TENDERING #4 Tendering (CONS6811) Lara Tookey

Size: px
Start display at page:

Download "TENDERING #4 Tendering (CONS6811) Lara Tookey"

Transcription

1 TENDERING #4

2 Session FOUR Face 2 Face (4 hours) Stage 2 Project appreciation & enquiries Introduction to subcontracting Why does a MC need subbies? How is the work split between the various parties? Self-directed (6 hours) Read before the session: Weebly ebook CIOB overview of subcontracting

3 ACTIVITY (20 MIN) Working with your peers Working with those around you, please evaluate the three samples provided in order to determine a BID / NO BID decision. Please keep a note of your queries / assumptions made for further discussion. Feedback will be requested.

4

5

6

7

8 Detailed Examination of Docs Adequacy of information in tender documents; Onerous or unusual conditions noted; Discrepancies; Specifications; Do they match the drawings? Could be main contract document (if no Schedule of Quantities) Constructional problems.

9 What kind of documents are we talking about? The Contract rules NZS 3910/5/6:2013 Schedule of Prices / Quantities Specifications Drawings Appendices i.e. consents; geotechnical reports

10 Project Appreciation View Drawings Visit Site & Locality: Visit site & prepare site report; Take photos (demolition, alterations, additions); Photograph surroundings i.e. buildings, fences, paths etc. Determine construction methods Prepare Preliminary Programme

11 CAN WE (THE MC) DO ALL THE WORK ON OUR OWN?

12 Aka What Packaging work with the Options MC do? Do it all within the contracting organisation!! Subcontract it all Construction Management approach Combination of own work & subcontract work packages Generally 30% own work 70% subcontracted Project & Contractor specific Most common approach

13 Objective of Packaging Strategies Obtaining competitive advantage through work package optimisation. Work packaging is the grouping of similar types of work processes to be carried out by one entity. Work Breakdown Structure (WBS) Trade Based packaging

14 Work packages Each work package should consist of work that would be done by a specific class of subcontractor.

15 Remember!! Increasing the number of subcontractors on the job reduces financial risk to MC but increases communication complexity and cash flow problems for the project team Decision to subcontract versus retain works is a risk/return optimization problem Retained work has potential for greater reward, but carries more risk Retained is less risky when you have long-term trades people and well-understood market

16

17 Enquiries to Subcontractors Which trade packages will require subcontract quotations send docs to subcontractors; Include all relevant info to enable technically accurate quotations; Terms & conditions detailed; Identify unique materials; Essential to indicate approximate time when goods / services required on site.

18 WHAT DO WE MEAN BY SUB CONTACTING?

19 A subcontractor is a construction specialist that generally contracts with the MC (using a contract called a subcontract) to perform some aspect of the MC s work (a particular portion / work package of the project)

20 WHAT LEAD TO THE DEVELOPMENT OF SUB CONTRACTING?

21 Technological Change Transaction costs Nature of the industry Just a few issues Employee Training Safety and Health Work Restructuring

22 General pressures Different types of projects - different skills required. Increasing technical complexity / diverse skill base requires increasing numbers of specialist inputs Perceived threat posed by trade unions.

23 Nature of Construction Industry Sites are geographically dispersed, some workers better placed for some sites than others. Traveling distances more inclined to employ from local workers.

24 Non-wage cost (transaction) of employment i.e. training, pension rights, sick pay, redundancy payments; If price of using SC s exceeds cost of internal utilisation of resources, firm will in-source. If, however, cost of in-house production exceeds that of contracting out work, firm will opt for outsourcing.

25 Advantages of using subbies Efficient and economical in the use of available resources. The prime contractor can obtain workers with the requisite skills when they are needed, without the necessity of maintaining an unwieldy and inefficient full-time labor force.

26 Advantages of using subbies Qualified subcontractors are usually able to perform their work more quickly and at lesser cost than can the main contractor. Many construction specialties have specific licensing, bonding, and insurance requirements that would be costly for the main contractor to secure for irregular use.

27 ACTIVITY (10 MIN) Working with your peers So, what do you think the disadvantages of subcontracting are?

28 Issues related to dealing with SC s Job spiking. Occurs when a SC signs up for more work than he can handle & then starts a little bit of each project to secure the work. The MC is left with a SC who simply does not have motivation or capabilities to pursue work in a timely manner. SC do not understand / care about the domino effect their non-performance causes.

29 Extensive subcontracting can seriously complicate the overall scheduling of job operations, lead to a serious division of project authority, fragmentize responsibility, make the coordination of construction activities difficult, weaken communication between management and the field, foster disputes, and be generally detrimental to job efficiency.

