1 Environmental Monitoring Report Semestral Report July to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May-Uyen Hung Transmission Line Prepared by the Southern Vietnam Power Project Management Board (SPPMB) for the National Power Transmission Corporation and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 NATIONAL POWER TRANSMISSION CORPORATION SOUTHERN VIETNAM POWER PROJECT MANAGEMENT BOARD POWER TRANSMISSION INVESTMENT PROGRAM TRANCHE 1 SUB-PROJECT: 220KV SONG MAY UYEN HUNG TRANSMISSION LINE LOAN 2848-VIE SEMI-ANNUAL ENVIRONMENT MONITORING REPORT No.2 (July - December 2014) January, 2015

3 Content 1. Introduction Project background Report Purpose Project Implementation Progress Compliance with ADB loan covenants and applicable government laws, regulations and requirements Incorporation of Safeguard Requirements into Project Contractual Arrangements Environmental Mitigations and Compensation Measures Implemented Environment compliance at construction site Community Health and safety (CHS) aspects Effectiveness of mitigation measures Summary of Inspection Activities Key Issues And Recommendation Key Issues Recommendation i

4 List of Table Table 1. Location of 220kV Song May Uyen Hung Transmission Line... 1 Table 2: Scope of Song May - Uyen Hung 220kV transmission line... 5 Table 3: Construction work completion up to the end of June, Table 4: Application Laws and Regulations... 7 Table 5: Compliance with the ADB safeguard requirements for environment... 8 Table 6: Compliance with Vietnam regulations on environmental protection... 9 Table 7: Monitoring programme Table 8: Summary of environmental compliance activities Table 9: Summary of CHS compliance activities Table 10: Mitigation compliance and effectiveness List of Picture Figure 1. Location Map of 220kV Song May Uyen Hung Transmission Line... 2 Figure 2. Diagram of 220kV Song May-Uyen Hung Transmission Line... 2 Figure 3: Diagram of construction site... 6 Figure 4: Diagram of safeguards monitoring and management ii

5 Abbreviations ADB CHS EA EMP EPC IA IEE IZ NPT PDMP SPMB ROW Asian Development Bank Community Health and safety Executing Agency Environmental Management Plan Environment Protection Commitment Implementing Agency Initial Environmental Examination Industrial Zone National Power Transmission Corporation Power Development Master Plan Southern Power Project Management Board Right of Way iii

6 1. Introduction 1.1. Project background 1. The Power Transmission Investment Program ( Investment Program ) is an integral part of the National Power Development Master Plan VII ( PDMP VII ) and comprises of: - Transmission Network Expansion Component to expand and upgrade 500 kv and 220 kv transmission lines and associated substations throughout Viet Nam; - Operational Improvement Component for strengthening operational effectiveness and efficiency of the National Power Transmission Corporation ( NPT ); and - Project Implementation Support Component for detailed technical design, construction supervision, safeguard compliance, and preparing subsequent projects of the Investment Program. 2. The Asian Development Bank (ADB) provides financing for the development the subprojects of Power Transmission Investment Program - Tranche 1, which includes the subproject of the 220 kv Song May Uyen Hung Transmission Line. 3. The National Power Transmission Corporation (NPT) of Viet Nam is the executing agency (EA) while the Southern Power Project Management Board (SPPMB) is the implementing agency (IA) of the sub-projects. 4. The sub-project has a total length of about km from 500kV Song May substation in Dong Nai province to 220kV Uyen Hung substation in Binh Duong province. Locations of this subproject are listed in Table 1: Table 1. Location of 220kV Song May Uyen Hung Transmission Line Item Province District Commune Remark 1 Dong Nai Trang Bom Vinh Cu Bac Son Tan An 2 Binh Duong North Tan Uyen Tan Uyen town Thuong Tan and Tan My Uyen Hung ward Former Tan Uyen district was separated into Tan Uyen town and North Tan Uyen district based on the Decision No. 136/NQ-CP of the Government dated December 20,

7 5. The 220kV Song May Uyen Hung Transmission Line starts from the 220kV busbar of the 500kV Song May Substation at Bac Son commune, Trang Bom district, Dong Nai province to ends at the 220kV busbar of the 220kV Uyen Hung Substation at Uyen Hung district, Binh Duong province. Figure 1 is location map of the subproject. Figure 1. Location Map of 220kV Song May Uyen Hung Transmission Line 6. The diagram of the subproject presents in the Figure 2. Figure 2. Diagram of 220kV Song May-Uyen Hung Transmission Line 2

8 7. The subproject will affect 214 households and 08 institutions and agencies in which 36 households is acquired land for constructing tower foundation and 15 households with grade 4 and 5 are affected. There are not any public facilities, historical and cultural structures affected by the subproject. 8. Total land affected by subproject is about 469, m2, of which 15,478.4 m2 of land, including 7,614.7 m2 managed by the Government, is permanently acquired for tower foundations and 453, m2 of land affected by ROW. 9. The total land of 7,086.4 m2 in Binh Duong province is permanently occupied by construction of tower foundations (38 towers). While the total area for constructing 32 tower foundations in Dong Nai is 8,392 m2 including m2 propertied by the local GOV that will not be compensated. 10. The main environmental issues during construction phase of the subproject are identified as following: Impact on vegetation: Trees and crops will be potentially damaged by construction activities such as assembly of steel towers, transmission line stringing, and temporary facilities such as materials storage, construction camp, and assembly areas. Soil runoff: Dong Nai River, Song May stream, irrigation and drainage canals in the subproject area will be affected by potential runoff during the construction phase. Impact on water quality: domestic sewage from construction workers, contamination due to spillage of oil and other lubricants, contamination due to disposal of construction wastes, and wastewater from washing of construction equipment and vehicles will potentially pollute the rivers, including the drainage canals and irrigation canals. Impact on air quality: Air quality in the area can be affected by exhaust gases containing total suspended particulates (TSP), SOx, NOx, and CO due to the movement of construction vehicles, excavation and backfilling works. Noise: Movement of vehicles transporting, construction activities make noisy and impact to surrounding residential areas. Construction waste: During the construction of the transmission towers, construction wastes such as discarded construction materials, cement bags, wood, steel, lubricants, fuels, and vegetation debris will be generated. 3

