SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan

Size: px
Start display at page:

Download "SACRAMENTO CITY UNIFIED SCHOOL DISTRICT Sustainable Facilities Master Plan"

Transcription

1 Albert Einstein Albert Einstein Campus Entry Student Centered Education School Mission Statement EXORE, DISCOVER, CREATE Mirandy Drive Site Plan of Campus Narrative Summary The site is just over 20.5 acres in a fully developed neighborhood and adjacent, on the north side, to Rosemont Community Park. The school was built in 1964 with a design shared by four other schools in the district and is in generally fair condition. Designed for an enrollment of 800 it currently serves 805 students. Access to the school from Kiefer Blvd. is convenient but there is not a convenient turn a round or loop route for buses. There are no designated passenger loading and unloading zones. Drop offs currently take place along the Mirandy Drive frontage and in the staff parking lot. Drop off in the parking lot creates conflicts with parking. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades for paving and striping to the parking lot and service drives plus some path of travel upgrades have been made but more are needed. At a minimum, a barrier free drop off space is required and separate designated drop off lanes for bus and parent use are recommended. About 20% of the classrooms are on the second floor and served by a single elevator and two stairways. Both stairs and elevator need barrier free upgrades. The nearly fifty year old school was built with little consideration for energy efficiency and improvements could be made through the use of more efficient windows and mechanical systems. Benefits could also be gained through more efficient lighting and effective energy control systems. The existing windows in the primary classrooms are minimal and do not provide a good level of natural light. The school has undergone some improvements but does not yet meet most contemporary educational needs. The student gathering areas of the campus are primarily associated with the Quad. This area is adequate and in reasonably good condition. The student snack bar is adjacent to the Quad. Other outdoor student areas include landscape planters, some with benches, between classroom buildings. The athletic fields and paved play courts are adequate for the current enrollment but in fair condition. Some areas need resurfacing and striping. More efficient irrigation and water management for the fields would be a recommended improvement. School Location Legend Based on the opportunities, facility conditions and code issues identified in this report, Albert Einstein appears to be in generally fair condition and should be a solid candidate for further modernization. AEMS-I

2 Albert Einstein High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off Undesignated parent and bus drop off occurs along street frontage or in staff parking lot. Neither have barrier free access spaces and conflicting traffic creates hazards. Sustainable Sites Outdoor Path of Travel Poor drainage creates hazardous walkways. Sustainable Sites Campus Core Most planting areas in campus core are on manual valves, on the domestic water system. Irrigation system needs updating. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior Multiple old controllers do not effectively manage irrigation. Replacement with central smart system would significantly improve water conservation. Water Efficiency Interior Replace plumbing fittings with low flow automatic devices. Energy & Atmosphere Some low voltage cabling installed in surface raceway. Other areas cabling is surface mounted or exposed. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Inadequate slopes and drainage allows the accumulation or water that damages roofing and creates leaks. Indoor Environmental Quality Barrier free casework, fixtures and teaching stations along with improved storage would greatly improve classrooms. Indoor Environmental Quality Inadequate power for contemporary uses plus surface mounted raceways and exposed wiring reduce functionality and contribute to unpleasant environments. AEMS-II

3 Albert Einstein Student Centered Education The following is a site organizational concept of Albert Einstein to implement the Strategic Plan : Putting Children First and the Common Core Standards. SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. Albert Einstein CAREER & COLLEGE READY CORE ACADEMIC (46,268 s.f.) Grades 7 & 8 Classroom Houses Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. Gym SUPPORT Support Spaces distributed Classroom Expansion Campus Quad FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (6,079 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Multi-Purpose (MP) Gym Drop Off Admin. MP TC Campus Entry Staff Parking Campus Entry Visitor/Parent ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (8,400 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Mirandy Drive Site Plan of Campus AEMS-III

4 Albert Einstein School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: - Overall face lift -Landscaping - New classrooms - New bleachers - Technology upgrades - New school to match Rosemont HS Schools as Teaching Tools Code, Life Safety & Access $ 660,270 Maintenance & Operations $ 791,700 Project Cost Summary Matrix High Performance Transformation $ 5,367,180 Sustainable Category Total $ 6,819,150 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $ 2,470 $ 381,290 $ 357,890 $ 741,650 $ 47,580 $ 47,580 $ 368,550 $ 37,310 $ 3,320,460 $ 1,590,290 Assessment Total $ 1,068,600 $ 6,083,740 $ 20,749,560 $ 27,901,900 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 7,142,460 $ 10,831,470 $ 1,156,740 $6,677,710 $ 2,784,340 $ 6,677,710 SUMMARY by CHPS Categories Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Eligible Actual Points Points Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points AEMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources - Signage - Door Hardware - Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation AEMS-IV

5 California Vallejo Way Campus Entry Student Centered Education California School Mission Statement At California, we know the importance of setting ambitious goals and maintaining our focus in support of student achievement. Narrative Summary The site is 13.5 acres at the corner of Land Park Drive and Vallejo Way in a fully developed neighborhood. Land Park Drive is a major street with public transportation. The school serves a student body of 688. The permanent buildings have three distinct components. The Auditorium and six classrooms identified as "3A" & "3C were built in An attached classroom wing, "3B" was added in Building 1 (core building) and the Gym were built in Vehicle access and student drop off is along Vallejo Way just off of Land Park Drive. The main entrance to the school and administration office is along Vallejo Way and reasonably well defined. There, however, is no convenient turn-a-round or exit for traffic back to Land Park except through narrow residential streets. Additionally, there are no designated passenger loading and unloading zones and no barrier free drop off space. Drop offs currently take place along the Vallejo Way frontage and in the staff/visitor parking lot fronting Vallejo Way. Both locations generate traffic conflicts and unsafe conditions. Path of travel upgrades are needed from the parking lots. At a minimum, a barrier free drop off space is required and a designated drop off lane is recommended along Vallejo Way. Building 1 houses Administration, Media Center, Multi- Purpose Cafeteria, Kitchen and 25 classrooms that include band, vocational and science classes. Site Plan of Campus The vocational shop classrooms have been closed and the spaces are being used for art and science classrooms and storage. In the current condition these spaces are not suited for these uses. The school is well designed and effectively integrates the older buildings with the newer. The buildings are in generally good condition. Upgrades are needed however, especially to the auditorium and associated classrooms, to comply with code egress and access requirements. Barrier free access upgrades are needed throughout the campus. The school buildings, especially the older ones, were built with little consideration for energy efficiency. Improvements could be made through the use of more efficient windows, lighting and mechanical systems. Benefits could also be gained through more effective energy control systems. The schools boiler is not currently in use and the system needs study for upgrading or removal. Outdoor student gathering areas include a large plaza or quad and a small amphitheater adjacent to the music classrooms and snack bar. The amphitheater however, is surrounded by asphalt paving and is not an inviting environment. It could be greatly improved with the addition of some drought tolerant landscaping and shade trees. School Location Legend The athletic fields and paved play courts are adequate for the current enrollment but only in fair condition. Resurfacing is needed. Primary service and emergency vehicle access is from 17th Street on the South side of the campus and crosses the play fields. Based on the opportunities, facility conditions and code issues identified in this report, California appears to be in generally fair condition and should be a solid candidate for further modernization. Together we work to support our staff in providing students with a well-rounded program focused on high academic standards. We expect all of our students to succeed, and our commitment is to provide them with the tools they will need to meet those expectations. CMS-I

6 California High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off There are no designated barrier free compliant drop off areas. Buses and parents use the same street frontage. Sustainable Sites Outdoor Activity Access for food service, maintenance and emergency vehicles crosses both playfields and hard courts. Sustainable Sites Campus Core The Quad area is ample and well developed with minor irrigation problems. The source of the irrigation water is uncertain and should be investigated. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior A review of the irrigation controllers is recommended. The addition of a smart system could be a valuable conservation effort. Water Efficiency Interior Restrooms and fixtures are in excellent condition. Installing low flow valves and fittings is recommended for better water conservation. Energy & Atmosphere Very inefficient 30 plus year old HVAC units have gone well beyond their expected life cycle and should be replaced. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Staining indicates leaking areas of roofing. Materials & Resources Interior Showers in the locker rooms are not being used and if future use is anticipated it will require considerable upgrades for barrier free access. Indoor Environmental Quality Casework, throughout the school, does not meet barrier free access requirements. CMS-II

7 California Student Centered Education Vallejo Way Drop Off The following is a site organizational concept of California to implement the Strategic Plan : Putting Children First and the Common Core Standards. Visitor Parking SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. TC Auditorium CAREER & COLLEGE READY CORE ACADEMIC (48,200 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. MP ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. California Gym SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (7,200 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Staff Parking Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (17,112 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus CMS-III

