1 DESIGN OF PRESSURIZED LIQUID DISTRIBUTION SYSTEM FOR LANDFILL LIQUIDS ADDITION AND AUGMENTATION Xianda Zhao, Ph.D., P.E. CTI and Associates, Inc., Brighton, Michigan USA Morgan Subbarayan, P.E. CTI and Associates, Inc., Brighton, Michigan USA Te-Yang Soong, Ph.D., P.E. CTI and Associates, Inc., Brighton, Michigan USA ABSTRACT Whether a landfill facility is conducting a bioreactor operation with large-scale liquid injection or simply recirculating site-generate leachate, achieving uniform liquid distribution in the waste mass is always a critical operational goal. Several methods of liquid introduction have been adopted by the industry. Of these methods, subsurface lateral injection lines (including perforated plastic pipes) have become standard design for many landfill engineers. The subsurface lateral injection lines not only provide for safe liquid injection, they also allow for the introduction of a large volume of liquid even after the waste mass has reached its permitted grade. Unfortunately, improperly-designed lateral injection lines may result in uneven liquid distribution. Primary concerns associated with uneven distribution include: leachate outbreaks, differential settlements, unstable working surfaces, and sometimes even slope instability. This paper provides methodology for the design of subsurface lateral injection lines, specifically the design of perforated pipes (pipe sizing, perforation sizing and the selection of spacing between perforations). Essential design equations, design principle and criteria will be presented. A design example will also be used to illustrate the step-by-step design procedures. INTRODUCTION During the lifespan of a landfill, moisture in the incoming waste as well as liquid entering the waste mass (in forms of precipitation, snowmelt, surface runoff, and other liquid addition) generates leachate. Leachate carries the characteristics of the waste constituents and needs to be properly contained, collected, removed, treated, and ultimately disposed of safely, in order to protect human health and minimize adverse effects to the environment. Due to the high cost of leachate treatment and disposal, much research has been performed to find alternative uses for leachate that can reduce amounts that must be removed from the landfill. Since as-received waste typically still possesses additional moisture absorptive capacity, reintroducing leachate back into the waste mass (commonly referred as leachate recirculation ) offers an effective way of reducing leachate treatment costs. The actual moisture absorptive capacity remains in the waste mass (sometimes referred moisture deficit ) varies greatly depending on the

2 geographic location, climate, type of waste and other pertinent factors. For landfill sites that are located in arid or semi-arid areas and for landfills that receive large amount of incoming waste volume, the remaining moisture absorptive capacity can be very significant. Such large amount of absorptive capacity represents an immense cost-saving potential for landfill owners and operators due to the circumvention of leachate disposal and treatment. In fact, reintroducing collected leachate is widely practiced in the municipal solid waste (MSW) landfills in the United States nowadays. In addition to cost savings, re-introducing leachate offers additional advantages in the operation of MSW landfills. For example, greater moisture content will increase waste compaction therefore increasing the filling capacity and consequently, service life of the facility. Furthermore, increased moisture promotes and accelerates biological decomposition of organic wastes, which will yield more reusable volume. Ultimately, decomposed wastes are biologically-stabilized which greatly reduces the long-term adverse impacts to human health and environment. Recently, bioreactor landfills have been designed, constructed, and operated at a number of commercial and municipal facilities throughout the United States. In bioreactor landfills, moisture content in the waste material is quickly increased to an elevated level to allow for the initiation of biological decomposition processes at a relatively early stage of waste filling. To achieve this goal, a large amount of liquid is generally required and in some cases, addition of supplementary liquid is necessary. Possible sources of supplementary liquids include leachate from other sites, storm water, wastewater (including biosolid and septage), commercial liquids, animal manure, and others. Whether a landfill is conducting a bioreactor operation with large-scale liquid injection or simply recirculating site-generate leachate, achieving uniform liquid distribution in the waste mass is always a critical operational goal. Several methods of liquid introduction have been adopted by the industry: surface spraying, infiltration ponds, subsurface injection via vertical wells, and subsurface injection via lateral injection lines. Due to concerns such as nuisance, safety, and volume restriction associated with some of the methods, subsurface lateral injection lines have become standard approach for many landfill engineers. The subsurface lateral injection lines not only allow for safe liquid injection, they also allow for introduction of large volume of liquid even after the waste mass has reached its permitted grade. Unfortunately, improperly-designed lateral injection lines can result in uneven liquid distribution, which will eventually lead to issues such leachate outbreaks, differential settlements, unstable working surface, or even slope instability. This paper provides design methodology for the design of subsurface lateral injection lines, including pipe sizing, perforation sizing and the perforation interval determination. Essential design equations will be presented first, followed by the design principle and criteria and the recommended design procedures. A design example will also be presented to illustrate the step-by-step design procedures. TYPICAL DESIGN AND COMMONLY SEEN ISSUES

3 Typical design and construction of subsurface lateral injection lines include perforated plastic pipes surrounded by porous media. The porous media allows for storage and rapid spreading of liquids. Both trench- and mound-designs have been used in the industry (Figure 1). These lateral distribution lines are typically horizontally spaced at 5 to 2 ft intervals and staggered vertically every 1 to 5 ft (Figure 2). Trench design Mound design Porous Media Perforated Pipe MSW Waste Porous Media Figure 1 Typical Subsurface Lateral Liquid Injection Lines 5 2 ft 1 5 ft Figure 2 - Typical Layout of Subsurface Lateral Liquid Injection Lines Adequately designed lateral injection lines should carry the injected liquid to the end of the perforated pipe and evenly discharge liquid along the entire line. Without proper engineering design, un-even distribution, prolonged percolation time and excessive pressure buildup can be expected. It is very common to see perforated injection pipe with relatively large perforations (e.g., ½ inch or greater in diameter) drilled at a densely-spaced pattern (e.g., 4 perforations for every 6 inches). Such design minimizes the entrance pressure head hence results in a quick pressure drop along the pipe. Consequently, vast majority of the injected liquid is discharged near the entrance of the pipe. As illustrated in an example shown in Figure 3, ninety percent of the injected liquid is discharged within the first 3 ft of the pipe and the discharge rate rapidly diminish beyond that point.