9 Disruption to traffic: The movement of construction vehicles along provincial and communal roads may cause increased traffic volume to and from the construction sites. Damage to infrastructure: The movement of vehicles and other construction activities may cause damage to irrigation and drainage canals crossed by or adjacent to the construction sites. The increased movement of vehicles along the existing access roads may also potentially damage the roads. Occupational health and safety: Construction activities may cause harm and danger to the lives and welfare of workers. Community health and safety: The project construction will result to impacts to community health and safety such as construction traffic, transport of materials, fires, emergency spills of materials, and unauthorized entry by the villagers into dangerous working areas. 11. To meet Vietnam regulations on environmental protection and ADB safeguard policy, the IEE report and EPC of the 220kV Song May Uyen Hung Transmission Line were approved by ADB and the state management agency on environment protection Report Purpose 12. This semi-annual report will describe progress with implementation of the EMP and compliance issues and carry out the environmental and social management programs during the work execution phase. The main contents are as follows: (i) (ii) Subproject implementation progress; Compliance with ADB loan covenants and applicable government laws, regulations and requirements; (iii) Incorporation of safeguard requirements into project contractual arrangements; (iv) (v) (vi) Environmental mitigations and compensation measures implemented; Summary of inspection activities; Key issues and recommendation. 4

10 2. Project Implementation Progress 13. The 220kV Song May Uyen Hung transmission line has 22,213km long and 70 towers. Scope of this subproject includes in the Table 2: Table 2: Scope of Song May - Uyen Hung 220kV transmission line Project component Length (m) Starting point Ending point Quantity of towers Transmission line in Dong Nai province 7, kV Song May substation G28 32 Transmission line in Binh Duong province 14,740 G28 220kV Uyen Hung substation 38 Total 22, The subproject construction activities in this period include excavation of towers foundation and tower erection. The construction progress of 220kV Song May - Uyen Hung up to end of December 2014 achieved 100%. Completion works are as in Table 3: Table 3: Construction work completion up to the end of December, 2014 Item Activities Binh Duong Dong Nai Total Completion (%) 1 Foundation excavation % 2 Foundation concretion % 3 Earth filling % 4 Earthing electrode % 5 Tower erection % 6 Cable stringing % 15. The diagram of the construction site is illustrated in Figure 3. 5

11 Figure 3: Diagram of construction site 6

12 3. Compliance with ADB loan covenants and applicable government laws, regulations and requirements 16. The subproject shall be complied with ADB safeguard requirements, Vietnam laws and regulations including Vietnam s obligations under international law. 17. The Table 4 presents the Laws and regulations which the subproject shall be complied. Table 4: Application Laws and Regulations Item Laws/Regulations Remark I ADB Requirements 1 Safeguard Policy Statement SPS 2009 II Vietnam Laws and regulations 1 Environmental protection Law Land Law Decree 80/2006/NĐ-CP detailing and guiding the implementation of a number of articles of the Law on Environment Protection Dated 09, 2006 August 4 Decree 21/2008/ND-CP by the Government on supplementing and amending a number of articles of Decree 80/2006/ND-CP detailing and guiding implementation of a number of articles in the Law on Environment Protection. 5 Decree No 29/2011/NĐ-CP on strategic environmental assessment, environmental impact assessment, environmental protection commitment. 6 The Decree 59/2007/NĐ-CP by the Government on solid waste management 7 Decree No 181/2004/NĐ-CP of Government guiding implementation the Land Law Dated February 28, 2008 Dated April 18, 2011 Dated April 09, 2007 Dated October 29,

13 18. The subproject compliance with the ADB safeguard requirements are as the in Table 5. Table 5: Compliance with the ADB safeguard requirements for environment Item Requirement Project compliance Remark I. Preparation Phase 1 The sub-project belongs to category B of project impacts and risks. An initial environmental examination The sub-project s IEE report was prepared. Submitted ADB November 2011 in (IEE) shall be prepared 2 Inclusion of the safeguard requirements in bidding documents 3 Inclusion of the safeguard requirements in civil works contracts 4 Disclose the final environmental assessment, EMP The provisions and appendixes of the bidding documents included the safeguard requirements. The provisions and appendixes of the civil works contract included the safeguard Requirements. SPMB already disclosed the final environmental assessment and EMP to affected people and stakeholders of the project area and construction site. The Contractor prepared a EMPs for bidding proposal II Construction Phase 8

14 1 Periodic monitoring report The SPMB prepared and submitted the following monitoring report: - Quarterly internal monitoring report No.1 in March, No.2 in June, No.3 in September, No. 4 in December 2014; - Semi-annual report No.1 in June The subproject compliance with the Vietnam regulations on environmental protection is presented in the Table 6. Table 6: Compliance with Vietnam regulations on environmental protection Item Requirement Project compliance Remark I. Preparation Phase 1 Preparation EPC The subproject s ECP prepared in November Tan Uyen district People Committee issued the approval letter No 2770/GXN-UBND dated December 26, 2008 II. Construction Phase 1 Implemetation the mitigation mesuares in the EPC Mitigation measres are being undertaken by the Contractor in construction phase 20. Safeguard monitoring plan is implemented by both project owner (SPMB) and contractors. The Figure 4 shows the safeguards management organization. 9

15 Vice Director of SPMB National Safeguard Consultant for Environment Technical Department Compensation Department Technical and Environmental Supervision Staff Resettlement Supervision Staff Contractors Safety and Environmental Specialist Construction Site 1 Construction Site 2 Figure 4: Diagram of safeguards monitoring and management 4. Incorporation of Safeguard Requirements into Project Contractual Arrangements 21. The Contract Agreement for construction the 220kV Song May Uyen Hưng Transmission Line has been signed between National Power Transmission (NPT), represented by the Southern Vietnam Power Project Management Board and Songda11-ThangLong Joint Stock Company. 22. The contractual agreement between the client (SPMB) and the Contractor indicates that the Contractor shall be undertaken mitigation measures in execution phase to avoid and minimize negative impacts on social and environment. The Environment management plan was enclosed in the working contract with Contractor. 23. The Biding Documents and the Contract Agreement included safeguard requirements, in which EMP mentioned in the IEE and the ECP are being adhered to during construction phase. 24. Monitoring program undertaken by the SPMB and Contractor during the excuting phase is presented in Table 7: 10

16 Table 7: Monitoring programme Environme ntal issues Monitoring Location Activities Monitoring Frequency Contractor SPMB Clearing of vegetation ROW and transportation routes Monitor tree cutting Daily Monthly Erosion and sedimentati on Tower foundation area Inspection of excavation works, silt arising from exposed soil surface, condition of erosion control measures Daily Monthly Dust - Local road, - Surrounding residential area, - Monitor and inspect dust condition around construction area and transportation routes, Daily Monthly - Construction site. - Consult with local people on dust problem during construction. Noise Surrounding residential area - Monitor noise during materials delivery and operation of construction equipments, Daily Monthly - Consult with local people on noise caused by construction activities Waste manageme nt Workers camp sites - Inspection of worker camp site condition, - Check proper solid waste disposal Daily Monthly 11

