Assessment
Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA
More informationACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL
Ottawa Ontario Canada ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL CITY OF OTTAWA Prepared for Bryden Martel Architects Inc. Prepared by Hugh Williamson
More informationENVIRONMENTAL NOISE ASSESSMENT
ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS
More informationNoise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario
Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,
More informationEnvironmental Noise Assessment Feasibility Assessment 92 Plains Road East
Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26
More informationNoise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario
Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,
More informationDraft Noise Abatement Guidelines
Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing
More informationPolicy for the Assessment and Mitigation of Traffic Noise on County Roads
Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H
More informationEnvironmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON
Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.
More informationNoise Impact Assessment 1158 Second Line Road Ottawa, Ontario
Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario Type of Document: Site Plan Submission Client: Theberge Homes Project Number: OTT-00245003-A0 Prepared By: M. Ghadban, EIT. Reviewed By: B.
More informationNoise Feasibility Study Proposed 6-storey Seniors Condominium 7480 Derry Road West Milton, Ontario
Noise Feasibility Study Proposed 6-srey Seniors Condominium 7480 Derry Road West Miln, Ontario Prepared for: FGL Derry Inc. 5400 Yonge Street, Suite 300 Toron, Ontario M2N 5R5 Prepared by Vicr Garcia,
More informationRoad and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario
Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario Prepared for: Attn: Nancy Shoemaker Black, Shoemaker, Robinson & Donaldson Limited 351 Speedvale Ave. West Guelph,
More informationNoise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario
Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario Prepared for: Jennark Homes 66 Wellington Road 7, Unit #1 Elora, Ontario N0B 1S0 Prepared by Rajjot Arora, BASc
More informationRoad and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario
Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario For Attn: Nancy Shoemaker Black, Shoemaker, Robinson & Donaldson Limited 351 Speedvale Ave. West Guelph, Ontario N1H
More informationThe content of this supplement is based upon the that described in our letter of May 28, 2012.
September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners
More informationStationary Noise Assessment. Orléans Gardens. Ottawa, Ontario
Stationary Noise Assessment Orléans Gardens Ottawa, Ontario REPORT: GWE15-053 Stationary Noise Prepared For: Prepared By: Michael Lafortune, Environmental Technologist Joshua Foster, P.Eng., Associate
More informationNOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO
NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared
More informationFor The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng
Noise and Vibration Compatibility Feasibility Assessment Residential Component Proposed RMOW Transit Hub King Street West and Victoria Street North, Kitchener, ON For The Regional Municipality of Waterloo
More informationENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary
ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary January 2016 Visit us: Ottawa.ca/planning Contents Introduction 1 Implementation and Interpretation 1 Structure of the Environmental Noise
More informationRail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario
Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario For Granite Holdings Ontario Limited 160 Southgate Drive Guelph, Ontario N1G
More informationMINISTRY OF TRANSPORTATION. Environmental Guide for Noise
MINISTRY OF TRANSPORTATION Version: October 2006 MINISTRY OF TRANSPORTATION Part of the Environmental Standards and Practices ISSUED BY: PROVINCIAL AND ENVIRONMENTAL PLANNING OFFICE MINISTRY OF TRANSPORTATION
More informationNoise Feasibility Study Proposed Mixed-Use Development 3385 Dundas Street West City of Toronto, Ontario
Noise Feasibility Study Proposed Mixed-Use Development 8 Dundas Street West City of Toronto, Ontario Prepared for: Terra Firma Homes Corp High Park Ave, Suite Toronto, Ontario M6P S7 Prepared by Rajjot
More informationBRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS
BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 Prepared for; B.C. Ministry of Transportation
More informationEnvironmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development
Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Novus Reference No. 12-0253 Version No. 1.1 (DRAFT) May 1, 2015 NOVUS PROJECT TEAM: Scientist: Specialist: Project
More informationNOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT
Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING
More informationAttachment E2 Noise Technical Memorandum SR 520
Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street
More informationASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE
ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE Technical Report Prepared For Ardstone Capital Ltd. 48 Fitzwilliam Square Dublin Technical Report
More informationBAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA
Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330
More informationNoise Feasibility Study Commercial Building, 65 Denzil Doyle Court Ottawa, Ontario
Noise Feasibility Study Commercial Building, 65 Denzil Doyle Court Ottawa, Ontario Prepared for: 8214221 Canada Inc. c/o LRL Associates Ltd. 1-2884 Chamerland Street Rockland, Ontario K4K 1M6 Prepared
More informationWhy does MnDOT build noise barriers? What is a Type I project? What is an impacted location?
Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation
More informationRural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...
Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance
More informationConstructing SoundPLAN Models for Noise Studies That Are Consistent With the HUD Noise Guidebook
Portland, Oregon NOISE-CON 2011 2011 July 25-27 Constructing SoundPLAN Models for Noise Studies That Are Consistent With the HUD Noise Guidebook Joshua D Leasure JEAcoustics 1705 W Koenig Lane Austin,
More informationSunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies
CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights
More informationGisborne District Council
11.0 NOISE AND VIBRATION... 1 11.1 STRUCTURE OF THIS CHAPTER... 1 11.2 INTRODUCTION... 1 11.3 ISSUES... 2 11.4 OBJECTIVES (NOISE INCLUDING VIBRATION)... 2 11.5 POLICIES (NOISE INCLUDING VIBRATION)... 2
More informationFIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES
NOISE ELEMENT OBJECTIVES AND POLICIES Noise Standards N1. To protect the citizens of Arroyo Grande from the harmful and annoying effects of exposure to excessive noise. Policy N1-1 The noise standards
More informationTraffic Noise Introduction to Traffic Noise Analysis and Abatement
Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?
More informationAPPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL
JUNE 2 016 A7.1 APPENDIX 7 AIRPORT NOISE AND DEVELOPMENT CONTROLS A7.1 INTRODUCTION The Rotorua Airport is an important resource for the Rotorua district and wider Bay of Plenty, East Coast and Central
More informationAssessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages ROL Phase
Road Traffic Traffic Noise Noise Impact Impact Assessment - Draft Assessment - Draft Ripley Valley Amex SUCE Development Stages 33-37 ROL Phase Ripley Valley Amex SUCE Development Stages 33-37 ROL Phase
More information3.1 Noise Overlay District
3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set
More informationSTANDARDS FOR LOW DENSITY RESIDENTIAL DEVELOPMENT. (in the Low Density Residential zone)
STANDARDS FOR LOW DENSITY RESIDENTIAL DEVELOPMENT (in the Low Density Residential zone) Hauraki Section (not former Franklin Area) of Hauraki District Plan This pamphlet sets out the main performance standards
More informationStantec. Allenby Court Extension, Waterloo Noise Impact Assessment. Prepared for: BU Holdings Inc Ontario Limited Waterloo ON.
Allenby Court Extension, Waterloo Noise Impact Assessment Stantec Prepared for: BU Holdings Inc. 907248 Ontario Limited Waterloo ON Prepared by: Stantec Consulting Ltd. 49 Frederick Street Kitchener ON
More informationAppendix F. Environmental Noise Assessment
Appendix F Environmental Noise Assessment FINAL REPORT ENVIRONMENTAL NOISE ASSESSMENT TRENT RIVER CROSSING CAMPBELLFORD, ONTARIO Project Number: # W08-5292A June 3, 2009 SUBMITTED TO: Garry Pappin, B.E.S.,
More information24 CFR Part 51 Noise Abatement and Control as part of a Part 58 HUD Environmental Review. November 19, 2013
24 CFR Part 51 Noise Abatement and Control as part of a Part 58 HUD Environmental Review November 19, 2013 1 Noise Control HUD Noise Standards Noise Evaluation Process Conducting a Noise Analysis Responsibilities
More informationAssessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages 42A ROL Phase
Road Traffic Traffic Noise Noise Impact Impact Assessment - Draft Assessment - Draft Ripley Valley Amex SUCE Development Stages 42A ROL Phase Ripley Valley Amex SUCE Development Stages 42A ROL Phase A038_790147
More informationPeak noise levels during any time period can be characterized with statistical terms.