4 Unit Discharge Rate (gpm) Total flowrate = 2 gpm Entrance Pressure =.5 ft W.C. Pipe ID = 3 inches Perforation: 4 holes every 6 inches Hole size: ½ inch Flowrate in Pipe (gpm) Distance from End of Pipe (ft) Unit Discharge Rate Flow rate in Pipe Figure 3 - Unit Discharge Rate and Flow Rate: the Typical Practice In order to uniformly distribute the injected liquid along the entire pipe length, a pressurized perforated pipe design is necessary, of which both the sizing and number of the perforations need to be reduced. In an example illustrated in Figure 4, one ¼ inch perforation is drilled for every linear foot of the pipe. As seen in the results, the perforated pipe is pressurized (entrance pressure head is 9 ft) and a relative uniform distribution of liquid along the entire length is achieved (between 2.2 and 1.8 gpm for any given perforation). The following sections will focus on the design of the pressurized liquid injection pipes Unit Discharge Rate (gpm) Total flowrate = 2 gpm.5 Entrance Pressure = 9 ft W.C. Pipe ID = 3 inches 5 Perforation: 1 holes every 1 ft Hole size: ¼ inch Distance from End of Pipe (ft) 15 1 Flowrate in Pipe (gpm) Unit Discharge Rate Flow rate in Pipe Figure 4 - Unit Discharge Rate and Flow Rate: the Pressurized Design

5 DESIGN METHOLOGY Design Equations The unit discharge rate (q) from each of the perforations is governed by the size of the perforation and the static pressure at its respective location along the pipe: q = 2 1/ 2 = BA 2gP 11.79d P (1) Where q = flow rate per perforation (gpm) B = orifice coefficient, assumed as.6 A = area of orifice (in 2 ) g = gravitational acceleration (32.2 ft/s 2 ) P = pressure head over orifice (water column in ft.) d = diameter of perforation (inch) According to Bernoulli s equation, total head at any given point in liquid under motion is the sum of pressure, velocity and elevation heads: 2 V h = P + + Z (2) 2g Where h = total head (feet) P = pressure head (feet) V = velocity (ft/sec) g = gravitational acceleration (32.2 ft/s 2 ) Z = elevation head (feet) Change of total head in pipes is primarily due to friction and other minor losses. Since perforated pipes are typically constructed with straight sections with limited number of joints, minor losses are generally considered negligible. Therefore, the friction loss along the pipe will determine the change in total head. Friction loss in pipes can be calculation using Hazen-Williams equation as: h f Q =.282L C D (3) Where h f = friction loss head (feet) L = length of pipe (feet) C = pipe friction factor (15 for HDPE pipes) Q = flow rate in pipe (gpm) D = nominal pipe size (inch) Due to discharge at perforations, flow in perforated pipes varies along the pipe length (Figure 5). Flow in perforated pipes can be obtained by summing discharges from all of the downstream holes: Q i = q j i j = 1 Where Q i = flow in the pipe before perforation i (gpm) q j = discharge rate at perforation j (downstream of i, gpm) 1.85 (4)

6 D L L Q= Q n Q n-1 Q n-2 Q n-3 n n-1 n-2 n Q 3 Q 2 Q 1 q n d q n-1 q n-2 q n-3 q 3 q 2 q 1 Figure 5 Flow Rate along Perforated Pipe Friction loss in each section between two perforations can be determined as: Q i h = f i.282 L C (5) D Where L is the spacing between two adjacent perforations. L can be calculated based on total number of perforations ( n ) as: L L = (6) n 1 Based on the conservation of energy, the total head can be calculated as: 2 2 Vi Vi+ 1 = Pi + + zi = Pi zi+ 1 h + h 2g 2g f i (7) For low velocity flow (less than 5 ft/sec), the kinetic head is generally very low (less than.4 ft) and is typically neglected. For horizontal-placed pipes, pressure at an upstream perforation can be determined as: P i+1 = Pi + h (8) The unit discharge rate at an upstream perforation can be calculated as: Q i q = + = + i d Pi h f 11.79d Pi.282 L C (9) i D The unit discharge rate at the end of the pipe (q 1 ) can be calculated as: where P 1 is the pressure at end of the pipe. f i 2 q 1 = d P1 (1) Once the far-end pressure value (P 1 ) and the far-end discharge rate (q 1 ) are determined, unit discharge rate for all perforations can be obtained using Equations (4) and (9). The entrance pressure and the total flow rate will be utilized in the pumping system calculations. The above-listed procedures can be readily incorporated in spreadsheet programs. However, a trial-and-error process may be required to match the pumping system requirements. Design Principles

7 The ratio of unit discharge rates between the first and the last perforations can be used to quantify the uniformity of liquid distribution. In other words, if the ratio for a given perforated pipe design is closer to unity, the liquid is more evenly distributed. As the examples illustrated in Figures 3 and 4, a satisfactory ratio of 1.2 can be found in the pressurized pipe design whereas a ratio greater than 1, (which is clearly inadequate) can be seen in the low pressure design. Note that the variation in the unit discharge rates is caused by the pressure change in the pipe and the relative change of the discharge rate can be determined as: qn q1 n 1 q n = P P n P (11) Deriving from Equation (11), a correlation between the change in discharge rate and the change in pressure can be developed as: 2 P q q = 2 Pn qn qn (12) where q = q n - q 1 P = P n - P 1 The correlation between the change in pipe pressure and the change in unit discharge rates can be established using Equation (12), see Figure 6. 6% Change in Entrance Pressure 5% 4% 3% 2% 1% % % 5% 1% 15% 2% 25% 3% Change in Unit Discharge Rate Figure 6 Correlation between Change in Unit Discharge Rate and Change in Entrance Pressure As previously discussed, pressure change in pipe is primarily due to friction loss:

8 = P h fi (13) i= 1 The total friction loss in perforated pipes can be estimated using Equation (14): n 1 * P = P F (14) Note that F is a correction factor and P * is the friction loss calculated for a solid wall pipe having same diameter, length, and total flow rate. Equations (15) and (16) depict the determinations for F and P *, respectively. Note that the correlation shown in Equation (15) is established based on an assumption that the change of unit discharge rate is less than 2%. F = n i i= ( n 1) n (15) * 1 Q n P =.282L C (16) D As shown in Equation (15), the correction factor F is a function of the number of perforations along the pipe. As the number of perforations increases, the correction factor decreases and ultimately levels off at a value of.36 (Figure 7). For most design with more than 1 holes along the pipe, a correction factor F of.36 can be used F=hf/hf* Number of Hole on Perforated Pipe (n) Figure 7 - Friction Loss Correction Factor for Perforated Pipe Finally, by combining and rearranging Equations (14) and (16), the required pipe diameter can be determined as: Design Procedures.255 LF Qn D = P C.382 (17)