8 California School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: list pending input from school Schools as Teaching Tools Code, Life Safety & Access $ 1,632,800 $ 1,820 Maintenance & Operations $ 763,230 $ 366,990 Project Cost Summary Matrix High Performance Transformation $ 5,041,660 $ 403,650 Sustainable Category Total $ 7,437,690 $ 772,460 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $69,550 $ 920,920 $ 990,470 $ 755,690 $ 1,327,300 $ 1,287,390 Assessment Total $ 2,390,310 $ 3,814,460 $ 21,403,460 $ 27,608,230 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 3,066,310 $ 1,229,150 $ 5,149,300 $ 2,516,540 $10,741,770 $ 10,741,770 SUMMARY by Eligible Actual CHPS Categories Points Points Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 0 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points CMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation CMS-IV

9 Fern Bacon Cuny Avenue Fern Bacon Campus Entry Student Centered Education School Mission Statement. Statement pending input from school Site Plan of Campus Narrative Summary Fern Bacon ; one of the District s Priority Schools, was originally constructed in The site is just under 14 acres in a fully developed neighborhood and adjacent, on the south side, to Bowling Green Charter Elementary School. The school s design is shared by four other schools in the district and is in generally fair condition. Designed for an enrollment of 800, it functioned as a K-8 until the K through 6 grade students moved to the new John Still Elementary School in John Still currently serves 611 students. There are no designated passenger loading and unloading zones. Drop offs currently take place along the Cuny Ave. frontage and in the staff parking lot. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades for paving and striping to the parking lot and service drives. Some path of travel upgrades have been made but more are needed. About 20% of the classrooms are on the second floor and served by a single ramp and two stairways. As with other schools of the period, the fifty year old school was built with little consideration for energy efficiency. The school has undergone some improvements but most areas still need considerable upgrades for CBC Access Compliance and to meet contemporary educational needs. The student gathering areas of the campus are primarily associated with the "Quad" which is adequate for school gatherings and in reasonably good condition. Other outdoor student areas include landscape planters, some with benches, between classroom buildings. Water drainage is also an issue creating large areas of puddles on the walks. The athletic fields and paved play courts are adequate for the current enrollment but in fair condition. Some areas received a seal coat which is problematic on hot days. Based on the opportunities, facility conditions and code issues identified in this report, Fern Bacon appears to be in generally fair condition and should be a solid candidate for further modernization. School Location Legend FBMS-I

10 Fern Bacon High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off No designated bus or parent drop off. Parent drop off in staff parking lot with congestion and conflicts. No barrier free drop off space or path of travel, Sustainable Sites Outdoor Activity Poor surface condition poses safety risk Sustainable Sites Campus Core Ample space but uninviting without shade. Concrete walks and surfaces are uneven and broken. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior Upgraded irrigation and drought tolerant planting should be incorporated for water conservation. Water Efficiency Interior Existing fittings should be replaced by low flow metering valves and faucets. Energy & Atmosphere Older fixtures with inefficient T-8 fluorescent lamps should be replaced. Installing/upgrading an energy management system needs review. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Standing water on roofs due to inadequate slopes and drainage. Materials & Resources Interior Flooring replacement needed. Indoor Environmental Quality Gym bleachers, classroom case work is not barrier free access compliant and needs replacement. FBMS-II

11 Fern Bacon Student Centered Education Cuny Avenue The following is a site organizational concept of Fern Bacon to implement the Strategic Plan : Putting Children First and the Common Core Standards. Visitor/Parent TC Campus Entry Campus Admin. Entry Staff Parking MP Campus Quad Fern Bacon Drop Off SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. CAREER & COLLEGE READY CORE ACADEMIC (46,268 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. Fern Bacon Gym SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (6,079 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (8,400 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus FBMS-III

12 School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: Rank order of priorities: 1. Install lighting in parking lot (a big safety concern of parents for years) 2. Repair broken bleachers in Gym (extreme safety and liability issue) 3. Replace old and broken lockers in locker rooms 4. Upgrade bathrooms 5. Upgrade WiFi technology infrastructure (not consistent in the building) 6. Improve athletic fields (including drinking fountains and grass that is not lumpy which leads to injury) 7. Plant more trees on campus (quad and back of school) 8. Repair unsightly and unsafe broken cement (work done last year for Priority School upgrade is already broken) Schools as Teaching Tools Code, Life Safety & Access $ 268,840 $ 749,840 $ 36,920 Maintenance & Operations $ 1,950,910 Assessment Total $ 1,055,600 $ 6,257,940 $ 19,758,180 $ 27,071,720 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 2,813,070 $ 1,493,960 Project Cost Summary Matrix High Performance Transformation $ 5,579,210 $ 704,430 $ 4,086,420 $ 1,899,820 $ 7,488,000 Sustainable Category Total $ 7,798,960 $ 704,730 $ 7,649,330 $ 3,430,700 $ 7,488,000 CHPS Summary Fern Bacon Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. SUMMARY by Eligible Actual CHPS Categories Points Points Leadership, Education & Innovation 13 1 Sustainable Sites 14 4 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points FBMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation FBMS-IV

13 John H. Still John Still Drive John H. Still Campus Entry Student Centered Education School Mission Statement Site Plan of Campus John Still is dedicated to ensuring the academic success of every student. Our mission is to prepare students to succeed in high school and beyond. We re a small middle school of only 350 students. We boast a relatively small teacher-to-student ratio and we place a strong emphasis in both Math and English-Language Arts. Narrative Summary The site is just over 22 acre in a fully developed neighborhood and adjacent, on the west side to John Still Elementary School and on the southeast side, to Meadowview Park. The school was built in 1967 with a design shared by four other schools in the district and is in generally fair condition. Designed for an enrollment of 800 and originally served as a K-8. In 2005 the K through 6 grades moved to the new, adjacent John Still Elementary School and the middle school currently serves 313 students. Access to the school from John Still Drive and is convenient but there is not a convenient turn a round or loop route for buses. There are no designated passenger loading and unloading zones. Drop offs currently take place along the John Still Drive frontage and in the staff parking lot. Drop off in the parking lot creates conflicts with parking and service access. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades for paving and striping to the parking lot and service drives plus some path of travel upgrades have been made but more are needed. At a minimum, a barrier free drop off space is required and separate designated drop off lanes for bus and parent use are recommended. The vocational shops are not used and the spaces are being made available for other uses. About 20% of the classrooms are on the second floor and served by a single ramp and two stairways. Both stairs and ramp need barrier free upgrades. The nearly fifty year old school was built with little consideration for energy efficiency and improvements could be made through the use of more efficient windows and mechanical systems. Benefits could also be gained through more efficient lighting and effective energy control systems. The existing windows in the primary classrooms are minimal and do not provide a good level of natural light. The school has undergone some improvements but does not yet meet most contemporary educational needs. The overall condition of the school is generally very good. The student gathering areas of the campus are primarily associated with the Quad. This area is adequate, however mostly landscaping, and in reasonably good condition. The student snack bar is adjacent to the Quad. Other outdoor student areas include landscape planters, some with benches, between classroom buildings. The athletic fields and paved play courts are ample for the current enrollment but in fair condition. Some areas need School Location Legend resurfacing and striping. More efficient irrigation and water management for the fields would be a recommended improvement. Based on the opportunities, facility conditions and code issues identified in this report, John Still appears to be in generally fair condition and should be a solid candidate for further modernization. JSMS-I

14 John H. Still High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off Parent drop off takes place in the staff parking lot creating potentially hazardous traffic conflicts. Additionally there in no barrier free drop off space. Sustainable Sites Outdoor Activity Poor surface condition and drainage poses safety risk and maintenance issues. Sustainable Sites Campus Core Quad has adequate shade but limited paved surfaces for assembly and barrier free access. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior There is no dedicated backflow or meter for the irrigation system. Much of the landscape is irrigated using manually operated valves and is in poor condition. Water Efficiency Interior Upgrade fixtures with low flow automatic metering fittings. Energy & Atmosphere Old fluorescent fixtures have T-8 bulbs. Update with new more efficient fixtures. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Inadequate slopes and drainage causes standing water that damages roofing. Materials & Resources Interior Steps, landing, railing and door clearances do not comply with CBC barrier free or egress requirements. Indoor Environmental Quality Casework and floor elevation changes are not barrier free compliant. JSMS-II

15 John H. Still Student Centered Education Visitor/Parent Campus Entry Staff Parking John Still Drive TC MP Campus Entry Admin. Campus Quad Drop Off The following is a site organizational concept of John H. Still to implement the Strategic Plan : Putting Children First and the Common Core Standards. SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. CAREER & COLLEGE READY CORE ACADEMIC (46,268 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. Gym SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (6,079 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. John H. Still Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (8,400 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus JSMS-III

