1 SAFEEND P4 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE Doc. No.: SafeEnd P4 - Rev. A

2 Working Description Prepared by: Fredrik Sangö Doc. no.: SafeEnd P4 Introduction/data: SafeEnd P4 is a terminal tested according ENV 37-4, performance class P4. Performance class P4 Permanent lateral displacement (approach side) X Permanent lateral displacement (departure side) Y Exit box Z ASI value. Impact severity class B The installation work can be broken down into the following 0 steps, which will be processed individually in the work description in the order shown below. ) Planning 2) Unloading of material 3) Proprietary inspection 4) Safety 5) Establishment 6) Installation 7) Repairs to zinc damage 8) Demobilisation 9) Repairs 0) Maintenance Chap. includes additional information (Drawings and Declaration of Conformity). Rev. no. Date Signature Reason for revision A Fredrik Sangö Approved by SafeRoad Birsta SafeRoad Birsta AB - Birstavägen 0 - S Sundsbruk - Tel: +46 (0) Fax: +46 (0)

3 SafeEnd P4 Page 3 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION Contents PLANNING UNLOADING OF MATERIAL PROPRIETARY INSPECTION SAFETY ESTABLISHMENT INSTALLATION REPAIRS TO ZINC DAMAGE DEMOBILISATION REPAIRS MAINTENANCE... 7 OTHER INFORMATION... 8

4 SafeEnd P4 Page 4 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION PLANNING It is at this point that the quality and flexibility of the project is determined. Well planned installation routines are a good basis when you are looking to achieve high quality, good logistics, work that is conducted safely and satisfied employees. All the parties involved should have discussed the preconditions for the installation in good time and agreed on how it should be done. It is important that both the client and the contractor are aware of the undertakings that each other have agreed to. These are best coordinated through good contacts. Plan deliveries and installation in a timely manner. All the parties involved must keep each other notified as to any changed circumstances. 2 UNLOADING OF MATERIAL The material is unloaded and suitably placed where the installation is to be carried out. This is to ensure that any unnecessary handling in the workplace can be avoided. Handle the material carefully, use wood pieces as support for material that is not placed on pallets. When unloading, check that the unloaded goods match the delivery note. The goods must be checked to ensure that no damage is present. Non-conformance regarding package quantities or damages must be indicated on the delivery note and the sender must be contacted immediately. 3 PROPRIETARY INSPECTION Assembly personnel are to perform and report, in the appropriate documents, proprietary inspections which must include the minimum of the following points: Inspection points for installation in settings with traffic: The material is checked for damage and quantity following delivery to the worksite The height is checked All bolt joints are fitted and tightened Any minor damage to the galvanizing or painting is treated

5 SafeEnd P4 Page 5 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 4 SAFETY As installation is often performed in a busy setting, the safety aspect is crucial. Temporary barriers (if needed) must be adapted to ensure that installation can be performed without them being removed. 5 ESTABLISHMENT Assembly personnel must be notified or be privy to the conditions prevailing in the workplace by the time of establishment at the latest. 6 INSTALLATION The installation description assumes that the company responsible for the installation has ensured that the assembly personnel have the necessary expertise with regard to the terminal components, terms and bolt dimensions, etc., see drawings in Chap... This information is available in the drawings. These are attached at the end of this description. Each bolt must be tightened with a normal torque. Care should be taken to ensure that any over-tightening is avoided. Setting out: Installation of nail : Before installation can commence, the location for the nail and post must be set out. This requires great accuracy. Setting out is done according to the drawing. NOTE: The dimension runs parallel with the roadway (inclined dimensions). The nail is installed by ramming. The nail is hammer down until the top is dm above ground level. Control point: Check so the twist is less than 0 degrees. If more adjusting by moving the bolts (see picture below) The nail is hammered to ground level. Nail length in asphalt 500 mm, and 2000 mm in gravel.

6 SafeEnd P4 Page 6 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION Installation of posts: The posts can be installed with different methods (depending on the post type and ground condition): Ramming the post Pre-drilled or pre-punched holes. The post must be fitted immediately after hole drilling/punching. Special equipment is needed for pre- punching holes in order to minimize damage in the asphalt and to optimize stability of the post. Note: If the ground where the pre-boring or pre-punched occurs is perceived as loose, the site management must be notified. Installation: Install the pre-mounted terminal to the nail and the post. Install the transition to the connection safety barrier. The terminal is correctly aligned and fully tightened followed by an inspection as specified in Chap 3. Unless different tolerances are specified, ± 20 mm applies for installation. 7 REPAIRS TO ZINC DAMAGE Repairs to any zinc damage in the delivered materials are carried out according to SS/EN-46 and Industry Standard - finishing and repairs. Zinc damage must be treated as follows: Scratches and elongated spots narrower than 2 mm and less than 0 cm 2. No action required. Damage wider than 2 mm and less than 3.6x3.6 cm (or less than 0 cm 2 ) must be rectified by painting with zinc-rich paint. It is also possible to use a suitable zinc paste, zinc flakes or alloyed sticks. Before any repairs are made, clean with a stainless steel brush. Damages larger than 0 cm 2 must be re-galvanized. 8 DEMOBILISATION Inspection regarding heights and general visual impression. A proprietary inspection in accordance with point 3 must be conducted and completed, and copies forwarded to the client (customer).

7 SafeEnd P4 Page 7 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION 9 REPAIRS All damaged material must be replaced immediately. Damage means that the steel is weakened such as deep scratches, rips, creases and suchlike. Damaged material must be replaced with genuine parts. Replacing damaged components following a collision is no different from a normal installation besides the disassembly operation. Bear in mind that there may be a lot of tension in the safety barrier that has been hit. 0 MAINTENANCE A minimum of maintenance includes rinsing with clean water where necessary followed by a visual inspection for damage.