17 Environme ntal issues Monitoring Location Activities Monitoring Frequency Health and safety Transmission line construction Review contractor/ construction worker health and safety plan and training activities on health and safety Daily Monthly Damage/nui sance - ROW and around the project area, - Public road - Monitor and inspect impact on community s infrastructure, river, irrigation and drainage system, - Monitoring and inspect public road condition Daily Monthly 5. Environmental Mitigations and Compensation Measures Implemented 25. The mitigating measures to minimise the environmental impacts on environmental quality include the following: Air quality: It shall apply measures to avoid and minimize air pollution caused by the construction activities such as regularly maintained construction vehicles to limit exhaust fumes generation, water sprinkling in access road near communities to reduce dust during dry and windy conditions. Water quality: It shall apply measures to prevent waste water running off from construction site, material storage area and worker camps to drainage and irrigation system. Noise quality: The contractor shall apply appropriate measures to control noise and vibration, creating by construction equipment such as regularly checking and maintaining vehicles and equipment, limit to use powered equipment at night near residential and school areas. Solid waste management: Excavated materials to be reused as fill material and the other construction debris will be disposed in an approved site by the village 12

18 authorities. Domestic solid waste will be stored in a covered container and periodically collected by functional agency. Hazardous management: Hazardous waste will be managed accordance with Circular 12/2011/TT-BTNMT dated l4/4/2011. Soil environment: It shall apply technical measures to minimize negative impacts on soil environment. Biodiversity and natural resources: It shall identify and inventory the affected trees by the construction activities and the workers only allow cutting permitted trees and prohibit from harvesting wood in the project area. Health and safety: Training courses and orientation will be conducted for workers to improve their knowledge and skill on construction health and safety management. Health and safety program will be prepared and strictly implemented by the contractors including provide first-aid facilities, properly sanitation, water supply and personal safety devices for workers; provision of signs, barriers, and gates/posts surrounding transmission towers particularly in built-up areas. Living conditions: the contractors apply measures to limit and reduce negative impact on living condition of local people including avoiding disturbance of field crops within one month of harvest wherever possible 5.1. Environment compliance at construction site 26. Table 8 shows the implemented mitigation measures on environmental and compensation by the contractors. Table 8: Summary of environmental compliance activities Location/ Time Negative Impact Implemented measures mitigation Impleme ntation Agency Recommendation /action required Location of tower foundation, along ROW Permanen t land acquisition Detailed Measurement Survey (DMS) has been carried out since September There are no public facilities, historical and cultural structures affected by the project implementation. There is no any ethnic SPMB 13

19 minority household affected by the project The land acquisition and site clearance for constructing tower foundations have achieved good results. Material transportat ion routes, worker camps, material storage areas Temporar y land acquisition Inventory activity of tree, crop and assets in the areas that may be affected by project implementation such as excavation and material transportation was undertaken before doing construction activities. The compensation to the lost assets was implemented. Contracto r Inventory activity of tree, crop and assets in the areas that may be affected by project implementation such as excavation and material transportation shall undertaken before doing construction activities. Tower foundation, Material transportat ion route Biodiversit y and natural resources The tower foundation sites are in paddy field with bushes, with no impact on biodiversity. Contracto r Tower foundation, transportat ion route, worker camp Solid waste managem ent Excavated material was used for filling ground. Dropping materials in the road were collected. Construction material destroyed in ROW clearance was collected for reused. Other wastes such as Contracto r Access roads shall be regularly cleaned of mud and other spilled materials from project vehicles, equipment and construction activities. 14

20 packing and material and equipment boxes were recycled and reused for construction activities or collected and treated as regulations Construction waste was removed from construction site. Domestic waste from worker camps is collected and treated by functional agency. Material storage area Hazardou s waste managem ent Materials and toxic chemicals are stored at high level ground that prevent from flood; Hazardous waste such as cloth-stained oil and lubricant, packing boxes with hazardous chemical or batteries were managed accordance with Circular 12/2011/TT-BTNMT dated l4/4/2011 Contracto r Ensure availability of spill clean-up materials (e.g., absorbent pads, etc.) specifically designed for petroleum products and other hazardous substances where such materials are being stored. Train relevant construction personnel in handling of fuels and spill control procedures. Worker camp, constructi on area Water quality Worker camps have sufficient waste water collection system and septic tank Workers did not allow Contracto r Construct bunds around storage areas and production areas and direct 15

21 encroaching and filling irrigation system; Waste water is not permitted to discharge directly to canal system. Washing tools or machinery strictly prohibited in any water sources or areas that drain into natural water body. all runoff to stilling basins before release into the environment through a silt fence. Material transport routes, constructi on area Air quality Sprayed water to minimize dust during windy and dry weather; Construction equipment is regularly maintained. Construction vehicles washed before entering into public roads; Prohibited burning of waste generated at the construction sites, work camps and other projectrelated activities. Contracto r It should daily visual inspect to identify and address potential areas of dust and odor emissions. It should be daily cleaned of access road surfaces of debris/spills from construction equipment, haulage trucks and vehicles. Constructi on area Noise and Vibration Material transportation and construction time is limited from 7: 00 pm to 6:00 am. All vehicle and equipment are required turning off in rest time; All vehicles, while parked on the site are requested to turn off their engines; Avoided noisy construction activities in the vicinity of sensitive areas during night Contracto r Construction equipment and vehicles shall be well maintained, regularly inspected for noise emissions. As much as possible, It should be used quiet equipment and working 16

22 time or other sensitive periods. method. Worker camp, material area, constructi on area, Erosion, sedimenta tion and flood Built temporary ditch and canal to prevent water flowing into the drainage system; Covered and fenced wall around the material storage areas to prevent water run off from that caused sedimentation for other site; Used appropriate technical construction methodology to minimize impact on soil environment Checked road status and potential risk in the project area Residual soil from filling power foundation hole is used for embankment internal road or surrounding household if received agreement from local people and authority. Contracto r It should be regularly inspected land subsidence of tower foundations for timely having suitable solution Community Health and safety (CHS) aspects 27. Table 9 shows the implemented mitigation measures on community health and safety by the contractors. Table 9: Summary of CHS compliance activities Location/Ti me Negati ve Impact Implemented mitigation measures Impleme ntation Agency Recommendation/a ction required Worker Safety The Contractor Contracto It should be 17