9 Uniform liquid distribution along the perforated liquid injection pipes can be achieved by proper selection of pipe diameter, size of perforations, and spacing between perforations. A systematic procedure can be presented in a flowchart format as shown in Figure 8. Individual steps will be discussed in detail in the following subsections. Input Pipe length (L) and linear discharge rate (q*) Calculation Total flow rate (Q) Change linear discharge rate (q*) Design Pumping system and entrance pressure Select Perforation diameter (d) and unit discharge rate (q) Calculate Number of perforations (n) and spacing ( L) Satisfied? No YES Calculation Pressure difference between first and last perforations Eq. 17 and Fig. 7 Input Allowed variation for unite discharge rate No Calculation Determine pipe diameter Satisfied? YES Output Perforation diameter (d), spacing ( L), pipe diameter (D) and entrance pressure (Pn) Figure 8 Design Procedure Flowchart 1. Selecting input parameters Length of the perforated pipe ( L ) is generally determined by the dimensions of the waste lift where the injection line is to be installed. To avoid leachate outbreaks on refuse slopes, the injection lines should not be located within 5 ft of the exterior waste slope. The injection lines are typically spaced horizontally 5- to 15 ft with a vertical interval of 2 ft. The linear discharge rate (q*) should also be pre-selected. The actual value is controlled by the infiltration capacity of the waste. Reinhart and Townsend (1998) suggested that injection rates between 25- to 5 gpd/ft are adequate. To further promote lateral distribution and minimize biological clogging, intermittent liquid injection should also be considered (Reinhart and Townsend, 1998). Generally speaking, selecting linear discharge rate between.2- to.4 gpm/ft seems appropriate. 2. Determining total flow rate

10 The total flow rate (Q) can be calculated as: * Q = Lq (18) Note that this total flow rate is identical to the entrance flow rate (Q n ). 3. Determining the entrance pressure Based on the required flow rate, the pumping and forcemain analyses can be conducted and subsequently, the entrance pressure can be determined. Since the procedure is a common practice for hydraulic engineers, no detailed discussed will be provided herein. Note that, however, the entrance pressure should be less than 5 psi (11.5 ft of water column) to avoid excessive increase in pore pressure which may adversely impact the slope stability (Bachus, et al., 24). 4. Selecting size of perforations and calculating the unit discharge rate As long as the clogging potential is avoided, smaller perforation sizes are preferred for better liquid distribution. Unit discharge rate can be determined based on the entrance pressure and the perforation size using Equation (1). See Figure 9 for typical correlations. Pressure (ft) d=1/8 in d=3/16 in Maximum Recommended Entrance Pressure 11.5 ft d=1/4 in d=5/16 in d=3/8 in d=7/16 in d=1/2 in Unit Discharge Rate (gpm) Figure 9 Unit Discharge Rate vs. Entrance Pressure for Different Sizes of Perforation

11 5. Calculating number and spacing of perforations Number of perforations (n) can be calculated as: Q n = (19) q Spacing between perforations ( L) can be calculated as: L L = (2) n 1 In most cases, the number of perforations (n) should be greater than 5 (i.e., q/q < 2%) and spacing between perforations ( L) should be less than 2% of the length of perforated section (L). If these requirements are met, the design procedure can continue. Otherwise, a new perforation size shall be selected and Step 4 shall be repeated until all design requirements are met. 6. Selecting the allowable variation for unit discharge rate and calculating the corresponding allowable pressure difference Friction loss along the perforated pipe can be minimized but can not be completely eliminated. In other words, some differences in the unit discharge rate will always exist. A tolerable variation should be pre-determined for each project. To maintain a reasonable pipe size, the tolerance ( q/q n ) can be set between 1% and 2%. The corresponding variance in pressure between the two extreme ends of the perforated pipe can be calculated using Equation (12) or Figure 6. Subsequently, the allowable pressure drop ( P) in the perforated pipe can be calculated based on the entrance pressure. 7. Determining pipe size Size of the perforated pipe can be determined using Equation (17), or Figure 1, based on the unit friction loss and total flow rate. Unit friction loss can be calculated by dividing the allowable pressure drop ( P) by the length of perforated pipe (L). Note that the correction factor (F) can be obtained from Figure 7. If the number of perforation is greater than 1, the value of F can be assumed as.36. The diameter of the perforated pipe should be rounded to higher standard size. If the result is not satisfactory, a new linear discharge rate can be selected and the entire design procedure can be repeated. The following example illustrates the use of the above-mentioned design procedures. DESIGN EXAMPLE A landfill plans to install several leachate recirculation lines on the active surface. Based on the geometry of the lift boundary, three subsurface leachate injection lines will be installed (Figure 11). Leachate will be pumped from the storage facility, through a forcemain, into a control vault located at the base of the northeastern slope. Designated transmission lines will direct leachate from the vault into the perforated pipes. Only one line will be used during each injection event.

12 Unit Friction Loss D=2 in D=3 in Unit Friction Loss D=2 in D=3 in D=4 in D=5 in D=6 in.1 D=4 in Flowrate in Pipe (gpm) Flowrate in Pipe (gpm) Figure 1 - Unit Friction Loss at Different Flow Rate N Leachate Storage Facility Control Vault Leachate Transmission Lines Lift Boundary Forcemain 5 ft 15 ft 1 ft 3 ft 1 ft 6 ft 1 ft Leachate Recirculation Lines Figure 11 Layout of the Proposed Leachate Recirculation System (Example Problem)

13 Using the recommended procedures discussed earlier, the following design can be formulated: 1. Selecting input parameters Line Length (ft) Linear Discharge Rate (gpm/ft) Note that the selected linear discharge rates will result in similar total discharge rate for each of the 3 injection lines. 2. Determining total flow rate using Equation (18) Line Linear Discharge Rate (gpm/ft) Total Flow Rate (gpm) Determining the entrance pressure To avoid excessive velocity and friction the loss, flow rate will be controlled below 1 gpm. Note that the entrance (immediately before the first perforation) pressures listed below were determined via separate forcemain analyses. Differences in the calculated entrance pressures are results of the different lengths in the transmission pipes between the control vault and the perforated pipes. Line Entrance Pressure (Water column in ft.) Selecting size of perforations and calculating the unit discharge rate A perforation size is pre-selected as 3/16 inches in diameter. With that, the unit discharge rates can be calculated using Equation (1). Results of the unit discharge rates are listed below: Line Entrance Pressure (Water column in ft.) Diameter of Perforation (inch) Unit Discharge Rate (gpm) / / / Calculating number and spacing of perforations For Line 1, the number of perforations can be calculated as:

