1 NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. Clarke Lands CITY OF OTTAWA March 2016 Prepared for: Minto Communities Inc Kent Street Ottawa, Ontario K1P 0B6 Prepared by: J.L. RICHARDS & ASSOCIATES LIMITED Consulting Engineers, Architects & Planners 864 Lady Ellen Place Ottawa, Ontario K1Z 5M2 JLR 24051

2 NOISE CONTROL FEASIBILITY STUDY Minto Communities Inc. Clarke Lands CITY OF OTTAWA - TABLE OF CONTENTS - PAGE 1.0 INTRODUCTION PROJECT DESCRIPTION TRANSPORTATION NOISE SOURCE Transportation Sound Level Criteria Transportation Noise Attenuation Requirements Prediction of Noise Levels (Transportation) Road Traffic Data Rapid Transit Corridor Data Noise Level Calculations (Transportation) Summary of Findings (Transportation) CONCLUSION AND RECOMMENDATIONS LIST OF TABLES - TABLE 1 - Outdoor Living Area... 3 TABLE 2 - Plane of Living/Dining Room Window... 4 TABLE 3 - Plane of Sleeping Quarters Window... 4 TABLE 4 - Road Traffic Data to Predict Noise Levels... 5 TABLE 5 - Bus Rapid Transit Corridor Traffic Data to Predict Noise Levels... 6 TABLE 6 - Predicted Freefield Noise Contours (Transportation)... 7 JLR i- J.L. Richards & Associates Limited March 2016

3 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment - LIST OF FIGURES AND DRAWINGS - FIGURE 1 - Site Location Plan Draft Plan of Subdivision DRAWING N1 - Freefield Outdoor Daytime Noise Contours DRAWING N2 - Freefield Indoor Daytime Noise Contours DRAWING N3 - Freefield Indoor Nighttime Noise Contours DRAWING N4 - Potential Noise Wall Locations - LIST OF APPENDICES - APPENDIX A - APPENDIX B - Drawings Transportation Noise Source Predictions - Bus Rapid Transit Corridor Data to Predict Noise Levels - Detailed Predicted Freefield Noise Level Calculations - Transportation Source Predictions JLR ii- J.L. Richards & Associates Limited March 2016

4 NOISE CONTROL FEASIBILITY STUDY MINTO COMMUNITIES INC. CLARKE LANDS CITY OF OTTAWA 1.0 INTRODUCTION This Feasibility Study has been prepared on behalf of Minto Communities Inc. (Minto) in order to assess the potential environmental noise impact on the proposed residential development Clarke Lands, due to vehicular traffic on Strandherd Drive, Cedarview Road, Chapman Mills Drive, and the proposed Rapid Transit Corridor (RTC). The Study assesses noise levels generated in order to determine noise attenuation measures required to satisfy the Part 4 Phase 1 criteria of the City of Ottawa Environmental Noise Control Guidelines (approved by City Council January 2016). 2.0 PROJECT DESCRIPTION The lands subject of this Study, which are shown on Figure 1, are described as the Clarke Lands, bounded by Strandherd Drive to the north, Cedarview Road to the west, vacant land to the south, and the existing Kennedy-Burnett Stormwater Management Facility to the east. The Clarke Lands have an area of approximately 34 ha and will include singles, townhouses, and walk up condos, commercial blocks and a school block. Blocks identified for development have been assessed from a preliminary perspective. Lands identified as the Mion Parcel, on Drawings N1 to N4, are not included in the scope of this study. Similarly, existing Residential Land Owned by Others at the west portion of the parcel are not included in the study. Blocks 110, 118, 119, and 120 are proposed to be commercial blocks. These have not been included in the study except to identify noise levels predicted for the site. Block 121 is proposed to be a future school. The need for a separate noise impact study will be required at the time of site plan application. Appendix A includes the Draft Plan of Subdivision. 3.0 TRANSPORTATION NOISE SOURCE The transportation noise sources include Strandherd Drive, Cedarview Road, Chapman Mills Drive, and the proposed RTC. Drawings N1 to N4 show the location of the existing and proposed roadways in relation to the proposed development. 3.1 Transportation Sound Level Criteria For the purpose of determining the predicted noise levels, and based on the sound level criteria established by the City of Ottawa Environmental Noise Control Guidelines JLR J.L. Richards & Associates Limited March 2016

5 CEDARVIEW ROAD TARTAN DRIVE JOCKVALE ROAD CEDARVIEW ROAD EXISTING FRASER FIELDS SUBDIVISION STRANDHERD DRIVE CLARKE LANDS EXISTING RESIDENTIAL (MATTAMY HOMES LTD.) MION EXISTING KENNEDY-BURNETT SWMF BRAOVAC-PAVIC FRASER-CLARKE WATERCOURSE File Location: P:\24000\24051 LD Minto Clarke\24051 C LOCATION PLAN.DWG PROJECT: DRAWING: BURNETT JOCK RIVER MINTO COMMUNITIES INC. CLARKE LANDS 4005 STRANDHERD DRIVE LOCATION PLAN This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: JLR NO: DRAWING NO.: FIGURE 1

6 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment (ENCG), the following will be used as the maximum acceptable sound levels (Leq) for residential development and other land uses, such as nursing homes, schools and daycare centres: Receiver Location Criteria Time Period Outdoor living area: 55 dba Daytime ( hrs) Indoor living/dining rooms (inside): 45 dba Daytime ( hrs) General Office, Reception Area (inside): 50 dba Daytime ( hrs) Sleeping Quarters (inside): 40 dba Nighttime ( hrs) Outdoor Living Areas (OLA) are defined as that portion of the outdoor amenity area of a dwelling for the quiet enjoyment of the outdoor environment during the daytime period. Typically, the point of assessment in an OLA is 3.0 m from the building façade and 1.5 m above the ground within the designated OLA for each individual unit and for the townhouse type units with an area greater than 37 m 2. The personal amenity area excludes balconies as per the City of Ottawa Environmental Noise Control Guidelines. Where standard building construction is used that complies with Part 4 of the Ontario Building Code, the indoor noise level should be at least 20 dba below the outdoor level when the windows are closed, and 10 dba below the outdoor level with the windows open. If the daytime sound levels at the outside walls are no more than 65 dba and the nighttime sound levels at the outside walls containing sleeping quarter windows are no more than 60 dba, then all the indoor requirements could normally be met by constructing the units in accordance with the standards established by the Ontario Building Code. 3.2 Transportation Noise Attenuation Requirements When the sound levels are equal to or less than the specified criteria, no noise attenuation (control) measures are required. When the excess above the recommended sound level limit is between 1 dba and 5 dba for the outdoor sound level criterion, the proposed development can be completed with no noise control measures incorporated into the site, but prospective occupants of the land should be made aware by suitable Warning Clauses. JLR J.L. Richards & Associates Limited March 2016