30 The MC remains responsible under its contract with the owner for any faulty performance by the subcontractor. The MC assumes complete responsibility to the owner for the direction and accomplishment of the total work including the responsibility of coordination and supervision of the subcontractors.

31 ACTIVITY (10 MIN) Working with your peers Identify and explain the difference between the various types of subcontractors.

32 Types of Sub-contractors Domestic Selected and appointed by the MC. MC responsibility to ensure delivery, quality, progress etc. Supply & fix all labour, plant & material.

33 Types of Sub-contractors Nominated Selected by Client Client negotiates a price with nominated subbie and then instructs MC to appoint them for that work. MC may make reasonable objection MC will include price as a prime cost sum, to which they can add overheads, profit and attendance. Declining practice

34 Types of Sub-contractors Named Subbie for a particular package selected from a list of acceptable subbies provided by the client. Allowed for in the tender docs by means of provisional sums for which the MC makes allowance for profit, attendance and programme within it s tender offer.

35 Named cont. Once appointed, the MC seeks tenders for the package from the named subbies, places a subcontract with successful tenderer, and provisional sum is replaced with tendered figure. MC responsible for performance Delays, performance etc MC also completes payment certificates.

36 Types of Sub-contractors Labour-only / Labour & plant only Materials provided by MC. Eg brickwork & concreting gangs; reinforcement steel SC. Selected & engaged as per Domestic SC. MC responsible for delivery, quality, progress etc

37 Subcontractor selection process

38 Three Stage Process Preparation phase Determine a bid list Public call or select Implementation phase Notification Analysis / tender phase Receive bids Evaluate the bids Choose the best SC Inform all bidders of results.

39 Preparation Phase - Determine a Bid List Most MC s maintain comprehensive records concerning suppliers & sub-contractors. History of past performance; Aka track record Perceptions of quality Financial stability Extent of geographical operation; Size & type of contract on which previously used; Information concerning contracts.

40 Implementation Phase Notification Provide info required by tenderers: Contract documents Tender information Tender format & submission date & time. Contact for further information Updates Clarifications

41

42 Method of Construction Alternative methods of construction, sequencing of work and site layouts need to be evaluated. Requirements for labour, plant & site facilities determined. Technical risks: Define construction methods before costing the work. If cost of failure high in relation to value of project insure against possible loss, or increase control.

43 Programme & Temp works design Done by specialists. You will need to work closely with them in order to develop your P&G costs.

44

45 Site Report Description of site Description of access to site Topographical details of the site Description of restrictions to / on site

46 Description of ground conditions Position of existing services Any problems related to security of the site Facilities for disposal / storage of soil Location of site amenities.

47 Description of any demolition work Description of temporary works Assessment of availability of labour

48 Identify Local Statutory Authorities Building surveyors City engineers Emergency services

49

50

51

52 Session FIVE Chris Prigg Face 2 Face (4 hours) Stage 3 Resource & Preparation of the Estimate Pricing Self-directed (6 hours)

53 Q&A YOUR ASSESSMENTS

Examples of Evidence Relating to the Project SHE Plan Examples of Evidence Relating to Health & Safety Management Systems

Examples of Evidence Relating to the Project SHE Plan Examples of Evidence Relating to Health & Safety Management Systems The following examples of evidence are provided to help the individual identify suitable workplace evidence that helps to supplement the narratives provided in response to the cognitive criteria of the

More information

TENDERING #3 Tendering (CONS6811) Lara Tookey

TENDERING #3 Tendering (CONS6811) Lara Tookey TENDERING #3 Recap on Session 2 Session THREE Stage 1 Initial actions & appraisals: What type of tendering methods are there? What does qualification mean? Do you (the MC) bid for every job? Do you (the

More information

COSCCOMO12 - SQA Unit Code FM7D 04 Obtain tenders and appoint successful contractors in construction contracting operations management

COSCCOMO12 - SQA Unit Code FM7D 04 Obtain tenders and appoint successful contractors in construction contracting operations management Obtain tenders and appoint successful contractors in construction Overview This unit is about shortlisting and selecting appropriate tenderers. It is also the about the review and amendment of tender documents

More information

Member level the optimum standard is given against each activity statement

Member level the optimum standard is given against each activity statement QUANTITY SURVEYING CORE COMPETENCIES 2018 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off

More information

Estimating specialism core competencies

Estimating specialism core competencies CORE ESTIMATING COMPETENCIES 2015 The estimating competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off to a specific

More information

NZQA Expiring unit standard version 2 Page 1 of 5. Prepare a schedule of quantities, cost estimate and tender documentation for landscape work

NZQA Expiring unit standard version 2 Page 1 of 5. Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Page 1 of 5 Title Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Level 5 Credits 15 Purpose This unit standard is for people working, or intending to work,