14 Q n = q 9 = Subsequently, the spacing between perforations ( L) can be determined as: L 6 L = = 4. 4 ft n For ease of construction, the spacing is set to 4.5 ft, which will result in a total of 134 perforations. Same procedures can be repeated for Lines 2 and 3. Results for all three lines are listed below. Line Length (ft) Total Flow Rate (gpm) Unit Discharge Rate (gpm) No. of Perforations Spacing (ft) * Note: *Spacing for the last two perforations at end of the pipe is 1.5 ft. 6. Selecting the allowable variation for unit discharge rate and calculating the corresponding allowable pressure difference The allowable variation in the unit discharge rate is pre-selected as 2%. With that, the allowable pressure drop can be calculated using Equation (12). Line Variation in Unit Discharge Rate Entrance Pressure (Water column in ft.) Allowed Pressure Drop (ft) 1 2% % % Determine pipe size Diameter of the pipe can be calculated using Equation (17). The correction factor F can be selected using Figure 6. Since the numbers of perforations are greater than 1 for all three lines, an F-value of.36 will be used for the pipe sizing calculations for all lines. Line Length (ft) Total Flow Rate (gpm) Allowed Pressure Drop (ft) No. of Perforations Pipe Diameter - Calculated (inch) Pipe Diameter - Selected (inch) Note that the pipe diameter can also be selected based on the unit friction loss and the total flow rate using Figure Results verification Based on output of the design procedures (i.e., pipe size, perforation size and spacing,

15 entrance pressure, etc.), three simulations were executed using a spreadsheet program that incorporates Equations (4), (9) and (1). Results of the simulation illustrate the predicted discharge rate at each of the perforations along the entire perforated sections, see Figure 12. Further examining the results shown in Figure 12 reveals that the actual variations of unit discharge flow rates (changes between the first and the last perforations) are 18%, 7% and 1% for Lines 1, 2 and 3, respectively. All of which are less than the pre-selected maximum allowable variation (2%, see Step 6 in the previous section). Therefore the design is verified as appropriate. Otherwise different pipe sizing may be considered and the procedures can be repeated until the result is successfully verified. Unit Discharge Flow per Flow Hole Rate (gpm) (gpm) Distance Length from from the end distal of (ft) pipe (ft) Line 1 Line 2 Line 3 Figure 12 Predicted Discharge Flow Rate along the Perforated Pipes (Example Problem) MAXIMUM PERFORATION LENGTH There is a theoretical length limitation to the perforated section of any liquid injection pipe. In other words, one set of design parameters (i.e., pipe size, perforation size and spacing, allowable variation in unit discharge rate and entrance pressure, etc.) will not offer same performance when different perforated lengths are used. To demonstrate this fact, two design charts were developed and shown in Figures 13 and 14. Both charts assumed a 5-ft spacing between perforations and an entrance pressure of 5-ft of water column. Additionally, both charts correlate the perforation size with the maximum pipe length and the corresponding discharge flow rates for different pipe sizes. The only difference between Figures 13 and 14 is the allowable variation among the unit discharge rates a maximum variation of 1% and 2% were assigned in Figures 13 and 14, respectively.

16 Max Pipe Length (ft) D=6 in D=5 in D=4 in D=3 in D=2 in 4 2 1/8 3/16 1/4 5/16 3/8 7/16 1/2 Orifice Diameter (in) 4 35 Total Flowrate (gpm) D=6 in D=5 in D=4 in D=3 in D=2 in 5 1/8 3/16 1/4 5/16 3/8 7/16 1/2 Orifice Diameter (in) Figure 13 Correlation between Size of Perforation, Maximum Pipe Length and Discharge Flow Rates for Different Pipe Sizes (maximum allowable difference on unit discharge rate = 1%)

17 25 2 Max Pipe Length (ft) 15 1 D=6 in D=5 in D=4 in D=3 in D=2 in 5 1/8 3/16 1/4 5/16 3/8 7/16 1/2 5 Orifice Diameter (in) 45 4 Total Flowrate (gpm) D=6 in D=5 in D=4 in D=3 in D=2 in 1/8 3/16 1/4 5/16 3/8 7/16 1/2 Orifice Diameter (in) Figure 14 Correlation between Size of Perforation, Maximum Pipe Length and Discharge Flow Rates for Different Pipe Sizes (maximum allowable difference on unit discharge rate = 2%) As clearly indicated in Figures 13 and 14, all of the design parameters are interrelated and no typical perforated pipe design is universally applicable. Design engineers should have a thorough understanding of both the project requirements and the design mechanism in order to provide an effective design of liquid injection system.

18 PARAMETRIC ANALYSES AND OBSERVATIONS This section presents the results of a series of parametric analyses. The parametric analyses were designed to demonstrate the sensitivity embedded in various design parameters in the design of perforated liquid injection pipes. Four critical design parameters including size of perforation, size of pipe, spacing between perforations, and the entrance pressure were evaluated. Table 1 summarizes the results of the parametric analyses and the authors observations and comments. Design Parameter Table 1 Results of the Parametric Analyses with Observations Range of Variation Perforation size 1/8- to 1/2 in diameter Pipe size Perforation spacing Entrance pressure 2- to 6 inch in diameter Graphical Results Figure 15 Figure 16 Observations/Comments Smaller perforations allow for longer liquid injection distances. However, total flow rate will decrease when smaller perforations are used, which implies a longer injection period during each injection event. Maximum injection distance varies between 8- to 54 ft within the range of analyses. Larger pipes allow for longer injection distances. Maximum injection distance varies between 1- to 71 ft within the range of analyses. 1- to 1 ft. Figure 17 Maximum injection length can be increased by using larger perforation spacing. Due to potential clogging of perforations, the authors recommend a maximum of 1-ft spacing between perforations. 1 to 1 ft of water column Figure 18 Entrance pressure has only slightly influence on the maximum injection length. However, flow rate does increase with higher pressure, which implies a shorter injection period during each injection event. CONCLUSIONS One of the essential goals when designing liquid injection lines is to uniformly distribute liquid into the waste mass. According to the information documented in literature and the authors past project experiences, the most effective injection method is the use of lateral injection lines (trenches or mounds). However, an improperly-designed lateral injection line can still result in an uneven liquid distribution, which may eventually lead to issues such leachate outbreaks, differential settlements, unstable working surface, or even slope instability. A systematic design procedure is recommended and presented in this paper, following which will allow the engineers to properly select system parameters (e.g., pipe size, perforation size, perforation spacing, and entrance pressure) and meet their project-specific requirements.