16 John H. Still School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: -Upgrade technology -Desktop Computers, WiFi access, cameras and LCD projectors -Smartboards -HVAC upgrades -Computer lab Schools as Teaching Tools Code, Life Safety & Access $ 189,540 $ 1,820 Maintenance & Operations $ 702,130 Project Cost Summary Matrix High Performance Transformation $ 4,268,160 Sustainable Category Total $ 5,159,830 $ 1,820 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $ 217,490 $ 333,480 $ 151,840 $ 703,170 $ 837,200 $ 2,813,590 $ 194,480 Assessment Total $ 1,246,050 $ 4,044,040 $ 18,359,120 $ 23,649,210 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 4,509,700 $ 209,170 $ 9,220,250 $ 8,160,490 $ 403,650 $ 9,220,250 SUMMARY by Eligible Actual CHPS Categories Points Points Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points JSMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation JSMS-IV

17 Kit Carson Proposed IB School Kit Carson School Campus Entry Student Centered Education N Street Site Plan of Campus School Mission Statement Kit Carson has a flourishing academic culture where students are motivated to learn and are excelling in all subject areas. They take responsibility for their daily and long-term success, and they understand the present and future value of what they learn. Students feel safe and encouraged and have confidence in their abilities. Narrative Summary The site is just over 9 acres in a fully developed residential neighborhood just off commercially developed Folsom Blvd. The site is small but appears adequate for this school that was built in 1976, This existing campus is in generally fair condition and has been looked at as a viable candidate to be converted into an IB Program to support Grades The Buses currently bring about 70% of the students to school and create some traffic issues within the neighborhood. The buses must route through the neighborhood to enter and exit the school but are able to loop from Folsom Blvd. and back with reasonable convenience. There are, however, no designated passenger loading and unloading zones, no separation for parents and buses and no barrier free drop off spaces. Drop offs take place along the "N" Street frontage and in the staff parking lot at the west side of the campus. Both locations currently generate traffic conflicts and unsafe conditions. At a minimum, a barrier free drop off space is required and a designated drop off lane is recommended. The public and main entrance to the school and administrative offices is located along "N" Street and at some distance from the available visitor parking. Additional parking area is recommended and should be located in reasonable proximity to the school's entrance and administrative office. There have been recent path of travel upgrades to the staff parking lots but more is needed to be fully code compliant. The campus is a pleasant homogenous design with good internal circulation and the core secured by ornamental steel gates. The campus is well planned for a compact facility and suited to the neighborhood. However an updated color scheme would be more appropriate for the age group. Some modernization has been completed to upgrade restrooms for code compliance but has left unsightly patches in tile finishes. Additional upgrades for code compliance are needed throughout the campus. The school buildings were built with little consideration for energy efficiency and improvements could be made through the use of more efficient windows and mechanical systems. Benefits could also be gained through more efficient lighting and effective energy control systems. The student gathering areas of the campus are primarily associated with the Quad. This area is well located, adequate and in reasonably good condition. The student snack bar is adjacent to the Quad. Other outdoor student School Location Legend areas include landscape planters, some with benches, between classroom buildings. The athletic fields and paved play courts are adequate for the current enrollment but in fair condition. Resurfacing is needed for some areas of the courts and water efficient irrigation recommended for the play fields. Based on the opportunities, facility conditions and code issues identified in this report, the Kit Carson School appears to be a fair candidate to support the facility and programmatic transformation to a 7-12 IB School. KCS-I

18 Kit Carson Proposed IB School High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off No designated drop off area. Bus and parent drop off combined along street frontage.. No barrier free drop off space or signage. Sustainable Sites Outdoor Activity Poor surface condition poses safety risk and upgrades for barrier free access are needed. Sustainable Sites Campus Core Trees in quad are in very poor condition, some are dead and others showing signs of decline. Soil is extremely compacted, and planters are too small for long-term survival. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency There are many old, broken and leaking fixtures that do not comply with barrier free access code. Energy & Atmosphere Original 1976 system with electric heating coils should be replaced with more efficient hot water heating coils. Materials & Resources Interior Areas modified for barrier free access are poorly patched and need new finishes. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Indoor Environmental Quality Areas that do not meet egress or barrier free codes need upgrading. Indoor Environmental Quality Vocational shop spaces used for storage could be reassigned and modernized for quality effective teaching environments. Indoor Environmental Quality Casework upgrades for storage and barrier free access is needed in most classrooms. KCS-II

19 N Street Kit Carson Proposed IB School Student Centered Education The following is a site organizational concept of Kit Carson 7-12 School to implement the Strategic Plan : Putting Children First and the Common Core Standards. Kit Carson 7-12 School SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff and Student Parking Outdoor Learning Courts Drop Off Rodeo Way Visitor Parking Admin Student Parking Gym Hard Court CAREER & COLLEGE READY CORE ACADEMIC (11,436 s.f.) Grades 7-12 Classrooms, Includes Science & Technology Labs & Teacher Planning Centers PROJECT LABS Project Labs () Art/Music/Tech Transformation (11,436 s.f.) Expansion (7,440 s.f.) SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation 6,500 s.f.) Media Center, Computer Area, Parent TC Center & Conference Room and Teacher Planning Center MP TC 54 th Street ORGANIZATIONAL TRANSFORMATION Classroom Expansion (4,608 s.f.) CR Expansion to meet optimized Campus Capacity and Grade Configuration Goals of ( students per grade level or 4 Classrooms and Support Spaces Site Plan of Campus KCS-III

20 School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: - Remedy traffic congestion - Fix PE lockers - Sound proofing between classrooms - Sound system in multi-purpose room -Garden improvements -Paint gym - Warm water in the rest rooms -Outdoor tables - Computer lab upgrades - Basketball nets and soccer goals - Efficient HVAC system - Additional restrooms -Resurface blacktop - Technology upgrades - Parking lot improvements -Resurface quad Schools as Teaching Tools Code, Life Safety & Access $ 274,430 $ 60,320 $ 574,860 $ 17,550 Maintenance & Operations $ 320,580 $ 26,520 $ 508,560 $ 606,840 $ 1,795,820 Assessment Total $ 927,160 $ 3,258,320 $ 17,700,280 $ 21,885,760 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost Project Cost Summary Matrix High Performance Transformation $ 6,632,990 $ 148,200 $ 35,230 $ 1,114,880 $ 694,200 $ 9,074,780 Sustainable Category Total $ 7,228,000 $ 235,040 $ 543,790 $ 2,296,580 $ 2,507,570 $ 9,074,780 Kit Carson Proposed IB School CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. SUMMARY by CHPS Categories Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Eligible Actual Points Points Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points KCS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation KCS-IV

21 Rosa Parks 68 th Avenue Rosa Parks Campus Entry Student Centered Education School Mission Statement Statement pending input from school Site Plan of Campus Narrative Summary Rosa Parks ; one of the District s Priority Schools, was originally constructed in Previously named Charles M. Goethe, the site is just over 13 acres in a fully developed neighborhood and is adjacent to an elementary school to the south and a city park to the southeast. The properties are separated by 6' chain link fences. The school was built in 1960 with a design shared by four other schools in the district and is in generally fair condition. It previously had an enrollment of nearly 800 but currently serves just 471 students. Access to the school is from 68th Avenue just west of 24th Street. There is no turn a round for buses but a loop route to and from major streets is available although long. There are also no designated passenger loading and unloading zones. Drop offs currently take place along the 68th Avenue frontage and in the staff parking lot. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades for paving and striping to the parking lot and service drives. Some path of travel upgrades have been made but more are needed. At a minimum, a barrier free drop off space is required and separate designated drop off lanes for bus and parent use are recommended. About 20% of the classrooms are on the second floor and served by a ramp and two stairways. The fifty plus year old school was built with little consideration for energy efficiency and improvements could be made through the use of more efficient windows and mechanical systems. Benefits could also be gained through more efficient lighting and additional newer energy control systems. The existing windows in the primary classrooms are minimal and do not provide a good level of natural light. Recent and ongoing upgrades to the site and modernization of the "Industrial Arts" wing to serve as computer, computer drafting and art labs are significant improvements. Some upgrades are still needed to comply with code access requirements. The student gathering areas of the campus are primarily associated with the Quad. This area is adequate and in reasonably good condition and would benefit from the addition of shade trees or canopies. The student snack bar is conveniently adjacent to the Quad. Other outdoor student areas include landscape planters, some with benches, between classroom buildings. School Location Legend The athletic fields and paved play courts are adequate for the current enrollment and in fair condition. Some areas need resurfacing and striping. More efficient irrigation and water management for the fields would be a recommended improvement. Based on the opportunities, facility conditions and code issues identified in this report, Rosa Parks appears to be in generally fair condition and should be a solid candidate for further modernization. RPMS-I