More information

ICES Core Cost Engineering Competencies

ICES Core Cost Engineering Competencies COST ENGINEERING CORE COMPETENCIES 2018 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off

More information

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018 PLANNING CORE COMPETENCIES 2018 The competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must be signed-off to a specific standard,

More information

PROCUREMENT DEFINITION

PROCUREMENT DEFINITION PROCUREMENT DEFINITION PROCUREMENT DEFINITION as well as the end receipt and approval of payment. It often involves (1) purchase planning, (2) standards determination, (3) specifications development, (4)

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents

6494 Latcha Rd. Walbridge, Ohio v: f: Table of Contents Document (00 21 13) Rudolph/Libbe Inc. www.rlcos.com 6494 Latcha Rd. Walbridge, Ohio 43465 v: 419.241-5000 f: 419.837.9373 Table of Contents 1.0 General Instructions 1.1 Document Hierarchy 1.2 Safety 1.3

More information

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program

Audio Sessions. Session 4 PROCUREMENT. Construction Contract Administration Education Program Audio Sessions Session 4 PROCUREMENT Construction Contract Administration Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications

More information

Prepare a schedule of quantities, cost estimate and tender documentation for landscape work

Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Page 1 of 5 Prepare a schedule of quantities, cost estimate and tender documentation for landscape work Level 5 Credits 15 Purpose This unit standard is for people working, or intending to work, in landscaping.

More information

Construction Financial Management

Construction Financial Management Unit 8: Construction Financial Management Unit code: K/504/4352 QCF level: 6 Credit value: 15 Aim This unit gives learners an understanding of the methods used to determine the price of a proposed. Learners

More information

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT ISSUE/REVISION JK 1 LAST MODIFIED 12 October 2011 DATE PRINTED RIBA stages JK JK 1 START OF MAIN CONTRACT WORKS 1. DEFINITION The Main

More information

SEPARATED PROJECT DELIVERY SYSTEMS

SEPARATED PROJECT DELIVERY SYSTEMS SEPARATED PROJECT DELIVERY SYSTEMS Separated (aka Traditional) The traditional delivery method typically involves three sequential project phases: The design phase, which requires the services of a designer

More information

ICES Core Cost Engineering Competencies

ICES Core Cost Engineering Competencies CM CORE 1 Cost Engineering Commercial Management Core Competency Cost Engineering Specialism COMPETENCIES AND ASSESSMENT Financial and commercial processes in civil engineering January 2015 Technical Member

More information

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell:

CONSTRUCTION MANAGEMENT. By GREEN PLANET SERVICES Lesley Padayachee Cell: CONSTRUCTION MANAGEMENT By GREEN PLANET SERVICES Lesley Padayachee Cell: 084 525 4720 Lesley.gpes@gmail.com 5 th FEBRUARY 2013 CONSTRUCTION MANAGEMENT - DEFINED Act of managing the construction process

More information

CONSTRUCTION MANAGER

CONSTRUCTION MANAGER The South African Council for the Project and Construction Management Professions CONSTRUCTION MANAGER IDENTIFICATION OF WORK AND SCOPE OF SERVICES FOR CONSTRUCTION MANAGERS REGISTERED IN TERMS OF THE

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 04.03.2015 Project phases time Inception initiation Preliminary analysis

More information

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2) CHANGES TO STAGE 2b, STAGE 3 & STAGE 4 ARISING FROM AMENDMENTS TO THE PUBLIC WORKS CONTRACTS 1. Introduction 1.1 Changes to Public Works Contracts (a)

More information

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents

The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents The Greater Toronto Electrical Contractors Association endorses the following CCDC/CCA Documents CCDC Standard Construction Documents CCDC 2-1994 Stipulated Price Contract Standard prime contract between

More information

EXHIBIT 6 Preconstruction Work

EXHIBIT 6 Preconstruction Work EXHIBIT 6 Preconstruction Work The following tasks shall be accomplished by the CM/GC as part of its obligations during the preconstruction phase. The work is to be coordinated with the services requirements

More information

Job Title Quantity Surveyor/Estimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports

Job Title Quantity Surveyor/Estimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports Job Description and Person Specification Job Title Quantity Surveyor/stimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports Other Resources

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

Unit 3: The Traditional Procurement Route

Unit 3: The Traditional Procurement Route Unit 3: The Traditional Procurement Route 3.1 Introduction This Unit briefly introduces the main features of the traditional procurement route as a widely used route that provides a good basis for examining

