1 SMART REINFORCING BETTER FASTER CHEAPER MITA (P) 269/06/2003 Dec 2016 foreword Prefab For Productivity In this issue of our newsletter, we showcase the productivity improvements which could be achieved from the use of bar mats for slabs with heavier loading. This, together with our welded wire mesh, enables a greater degree of prefabrication for all types of slabs, assisting builders in fulfiling BCA s requirement that 65% of slabs in local building structures have to be prefabricated. You will also find in this issue other examples of our extensive range of prefabricated products used in some of our recent projects which have allowed their respective building contractors to save time, labour and money. As a responsible member of the Singapore construction community and a leader in Better Faster Cheaper Total Prefabricated Reinforcing Steel Solutions, we aim to do our part in Singapore s ongoing drive to improve construction productivity. Contact us for a consultation for your project today! Lim Siak Meng Group Managing Director 1
2 42 Storey Residential Bu 6 Storey Instituition Building in Original bottom slab detail. Lift pit section. Better 2 4.0m deep lift pit integrated within raft foundation. Reinforcement T bothways+t bothways, top and bottom. Total weight for stage one 2.0m deep casting MT covering 330m 2. Reinforcement supplied as single directional bar mat to speed up steel fixing work.
3 ilding at Robinson Road Jurong Lift Pit / Raft Foundation Original top slab detail. 1. Laying the BB layer of bar mat. Better 4 layers of bars for both top and bottom reinforcement. T and T changed to 2xT and 2xT bar mats to facilitate steel fixing work and concreting. Each sheet of bar mat weighed between 500 kg to 1250 kg. 3
4 6 Storey Instituition Building in 2. BB layer of bar mat completed and proceeding with B layer. 3. Preparing for the top bar mat for lift pit. Faster 4 Total weight for BB and B layer bar mat 100 MT. 13 workers took 2 days to lay the mats or 2.9 manhour/mt. Total weight for lift pit area T and TT bar mat and wall starter bars 70 MT. 13 workers took 2 days to complete or 4 manhour/mt.
5 Jurong Lift Pit / Raft Foundation Saved 3 to 4 Days 4. Aerial view of reinforcing work in porgress. 5. Lift pit reinforcement completed and ready for stage one casting. Faster Tying loose bars will take at least 7 to 8 days. Time savings of 3 to 4 days. 5
6 6 Storey Instituition Building in Original bottom slab detail. Cheaper 6 Trench section. 2.0m (D) x 6.5m (W) trench raft foundation slab. Reinforcement Combination of T32-100,T25-100, T20-100, T and T Total weight MT covering 900m 2.
7 Jurong - Trench / Raft Foundation Original top slab detail workers positioning the bottom bar mat in place. Cheaper T and T supplied as 2xT and 2xT to ease congestion of rebar and concreting. Each sheet of bar mat took only 5 minutes to position in place. 7
8 6 Storey Instituition Building in 2. BB and B layer of the trench bar mat completed. 3. Prefab column stump installed and topped with F13150 mesh. Better 8 4 workers took 1 day to lay the BB and B layer for one of the trench measuring 2.0m (D) x 6.5m (W) x 35m (L). Prefab column stumps were hoisted in place in 10 minutes.
9 Jurong - Trench / Raft Foundation Saved 3 Days 4. T layer of 2xT mats laid. 5. Raft foundation with trench completed, ready for casting. Better The area of 35m (L) x 20m (W) with 2 trenches took 13 workers 4 days (15 hours/day) to complete or 3.1 manhour/mt. Tying loose bars will take about 7 days. Savings of 3 days. 9
10 7 Storey Ramp Up Warehouse at Pioneer Original drop panel detail. Faster 10 Warehouse post-tensioned slab system with drop panel. Average of 400 x T10 shear links per 4.2m x 4.2m drop panel. Total weight of links 250 kg per drop panel. Links supplied as prefabricated cages to improve site productivity.