8 SafeEnd P4 Page 8 SafeEnd P4 - Rev. A INSTALLATION, REPAIRS AND MAINTENANCE WORKING DESCRIPTION OTHER INFORMATION. Drawings: Page Declaration of Conformity: Page 4

9 SafeEnd 07 Copyright Birstaverken AB HEIGHT ACC. TO CONNECTING SYSTEM CONNECTING SYSTEM SINGLE SIDED PROFILE-A (W-PROFILE) HEIGHT 700 / 750 MM B ( : 5 ) A ( : 5 ) 33 E ( : 5 ) RIGHT MOUNTED D ( : 5 ) LEFT MOUNTED REGULATIONS C ( : 5 ) ENV 37-4 EN ISO 46 (HOT DIP GAVANIZING) / RSK750.5BL A (ASSAMBLED) / CONNECTION ~700 M6M M6 7x34 M6x50 3x24x4 M2x30 C M6M M20 2x36 M20x / 500 B ADDITIONAL INFORMATION 2 SafeEnd SIDE CAP PE 0 6 HEX NUT M6 9 2 WASHER ROUND 8 6 BOLT M6 7 CONNECTION REVERSIBLE 6.3 WASHER ROUND TBRUB 6.2 SCREW M2 6. CONNECTOR PLATE 6 C-POST 40x HEX NUT M WASHER ROUND 3 2 CARRIAGE BOLT M20 2 Birsta "Nail" ANCHOR TUBE Birsta SafeEnd ASSEMBLY DRAWING In Review E 3 D SafeEnd ~ A 4 Design. GLN Drawn Copied Checked Stand. Appr. Scale Replaces Replaced by GLN 507,9 kg Date Drawing no. Rev. SafeEnd 07 Birsta SafeEnd P4 PROFILE-A LEFT/RIGHT a SAFEROAD company OPTION: PLASTIC COVER MOUNTED ON SITE WITH 6x MAURUTEX SCREW A2 M5,5x20. CAN BE PROVIDED WITH VARIOUS TYPE OF REFLEX, POINTING TO RIGHT, LEFT OR MIDDLE EX. PERFOMANCE LEVEL: P4 IMPACT SEVERITY LEVEL: B LATERAL DISPLACEMENT CLASS: D. REDIRECTION ZONE: Z. IN PART LIST STANDS FOR HOT DIP GALVANIZING ACCORDING TO EN ISO 46 BOLT, SCREWS & NUTS ACC. TO EN ISO 0648 Page ~ 295

10 SafeEnd 08 Copyright Birstaverken AB L=2000 IN GRAVEL L=500 IN ASPHALT HEIGHT ACC. TO CONNECTING SYSTEM CONNECTING SYSTEM DOUBLE PROFILE-A (W-PROFILE) HEIGHT 700 / 750 MM B ( : 5 ) CONNECTION ~700 REGULATIONS A ( : 5 ) D ( : 5 ) ENV 37-4 EN ISO 46 (HOT DIP GAVANIZING) C ( : 5 ) / RSK750.5BL A (ASSAMBLED) / D M6M M6 7x34 M6x50 C ADDITIONAL INFORMATION 3 3x24x4 M2x30 M6M M20 2x36 M20x / SafeEnd SIDE CAP PE 0 6 HEX NUT M6 9 2 WASHER ROUND 8 6 BOLT M6 7 CONNECTION DOUBLE 6.3 WASHER ROUND TBRUB 6.2 SCREW M2 6. CONNECTOR PLATE 6 C-POST 40x HEX NUT M WASHER ROUND 3 2 CARRIAGE BOLT M20 2 Birsta "Nail" ANCHOR TUBE Birsta SafeEnd ASSEMBLY DRAWING In Review B SafeEnd ~ A Design. GLN Drawn Copied Checked Stand. Appr. Scale Replaces Replaced by GLN 57,4 kg Date Drawing no. Rev. SafeEnd 08 Birsta SafeEnd P4 PROFILE-A DOUBLE a SAFEROAD company OPTION: PLASTIC COVER MOUNTED ON SITE WITH 6x MAURUTEX SCREW A2 M5,5x20.. IN PART LIST STANDS FOR HOT DIP GALVANIZING ACCORDING TO EN ISO 46 BOLT, SCREWS & NUTS ACC. TO EN ISO 0648 CAN BE PROVIDED WITH VARIOUS TYPE OF REFLEX, POINTING TO RIGHT, LEFT OR MIDDLE EX. PERFOMANCE LEVEL: P4 IMPACT SEVERITY LEVEL: B LATERAL DISPLACEMENT CLASS: D. REDIRECTION ZONE: Z Page 0 7 ~ 295

11 SafeEnd 09 Copyright Birstaverken AB L=2000 IN GRAVEL L=500 IN ASPHALT B ( : 5 ) A ( : 5 ) HEIGHT ACC. TO CONNECTING SYSTEM CONNECTING SYSTEM SINGLE SIDED PROFILE-B HEIGHT 700 / 750 MM 28 E ( : 5 ) RIGHT MOUNTED D ( : 5 ) LEFT MOUNTED REGULATIONS CONNECTION ~700 C ( : 5 ) / RSK750.5BL A (ASSAMBLED) / M6M M6 7x34 M6x50 C ENV 37-4 EN ISO 46 (HOT DIP GAVANIZING) 3x24x4 M2x30 M6M M20 2x36 M20x / SafeEnd SIDE CAP PE 0 6 HEX NUT M6 9 2 WASHER ROUND 8 6 BOLT M6 7 CONNECTION REVERSIBLE 6.3 WASHER ROUND TBRUB 6.2 SCREW M2 6. CONNECTOR PLATE 6 C-POST 40x HEX NUT M WASHER ROUND 3 2 CARRIAGE BOLT M20 2 Birsta "Nail" ANCHOR TUBE Birsta SafeEnd ASSEMBLY DRAWING In Review E ADDITIONAL INFORMATION D B SafeEnd ~ A Drawn GLN Copied Design. GLN Stand. Scale Checked Appr. Replaces Replaced by 508, kg Date Drawing no. Rev. SafeEnd 09 Birsta SafeEnd P4 PROFILE-B LEFT/RIGHT a SAFEROAD company OPTION: PLASTIC COVER MOUNTED ON SITE WITH 6x MAURUTEX SCREW A2 M5,5x20. CAN BE PROVIDED WITH VARIOUS TYPE OF REFLEX, POINTING TO RIGHT, LEFT OR MIDDLE EX. PERFOMANCE LEVEL: P4 IMPACT SEVERITY LEVEL: B LATERAL DISPLACEMENT CLASS: D. REDIRECTION ZONE: Z. IN PART LIST STANDS FOR HOT DIP GALVANIZING ACCORDING TO EN ISO 46 BOLT, SCREWS & NUTS ACC. TO EN ISO 0648 Page 30 7 ~ 295