More information

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS

CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS CHAPTER 2 DEVELOPMENT AND ORGANIZATION OF PROJECTS 1) THE LIFE CYCLE OF A CONSTR. PROJECT: 1.1:CONCEPT AND FEASIBILITY STUDIES: THE START Recognition of a need for a new facility conceptual analyses Technical

More information

EJCDC Contract Documents for America s Infrastructure Buy online at

EJCDC Contract Documents for America s Infrastructure Buy online at EJCDC Contract Documents for America s Infrastructure Buy online at www.booksforengineers.com N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

FIDIC Contracts. Training Course in English language. May, 25-26, Two days course on:

FIDIC Contracts. Training Course in English language. May, 25-26, Two days course on: FIDIC Contracts Training Course in English language May, 25-26, 2018 Two days course on: FIDIC Module 4 - FIDIC Contracts Management and Administration FIDIC 99 EDITIONS ESSENTIALS FOR WORKING IN INTERNATIONAL

More information

Project phases II. Tendering-constructionoperation

Project phases II. Tendering-constructionoperation Project phases II. -constructionoperation Construction management 2. Lepel BME Department of Construction Technology and Management 09.03.2016 Project phases time Inception initiation Preliminary analysis

More information

COSCCOO08 Prepare estimates, bids and tenders in construction

COSCCOO08 Prepare estimates, bids and tenders in construction Overview This unit is about the evaluation of tender enquiries, identifying and making necessary measurements and producing estimates by costing resources. You will need to check and summarise tender details

More information

Level 6 NVQ Diploma in Construction Contracting Operations Management

Level 6 NVQ Diploma in Construction Contracting Operations Management Level 6 NVQ Diploma in Construction Contracting Operations Management Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements

More information

Blue List. Green List. Civil Engineering Commercial Training Courses

Blue List. Green List. Civil Engineering Commercial Training Courses Blue List Green List Civil Engineering Commercial Training Courses From SURCO, the information business of the Chartered Institution of CIVIL ENGINEERING SURVEYORS SURCO Limited Chartered Institution of

More information

Chapter 2 Parties to the Contract

Chapter 2 Parties to the Contract Chapter 2 Parties to the Contract 2.1 Introduction Construction work may include building of a new structure, additions, alterations, expansion, replacement, dismantling, erection, commissioning, rehabilitation,

More information

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center

EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center EJCDC Contract Documents for America s Infrastructure Buy online at the ACEC Business Resource Center N-122 Uniform Location of Subject Matter (2012) Published jointly with AIA and CSI. FREE DOWNLOAD Construction

More information

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition

Document B Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition Document B132 2009 Standard Form of Agreement Between Owner and Architect, Construction Manager as Adviser Edition AGREEMENT made as of the in the year (In words, indicate day, month and year.) BETWEEN

More information

This additional work is carried out by internal auditors, who may be company

This additional work is carried out by internal auditors, who may be company TOPIC 8: INTERNAL AUDIT The Role of Internal Audit Function Company directors have a legal requirement to produce true and fair annual financial statements. To help ensure this is done, companies are required

More information

45. Feedlot construction delivery

45. Feedlot construction delivery Client Des i gn/ Builder Design Consultant Construction Sub-contractors and suppliers FEEDLOT DESIGN AND CONSTRUCTION 45. Feedlot construction delivery AUTHORS: Rod Davis and Ross Stafford Introduction

More information

2. Clarification: The building address is 801 Henderson Street.

2. Clarification: The building address is 801 Henderson Street. East Energy Structural Steel Painting University of South Carolina Project Number H27-Z037 Addendum One October 19, 2015 NOTE: The following amendments, additions, and deletions shall be made to the Construction

More information

CIC Guidelines Detailed Design

CIC Guidelines Detailed Design Version 1.0 / August 2016 Stage 5 of 8 Approval: Of previous stage, design documentation, updated programme and cost plan. List matters from previous stage to be addressed in current stage. Documentation:

More information

Company QESH Management Representative

Company QESH Management Representative PROJECT MANAGEMENT Page: 1 of 8 PROJECT MANAGEMENT ISSUE STATUS Issue Date: 11-04-2016 Issued for Use Revision Date: 05-06-2017 Revision No.: 1 Action Position Issued By: Reviewed By: Reviewed By: Approved

More information

Construction Family of Documents

Construction Family of Documents Construction Family of Documents The EJCDC Construction Family Documents (C-Series) is intended for engineered construction projects. The current edition (2013) is endorsed by both the Construction Specifications

More information

10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS

10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS 10 CRITICAL STEPS REQUIRED FOR EFFECTIVE EPC BOP COST MANAGEMENT RENEWABLE ENERGY PROJECTS Engineering, Procurement and Construction Management (EPCM) costs for Balance of Plant (BOP) installations seriously