11 Road - Drop Panel Shear Link Cage 100% Productivity Improvement 1. Links manufactured as 0.34m (H) and 0.72m (H) link cages. 2. Drop panel completed using the link cages. Faster 2 workers took 3 hours to complete placing the cages for 1 drop panel. Conventional method of tying loose links will take 2 workers 6 hours to complete. 100% productivity improvement. 11
12 7 Storey Ramp Up Fonda Warehouse at Pioneer Bottom mesh layout. Top mesh layout. Cheaper 12 Warehouse post-tensioned slab system with drop panel. A9 mesh specified. Mesh scheduled as large sheets of upto 8.0m (L) X 2.5m (W) to minimise lapping. Mesh manufactured and packed in laying sequence to avoid searching and double handling on site.
13 Road - Post-tensioned Slab Mesh Slab 25% Time Savings 1. Large sheet of bottom mesh easily carried and laid by 4 workers. 2. Slab reinforcement completed for casting. Cheaper 5 workers took 2 days to complete laying top and bottom mesh for an area of 2400m 2. Large sheet configuration and sequential packing improved mesh laying productivity by 25%. 13
14 FondaSchool at Sengkang a1 3 COLUMN / WALL L a T1/B1 a1 B b1 b1 22 V, V1 H 3 PLAN (2-PILE GROUP) BORED PILE COLUMN / WALL STARTER BARS H T1 TOP OF PILECAP H T1 V, V1 V D F.T.L B2 D 75 V1 B2 75 LEAN CONC. BORED PILE B1 LEAN CONC Original pilecap detail. B1 BORED PILE 1. Prefab pilecap delivered to site for drop in installation. Better m (W) x 1.2m(L) x 2.2m(H) pilecap. Reinforcement 13 x T25 top x T32 bottom with T25 binders and T13 links. Total weight 1.5 MT per pilecap.
15 - Prefab Pilecap 88% Productivity Improvement 2. Hoisting prefab pilecap into formwork using an excavator. 3. Pilecap in position for further placement of column starter bars. Better 5 workers took 25 minutes or 1.4 manhour/mt to install the pilecap with the assistance of an excavator. Tying loose bars will take 3 workers 6 hours to complete. 88% productivity improvement. 15
16 7 Storey Ramp Up Warehouse at Pioneer Road m prefab column Floor height of 13.5m. Full height casting. Reinforcement - 40 x T40 +9 x T Lapping - 49 x diameter. Supplied as 2 nos. of prefab column: - 9.0m + lap = 4.8 mt - 4.5m + lap = 2.8 mt Prefab columns completed in 2 hoists by 3 workers in 30 minutes without the need for scaffolding. Boom lift was used by workers to work at height at lapping zone to secure the laps and links. Improved site safety and productivity. BRC ASIA LIMITED Jalan Boon Lay Singapore Telephone enquiries Fax Visit our website at Or us at sales@brc.com.sg
SMART REINFORCING BETTER FASTER CHEAPER
SMART REINFORCING BETTER FASTER CHEAPER MITA (P) 269/06/2003 October 2014 foreword Prefabricated Reinforcement a Better, Faster, Cheaper solution to fastrack your project! The unrelenting pressure from
More informationThe Art of Construction and The Design. Direct, rebar chair.
The Art of Construction and The Design Direct, rebar chair. Prefabricated element, made out of a thin steel rebar with plastic tipped legs in order to prevent corrosion of the support area between the
More informationWORKPLACE SAFETY AND HEALTH PRACTICES AWARD 2011
WORKPLACE SAFETY AND HEALTH PRACTICES AWARD 2011 Silent Black Balls (SB2) COMPANY INTRODUCTION In Singapore, we act as the main contractor in construction projects for both private and public sectors Over
More informationWORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00
Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type
More informationThe Construction of the Langham Place. An Urban Renewal Project that re-shaped the urban landscape of Mong Kok
The Construction of the Langham Place An Urban Renewal Project that re-shaped the urban landscape of Mong Kok Artist Impression of Langham Place Fast Fact The site located in the heart of the Mongkok District
More information1 Exam Prep Placing Reinforcing Bars Tabs and Highlights
1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.
