SMART REINFORCING BETTER FASTER CHEAPER

Size: px
Start display at page:

Download "SMART REINFORCING BETTER FASTER CHEAPER"

Transcription

1 SMART REINFORCING BETTER FASTER CHEAPER MITA (P) 269/06/2003 Dec 2016 foreword Prefab For Productivity In this issue of our newsletter, we showcase the productivity improvements which could be achieved from the use of bar mats for slabs with heavier loading. This, together with our welded wire mesh, enables a greater degree of prefabrication for all types of slabs, assisting builders in fulfiling BCA s requirement that 65% of slabs in local building structures have to be prefabricated. You will also find in this issue other examples of our extensive range of prefabricated products used in some of our recent projects which have allowed their respective building contractors to save time, labour and money. As a responsible member of the Singapore construction community and a leader in Better Faster Cheaper Total Prefabricated Reinforcing Steel Solutions, we aim to do our part in Singapore s ongoing drive to improve construction productivity. Contact us for a consultation for your project today! Lim Siak Meng Group Managing Director 1

2 42 Storey Residential Bu 6 Storey Instituition Building in Original bottom slab detail. Lift pit section. Better 2 4.0m deep lift pit integrated within raft foundation. Reinforcement T bothways+t bothways, top and bottom. Total weight for stage one 2.0m deep casting MT covering 330m 2. Reinforcement supplied as single directional bar mat to speed up steel fixing work.

3 ilding at Robinson Road Jurong Lift Pit / Raft Foundation Original top slab detail. 1. Laying the BB layer of bar mat. Better 4 layers of bars for both top and bottom reinforcement. T and T changed to 2xT and 2xT bar mats to facilitate steel fixing work and concreting. Each sheet of bar mat weighed between 500 kg to 1250 kg. 3

4 6 Storey Instituition Building in 2. BB layer of bar mat completed and proceeding with B layer. 3. Preparing for the top bar mat for lift pit. Faster 4 Total weight for BB and B layer bar mat 100 MT. 13 workers took 2 days to lay the mats or 2.9 manhour/mt. Total weight for lift pit area T and TT bar mat and wall starter bars 70 MT. 13 workers took 2 days to complete or 4 manhour/mt.

5 Jurong Lift Pit / Raft Foundation Saved 3 to 4 Days 4. Aerial view of reinforcing work in porgress. 5. Lift pit reinforcement completed and ready for stage one casting. Faster Tying loose bars will take at least 7 to 8 days. Time savings of 3 to 4 days. 5

6 6 Storey Instituition Building in Original bottom slab detail. Cheaper 6 Trench section. 2.0m (D) x 6.5m (W) trench raft foundation slab. Reinforcement Combination of T32-100,T25-100, T20-100, T and T Total weight MT covering 900m 2.

7 Jurong - Trench / Raft Foundation Original top slab detail workers positioning the bottom bar mat in place. Cheaper T and T supplied as 2xT and 2xT to ease congestion of rebar and concreting. Each sheet of bar mat took only 5 minutes to position in place. 7

8 6 Storey Instituition Building in 2. BB and B layer of the trench bar mat completed. 3. Prefab column stump installed and topped with F13150 mesh. Better 8 4 workers took 1 day to lay the BB and B layer for one of the trench measuring 2.0m (D) x 6.5m (W) x 35m (L). Prefab column stumps were hoisted in place in 10 minutes.

9 Jurong - Trench / Raft Foundation Saved 3 Days 4. T layer of 2xT mats laid. 5. Raft foundation with trench completed, ready for casting. Better The area of 35m (L) x 20m (W) with 2 trenches took 13 workers 4 days (15 hours/day) to complete or 3.1 manhour/mt. Tying loose bars will take about 7 days. Savings of 3 days. 9

10 7 Storey Ramp Up Warehouse at Pioneer Original drop panel detail. Faster 10 Warehouse post-tensioned slab system with drop panel. Average of 400 x T10 shear links per 4.2m x 4.2m drop panel. Total weight of links 250 kg per drop panel. Links supplied as prefabricated cages to improve site productivity.