7 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Noise attenuation measures may include any or all of the following: noise attenuation barrier (wall or berm or a berm/wall combination); forced air heating system with provisions for the installation of central air conditioning; central air conditioning; and architectural components designed to provide additional acoustic insulation. In addition to the implementation of noise attenuation features, if required, and depending on the severity of the noise problem, Warning Clauses may be recommended to advise the prospective purchasers/tenants of affected units of the potential environmental noise problem. These Warning Clauses should be included in the Site Plan and Subdivision Agreements, in the Offers of Purchase and Sale, and must be registered on Title. A building component review is required in cases where the noise levels at the building face exceed 65 dba daytime and/or 60 dba nighttime. The Acoustic Insulation Factor Method is to be used in the review, as per the Road and Rail Noise: Effects on Housing manual published by the Canada Mortgage and Housing Corporation. The following tables outline the noise attenuation requirements for the Exterior Walls Containing Sleeping Quarters and/or Living Rooms for the daytime and nighttime periods. Leq (16 hr) (dba) Table 1: Outdoor Living Area (OLA) Daytime ( ) and Nighttime ( ) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements Leq 16 hr 55 dba N/A None required None required 55 dba < Leq 60 dba N/A Control measures (barriers) not required but should be considered Leq > 60 dba N/A Control measures (barriers) required to reduce Leq to below 60 dba and as close to 55 dba as technically, economically and administratively possible Required if resulting Leq exceeds 55 dba Type A Required if resulting Leq exceeds 55 dba Type B JLR J.L. Richards & Associates Limited March 2016

8 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Table 2: Plane of Living/Dining Room Window Daytime ( ) and Nighttime ( ) Leq (16 hr) (dba) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements Leq 16 hr 55 dba None required N/A None required 55 dba < Leq 16 hr 65 dba Forced air heating with provision for air conditioning N/A Required Type C Leq 16 hr > 65 dba* Central air conditioning N/A Required Type D * In cases where sound levels exceed 65 dba, building components must be designed to achieve indoor sound level criteria. Table 3: Plane of Sleeping Quarters Window Daytime ( ) and Nighttime ( ) Leq (8 hr) (dba) Ventilation Requirements Outdoor Control Measures Warning Clause Requirements 50 dba < Leq 8 hr 60 dba Forced air heating with provision for central air conditioning N/A Required Type C 60 dba < Leq 8 hr* Central air conditioning N/A Required Type D * In cases where sound levels exceed 60 dba, building components must be designed to achieve indoor sound level criteria. The wording of the notices to be placed on Title and included in the Site Plan Agreement, as well as the Offers of Purchase and Sale, are provided below: Type A "Purchasers/tenants are advised that noise levels due to increasing road traffic may occasionally interfere with some activities of the dwelling occupants as the sound levels exceed the City s and Ministry of the Environment s noise criteria. Type B "Purchasers/tenants are advised that despite the inclusion of noise control features in the development and within the building units, sound levels due to increasing road traffic may on occasions interfere with some activities of the dwelling occupants as the sound level exceeds the City s and the Ministry of the Environment s noise criteria. JLR J.L. Richards & Associates Limited March 2016

9 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Type C "This unit has been fitted with a forced air heating system and the ducting, etc. was sized to accommodate central air conditioning. Installation of central air conditioning by the occupant will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment s noise criteria. Note: The location and installation of the outdoor air conditioning device should be done so as to comply with noise criteria of MOE Publication NPC-216, Residential Air Conditioning Devices and thus minimize the noise impacts both on and in the immediate vicinity of the subject property. Type D "This unit has been supplied with a central air conditioning system which will allow windows and exterior doors to remain closed, thereby ensuring that the indoor sound levels are within the City s and the Ministry of the Environment s noise criteria. 3.3 Prediction of Noise Levels (Transportation) Road Traffic Data The following traffic data was used to predict noise levels: Table 4: Road Traffic Data to Predict Noise Levels Strandherd Drive Cedarview Road Chapman Mills Drive Total Traffic Volume (AADT) 35,000 35,000 12,000 Day/Night Split (%) 92/8 92/8 92/8 Medium Trucks (%) Heavy Trucks (%) Posted Speed (km/hr) 70/ Road Gradient (%) Schedule E and Annex 1 of the City of Ottawa Official Plan (May 2003) were utilized to determine the correct road classification and protected right-of-way. These road classifications were compared to Map 6 of the City of Ottawa Transportation Master Plan (Road Network Urban). All findings were then compared to Table B1 (Part 4, Appendix B ) of the City of Ottawa Environmental Noise Control Guidelines in order to determine an appropriate AADT value. JLR J.L. Richards & Associates Limited March 2016

10 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Rapid Transit Corridor Data Figure 1 shows the location of the Rapid Transit Corridor in relation to the proposed residential development. The City has classified this corridor as a Bus Rapid Transit Corridor. The following data was used to predict noise levels: Table 5: Bus Rapid Transit Corridor Data to Predict Noise Levels Bus Rapid Transit Corridor Total Traffic Volume (AADT) 258 Day/Night Split (%) 74/26 Medium Trucks (%) 100 Heavy Trucks (%) 0 Posted Speed (km/hr) 80 Road Gradient (%) 1 Appendix B includes a summary of the information provided by the City specific to the Bus Rapid Transit Corridor, including how the AADT value and the day/night split was calculated. The computer program Stamson is used to predict noise levels associated with the bus rapid transit corridor. According to the City of Ottawa Noise Control Guidelines bus traffic on dedicated bus transitways is to be entered into the Stamson program using the Road Template. The Custom Source category Rapid Transit Corridor in the Stamson model was not used for the purposes of this Report as it utilizes a pre-defined sound emission level (i.e., maximum pass-by sound level measured at a distance of 15 m from the centre of the vehicle path). Based on the fact that Stamson does not permit an AADT value with a corresponding vehicle per hour count of less than 40, the AADT value inputted for the bus rapid transit corridor was increased by an appropriate factor. The noise level prediction output was then reduced by 3 dba per doubling. As a result of having to undertake this adjustment, the noise level predictions were undertaken separately for the road traffic and for the bus rapid transit corridor. The nomograph method to add decibel levels was then used to determine a representative total decibel level at the various receivers. These adjustments have been summarized in Appendix B. JLR J.L. Richards & Associates Limited March 2016

11 Minto Communities Inc. Clarke Lands Preliminary Noise Assessment Noise Level Calculations (Transportation) Noise contours for the daytime and nighttime periods were calculated using the MOE Road Traffic Noise Computer program STAMSON, Version The resulting noise contours, clause ranges, and potential noise attenuation barrier locations are shown on Drawings N1 to N4. Computer printouts are included in Appendix B. Table 6: Predicted Freefield Noise Contours (Transportation) Roads Contour (dba) and File Name Outdoor Living Areas (Freefield) Distance (m) Indoor Living Areas (Freefield) Distance (m) Daytime Daytime Nighttime 4 Lane Urban Arterial Divided 70 km/h / 80 km/h (Strandherd Drive, Cedarview Road) 50 n/a n/a 158.9/ / / 241 n/a / 115 n/a 37 / / / 59 n/a 2 Lane Major Collector Chapman Mills Drive/ Combined Chapman Mills & Proposed RTC 50 n/a n/a 53.0/71.0* / / 78 n/a / 38 n/a 15 / / 19 n/a **Note: Refer to Detailed Predicted Freefield Noise Level Calculations summary sheet in Appendix B for more information. 3.4 Summary of Findings (Transportation) Required Warning Clauses and noise contours are shown on Drawings N1 to N3. The units identified will require notices to be registered on Title, advising the occupants of the environmental noise problems and/or of the noise attenuation measures being JLR J.L. Richards & Associates Limited March 2016