23 camp, construction area and hygieni c conducted training courses and meeting for workers on safety and environmental hygienic; r regularly check worker s health for the people working in height. Two buildings with a good hygienic condition including fresh water supply, building and furnishing equipment for conduction and treatment waste water and solid waste are used for workers living; It shall be checked all tools and devices before working in height. The Contractor provides personal safety devices for workers such as safety boots, helmets, gloves and protective clothes; Only well-trained persons and having license are permitted working on electricity equipments. Residential area near the construction site safety issues The vehicle speed has been reduced and kept at 5km/h in construction site and residential area; Warning signs have been put on the towers, around the construction sites and road near the construction sites; Contracto r The Contractor shall arrange a flag person to control traffic at the station sites when construction equipment is entering or leaving the work area. Constructio Public Contractors work closely with local agencies such Contracto The Contractor should provide 18

24 n site safety as local people committee, policeman, fire fighting and prevention agency. Wall fencing around the construction sites to protect illegal entrance was placed; Installed scaffold and present flag person when pulling strings over the significant barricades such as Dong Nai river, the provincial roads, and crossing other existing electrical transmission line. r advance notification to the community regarding changes to public transport facilities or routes 5.3. Effectiveness of mitigation measures 28. Mitigation compliance and Effectiveness could be described in qualitative terms or be evaluated based on a ranking system. The Table 10 shows the effectiveness of the mitigation measures. Table 10: Mitigation compliance and effectiveness Mitigation Measures Compliance Effectiveness Environment compliance at construction site Permanent land acquisition 2 2 Temporary land acquisition 2 2 Biodiversity and natural resources 2 2 Air quality 2 2 Noise and Vibration

25 Mitigation Measures Compliance Effectiveness Waste management 2 2 Hazardous waste management 2 2 Water quality 2 2 Erosion, sedimentation and flood 2 2 Community Health and safety (CHS) Safety and hygienic 2 2 Safety issues 2 2 Public safety 2 2 Note: 1. Very Good 2. Good 3. Fair 4. Poor 5. Very Poor 6. Summary of Inspection Activities SPMB Inspection 29. The SPMB s staff for environmental and technical supervision regularly visits the construction site and monitors the safeguard compliance of the contractors. The safeguards undertaken compliance as following: - Supervise the Contractors in their performance of safety methods and safety regulations on the site. - Examine, request, and supervise the Contractor in its implementation of traffic organization methods within the site and at the locations crossing the existing roads. - Instruct and supervise the Contractors to carry out the environmental and social management programs during the work execution; 20

26 - Examine and supervise the environment protection methods in favour of the workers on the site and the surrounding environment proposed by the Contractor, including: dust and noise mitigation measures, waste treatment and site clearing methods. Contractors Inspection 30. Contractors mobilize enough human, technical resources to timely prevent or mitigate possible advert environmental impacts caused by construction works or recovery works at site. Contractors daily implement mitigation measures and undertake internal monitoring safeguards compliance including conducts detailed inventory of the identified environmental and social impacts that will be caused by executing the works. 31. Contractors timely prevent or mitigate possible advert environmental and social impacts caused by construction works and recovery works. National Safeguard Consultant for Environment 32. The Consultant undertakes environmental safeguard policy compliance monitoring as below: - Coordinate with the related agencies to ensure that the EMPs including all proposed mitigation measures and monitoring programs are properly implemented. - Monitor environmental safeguard policy compliance of subprojects during implementation including pre-construction and construction phase. 7. Key Issues And Recommendation 7.1. Key Issues Safety and land subsidence 33. Project s activities of tower erection and implementing cable stringing may cause unsafe for worker, community in especial cases as follows: - In the rainy and stormy season and the works in lower land area such as tower foundation No. 20, 21, 22, 23, 24, 25, 27, 22A, 23A and 23B. - In areas adjacent to the existing transmission lines such as in area crossing the 550kV Song May Tan Dinh transmission line at location from 4B to G5A, and 500kV Pleiku-Tan Dinh at location from G8A to G8B, and in area of parallel with existing transmission line at location of G0-G1, G5B G6, G6 G7, G9-G10. - In the area crossing Dong Nai River, provincial road N0 768 and N

27 34. Some tower locations have sign of land subsidence, particularly at tower No. 29 and No.37. Hygienic sanitation at worker camp and material storage area 35. Contractor uses some area for worker camps and material storage areas such as material storage at Thai My commune, worker camp in Bac Son commune. It generates domestic waste and redundant materials from worker daily activities and construction works. The contractor shall keep hygienic sanitation before demobilize workers and hand over these areas to local people Recommendation Safety and land subsidence 36. The Contractor shall apply measures to prevent the works flooded in rainy season, especially in the lower areas. 37. The Contractor should enhance safety measures for workers, especially working in high elevation, in area crossing and parallel with the existing transmission. The Contractor shall apply, but not limited to, the following measures: - The Contractor should provide sufficient personal safety devices for workers including: safety boots, helmets, gloves, protective clothes, safety belt; - Theo Contractor should provide medicine cabinet and equipment for first aid at the site; - Each construction team should have at least a staff who knows first aid for emergencies. 38. The contractor shall apply measures to ensure community safety, particularly during cable stringing. The Contractor shall apply, but not limited to, the following measures: - It should have more concern on warning signs and barrier and has warning lamp at night when implement cable stringing over the barricades. - It should more pay attention on erecting scaffold and arrange flag person when cable stringing over the significant barricades such as Dong Nai river and roads, and crossing other existing electrical transmission line. 22

28 39. Land subsidence: - Treatment the land subsidence area: The contractor shall undertake suitable measures for treatment land subsidence of tower No. 29 and No Land subsidence monitoring: It should be regularly inspected during tower construction and have timely solution. Hygienic sanitation at worker camp and material storage area 40. Hygienic sanitation at worker camp and material storage area: - The Contractor shall remove from the worker camps and material storage areas all waste from whatever source on site. - Any spoil or debris from construction works being deposited on worker camp and storage area shall be removed and the affected land and areas will be restored to their natural condition before handover these areas to local people. Recommend for operation stage 41. The operation phase shall comply with regulations on performance, maintenance and repair of power transmission line. It should have regular inspection and timely solutions for the illegal activities on safety corridor, issues raising during operation as well as the impacts to local people. 23