More information

Project Accounting Menu Structure and Reporting Guide

Project Accounting Menu Structure and Reporting Guide Project Accounting Menu Structure and Reporting Guide 1 SETUP 3 ADMINISTRATION 3 PROCESSING 4 COST REPORTING 4 RESOURCE REPORTING 5 FEE REPORTING 6 PROFIT AND BUDGET REPORTING 7 WIP REPORTING 8 LEDGER

More information

CATProjects Functionality Snapshot

CATProjects Functionality Snapshot CATProjects Functionality Snapshot LEAD MANAGEMENT Lead Management ESTIMATING Start a New Estimate Subcontractor Pricing Estimate Build Up Summary and Margins Estimate Options Present Tender Module Admin

More information

The Superintendent is appointed by the Area Manager and must have the following qualifications:

The Superintendent is appointed by the Area Manager and must have the following qualifications: SUPERINTENDENT Introduction The Superintendent s primary function for Superior Gunite is one of the most important activities in our operations. The Superintendent is the company's representative with

More information

CHAPTER 1 INTRODUCTION

CHAPTER 1 INTRODUCTION CHAPTER 1 INTRODUCTION Cost is a major factor in most decisions regarding construction, and cost estimates are prepared throughout the planning, design, and construction phases of a construction project,

More information

CONSTRUCTION DOCUMENTS Part 1

CONSTRUCTION DOCUMENTS Part 1 Audio Presentation Session 4 CONSTRUCTION DOCUMENTS Part 1 Project Delivery Education Program Construction Document Technology (CDT) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org

More information

Procurement Options for NZ Construction Contracts

Procurement Options for NZ Construction Contracts 1 P a g e Tool Box Resource Procurement Options for NZ Construction Contracts A wide variety of contract arrangements have evolved in NZ for use on construction contracts. The following describes the most

More information

Chapter 4 State Requirements for Educational Facilities Section 4.1

Chapter 4 State Requirements for Educational Facilities Section 4.1 providential cause, other impending danger to life safety, or pursuant to Section 1013.46(1)(b), F.S., the board can declare an emergency, can negotiate a contract with a design-build firm, design professional,

More information

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing

Olympic and Paralympic Games Tokyo. Overlay Work (1) Ariake Arena, and Ariake Tennis Park. Tender Briefing B-Ⅰ Olympic and Paralympic Games Tokyo Overlay Work (1) Ariake Arena, and Ariake Tennis Park Tender Briefing April 2018 The Tokyo Organising Committee of the Olympic and Paralympic Games Contents 1. Provisions

More information

Scope of Work Bid Package C-4 - West Polished Concrete

Scope of Work Bid Package C-4 - West Polished Concrete Scope of Work Bid Package C-4 - West Polished Concrete CONTRACT DOCUMENTS and REQUIREMENTS The Work of this Agreement shall include but shall not be limited to all labor, fringe benefits, materials, tools,

More information

Selection of Contractor Step 5. June 2013

Selection of Contractor Step 5. June 2013 Selection of Contractor Step 5 June 2013 Project Management Concept Step 1: Needs Development Step 2: Scope Development Step 3: Procurement of Design Team Step 4: Design Step 5: Bid/Procurement of Contractor

More information

NZS 3916:2013. Conditions of contract for building and civil engineering Design and construct NZS 3916:2013. New Zealand Standard

NZS 3916:2013. Conditions of contract for building and civil engineering Design and construct NZS 3916:2013. New Zealand Standard New Zealand Standard Conditions of contract for building and civil engineering Design and construct Superseding (in part) NZS 3910:2003 NZS 3916:2013 COMMITTEE REPRESENTATION This Standard was prepared

More information

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors.

RFP SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES. 1. Is this a new solicitation? If not, please share the name of incumbent vendors. RFP 19-006 SOURCING SERVICES AND TEMPORARY STAFFING AGENCIES Questions/Answers in BOLD Addendum #1 Date 1/30/2019 1. Is this a new solicitation? If not, please share the name of incumbent vendors. This

More information

COUNTY OF SAN JOAQUIN

COUNTY OF SAN JOAQUIN June 4, 2012 COUNTY OF SAN JOAQUIN General Services Department 44 North San Joaquin Street, Suite 590 Stockton, California 95202-2778 (209) 468-3357, Fax (209) 468-2186 GABRIEL E. KARAM Director Capital

More information

CIC Guidelines Procurement

CIC Guidelines Procurement Version 1.0 / August 2016 Stage 6 of 8 Approval: Of previous stage design documentation, updated programme and cost plan. List matters from previous stage to be addressed in current stage. Documentation:

More information

ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR CONSTRUCTION COST ESTIMATING

ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR CONSTRUCTION COST ESTIMATING ILLINOIS HOUSING DEVELOPMENT AUTHORITY STANDARDS FOR CONSTRUCTION COST ESTIMATING December 18, 2017 As part of the Application for Multifamily Financing, the Illinois Housing Development Authority (IHDA)

More information

Planning and Analysis Construction Operation

Planning and Analysis Construction Operation Planning and Analysis Construction Operation Session 2: Contract Strategy Prepared by zacoeb@ub.ac.id Introduction At the early stage of a project and once a project manager is selected, the main issue

More information

Architectural Design and Build Process. A Client Guide

Architectural Design and Build Process. A Client Guide Architectural Design and Build Process A Client Guide This guide has been prepared to summarise the various stages of a new-build residential design & construction process. It identifies important tasks

More information

Single or multi-sourcing model?

Single or multi-sourcing model? Outsourcing 2007/08 Single and multi-sourcing models Anthony Nagle and Alistair Maughan, Morrison & Foerster www.practicallaw.com/8-380-6567 Once an organisation decides to outsource, one of its biggest

More information

Request for Proposal. February 6, 2017

Request for Proposal. February 6, 2017 Request for Proposal Holy Redeemer Medical Office Building 1648-1650 Huntingdon Pike Huntingdon Valley, PA 19046 MANDATORY CONTRACTOR WALK-THRU: Wednesday, February 8, 2017 at 8:30 AM BIDS DUE: Monday,

More information

Conception Design Construction Operation.

Conception Design Construction Operation. 4 Development Process and Procurement 4.1 The development process by which the project moves from the earliest ideas to the final completion of the facilities and their use can be considered as having

More information

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk REQUEST FOR PROPOSAL Construction Management Services Not at Risk The St. Charles County Ambulance District proposes to retain a qualified firm/team for the Construction Management Services Not at Risk

More information

Commercial QS Specialism (July 17) QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017

Commercial QS Specialism (July 17) QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017 QUANTITY SURVEYING SPECIALIST COMPETENCIES 2017 The quantity surveying competencies are split into core and specialist competencies. OPTIMUM STANDARDS Each of the activities under the competencies must

More information

Diploma in Construction Management

Diploma in Construction Management Brentwood Open Learning College Diploma in Construction Management (Level 4) Course Structure & Contents Diploma in Construction Management Course Structure Contents Page 1 Unit 1 to Construction Management

More information

Partnering In Construction: Improvementthrough. Integration And Collaboration

Partnering In Construction: Improvementthrough. Integration And Collaboration Partnering In Construction: Improvementthrough Downloaded from ascelibraryorg by 3744193189 on 01/24/18 Copyright ASCE For personal use only; all rights reserved Integration And Collaboration SEVDA BAYRAMOGLU

More information

VANDERBILT UNIVERSITY

VANDERBILT UNIVERSITY VANDERBILT UNIVERSITY CAMPUS PLANNING & CONSTRUCTION PROJECT MANUAL GUIDELINES INTRODUCTION These instructions are intended to guide the Architect in preparing the Project Manual for Vanderbilt University

More information

SMART ENERGY ISLANDS: Employment Services Framework QUERIES AND RESPONSES

SMART ENERGY ISLANDS: Employment Services Framework QUERIES AND RESPONSES SMART ENERGY ISLANDS: Employment Services Framework QUERIES AND RESPONSES Please ensure all queries are submitted by e-mail, are recorded on this sheet and are immediately updated onto the relevant procurement

More information

DEMOLITION TRADE SPECIFICATION

DEMOLITION TRADE SPECIFICATION DEMOLITION TRADE SPECIFICATION GENERAL a) BDW Trading Limited Barratt Homes and David Wilson Homes are all trading names of BDW Trading Limited the Company. b) Site Condition The Contractor is to examine

More information

Central Procurement Directorate. removing the barriers to SMEs

Central Procurement Directorate. removing the barriers to SMEs Central Procurement Directorate removing the barriers to SMEs A GUIDE TO PURCHASERS FOREWORD Public procurement policy recognises the importance of SMEs both for the vital contribution they make to the

More information

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12

Cherokee Nation Entertainment Casino Ramona, Oklahoma. WORK PACKAGE: Existing Casino Demolition and Dismantling 8/7/12 SCOPE SUMMARY: DIVISION: 0 - LEGAL DOCUMENTS Complete; DIVISION: 1 - GENERAL REQUIREMENTS As Applicable; SECTION: - ATTACHED SKETCH Complete; Geotechnical Engineering Report as prepared by Building and