11 Road - Drop Panel Shear Link Cage 100% Productivity Improvement 1. Links manufactured as 0.34m (H) and 0.72m (H) link cages. 2. Drop panel completed using the link cages. Faster 2 workers took 3 hours to complete placing the cages for 1 drop panel. Conventional method of tying loose links will take 2 workers 6 hours to complete. 100% productivity improvement. 11

12 7 Storey Ramp Up Fonda Warehouse at Pioneer Bottom mesh layout. Top mesh layout. Cheaper 12 Warehouse post-tensioned slab system with drop panel. A9 mesh specified. Mesh scheduled as large sheets of upto 8.0m (L) X 2.5m (W) to minimise lapping. Mesh manufactured and packed in laying sequence to avoid searching and double handling on site.

13 Road - Post-tensioned Slab Mesh Slab 25% Time Savings 1. Large sheet of bottom mesh easily carried and laid by 4 workers. 2. Slab reinforcement completed for casting. Cheaper 5 workers took 2 days to complete laying top and bottom mesh for an area of 2400m 2. Large sheet configuration and sequential packing improved mesh laying productivity by 25%. 13

14 FondaSchool at Sengkang a1 3 COLUMN / WALL L a T1/B1 a1 B b1 b1 22 V, V1 H 3 PLAN (2-PILE GROUP) BORED PILE COLUMN / WALL STARTER BARS H T1 TOP OF PILECAP H T1 V, V1 V D F.T.L B2 D 75 V1 B2 75 LEAN CONC. BORED PILE B1 LEAN CONC Original pilecap detail. B1 BORED PILE 1. Prefab pilecap delivered to site for drop in installation. Better m (W) x 1.2m(L) x 2.2m(H) pilecap. Reinforcement 13 x T25 top x T32 bottom with T25 binders and T13 links. Total weight 1.5 MT per pilecap.

15 - Prefab Pilecap 88% Productivity Improvement 2. Hoisting prefab pilecap into formwork using an excavator. 3. Pilecap in position for further placement of column starter bars. Better 5 workers took 25 minutes or 1.4 manhour/mt to install the pilecap with the assistance of an excavator. Tying loose bars will take 3 workers 6 hours to complete. 88% productivity improvement. 15

16 7 Storey Ramp Up Warehouse at Pioneer Road m prefab column Floor height of 13.5m. Full height casting. Reinforcement - 40 x T40 +9 x T Lapping - 49 x diameter. Supplied as 2 nos. of prefab column: - 9.0m + lap = 4.8 mt - 4.5m + lap = 2.8 mt Prefab columns completed in 2 hoists by 3 workers in 30 minutes without the need for scaffolding. Boom lift was used by workers to work at height at lapping zone to secure the laps and links. Improved site safety and productivity. BRC ASIA LIMITED Jalan Boon Lay Singapore Telephone enquiries Fax Visit our website at Or us at sales@brc.com.sg

SMART REINFORCING BETTER FASTER CHEAPER

SMART REINFORCING BETTER FASTER CHEAPER SMART REINFORCING BETTER FASTER CHEAPER MITA (P) 269/06/2003 October 2014 foreword Prefabricated Reinforcement a Better, Faster, Cheaper solution to fastrack your project! The unrelenting pressure from

More information

The Art of Construction and The Design. Direct, rebar chair.

The Art of Construction and The Design. Direct, rebar chair. The Art of Construction and The Design Direct, rebar chair. Prefabricated element, made out of a thin steel rebar with plastic tipped legs in order to prevent corrosion of the support area between the

More information

WORKPLACE SAFETY AND HEALTH PRACTICES AWARD 2011

WORKPLACE SAFETY AND HEALTH PRACTICES AWARD 2011 WORKPLACE SAFETY AND HEALTH PRACTICES AWARD 2011 Silent Black Balls (SB2) COMPANY INTRODUCTION In Singapore, we act as the main contractor in construction projects for both private and public sectors Over

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

The Construction of the Langham Place. An Urban Renewal Project that re-shaped the urban landscape of Mong Kok

The Construction of the Langham Place. An Urban Renewal Project that re-shaped the urban landscape of Mong Kok The Construction of the Langham Place An Urban Renewal Project that re-shaped the urban landscape of Mong Kok Artist Impression of Langham Place Fast Fact The site located in the heart of the Mongkok District