29 ANNEX Annex 1. Contractor s Human resource for safety and environmental management at site Annex 2. Photographs 24

30 ANNEX 1 Contractor s Human resource for safety and environmental management at site 25

31 Song Da11-Thang Long Joint Stock Company Song Da 11.2 Thang Long Branch N0. 17CN/CV-PCC-KTCG Regarding on Human resources for implementation environment management plan of Construction package N02 lot kV Song May- Uyen Hung transmission line SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness Gia Lai 24 June 2014 To The Southern Vietnam Power Project Management Board Base on the Civil Contract N0 05/2013 HDXL/AMN-SELCO dated 26 August 2013 between The Southern Vietnam Power Project Management Board and Song Da11- Thang Long Joint Stock Company regarding to construction and erection (including steel tower) of Construction package N02 lot kV Song May- Uyen Hung transmission line. Base on the authorized letter N CTT/KTKH dated 26 August 2013 between Song Da11-Thang Long Joint Stock Company and Song Da 11.2 Thang Long Branch on implementation the Contract N0 05/2013 HDXL/AMN-SELCO. Base on the list documents requested by the Environmental Consultant. Song Da 11.2 Thang Long Branch would like sending the list of human resources for implementation the environmental management plan during construction phase as follow: Item Name Responsibility Remark 1 Dao Minh Hien Specialist for community communication (CLO) Minhhien11.2@gmail.com 2 Vuong Tri Tuan Site engineer (SE) Mr.tuan2409@gmail.com 3 Nguyen Duy Binh Responsibility for environment, safety and health Duybinh07xl@gmail.com With highly appreciated your concerning and cooperation On Behalf of Contractor Nguyen Van Tuy 26

32 ANNEX 2: Photographs The Contractor hired local house with water supply for his workers Safety warning signal 27

33 Scaffold erected in areas of crossing road and existing electrical transmission line in Tan An Commune, Dong Nai province Safety measure to protect local people and passer-by from accident at provincial road N0 768, Dong Nai Province 28

34 Provided insufficient labor safety for worker Provided sufficient safety labor for worker It should be monitoring the land subsidence at the tower foundation 29

35 Consult with affected people on safeguard measures Consulting with local people on the impact of the subproject 30

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line

VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 1 220kV Song May Uyen Hung Transmission Line Prepared by the Southern Vietnam

More information

IN THE KYRGYZ REPUBLIC

IN THE KYRGYZ REPUBLIC Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL ROAD REHABILITATION (OSH-ISFANA) PROJECT (NRRP)- WORLD BANK PPA Q 6240 CONSULTANCY

More information

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report 4th Quarterly Report February 2016 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Quarterly Report October to December 2014 VIE: Power Transmission Investment Program, Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by

More information

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP)

CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN (EMP) Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized CAMLICA ELEKTRIK URETIM A.S. CAMLICA III RESERVOIR AND HYDROELECTRIC POWER PLANT (HEPP)

More information

Sri: Sustainable Power Sector Support Project

Sri: Sustainable Power Sector Support Project Environmental Monitoring Report June 2015 Sri: Sustainable Power Sector Support Project Prepared by Ceylon Electricity Board for the Asian Development Bank. This environmental monitoring report is a document

More information

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives

E767 May 2003 ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT. Objectives Objectives ENVIRONMlENT AND SOCIAL SAFEGUARD FRAMEWORK ISLAMIC REPUBLIC OF IRAN EARTHQUAKE EMERGENCY RECOVERY PROJECT E767 May 2003 The environmental and social safeguards framework provides general policies,

More information

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge

Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY PROJECT Rehabilitation works on the big arch of Krk Bridge Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Republic of Croatia HRVATSKE AUTOCESTE (Motorway Maintenance Department) RIJEKA GATEWAY

More information

VIE: Power Transmission Investment Program -Tranche 3

VIE: Power Transmission Investment Program -Tranche 3 Environmental Monitoring Report # Quarterly Report January March 2018 VIE: Power Transmission Investment Program -Tranche 3 COVERING THE FOLLOWING SUBPROJECT (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix)

More information

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line

VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Environmental Monitoring Report Semestral Report July to December 2015 VIE: Power Transmission Investment Program - Tranche 2 220kV Cau Bong-Hoc Mon-Branches to Binh Tan Transmission Line Prepared by Southern

More information

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN

YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized YUCE HYDROELECTRIC POWER PLANT (HEPP) ENVIRONMENTAL MANAGEMENT PLAN ENVIRONMENTAL MANAGEMENT

More information

VIE: Northern Power Transmission Expansion Sector Project

VIE: Northern Power Transmission Expansion Sector Project Environmental Monitoring Report Semestral Report July-December 2012 VIE: Northern Power Transmission Expansion Sector Project Prepared by the Local Implementation consultant (LIC), with information mostly

More information

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES Environmental / Social issue/ aspect/ activity Anticipated negative impact Management and mitigation

More information

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are: 4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES 4.1 POTENTIAL ENVIRONMENTAL IMPACTS 4.1.1 Impacts during Construction Phase Negative or adverse impacts during the construction phase are: Land environment:

More information

NORTHERN POWER TRANSMISSION EXPANSION PROJECT

NORTHERN POWER TRANSMISSION EXPANSION PROJECT SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 38196-013 Period: July- December 2013 NORTHERN POWER TRANSMISSION EXPANSION PROJECT Prepared by the Local Implementation consultant (LIC) for

More information

VIE: Power Transmission Investment Program -Tranche 3

VIE: Power Transmission Investment Program -Tranche 3 Environmental Monitoring Report # Quarterly Report (Q2 2018) Jan 2019 VIE: Power Transmission Investment Program -Tranche 3 COVERING THE FOLLOWING SUBPROJECTS: (i) 500kV My Tho Duc Hoa transmission line,

More information

VIE: Mong Duong 1 Thermal Power Plant

VIE: Mong Duong 1 Thermal Power Plant 7 th Independent Monitoring Report September 2011 VIE: Mong Duong 1 Thermal Power Plant Prepared by the Development Research and Consultancy Center (DRCC) for Viet Nam Electricity (EVN) Thermal Power Project

More information

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION

10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10. STAGE FOUR: MONITORING OF ENVIRONMENTAL AND SOCIAL MEASURES (MESM) DURING ROAD CONSTRUCTION 10.1 Objective The main objective is to confirm the implementation of mitigation measures recommended in

More information

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003) Proposed Revision To: Standard Specifications For Public Works Construction Standard Plans For Public Works Construction Public Works Standards, Inc. AGC Southern California Regional Office 1906 West Garvey