22 Rosa Parks High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off Parent drop off takes place in the staff parking lot creating potentially hazardous traffic conflicts. Additionally there in no barrier free drop off space. Sustainable Sites Outdoor Activity Poor surface condition and drainage poses safety risk and maintenance issues. Sustainable Sites Campus Core The Quad area is large enough but without shade does not promote education and informal gathering opportunities. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior Backflow prevention serves fields but not the rest of the campus. Domestic water and irrigation water are not separated. Cross contamination possible. Water Efficiency Interior Upgrade fixtures with Low flow automatic metering fittings. Energy & Atmosphere Old fluorescent fixtures have T-8 bulbs. Update with new more efficient fixtures. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Inadequate slopes and drainage causes standing water that damages roofing. Materials & Resources Interior Insufficient outlets and low voltage cabling run in surface raceways or exposed in classrooms. Indoor Environmental Quality Casework and fixtures need to be upgraded to comply with barrier free access requirements. RPMS-II

23 Rosa Parks Visitor/Parent Campus Entry TC Campus Entry Admin. Drop Off 68 th Avenue Student Centered Education The following is a site organizational concept of Rosa Parks to implement the Strategic Plan : Putting Children First and the Common Core Standards. SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. Staff Parking MP Campus Quad CAREER & COLLEGE READY CORE ACADEMIC (46,268 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. Gym SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (6,079 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Rosa Parks Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (8,400 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus RPMS-III

24 Rosa Parks School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: NEEDS: - School security - Cameras outside - Technology ready classrooms Schools as Teaching Tools Code, Life Safety & Access $ 1,370,330 $ 144,560 Maintenance & Operations $ 1,385,540 $ 53,560 Project Cost Summary Matrix High Performance Transformation $ 6,123,780 $ 374,530 Sustainable Category Total $ 8,879,650 $ 572,650 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $ 33,020 $ 451,100 $ 484,120 $ 753,480 $ 98,150 $ 3,069,820 $ 3,875,300 Assessment Total $ 2,399,540 $ 8,835,320 $ 18,257,070 $ 29,491,930 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 4,320,160 $ 1,762,800 $ 5,675,800 $ 8,143,460 $ 5,736,250 $ 5,675,,800 SUMMARY by Eligible Actual CHPS Categories Points Points Leadership, Education & Innovation 13 1 Sustainable Sites 14 4 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points RPMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation RPMS-IV

25 Sam Brannan Elmer Way Sam Brannan Campus Entry Student Centered Education School Mission Statement Our goal is to inspire, enrich, and challenge the developing minds of middle school children. We strive to create a safe and secure learning environment ensuring students are provided an optimum learning experience. Our learning community consists of caring, compassionate and committed students, parents, and faculty that aim to make SBMS a true school of excellence. Site Plan of Campus Narrative Summary The site is just over 22 acres in a fully developed neighborhood and adjacent to Cabrillo Elementary School and a community park with tennis and swim facilities. The school was built in 1961, it is in generally fair condition and currently serves 706 students. Vehicle access uses fairly wide neighborhood streets and a loop route is available that helps avoid some potential conflicts. The entry to the school is clear with convenient visitor parking. However, there are no designated passenger loading and unloading zones nor a barrier free drop off space. Drop offs currently take place along the Elmer Way frontage, where sidewalks are narrow, and in the staff parking lot at the north end of the campus. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades to the visitor parking lot and entry walkways but the staff parking lots need paving and path of travel upgrades. At a minimum, a barrier free drop off space is required and a designated drop off lane is recommended along Elmer Way. There are 7 classrooms on the second floor served by a ramp and two stairways. The fifty year old school was built with little consideration for energy efficiency but improvements could be made through the use of more efficient windows, lighting and mechanical systems. Benefits could also be gained through more effective energy control systems. The school has undergone some improvements and Building 3 is currently undergoing some modernization. Upgrades for code access compliance however, are still needed throughout the campus. Classrooms previously used for vocational shops are used for storage or converted to other uses. The campus core is secured by ornamental steel gates and fencing and the student gathering areas of the campus appear adequate and well maintained. The campus core has a large quad with a concrete platform for events and areas adjacent to the snack bar for outdoor eating. School Location Legend The athletic fields and paved play courts are adequate for the current enrollment but in fair condition. Resurfacing is needed. Based on the opportunities, facility conditions and code issues identified in this report, Sam Brannan appears to be in generally fair condition and should be a solid candidate for further modernization. SBMS-I

26 Sam Brannan High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off Parent and bus combined in street right of way. Rolled curb without barrier free curb ramps and warnings. Sustainable Sites Outdoor Activity Bleachers are in poor condition and are not compliant with barrier free access requirements. Sustainable Sites Campus Core Walks are concrete and generally good. Some railing, grates and steps do not comply with current access codes. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Water Efficiency Exterior Irrigation controllers manage part of the campus with balance manually watered. Recommend updating with smart system to comply with city conservation ordinance. Water Efficiency Interior New metering water conserving valves and fittings should be installed at all fixture locations. Energy & Atmosphere Appears no kitchen cooling or heating except for the transfer air and a single gas unit heater. Hood at oven is too small. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Built-up roofing with significant standing water due to poor slopes and inadequate drainage. Materials & Resources Interior Old flooring tile is vinyl asbestos in poor condition and should be replaced. Indoor Environmental Quality Cabinets do not provide sufficient storage and do not comply with barrier free requirements. SBMS-II

27 Sam Brannan Student Centered Education The following is a site organizational concept of Sam Brannan to implement the Strategic Plan : Putting Children First and the Common Core Standards. TC SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Elmer Way Campus Entry Admin. MP Drop Off Outdoor Learning Courts. CAREER & COLLEGE READY CORE ACADEMIC (53,600 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. SUPPORT Support Spaces distributed Gym Sam Brannan Middle School FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation/Expansion (6,160 s.f.) Media Center, Computer Lab Parent Center & Conference Room TC and Teacher Planning Center. Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (0) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus SBMS-III

28 Sam Brannan School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: - Technology upgrades - Fix the hallway locker issue - Improve the athletic fields Schools as Teaching Tools Code, Life Safety & Access $ 798,980 Maintenance & Operations $ 906,750 Project Cost Summary Matrix High Performance Transformation $ 4,561,310 Sustainable Category Total $ 6,267,040 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $ 5,330 $ 140,270 $ 208,260 $ 353,860 $ 721,760 $555,620 $ 850,590 $ 3,780,400 $ 5,127,200 $ 1,913,080 $ 1,907,230 $ 9,972,820 Assessment Total $2,081,690 $10,805,210 $18,562,700 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost $ 850,590 $ 6,415,240 $ 7,590,050 $ 9,972,820 $31,449,600 SUMMARY by Eligible Actual CHPS Categories Points Points Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 1 TOTAL Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points SBMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation SBMS-IV

29 Sutter I Street Alhambra Blvd. Narrative Summary J Street Sutter The site is 7.5 acres in a confined fully developed semiurban location and is un-suitably small for this middle school. A typical suburban site for this size school would be at least twice the area. The school was built in 1958 and serves just over 1,200 students with most of the classrooms on second and third floors. Access to the campus is along "I" Street just off Alhambra Blvd. A drop off lane was added along "I" Street but conflicts with traffic into and out of the parking areas remain. There is no convenient turn a round or loop routing for buses. Parking is less than adequate and adversely affects student circulation. In addition to street, parking and drive conflicts there are significant "path of travel" issues around and within the campus. While the area is served by public transportation, there is no fully compliant path of travel to the campus. These are apt to become major circumstances with future modernization. The upper floors are served by stairs and a single elevator. The fifty plus year old school was built with little consideration for energy efficiency and improvements could be made through the use of more efficient windows, wall systems and mechanical systems. Site Plan of Campus Benefits could also be gained through more efficient lighting and effective energy control systems. The structure is primarily steel and masonry with large areas of window wall systems including awning windows and spandrel panels. The condition and age of the windows and window system shows signs of deterioration and has numerous leaks. In addition to the overall condition issues, the windows and panels are single glazed un-insulated and inefficient. The interior corridors on the second and third floors of the main classroom building are wide and lined with lockers, but access to and from the classrooms does not comply with code. These conditions will likely require significant upgrades with any future modernization. The design of the school is dated and the classrooms and amenity areas reflect the age of the school with some deterioration and many barrier free access issues. The student snack bar has access to the Quad for outdoor eating. The gathering areas of the campus appear adequate and in reasonably good condition. The campus core has a small "Quad" area that appears underutilized. The campus core is secured by unsightly ornamental steel gates and fencing. Campus Entry School Location Legend The site can be accessed from "J" Street by larger vehicles and from Alhambra Blvd. by smaller service vehicles. The athletic fields and paved play courts are small for the current enrollment and in fair condition. Resurfacing is needed. Library Media Center for small group activities. Based on the opportunities, facility conditions and code issues identified in this report, Sutter appears to be in just fair condition and suitable for further modernization although upgrades required for code compliance could be extensive. Student Centered Education School Mission Statement Create an academic environment where every classroom is focused on learning so that every Sutter Miner has an equal chance of success here, in high school, in college, and in their career. Students will be able to critically think, problem solve, work collaboratively, and be proficient writers, all skills necessary in the 21st Century. SMS-I