More information

Procurement Policy. Purchasing guidelines

Procurement Policy. Purchasing guidelines POLICY MANUAL POLICY NO: 1.4.19 FUNCTION: ACTIVITY: OBJECTIVE: SECTION RESPONSIBLE: Procurement Policy Purchasing guidelines To provide Council with a fair and open process coupled with clear guiding principles

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

Deadline for documents submission June 11, 2009 before 12:00 hours (local time)

Deadline for documents submission June 11, 2009 before 12:00 hours (local time) United Nations Development Programme Date: 26 May 2009 Expression of Interest Pre-Qualification for Civil Works Ref: PRQ/KRT/09/001- R1 United Nations Development Programme (UNDP), Sudan office announces

More information

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018

ADDENDUM 1. Repair and Maintenance of Landfill Gas Chiller System. Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 ADDENDUM 1 Date: June 13, 2018 Bid No.: Title: 18-11/AL Repair and Maintenance of Landfill Gas Chiller System Return date: Bid must be received no later than 2:00 PM, Monday, June 25, 2018 This Addendum

More information

West Irbid Wastewater Project - Detailed Design Study, Tender Documents Preparation, Procurement Support and Construction Supervision

West Irbid Wastewater Project - Detailed Design Study, Tender Documents Preparation, Procurement Support and Construction Supervision West Irbid Wastewater Project - Detailed Design Study, Tender Documents Preparation, Procurement Support and Construction Supervision CLARIFICATIONS No. 2 Friday 11 May 2018 No further requests for clarification

More information

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide

Estates, Facilities & Professional Services. Transactional Finance, Accountancy & Transactional Procurement Services Framework User Guide . Estates, Facilities & Professional Services Transactional Finance, Accountancy & Transactional Procurement Services Framework Framework Reference Number: LPP/2013/00002 April 2015 2 Version Control Contributor(s)

More information

Practical Strategies to Make Your Next Project Profitable

Practical Strategies to Make Your Next Project Profitable 55 th Annual TIAC Conference Practical Strategies to Make Your Next Project Profitable Matthew Nicholas Revay and Associates Ltd Toronto August 26, 2017 1 Profit in Construction 2 Profit In Construction»

More information

TDOT PROPOSED SCOPE OF WORK CEI

TDOT PROPOSED SCOPE OF WORK CEI REVISED 12/14/09 TDOT PROPOSED SCOPE OF WORK CEI SCOPE OF SERVICES SUMMARY This document is to define as clearly as possible the duties of the consultant with regard to administration of the TDOT construction

More information

Advanced Engineering Projects Management

Advanced Engineering Projects Management Advanced Engineering Projects Management Dr. Nabil I El Sawalhi Assistant Professor of Construction Management AEPM L8 1 Preparing For the Detailed Estimate Listing Quantities Tender Cost Direct Project

More information

PLANNING AND EVALUATION PRELIMINARY DESIGN

PLANNING AND EVALUATION PRELIMINARY DESIGN PLANNING AND EVALUATION Project Initiation Discuss and refine client requirements Project brief, Schedule, Budget Confirm client's space needs and program Establish scope of work Obtain client-supplied

More information

Filey Town Council Council Offices 52A Queen Street Filey North Yorkshire YO14 9HE TEL:

Filey Town Council Council Offices 52A Queen Street Filey North Yorkshire YO14 9HE TEL: JOB DESCRIPTION TOWN CLERK/RESPONSIBLE FINANCIAL OFFICER The Town Clerk will be the Proper Officer of the Council and as such is under a statutory duty to carry out all the functions, and in particular

More information

Note for Drafting Public Procurement Regulations

Note for Drafting Public Procurement Regulations Note for Drafting Public Procurement Regulations (March 2002) 1. Introduction INTRODUCTION Improving a government procurement regulatory framework calls for a number of actions intended to establish or

More information

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina

Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina Project Manual for Coastal Carolina University RE-BID WILLIAMS BRICE RENOVATION AND REPAIR Conway, South Carolina DWG Consulting Engineers 1009 Anna Knapp Blvd. Suite 202 Mt Pleasant, South Carolina 29464

More information

MARK TURTON MCIOB, MAPM

MARK TURTON MCIOB, MAPM MARK TURTON MCIOB, MAPM Southside (6 th Floor) 105 Victoria Street Westminster London SW1E 6QT 0870 9917749 info@somersetconsult.com BRIEF SUMMARY Mark is a Construction Industry /Contract Manager with

More information

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility RFP Components CLIENT: TradePort International Corporation, Operators of John C. Munro

More information

NZS 3917:2013. Conditions of contract for building and civil engineering Fixed term NZS 3917:2013. New Zealand Standard