More informationPOST-TENSIONING APPLICATION AND TECHNOLOGY. Moe Kyaw Aung
POST-TENSIONING APPLICATION AND TECHNOLOGY Moe Kyaw Aung Overview 1. Background 2. Basic Design Concept 3. Application and Benefits 4. Components of Post-tensioning System 5. Installation Process 6. Construction
More informationConcrete Slab-on-Ground
Concrete Slab-on-Ground This training package provides information on concrete slab-on-ground construction, including reinforcement, formwork, mix, placement and curing, for village infrastructure and
More informationLintel Tables Design Notes and Limitations
LINTEL TABLES Lintel Tables Design Notes and Limitations 1. These tables apply to one and two family residential structures only that conform to the requirements of the 2006, 2009 or 2012 International
More informationHeavy Rib. Page 1 of 6. Expanded Mesh & Metal Products. Key Product Features:
TMI- is used widely in construction work for joints, stop-end, retaining walls and columns. It creates a strong bond base for successive pours. is fixed as permanent formwork. Key Product Features: Unique
More informationEconomic concrete distribution with stationary booms
Economic concrete distribution with stationary booms 1 MT 2059-5 GB File under: A 1.00, BP 1.03, A 4.00, BP 4.03, CPD 4.10 The MX stationary boom system a summary The factor of time is playing an increasingly
More informationElevated Slab Sequence
Elevated Slab Sequence The following group of photos shows the sequence for installa4on of a one- way elevated slab. (Slab & Beam with Reinforcing & Post- Tensioning) Columns Placed & Form Support (Scaffolding)
More informationSCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.
SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST RAIGARH, MUMBAI. Tender Reference No. BL/LI/CC/TCWMUM/BOUNDARY WALL/1617/04
More informationCase examples for the construction of complex basement
Case examples for the construction of complex basement Project Case 1 Urban Renewal Authority s Redevelopment project at Wanchai Road, H K Site area 7500 m 2 (divided into 2 sites by the Wanchai Road)
More informationFRANK Stremaform formwork elements
FRANK formwork elements technologies for the construction industry Applications Working joints working joints enable large structural elements to be formed in sections. The sequence of these working joints
More informationCI/SfB. Xt6. May 2010 HALFEN KWIKASTRIP KT 10-EE HALFEN KWIKASTRIP CONCRETE CONCRETE
CI/SfB ay 2010 Xt6 HALFEN KWIKASTRIP HALFEN KWIKASTRIP CONCRETE CONCRETE KT 10-EE Halfen Kwikastrip reinforcement continuity strip Halfen Halfen Limited is a leading supplier of building fixings and components,
More informationConcrete Framing systems. Design choices. Basic flavors
Concrete Framing systems Design choices Site Cast Concrete gives a designer a lot of freedom in the design and construction of walls, columns and surface textures. When it comes to spanning, concrete offers
More informationPROJECT: SLAB DESIGN SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340
SITE ADDRESS LOT 36, HAMISH ROAD, DARLEY VICTORIA 3340 ABN: 84119322438, EC 19060 9 NUMERING COURT, MELTON 3337 PHONE: 03 9746 0089 MOBILE: 0401023328 EMAIL: priyan@wbcse.com.au NOTE: SETTING-OUT OF ANY
More informationTips For Designing Constructable Concrete Buildings
Tips For Designing Constructable Concrete Buildings by Clifford Schwinger, P.E. The Harman Group, Structural Engineers King of Prussia, Pa. Structural Engineers Association of Ohio Annual Conference Presentation
More informationBridge Beams/Girders
Bridge Beams/Girders Introduction Simplifying Concrete Construction Insteel Wire Products is the nation s largest manufacturer of steel wire reinforcing products for concrete construction applications.