19 Maximum Length (ft) Entrance Pressure = 5 ft W.C. Pipe ID = 3 inches Perforation: 1 hole every 5 ft Total Flowrate (gpm) 1/8 3/16 1/4 5/16 3/8 7/16 1/2 Hole Size (inch) Max Pipe Length Flowrate Figure 15 - Effect of Perforation Sizes ( q/q =1%) Maximum Length (ft) Entrance Pressure = 5 ft W.C. Perforation: 1 hole every 5 ft Hole size = ¼ inch Pipe ID (inch) Total Flowrate (gpm) Max Pipe Length Flowrate Figure 16 - Effect of Pipe Sizes ( q/q =1%)

20 Maximum Pipe Length (ft) Total Flowrate (gpm) Entrance Pressure = 5 ft W.C. 1 Hole size = ¼ inch 5 Pipe ID = 3 inch Spacing between Holes (ft) dq/q=1% dq/q=2% Spacing between Holes (ft) dq/q=1% dq/q=2% Maximum Pipe Length (ft) Total Flowrate (gpm) Figure 17 - Effect of Perforation Spacing 15 Hole size = ¼ inch 1 Spacing = 5 ft 5 Pipe ID = 3 inch Entrance Pressure (ft W.C.) dq/q=1% dq/q=2% Entrance Pressure (ft W.C.) dq/q=1% dq/q=2% Figure 18 - Effect of Entrance Pressure

21 REFERNCES Reinhart, D.R. and T.G. Townsend (1998). Landfill Bioreactor Design and Operation, published by Lewis Publishers, New York Bachus, R.C., M.F. Houlihan, E. Kavazanjian, R. Isenberg, and J.F. Beech (24). Bioreactor landfill stability: key considerations, in MSW Management, September/October,

Bioreactor Landfill Design

Bioreactor Landfill Design Bioreactor Landfill Design Timothy Townsend, PhD, PE Department of Environmental Engineering Sciences University of Florida ttown@ufl.edu Bioreactor Landfill Design Modern landfill design entails many

More information

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors

Leachate Recirculation and Biogas Collection Methodologies in Bioreactors Leachate Recirculation and Biogas Collection Methodologies in Bioreactors E. McBean, Ph.D., P.Eng., P.E. School of Engineering University of Guelph 1 INPUT OUTPUT Municipal Solid Waste Moisture Decomposed

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

10.0 Storm Sewer Systems

10.0 Storm Sewer Systems October 2003 Chapter 10.0, Storm Sewer Systems Page 1 10.0 Storm Sewer Systems 10.1 Introduction A storm sewer system consists of a system of inlets, pipes, manholes, junctions, cleanouts, outlets, and

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of stormwater as it infiltrates into the ground. Dry wells, infiltration

More information

Leachate Management Leachate Control and Collection

Leachate Management Leachate Control and Collection Leachate Management Leachate Control and Collection Leachate Collection Sanitary landfills have leachate collection and removal system above liner At un-lined landfills and dump sites Perimeter Ditch -

More information

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance TECHNICAL BULLETIN Synthetic Turf Athletic Field Drainage Design Assistance The SportsEdge HQ geocomposite strip drain products are engineered specifically for use in synthetic turf athletic field base

More information

Landfill Gas Systems

Landfill Gas Systems Landfill Gas Systems A General Overview ASTSWMO STATE SOLID WASTE MANAGERS CONFERENCE Scottsdale, Arizona September 12-14, 14, 2005 Landfill Gas Management Issues/Objectives Topics to be Covered Reasons

More information

VOLUME 1 Overview of the Florida bioreactor demonstration project and the work plan

VOLUME 1 Overview of the Florida bioreactor demonstration project and the work plan VOLUME 1 Overview of the Florida bioreactor demonstration project and the work plan 1.1 Introduction The Florida Department of Environmental Protection (FDEP) awarded a grant to the Florida Center for

More information

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification 7. Introduction This chapter summarizes methods to evaluate runoff conveyance in various street cross sections and curb types in the Town of Castle Rock and identifies acceptable upper limits of street

More information

BMP 6.4.4: Infiltration Trench

BMP 6.4.4: Infiltration Trench BMP 6.4.4: Infiltration Trench An Infiltration Trench is a leaky pipe in a stone filled trench with a level bottom. An Infiltration Trench may be used as part of a larger storm sewer system, such as a

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

4.8. Subsurface Infiltration

4.8. Subsurface Infiltration 4.8. Subsurface Infiltration Subsurface infiltration systems are designed to provide temporary below grade storage infiltration of storm water as it infiltrates into the ground. Dry wells, infiltration

More information

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc.

Successfully dosing pipe networks. Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. Successfully dosing pipe networks Kevin Sherman, Ph.D., P.E., D.WRE Vice President of Engineering Clearstream Wastewater Systems, Inc. What is a successful dose? Spreads effluent throughout soil disp.

More information

APPENDIX G HYDRAULIC GRADE LINE

APPENDIX G HYDRAULIC GRADE LINE Storm Drainage 13-G-1 APPENDIX G HYDRAULIC GRADE LINE 1.0 Introduction The hydraulic grade line is used to aid the designer in determining the acceptability of a proposed or evaluation of an existing storm

More information

Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California

Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California Case Study A Comparison of Well Efficiency and Aquifer Test Results Louvered Screen vs. Continuous Wire-Wrapped Screen Big Pine, California Executive Summary Aquifer test results demonstrated that the

More information

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Session 2 Pump Selection Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Quick Refresh System Curves graphically show the relationship between flow rates and associated total dynamic

More information

Landfill Cover Design and Operation

Landfill Cover Design and Operation Landfill Cover Design and Operation USEPA Workshop on Bioreactor Landfills Beth A. Gross, P.E. GeoSyntec Consultants Engineered Systems at Landfills Gas Collection and Removal System Surface-Water Management

More information

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN CHECKLIST FOR STREETS, INLETS, I. STREET CLASSIFICATION AND DESIGN CRITERIA A. Determine drainage classification for the roadway section using Table 7-1 or Table 7-2. B. Determine the allowable flow depth

More information

Calculate the Costs of Piping System Elements

Calculate the Costs of Piping System Elements Calculate the Costs of Piping System Elements by Ray Hardee, Engineered Software, Inc. Last month s column described the process of creating an energy cost balance sheet for a piping system (see Figure

More information

Facilities Development Manual

Facilities Development Manual State of Wisconsin Department of Transportation Facilities Development Manual ORIGINATOR Director, Bureau of Highway Development PROCEDURE 13-25-35 CHAPTER 13 Drainage SECTION 25 Storm Sewer Design SUBJECT

More information

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities 1 Introduction This document, developed by the San Francisco Public Utilities Commission

More information

HOLE CLEANING IN DIRECTIONAL WELLS

HOLE CLEANING IN DIRECTIONAL WELLS HOLE CLEANING IN DIRECTIONAL WELLS 1 ❶ Welcome to this presentation about Hole Cleaning in Directional Wells. It has been prepared by Sedco Forex, to give you a better understanding of the cuttings-transport

More information

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming

To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming To The Applicant For A Small Wastewater System Permit Sheridan County, Wyoming PRIOR TO SUBMITTING APPLICATION 1) Ground water test pit This pit is required to be inspected by a representative of Sheridan