3.11 NOISE Introduction This Noise section provides a discussion of applicable noise policies and standards, the results of ambient noise measurements, an evaluation of the projects compatibility with
More informationBuffer distances for surface roads and elevated highways correlated with pre-existing ambient noise
Buffer distances for surface s and elevated highways correlated with pre-existing ambient noise Jiping ZHANG 1 ;MarcBURET 2 ; Shuoxian WU 3 ;Yuezhe ZHAO 3 ; Saiyan SHEN 1 ;Xin ZHANG 1 1 Zhejiang Research
More informationCOMPONENTS OF THE NOISE ELEMENT
COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated
More informationSPECIFICATION FOR NOISE MITIGATION
SPECIFICATION FOR NOISE MITIGATION 1. SCOPE This specification covers the design, construction, documentation and postconstruction review of state highway road-traffic noise mitigation. This specification
More informationDulles Toll Road Highway Traffic Noise Policy. February 2, 2011
Dulles Toll Road Highway Traffic Noise Policy February 2, 2011 as revised February 1, 2012 Table of Contents 1. Purpose... 1 2. Definitions... 1 3. Applicability... 5 4. Sound Fundamentals... 6 5. Highway
More informationMnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM
MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls
More informationAcoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332
Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092
More informationNoise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES
Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES A bit about your speaker Presentation Overview 1. Some Case Studies 2. Mystery 3. Drama 4. Danger Environmental Noise Impact an Overview
More informationNoise measurement and mitigation for urban building foundation excavation
PROCEEDINGS of the 22 nd International Congress on Acoustics Challenges and Solutions in Acoustical Measurement and Design: Paper ICA2016-552 Noise measurement and mitigation for urban building foundation
More informationSECTION 7: INDUSTRIAL ZONE RULES
SECTION 7: INDUSTRIAL ZONE RULES 7.1 CATEGORIES OF ACTIVITIES 7.1.1 PERMITTED ACTIVITIES The following activities are permitted activities in the Industrial Zone, provided activities comply with all relevant
More information5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN
Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee
More informationpaterson -MEMO consulting engineers
paterson consulting engineers EMAIL-MEMO to: Minto Communities Inc. - Mr. Barry Gray bgray@minto.com cc: Minto Communities Inc. - Mr. Julio Da Silva julio_dasilva@minto.com re: Grade Raise Recommendations
More information9. NOISE AND VIBRATION
9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial
More informationEnvironmental Assessment May 2007
jurisdictional waters. It is assumed that, at a minimum, a USACE Section 404 Nationwide Permit would be necessary to construct these features. The impacts of the fill into the floodplain cannot be fully
More information1. Introduction Noise Analysis Results Figures. List of Tables
Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions
More informationDebrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH
JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,
More informationAPPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION
APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION FINAL PROJECT NOISE ANALYSIS Artesian Substation B&V PROJECT NO. 188602 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR
More informationPROPOSED CHILDCARE 11 CRYERS ROAD, HIGHBROOK ASSESSMENT OF NOISE
1/355 Manukau Road Epsom, Auckland 1023 PO Box 26283 Epsom, Auckland 1344 T: 09 638 8414 E: hegley@acoustics.co.nz PROPOSED CHILDCARE 11 CRYERS ROAD, HIGHBROOK ASSESSMENT OF NOISE Report No 16295 Prepared
More informationADMINISTRATIVE HEARING STAFF REPORT
ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community
More informationSection 1 OBC FADS /13 Access to Parking Areas
Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator
More informationHAINE ROAD, RAMSGATE NOISE ASSESSMENT
PROJECT NAME CLIENT PROJECT RECORD HAINE ROAD, RAMSGATE ACTIVE LAND & BUILD LTD. REPORT DETAILS TYPE REFERENCE 1775\AR\12-2017\748 ISSUE DATE DECEMBER 2017 NICHOLAS JONES AUTHOR REVIEWER BEng(Hons) CEng
More informationC&B Alberta Solar Development ULC
Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by
More informationARTICLE 4 SUPPLEMENTARY PROVISIONS
ARTICLE 4 SUPPLEMENTARY PROVISIONS Section 4-10 1. Permitted Uses and Conditional Uses Permitted uses and uses permitted by special review may be located in the same building Section 4-102. District Boundaries
More informationNORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV
Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project
More informationAustralian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS
AS 3671 1989 Australian Standard Acoustics Road traffic noise intrusion Building siting and construction This Australian Standard was prepared by Committee AV/5, Acoustics Community Noise. It was approved
More informationNoise Assessments for Construction Noise Impacts
Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources
More informationCompatible Use Odour, Dust, and Noise Assessment
Compatible Use Odour, Dust, and Noise Assessment Northridge Property Management Inc. 1101 2nd Avenue East, Suite 200 P.O. Box 325, Owen Sound, Ontario, N4K 5P5 3195 East Bayshore Road, Owen Sound, Ontario
More informationNoise Study Bristol Park Redevelopment Area
Noise Study Bristol Park Redevelopment Area Distribution No. of Copies Sent To 3 Ms. Susan K. Jones Environmental Coordinator City of Champaign 102 N. Neil Street Champaign, IL 61820 X:\CH\IE\2013\13C018.00\10000
More information4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics
4.10 This section evaluates the noise impacts upon existing and future noise sensitive receivers in and around the project area. The chapter includes background information on acoustics, a summary of the
More informationWelcome to the Noise Barrier Workshop
Welcome to the Noise Barrier Workshop DETROIT RIVER INTERNATIONAL CROSSING STUDY Initial Construction of The Windsor-Essex Parkway: Bridge No. 13, Bridge No. 14 & Noise Mitigation Adjacent to Southwood
More informationMCKENZIE INTERCHANGE PROJECT
BKL CONSULTANTS LTD acoustics noise vibration MCKENZIE INTERCHANGE PROJECT PREPARED FOR: MAY 2016 REVISION 1 NOTICE BKL Consultants Ltd. (BKL) has prepared this report for the sole and exclusive benefit
More informationAppendix D Environmental Noise Assessment
Appendix D Environmental Noise Assessment AREAS 3 AND 4 SPECIFIC PLAN EIR NOISE AND VIBRATION ASSESSMENT NEWARK, CALIFORNIA January 30, 2009 Prepared for: Julie Mier David J. Powers and Associates, Inc.