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung

POST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung POST-TENSIONING APPLICATION AND TECHNOLOGY Moe Kyaw Aung Overview 1. Background 2. Basic Design Concept 3. Application and Benefits 4. Components of Post-tensioning System 5. Installation Process 6. Construction

More information

Concrete Slab-on-Ground

Concrete Slab-on-Ground Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and

More information

Lintel Tables Design Notes and Limitations

Lintel Tables Design Notes and Limitations LINTEL TABLES Lintel Tables Design Notes and Limitations 1. These tables apply to one and two family residential structures only that conform to the requirements of the 2006, 2009 or 2012 International

More information

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:

Heavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features: TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique

More information

Economic concrete distribution with stationary booms

Economic concrete distribution with stationary booms Economic concrete distribution with stationary booms 1 MT 2059-5 GB File under: A 1.00, BP 1.03, A 4.00, BP 4.03, CPD 4.10 The MX stationary boom system a summary The factor of time is playing an increasingly

More information

Elevated Slab Sequence

Elevated Slab Sequence Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)

More information

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI. SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04

More information

Case examples for the construction of complex basement

Case examples for the construction of complex basement Case examples for the construction of complex basement Project Case 1 Urban Renewal Authority s Redevelopment project at Wanchai Road, H K Site area 7500 m 2 (divided into 2 sites by the Wanchai Road)

More information

FRANK Stremaform formwork elements

FRANK Stremaform formwork elements FRANK formwork elements technologies for the construction industry Applications Working joints working joints enable large structural elements to be formed in sections. The sequence of these working joints

More information

CI/SfB. Xt6. May 2010 HALFEN KWIKASTRIP KT 10-EE HALFEN KWIKASTRIP CONCRETE CONCRETE

CI/SfB. Xt6. May 2010 HALFEN KWIKASTRIP KT 10-EE HALFEN KWIKASTRIP CONCRETE CONCRETE CI/SfB ay 2010 Xt6 HALFEN KWIKASTRIP HALFEN KWIKASTRIP CONCRETE CONCRETE KT 10-EE Halfen Kwikastrip reinforcement continuity strip Halfen Halfen Limited is a leading supplier of building fixings and components,

More information

Concrete Framing systems. Design choices. Basic flavors

Concrete Framing systems. Design choices. Basic flavors Concrete Framing systems Design choices Site Cast Concrete gives a designer a lot of freedom in the design and construction of walls, columns and surface textures. When it comes to spanning, concrete offers

More information

PROJECT: SLAB DESIGN SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340

PROJECT: SLAB DESIGN SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340 SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340 ABN: 84119322438, EC 19060 9 NUMERING COURT, MELTON 3337 PHONE: 03 9746 0089 MOBILE: 0401023328 EMAIL: priyan@wbcse.com.au NOTE: SETTING-OUT OF ANY

More information

Tips For Designing Constructable Concrete Buildings

Tips For Designing Constructable Concrete Buildings Tips For Designing Constructable Concrete Buildings by Clifford Schwinger, P.E. The Harman Group, Structural Engineers King of Prussia, Pa. Structural Engineers Association of Ohio Annual Conference Presentation

More information

Bridge Beams/Girders

Bridge Beams/Girders Bridge Beams/Girders Introduction Simplifying Concrete Construction Insteel Wire Products is the nation s largest manufacturer of steel wire reinforcing products for concrete construction applications.

More information

Thin Slabs in Permanent Form Wall Structures

Thin Slabs in Permanent Form Wall Structures Page 1 of 6 INTRODUCTION AFS-CSR Permanent Form Wall Systems provide a structure that is competitive against other current building systems. Typical uses are in Residential, Motel, Accommodation and Health

More information

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3

1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3 Contents 1. Introduction 3 2. Selection of Pile Type 3 3. Soil Report / Boreholes 3 4. Obstructions 3 5. Design and Installation of Piling Mat 3 6. Permit to Dig 4 7. Setting out 4 8. Water 5 9. Attendant

More information

Talk to us, THE SMART DECKING PEOPLE Visit or Global Roofing Solutions Bond-Dek Composite Deck

Talk to us, THE SMART DECKING PEOPLE Visit  or  Global Roofing Solutions Bond-Dek Composite Deck Talk to us, THE SMART DECKING PEOPLE Visit www.globalroofs.co.za or email info@globalroofs.co.za Global Roofing Solutions Bond-Dek Composite Deck Bond-Dek composite deck Bond-Dek is a composite steel flooring