NZS 3917:2013. Conditions of contract for building and civil engineering Fixed term NZS 3917:2013. New Zealand Standard New Zealand Standard Conditions of contract for building and civil engineering Fixed term Superseding (in part) NZS 3910:2003 NZS 3917:2013 COMMITTEE REPRESENTATION This Standard was prepared under the

More information

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY

INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY INTERNATIONAL JOURNAL OF PURE AND APPLIED RESEARCH IN ENGINEERING AND TECHNOLOGY A PATH FOR HORIZING YOUR INNOVATIVE WORK STANDARD SUBCONTRACTING PROCEDURE AND ITS MANAGEMENT ANKIT G.CHANDAK 1, SHRIKANT

More information

1. FROM (Bidder): (Name)

1. FROM (Bidder): (Name) Tender No. [ ] Tender Forms Page 1 1. FROM (Bidder): (Name) (Address) TO: Alberta Transportation, Strategic Procurement Branch Main Floor, Twin Atria Building 4999 Avenue 5000 Edmonton, Alberta, T6B 2X3

More information

SMALL CONTRACTORS INITIATIVE ASSESSMENT TOOL USER S GUIDE

SMALL CONTRACTORS INITIATIVE ASSESSMENT TOOL USER S GUIDE SMALL CONTRACTORS INITIATIVE ASSESSMENT TOOL USER S GUIDE SMALL CONTRACTORS INITIATIVE Assessment Tool User s Guide OVERVIEW OF THE INITIATIVE Federally funded construction projects represent substantial

More information

Construction Contracts

Construction Contracts Construction Contracts By Dr. Ibrahim Assakkaf Construction Contracts By Dr. Ibrahim Assakkaf 1 The Need Web-based Contracts Supporting scheduling Controlling Regulating Analyzing Auditing the procurement

More information

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods

5/21/13 PROCUREMENT 5/21/13. Agenda. Common Tendering Systems Procurement Methods PROCUREMENT 5/21/13 Agenda Common Tendering Systems Procurement Methods 1 Agenda Common Tendering Systems Procurement Methods Common Tendering Systems Competitive / Open-bid: (Qualified) contractors are

More information

UNC Chapel Hill Informal Contracting Guidelines

UNC Chapel Hill Informal Contracting Guidelines UNC Chapel Hill Informal Contracting Guidelines 1. Informal Contracts Informal bids are referenced by NC General Statute (NCGS) 143-131 as construction or repair work that does not reach the limits prescribed

More information

ATTACHMENT D SCOPE OF SERVICES

ATTACHMENT D SCOPE OF SERVICES ATTACHMENT D SCOPE OF SERVICES OBJECTIVE Owner s Capital Improvement Program (major capital, minor construction, repair, and rehabilitation projects) includes numerous construction and renovation projects.

More information

ALTERNATE FORMS OF PROJECT DELIVERY

ALTERNATE FORMS OF PROJECT DELIVERY ALTERNATE FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND.1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors

More information

NOTICE INVITING BIDS

NOTICE INVITING BIDS NOTICE INVITING BIDS NOTICE IS HEREBY GIVEN that the City of Long Beach, California, acting by and through the City s Board of Harbor Commissioners ( City ) will receive, before the Bid Deadline established

More information

REDUCING PRECARIOUS WORK IN EUROPE THROUGH SOCIAL DIALOGUE

REDUCING PRECARIOUS WORK IN EUROPE THROUGH SOCIAL DIALOGUE REDUCING PRECARIOUS WORK IN EUROPE THROUGH SOCIAL DIALOGUE THE CASE OF DENMARK (1 ST PART OF NATIONAL REPORT) EXECUTIVE SUMMARY Stine Rasmussen Bjarke Refslund Ole H Sørensen Aalborg University December

More information

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No.

J&P OMAN COMPANY ORGANISATION P.110 PROCEDURE. Page: 1 of 16. Document Title: Issue Date: 13/04/2014. Revision Date: 06/06/2016 Revision No. OMAN PROCEDURE Page: 1 of 16 Title: Issue Date: 13/04/2014 Revision Date: 06/06/2016 Revision No.: 2 Issued By: QESH Controller Approved By: QESH Management Representative Approved By: Company QESH Management

More information

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) Selection Committee

PROPOSAL EVALUATION WORKSHEET (INDIVIDUAL) EVALUATION FACTOR: DISADVANTAGED BUSINESS ENTERPRISE PLAN AND PROGRAM (RATED) Selection Committee Selection Committee PROPOSER: Keolis DATE: 8/25/2013 OVERALL RATING: NARRATIVE SUMMARY: DBE Plan submitted in the Proposal meets both the federal and 's DBE program requirements. DBE Utilization is proposed

More information