More informationAPPENDIX C NOISE STUDY TECHNICAL REPORT
APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical
More informationAPPENDIX H COMPARISON OF FUTURE NOISE BARRIER OPTIONS
APPENDIX H COMPARISON OF FUTURE NOISE BARRIER OPTIONS July 27, 2010 Robert Hunton McCormick Rankin Corporation 1145 Hunt Club Road, Suite 300 Ottawa, Ontario K1V 0Y3 FOR INFORMATION PURPOSES ONLY Mr. Hunton,
More informationAPPENDIX C NOISE STUDY TECHNICAL REPORT
APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place
More information4.13 NOISE AND VIBRATION
4.13 NOISE AND VIBRATION 4.13.1 INTRODUCTION This section describes and analyzes the current noise environment in the areas where project facilities will be located, and evaluates the potential impacts
More information5.8 LOW DENSITY RESIDENTIAL ZONE
5.8 LOW DENSITY RESIDENTIAL ZONE 5.8.1 ZONE PURPOSE (1) Low density residential development areas are designed to satisfy a particular demand from people wishing to live in a semi-rural setting, but to
More informationThe rezoning application and proposed transportation facility warrants consideration.
Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General
More informationDesign Specifications & Requirements Manual
18 DRAFTING AND DESIGN REQUIREMENTS FOR NEW SUBDIVISIONS 18.1 DRAWING REQUIREMENTS FOR NEW SUBDIVISIONS... 1 18.1.1 Basic Drawing Requirements... 1 18.1.2 Transportation Drawing Requirements... 1 a) Road
More informationImpact Assessment Methodology for the. Somerville Public Library August 4, 2008 Jason Ross, P.E. Harris Miller Miller & Hanson Inc.
Noise and Vibration Impact Assessment Methodology for the MBTA Green Line Extension P j t Project Presentation to the Advisory Group Meeting Meeting Somerville Public Library August 4, 2008 Jason Ross,
More informationSITE PLAN AND ARCHITECTURAL REVIEW APPLICATION
SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote
More informationHOW TO OBTAIN A BUILDING PERMIT
HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT
More information7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H
7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H (HERITAGE) ZONES 7.1 ZONE STATEMENTS 7.1.1 BUSINESS 1 AND 1A ZONES - (INNER COMMERCIAL) The Business 1 and 1A Zones represent the inner commercial area of Oamaru
More informationSan Joaquin Apartments and Precinct Improvements Project EIR Noise
5.7 NOISE This section evaluates the potential for the San Joaquin Apartments project to result in significant short- and long-term noise impacts. The evaluation includes an assessment of potential construction-related
More information18 RESIDENTIAL ZONE RULES
18 RESIDENTIAL ZONE RULES Activities Tables Policies 3.4.1, 4.4.3, 4.4.11, 4.4.13, 16.4.3, 16.4.7 18.1 Subdivision Activities Subdivision excluding unit title subdivision Subdivision which complies with
More informationBUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER
THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca
More informationProposed Lidl Food Store Muller Road Bristol. Environmental Noise Report for Planning
Proposed Lidl Food Store Muller Road Bristol Environmental Noise Report for Planning Reference: 5772/P/BL/pw October 2014 2 Proposed Lidl Food Store, Muller Road, Bristol Environmental Noise Report for
More informationSection 10 - Airport Business Zone (Titanium Park)
10.1 Introduction 10.1.1 The Hamilton International Airport (the Airport) is a facility of economic and social importance to the Waikato Region. The Airport Business Zone associated with it (Titanium Park)
More information