12 SafeEnd 0 Copyright Birstaverken AB L=2000 IN GRAVEL L=500 IN ASPHALT HEIGHT ACC. TO CONNECTING SYSTEM CONNECTING SYSTEM DOUBLE SIDED PROFILE-B HEIGHT 700 / 750 MM B ( : 5 ) CONNECTION ~700 REGULATIONS A ( : 5 ) D ( : 5 ) ENV 37-4 EN ISO 46 (HOT DIP GAVANIZING) C ( : 5 ) / RSK750.5BL A (ASSAMBLED) / D M6M M6 7x34 M6x50 C ADDITIONAL INFORMATION 3 3x24x4 M2x30 M6M M20 2x36 M20x / SafeEnd SIDE CAP PE 0 6 HEX NUT M6 9 2 WASHER ROUND 8 6 BOLT M6 7 CONNECTION 6.3 WASHER ROUND TBRUB 6.2 SCREW M2 6. CONNECTOR PLATE 6 C-POST 40x HEX NUT M WASHER ROUND 3 2 CARRIAGE BOLT M20 2 Birsta "Nail" ANCHOR TUBE Birsta SafeEnd ASSEMBLY DRAWING In Review B SafeEnd ~ A Drawn GLN Copied Design. GLN Stand. Scale Checked Appr. Replaces Replaced by N/A Date Drawing no. Rev. SafeEnd 0 Birsta SafeEnd P4 PROFILE-B DUBLE a SAFEROAD company OPTION: PLASTIC COVER MOUNTED ON SITE WITH 6x MAURUTEX SCREW A2 M5,5x20.. IN PART LIST STANDS FOR HOT DIP GALVANIZING ACCORDING TO EN ISO 46 BOLT, SCREWS & NUTS ACC. TO EN ISO 0648 CAN BE PROVIDED WITH VARIOUS TYPE OF REFLEX, POINTING TO RIGHT, LEFT OR MIDDLE EX. PERFOMANCE LEVEL: P4 IMPACT SEVERITY LEVEL: B LATERAL DISPLACEMENT CLASS: D. REDIRECTION ZONE: Z Page 2 7 ~ 295

13 SafeEnd Copyright Birstaverken AB L=2000 IN GRAVEL L=500 IN ASPHALT HEIGHT ACC. TO CONNECTING SYSTEM± CONNECTING SYSTEM ER OBB HEIGHT 720±30 MM B ( : 5 ) CONNECTION ~544 A ( : 5 ) C C(:5) A 2 SafeEnd SIDE CAP PE / RSK750.5BL 0 6 HEX NUT M6 M6M M WASHER ROUND 7x BOLT M6 M6x CONNECTION 6.3 WASHER ROUND TBRUB 3x24x SCREW M2 M2x CONNECTOR PLATE C-POST 40x A (ASSAMBLED) 5 2 HEX NUT M20 M6M M WASHER ROUND 2x CARRIAGE BOLT M20 M20x Birsta "Nail" ANCHOR TUBE 2000 / / Birsta SafeEnd ASSEMBLY DRAWING In Review B SafeEnd ~ REGULATIONS ENV 37-4 EN ISO 46 (HOT DIP GAVANIZING) ADDITIONAL INFORMATION Design. GLN Drawn Copied Checked Stand. Appr. Scale Replaces Replaced by GLN 525, kg Date Drawing no. Rev. SafeEnd Birsta SafeEnd P4 ER OBB a SAFEROAD company OPTION: PLASTIC COVER MOUNTED ON SITE WITH 6x MAURUTEX SCREW A2 M5,5x20. CAN BE PROVIDED WITH VARIOUS TYPE OF REFLEX, POINTING TO RIGHT, LEFT OR MIDDLE EX.. IN PART LIST STANDS FOR HOT DIP GALVANIZING ACCORDING TO EN ISO 46 BOLT, SCREWS & NUTS ACC. TO EN ISO PERFOMANCE LEVEL: P4 IMPACT SEVERITY LEVEL: B LATERAL DISPLACEMENT CLASS: D. REDIRECTION ZONE: Z Page ~ 295

14 Page 4 Supplier s Declaration of Conformity No: SafeEnd P4 terminal Issuer s name: Birstaverken AB Issuer s address: Box 30 SE Sundsbruk Sweden Object of the declaration: SafeEnd P4 terminal The object of the declaration described above is in conformity with the requirements of the following documents: Document No. Edition/Date of issue ENV 37-4 November 200 EN ISO 46 April 2009 Additional information: Performance level: P4 Impact severity level: B Lateral Displacement Class: D. Redirection zone: Z Durability: according to EN ISO 46 Signed for and on behalf of: Birstaverken AB Sundsvall, Fredrik Sangö Senior Technical Adviser Post address City Country Visit address Telephone Fax Web Box 30 Sundsvall Sweden Birstavägen

15 Main Office SafeRoad Birsta AB Birstavägen 0 Box Sundsbruk Sweden Tel: Fax: Arboga Office Kapellgatan 29 Box Arboga Sweden Borås Office Viaredsvägen Borås Sweden

BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE. Doc. No.: Birsta 1P N2 - Rev. 0

BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE. Doc. No.: Birsta 1P N2 - Rev. 0 BIRSTA 1P N2 WORKING DESCRIPTION INSTALLATION, REPAIRS AND MAINTENANCE Doc. No.: Birsta 1P N2 - Rev. 0 Working Description Prepared by: Fredrik Sangö Doc. no.: Birsta 1P N2 Introduction/data: Birsta 1P

More information

ASSEMBLY INSTRUCTIONS

ASSEMBLY INSTRUCTIONS ASSEMBLY INSTRUCTIONS for the vehicle barrier system KREMSBARRIER 2 RH2B for pile-drivable subgrades Performance class in accordance with EN 1317-2: Containment level: Impact severity level: Working width:

More information

Monoline. Mid barrier Installation manual. Leverandør: Vik: 6893 Vik i Sogn. Ørsta: Skorgeura 6150 Ørsta