More information

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building

Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices

More information

National Craft Assessment and Certification Program S P E C I F I C A T I O N S

National Craft Assessment and Certification Program S P E C I F I C A T I O N S National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places

More information

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS

Modcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS Modcrete OVERVIEW Modcrete COMPONENTS 7 > Modcrete is a fast, versatile and cost effective permanent formwork system for the construction of reinforced concrete filled structural walls for single and multi-storey

More information

Retaining Walls. Made Easy

Retaining Walls. Made Easy Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting

More information

Estimate FOR THE SEPTIC TANK

Estimate FOR THE SEPTIC TANK Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks

More information

INSTEEL WIRE PRODUCTS. Product Catalog

INSTEEL WIRE PRODUCTS. Product Catalog INSTEEL WIRE PRODUCTS Product Catalog Introduction Simplifying Concrete Construction Insteel Wire Products is one of the nation s largest manufacturers of steel wire reinforcing products for concrete construction

More information

www.fastformsystems.com info@fastformsystems.comm South Tel: 00 44 (0) 207 1481274 North Tel: 00 44 (0) 8456 171152 Fast-Form The Complete Formwork system Safer / Faster / Greener / Cheaper One system,

More information

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures

Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures Ashley P. Thrall (presenter), University of Notre Dame Yahya C. Kurama,

More information

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B

TERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B EURO ACCESSORIES TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B www.euroacc.co.uk Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger

More information

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS SigmaJoint Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS TYPE - D TYPE - O The Ultimate Joint J Armouring & Load Transfer Systems SigmaJoint Introduction Joints are unavoidable

More information

HIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue.

HIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue. HIGH PERFORMANCE REINFORCEMENT PRODUCTS Product Catalogue www.hrc-europe.com HRC and its product philosophy The use of T-headed bars in concrete structures has some remarkable benefits compared to the

More information

INSPECTION REQUIREMENTS: FOUNDATIONS

INSPECTION REQUIREMENTS: FOUNDATIONS Foundations Page 1 of 9 Revision Date: 1/2/2018 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION REQUIREMENTS: FOUNDATIONS INSPECTION CODE: 204 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,

More information

CI/SfB (29) Et6. October Starter Bar System for the Construction Industry

CI/SfB (29) Et6. October Starter Bar System for the Construction Industry CI/SfB (29) Et6 October 2007 Starter Bar System for the Construction Industry 2 ncon designs and manufactures high integrity steel products for the construction industry. Through continuous programmes

More information

A KNOWLEDGE CLASSIFICATION SCHEME FOR CONSTRUCTABLE DESIGNS

A KNOWLEDGE CLASSIFICATION SCHEME FOR CONSTRUCTABLE DESIGNS A KNOWLEDGE CLASSIFICATION SCHEME FOR CONSTRUCTABLE DESIGNS Yi Qing Yang 1, Sui Pheng Low 2, Shou Qing Wang 3 and Bee Hua Goh 4 Department of Building, National University of Singapore 1 sdep0178@nus.edu.sg,

More information

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for

Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for seismic analysis Analysis done using structural designing

More information

Lifting Sockets. Flat Lifting Sockets

Lifting Sockets. Flat Lifting Sockets Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer

More information

Schöck Isokorb type CV

Schöck Isokorb type CV Schöck Isokorb type The Schöck Isokorb type is suitable for supported reinforced concrete slabs. (C concrete slab) It transmits positive shear force (vertical shear). 71 72 Section/element arrangement

More information

TERWA REBAR CONNECTION COUPLERS

TERWA REBAR CONNECTION COUPLERS TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger than the associated rebar, sometimes

More information

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017

Premier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017 Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins

More information

METHOD STATEMENT for INSTALLATION OF MICROPILE

METHOD STATEMENT for INSTALLATION OF MICROPILE METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which

More information

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1

THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1 THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter

More information

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes,

More information

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel

More information

High Performance Cost-Effective Buildings with Kayson's Cast-in-Situ Monolithic Reinforced Concrete Construction System