12

13 A P P E N D I X A DRAWINGS

14 SUBJECT TO THE CONDITIONS, IF ANY, SET FORTH IN OUR LETTER DATED _. THIS DRAFT PLAN IS APPROVED BY THE CITY OF OTTAWA UNDER SECTION 51 OF THE PLANNING ACT. THIS DAY OF _. FELICE PETTI, P. ENG., MANAGER DEVELOPMENT REVIEW, SUBURBAN SERVICES PLANNING AND GROWTH MANAGEMENT DEPARTMENT PLANNING AND INFRASTRUCTURE PORTFOLIO CITY OF OTTAWA KEY MAP NOT TO SCALE DRAFT PLAN OF SUBDIVISION OF PART OF LOTS 14 And 15 CONCESSION 3 ( RIDEAU FRONT ) Geographic Township of Nepean CITY OF OTTAWA Prepared by Annis, O'Sullivan, Vollebekk Ltd. Scale 1 : Metres Metric DISTANCES SHOWN ON THIS PLAN ARE IN METRES AND CAN BE CONVERTED TO FEET BY DIVIDING BY SURVEYOR'S CERTIFICATE I CERTIFY THAT : The boundaries of the lands to be subdivided and their relationship to adjoining lands have been accurately and correctly shown. Date V. Andrew Shelp ONTARIO LAND SURVEYOR OWNER'S CERTIFICATE This is to certify that I am the owner / agent of the lands to be subdivided and that this plan was prepared in accordance with my instructions. Date Minto Communities Inc. I have the authority to bind the corporation ADDITIONAL INFORMATION REQUIRED UNDER SECTION OF THE PLANNING ACT (a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) see plan see plan see plan single family,multi-family residential housing, commercial, open space, park land and institutional see plan see plan see plan City of Ottawa see soils report see plan sanitary, storm sewers, municipal water, bell, hydro, cable and gas to be available see plan REVISION SCHEDULE No. 4 Revision revised transit corridor and adjacent blocks Date BY March 10, 2016 N 3 contours added March 8, 2016 N 2 lot revisions(15-23,48-58) February 25, 2016 N 1 plan for discussion February 23, 2016 N 14 Concourse Gate, Suite 500 Nepean, Ont. K2E 7S6 Phone: (613) / Fax: (613) Nepean@aovltd.com

15 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE 65 dba CONTOUR CEDARVIEW ROAD 55 dba CONTOUR 65 dba CONTOUR 60 dba CONTOUR 55 dba CONTOUR FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) 60 dba CONTOUR MION PARCEL File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'A' REQUIRED ON TITLE WARNING CLAUSE 'B' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD OUTDOOR DAYTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N1 PLOT DATE: March 8, :24:08 PM

16 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE 65 dba CONTOUR CEDARVIEW ROAD 55 dba CONTOUR 65 dba CONTOUR 55 dba CONTOUR MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'C' REQUIRED ON TITLE WARNING CLAUSE 'D' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD INDOOR DAYTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N2 PLOT DATE: March 8, :25:02 PM

17 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h 60 dba CONTOUR STRANDHERD DRIVE CEDARVIEW ROAD 60 dba CONTOUR 50 dba CONTOUR 50 dba CONTOUR MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 WARNING CLAUSE 'C' REQUIRED ON TITLE WARNING CLAUSE 'D' REQUIRED ON TITLE 50 dba 55 dba 60 dba 65 dba STUDY AREA PROJECT: DRAWING: CHAPMAN MILLS DRIVE MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. DESIGN: DRAWN: CHECKED: PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 FREEFIELD INDOOR NIGHTTIME NOISE CONTOURS TB TB LJ JLR NO: DRAWING NO.: N3 PLOT DATE: March 8, :25:56 PM

18 EXISTING RESIDENTIAL STRANDHERD CENTERLINE AADT 35,000 EXISTING RESIDENTIAL CHAPMAN MILLS CENTERLINE AADT 12,000 80km/h CHAPMAN MILLS DRIVE 70km/h STRANDHERD DRIVE CEDARVIEW ROAD MION PARCEL FUTURE TRANSIT CORRIDOR (CONTOURS NOT ASSESSED) CHAPMAN MILLS DRIVE File Location: P:\24000\24051 LD Minto Clarke\24051 C NIS.dwg CEDARVIEW CENTERLINE AADT 35,000 POTENTIAL PERMANENT NOISE WALL STUDY AREA PROJECT: DRAWING: MINTO COMMUNITIES INC. CLARKE LANDS OTTAWA, ONTARIO POTENTIAL NOISE WALL LOCATIONS This drawing is copyright protected and may not be reproduced or used for purposes other than execution of the described work without the express written consent of J.L. Richards & Associates Limited. PROPOSED RAPID TRANSIT CORRIDOR CENTERLINE AADT 258 DESIGN: DRAWN: CHECKED: TB TB LJ JLR NO: DRAWING NO.: N4 PLOT DATE: March 8, :26:27 PM

19 A P P E N D I X B TRANSPORTATION NOISE SOURCE PREDICTIONS

20 STAMSON 5.0 NORMAL REPORT Date: :57:54 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a55d70k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 55dBA at 70km/hr Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba

21 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :03:06 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a55d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 55dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba

22 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :01:33 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a60d70k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 60dBA at 70 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)

23 Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :42:02 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a60d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ola 60dBA at 80km/hr Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00

24 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :07:57 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a65d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod *

25 Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 57.92

26 STAMSON 5.0 NORMAL REPORT Date: :07:57 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 4a65d80k.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba

27 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :50:46 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a50d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila night 50dBA at 80km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba

28 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :48:19 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d70ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 70km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 70 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)

29 Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :49:42 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 80km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00

30 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :49:42 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a60d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila day & night 60dBA at 80km/h Road data, segment # 1: 4-UAD (day/night)

31 Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): 60.00

32 (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :30:20 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: a65d80ki.te Time Period: Day/Night 16/8 hours Description: 4 Lane Arterial ila 65dBA at 80 km/h Road data, segment # 1: 4-UAD (day/night) Car traffic volume : 28336/2464 veh/timeperiod * Medium truck volume : 2254/196 veh/timeperiod * Heavy truck volume : 1610/140 veh/timeperiod * Posted speed limit : 80 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 4-UAD (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 4-UAD (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 4-UAD (night)

33 ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :09:19 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc50di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila night 50dBA at 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba

34 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :38:53 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc55di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 55dBA at 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0

35 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :00:06 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc55do.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ola 55dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete)

36 * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): 48.15

37 STAMSON 5.0 NORMAL REPORT Date: :04:51 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc60dio.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila day & night 60dBA 50kmh Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba

38 Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :58:27 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc60do.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ola 60dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 1.50 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier) Results segment # 1: 2-UMCU (day) ROAD ( ) = dba

39 Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :02:08 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: 2mc65di.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 65dBA at 50km/h Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00 Heavy Truck % of Total Volume : 5.00 Day (16 hrs) % of Total Volume : Data for Segment # 1: 2-UMCU (day/night) Angle1 Angle2 : deg deg No of house rows : 0 / 0 Surface : 1 (Absorptive ground surface) Receiver source distance : / m Receiver height : 2.25 / 4.50 m Topography : 1 (Flat/gentle slope; no barrier)