30 Sutter High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off Parent & bus drop off on narrow residential street frontage conflicts with parking and path of travel creating serious hazards. Sustainable Sites Outdoor Activity Poor surface condition poses safety risk. Sustainable Sites Campus Core Does not promote education and informal gathering opportunities. Recommend updating irrigation to campus wide smart system. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Interior Replace outdated and inefficient fixtures with efficient barrier free fixtures. Energy & Atmosphere Replace old improperly sized equipment with new efficient equipment. Materials & Resources Exterior Both built up and steel roofs are in poor condition. Built up roofs have slope and drainage problems. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Interior Doors do not comply with CBC due to wall thickness created by recessed lockers in corridors. Indoor Environmental Quality Exposed conduit, patches in VAT tile floor and no acoustic treatment on walls and ceiling in Multi-Purpose room creates a less than quality environment. Indoor Environmental Quality Inadequate storage combined with casework, plumbing, floors and circulation not compliant with barrier free requirements, creates less than suitable learning environments. SMS-II

31 Sutter Student Centered Education Visitor I Street The following is a site organizational concept of Sutter to implement the Strategic Plan : Putting Children First and the Common Core Standards. SAFE & WELCOMING SCHOOL J Street Alhambra Blvd. MP Sutter Gym Admin Drop Off & Parking TC TC Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. CAREER & COLLEGE READY CORE ACADEMIC (47,207 s.f.) Grades 7 & 8 Classroom Houses, Includes Science & Technology Labs & Teacher Planning Centers. ACTIVE LEARNING Project Labs () Transformation Art/Music/Tech. SUPPORT Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Expansion (8,500 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Staff Parking Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (11,000 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Site Plan of Campus SMS-III

32 Sutter School Site Facilities Needs The Following List was provided by the School s Principal as generated from School Site Council and Community Meetings: - Technology (ELMO's & smart boards for the classrooms) - School needs more electrical outlets - Working AC/Heaters throughout the school - Add A/C to multi-purpose room and gym. - More security cameras - More white boards for the classrooms -New windows Schools as Teaching Tools Code, Life Safety & Access $ 769,600 $ 96,070 Maintenance & Operations $ 826,410 $ 939,120 Project Cost Summary Matrix High Performance Transformation $ 1,736,150 $ 1,634,230 Sustainable Category Total $ 3,332,160 $ 2,669,420 CHPS Summary Collaborative for High Performance Schools Supports the idea that a well-designed facility can truly enhance performance and make education more enjoyable and rewarding and a productive learning experience. In accordance with the Green and Grid Neutral Model Schools Policy Initiative-BP 3511and Resolution No. 2583; Adopting the Collaborative for High Performing Schools (CHPS) Criteria, the following summary characterizes how the Schools align with the Best Practices Criteria. $ 321,750 $ 4,715,100 $ 128,050 $ 5,164,900 $ 1,761,630 $ 572,650 $ 4,135,560 $ 5,018,780 $ 8,109,920 $ 14,007,110 $ 1,138,410 $ 6,729,840 $ 11,613,940 $ 11,613,940 Assessment Total $ 3,521,700 $ 15,634,970 $ 24,360,700 $ 43,517,370 Cost Summary reflects Total Project Cost Estimate, inclusive of Construction Cost and Soft Cost SUMMARY by CHPS Categories Leadership, Education & Innovation 13 1 Sustainable Sites 14 3 Water Efficiency 9 0 Energy & Atmosphere 29 1 Climate 10 0 Materials & Resources 18 2 Indoor Environmental Quality 23/25 2 TOTAL Eligible Actual Points Points Under CHPS CHPS High Performing Minimum Performing Campus Assessment Summary Points SMS Sustainable Sites - School Entry & Drop-off -Parking& Drives - Service Access - Outdoor Activity -Campus Core - Utilities & Infrastructure Water Efficiency - Site Utilities & Infrastructure -Plumbing Systems -Specialty Systems - Fire Protection Systems Energy & Atmosphere - Central Plant -HVAC Systems -Specialty Systems - Alternative Energy Systems Materials & Resources -Signage - Door Hardware -Interior Space -Exterior Finish Indoor Environmental Quality - Electrical Systems - Lighting Systems - Technology Systems - Low Voltage Systems Leadership, Education & Innovation - Career & College Ready - Family & Community Engagement - Organizational Transformation SMS-IV

33 Will C. Wood Will C. Wood 65 th Stet Expressway Campus Entry Student Centered Education School Mission Statement Lemon Hill Avenue Success For Every Student Site Plan of Campus Students actively preparing to become academically and socially capable of meeting the challenges of the 21 st century. Narrative Summary Will C. Wood ; one of the District s Priority Schools was constructed in The site is just under 19 acres in a fully developed neighborhood and adjacent, on the east side, to 65th Street Expressway. The school s design is shared by four other schools in the district and is in generally fair condition. Designed for an enrollment of 800 it currently serves 771 students. There are no designated passenger loading and unloading zones. Drop offs currently take place along the Lemon Hill Ave. frontage and in the staff parking lot. Both locations generate traffic conflicts and unsafe conditions. There have been recent upgrades for paving and striping to the parking lot and service drives. Some path of travel upgrades have been made but more are needed. About 20% of the permanent classrooms are on the second floor and served by a single ramp and two stairways. Nine of the 49 classrooms are in portables. As with other schools of the period, the fifty year old school was built with little consideration for energy efficiency. Some of Building "E", previously used as Industrial Arts studies has been converted to serve other needs including storage and classrooms. The school has undergone other improvements but most areas still need considerable upgrades for CBC Access Compliance and to meet contemporary educational needs. The student gathering areas of the campus are primarily associated with the "Quad" which is adequate for school gatherings and in reasonably good condition. Other outdoor student areas include landscape planters, some with benches, between classroom buildings. The large ramp however, in the court between classroom wings, has created concerns for safety and visibility in the core area. The need for cameras to monitor the area behind the gym building and around the portables has also been noted. Some covered walk roofs are leaking and rainwater flowing from the roofs create large, hazardous puddles on the walks. Water drainage is also an issue adding to the problem. School Location Legend The athletic fields and paved play courts are adequate for the current enrollment but in fair condition. Based on the opportunities, facility conditions and code issues identified in this report, Will C. Wood appears to be in generally fair condition and should be a solid candidate for further modernization. WWMS-I

34 Will C. Wood High Performance Transformation Encourage innovation in high performance school design creating safe, motivating and sustainable learning environments that reduce dependence on non-sustainable resources. Sustainable Sites School Entry/Drop Off No designated bus or parent drop off. Parent drop off in staff parking lot with congestion & conflicts. No barrier free drop off space or path of travel, Sustainable Sites Outdoor Activity Poor surface condition poses safety risk Sustainable Sites Campus Core Ample space but uninviting without shade. Concrete walks and surfaces are uneven and broken. Create safe, barrier free outdoor learning environments incorporating efficient and effective storm water management, landscaping, lighting and surfaces. Improve the efficiency of fixtures, appliances and irrigation systems to reduce domestic water usage. Optimize energy efficiency and performance to minimize environmental impacts and reduce operating costs associated with fossil fuels. Improve the learning environment and extend the lifecycle of facilities while encouraging the use of efficient sustainable materials and reducing waste. Water Efficiency Exterior Upgraded irrigation and drought tolerant planting should be incorporated for water conservation. Water Efficiency Interior Replace old fixtures & fittings with new efficient low flow fixtures that are barrier free access compliant. Energy & Atmosphere Upgrade or replace older energy management system to include all rooms, door/window interlocks and plug load controls. Enhance air quality, thermal comfort, natural light, acoustic performance and physical environments while reducing pollutants. Provide a safe, healthy, functional environment to help motivate students and encourage attendance. Materials & Resources Exterior Standing water on roofs due to inadequate slopes and drainage. Materials & Resources Interior Areas with patched tile and other materials and finishes should be re-surfaced with new material. Indoor Environmental Quality Replace casework, fixtures and fittings to meet barrier free access code. WWMS-II

35 Will C. Wood Student Centered Education The following is a site organizational concept of Will C. Wood to implement the Strategic Plan : Putting Children First and the Common Core Standards. SAFE & WELCOMING SCHOOL Dedicated Drop-Off Visitor/Staff Parking Outdoor Learning Courts. Will C. Wood CAREER & COLLEGE READY Academic Pathway Transformation (46,268 s.f.) Grades 7 & 8 Classroom Houses, Includes Core Academic, Learning Labs; Science & Technology Labs & Teacher Planning Centers. Gym Specialized Learning Lab Transformation Project Labs (); Art/Music/Tech. Drop Off Campus Quad Admin. Campus Entry MP TC Staff Parking Campus Entry Visitor/Parent 65 th Stet Expressway Support Support Spaces distributed FAMILY & COMMUNITY ENGAGEMENT Technology Center (TC) Transformation (6,079 s.f.) Media Center, Computer Lab TC Parent Center & Conference Room and Teacher Planning Center. Multi-Purpose (MP) Gym ORGANIZATIONAL TRANSFORMATION Classroom Conversion / Expansion (8,400 s.f.) Portable to Permanent and CR Expansion to meet optimized Campus Capacity Goals Lemon Hill Avenue Site Plan of Campus WWMS-III