Monoline. Mid barrier Installation manual. Leverandør: Vik: 6893 Vik i Sogn. Ørsta: Skorgeura 6150 Ørsta Mid barrier Installation manual Leverandør: Vik: 6893 Vik i Sogn Tlf: +47 57 69 86 50 Faks: +47 57 69 86 60 firmapost@vikorsta.no Ørsta: Skorgeura 6150 Ørsta Tlf: +47 70 04 70 00 Faks: +47 70 04 70 04

More information

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB

801-MORD Mordred FIXING: Ground. ORDER No: CUSTOMER: Complied by Date AB 30/06/15 ISSUE ECN DATE SIGN /07/15 AB CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Complied by Date 0/0/5 ISSUE ECN DATE SIGN 0 7 0/07/5 CUSTOMER: 0-MORD Mordred ORDER No: FIXING: Ground Low tower.m single slide Low scramble net High

More information

Installation Instructions Easy Climb 1 Art

Installation Instructions Easy Climb 1 Art Installation Instructions Easy Climb 1 Art. 4591-40-1 Operator: Location: Revision history Revision 0 2009-08-21 The first allowed version Assembly instruction Revision 1 2011-08-12 B25 in C25/30 u. Fallschutz

More information

Huck Seiltechnik GmbH Aßlar/Berghausen Germany

Huck Seiltechnik GmbH Aßlar/Berghausen Germany Seiltechnik GmbH 35614 Aßlar/Berghausen Germany A Assembly Instructions Arch Swing with Buried Ground Anchors Art-No. 4580-4B Operator: Location: T:\PLAY\Play Installation Instructions\Word Document Install

More information

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION

More information

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL)

ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) ITEM 686 TRAFFIC SIGNAL POLE ASSEMBLIES (STEEL) 686.1. Description. This Item shall govern for designing, fabricating, furnishing and erecting steel traffic signal pole assemblies of the various types

More information

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 772 NOVEMBER 2010 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 772.01 SCOPE 772.02 REFERENCES 772.03 DEFINITIONS 772.04 DESIGN

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Sign & Post Installation. Standard Specifications and Standard Drawings. July 2017 Edition

Sign & Post Installation. Standard Specifications and Standard Drawings. July 2017 Edition Standard Specifications Sign & Post Installation Utility Services Department 500 George Street North, Peterborough, Ontario, K9H 3R9 Transportation Division Telephone: 705-742-7771 Fax: 705-876-4621 Sign

More information

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2) Installation Manual Orion TL-3 Steel Barrier VHD (v2) 300914 Table of Contents Orion Introduction.......... 3 Limitations & Warnings. 4 Before Installation..... 3 System Design & Design Considerations

More information

distribution Modular Scaffolding

distribution Modular Scaffolding Modular Scaffolding Modular scaffolding PDM Universal scaffolding system plettac-pl PDM Application A characteristic feature of plettac PDM system is the use of wedge joint which provides quick and safe

More information

TRACC. Crash Attenuation Cushion. Product Manual

TRACC.  Crash Attenuation Cushion. Product Manual TRACC Crash Attenuation Cushion Product Manual Release 08/16 TRACC is licensed to Ingal Civil Products by Trinity Industries Inc. of the U.S.A. www.ingalcivil.com.au TRACC Crash Attenuation Cushion 1.0

More information

TRACC. Product Manual. Crash attenuation cushion. Release 10/14

TRACC.  Product Manual. Crash attenuation cushion. Release 10/14 TRACC Crash attenuation cushion Product Manual Release 10/14 TRACC is licensed to Ingal Civil Products by Trinity Industries Inc. of the U.S.A. www.ingalcivil.com.au TRACC Crash attenuation cushion 1.0

More information

Conergy SolarFamulus II

Conergy SolarFamulus II Conergy SolarFamulus II Installation manual www.conergy.com Table of Contents Table of Contents SolarFamulus II for universal use on flat roofs 1 Introduction 1 1.1 Short description 1 1.2 Intended use

More information

Aqua Swing Tub Door & EX/RT Panel

Aqua Swing Tub Door & EX/RT Panel Aqua Swing Tub Door & EX/RT Panel TUB DOOR AND PANEL INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest

More information

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4" x 4" x 3/8" Brace. C8 x 4.25 Strut. WT9 x 17.5.

D D TYPE A1, A2 & B MICHIGAN DEPARTMENT OF TRANSPORTATION 5-40 CONNECTION. L4 x 4 x 3/8 Brace. C8 x 4.25 Strut. WT9 x 17.5. Sign length minus Adjust to avoid interference with sign legend A Deck fascia A 6" Equal Equal 6" Sign length (L) varies 6 to 12 PLAN 0 CONNECTION (DECK FASCIA) Angle connection assembly F Face of concrete

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Structural Steel as shown and detailed on the Drawings

More information

Deck Designer Specification Kit For AZEK. All rights reserved copyright 2015 AZEK Building Products

Deck Designer Specification Kit For AZEK.  All rights reserved copyright 2015 AZEK Building Products Deck Designer Specification Kit For AZEK All rights reserved copyright 205 AZEK Building Products Deck layout diagram Top view without planks Bottom view with planks Top view with planks Page 2 Permit

More information

Product Manual Release 05/17

Product Manual Release 05/17 Temporary Safety Barrier (TL-2 MASH) Product Manual VHD (v3) www.valmonthighway.com Table of Contents 1.0 ArmorZone Introduction... 3 2.0 Before Installation... 3 3.0 Limitations & Warnings... 3 4.0 System

More information

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL

CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 906 FEBRUARY 1993 CONSTRUCTION SPECIFICATION FOR STRUCTURAL STEEL 906.01 SCOPE 906.02 REFERENCES 906.03 DEFINITIONS TABLE OF CONTENTS 906.04 SUBMISSION

More information

Introduction Introduction

Introduction Introduction Introduction Maritime International is a leading manufacturer of marine bollards and cleats worldwide. Our range of bollards and cleats is unsurpassed by any other manufacturer or supplier. Maritime can

More information

I-GUIDE SAFEPASS ROAD BARRIER SAFETY SOLUTIONS JONSEREDS 1/12 IG-SAFEPASS ROAD BARRIER-1710

I-GUIDE SAFEPASS ROAD BARRIER SAFETY SOLUTIONS JONSEREDS 1/12 IG-SAFEPASS ROAD BARRIER-1710 I-GUIDE SAFEPASS ROAD BARRIER IG-SAFEPASS ROAD BARRIER-1710 1/12 SAFEPASS GENERAL About SafePass Road Barrier SafePass Road Barrier is intended for use as work zone protection where a longitudinal road