40 Results segment # 1: 2-UMCU (day) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba Results segment # 1: 2-UMCU (night) ROAD ( ) = dba Segment Leq : dba Total Leq All Segments: dba TOTAL Leq FROM ALL SOURCES (DAY): (NIGHT): STAMSON 5.0 NORMAL REPORT Date: :31:54 MINISTRY OF ENVIRONMENT AND ENERGY / NOISE ASSESSMENT Filename: mcbrt55i.te Time Period: Day/Night 16/8 hours Description: 2 Lane Major Collector ila 55dBA with BRT Road data, segment # 1: 2-UMCU (day/night) Car traffic volume : 9715/845 veh/timeperiod * Medium truck volume : 773/67 veh/timeperiod * Heavy truck volume : 552/48 veh/timeperiod * Posted speed limit : 50 km/h Road gradient : 1 % Road pavement : 1 (Typical asphalt or concrete) * Refers to calculated road volumes based on the following input: 24 hr Traffic Volume (AADT or SADT): Percentage of Annual Growth : 0.00 Number of Years of Growth : 0.00 Medium Truck % of Total Volume : 7.00

Noise Assessment Report Main Street, Residential Site Cambridge, ON

Noise Assessment Report Main Street, Residential Site Cambridge, ON Noise Assessment Report 825-875 Main Street, Residential Site Cambridge, ON Prepared for: 2536546 Ontario Inc. Prepared by: Stantec Consulting Ltd. 100-300 Hagey Boulevard Waterloo, ON N2L 0A4 Project:

More information

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario

Noise Feasibility Study Proposed Residential Development Old Barber House 5155 Mississauga Road City of Mississauga, Ontario Noise Feasibility Study Proposed Residential Development Old Barber ouse 5155 Mississauga Road City of Mississauga, Ontario Prepared for: City Park (Old Barber) omes Inc. 950 Nashville Road Kleinburg,

More information

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6 RESIDENTIAL / HOTEL DEVELOPMENT 141 GEORGE STREET / 325 DALHOUSIE STREET OTTAWA, ONTARIO Prepared By: NOVATECH ENGINEERING CONSULTANTS LTD. Suite 200, 240 Michael Cowpland Drive Ottawa, Ontario K2M 1P6

More information

UAL URBAN AERODYNAMICS LTD

UAL URBAN AERODYNAMICS LTD UAL URBAN AERODYNAMICS LTD 23 Waterford Drive Telephone (613) 225-6362 Ottawa, Ontario, Canada Facsimile (613) 225-3022 K2E 7V4 e-mail standen.ual@sympatico.ca website: http://www.urban-noise.ca 1.0 Background

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT STONEPAY - PICKERING WEST OF BROCK ROAD AND SOUTH OF DERSAN STREET PART OF LOTS 19 AND 20, CONCESSION 3 PLAN 40R-28764 CITY OF PICKERING PREPARED FOR: STONEPAY 7603860 CANADA

More information

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario

Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Noise Feasibility Study Proposed Residential Development Brock Road Pickering, Ontario Prepared for: Madison Brock Limited 369 Rimrock Road Toronto, Ontario M3J 3G2 Prepared by: Jingyi Guo Reviewed by:

More information

Place Vanier Édifice AEFO

Place Vanier Édifice AEFO Place Vanier Édifice AEFO Martineau Architecture Inc. + Smith Carter Architects & Engineers Inc. TRAFFIC NOISE ASSESSMENT 250 Montreal Road Gradient Microclimate Engineering Inc. Prepared by Thomas Couper,

More information

SS WILSON ASSOCIATES Consulting Engineers

SS WILSON ASSOCIATES Consulting Engineers SS WILSON ASSOCIATES Consulting Engineers REPORT NO. WA10-089 DETAILED NOISE CONTROL STUDY PROPOSED 6-STOREY APARTMENT BUILDING 17, 19 & 23 ROBINSON AVENUE OTTAWA, ONTARIO SUBMITTED TO: ROBINSON PARK DEVELOPMENT

More information

Appendix K. Environmental Noise Assessment

Appendix K. Environmental Noise Assessment Appendix K Environmental Noise Assessment ENVIRONMENTAL NOISE ASSESSMENT THORNTON ROAD NORTH TAUNTON ROAD WEST TO WINCHESTER ROAD WEST SCEDULE 'C' MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT CITY OF OSHAWA

More information

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL

ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL Ottawa Ontario Canada ACOUSTIC ASSESSMENT OF TRAFFIC NOISE IMPACTS ON THE PROPOSED AVALON CATHOLIC ELEMENTARY SCHOOL CITY OF OTTAWA Prepared for Bryden Martel Architects Inc. Prepared by Hugh Williamson

More information

ENVIRONMENTAL NOISE ASSESSMENT

ENVIRONMENTAL NOISE ASSESSMENT ENVIRONMENTAL NOISE ASSESSMENT LAKEVIEW BOULEVARD ENVIRONMENTAL ASSESSMENT LAKEVIEW BOULEVARD BETWEEN POPLAR AVENUE AND MAPLE AVENUE TOWN OF AJAX PREPARED FOR: TMIG February 2017 Y1610 TABLE OF CONTENTS

More information

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario

Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Noise Feasibility Study Framgard Apartments (South Block) NW corner of Britannia Road and Regional Road 25 Town of Milton, Ontario Prepared for: Mattamy Homes Ltd. 433 Steeles Avenue East, Suite 110 Milton,

More information

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East

Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Environmental Noise Assessment Feasibility Assessment 92 Plains Road East Novus Reference No. 16-0006 Version No. 1.1 (Final) February 26, 2016 NOVUS PROJECT TEAM: Specialist: Marcus Li, P.Eng. 16/02/26

More information

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario

Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Noise Feasibility Study 2480 Old Bronte Road, Oakville, Ontario Prepared for: New Horizon Development Group (Bronte) Inc. 69 John Street South, Suite 400 Hamilton, Ontario L8N 2B9 Prepared by Sheeba Paul,

More information

Draft Noise Abatement Guidelines

Draft Noise Abatement Guidelines Document under Separate Cover refer to IMLC01-13 Draft Noise Abatement Guidelines April 2013 Legislative & Planning Services Table of Contents 1.0 Introduction...1 1.1 Key Definitions...1 2.0 Existing

More information

Policy for the Assessment and Mitigation of Traffic Noise on County Roads

Policy for the Assessment and Mitigation of Traffic Noise on County Roads Lanark County Policy for the Assessment and Mitigation of Traffic Noise on County Roads d r a f t f o r d i s c u s s i o n Prepared by: AECOM Canada Ltd. 302 1150 Morrison Drive, Ottawa, ON, Canada K2H

More information

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON

Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Environmental Noise Feasibility Assessment Proposed Guelph Woods Development Guelph, ON Novus Reference No. 12-0292C DRAFT (v2.2) February 7, 2014 NOVUS PROJECT TEAM: Specialist: Marcus Li, B.Sc., B.Eng.Sc.