Collins Middle School

Collins Middle School Contents Collins Middle School...2 General comments, campus capacity, and student demographics:...2 1.0 School Site...4 2.0 Building Systems and Components...5 3.0 Building Safety and Security...19 4.0

More information

WILKINSON ELEMENTARY SCHOOL

WILKINSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1976 BUILDING AREA 144,900 SF CURRENT PROGRAM CAPACITY 508 ENROLLMENT 2008 451 WARD 8 PROPOSED PROGRAM CAPACITY 600 Site Plan WILKINSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HIDDEN VALLEY ELEMENTARY SCHOOL

HIDDEN VALLEY ELEMENTARY SCHOOL SCHOOL DATA Address: 3435 Bonita Vista Santa Rosa, CA 95404 Established: 975 Permanent Classrooms: 29 Portable Classrooms: 8 Building Area: Site Area: Satellite Building Area: Satellite Site Area: 48,802

More information

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment

Facilities Feasibility Study Matthew A. Henson ES Condition Assessment Summary of Findings The Matthew A. Henson ES Facility located at 1600 N. Payson Street in Baltimore, Maryland, was built in 1964. It comprises 75,228 gross square feet. The total current deficiencies for

More information

SHEPHERD ELEMENTARY SCHOOL

SHEPHERD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1932 BUILDING AREA 79,700 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 355 WARD 4 PROPOSED PROGRAM CAPACITY 400 Site Plan SHEPHERD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

RAYMOND EDUCATION CAMPUS

RAYMOND EDUCATION CAMPUS INITIAL YEAR BUILT 1924 BUILDING AREA 73,600 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 302 WARD 1 PROPOSED PROGRAM CAPACITY 600 Site Plan RAYMOND - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

CESAR CHAVEZ LANGUAGE ACADEMY

CESAR CHAVEZ LANGUAGE ACADEMY SCHOOL DAA Address: 2570 West Steele Lane Santa Rosa, CA 95403 Established: Campus - 1972, CCLA - 2013 Permanent Classrooms: 14 Portable Classrooms: 4 Building Area: Site Area: 17,000 sq. ft. 24.08 acres

More information

WATKINS ELEMENTARY SCHOOL

WATKINS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 69,300 SF CURRENT PROGRAM CAPACITY 578 ENROLLMENT 2008 550 WARD 6 PROPOSED PROGRAM CAPACITY 550 Site Plan WATKINS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 2.0 2.0 0.30 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 1.0 3.0 0.22 Four fewer stalls

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DAVIS ELEMENTARY SCHOOL

DAVIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1943 BUILDING AREA 71,100 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 227 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan DAVIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions The 1966 non-core school has actively pursued an ongoing maintenance and upgrade program to improve a number of past problem areas within the school. Extensive

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

STUART-HOBSON MIDDLE SCHOOL

STUART-HOBSON MIDDLE SCHOOL INITIAL YEAR BUILT 1927 BUILDING AREA 105,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 399 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan STUART-HOBSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y

WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE M a y 2 0 1 8 Agenda Overview of the Bond 2018 Work 2 Agenda Overview of the Bond 2018 Work 3 Overview of Bond Why Now? Interest rates remain at historic

More information

Edmonton Public School District No. 7

Edmonton Public School District No. 7 EXECUTIVE SUMMARY 1. Overall Impressions Sherwood Elementary School resides in a quiet residential neighborhood with a shared parking area adjacent to the community league on the north and a generous play

More information

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data

Evansville Public Schools. Facility Assessment Report January 28, 2 , General Building Data Evansville Public Schools Facility Assessment Report January 28, 2, 2013 SGN/Wendel Architects, Design Tree Engineering and R.A. Morton Construction Managers were retained by the Evansville Public School

More information

NALLE ELEMENTARY SCHOOL

NALLE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1950 BUILDING AREA 83,900 SF CURRENT PROGRAM CAPACITY 460 ENROLLMENT 2008 372 WARD 7 PROPOSED PROGRAM CAPACITY 400 Site Plan NALLE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

LASALLE - BACKUS EDUCATION CAMPUS

LASALLE - BACKUS EDUCATION CAMPUS INITIAL YEAR BUILT 1957 BUILDING AREA 63,000 SF CURRENT PROGRAM CAPACITY 406 ENROLLMENT 2008 349 WARD 4 PROPOSED PROGRAM CAPACITY 425 Site Plan LASALLE - BACKUS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND

MCKINLEY INSTITUTE OF TECHNOLOGY BRAILSFORD & DUNLAVEY RGM AND ASSOCIATES MEASURE T BOND MCKINLEY INSTITUTE OF TECHNOLOGY N E I G H B O R H O O D M E E T I N G A P R I L 2 4, 2 0 1 7 1 1 LPA MASTER PLAN 2 PHASE 1 SCOPE Blue Line 3 PHASE 1 SCOPE Blue Line 4 BOND T REVISED PROGRAM SCOPE 1 Modernize

More information

Facilities Feasibility Study Frederick Douglass HS Condition Assessment

Facilities Feasibility Study Frederick Douglass HS Condition Assessment Summary of Findings The Frederick Douglass HS Facility located at 2301 Gwynns Falls Parkway in Baltimore, Maryland, was built in 1927. It comprises 194,249 gross square feet. The total current deficiencies

More information

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment

Facilities Feasibility Study Laurence G. Paquin Building Condition Assessment Summary of Findings The Laurence G. Paquin Building Facility located at 2200 SINCLAIR LANE in Baltimore, Maryland, was built in 1975. It comprises 65,666 gross square feet. The total current deficiencies

More information

SEATON ELEMENTARY SCHOOL

SEATON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1969 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 428 ENROLLMENT 2008 280 WARD 2 PROPOSED PROGRAM CAPACITY 325 Site Plan SEATON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Facility Improvements

Facility Improvements CA-SI-01 ACCESSIBLE PARKING STALL ADDITIONS CA-SI-07 BASEBALL & SOFTBALL INFIELD IMPROVEMENTS Additional parking stalls and signage needed for disabled individuals and to meet ADA requirements. Installation

More information

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014

HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 HUGHES STADIUM CONTROLLED MAINTENANCE THROUGH 2020 Description of Projects on Facilities Management List September 18, 2014 1. Upgrade Video Security and Surveillance Systems - Replace with New a. Existing

More information

2016 BOND INFORMATION

2016 BOND INFORMATION 2016 BOND INFORMATION This publication is provided as a public service by the offices of Operations and Maintenance, Communications and Financial Services. www.svvsd.org @svvsd 395 South Pratt Parkway,

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: West Hartsville Elementary Observed By: Cannon/Carter Principal:

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Cain Elementary School Observed By: Creed/Carter Principal: Grade

More information

POWELL ELEMENTARY SCHOOL

POWELL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 38,500 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 319 WARD 4 PROPOSED PROGRAM CAPACITY 325 Site Plan POWELL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-3

More information

SYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community.

SYLVAN. inspire MIDDLE SCHOOL. which is to. instruction and programs. in a safe, caring, and. collaborative learning community. SYLVAN MIDDLE SCHOOL The mission of Sylvan Middle School is consistent with that of the San Juan Unified School District, which is to inspire each student tosucceed and responsibly contribute to a radically

More information

N o v e m b e r

N o v e m b e r WARREN CONSOLIDATED SCHOOLS 2016 BOND PROJECT UPDATE N o v e m b e r 2 0 1 7 Agenda Overview of the Bond 2017 Update 2018 Work 2 Agenda Overview of the Bond 2017 Update 2018 Work 3 Overview of Bond Why

More information

Architect and Engineer: Friar Associates inc.