More information

VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE

VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE ENVIRONMENTAL MONITORING REPORT Project Number: 42039-036 Period: April - June, 2017 VIE: POWER TRANSMISSION INVESTMENT PROGRAM, TRANCHE 3 Loan: 3374-VIE COVERING THE FOLLOWING SUBPROJECTS: (i) 500kV My

More information

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation Energy Resilience for Climate Adaptation Project (ERCAP) Environmental Code of Practice (ECOP) for COMPONENT 2: Demonstration Measures to Enhance Resilience of Energy Sector (Pilot for Strengthening Transmission

More information

Papua New Guinea: Pilot Border Trade and Investment Development Program

Papua New Guinea: Pilot Border Trade and Investment Development Program Environmental Monitoring Report Semiannual Report January June 2016 Papua New Guinea: Pilot Border Trade and Investment Development Program Prepared by Border Development Authority for the Government of

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Social Monitoring Report #1 Semestral Report Project Number: 46391-001 August 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh Power Corporation for the

More information

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized E3072 v2 GEF Large City Congestion and Carbon Reduction Project Environment Management

More information

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2

Environmental Compliance Audit Report. MFF 0054-VIE: Water Sector Investment Program Tranche 2 Environmental Compliance Audit Report Project Number: 41456-033 June 2012 MFF 0054-VIE: Water Sector Investment Program Tranche 2 This environmental compliance audit report is a document of the borrower.

More information

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project

Environmental Impact Assessment. GEO: East West Highway (Khevi Ubisa Section) Improvement Project May 2018 Third Draft GEO: East West Highway (Khevi Ubisa Section) Improvement Project Section F2 of the Khevi Ubisa Shorapani Argveta Road (E60 Highway) Part 6 Appendices A D Prepared by JV IRD Engineering

More information

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank.

Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian Development Bank. Environmental Monitoring Report Semestral Report for July - December 2016 UZB: Samarkand Solar Power Project Prepared by State Joint Stock Company UzbekEnergo for the Republic of Uzbekistan and the Asian

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Resettlement Due Diligence Report April 2016 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation for the Asian Development Bank. Resettlement

More information

VIE: Northern Power Transmission Expansion (Sector) Project

VIE: Northern Power Transmission Expansion (Sector) Project Environmental Monitoring Report Post-Evaluation Report January 2016 VIE: Northern Power Transmission Expansion (Sector) Project Prepared by the Local Implementation Consultant (LIC) for Northern Power

More information

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT:

NORTH POWER CORPORATION Electric Network Project Management Board RESETTLEMENT PLAN (RP) SUBPROJECT: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Sub-project: Improving grid medium, low voltage NORTH POWER COORATION Electric Network

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

CCSD#1 Stormwater Standards

CCSD#1 Stormwater Standards SECTION 6 EROSION CONTROL STANDARDS 6.1 INTRODUCTION The policies of this section shall apply during construction and until permanent measures are in place following construction as described herein, unless

More information

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments District Capitals Water Supply Project (RRP TIM 44130-02) Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments PRE-CONSTRUCTION ACTIVITIES Safety at Work Accidents Include

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Environmental Monitoring Report # Semestral Report June 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation, Electricity of Viet Nam

More information

DOORNVALLEI EXT 5 & 6

DOORNVALLEI EXT 5 & 6 DOORNVALLEI EXT 5 & 6 Proposed township establishment on portion 107 the farm Doornkloof 391 JR Sewer Pipe Crossings - Sesmylspruit Construction Method Statement April 2016 Revision 3 PREPARED FOR: PREPARED

More information

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER FOR SPECIAL CONDITIONS AND PERMIT NUMBERING GENERAL NOTES: HOUSE GREEN HOUSE 1900 S. NORFOLK ST. SUITE 350 GARAGE GRADING

More information

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT. VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project SEMI-ANNUAL ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 December 2017 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Ho Chi Minh City Power Corporation,

More information

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE THE GOVERNMENT ------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No.: 19/2015/ND-CP Hanoi, 14 February 2015 DECREE DETAILING THE IMPLEMENTATION OF A NUMBER OF ARTICLES

More information

DRAFT FOR CONSULTATION OCTOBER 7, 2014

DRAFT FOR CONSULTATION OCTOBER 7, 2014 The Board has authorized the release of this document for consultation purposes to seek feedback on its content. It has not endorsed the content of the draft, and the Committee on Development Effectiveness

More information

THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No. 64/2012/ND-CP Hanoi, September 04, 2012

THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM Independence Freedom Happiness No. 64/2012/ND-CP Hanoi, September 04, 2012 THE GOVERNMENT THE SOCIALIST REPUBLIC OF VIETNAM ------- Independence Freedom Happiness --------------- No. 64/2012/ND-CP Hanoi, September 04, 2012 DECREE ON CONSTRUCTION PERMIT Pursuant to the Law on

More information

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY Public Disclosure Authorized October 2015 Public Disclosure

More information

VIE: Power Transmission Investment Program, Tranche 2

VIE: Power Transmission Investment Program, Tranche 2 Environmental Monitoring Report Semestral Report January to June 2014 VIE: Power Transmission Investment Program, Tranche 2 Prepared by the Central Vietnam Power Project Management Board (CPPMB) for the

More information

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani

Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Livezeni Coal Washing Plant, Hunedoara County, Design: ICPM Petrosani DESCRIPTION OF

More information

Environment Management Plan

Environment Management Plan Environment Management Plan Project Activity Pre Location of transmission towers and transmission line and Equipment specifications and parameters Transmission line Substation location and Location of

More information

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT

Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Bosnia and Herzegovina Route Donja Gračanica - Klopče and Svilaj - Odzak (Part of Corridor Vc) ENVIRONMENTAL AND SOCIAL ASSESSMENT Environmental and Social Action Plan August 2016 Project: Bosnia and Herzegovina

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

REGULATIONS OF ENVIRONMENTAL MANAGEMENT OF THE CONSTRUCTION PROJECTS Dr. Pham Van Bo Vice president Academy of Managers for Construction and Cities Ministry of Construction - Vietnam List of abbreviations

More information

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN

SANKO GEOTHERMAL POWER PROJECT TRAFFIC MANAGEMENT PLAN Draft A.0 January 10, 2018 Version Revision Date SANKO GEOTHERMAL POWER PROJECT Prepared by Checked by Approved by Muhsin Dervişoğulları Environmental Manager Project Manager General Manager of Geothermal