More information

Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario

Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario Noise Impact Assessment 1158 Second Line Road Ottawa, Ontario Type of Document: Site Plan Submission Client: Theberge Homes Project Number: OTT-00245003-A0 Prepared By: M. Ghadban, EIT. Reviewed By: B.

More information

Noise Feasibility Study Proposed 6-storey Seniors Condominium 7480 Derry Road West Milton, Ontario

Noise Feasibility Study Proposed 6-storey Seniors Condominium 7480 Derry Road West Milton, Ontario Noise Feasibility Study Proposed 6-srey Seniors Condominium 7480 Derry Road West Miln, Ontario Prepared for: FGL Derry Inc. 5400 Yonge Street, Suite 300 Toron, Ontario M2N 5R5 Prepared by Vicr Garcia,

More information

Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario

Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario Prepared for: Attn: Nancy Shoemaker Black, Shoemaker, Robinson & Donaldson Limited 351 Speedvale Ave. West Guelph,

More information

Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario

Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario Noise and Vibration Feasibility Study 1 and 15 Stevenson St & 8 William St Guelph, Ontario Prepared for: Jennark Homes 66 Wellington Road 7, Unit #1 Elora, Ontario N0B 1S0 Prepared by Rajjot Arora, BASc

More information

Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario

Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario Road and Rail and Vibration Noise Impact Study Valeriote Subdivision, Guelph, Ontario For Attn: Nancy Shoemaker Black, Shoemaker, Robinson & Donaldson Limited 351 Speedvale Ave. West Guelph, Ontario N1H

More information

The content of this supplement is based upon the that described in our letter of May 28, 2012.

The content of this supplement is based upon the that described in our letter of May 28, 2012. September 20, 2012 30 Wertheim Court, Unit 25 Richmond Hill, Ontario, Canada L4B 1B9 email solutions@valcoustics.com web www.valcoustics.com telephone 905 764-5223 fax 905 764-6813 Davis Howe Partners

More information

Stationary Noise Assessment. Orléans Gardens. Ottawa, Ontario

Stationary Noise Assessment. Orléans Gardens. Ottawa, Ontario Stationary Noise Assessment Orléans Gardens Ottawa, Ontario REPORT: GWE15-053 Stationary Noise Prepared For: Prepared By: Michael Lafortune, Environmental Technologist Joshua Foster, P.Eng., Associate

More information

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO

NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO NOISE AND VIBRATION FEASIBILITY STUDY 316 BLOOR STREET WEST CITY OF TORONTO, ONTARIO Prepared for: State Building Group Attn.: John Guanti 27 Dufferin Street, Unit 34 Toronto, Ontario M6B 4J3 Prepared

More information

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng

For The Regional Municipality of Waterloo 150 Frederick Street, 8 th Floor Kitchener, Ontario, N2G 4J3. Prepared by. Sheeba Paul, MEng, PEng Noise and Vibration Compatibility Feasibility Assessment Residential Component Proposed RMOW Transit Hub King Street West and Victoria Street North, Kitchener, ON For The Regional Municipality of Waterloo

More information

ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary

ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary ENVIRONMENTAL NOISE CONTROL GUIDELINES: Introduction and Glossary January 2016 Visit us: Ottawa.ca/planning Contents Introduction 1 Implementation and Interpretation 1 Structure of the Environmental Noise

More information

Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario

Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario Rail Traffic Noise and Vibration Feasibility Study Proposed Zone Change for 6 Residential Lots Inkerman Street Guelph, Ontario For Granite Holdings Ontario Limited 160 Southgate Drive Guelph, Ontario N1G

More information

MINISTRY OF TRANSPORTATION. Environmental Guide for Noise

MINISTRY OF TRANSPORTATION. Environmental Guide for Noise MINISTRY OF TRANSPORTATION Version: October 2006 MINISTRY OF TRANSPORTATION Part of the Environmental Standards and Practices ISSUED BY: PROVINCIAL AND ENVIRONMENTAL PLANNING OFFICE MINISTRY OF TRANSPORTATION

More information

Noise Feasibility Study Proposed Mixed-Use Development 3385 Dundas Street West City of Toronto, Ontario

Noise Feasibility Study Proposed Mixed-Use Development 3385 Dundas Street West City of Toronto, Ontario Noise Feasibility Study Proposed Mixed-Use Development 8 Dundas Street West City of Toronto, Ontario Prepared for: Terra Firma Homes Corp High Park Ave, Suite Toronto, Ontario M6P S7 Prepared by Rajjot

More information

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS

BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS BRITISH COLUMBIA MINISTRY OF TRANSPORTATION AND INFRASTRUCTURE POLICY FOR ASSESSING AND MITIGATING NOISE IMPACTS FROM NEW AND UPGRADED NUMBERED HIGHWAYS April, 2014 Prepared for; B.C. Ministry of Transportation

More information

Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development

Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Environmental Noise Assessment Feasibility Assessment 939 Eglinton Avenue Development Novus Reference No. 12-0253 Version No. 1.1 (DRAFT) May 1, 2015 NOVUS PROJECT TEAM: Scientist: Specialist: Project

More information

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT

NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING FOR BLUEWATER RIVER CROSSING REPLACEMENT PROJECT Stantec Consulting Ltd. 300-675 Cochrane Drive West Tower Markham ON L3R 0B8 Tel: (905) 944-7777 Fax: (905) 474-9889 August 9, 2012 File: 160960699 NOISE IMPACT STUDY - HORIZONTAL DIRECTIONAL DRILLING

More information

Attachment E2 Noise Technical Memorandum SR 520

Attachment E2 Noise Technical Memorandum SR 520 Attachment E2 Noise Technical Memorandum SR 520 Prepared for: Prepared by: Jodi Ketelsen Michael A. Minor Date: November 4, 2012 Subject: Project: Noise Modeling Results: NE 51st Street to NE 65th Street

More information

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE

ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE ASSESSMENT OF INWARD TRAFFIC NOISE IMPACT AT RESIDENTIAL DEVELOPMENT, WONDERFUL BARN, LEIXLIP, CO. KILDARE Technical Report Prepared For Ardstone Capital Ltd. 48 Fitzwilliam Square Dublin Technical Report

More information

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA

BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA Charles M Salter Associates Inc BAY MEADOWS PHASE II SPAR 2 SAN MATEO, CALIFORNIA RESIDENTIAL INTERIOR NOISE ANALYSIS Prepared for: Kim Havens Wilson Meany Sullivan Four Embarcadero Center, Suite 3330

More information

Noise Feasibility Study Commercial Building, 65 Denzil Doyle Court Ottawa, Ontario

Noise Feasibility Study Commercial Building, 65 Denzil Doyle Court Ottawa, Ontario Noise Feasibility Study Commercial Building, 65 Denzil Doyle Court Ottawa, Ontario Prepared for: 8214221 Canada Inc. c/o LRL Associates Ltd. 1-2884 Chamerland Street Rockland, Ontario K4K 1M6 Prepared

More information

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location?

Why does MnDOT build noise barriers? What is a Type I project? What is an impacted location? Why does MnDOT build noise barriers? Noise barriers generally prove to be quite effective in providing noise reduction at receptors near transportation facilities. In 1972, the U.S. Congress passed legislation

More information

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies...