Architect and Engineer: Friar Associates inc. Architect and Engineer: Friar Associates inc. BACKGROUND In June, after soliciting and interviewing several professional firms, Friar Associates was hired to perform an Existing Conditions Survey and Facilities

More information

School Without Walls

School Without Walls INITIAL YEAR BUILT 1938 BUILDING AREA 59,400 SF CURRENT PROGRAM CAPACITY 304 ENROLLMENT 2008 276 WARD 1 PROPOSED PROGRAM CAPACITY 400 SCHOOL WITHOUT WALLS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Scripps Ranch High School

Scripps Ranch High School Scripps Ranch High School 10410 Treena St. San Diego, CA 92131 Sub-district: B Cluster: Scripps Ranch Year School Opened: 1993 Grades: 9-12 4 3 1 2 1 2 3 4 Sustainable Technologies Buildings Synthetic

More information

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS

DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION DESIGN GUIDELINES DUVAL COUNTY PUBLIC SCHOOLS DIVISION 2 SITE DEVELOPMENT DESIGN CONSIDERATIONS SECTION 02001 Bus Traffic. Separation between bus traffic, regular vehicular flow, service traffic and pedestrian traffic. Bus traffic must have adequate

More information

Corsicana High School

Corsicana High School Contents Corsicana High School...2 General comments, campus capacity, and student demographics...2 1.0 School Site...4 2.0 Building Systems and Components...6 3.0 Building Safety and Security...19 4.0

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Brunson-Dargan Observed By: Creed/Carter Principal: Mrs. Ada O Sindab

More information

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting

CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan. Community Information Meeting CORVALLIS SCHOOL DISTRICT Long-Range Facility Master Plan Community Information Meeting October 2017 AGENDA Meeting Objectives Draft Plan Overview School Improvements for specific site Feedback/Listening

More information

Board Work Session Feasibility Study. January 9, 2017

Board Work Session Feasibility Study. January 9, 2017 Board Work Session Feasibility Study January 9, 2017 1 Process Staff Input Sessions at all schools What can you tell us about your building, your site, your space? Group collaboration exercise looking

More information

MAURY ELEMENTARY SCHOOL

MAURY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1886 BUILDING AREA 46,800 SF CURRENT PROGRAM CAPACITY 276 ENROLLMENT 2008 238 WARD 6 PROPOSED PROGRAM CAPACITY 325 Site Plan MAURY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Independence Adult Center

Independence Adult Center Campus Master Plan March 15, 2004 Master Plan Contents Volume I: District Master Plan Andrew P. Hill High School Campus Master Plan Foothill High School Campus Master Plan Independence High School Campus

More information

CONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO

CONSTRUCTION REPORT. Zionsville Community Schools Zionsville, Indiana. October 2014 TSC NO CONSTRUCTION REPORT TSC NO. 21319.1 October 2014 Zionsville Community Schools Zionsville, Indiana The SKILLMAN Corporation Project Administration Construction Management Zionsville Community Schools 2005

More information

LECKIE ELEMENTARY SCHOOL

LECKIE ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 65,000 SF CURRENT PROGRAM CAPACITY 471 ENROLLMENT 2008 321 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan LECKIE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

HIGH PERFORMANCE FACILITY ASSESSMENT

HIGH PERFORMANCE FACILITY ASSESSMENT JOHN H. STILL MIDDLE SCHOOL Schools as Teaching Tools Formula for Success: High Performing Education + High Performing Facilities + Community Partnerships = HIGH PERFORMING STUDENTS HIGH PERFORMANCE FACILITY

More information

Santa Teresa High School

Santa Teresa High School Santa Teresa High School Campus Master Plan March 15, 2004 Volume II: Campus Master Plan Santa Teresa High School Master Plan Contents Volume I: District Master Plan Volume II: Campus Master Plan Andrew

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Southside Early Childhood Observed By: Cannon/Carter Principal: Grade

More information

James Lick High School

James Lick High School James Lick High School Campus Master Plan March 15, 2004 Volume II: Campus Master Plan James Lick High School Master Plan Contents Volume I: District Master Plan Volume II: Campus Master Plan Andrew P.

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Cupertino Union School District

Cupertino Union School District Cupertino Union School District Update For Citizens Bond Oversight Committee September 21, 2016 WORK IN PROGRESS 1 STEVENS CREEK KINDERGARTEN CLASSROOM STEVENS CREEK KINDERGARTEN CLASSROOM 2 STEVENS CREEK

More information

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000

3. 21st Century Learning A. Districtwide Flexible Learning $600,000 Subtotal $600,000 1. Safety and Security A. Additional Cameras District Wide $382,000 B. Interior Locks Upgrades $300,000 C. Tilden Entrance Upgrades $50,000 D. Door and Glass Improvements $500,000 E. Alert Systems $800,000

More information

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018

FREMONT UNIFIED. Thornton Middle School Conversion S C H O O L D I S T R I C T. Quattrocchi Kwok Architects. Sept 26, 2018 FREMONT UNIFIED S C H O O L D I S T R I C T Thornton Middle School Conversion Quattrocchi Kwok Architects Sept 26, 2018 1 Transforming Thornton Incoming 6 th graders in year 2021/22 Student population

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District NATATORIUM CAMPUS DATA NATATORIUM 22628 Hwy 105 West, Montgomery TX 77356 Year Built 2009 Approx. Total Square Footage Grades Served 30,420 n/a Current Enrollment n/a Building Levels 1 1 MASTER PLAN 2

More information

Madison School District. Strategic Five-Year Facility Maintenance Plan

Madison School District. Strategic Five-Year Facility Maintenance Plan Madison School District Strategic Five-Year Facility Maintenance Plan 2016 2020 Dear Madison Stakeholder, Throughout the past twenty years, Madison School District has experienced tremendous growth. Since

More information

BALLOU SENIOR HIGH SCHOOL

BALLOU SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1960 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1565 ENROLLMENT 2008 9-12 (1,252) STAY (753) WARD 8 PROPOSED PROGRAM CAPACITY 1200 Site Plan BALLOU - 1 PROPOSED PROGRAM PROFILE

More information

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017

Chenango Valley Central School District Potential Capital Project BCK-IBI Group Project No October 23, 2017 Chenango Bridge Elementary School Phase 1 Asphalt Pavement Reconstruction Reconstruct asphalt parking located on west side of building including access drive. Sidewalk Replacement Replace cracked sections

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

PRESENTATION JANUARY 24, 2017

PRESENTATION JANUARY 24, 2017 4918 HOVENKAMP DRIVE DALLAS, TEXAS 75227 PRESENTATION JANUARY 24, 2017 RGM ARCHITECTS OCTOBER 25, 2016 1 2 COMMUNITY INPUT DESIGN DOCUMENT PROCUREMENT CONSTRUCTION PD SD DD CD BD CA PROJECT PROCESS 3 Construction

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:29:07 AM FOR OFFICIAL USE ONLY Final School Assessment

More information

Lisbon School Department. 5 Year Plan-Buildings, Grounds, Equipment, & Technology. April 2016

Lisbon School Department. 5 Year Plan-Buildings, Grounds, Equipment, & Technology. April 2016 April 2016 Following is a list of items that the Lisbon School Department deems necessary for Capital Improvements for the next 5 years. Capital Improvements shall mean any construction project exceeding

More information

CITY OF NOVI. Police Department

CITY OF NOVI. Police Department CITY OF NOVI Police Department Indoor Gun Range and Training Facility Assessment Analysis with Master Plan for Novi Police Department at Community Build Out Field Services Complex Facility Needs Master

More information

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 82 82% 2.3 Structural 0 7 7% 2.4 Building Envelope 0 47 47% 2. Interior

More information

Chino Valley Unified School District Monthly Construction Update

Chino Valley Unified School District Monthly Construction Update h Construction of One Classroom Wing Cattle Elementary School Architect: WLC Architects, Inc. Contractor: Pacwest Corporation Construction Manager: Bernards Contract Amount: $2,974,000 Contract Start:

More information

Design Advisory Committee Meeting #5. December 19, 2017

Design Advisory Committee Meeting #5. December 19, 2017 Design Advisory Committee Meeting #5 December 19, 2017 1 Meeting Agenda 1. Agenda / Attendance Sheet 5 minutes 2. BEST Grant Recap 3. Review Funding Options additional information 4. Master Plan Summary

More information

GARFIELD ELEMENTARY SCHOOL

GARFIELD ELEMENTARY SCHOOL INITIAL YEAR BUILT 1910 BUILDING AREA 58,908 SF CURRENT PROGRAM CAPACITY 446 ENROLLMENT 2008 278 WARD 8 PROPOSED PROGRAM CAPACITY 400 Site Plan GARFIELD - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN INITIAL YEAR BUILT 1935 BUILDING AREA 47,200 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 418 WARD 6 PROPOSED PROGRAM CAPACITY 450 Site Plan LOGAN - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION HS

More information

Laurel School Upper Campus Building Features

Laurel School Upper Campus Building Features Laurel School Upper Campus Building Features INTRODUCTION Laurel School Upper Campus is tucked into the Willows neighborhood in Menlo Park surrounded by residential housing on all sides. The oddly shaped

More information

Darlington Area Schools - Building Evaluations

Darlington Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 2, 2012 Darlington Area Schools - Building Evaluations School Name: Pate Elementary School Observed By: Creed/Carter Principal: Grade

More information

LOVEJOY Independent School District

LOVEJOY Independent School District Long-Range Facilities Planning Projected Bond Sale Project Series 2014 Series 2018 Series 2023 Total (2013 Cost) (with 6% Yearly Inflation) 1. Hart Elementary $ 6,716,424 $ 6,168,802 $ 1,200,121 $ - $