More information

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA

Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA Commonwealth of Pennsylvania Department of Environmental Protection (DEP) Bureau of Water Standards and Facility Regulation Harrisburg, PA Issued to: Eljen Corporation 125 McKee Street East Hartford, CT

More information

Hancor, Inc. Drainage Handbook Hydraulics 3-1

Hancor, Inc. Drainage Handbook Hydraulics 3-1 Hancor, Inc. Drainage Handbook Hydraulics 3-1 3-0 HYDRAULICS TABLE OF CONTENTS 3-1 Overview of Hydraulic Considerations...3-2 3-2 Design Manning s Value...3-2 3-3 Discharge Curves...3-4 3-3 The Conveyance

More information

Lab 6 - Pumping Test. Pumping Test. Laboratory 6 HWR 431/

Lab 6 - Pumping Test. Pumping Test. Laboratory 6 HWR 431/ Pumping Test Laboratory 6 HWR 431/531 7-1 Introduction: Aquifer tests are performed to evaluate the capacity of an aquifer to meet municipal or industrial water requirements. Hydraulic characteristics

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls

More information

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL

CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL CHAPTER 6 COLLECTION SYSTEM HYDRAULIC MODEL INTRODUCTION The District developed a hydraulic model of the sanitary sewer system as part the 2000 Wastewater Comprehensive Plan. The output from this model

More information

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d Design Data 6 Loads and Supporting Strengths Elliptical and Arch Pipe The hydraulic and structural characteristics of elliptical and arch shapes offer advantages, under certain conditions, over the circular

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

DRAINAGE & DESIGN OF DRAINAGE SYSTEM

DRAINAGE & DESIGN OF DRAINAGE SYSTEM Drainage on Highways DRAINAGE & DESIGN OF DRAINAGE SYSTEM P. R.D. Fernando Chartered Engineer B.Sc.(Hons), M.Eng. C.Eng., MIE(SL) Drainage Requirement of Highway Drainage System Introduction Drainage means

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

Wastewater Flow Monitoring Services

Wastewater Flow Monitoring Services Wastewater Flow Monitoring Services For San Gabriel, CA July 13, 2015 through July 21, 2015 Revised October 9, 2015 Leaders in Sewer Flow Monitoring Services 601 N. Parkcenter Dr., Suite 209 Santa Ana,

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall 6.0 Introduction This chapter summarizes methodology for determining rainfall and runoff information for the design of stormwater management facilities in the City. The methodology is based on the procedures

More information

Drip System Design for Established Landscape Trees and Shrubs

Drip System Design for Established Landscape Trees and Shrubs Drip System Design for Established Landscape Trees and Shrubs Robert D. von Bernuth, PhD, PE, CIC, CID, CIT, CLIA, CLWM Technical Advisor, Irrigation Association Brent Q. Mecham, CAIS, CGIA, CIC, CID,

More information

GREEN THREAD Piping Systems

GREEN THREAD Piping Systems Bulletin No. A1300 February 15, 2006 SMITH FIBERCAST GREEN THREAD Piping Systems PRODUCT GREEN THREAD pipe is filament wound using an amine cured epoxy resin and fiberglass and has a resin-rich liner reinforced

More information

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E.

LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS. Mike Bradford, P.E. LANDFILL GAS CONTROL SYSTEMS: DESIGN AND CONSTRUCTION CONSIDERATIONS Mike Bradford, P.E. 2 Today s Agenda SOLUTIONS YOU CAN COUNT ON. PEOPLE YOU CAN TRUST. What are we controlling? FOCUS: How do we control

More information

Index. Page numbers followed by f indicate figures.

Index. Page numbers followed by f indicate figures. Index Aerodynamic method, 103, 110 111 Algae, 131, 173, 175 Alternate depth, 88 Alternating block method, 132, 140 141 Attenuation, 106, 107f, 118, 120 Page numbers followed by f indicate figures. Baseflow

More information

8.4.2 Steady flow: Hooghoudt equation

8.4.2 Steady flow: Hooghoudt equation 8.4.2 Steady flow: Hooghoudt equation As explained in Section 1.1, steady flow does not,. in reality, occur. At the end of tail recession, however, because of a small amount of seepage, the flow of some

More information

Lift irrigation Using man or Animal power Using Mechanical or Electrical Power Flow irrigation a)inundation Irrigation b) Perennial Irrigation Direct

Lift irrigation Using man or Animal power Using Mechanical or Electrical Power Flow irrigation a)inundation Irrigation b) Perennial Irrigation Direct Lift irrigation Using man or Animal power Using Mechanical or Electrical Power Flow irrigation a)inundation Irrigation b) Perennial Irrigation Direct irrigation Storage irrigation a)flow irrigation system:

More information

North Domingo Baca Extension at Barstow

North Domingo Baca Extension at Barstow Modeling Report April 5, 2001 North Domingo Baca Extension at Barstow Prepared for the Albuquerque Metropolitan Arroyo Flood Control Authority Julie Coonrod, Ph.D., P.E. Department of Civil Engineering

More information

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES

SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES SECTION 4 - DESIGN STANDARDS FOR WATER DISTRIBUTION FACILITIES 4.1 GENERAL REQUIREMENTS 4.1.1 Water and fire protection distribution facilities are to be provided solely for the purpose of supplying potable

More information

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California The First Pan American Geosynthetics Conference & Exhibition 2-5 March 2008, Cancun, Mexico Geosynthetics Cost/Benefit Analysis for the Development of a Landfill Expansion Module in Monterey, California

More information

SEWER SYSTEM DESIGN GUIDELINES

SEWER SYSTEM DESIGN GUIDELINES SEWER SYSTEM DESIGN GUIDELINES PART 1 GENERAL 1.1 GENERAL GUIDELINES A. The following sewer system design guidelines are based on Federal, State and Local health requirements, and the Berkeley County Water

More information

Basic Irrigation Design

Basic Irrigation Design Basic Irrigation Design Basic Irrigation Design Table of Contents Introduction............................ii Terminology...........................iii System Diagram.........................1 Hydraulics..............................2

More information

C. Foundation stabilization for pipe and utility structures.

C. Foundation stabilization for pipe and utility structures. PART 1 - GENERAL 1.1 SECTION INCLUDES A. Excavating, backfilling, and compacting for utilities, including pipe, structures, and appurtenances. B. Control of water in trenches. C. Foundation stabilization

More information

CHAPTER 12 TRICKLING FILTER PLANTS

CHAPTER 12 TRICKLING FILTER PLANTS CHAPTER 12 TRICKLING FILTER PLANTS TM 5-814-3/AFM 88-11, Volume III 12-1. General considerations. Trickling filter plants have been justified by their low initial cost, low operating and maintenance costs,