Rural-Residential Rural-Residential Explanatory Statement Significant Issues Objectives and Policies... Section Contents Rural-Residential... 2 16. Rural-Residential... 2 Explanatory Statement... 2 16.1 Significant Issues... 2 16.2 Objectives and Policies... 3 16.3 Activity Lists... 3 16.4 Activity Performance

More information

Constructing SoundPLAN Models for Noise Studies That Are Consistent With the HUD Noise Guidebook

Constructing SoundPLAN Models for Noise Studies That Are Consistent With the HUD Noise Guidebook Portland, Oregon NOISE-CON 2011 2011 July 25-27 Constructing SoundPLAN Models for Noise Studies That Are Consistent With the HUD Noise Guidebook Joshua D Leasure JEAcoustics 1705 W Koenig Lane Austin,

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

Gisborne District Council

Gisborne District Council 11.0 NOISE AND VIBRATION... 1 11.1 STRUCTURE OF THIS CHAPTER... 1 11.2 INTRODUCTION... 1 11.3 ISSUES... 2 11.4 OBJECTIVES (NOISE INCLUDING VIBRATION)... 2 11.5 POLICIES (NOISE INCLUDING VIBRATION)... 2

More information

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES

FIGURE N-1 LAND USE COMPATIBILITY FOR NEW DEVELOPMENT NEAR TRANSPORTATION NOISE SOURCES NOISE ELEMENT OBJECTIVES AND POLICIES Noise Standards N1. To protect the citizens of Arroyo Grande from the harmful and annoying effects of exposure to excessive noise. Policy N1-1 The noise standards

More information

Traffic Noise Introduction to Traffic Noise Analysis and Abatement

Traffic Noise Introduction to Traffic Noise Analysis and Abatement Traffic Noise Introduction to Traffic Noise Analysis and Abatement NW Bethany Blvd Improvement Project Michael Minor, President Michael Minor & Associates Inc. Introduction to Acoustics What is Noise?

More information

APPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL

APPENDIX 7 - AIRPORT NOISE AND DE VE LOPMENT CONTROL JUNE 2 016 A7.1 APPENDIX 7 AIRPORT NOISE AND DEVELOPMENT CONTROLS A7.1 INTRODUCTION The Rotorua Airport is an important resource for the Rotorua district and wider Bay of Plenty, East Coast and Central

More information

Assessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages ROL Phase

Assessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages ROL Phase Road Traffic Traffic Noise Noise Impact Impact Assessment - Draft Assessment - Draft Ripley Valley Amex SUCE Development Stages 33-37 ROL Phase Ripley Valley Amex SUCE Development Stages 33-37 ROL Phase

More information

3.1 Noise Overlay District

3.1 Noise Overlay District 3.1 A. Purpose The purpose of this District is to establish a Noise Overlay Zoning District within the. B. Special Definitions As used in this Article only, the following terms shall be defined as set

More information

STANDARDS FOR LOW DENSITY RESIDENTIAL DEVELOPMENT. (in the Low Density Residential zone)

STANDARDS FOR LOW DENSITY RESIDENTIAL DEVELOPMENT. (in the Low Density Residential zone) STANDARDS FOR LOW DENSITY RESIDENTIAL DEVELOPMENT (in the Low Density Residential zone) Hauraki Section (not former Franklin Area) of Hauraki District Plan This pamphlet sets out the main performance standards

More information

Stantec. Allenby Court Extension, Waterloo Noise Impact Assessment. Prepared for: BU Holdings Inc Ontario Limited Waterloo ON.

Stantec. Allenby Court Extension, Waterloo Noise Impact Assessment. Prepared for: BU Holdings Inc Ontario Limited Waterloo ON. Allenby Court Extension, Waterloo Noise Impact Assessment Stantec Prepared for: BU Holdings Inc. 907248 Ontario Limited Waterloo ON Prepared by: Stantec Consulting Ltd. 49 Frederick Street Kitchener ON

More information

Appendix F. Environmental Noise Assessment

Appendix F. Environmental Noise Assessment Appendix F Environmental Noise Assessment FINAL REPORT ENVIRONMENTAL NOISE ASSESSMENT TRENT RIVER CROSSING CAMPBELLFORD, ONTARIO Project Number: # W08-5292A June 3, 2009 SUBMITTED TO: Garry Pappin, B.E.S.,

More information

24 CFR Part 51 Noise Abatement and Control as part of a Part 58 HUD Environmental Review. November 19, 2013

24 CFR Part 51 Noise Abatement and Control as part of a Part 58 HUD Environmental Review. November 19, 2013 24 CFR Part 51 Noise Abatement and Control as part of a Part 58 HUD Environmental Review November 19, 2013 1 Noise Control HUD Noise Standards Noise Evaluation Process Conducting a Noise Analysis Responsibilities

More information

Assessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages 42A ROL Phase

Assessment - Draft. Assessment - Draft. Ripley Valley Amex SUCE Development Stages 42A ROL Phase Road Traffic Traffic Noise Noise Impact Impact Assessment - Draft Assessment - Draft Ripley Valley Amex SUCE Development Stages 42A ROL Phase Ripley Valley Amex SUCE Development Stages 42A ROL Phase A038_790147

More information

Peak noise levels during any time period can be characterized with statistical terms.

Peak noise levels during any time period can be characterized with statistical terms. 3.11 NOISE Introduction This Noise section provides a discussion of applicable noise policies and standards, the results of ambient noise measurements, an evaluation of the projects compatibility with

More information

Buffer distances for surface roads and elevated highways correlated with pre-existing ambient noise

Buffer distances for surface roads and elevated highways correlated with pre-existing ambient noise Buffer distances for surface s and elevated highways correlated with pre-existing ambient noise Jiping ZHANG 1 ;MarcBURET 2 ; Shuoxian WU 3 ;Yuezhe ZHAO 3 ; Saiyan SHEN 1 ;Xin ZHANG 1 1 Zhejiang Research

More information

COMPONENTS OF THE NOISE ELEMENT

COMPONENTS OF THE NOISE ELEMENT COMPONENTS OF THE NOISE ELEMENT Definitions Following is a list of commonly used terms and abbreviations that may be found within this element or when discussing the topic of noise. This is an abbreviated

More information

SPECIFICATION FOR NOISE MITIGATION

SPECIFICATION FOR NOISE MITIGATION SPECIFICATION FOR NOISE MITIGATION 1. SCOPE This specification covers the design, construction, documentation and postconstruction review of state highway road-traffic noise mitigation. This specification

More information

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011

Dulles Toll Road Highway Traffic Noise Policy. February 2, 2011 Dulles Toll Road Highway Traffic Noise Policy February 2, 2011 as revised February 1, 2012 Table of Contents 1. Purpose... 1 2. Definitions... 1 3. Applicability... 5 4. Sound Fundamentals... 6 5. Highway

More information

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM

MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM MnDOT GREATER MN STAND ALONE NOISE BARRIER PROGRAM 7 November 2017 MINNESOTA S EXPERIENCE WITH HIGHWAY NOISE MITIGATION The Minnesota Department of Transportation (MnDOT) has been constructing noise walls