More information

CITY OF FARGO SPECIFICATIONS SIGNING

CITY OF FARGO SPECIFICATIONS SIGNING SIGNING PART 1 DESCRIPTION OF WORK The work to be done under this section of the Specifications and the accompanying plans consists of furnishing all labor, material and accessories necessary to complete

More information

APPLIANCE INDUSTRY AUTOMATED SOLUTIONS AND TOOLING FOR APPLIANCE MANUFACTURING FORMING JOINING FABRICATING ASSEMBLY. Manufacturing Your Success

APPLIANCE INDUSTRY AUTOMATED SOLUTIONS AND TOOLING FOR APPLIANCE MANUFACTURING FORMING JOINING FABRICATING ASSEMBLY. Manufacturing Your Success APPLIANCE INDUSTRY AUTOMATED SOLUTIONS AND TOOLING FOR APPLIANCE MANUFACTURING FORMING JOINING FABRICATING ASSEMBLY Manufacturing Your Success MANUFACTURING SOLUTIONS FOR The first flexible and modular

More information

Mounting systems for solar technology

Mounting systems for solar technology Mounting systems for solar technology ASSEMBLY INSTRUCTIONS S-DOME SYSTEM GB TABLE OF CONTENTS TABLE OF CONTENTS THE COMPANY SAFETY REGULATIONS MATERIALS REQUIRED TOOLS REQUIRED ASSEMBLY 3 4 5 8 9 Table

More information

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier

Section 2 Supplemental Specification 2.11 High Tension Cable Barrier 2.11 HIGH TENSION CABLE BARRIER 2.11.1 GENERAL This Work consists of the supply, installation, removal, disposal and reinstallation of High Tension Cable Barrier (HTCB) system. 2.11.2 DEFINITIONS AND INTERPRETATION

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

Tnemec 394 Proprietary Long Form Coatings Schedule

Tnemec 394 Proprietary Long Form Coatings Schedule 1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following

More information

Notes Changed note Date. 1 (A) Changed template 09 / 07 / 2008

Notes Changed note Date. 1 (A) Changed template 09 / 07 / 2008 Revisions Notes Changed note Date 1 (A) Changed template 09 / 07 / 2008 2 Changed template. Clause 12.5.4.1 hot-rolled steel added. Clause 12.5.4.2, 12.5.2.4, 12.5.3.4, 12.5.4.4, 12.5.5.4, 12.5.6.4, 12.5.7.4

More information

Model # 238-U6. 5/24/2013 Page 1 of 11

Model # 238-U6. 5/24/2013 Page 1 of 11 Model # 238-U6 5/24/2013 Page 1 of 11 /24/2013 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

Shackles. Applications. Range. Design. CAD drawings. Finish

Shackles. Applications. Range. Design. CAD drawings. Finish Applications Shackles are used in lifting and static systems as removable links to connect (steel) wire rope, chain and other fittings. Screw pin shackles are used mainly for non-permanent applications.

More information

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual

Aegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual Installation Manual Aegis Heavy Capacity 20K Floor Scale MODEL: 6200 Series Copyright 1997-2014 Fairbanks Scales, Inc. Revision 3 50637 All Rights Reserved 07/14 Aegis Heavy Capacity 20K Floor Scale Model:

More information

Safety Ladders: Made of Aluminium

Safety Ladders: Made of Aluminium Y-Spar Anodized aluminium alloy ladder. Guide-rail profile: 52 x 51 mm. Comes with joint plate. Mounting brackets extra to order. Mounting distance: recommended 1400 mm - max. 1680 mm. Installation of

More information

NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings

NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings Version:- 5.0 Date of Issue:- July 2017 Page 1 of 12 NPS/001/024 Technical Specification for Low Voltage Aerial Bundled Conductor Fittings 1. Purpose The purpose of this document is to outline the technical

More information

Platform stair lift PLG7

Platform stair lift PLG7 Platform stair lift PLG7 ORIGINAL-user manual Part 2: Assembly Instruction English Version 2.00 ASCENDOR GMBH Drautendorf 48 4174 Niederwaldkirchen Austria Tel.: +43 7231 40040 Fax: +43 7231 40040-590

More information

FASTENERS FOR THE AGRICULTURAL INDUSTRY

FASTENERS FOR THE AGRICULTURAL INDUSTRY FASTENERS FOR THE AGRICULTURAL INDUSTRY 2 Fully-automated warehouse logistics About REYHER Today, with 130 years experience REYHER is one of the leading trading companies for fasteners and fixing technology

More information

TIMBER REFLECTIVE NOISE BARRIER - ACOUSTIC FENCING. Acoustic Barriers. Gramm Barrier Systems Registered in England and Wales No:

TIMBER REFLECTIVE NOISE BARRIER - ACOUSTIC FENCING. Acoustic Barriers. Gramm Barrier Systems Registered in England and Wales No: TIMBER REFLECTIVE NOISE BARRIER - ACOUSTIC FENCING Acoustic Barriers Gramm Barrier Systems Registered in England and Wales No: 05836133 We have put a lot of thought into our noise barrier range and have

More information

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS

SECTION MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS SECTION 11000 MECHANICAL EQUIPMENT - GENERAL REQUIREMENTS PART 1 - GENERAL 1.1 DESCRIPTION A. This section contains general information required to install mechanical equipment as shown on the plans and

More information

American Metal Specialties, Inc.