More information

Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007

Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007 E1467 v 25 Environment Management Report Pagsanjan-Luisiana-Lucban-Lucena City Road Section March 31, 2007 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007

Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007 Environmental Management Plan Prov l. Brdry-Caticlan-Kalibo-Capiz Brdy. May 31, 2007 E1467 v 22 1 losure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

More information

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya

Environmental and Social Monitoring Report. THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya Environmental and Social Monitoring Report Annual Report Project Number: 45923-014 April 2014 to June 2015 THA: Provincial Solar Power Project Phase 2B Bang Pa-hun, Phranakorn Sri Ayutthaya This environmental

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN INTRODUCTION ENVIRONMENTAL MANAGEMENT PLAN An environmental management plan (EMP) has been prepared for the proposed construction of commercial project to minimize negative impacts and is formed on the

More information

Environmental Assessment Registration Destination RV Resort

Environmental Assessment Registration Destination RV Resort Environmental Assessment Registration Destination RV Resort Nine Island Pond South,Newfoundland and Labrador Prepared for: Department of Environment and Conservation Environmental Assessment Division Prepared

More information

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department 2017 [Type a quote from the document or the summary of an interesting point. You can position the text box anywhere in the document. Use the Drawing Tools tab to change the formatting of the pull quote

More information

Chapter 13 Management and Implementation

Chapter 13 Management and Implementation Chapter 13 Management and Implementation TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Overview of AGT Region Operating Management System... 13-1 13.3 Construction

More information

Organizational Report Department of Water Resources Management, MoNRE Vietnam

Organizational Report Department of Water Resources Management, MoNRE Vietnam Organizational Report Department of Water Resources Management, MoNRE Vietnam 1. Organisational Structure and Role: Name: Department of Water Resources Management, Ministry of Natural Resources and Environment

More information

Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants)

Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants) Environmental Monitoring Report Annual Report November 2016 Bhutan: Rural Renewable Energy Development Project (Part D Biogas Plants) Prepared by the Department of Renewable Energy, Royal Government of

More information

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV

Papua New Guinea LNG Project. Environmental and Social Management Plan Appendix 11: Reinstatement Management Plan PGGP-EH-SPENV Esso Highlands Limited Papua New Guinea LNG Project Environmental and Social Management Plan Appendix 11: PGGP-EH-SPENV-000018-013 LNG Project Page 2 of 13 CONTENTS 1.0 Objectives... 3 2.0 Legal and Other

More information

Public Disclosure Authorized EXECUTIVE SUMMARY

Public Disclosure Authorized EXECUTIVE SUMMARY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized EXECUTIVE SUMMARY Introduction Georgia is an important transport corridor connecting

More information

Japanese ODA. Ex-ante Evaluation

Japanese ODA. Ex-ante Evaluation Japanese ODA Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Second Ho Chi Minh City Water Environment Improvement Project (I) (II) (III) L/A signed on: March

More information

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors

ENVIRONMENTAL MANAGEMENT PLAN. CONSTRUCTION PHASE 1.Construction Contractors 1. Increased water demand (12 KLD) due water usage for, dust suppression and for workers 2. Sewage generation (11 KLD) and disposal 3. Municipal solid waste generation (15 kg/day) by workers 4. Construction

More information

POWER GRID IMPROVEMENT PROJECT

POWER GRID IMPROVEMENT PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Draft Environmental Code of Practices POWER GRID IMPROVEMENT PROJECT (Project ID: P149599)

More information

Factor Potential Effects Mitigation Measures

Factor Potential Effects Mitigation Measures Natural Environment No impacts of provincial significance to the natural environment are anticipated for the rapid transit project. Other impacts and how they will be mitigated are outlined in the table

More information

SECTORAL ENVIRONMENTAL ASSESSMENT

SECTORAL ENVIRONMENTAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized REPUBLIC OF MACEDONIA Regional and Roads Program Support Project SECTORAL ENVIRONMENTAL

More information

QUANG NGAI PROVINCE PEOPLE S COMMITTEE. Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development

QUANG NGAI PROVINCE PEOPLE S COMMITTEE. Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development SFG3446 V5 REV QUANG NGAI PROVINCE PEOPLE S COMMITTEE Quang Ngai Provincial Project Management Unit of Construction Works for Agriculture & Rural Development ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP)

More information

SRI : Dry Zone Urban Water and Sanitation Project (DZUW&SP) Chilaw & Puttalam Districts

SRI : Dry Zone Urban Water and Sanitation Project (DZUW&SP) Chilaw & Puttalam Districts Environmental Report Project Number 37381-013 Loan Numbers 2477-SRI (SF)/2977 SRI (SF) and Grant Numbers 0129-SRI(SF)/0130-SRI Semestral Report January to June 2015 SRI : Dry Zone Urban Water and Sanitation

More information

Environmental Guidelines for Construction Sites

Environmental Guidelines for Construction Sites Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building

More information

Environmental Control Plan

Environmental Control Plan Environmental Control Plan Environmental Control Plan In accordance with Watts & Hughes Construction Waikato Bay of Plenty Limited. corporate strategies the Company has an Environment Control Plan which

More information

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN

Doc. No H1 Rev. 0 - July 2011 APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN APPENDIX C ENVIRONMENTAL AND SOCIAL ACTION PLAN Taking into account the findings of the ESDD, an Environmental and Social Plan (ESAP) has been developed

More information

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized NATIONAL POWER TRANSMISSION CORPORATION ---------------------------------------------------------------

More information

Initial Environmental Examination. Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

Initial Environmental Examination. Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program Power Transmission Investment Program (RRP VIE 42039) Initial Environmental Examination Project Number: 42039-034 November 2011 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission

More information

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN

VIETNAM ELECTRICITY TRUNGSON HYDROPOWER COMPANY LIMITED ENVIRONMENTAL MANAGEMENT PLAN Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Subproject: Mai Chau 110 kv substation and 35 kv power line supply for construction of

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway in association with Design 151.66 Km (Existing Road Apr. 180 km) 2 OBJECTIVE: The Government of Timor Lestewishes to Engage Consultant to carry out the Preliminary, Detailed Engineering Design and Environment

More information

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP)

ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN (ESMP) SFG3446 V1 REV BINH DINH PROVINCIAL PEOPLE S COMMITTEE BINH DINH PMU FOR CONSTRUCTION INVESTMENT WORKS OF AGRICULTURE AND RURAL DEVELOPMENT --------------o0o-------------- ENVIRONMENTAL AND SOCIAL MANAGEMENT

More information

Environmental Assessment and Review Framework. Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project