More information

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332

Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Pg 'P. Acoustic Consulting Australia PtyLtd. I Consultants on Noise and Vibration P0 Box 332 Heidelberg i#i..wr. David, u.,0 Victoria 3054 Phone 0412 375 234 Email: acausteblgpond.corn ABN 49 095 932 092

More information

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES

Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES Noise Control Case Studies TIM WIENS CONESTOGA-ROVERS & ASSOCIATES A bit about your speaker Presentation Overview 1. Some Case Studies 2. Mystery 3. Drama 4. Danger Environmental Noise Impact an Overview

More information

Noise measurement and mitigation for urban building foundation excavation

Noise measurement and mitigation for urban building foundation excavation PROCEEDINGS of the 22 nd International Congress on Acoustics Challenges and Solutions in Acoustical Measurement and Design: Paper ICA2016-552 Noise measurement and mitigation for urban building foundation

More information

SECTION 7: INDUSTRIAL ZONE RULES

SECTION 7: INDUSTRIAL ZONE RULES SECTION 7: INDUSTRIAL ZONE RULES 7.1 CATEGORIES OF ACTIVITIES 7.1.1 PERMITTED ACTIVITIES The following activities are permitted activities in the Industrial Zone, provided activities comply with all relevant

More information

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN

5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN Report No. 3 of the Transportation Services Committee Regional Council Meeting of March 24, 2011 5 INFORMATION UPDATE TRAFFIC NOISE ASSESSMENT TESTON ROAD CITY OF VAUGHAN The Transportation Services Committee

More information

paterson -MEMO consulting engineers

paterson  -MEMO consulting engineers paterson consulting engineers EMAIL-MEMO to: Minto Communities Inc. - Mr. Barry Gray bgray@minto.com cc: Minto Communities Inc. - Mr. Julio Da Silva julio_dasilva@minto.com re: Grade Raise Recommendations

More information

9. NOISE AND VIBRATION

9. NOISE AND VIBRATION 9. NOISE AND VIBRATION 9.1 Introduction 9.1.1 This Chapter details the existing baseline noise and vibration levels together with assessments of the suitability of the site for residential and commercial

More information

Environmental Assessment May 2007

Environmental Assessment May 2007 jurisdictional waters. It is assumed that, at a minimum, a USACE Section 404 Nationwide Permit would be necessary to construct these features. The impacts of the fill into the floodplain cannot be fully

More information

1. Introduction Noise Analysis Results Figures. List of Tables

1. Introduction Noise Analysis Results Figures. List of Tables Traffic Noise Technical Report FM 2218 Widening (From US 59 to SH 36) Fort Bend County Prepared by: Houston District Date: July 2017 CSJ: 2093-01-010 The environmental review, consultation, and other actions

More information

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH

Debrob Investments Limited FUNCTIONAL SERVICING REPORT DRAFT PLAN OF SUBDIVISION, CITYVIEW DRIVE CITY OF GUELPH JULY 2013 DOCUMENT CONTROL Client: Project Name: Report Title: IBI Reference: 25528 Cityview Drive Version: JULY 2013 Digital Master: Originator: Reviewer: Authorization: [File Location] Scott MacDonald,

More information

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION

APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION APPENDIX 5.12-A PROJECT NOISE ANALYSIS: ARTESIAN SUBSTATION FINAL PROJECT NOISE ANALYSIS Artesian Substation B&V PROJECT NO. 188602 Black & Veatch Holding Company 2015. All rights reserved. PREPARED FOR

More information

PROPOSED CHILDCARE 11 CRYERS ROAD, HIGHBROOK ASSESSMENT OF NOISE

PROPOSED CHILDCARE 11 CRYERS ROAD, HIGHBROOK ASSESSMENT OF NOISE 1/355 Manukau Road Epsom, Auckland 1023 PO Box 26283 Epsom, Auckland 1344 T: 09 638 8414 E: hegley@acoustics.co.nz PROPOSED CHILDCARE 11 CRYERS ROAD, HIGHBROOK ASSESSMENT OF NOISE Report No 16295 Prepared

More information

ADMINISTRATIVE HEARING STAFF REPORT

ADMINISTRATIVE HEARING STAFF REPORT ADMINISTRATIVE HEARING STAFF REPORT Salt Lake City Water Treatment Facility 1365 West 2300 North CONDITIONAL USE Case #PLNPCM2013-00762 December 12, 2013 Planning and Zoning Division Department of Community

More information

Section 1 OBC FADS /13 Access to Parking Areas

Section 1 OBC FADS /13 Access to Parking Areas Section 1 OBC 3.8.2.2 4.3.12/13 Access to Parking Areas A barrier-free path of travel is provided from: a) the entrance to the exterior parking area b) at least one parking level where a passenger elevator

More information

HAINE ROAD, RAMSGATE NOISE ASSESSMENT

HAINE ROAD, RAMSGATE NOISE ASSESSMENT PROJECT NAME CLIENT PROJECT RECORD HAINE ROAD, RAMSGATE ACTIVE LAND & BUILD LTD. REPORT DETAILS TYPE REFERENCE 1775\AR\12-2017\748 ISSUE DATE DECEMBER 2017 NICHOLAS JONES AUTHOR REVIEWER BEng(Hons) CEng

More information

C&B Alberta Solar Development ULC

C&B Alberta Solar Development ULC Decision 22296-D01-2017 Hays Solar Power Plant June 7, 2017 Alberta Utilities Commission Decision 22296-D01-2017 Hays Solar Power Plant Proceeding 22296 Application 22296-A001 June 7, 2017 Published by

More information

ARTICLE 4 SUPPLEMENTARY PROVISIONS

ARTICLE 4 SUPPLEMENTARY PROVISIONS ARTICLE 4 SUPPLEMENTARY PROVISIONS Section 4-10 1. Permitted Uses and Conditional Uses Permitted uses and uses permitted by special review may be located in the same building Section 4-102. District Boundaries

More information

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV Noise Technical Report 2015 Addendum NOISE TECHNICAL REPORT 2015 Addendum PREPARED FOR: Federal Highway Administration and Georgia Department of Transportation PREPARED BY: Parsons Brinckerhoff Project

More information

Australian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS

Australian Standard. Acoustics Road traffic noise intrusion Building siting and construction AS AS 3671 1989 Australian Standard Acoustics Road traffic noise intrusion Building siting and construction This Australian Standard was prepared by Committee AV/5, Acoustics Community Noise. It was approved

More information

Noise Assessments for Construction Noise Impacts

Noise Assessments for Construction Noise Impacts Noise Assessments for Construction Noise Impacts Weixiong Wu a AKRF, Inc., 440 Park Avenue, 7th floor, New York, NY, 10016, USA. ABSTRACT Construction noise is one of the most disruptive noise sources

More information

Compatible Use Odour, Dust, and Noise Assessment

Compatible Use Odour, Dust, and Noise Assessment Compatible Use Odour, Dust, and Noise Assessment Northridge Property Management Inc. 1101 2nd Avenue East, Suite 200 P.O. Box 325, Owen Sound, Ontario, N4K 5P5 3195 East Bayshore Road, Owen Sound, Ontario