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

Irrigation Rehabilitation Program Design and Construction Standards

Irrigation Rehabilitation Program Design and Construction Standards Irrigation Rehabilitation Program Design and Construction Standards Prepared by the IRP Standards Review Committee For Alberta Agriculture and Rural Development, Irrigation Secretariat April 26, 2010 Adopted

More information

POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION. Physical properties of

POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION. Physical properties of POROSITY, SPECIFIC YIELD & SPECIFIC RETENTION Porosity is the the ratio of the voids to the total volume of an unconsolidated or consolidated material. Physical properties of n = porosity as a decimal

More information

Peerless Pump Company Handbook of Engineering Data

Peerless Pump Company Handbook of Engineering Data Peerless Pump Company Handbook of Engineering Data Brochure EM77 DEFINITION OF PUMP TERMS A.1 A line shaft vertical turbine pump is a vertical-shaft centrifugal or mixed-flow pump with rotating impeller

More information

DRIP EMITTER SYSTEM STUDY GUIDE

DRIP EMITTER SYSTEM STUDY GUIDE DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative

More information

Bioreactor Landfills An Innovative Technology for Biostabilization of Municipal Solid Waste

Bioreactor Landfills An Innovative Technology for Biostabilization of Municipal Solid Waste Bioreactor Landfills An Innovative Technology for Biostabilization of Municipal Solid Waste Nandana Perera, M.Sc., P.Eng. 1, David van Everdingen, Ph.D., P.Geol. 2, Don Davies 1, Jasna Hundal P.Eng. 2,

More information

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL /

INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL / INSTALLING A SEPTIC SYSTEM IN LIVINGSTON COUNTY LIVINGSTON COUNTY PUBLIC HEALTH DEPARTMENT 310 TORRANCE AVENUE PONTIAC, IL 61764 815/844-7174 MALINDA HILLMAN, ADMINISTRATOR DONNIE SIMMONS, L.E.H.P. DIRECTOR

More information

ENVIRONMENTAL MONITORING AT LANDFILLS

ENVIRONMENTAL MONITORING AT LANDFILLS ENVIRONMENTAL MONITORING AT LANDFILLS September 7, 2017 George Schuman Permit Section Manager, Solid Waste Bureau New Mexico Environment Department Environmental Monitoring at 2 SWB considers three activities

More information

Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing

Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing Mr. Dennis F. Hallahan, P.E. Infiltrator Water Technologies 4 Business Park Road PO Box 768 Old Saybrook, CT 06475 RE: Product Registration Renewal #2 Notice of Proprietary Distribution Product Listing

More information

GRAY WATER RECYCLING SYSTEMS

GRAY WATER RECYCLING SYSTEMS GRAY WATER RECYCLING SYSTEMS Note: Section P2601.2 of the International Residential Code requires all plumbing fixtures that receive water or waste to discharge to the sanitary drainage system of the structure.

More information

Figure 1. Report of Inspection Process Flowchart.

Figure 1. Report of Inspection Process Flowchart. INSTRUCTIONS FOR A REPORT OF INSPECTION FOR AN ON-SITE WASTEWATER TREATMENT FACILITY INSTRUCTIONS Within six months before the date of a property transfer, the person who is transferring a property served

More information

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions. SECTION 31 23 33 - TRENCHING, BACKFILLING AND COMPACTION PART 1 - GENERAL 1.1 SCOPE A. This Section specifies the requirements for excavating and backfilling for storm sewer, sanitary sewer, water distribution

More information

Field Evaluations of Irrigation Systems: Solid Set or Portable Sprinkler Systems 1

Field Evaluations of Irrigation Systems: Solid Set or Portable Sprinkler Systems 1 Bulletin 266 Field Evaluations of Irrigation Systems: Solid Set or Portable Sprinkler Systems 1 A.G. Smajstrla, B.J. Boman, G.A. Clark, D.Z. Haman, D.J. Pitts and F.S. Zazueta 2 Introduction This bulletin

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility: Oklahoma Department of Environmental Quality Water Quality Division Phone: 405-702-8100 Construction Permitting Section 707 N. Robinson, OKC, OK 73102-6010 P.O. Box 1677, OKC, OK 73101-1677 Sanitary Sewer

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

HYDRAULIC DEMONSTRATION CHANNEL

HYDRAULIC DEMONSTRATION CHANNEL HYDRAULIC DEMONSTRATION CHANNEL PACKING LIST Pitot-Static Tube and Manometer Tube Flow Meters 1. 48 Long Differential Manometer 2. Clear Tubing 3. Pitot-static Tube Clamp 4. Pitot-static Tube 1. Venturi

More information

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14

GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter 16 and 16A) Revised: 6/11/14 Planning and Building Department 525 San Anselmo Avenue Building Division San Anselmo, CA 94960 Phone: (415) 258-4616 Fax: (415) 454-4683 GRAY WATER SYSTEMS (Reference California Plumbing Code Chapter

More information

Modelling and Analysis of EES Systems Using SWMM

Modelling and Analysis of EES Systems Using SWMM Planning and Design of a Right-of-Way LID (Etobicoke Exfiltration System) July 24 th 2015 Toronto, Ontario, Canada ling and Analysis of EES Systems Using SWMM Darko Joksimovic Department of Civil Engineering,

More information

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION

NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL HEALTH ON-SITE WASTEWATER SECTION INNOVATIVE WASTEWATER SYSTEM APPROVAL, Attachment INNOVATIVE WASTEWATER SYSTEM

More information

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Learning objectives. Upon successful completion of this lecture, the participants will be able to: Solomon Seyoum Learning objectives Upon successful completion of this lecture, the participants will be able to: Describe and perform the required step for designing sewer system networks Outline Design

More information

Ordinance No Lot Surface Drainage

Ordinance No Lot Surface Drainage Ordinance No. 35-2008 - Lot Surface Drainage The Township has adopted a new Lot Surface Drainage Ordinance which amends Chapter 170, Article IX, Subdivision and Site Plan Review by adding a new Section

More information

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016 April 12, 2016 Mr. Craig Perl, P.E. Senior Engineer City of Aurora Public Works Department 15151 E. Alameda Parkway Aurora, CO 80012 RE: Final Drainage Letter: Northwest Aurora Alley Improvements 2016

More information

FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL

FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL FULL SCALE OPERATION OF A UNIQUE LANDFILL BIOREACTOR: THE CALGARY BIOCELL J. Patrick. A. HETTIARATCHI (1), Carlos HUNTE (1), and Sunil KUMAR (2) (1) Center for Environmental Engineering Research and Education

More information

Screening, Definition: The unit involved is called a screen.