Environmental Assessment and Review Framework. Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project Environmental Assessment and Review Framework October 2016 Lao People s Democratic Republic: Greater Mekong Subregion Health Security Project Prepared by the Ministry of Health for the Asian Development

More information

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity

Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Lao People s Democratic Republic Peace Independence Democracy Unity Prosperity Ministry of Agriculture and Forestry No 0538/MAF Vientiane, Date 09/02/2011 Agreement of the Minister on Good Agriculture

More information

Mining Environmental Impact Assessment Guidelines. May 2018

Mining Environmental Impact Assessment Guidelines. May 2018 Mining Sector Environmental and Social Impact Assessment Guidelines Mining Environmental Impact Assessment Guidelines May 2018 Background Mining EIA Guidelines Working Group established by Minister of

More information

Summary of Preparatory Study

Summary of Preparatory Study Summary of Preparatory Study 1. Title of the Cooperation Project, Relevant Project Report Preparatory Survey on the Project for the Establishment of Rural Water Supply System in Kambia Town in the Republic

More information

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL o PUBLIC WORKS DEPARTMENT PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL CIVIL ENGINEERING AND ARCHITECTURE 1. Offsite Improvements - Civil Engineering drawings may be required to show the following: Replacement

More information

Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS

Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS Terms of Reference I. PROJECT MANAGEMENT SUPPORT AND CAPACITY DEVELOPMENT CONSULTANTS A. Background 1. The Government of the Socialist Republic of Viet Nam, has requested a loan and grant from the Asian

More information

Land Acquisition and Resettlement Due Diligence Report. IND: Kolkata Environmental Improvement Investment Program (TR2 WS24)

Land Acquisition and Resettlement Due Diligence Report. IND: Kolkata Environmental Improvement Investment Program (TR2 WS24) Land Acquisition and Resettlement Due Diligence Report Document stage: Draft for consultation Project number: 42266 April 2016 IND: Kolkata Environmental Improvement Investment Program (TR2 WS24) Prepared

More information

A. Each Contractor shall comply with the requirements outlined in these documents.

A. Each Contractor shall comply with the requirements outlined in these documents. Section 000700 Stormwater Management Plan for Aurora Public Schools PART 1 GENERAL 1.0 DESCRIPTION A. Each Contractor shall comply with the requirements outlined in these documents. PART 2 PRODUCTS Not

More information

CIRCULAR GENERAL PROVISIONS

CIRCULAR GENERAL PROVISIONS MINISTRY OF CONSTRUCTION -------- SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness --------------- No. 10/2013/TT-BXD Hanoi, July 25, 2013 CIRCULAR ON CONSTRUCTION QUALITY MANAGEMENT Pursuant

More information

Environmental Codes of Practice. Sewage Interception Pipeline

Environmental Codes of Practice. Sewage Interception Pipeline Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized World Bank-financed Jiangxi Poyang Lake Basin and Ecological Economic Zone Small Town

More information

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project

VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project ENVIRONMENTAL MONITORING REPORT Project Number: 46391-001 March 2018 VIE: Ha Noi and Ho Chi Minh City Power Grid Development Sector Project Prepared by Hanoi City Power Corporation, Electricity of Vietnam

More information

PRC: Inner Mongolia Autonomous Region Environment Improvement Project

PRC: Inner Mongolia Autonomous Region Environment Improvement Project Environmental Monitoring Report Project Number: 40634-03 August 206 PRC: Inner Mongolia Autonomous Region Environment Improvement Project Prepared by Inner Mongolia Project Management Office and Energy

More information

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION REPUBLIC OF ARMENIA MINISTRY OF TRANSPORT AND COMMUNICATION TRANSPORT SI LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION REHABILITATION OF THE

More information

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S SPECIFICATIONS - DETAILED PROVISIONS Section 02210 - Site Grading C O N T E N T S PART 1 - GENERAL... 1 1.01 REQUIREMENT... 1 1.02 STRUCTURE PROTECTION... 2 1.03 JOB CONDITIONS... 3 PART 2 - PRODUCTS...

More information

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements

INTRODUCTION. A. Overview. A. Scope of Work. B. Additional Requirements RFP 2019-01 Reeta s Building Demolition City of Morgantown REQUEST FOR PROPOSALS Demolition Contractors INTRODUCTION A. Overview This Request for Proposals ( RFP ) is being issued by the City of Morgantown

More information

ENVIRONMENTAL MANAGEMENT FRAMEWORK UPDATED FOR ADDITIONAL FINANCING PROJECT

ENVIRONMENTAL MANAGEMENT FRAMEWORK UPDATED FOR ADDITIONAL FINANCING PROJECT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT MANAGEMENT NO. 6 RURAL TRANSPORT PROJECT NO.3 ENVIRONMENTAL MANAGEMENT FRAMEWORK

More information

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw 6410 2006 The Erosion and Sediment Control plan should seek (i) to protect the soil surface from erosion where possible and (ii) capture

More information

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. SECTION 311000 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting

More information

Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program [VIE MFF0066 PFR2] POWER TRANSMISSION INVESTMENT PROGRAM Initial Environmental Examination July 2012 Multitranche Financing Facility Socialist Republic of Viet Nam: Power Transmission Investment Program

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

D EROSION AND SEDIMENT CONTROL. Table of Contents

D EROSION AND SEDIMENT CONTROL. Table of Contents Table of Contents D1. GENERAL... 1 D2. OBJECTIVE... 1 D3. REFERENCE MATERIAL... 1 D4. REGULATORY REQUIREMENTS... 1 D5. EROSION AND SEDIMENT CONTROL (ESC) PLANS... 2 D5.1 Goals and Objectives:... 2 D5.2

More information

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell) ENVIRONMENT MANAGEMENT PLAN No. 1. Increase in water demand due to water usage for, dust suppression and for domestic purpose of workers 2. Sewage generation (9 KLD) and disposal 3. Solid waste generation

More information

EBRD Environmental and Social Action Plan

EBRD Environmental and Social Action Plan PR 1 Assessment and Management of Environmental and Social Impacts and Issues 1.1 to establish PIU and dedicate a responsible person (head of PIU) for coordination between the various departments so as

More information

Chapter 13 Management and Monitoring

Chapter 13 Management and Monitoring Chapter 13 Management and Monitoring TABLE OF CONTENTS 13 MANAGEMENT AND MONITORING... 13-1 13.1 Introduction... 13-1 13.2 Construction Phase Roles and Responsibilities... 13-1 13.2.1 BP... 13-1 13.2.2

More information