More information

Noise Study Bristol Park Redevelopment Area

Noise Study Bristol Park Redevelopment Area Noise Study Bristol Park Redevelopment Area Distribution No. of Copies Sent To 3 Ms. Susan K. Jones Environmental Coordinator City of Champaign 102 N. Neil Street Champaign, IL 61820 X:\CH\IE\2013\13C018.00\10000

More information

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics

4.10 NOISE. A. Fundamental Concepts of Environmental Acoustics 4.10 This section evaluates the noise impacts upon existing and future noise sensitive receivers in and around the project area. The chapter includes background information on acoustics, a summary of the

More information

Welcome to the Noise Barrier Workshop

Welcome to the Noise Barrier Workshop Welcome to the Noise Barrier Workshop DETROIT RIVER INTERNATIONAL CROSSING STUDY Initial Construction of The Windsor-Essex Parkway: Bridge No. 13, Bridge No. 14 & Noise Mitigation Adjacent to Southwood

More information

MCKENZIE INTERCHANGE PROJECT

MCKENZIE INTERCHANGE PROJECT BKL CONSULTANTS LTD acoustics noise vibration MCKENZIE INTERCHANGE PROJECT PREPARED FOR: MAY 2016 REVISION 1 NOTICE BKL Consultants Ltd. (BKL) has prepared this report for the sole and exclusive benefit

More information

Appendix D Environmental Noise Assessment

Appendix D Environmental Noise Assessment Appendix D Environmental Noise Assessment AREAS 3 AND 4 SPECIFIC PLAN EIR NOISE AND VIBRATION ASSESSMENT NEWARK, CALIFORNIA January 30, 2009 Prepared for: Julie Mier David J. Powers and Associates, Inc.

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT 1) 9/25/06 Noise Study Technical Report; revised 05/08 2) 9/4/09 Memo Regarding Option 3 Noise Impacts to Pelican Lake Game Production Area Noise Study Technical

More information

APPENDIX H COMPARISON OF FUTURE NOISE BARRIER OPTIONS

APPENDIX H COMPARISON OF FUTURE NOISE BARRIER OPTIONS APPENDIX H COMPARISON OF FUTURE NOISE BARRIER OPTIONS July 27, 2010 Robert Hunton McCormick Rankin Corporation 1145 Hunt Club Road, Suite 300 Ottawa, Ontario K1V 0Y3 FOR INFORMATION PURPOSES ONLY Mr. Hunton,

More information

APPENDIX C NOISE STUDY TECHNICAL REPORT

APPENDIX C NOISE STUDY TECHNICAL REPORT APPENDIX C NOISE STUDY TECHNICAL REPORT Noise Study Technical Report Watertown South Connector US 81 to 29 th Street SE Watertown, South Dakota HDR Project No. 39319 Prepared by 6300 So. Old Village Place

More information

4.13 NOISE AND VIBRATION

4.13 NOISE AND VIBRATION 4.13 NOISE AND VIBRATION 4.13.1 INTRODUCTION This section describes and analyzes the current noise environment in the areas where project facilities will be located, and evaluates the potential impacts

More information

5.8 LOW DENSITY RESIDENTIAL ZONE

5.8 LOW DENSITY RESIDENTIAL ZONE 5.8 LOW DENSITY RESIDENTIAL ZONE 5.8.1 ZONE PURPOSE (1) Low density residential development areas are designed to satisfy a particular demand from people wishing to live in a semi-rural setting, but to

More information

The rezoning application and proposed transportation facility warrants consideration.

The rezoning application and proposed transportation facility warrants consideration. Date: November 11, 2014 To: Re: Chair and Members Planning & Development Committee PDE File Number: REZ1400020 275 Conception Bay South Bypass Road, Ward 5 Application to Rezone Land to Industrial General

More information

Design Specifications & Requirements Manual

Design Specifications & Requirements Manual 18 DRAFTING AND DESIGN REQUIREMENTS FOR NEW SUBDIVISIONS 18.1 DRAWING REQUIREMENTS FOR NEW SUBDIVISIONS... 1 18.1.1 Basic Drawing Requirements... 1 18.1.2 Transportation Drawing Requirements... 1 a) Road

More information

Impact Assessment Methodology for the. Somerville Public Library August 4, 2008 Jason Ross, P.E. Harris Miller Miller & Hanson Inc.

Impact Assessment Methodology for the. Somerville Public Library August 4, 2008 Jason Ross, P.E. Harris Miller Miller & Hanson Inc. Noise and Vibration Impact Assessment Methodology for the MBTA Green Line Extension P j t Project Presentation to the Advisory Group Meeting Meeting Somerville Public Library August 4, 2008 Jason Ross,

More information

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION CITY OF GENEVA, NEW YORK The purpose of the site plan and architectural review process is to secure compliance with the City s Zoning Ordinance and to promote

More information

HOW TO OBTAIN A BUILDING PERMIT

HOW TO OBTAIN A BUILDING PERMIT HOW TO OBTAIN A BUILDING PERMIT A GUIDE TO THE HOMEOWNER Copies of this Guide can be obtained from the Building Department upon request THE CORPORATION OF THE TOWNSHIP OF GEORGIAN BAY BUILDING DEPARTMENT

More information

7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H

7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H 7 BUSINESS 1, 1A 2, 3, 3A, 4, 5, 6 AND H (HERITAGE) ZONES 7.1 ZONE STATEMENTS 7.1.1 BUSINESS 1 AND 1A ZONES - (INNER COMMERCIAL) The Business 1 and 1A Zones represent the inner commercial area of Oamaru

More information

San Joaquin Apartments and Precinct Improvements Project EIR Noise

San Joaquin Apartments and Precinct Improvements Project EIR Noise 5.7 NOISE This section evaluates the potential for the San Joaquin Apartments project to result in significant short- and long-term noise impacts. The evaluation includes an assessment of potential construction-related

More information

18 RESIDENTIAL ZONE RULES

18 RESIDENTIAL ZONE RULES 18 RESIDENTIAL ZONE RULES Activities Tables Policies 3.4.1, 4.4.3, 4.4.11, 4.4.13, 16.4.3, 16.4.7 18.1 Subdivision Activities Subdivision excluding unit title subdivision Subdivision which complies with

More information

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER

BUILDING PERMIT INFORMATION GUIDE FOR THE HOMEOWNER THE CORPORATION OF THE MUNICIPALITY OF SOUTH HURON 322 Main Street South, P.O. Box 759, Exeter, Ontario N0M 1S6 PHONE: (519) 235-0310 FAX: (519) 235-3304 TOLL FREE: 1-877-204-0747 WEBSITE: www.southhuron.ca

More information

Proposed Lidl Food Store Muller Road Bristol. Environmental Noise Report for Planning

Proposed Lidl Food Store Muller Road Bristol. Environmental Noise Report for Planning Proposed Lidl Food Store Muller Road Bristol Environmental Noise Report for Planning Reference: 5772/P/BL/pw October 2014 2 Proposed Lidl Food Store, Muller Road, Bristol Environmental Noise Report for

More information

Section 10 - Airport Business Zone (Titanium Park)

Section 10 - Airport Business Zone (Titanium Park) 10.1 Introduction 10.1.1 The Hamilton International Airport (the Airport) is a facility of economic and social importance to the Waikato Region. The Airport Business Zone associated with it (Titanium Park)

More information