More informationThin Slabs in Permanent Form Wall Structures
Page 1 of 6 INTRODUCTION AFS-CSR Permanent Form Wall Systems provide a structure that is competitive against other current building systems. Typical uses are in Residential, Motel, Accommodation and Health
More information1. Introduction Selection of Pile Type Soil Report / Boreholes Obstructions Design and Installation of Piling Mat 3
Contents 1. Introduction 3 2. Selection of Pile Type 3 3. Soil Report / Boreholes 3 4. Obstructions 3 5. Design and Installation of Piling Mat 3 6. Permit to Dig 4 7. Setting out 4 8. Water 5 9. Attendant
More informationTalk to us, THE SMART DECKING PEOPLE Visit or Global Roofing Solutions Bond-Dek Composite Deck
Talk to us, THE SMART DECKING PEOPLE Visit www.globalroofs.co.za or email info@globalroofs.co.za Global Roofing Solutions Bond-Dek Composite Deck Bond-Dek composite deck Bond-Dek is a composite steel flooring
More informationComparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building
Comparative Study on Post - Tensioned and Reinforced Concrete flat Slab Systems for a Multistory Building Thayapraba M Civil Department, NIT Trichy, (India) ABSTRACT Designers have a huge number of choices
More informationNational Craft Assessment and Certification Program S P E C I F I C A T I O N S
National Craft Assessment and Certification Program S P E C I F I C A T I O N S Industrial Carpentry V5 TBD Focus Statement An industrial carpenter erects concrete forms, plumb, level and to grade; places
More informationModcrete. Modcrete OVERVIEW COMPONENTS COMPONENTS
Modcrete OVERVIEW Modcrete COMPONENTS 7 > Modcrete is a fast, versatile and cost effective permanent formwork system for the construction of reinforced concrete filled structural walls for single and multi-storey
More informationRetaining Walls. Made Easy
Retaining Walls Made Easy Retaining Walls Made Easy! Contents Page 1 Contents Page 2 Foreword Page 3 Demolition Page 3 Removal Vegetation Page 3 Excavation Page 4 Reinforcement Steel Page 6 Concreting
More informationEstimate FOR THE SEPTIC TANK
Estimate FOR THE SEPTIC TANK S.NO ITEM DESCRIPTION. 1 Excavation in soil,soft & hard murum... Qty UNIT Rate Excavation for footing, machine foundation, plinth beams, wall footing, gutters,brick wall, tanks
More informationINSTEEL WIRE PRODUCTS. Product Catalog
INSTEEL WIRE PRODUCTS Product Catalog Introduction Simplifying Concrete Construction Insteel Wire Products is one of the nation s largest manufacturers of steel wire reinforcing products for concrete construction
More informationwww.fastformsystems.com info@fastformsystems.comm South Tel: 00 44 (0) 207 1481274 North Tel: 00 44 (0) 8456 171152 Fast-Form The Complete Formwork system Safer / Faster / Greener / Cheaper One system,
More informationPrefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures
Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures Ashley P. Thrall (presenter), University of Notre Dame Yahya C. Kurama,
More informationTERWA REBAR CONNECTION COUPLERS. CARES Technical Approval 5058 TA1B
EURO ACCESSORIES TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B www.euroacc.co.uk Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger
More informationSigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS
SigmaJoint Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS TYPE - D TYPE - O The Ultimate Joint J Armouring & Load Transfer Systems SigmaJoint Introduction Joints are unavoidable
More informationHIGH PERFORMANCE REINFORCEMENT PRODUCTS. Product Catalogue.
HIGH PERFORMANCE REINFORCEMENT PRODUCTS Product Catalogue www.hrc-europe.com HRC and its product philosophy The use of T-headed bars in concrete structures has some remarkable benefits compared to the
More informationINSPECTION REQUIREMENTS: FOUNDATIONS
Foundations Page 1 of 9 Revision Date: 1/2/2018 DEVELOPMENT SERVICES BUILDING INSPECTION INSPECTION REQUIREMENTS: FOUNDATIONS INSPECTION CODE: 204 SCOPE: RESIDENTIAL APPLICABLE CODES: 2016 CBC, CRC, CPC,
More informationCI/SfB (29) Et6. October Starter Bar System for the Construction Industry