High Performance Cost-Effective Buildings with Kayson's Cast-in-Situ Monolithic Reinforced Concrete Construction System High Performance Cost-Effective Buildings with Kayson's Cast-in-Situ Monolithic Reinforced Concrete Construction System Foreword Housing standards and construction methods are by no means static. In fact,

More information

Method Statement for Rectification to L-Shape Windows of HDB Flat in Singapore

Method Statement for Rectification to L-Shape Windows of HDB Flat in Singapore Engineering and Technology 2015; 2(4): 171-177 Published online May 20, 2015 (http://www.aascit.org/journal/et) Method Statement for Rectification to L-Shape Windows of HDB Flat in Singapore Cai Xue Song

More information

The Construction of Deep and Complex Basements and underground structures within extremely difficult urban environment.

The Construction of Deep and Complex Basements and underground structures within extremely difficult urban environment. The Construction of Deep and Complex Basements and underground structures within extremely difficult urban environment Presented by Raymond W M Wong Division of Building Science & Technology City University

More information

Concrete weighs about 150 pounds per cubic foot

Concrete weighs about 150 pounds per cubic foot At Bassora, where they have no timber, they make arches without any frame. The mason, with a nail and a bit of string, marks a semicircle on the ground, lays his bricks, fastened together with a gypsum

More information

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES

PROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES GENERAL NOTES TYPICAL DETAILS REQUIRED VERIFICATION & INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION 1. Inspection of reinforcing steel, including prestressing tendons and placement. 2.

More information

Locrete Building System: the Technology Handbook

Locrete Building System: the Technology Handbook Locrete Building System: the Technology Handbook 1 3... Introduction 4... Characteristics 6... Locrete Production 8... Locrete Testing 12... Building with Locrete 16... Shuttering System 13... External

More information

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication... SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy

More information

GeoEng2000 An International Conference on Geotechnical & Geological Engineering

GeoEng2000 An International Conference on Geotechnical & Geological Engineering GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for

More information

CURRICULUM VITAE. Personal Details. Technical Director Temporary Works. Professional Qualifications. BE (Hons), Eur Ing, CEng, MICE, FIEI

CURRICULUM VITAE. Personal Details. Technical Director Temporary Works. Professional Qualifications. BE (Hons), Eur Ing, CEng, MICE, FIEI CURRICULUM VITAE Personal Details Name: Position: John Sharkey Technical Director Temporary Works Professional Qualifications BE (Hons), Eur Ing, CEng, MICE, FIEI Key Role Responsibilities Responsible

More information

Mi M dri d s ri e s Bui Bu ldi d ng n s

Mi M dri d s ri e s Bui Bu ldi d ng n s Midrise Buildings CBM In May 2015, CBM Engineers and Optimal Consultancy Services Pvt. Ltd. [OCSPL] entered into an agreement that allows both the parties to share its resources and provide with an array

More information

SCOPE OF WORK FOR PILING JOB

SCOPE OF WORK FOR PILING JOB SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala

More information

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio

03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio 03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary Ryan Manocchio rmanocchio@stackct.com Concrete Takeoff Summary Report The STACK To Go Team is capable of performing takeoff for concrete

More information

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1

The Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1 Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section

More information

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.

Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL. Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,

More information

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...

Guideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses... Guidelines for the Safe Erection of Supaloc roof trusses October 2012 CONTENTS Guideline for the erection of Supaloc Steel Trusses... 4 Pre- Delivery preparation by the supplier... 5 Main Roof Truss Bracing

More information

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University

151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...

More information

New Ways in Concrete Construction

New Ways in Concrete Construction New Ways in Concrete Construction BubbleDeck the Biaxial System Multi-storey building in the future To develop constructions as flexible and generally applicable that they will be able to pick up changes

More information

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE

NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)

More information

_spav prefabbricati s.p.a. historical notes

_spav prefabbricati s.p.a. historical notes _spav prefabbricati s.p.a. historical notes The activity Spav Prefabbricati started its activity in 1960 in the outskirts of Udine (north east of Italy) Until this time it has realized more than 2000 buildings

More information

Description Unit Quantity Rate Kshs. Amount Kshs.