American Metal Specialties, Inc. American Metal Specialties, Inc. www.cablerailings.com (253) 272-9344 (253) 627-3843 Fax PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 05 73 00 STAINLESS STEEL ORNAMENTAL HANDRAILS AND RAILINGS For best

More information

ArmorZone TL-2 Barrier and End Treatment

ArmorZone TL-2 Barrier and End Treatment ArmorZone TL-2 Barrier and End Treatment Product and Installation Manual ANOTHER AMORFLEX DEVELOPMENT Table of contents Introduction 3 System Overview 3 Before Installation 3 Limitations and Warnings 4

More information

SHORING & UNDERPINNING 02250

SHORING & UNDERPINNING 02250 Subsidiary of Hubbell Power Systems 210 North Allen St. Centralia, MO 65240 Phone: (573) 682-8414 Fax: (573) 682-8660 E-mail: hpscontact@hps.hubbell.com www.abchance.com This MANU-SPEC utilizes the Construction

More information

SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS

SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS Page no. :1 of 11 SPECIFICATION: LINE TAPS FOR ALUMINIUM/ACSR AND COPPER CONDUCTORS Prepared by: Eng. T. Lev (-חתום-) Checked by: I. Bester (-חתום (- Approved by: Eng. Y. Samoocha (-חתום (- 1 Page no.

More information

SECTION 716 SIGN MATERIALS SCOPE

SECTION 716 SIGN MATERIALS SCOPE 716 716.01.01 MATERIALS COVERED SECTION 716 SIGN MATERIALS SCOPE A. This specification covers the kind and quality of materials used in the construction and fabrication of traffic control devices used

More information

ETALLODOMI S.A. Head Office: 12, Kastorias str Athens GREECE. Main Warehouse: 49, Agiou Orous str. GREECE

ETALLODOMI S.A. Head Office: 12, Kastorias str Athens GREECE. Main Warehouse: 49, Agiou Orous str. GREECE About the company... METALLODOMI S.A. was founded in 1995 and since then is experiencing a constant growth. The company operates primarily in steel sheet processing sector and in particular the production

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION COLD-FORMED METAL FRAMING

SECTION COLD-FORMED METAL FRAMING SECTION 05400 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section shall include all materials and installation necessary to provide all cold formed metal framing. B. This Section includes:

More information

SECTION CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Use this section in specifying permanent chain

More information

Electrical Metallic Tubing (EMT) Fittings

Electrical Metallic Tubing (EMT) Fittings Suggested Specifications for Electrical Metallic Tubing (EMT) Fittings Series 2 Insulated EMT Connector (Raintight) (Compression Type) Series 20 EMT Coupling (Raintight) (Compression Type) Series 0 Pipe

More information

AS/NZS 5131:2016. Australian/New Zealand Standard. Structural steelwork Fabrication and erection AS/NZS 5131:2016

AS/NZS 5131:2016. Australian/New Zealand Standard. Structural steelwork Fabrication and erection AS/NZS 5131:2016 AS/NZS 5131:2016 Australian/New Zealand Standard Structural steelwork Fabrication and erection AS/NZS 5131:2016 AS/NZS 5131:2016 This joint Australian/New Zealand standard was prepared by joint Technical

More information

Originally Issued: 02/11/2011 Revised: 02/23/2018 Valid Through: 02/28/2019

Originally Issued: 02/11/2011 Revised: 02/23/2018 Valid Through: 02/28/2019 MITEK USA, INC. USP HOLDOWN AND TENSION-TIE CONNECTORS CSI Section: 06 05 23 Wood, Plastic and Composite Fastenings 1.0 RECOGNITION MiTek USA, Inc. USP holdown and tension-tie connectors recognized in

More information

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS

CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS CARROLL COUNTY BUREAU OF PERMITS AND INSPECTIONS RESIDENTIAL CODE COMPLIANCE GUIDELINES FOR DECKS Code Reference: Chapter 97, Code of Public Local Laws and Ordinances of Carroll County and The International

More information

Originally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019

Originally Issued: 03/08/2013 Revised: 03/14/2017 Valid Through: 03/31/2019 EVALUATION SUBJECT: ALUR DIVIDING WALL REPORT HOLDER: Modular Architectural Interiors LLC dba MAI 330 Waterloo Valley Road Mount Olive, NJ 07828 Phone: (973) 446-2300 Fax: (973) 446-2399 www.maispace.com

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES SECTION 32 31 19 SPEC WRITER NOTE: Use this section only for NCA projects. Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section

More information

Model # 362S-RDP. 9/17/2012 Page 1 of 12

Model # 362S-RDP. 9/17/2012 Page 1 of 12 Model # 362S-RDP 9/17/2012 Page 1 of 12 9/17/2012 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

Fall Protection Guardrails

Fall Protection Guardrails Fall Protection Guardrails XTP Installation Manual English - Fall Protection XTP Installation Manual - Version 3.0 Contents Fall Protection Guardrails 1.0 Introduction 2 1.1 Fall Protection by XSPlatforms

More information

SECTION ROOF SPECIALTIES

SECTION ROOF SPECIALTIES PART 1 - GENERAL 1.1 DESCRIPTION SECTION 07 71 00 1. Use this section only for NCA projects. 2. Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

SIMPSON STRONG-TIE LIEBIG MECHANICAL ANCHOR SYSTEM SEISMIC TESTING AND ASSESSMENT IN ACCORDANCE WITH ACI

SIMPSON STRONG-TIE LIEBIG MECHANICAL ANCHOR SYSTEM SEISMIC TESTING AND ASSESSMENT IN ACCORDANCE WITH ACI SIMPSON STRONG-TIE LIEBIG MECHANICAL ANCHOR SYSTEM SEISMIC TESTING AND ASSESSMENT IN Final Report WJE No. 2009.3396 Prepared for: Simpson Strong-Tie Ireland Ltd. Prepared by: Wiss, Janney, Elstner Associates,

More information

Electrical Metallic Tubing (EMT) Fittings

Electrical Metallic Tubing (EMT) Fittings Suggested Specifications for Electrical Metallic Tubing (EMT) Fittings Series 2 Insulated EMT Connector (Raintight) (Compression Type) Series 20 EMT Coupling (Raintight) (Compression Type) Series 0 Pipe

More information

660 Volts 630 & 800AMP

660 Volts 630 & 800AMP Ergon Energy Corporation Limited Technical Specification for Switch- Disconnectors and Fuse-Switch- Disconnectors 660 Volts 630 & 800AMP ETS-06-02-01 Check this is the latest Process Zone version before

More information

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION

SECTION SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION SECTION 16-372 SUBSTATION BUS ASSEMBLIES ERGLE SUBSTATION 1. GENERAL SPECIFICATIONS The work of this Section includes furnishing all labor, equipment, materials (unless specifically identified as Owner-furnished)