CI/SfB (29) Et6 October 2007 Starter Bar System for the Construction Industry 2 ncon designs and manufactures high integrity steel products for the construction industry. Through continuous programmes
More informationA KNOWLEDGE CLASSIFICATION SCHEME FOR CONSTRUCTABLE DESIGNS
A KNOWLEDGE CLASSIFICATION SCHEME FOR CONSTRUCTABLE DESIGNS Yi Qing Yang 1, Sui Pheng Low 2, Shou Qing Wang 3 and Bee Hua Goh 4 Department of Building, National University of Singapore 1 sdep0178@nus.edu.sg,
More informationGround + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for
Ground + 4 floor RCC frame structure in Goa Floor to floor height is 3.0m Plan dimension, 24.0 m x 13.5 m SBC = 20 t/sqm, hard Strata is consider for seismic analysis Analysis done using structural designing
More informationLifting Sockets. Flat Lifting Sockets
Lifting sockets are widely used in the application of precast concrete construction, such as lifting beams, wall and floor slabs etc.. A reinforcement bar is to be inserted through the cross hole to transfer
More informationSchöck Isokorb type CV
Schöck Isokorb type The Schöck Isokorb type is suitable for supported reinforced concrete slabs. (C concrete slab) It transmits positive shear force (vertical shear). 71 72 Section/element arrangement
More informationTERWA REBAR CONNECTION COUPLERS
TERWA REBAR CONNECTION COUPLERS CARES Technical Approval 5058 TA1B Introduction The Terwa Parallel Threaded Coupler is a full bar strength system (the coupling is stronger than the associated rebar, sometimes
More informationPremier Inn, Wilson Street, Middlesbrough, TS1 1AE. Site progress report. February 2017
Premier Inn, Wilson Street, Middlesbrough, TS1 1AE Site progress report February 2017 Site set up Currently 4 weeks in to the build the site has been cleared and hoardings have been erected. Welfare cabins
More informationMETHOD STATEMENT for INSTALLATION OF MICROPILE
METHOD STATEMENT for INSTALLATION OF MICROPILE A. MATERIAL TO BE USED 1. Grout Grout shall be mixed from Ordinary Portland Cement and clean water free from harmful substances. Usage of other cement which
More informationTHE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING. D H Chisholm 1
THE PERFORMANCE OF CONCRETE GROUND FLOOR SLAB REINFORCEMENT TO CONTROL SHRINKAGE CRACKING D H Chisholm 1 ABSTRACT In a typical residential concrete floor slab, the cast in strip footings on the slab perimeter
More informationLow Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade
TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes,
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationHigh Performance Cost-Effective Buildings with Kayson's Cast-in-Situ Monolithic Reinforced Concrete Construction System
High Performance Cost-Effective Buildings with Kayson's Cast-in-Situ Monolithic Reinforced Concrete Construction System Foreword Housing standards and construction methods are by no means static. In fact,
More informationMethod Statement for Rectification to L-Shape Windows of HDB Flat in Singapore
Engineering and Technology 2015; 2(4): 171-177 Published online May 20, 2015 (http://www.aascit.org/journal/et) Method Statement for Rectification to L-Shape Windows of HDB Flat in Singapore Cai Xue Song
More informationThe Construction of Deep and Complex Basements and underground structures within extremely difficult urban environment.
The Construction of Deep and Complex Basements and underground structures within extremely difficult urban environment Presented by Raymond W M Wong Division of Building Science & Technology City University
More informationConcrete weighs about 150 pounds per cubic foot
At Bassora, where they have no timber, they make arches without any frame. The mason, with a nail and a bit of string, marks a semicircle on the ground, lays his bricks, fastened together with a gypsum
More informationPROJECT: TULSA COMMUNITY COLLEGE BOOKSTORE RENOVATION PROJECT NUMBER: ISSUE: CONSULTANT: SEAL: SHEET NUMBER: GENERAL NOTES
GENERAL NOTES TYPICAL DETAILS REQUIRED VERIFICATION & INSPECTION OF CONCRETE CONSTRUCTION VERIFICATION AND INSPECTION 1. Inspection of reinforcing steel, including prestressing tendons and placement. 2.