Screening, Definition: The unit involved is called a screen. Screening, Definition: Screening is a unit operation that separates materials in and/or on water (found in different sizes) from water and from entering water treatment facilities and mains. The unit involved

More information

The use of 0.5 and 0.6 in. (13 and 15 mm) diameter

The use of 0.5 and 0.6 in. (13 and 15 mm) diameter Benefits of using.7 in. (18 mm) diameter strands in precast, pretensioned girders: A parametric investigation Jessica Salazar, Hossein Yousefpour, Alex Katz, Roya Alirezaei Abyaneh, Hyun su Kim, David

More information

Wastewater Capital Projects Management Standard Construction Specification

Wastewater Capital Projects Management Standard Construction Specification CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 7.4 PERMEATION GROUTING 7.4.1 Definitions 7.4.1.1 Geotechnical Data Report (GDR)

More information

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation:

Property Owner's Name: Telephone #: Mailing Address: System Address (if different): Directions to location of installation: SANGAMON COUNTY DEPARTMENT OF PUBLIC HEALTH Environmental Health Division 2833 S. Grand Ave. East Springfield, Illinois 62703 Phone: (217) 535-3145 Fax: (217) 747-5103 envhealth@co.sangamon.il.us, website

More information

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006

SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Michigan Department Of Transportation 3703C (11/06) 1 Materials 1.1 Pipe SPECIAL CONDITIONS FOR PIPE JACKING (PJ) October, 2006 Page 1 of 5 The type of pipe used for the pipe jacking method shall be capable

More information

APPENDIX "B" November 5, 2002 Page 1 of 6 BOILERSMITH LTD. STACKS AND BREECHING

APPENDIX B November 5, 2002 Page 1 of 6 BOILERSMITH LTD. STACKS AND BREECHING APPENDIX "B" November 5, 2002 Page 1 of 6 BOILERSMITH LTD. STACKS AND BREECHING NOTE The Stack and Breeching shall be installed in conformance with national, regional and local codes and standards and/or

More information

The following sections provide the approved standard infiltration testing specifications.

The following sections provide the approved standard infiltration testing specifications. APPENDIX F.2 INFILTRATION TESTING To properly size and locate stormwater management facilities, it is necessary to characterize the soil infiltration conditions at the location of the proposed facility.

More information

Transient and Succession-of-Steady-States Pipeline Flow Models

Transient and Succession-of-Steady-States Pipeline Flow Models Transient and Succession-of-Steady-States Pipeline Flow Models Jerry L. Modisette, PhD, Consultant Jason P. Modisette, PhD, Energy Solutions International This paper is copyrighted to the Pipeline Simulation

More information

Chapter 8. Inlets. 8.0 Introduction. 8.1 General

Chapter 8. Inlets. 8.0 Introduction. 8.1 General . Introduction This chapter provides criteria and design guides for evaluating and designing storm sewer inlets in the City of Centennial. The review of all planning submittals will be based on the criteria

More information

Glossary Irrigation Terminology

Glossary Irrigation Terminology Glossary Irrigation Terminology ANGLE VALVE A valve configured so its outlet is oriented 90 from its inlet. In irrigation, these valves are generally installed with the inlet at the bottom of the valve.

More information

VERIFICATION STATEMENT

VERIFICATION STATEMENT Verification Statement Verification Statement Verification Statement VERIFICATION STATEMENT GLOBE Performance Solutions Verifies the performance of Stormceptor EF4 and EFO4 Oil-Grit Separators Developed

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8, Classic 6 and Legend unit segmental

More information

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Local Design Manual For Houston County, Georgia Stormwater Local Design Manual For Houston County, Georgia Adopted November 15, 2005 TABLE OF CONTENTS 1. FORWARD... 1 2. GENERAL LEVEL OF SERVICE STANDARDS... 2 2.1. DETENTION REQUIREMENTS... 2 2.1.1.

More information

Chapter 11 Culverts and Bridges

Chapter 11 Culverts and Bridges Chapter 11 Culverts and Bridges Contents 1.0 Introduction... 1 2.0 General Design... 1 2.1 Design Criteria... 1 2.2 Design Flows... 1 2.3 Permitting and Regulations... 1 2.4 Aesthetics and Safety... 2

More information

Recovering a Failed Sand Filter Wastewater Treatment System

Recovering a Failed Sand Filter Wastewater Treatment System Recovering a Failed Sand Filter Wastewater Treatment System By Michael C. Brandt, PE Advanced Designer of Subsurface Sewage Treatment Systems Project Manager MFRA, Inc. All subsurface treatment systems

More information

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains

Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7: Hydraulic Design of Sewers and Storm Water Drains Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7: Hydraulic Design of Sewers and Storm Water Drains 7.0 HYDRAULIC DESIGN OF SEWERS AND STORM WATER DRAINS 7.1 General Consideration

More information

Private Sewage Systems Standard of Practice Proposed Revisions

Private Sewage Systems Standard of Practice Proposed Revisions Private Sewage Systems Standard of Practice Proposed Revisions The Government of Alberta is currently reviewing the Standard of Practice (SOP) for Private Sewage Systems. To this end, the Alberta government

More information

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01 Stormwater Management Studies PDS Engineering Services Division Revised Date: 2/28/08 INTRODUCTION The City of Overland Park requires submission of a stormwater management study as part of the development

More information

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park

Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Feasibility Study for Groundwater Availability for Spring Creek Creation at Squalicum Creek Park Prepared for: City of Bellingham Public Works Department Environmental Resource Division 210 Lottie St.

More information

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES

A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES A HYDROLOGY MODEL FOR MIMICKING PRE AND POST DEVELOPMENT RUNOFF VOLUMES Mr. Randel Lemoine AUTHOR: Fort Benning, DPW Engineering Division, Meloy Dr. Bldg 6, RM 320-T, Fort Benning, Georgia, 315. REFERENCE:

More information

Geotextile Sand Filter

Geotextile Sand Filter Geotextile Sand Filter CORPORATION Innovative Environmental Products & Solutions Since 1970 Table of Contents Subject Page Terms and Definitions 3 GSF System Description 6 1.0 Basic System Design 7 2.0

More information

SECTION TRENCHING & BACKFILLING

SECTION TRENCHING & BACKFILLING SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications

More information

A-2000 PVC Pipe for Storm Sewers and Drainage

A-2000 PVC Pipe for Storm Sewers and Drainage ENGINEERED SOLUTIONS A-2000 PVC Pipe for Storm Sewers and Drainage A-2000 Drainage Pipe Drainage systems are required to meet multiple criteria. The choice of a particular material depends upon a number

More information