Description Unit Quantity Rate Kshs. Amount Kshs. BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove

More information

Aluma EasySet Continuing Innovation from Aluma S ystems

Aluma EasySet Continuing Innovation from Aluma S ystems Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma

More information

Inverted Double T BEAMS and SLABS Applications

Inverted Double T BEAMS and SLABS Applications NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Inverted Double T BEAMS and SLABS Applications Inverted Double T Beams U Panels Inverted Double T Slabs Inverted Triple

More information

COST EFFECTIVE BUILDING SYSTEMS FOR RAPID CONSTRUCTION IN TROPICAL CLIMATES

COST EFFECTIVE BUILDING SYSTEMS FOR RAPID CONSTRUCTION IN TROPICAL CLIMATES COST EFFECTIVE BUILDING SYSTEMS FOR RAPID CONSTRUCTION IN TROPICAL CLIMATES M.T.R. Jayasinghe *, K.K.G.K.D. Kariyawasam, C. Jayasinghe Department of Civil Engineering; University of Moratuwa-Sri Lanka

More information

Reinforced concrete double walls

Reinforced concrete double walls Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice

More information

3. Bond, Anchorage and Shear This chapter will discuss the following topics:

3. Bond, Anchorage and Shear This chapter will discuss the following topics: 3. Bond, Anchorage and Shear This chapter will discuss the following topics: Outline the theory of calculating the anchorage bond length. Determination of anchorage bond length, tension lap length and

More information

Soil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface

Soil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface Soil Mechanics Lateral Earth Pressures page 9 7.6 Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface By now, we have considered the wall as perfectly smooth

More information

Jackson Crossing. Proposal. Alexandria, Virginia. Michael Bologna Structural Option. December 11, 2015 Advisor: Dr. Linda Hanagan

Jackson Crossing. Proposal. Alexandria, Virginia. Michael Bologna Structural Option. December 11, 2015 Advisor: Dr. Linda Hanagan Jackson Crossing Alexandria, Virginia Proposal Michael Bologna Structural Option December 11, 2015 Advisor: Dr. Linda Hanagan Executive Summary... 3 Introduction Purpose... 4 Scope... 4 General Building

More information

Stormwater collection products for all NZ stormwater specifications

Stormwater collection products for all NZ stormwater specifications Stormwater collection products for all NZ stormwater specifications Designs to meet your local requirements Stormwater drainage is an essential task, with the need to convey water from the sides of roads

More information

BETO-Concepts Wall Systems. from France

BETO-Concepts Wall Systems. from France BETO-Concepts Wall Systems from France Introduction Betoconcepts (the Company) was incorporated in France over 2 decades ago Hundreds of Betoconcept walls are built world-wide Modern Plaza Sdn Bhd is Betoconcepts

More information

Ironton Russell Bridge Project

Ironton Russell Bridge Project Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014

More information

Stremaform. Formwork elements. Edition International

Stremaform. Formwork elements.  Edition International Formwork elements Edition International www.maxfrank.com Formwork elements Content Applications...................................4 System........................................6 Material types..................................7

More information

T-WALL & STONE STRONG

T-WALL & STONE STRONG shawprecastsolutions.com & STONE STRONG Retaining Walls PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. The Retaining Wall System is a gravity structure constructed of individual

More information

Hollow Core Slabs Applications

Hollow Core Slabs Applications NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Hollow Core Slabs Applications Hollow Core Slabs Technology for the Precast and Prestressed Concrete Industry HOLLOW RESIDENTIAL,

More information

Couplers For Reinforcement Bars

Couplers For Reinforcement Bars Couplers For Reinforcement Bars Tata Steel Limited Tata Centre, 43 Jawaharlal Nehru Rd. Kolkata 700071. India T : 91 33 2288 7051 2288 9251 F : 91 33 2288 1640 W: www.readybuild.tatatiscon.co.in For further

More information

Jobsite Layout Considerations

Jobsite Layout Considerations 1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration

More information

North Mountain IMS Medical Office Building

North Mountain IMS Medical Office Building North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 1 October 5 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,

More information

PROPOSED YONTOY PREFAB OFFICES PROPOSED PREFAB INSTALLATION -YONTOY- JUBBALAND STATE OF SOMALIA PROJECT: IMPLMENTED BY: GOVERNMENT.