More informationLocrete Building System: the Technology Handbook
Locrete Building System: the Technology Handbook 1 3... Introduction 4... Characteristics 6... Locrete Production 8... Locrete Testing 12... Building with Locrete 16... Shuttering System 13... External
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL TABLE OF CONTENTS 5.1 General...5-1 5.2 Certification...5-1 5.3 Fabrication...5-1 5.4 Handling and Storage...5-1 5.5 Field Repair of Epoxy
More informationGeoEng2000 An International Conference on Geotechnical & Geological Engineering
GeoEng2000 An International Conference on Geotechnical & Geological Engineering 19-24 November 2000 Melbourne Exhibition and Convention Centre Melbourne, Australia Barrettes : A versatile foundation for
More informationCURRICULUM VITAE. Personal Details. Technical Director Temporary Works. Professional Qualifications. BE (Hons), Eur Ing, CEng, MICE, FIEI
CURRICULUM VITAE Personal Details Name: Position: John Sharkey Technical Director Temporary Works Professional Qualifications BE (Hons), Eur Ing, CEng, MICE, FIEI Key Role Responsibilities Responsible
More informationMi M dri d s ri e s Bui Bu ldi d ng n s
Midrise Buildings CBM In May 2015, CBM Engineers and Optimal Consultancy Services Pvt. Ltd. [OCSPL] entered into an agreement that allows both the parties to share its resources and provide with an array
More informationSCOPE OF WORK FOR PILING JOB
SCOPE OF WORK FOR PILING JOB 1.0 PURPOSE This document defines the scope of works and specific requirements for the tank pad construction including pile foundation system for the proposed tanks at Wadala
More information03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary. Ryan Manocchio
03 CONCRETE TAKEOFF SUMMARY REPORT Takeoff and Items Cost Summary Ryan Manocchio rmanocchio@stackct.com Concrete Takeoff Summary Report The STACK To Go Team is capable of performing takeoff for concrete
More informationThe Hashemite University Department of Civil Engineering. Dr. Hazim Dwairi. Dr. Hazim Dwairi 1
Department of Civil Engineering Lecture 2.1 Methods of Prestressing Advantages of Prestressing Section remains uncracked under service loads Reduction of steel corrosion (increase durability) Full section
More informationDevelopment of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities. for LOCATED AT PRIMARY & SECONDARY SCHOOL.
Development of the Urban Water and Sanitation Sector in South Sudan (DUWSS) Bill of Quantities for SIX CHAMBER VIP LATRINE FACILITY LOCATED AT PRIMARY & SECONDARY SCHOOL YEI RIVER COUNTY South Sudan JUN,
More informationGuideline for the erection of Supaloc Steel Trusses Pre- Delivery preparation by the supplier Installing Supaloc Steel roof trusses...
Guidelines for the Safe Erection of Supaloc roof trusses October 2012 CONTENTS Guideline for the erection of Supaloc Steel Trusses... 4 Pre- Delivery preparation by the supplier... 5 Main Roof Truss Bracing
More information151 First Side. Technical Assignment 2 November 16 th, William J. Buchko. AE 481w Senior Thesis The Pennsylvania State University
November 16 th, 2007 William J. Buchko AE 481w Senior Thesis The Pennsylvania State University Thesis Advisor: Kevin Parfitt Table of Contents Executive Summary... 3 Structural System Overview Foundation...
More informationNew Ways in Concrete Construction
New Ways in Concrete Construction BubbleDeck the Biaxial System Multi-storey building in the future To develop constructions as flexible and generally applicable that they will be able to pick up changes
More informationNEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE
NEW PERFORMANCE CRITERIA FOR FRESH TREMIE CONCRETE Karsten Beckhaus (1), Martin Larisch (2), Habib Alehossein (3,4) (1) BAUER Spezialtiefbau GmbH, Deutschland (2) Keller Australia Pty Ltd, Australia (3)
More information_spav prefabbricati s.p.a. historical notes
_spav prefabbricati s.p.a. historical notes The activity Spav Prefabbricati started its activity in 1960 in the outskirts of Udine (north east of Italy) Until this time it has realized more than 2000 buildings
More informationDescription Unit Quantity Rate Kshs. Amount Kshs.