More information

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations Project Update Project Update September 8, 2006 January 06, 2010 Project Manager Project Manager Anibal Caussade Dennis Bonny Field Coordinator Field Coordinator Bud Ball Paul Friel Project Budget Project

More information

LEWIS ELEMENTARY SCHOOL

LEWIS ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 49,500 SF CURRENT PROGRAM CAPACITY 550 ENROLLMENT 2008 288 WARD 1 PROPOSED PROGRAM CAPACITY 450 Site Plan LEWIS - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

NOYES EDUCATION CAMPUS

NOYES EDUCATION CAMPUS INITIAL YEAR BUILT 1930 BUILDING AREA 49,700 SF CURRENT PROGRAM CAPACITY 321 ENROLLMENT 2008 337 WARD 5 PROPOSED PROGRAM CAPACITY 450 Site Plan NOYES - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-8

More information

Al Behrman Elementary School

Al Behrman Elementary School Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior

More information

Cheldelin Middle School

Cheldelin Middle School Facility Information Address: 987 NE Conifer Blvd Corvallis Site Size: Building Area: Construction Date: Improved Parking: Grade Levels Served: Regular Classrooms: Portable Classrooms: Sept. 2007 Enrollment:

More information

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services

Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Facilities Management Services & Funding Guide Centrally Funded and Recharge Services Table of Contents About the Funding Guide Page 3 Carpenter Shop Page 4 Custodial Services Page 5 Electrical Shop Page

More information

Update on FCPS Construction/Renovation Projects. June 2016

Update on FCPS Construction/Renovation Projects. June 2016 Update on FCPS Construction/Renovation Projects Squires Elementary -- Renovation Architect: General Contractor: JRA Architects D.W. Wilburn, Inc. GC Contract Sum: $12,166,000 Total Project Cost: $15,207,000

More information

School Assessment Report

School Assessment Report School Assessment Report School: Carver High School Report: Nov 17, 2015 Condition Assessment: Suitability Assessment: Generated: 11/17/2015 10:37:23 AM FOR OFFICIAL USE ONLY Final School Assessment Report

More information

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report

Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report Peter Kirk Elementary School Modernization vs. New-in-lieu of Modernization Report January 2016 Summary In consideration for a potential 2016 Bond measure for the Capital Facilities Program, Kirk Elementary

More information

Boynton High School & Blackford Site

Boynton High School & Blackford Site Boynton High School & Blackford Site Balance (E- D) 980075 Blackford Campus Repairs (Asphalt, Plaster, Complete 100% 07/16/18 10/05/18 $725,367.67 $735,233.50 $352,463.56 -$9,865.83 $382,769.94 4 980066

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % BartelsRode Gymnasium 8/11/ Building Rating System Percent Site: 1.0 Total 0 13 77% Building: 2.1 Building Exterior Elements 0 8 8% 2.2 Accessibility 0 74 74% 2.3 Structural 0 76 76% 2.4 Building Envelope

More information

Hampton Township School District High School Feasibility Study. Final Feasibility Study Presentation. VEBH Architects

Hampton Township School District High School Feasibility Study. Final Feasibility Study Presentation. VEBH Architects 2018 High School Feasibility Study Final Feasibility Study Presentation January 28, 2019 1 Study Updates I. Latest HS Concepts for Academic / Wellness Redesign II. Associated Conceptual Construction Costs

More information

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING PROPOSED MAIN ENTRY - EXTERIOR RENDERING EXISTING SITE AERIAL PHOTOGRAPH 6TH STREET NW PEDESTRIAN ACCESS School access to existing alley leads students through vehicular path CHAIN LINK ENCLOSED PARKING

More information

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements %

Overbrook Theater / Fruenthal Foundation Art Center. 1.0 Total Points % 2.1 Building Exterior Elements % 8/13/ Building Rating System Percent Site: 1.0 Total 0 9 8 Building: 2.1 Building Exterior Elements 0 64 64% 2.2 Accessibility 0 66 66% 2.3 Structural 0 77 77% 2.4 Building Envelope 0 4 4% 2. Interior

More information

KEY ELEMENTARY SCHOOL

KEY ELEMENTARY SCHOOL INITIAL YEAR BUILT 1925 BUILDING AREA 52,000 SF CURRENT PROGRAM CAPACITY 320 ENROLLMENT 2008 328 WARD 3 PROPOSED PROGRAM CAPACITY 325 Site Plan KEY - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Hartsville Area Schools - Building Evaluations

Hartsville Area Schools - Building Evaluations Darlington County School District Darlington, South Carolina August 8, 2012 Hartsville Area Schools - Building Evaluations School Name: Principal: Grade Levels: Site Size: Student Population: Staff Size:

More information

FACILITIES PROJECTS UPDATE BOARD OF EDUCATION. August 11, 2015

FACILITIES PROJECTS UPDATE BOARD OF EDUCATION. August 11, 2015 FACILITIES PROJECTS UPDATE BOARD OF EDUCATION August 11, 2015 AGENDA Measure R Bond Projects Fund 40 Capital Projects Maintenance Projects MEASURE R BOND PROJECTS KINDERGARTEN MODERNIZATIONS PROGRAM BUDGET:

More information

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3

Deficiency ID Qty UoM Priority. Concrete Walks Are Damaged And Require Replacement ,000 SF 3 School and Site Level Deficiencies Site Concrete Walks Are Damaged And Require Replacement 5539 4,000 SF 3 Bus drop-off area does not have a canopy. 14005 250 LF 5 Paved Play Requires Recoating And Resurfacing

More information

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016

PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 PRESENTATION TO THE FARMINGTON CITY COUNCIL FOR THE PROPOSED FARMINGTON CIVIC CENTER EXPANSION SEPTEMBER 20, 2016 WORK LEGEND OVERALL WORK TO BOTH BUILDINGS 1 2 3 4 Existing corridors will receive new

More information

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural %

1.0 Total Points % 2.1 Building Exterior Elements % 2.2 Accessibility % 2.3 Structural % 8/11/ Building Rating System Percent Site: 1.0 Total 0 163 82% Building: 2.1 Building Exterior Elements 0 82 82% 2.2 Accessibility 0 92 92% 2.3 Structural 0 91 91% 2.4 Building Envelope 0 84 84% 2. Interior

More information

School Assessment Report

School Assessment Report School Assessment Report School: KIPP Vision Report: Dec 15, 14 Condition Assessment: Suitability Assessment: Generated: 12/15/14 12:33:33 PM Final School Assessment Report - Charter Schools, KIPP Vision

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Bronx Community College. Five-Year Capital Plan FY through FY

Bronx Community College. Five-Year Capital Plan FY through FY Five-Year Capital Plan FY 2019-20 through FY 2023-24 Projects in priority order / costs in $ thousands Project Name FY 19-20 FY 20-21 FY 21-22 FY 22-23 FY 23-24 (B) Campus-Wide Fire Alarm Replacement DC

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

COOLIDGE SENIOR HIGH SCHOOL

COOLIDGE SENIOR HIGH SCHOOL INITIAL YEAR BUILT 1940 BUILDING AREA 271,300 SF CURRENT PROGRAM CAPACITY 1240 ENROLLMENT 2008 652 WARD 4 PROPOSED PROGRAM CAPACITY 1100 Site Plan COOLIDGE - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2

Deficiency ID Qty UoM Priority. K Play Area Requires Impact Resistant Material Ea. 2 School and Site Level Deficiencies Site K Play Area Requires Impact Resistant Material 1320 1 Ea. 2 Exterior Basketball Goals Are Damaged And Require Replacement 1322 1 Ea. 4 Bus drop-off area does not

More information

School Assessment Report

School Assessment Report School Assessment Report School: Morningside Elementary School Report: Dec 15, 2014 Condition Assessment: Suitability Assessment: Generated: 12/15/2014 12:11:31 PM FOR OFFICIAL USE ONLY Final School Assessment

More information

The Knox County Recommended 5 million PPU FY11 by needs

The Knox County Recommended 5 million PPU FY11 by needs The Knox County Recommended 5 million PPU FY11 by needs Electrical D W/O Request Description Budgeted GREEN MAGNET 1 60848 Install new intercom system $19,000 BELLE MORRIS ELEMENTARY 2 60850 Install new

More information

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS

CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS CONCURRENT ADVERTISEMENT FOR SUBCONTRACTOR PREQUALIFICATION AND BIDS (August 28, 2018) PIERCE HALL IMPROVEMENTS PROJECT NO. 950511-950532 UNIVERSITY OF CALIFORNIA, RIVERSIDE PREQUALIFICATION PROCESS ALL

More information

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1

GFW Schools Task Force Meeting 1/23/19 R.A. MORTON & ASSOCIATES GLT ARCHITECTS 1 GFW Schools Task Force Meeting 1/23/19 1 AGENDA 1. Introductions 2. Review of building tours Primary Needs 3. Review Space Programs 4. Review Concept Options District and Facility needs 5. Review Concept

More information