More information

NON-CLEANING AND OPTIMIZED FOR CORROSIVE ENVIRONMENTS. Hilti HIT-Z-F and HIT-HY 200 ultimate performance chemical anchor system

NON-CLEANING AND OPTIMIZED FOR CORROSIVE ENVIRONMENTS. Hilti HIT-Z-F and HIT-HY 200 ultimate performance chemical anchor system NON-CLEANING AND OPTIMIZED FOR CORROSIVE ENVIRONMENTS Hilti HIT-Z-F and HIT-HY 200 ultimate performance chemical anchor system ULTIMATE PERFORMANCE THAT LASTS Hilti HIT-Z-F corrosion-resistant anchor rod

More information

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols. VIGO INDUSTRIES INSTALLATION GUIDE FOR STANDING SHOWER CABIN (MODEL VG06062) SAFETY PRECAUTIONS This Installation Guide uses the following symbols to indicate important information. Always observe the

More information

European Technical Assessment ETA-10/0422 of 08/01/2016

European Technical Assessment ETA-10/0422 of 08/01/2016 ETA-Danmark A/S Göteborg Plads 1 DK-2150 Nordhavn Tel. +45 72 24 59 00 Fax +45 72 24 59 04 Internet www.etadanmark.dk Authorised and notified according to Article 29 of the Regulation (EU) No 305/2011

More information

Aluminium VGAN 500 Series Vehicle Restraint System Specification Manual.

Aluminium VGAN 500 Series Vehicle Restraint System Specification Manual. Aluminium VGAN 500 Series Vehicle Restraint System Specification Manual. Varley and Gulliver Limited. Page 1 of 22 VGAN 500 CONTENTS SECTION A Specification Manual. 1.0 List of Drawings:... 5 1.1 System

More information

SPECIFICATION FOR REINFORCED SOIL WALL

SPECIFICATION FOR REINFORCED SOIL WALL SPECIFICATION FOR REINFORCED SOIL WALL 1.0 EXTENT OF WORK The work shall consist of Reinforced Soil walls built in accordance with this specification and in conformity with the lines, levels and details

More information

Model # BT238-U6. 9/30/2014 Page 1 of 12

Model # BT238-U6. 9/30/2014 Page 1 of 12 Model # BT238-U6 9/30/2014 Page 1 of 12 /30/2014 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information

TITEN HD Heavy Duty Screw Anchor for Concrete & Masonry

TITEN HD Heavy Duty Screw Anchor for Concrete & Masonry TITEN HD Heavy Duty Screw Anchor for & Masonry The Titen HD is a patented, high-strength screw anchor for concrete and masonry. The self-undercutting, non-expansion characteristics of the Titen HD makes

More information

IBC Compliant Seismic Rated Isolators

IBC Compliant Seismic Rated Isolators ISOLATORS IBC Compliant Seismic Rated Isolators Features & Benefits Rugged steel housing is designed to handle high wind and seismic forces. Housing serves as blocking during equipment erection. Top plate

More information

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED

TS 805 POLES TTS CONSTRUCTION SPECIFICATION FOR POLE INSTALLATION TTS MATERIAL SPECIFICATION FOR STEEL POLES BASE MOUNTED TORONTO TRANSPORTATION January 2012 TS 805 POLES TABLE OF CONTENTS 1. DRAWINGS TTD 805.001 POLE HANDHOLE ORIENTATION DETAILS TTD 805.005 WOOD POLE IN EARTH TTD 805.010 BACK GUY MOUNTING DETAILS TTD 805.015

More information

Installation instructions LORO-DRAINJET. siphonic scupper drainage system with clamping flange, without roof penetration

Installation instructions LORO-DRAINJET. siphonic scupper drainage system with clamping flange, without roof penetration LORO-DRAINJET Siphonic scupper drainage systems instructions LORO-DRAINJET siphonic scupper drainage system, without roof penetration and plastic, made of hot-dip galvanised steel, DN 50 and DN 70 LORO-DRAINJET

More information

Connectors. Multi-purpose connecting clamps. Stainless steel cross connectors

Connectors. Multi-purpose connecting clamps. Stainless steel cross connectors Connectors Multi-purpose connecting clamps Thread in lower part With mushroom head bolt and protection against twisting Art. No. Design Pack / Weight 100147 Galvanised steel, 2-part, round/round 100149

More information

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE.

FEATURES APPLICATIONS. Technical data sheet SSW - STEEL STRONG-WALL FOR TIMBER FRAME RACKING RESISTANCE. The Steel Strong-Wall is a corrugated steel panel which is designed to be fixed directly to the concrete foundations of a building, within the external or internal wall, via a bolted connection. FEATURES

More information

Originally Issued: 04/15/2011 Revised: 04/05/2018 Valid Through: 04/30/ Materials

Originally Issued: 04/15/2011 Revised: 04/05/2018 Valid Through: 04/30/ Materials EVALUATION SUBJECT: GREENFASTEN-1-812 AND COMPSLIDE ROOF MOUNT ASSEMBLIES REPORT HOLDER: EcoFasten Solar 4741 W. Polk St., Ste. 4 Phoenix, AZ 85043 (877) 589-3947 brian@ecofastensolar.com CSI DIVISION:

More information

SECTION 552 HELICAL ANCHORS AND HELICAL PILES

SECTION 552 HELICAL ANCHORS AND HELICAL PILES SECTION 552 HELICAL ANCHORS AND HELICAL PILES DESCRIPTION 552.01 This work pertains to furnishing and installing helical anchors and helical piles shown in the Contract in accordance with the Drawings

More information

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA

ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA ASSEMBLY INSTRUCTIONS RESIDENTIAL SOLUTION CROSSRAIL GROUND MOUNT SYSTEM USA TABLE OF CONTENTS TABLE OF CONTENTS SAFETY REGULATIONS MATERIALS REQUIRED ASSEMBLY ENGINEERING DRAWINGS TERMS AND CONDITIONS

More information

1470 Dale Court Austell, GA Phone: Fax:

1470 Dale Court Austell, GA Phone: Fax: 1470 Dale Court Austell, GA 30168 Phone: 404-351-2202 Fax: 404-351-2203 LC METALS, INC. PRODUCT INDEX Page # STUD GUARDS...3 FHA STRAPS...3 BOCA PLATES (Nail Plates)...4 PLUMBERS TAPE (Banding Iron)...4

More information

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS

SECTION HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 HEAVY GLASS TOP HUNG SLIDING BI-FOLD DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED BI-FOLD GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Planning and installation instructions

Planning and installation instructions Planning and installation instructions Stofix Oy Ahlmaninkatu 2 E 40100 Jyväskylä Finland stofixgroup@stofix.com www.stofix.com 2 PLANNING AND INSTALLATION INSTRUCTIONS... 1 1 General... 3 2 Project Design...