BILL No.1 40m3 MASONRY STORAGE TANK No. Description Unit Quantity Rate Kshs. Amount Kshs. 1 SETTING OUT AND EARTH WORKS 1.1 General site clearance and setting out 1.2 Excavate over site 200mm to remove
More informationAluma EasySet Continuing Innovation from Aluma S ystems
Product Sheet Aluma EasySet Aluma Systems Concrete Construction Aluma EasySet Continuing Innovation from Aluma S ystems Introduction With more than 35 years of experience in shoring and formwork, Aluma
More informationInverted Double T BEAMS and SLABS Applications
NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Inverted Double T BEAMS and SLABS Applications Inverted Double T Beams U Panels Inverted Double T Slabs Inverted Triple
More informationCOST EFFECTIVE BUILDING SYSTEMS FOR RAPID CONSTRUCTION IN TROPICAL CLIMATES
COST EFFECTIVE BUILDING SYSTEMS FOR RAPID CONSTRUCTION IN TROPICAL CLIMATES M.T.R. Jayasinghe *, K.K.G.K.D. Kariyawasam, C. Jayasinghe Department of Civil Engineering; University of Moratuwa-Sri Lanka
More informationReinforced concrete double walls
Reinforced concrete double walls Build faster, pay less. Strength in building technology Uses The Kerkstoel reinforced double walls consist of two slabs of reinforced concrete joined to each other by lattice
More information3. Bond, Anchorage and Shear This chapter will discuss the following topics:
3. Bond, Anchorage and Shear This chapter will discuss the following topics: Outline the theory of calculating the anchorage bond length. Determination of anchorage bond length, tension lap length and
More informationSoil Mechanics Lateral Earth Pressures page Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface
Soil Mechanics Lateral Earth Pressures page 9 7.6 Lateral Earth Pressures in case of inclined ground surface or friction at wall-ground interface By now, we have considered the wall as perfectly smooth
More informationJackson Crossing. Proposal. Alexandria, Virginia. Michael Bologna Structural Option. December 11, 2015 Advisor: Dr. Linda Hanagan
Jackson Crossing Alexandria, Virginia Proposal Michael Bologna Structural Option December 11, 2015 Advisor: Dr. Linda Hanagan Executive Summary... 3 Introduction Purpose... 4 Scope... 4 General Building
More informationStormwater collection products for all NZ stormwater specifications
Stormwater collection products for all NZ stormwater specifications Designs to meet your local requirements Stormwater drainage is an essential task, with the need to convey water from the sides of roads
More informationBETO-Concepts Wall Systems. from France
BETO-Concepts Wall Systems from France Introduction Betoconcepts (the Company) was incorporated in France over 2 decades ago Hundreds of Betoconcept walls are built world-wide Modern Plaza Sdn Bhd is Betoconcepts
More informationIronton Russell Bridge Project
Construction Update October 1, 2014 Rendering by URS Responsible for Construction Inspection & Engineering Prepared by: Brian Davidson, P.E. Ironton Russell Bridge Project Project Summary: October 1, 2014
More informationStremaform. Formwork elements. Edition International
Formwork elements Edition International www.maxfrank.com Formwork elements Content Applications...................................4 System........................................6 Material types..................................7
More informationT-WALL & STONE STRONG
shawprecastsolutions.com & STONE STRONG Retaining Walls PRODUCT GUIDE & TECHNICAL REFERENCE MANUAL Providing the right solutions. The Retaining Wall System is a gravity structure constructed of individual
More informationHollow Core Slabs Applications
NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Hollow Core Slabs Applications Hollow Core Slabs Technology for the Precast and Prestressed Concrete Industry HOLLOW RESIDENTIAL,
More informationCouplers For Reinforcement Bars
Couplers For Reinforcement Bars Tata Steel Limited Tata Centre, 43 Jawaharlal Nehru Rd. Kolkata 700071. India T : 91 33 2288 7051 2288 9251 F : 91 33 2288 1640 W: www.readybuild.tatatiscon.co.in For further
More informationJobsite Layout Considerations
1 Jobsite Layout Considerations The controlling contractor must consider many factors when laying out a site to support construction operations Site and building size and Equipment requirements configuration
More informationNorth Mountain IMS Medical Office Building
North Mountain IMS Medical Office Building Phoenix, Arizona Michael Hopple Technical Assignment 1 October 5 th, 2007 AE 481W-Senior Thesis The Pennsylvania State University Faculty Adviser: Dr. Ali Memari,
More informationPROPOSED YONTOY PREFAB OFFICES PROPOSED PREFAB INSTALLATION -YONTOY- JUBBALAND STATE OF SOMALIA PROJECT: IMPLMENTED BY: GOVERNMENT.