PROPOSED YONTOY PREFAB OFFICES PROPOSED PREFAB INSTALLATION -YONTOY- JUBBALAND STATE OF SOMALIA PROJECT: IMPLMENTED BY: GOVERNMENT. PROJECT: IMPLMENTED BY: PROPOSED YONTOY GOVERNMENT. PREFAB OFFICES JUBBALAND STATE OF SOMALIA - YONTOY - OCTOBER 2017 DRAWING INDEX 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. SHEET N O 01/27 02/27 03/27

More information

EXPO'98 PORTUGUESE NATIONAL PAVILION A LARGE USE OF LIGHT WEIGHT STRUCTURAL CONCRETE

EXPO'98 PORTUGUESE NATIONAL PAVILION A LARGE USE OF LIGHT WEIGHT STRUCTURAL CONCRETE \ EXPO'98 PORTUGUESE NATIONAL PAVILION A LARGE USE OF LIGHT WEIGHT STRUCTURAL CONCRETE A. Segadães Tavares Rui R. Vieira ABSTRACT The Portuguese National Pavilion is a special building that shall provide

More information

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)

EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23 The following presentation discusses

More information

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012)

Statement of Special Inspections Michigan Building Code 2012 (MBC 2012) Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012

More information

Major Building and Special Structures

Major Building and Special Structures TECHNICAL SESSION 1 Major Building and Special Structures Moderator Russell B. Price, P.E. Suncoast Post-Tension L.P. Houston, Texas 2004 PTI Technical Conference Session 1 Dennis Wittry -- Denver's Invesco

More information

Structural and Construction Feature of the Hong Kong International Financial Center Phase II

Structural and Construction Feature of the Hong Kong International Financial Center Phase II Structural and Construction Feature of the Hong Kong International Financial Center Phase II Raymond W M Wong 1 and M F Ho 2, 1 Division of Building Science and Technology, City University of Hong Kong

More information

PRE-CAST HOUSE CONSTRUCTION

PRE-CAST HOUSE CONSTRUCTION PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads

More information

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.

See the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals. As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed

More information

POST TENSIONED SLABS. Imagineering the possibilities

POST TENSIONED SLABS. Imagineering the possibilities POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems

More information

The superior self-compacting concrete

The superior self-compacting concrete LAFARGE READYMIX The superior self-compacting concrete The superior selfcompacting concrete THE ADVANTAGES ARE IMPRESSIVE REDUCES LABOUR COSTS Lafarge has developed a superior range of concretes in response

More information

Geotechnical Engineering Software GEO5

Geotechnical Engineering Software GEO5 Geotechnical Engineering Software GEO5 GEO5 software suite is designed to solve various geotechnical problems. The easy -to -use suite consists of individual programs with an unified and user-friendly

More information

two structural systems, planning and design Structural Organization Bearing Walls Structural Components

two structural systems, planning and design Structural Organization Bearing Walls Structural Components ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS FALL 2013 lecture two structural systems, planning and design AISC teaching aids: Courtesy of John Hooper, MKA Seattle Structural Organization

More information

Rapid Axial Load Testing of Drilled Shafts

Rapid Axial Load Testing of Drilled Shafts Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial

More information

Site Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco

Site Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco A Site Analysis Site Conditions: Seismic Challenges Strong Winds Average Temperature 69 San Francisco A Site Analysis A Engineering School of San Francisco Requirements 2015 Innovative Design Gold LEED

More information

THE NEW CONTROL TOWER OF THE MALAGA AIRPORT (SPAIN)

THE NEW CONTROL TOWER OF THE MALAGA AIRPORT (SPAIN) THE NEW CONTROL TOWER OF THE MALAGA AIRPORT (SPAIN) M.E. Giuliani 1 1 Dr.Engineer Managing Partner Studio Giuliani -Redesco srl Milano Italy ABSTRACT: Reinforced concrete shells have been widely used for

More information

PRODUCT DATA SHEET SikaProof Bentonite

PRODUCT DATA SHEET SikaProof Bentonite PRODUCT DATA SHEET NATURAL SODIUM BENTONITE BELOW GROUND WATERPROOFING SYSTEM (ONLY TO BE APPLIED BY A SIKA APPROVED CONTRACTOR) PRODUCT DESCRIPTION SikaProof Bentonite is a needle punched thermally locked

More information

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site

Installing DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan

More information