More information

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES

CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 615 April 2017 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF POLES TABLE OF CONTENTS 615.01 SCOPE 615.02 REFERENCES 615.03 DEFINITIONS - Not

More information

Operating Instructions

Operating Instructions Operating Instructions A-2600 SERIES AWWA SWING CHECK VALVE 500 West Eldorado Street Decatur, Illinois 62522 www.muellercompany.com! WARNING! 1. Read and follow all pertinent instructions carefully. Proper

More information

HIGH MAST CAMERA POLE ASSEMBLY GENERAL

HIGH MAST CAMERA POLE ASSEMBLY GENERAL 10-3.24 HIGH MAST CAMERA POLE ASSEMBLY GENERAL The Contractor must furnish and install the following equipment for high mast camera pole assembly as described herein and as shown on the plans: 1. Camera

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 3 BEARING PILES TABLE OF CONTENTS 3.1 General... 3-1 3.2 Materials... 3-1 3.2.1 Steel "H" Piling... 3-1 3.2.2 Steel Pipe Piling... 3-1 3.2.3 Timber Piling...

More information

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107

SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SOUTHEASTERN PENNSYLVANIA TRANSPORTATION AUTHORITY 1234 MARKET STREET, PHILADELPHIA, PA 19107 SPECIFICATION FOR PLATFORM RUBBING EDGE ASSEMBLIES FOR 69 TH ST TC, 40 TH ST, 34 TH ST, 2 ND ST, SPRING GARDEN

More information

Stop the damaging effects of foundation settling...

Stop the damaging effects of foundation settling... from Stop the damaging effects of foundation settling... Sinking foundations, cracked and buckled walls and uneven floors are problems commonly faced annually by some quarter-million homeowners. Homes

More information

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year

PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year PART 7 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17 Technical Specification for Overhead and Underground Service Connection works for the Year 2016-17

More information

POST FRAME BUILDING STANDARDS

POST FRAME BUILDING STANDARDS CASS COUNTY, MISSOURI BUILDING CODES, ENVIRONMENTAL HEALTH AND ZONING DEPARTMENT 30508 S. West Outer Road, Harrisonville, MO 64701 P- (816) 380-8134 F- (816) 380-8130 POST FRAME BUILDING STANDARDS 201.3

More information

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

B. Polyethylene samples shall be submitted for Owner approval of color and quality. Glass Rail ENGINEERED DASHERBOARD SPECIFICATIONS PART 1 - GENERAL 1.01 PROJECT SCOPE A. Contractor shall furnish and install one complete set of steel framed dasherboards as indicated on the drawings and

More information

PE/PH. Product Data Parking Pallet. longitudinally shifting. Parking Pallet PE/PH

PE/PH. Product Data Parking Pallet. longitudinally shifting. Parking Pallet PE/PH of 5 Car Parking Pallet PE/PH Warning light or support Product Data Parking Pallet PE/PH longitudinally shifting CONFORMITY DH 9.5 B Direction of movement 32 : All space requirements are minimum finished

More information

TERRATORQUE HELICAL ANCHORS AND HELICAL PILING PRODUCT CATALOG

TERRATORQUE HELICAL ANCHORS AND HELICAL PILING PRODUCT CATALOG INTRODUCTION TERRATORQUE HELICAL ANCHORS AND HELICAL PILING PRODUCT CATALOG TerraTorque offers quality helical anchors and helical piling to the construction industry. Our products are available in solid

More information

Section 906. STRUCTURAL STEEL

Section 906. STRUCTURAL STEEL 906.01 Section 906. STRUCTURAL STEEL 906.01. General Requirements. Finished rolled shapes must be free from imperfections that affect strength and durability in accordance with ASTM A 6. Rolled shapes

More information

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

SECTION BASIC ELECTRICAL MATERIALS AND METHODS SECTION 26 05 05 BASIC ELECTRICAL MATERIALS PART 1 - GENERAL 1.1 SUMMARY A. Section includes the limited scope construction materials and methods for application with electrical installations as follows:

More information

Code Compliance Research Report CCRR-0194

Code Compliance Research Report CCRR-0194 Code Compliance Research Report CCRR-0194 Issued: 09-16-2013 Renewal Due: 09-16-2018 Revised: 10-12-2017 DIVISION: 06 00 00 WOOD, PLASTICS AND COMPOSITES Section: 06 05 23 Wood, Plastic, and Composite

More information

HDI 2200 Choke Position Indicator

HDI 2200 Choke Position Indicator HDI 2200 Choke Position Indicator Operations and Maintenance Manual Rev. 1203 www.houstondigital.com email: sales@houstondigital.com or service@houstondigital.com TABLE OF CONTENTS SECTION 1 SECTION 2

More information

PERI PD 8 The cost-effective shoring for slab tables and high loads

PERI PD 8 The cost-effective shoring for slab tables and high loads PERI PD 8 The cost-effective shoring for slab tables and high loads Edition 06/2010 PERI GmbH Formwork Scaffolding Engineering P.O. Box 1264 89259 Weissenhorn Germany Tel +49 (0)7309.950-0 Fax +49 (0)7309.951-0

More information

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans

Allround Scaffolding. Layher Allround Bridging System Instructions for Assembly and Use. Modular truss system for wide spans Layher Allround Bridging System Instructions for Assembly and Use Modular truss system for wide spans Certification according to DIN ISO 9001/EN 29 001 by TÜV-CERT Allround Scaffolding } CONTENT 1. Introduction...3

More information

Model # 358-R48. 7/7/2011 Page 1 of 11

Model # 358-R48. 7/7/2011 Page 1 of 11 Model # 358-R48 7/7/2011 Page 1 of 11 7/7/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic

More information