PROJECT: IMPLMENTED BY: PROPOSED YONTOY GOVERNMENT. PREFAB OFFICES JUBBALAND STATE OF SOMALIA - YONTOY - OCTOBER 2017 DRAWING INDEX 01. 02. 03. 04. 05. 06. 07. 08. 09. 10. 11. SHEET N O 01/27 02/27 03/27
More informationEXPO'98 PORTUGUESE NATIONAL PAVILION A LARGE USE OF LIGHT WEIGHT STRUCTURAL CONCRETE
\ EXPO'98 PORTUGUESE NATIONAL PAVILION A LARGE USE OF LIGHT WEIGHT STRUCTURAL CONCRETE A. Segadães Tavares Rui R. Vieira ABSTRACT The Portuguese National Pavilion is a special building that shall provide
More informationEVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS)
EVALUATION & REPAIR OF CORROSION DAMAGED ROOF LIFT SLAB WITH WIRE POST-TENSIONING SYSTEM (BUTTON HEADS) (C) COPYRIGHT POST-TENSIONING INSTITUTE, ALL RIGHT RESERVED 1 of 23 The following presentation discusses
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationMajor Building and Special Structures
TECHNICAL SESSION 1 Major Building and Special Structures Moderator Russell B. Price, P.E. Suncoast Post-Tension L.P. Houston, Texas 2004 PTI Technical Conference Session 1 Dennis Wittry -- Denver's Invesco
More informationStructural and Construction Feature of the Hong Kong International Financial Center Phase II
Structural and Construction Feature of the Hong Kong International Financial Center Phase II Raymond W M Wong 1 and M F Ho 2, 1 Division of Building Science and Technology, City University of Hong Kong
More informationPRE-CAST HOUSE CONSTRUCTION
PRE-CAST HOUSE CONSTRUCTION BDA is a Planning and Development Authority Jurisdictional Area is 1370 sq.km. Developed 64 Layouts Distributed 1,40,000 of sites Developed Infrastructure Works like Ring Roads
More informationSee the IRC for additional information. See CPD-DS Information Bulletin 100 for Requirements for 1 & 2 Family Dwelling plan submittals.
As a customer service initiative, the Kansas City, Missouri, City Planning and Development Department/Development Services, in cooperation with the Greater Kansas City Home Builders Association, has developed
More informationPOST TENSIONED SLABS. Imagineering the possibilities
POST TENSIONED SLABS Imagineering the possibilities imagineering... CCL post - tensioned slab solutions represent continuous development through involvement in building structures worldwide. CCL systems
More informationThe superior self-compacting concrete
LAFARGE READYMIX The superior self-compacting concrete The superior selfcompacting concrete THE ADVANTAGES ARE IMPRESSIVE REDUCES LABOUR COSTS Lafarge has developed a superior range of concretes in response
More informationGeotechnical Engineering Software GEO5
Geotechnical Engineering Software GEO5 GEO5 software suite is designed to solve various geotechnical problems. The easy -to -use suite consists of individual programs with an unified and user-friendly
More informationtwo structural systems, planning and design Structural Organization Bearing Walls Structural Components
ARCHITECTURAL STRUCTURES: FORM, BEHAVIOR, AND DESIGN DR. ANNE NICHOLS FALL 2013 lecture two structural systems, planning and design AISC teaching aids: Courtesy of John Hooper, MKA Seattle Structural Organization
More informationRapid Axial Load Testing of Drilled Shafts
Supplemental Technical Specification for Rapid Axial Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 4, 2015 1.0 GENERAL This work shall consist of performing a rapid axial
More informationSite Analysis. Site Conditions: Seismic Challenges Strong Winds Average Temperature 69. San Francisco
A Site Analysis Site Conditions: Seismic Challenges Strong Winds Average Temperature 69 San Francisco A Site Analysis A Engineering School of San Francisco Requirements 2015 Innovative Design Gold LEED
More informationTHE NEW CONTROL TOWER OF THE MALAGA AIRPORT (SPAIN)
THE NEW CONTROL TOWER OF THE MALAGA AIRPORT (SPAIN) M.E. Giuliani 1 1 Dr.Engineer Managing Partner Studio Giuliani -Redesco srl Milano Italy ABSTRACT: Reinforced concrete shells have been widely used for
More informationPRODUCT DATA SHEET SikaProof Bentonite
PRODUCT DATA SHEET NATURAL SODIUM BENTONITE BELOW GROUND WATERPROOFING SYSTEM (ONLY TO BE APPLIED BY A SIKA APPROVED CONTRACTOR) PRODUCT DESCRIPTION SikaProof Bentonite is a needle punched thermally locked
More informationInstalling DELTABEAM. Installation of DELTABEAM. Deliveries. Storage on-site
Installing DELTABEAM Installation of DELTABEAM These DELTABEAM installation instructions are intended to complement the project s erection plan. Peikko s technical support can help with the erection plan
More information