GCCPRD. The Gulf Coast Community Protection and Recovery District S TO R M SU RG E SU PPR E SSIO N S T U DY. June 21, 2016.

Size: px
Start display at page:

Download "GCCPRD. The Gulf Coast Community Protection and Recovery District S TO R M SU RG E SU PPR E SSIO N S T U DY. June 21, 2016."

Transcription

1 GCCPRD The Gulf Coast Community Protection and Recovery District S TO R M SU RG E SU PPR E SSIO N S T U DY PHASE 3 REPORT RECOMMENDED ACTIONS June 21, 2016 Central Region Harris County South Region Brazoria County North Region Orange County Jefferson Chambers County County Galveston County

2 Contents Storm Surge Suppression Study 1. Executive Summary Recommended Alternatives North Region: Jefferson and Orange Counties Central Region: Chambers, Harris and Galveston Counties South Region: Brazoria County Study Area Summary Introduction Gulf Coast Community Protection and Recovery District (GCCPRD) Study Purpose Phase 1 and Phase Phase 3 - Scope of Work Identifying the Threat Now, in 2035, and Storm Simulations Return Frequency Analysis Preliminary Design Elevations Economic Evaluation: What needs to be protected? Technical and Environmental Evaluation: How do we protect while limiting environmental impacts? Technical Evaluation Environmental Impacts Public Outreach Recommended Alternatives North Region Alternatives - Jefferson and Orange Counties Basis of Recommendation Central Region - Chambers, Harris and Galveston Counties Basis of Recommendation South Region - Brazoria County Basis of Recommendation Study Area Summary The Way Ahead Phase 3 Report Recommended Actions Page i

3 List of Figures Storm Surge Suppression Study Figure 1: Recommended North Region Alternative (NR#2) - Levees Only...2 Figure 2: Recommended Central Region Alternative (CR#1) - Coastal Spine...3 Figure 3: Recommended South Region Alternative (SR#2)...4 Figure 4: FEMA map illustrating coastal areas within the study vulnerable to storm surge...7 Figure 5: GCCPRD study area...8 Figure 6: Storm tracks for the 254 ADCIRC storm simulations. Purple lines are Texas storm tracks, and green lines are Louisiana storm tracks Figure 7: 100-year stillwater elevations for Current Conditions. Data referenced from FEMA 2008 FIS Map. 12 Figure 8: 100-year stillwater elevations for FWOA 2035 conditions. This model scenario includes 0.9 feet of Relative Sea level Rise Figure 9: 100-year Stillwater elevations for FWOA 2085 conditions. This model scenario includes 2.4 feet of Relative Sea level Rise Figure 10: Sample locations where stillwater elevations are extracted and compared in Table Figure 11: Damage reaches established in HEC-FDA for the study area Figure 12: North Region Alternatives Selected for Development Figure 13: Surge reduction 100-year event in 2085 with NR# Figure 14: USACE Tentatively Selected Plan for Orange and Jefferson Counties Figure 15: Central Region Alternatives Selected for Development Figure 16: Surge reduction 100-year event in 2085 with CR# Figure 17: SSPEED H-GAPS Figure 18: Levee cross section for the potential alignment along Galveston Island Beach Figure 19: South Region Alternatives Selected for Development Figure 20: Surge reduction 100-year event in 2085 with SR# List of Tables Table 1: NR#2 Technical Details...2 Table 2: CR#1 Technical Details...3 Table 3: SR#2 Technical Details...5 Table 4: GCCPRD Study Area Summary...5 Table 5: 100-year stillwater elevations (feet, NAVD88) compared across the four model scenarios Table 6: Comparison of Alternatives NR#1 and NR# Table 7: Comparison of Alternatives CR#1 and CR# Table 8: Comparison of Alternatives SR#1 and SR# Table 9: Study Area Summary Phase 3 Report Recommended Actions Page ii

4 1. Executive Summary The Gulf Coast Community Protection and Recovery District (GCCPRD) finds a compelling need for a storm surge protection system on the upper Texas coast. This report presents (GCCPRD) Phase 3: Recommended Actions for the Storm Surge Suppression Study. The results of the study clearly illustrate the need for a storm surge protection system in the six-county region to mitigate current and future risks to the public, the economy, and the environment. The recommendations put forward in this report establish a framework for a plan and serve as a call to action for local, state, and federally elected officials to become advocates for coastal protection. The time has come to move beyond concepts and feasibility studies and begin preliminary engineering design and construction of the system. The solution is actionable provided there is the will at the local, state, and federal level to make the necessary strategic investments. Until the full system is built, the entire region will remain at risk to surge flooding from tropical events. The GCCPRD has been executing this study for the past two and a half years. This effort involved extensive storm surge and wave modeling focused on evaluating and mitigating the region s risks associated with tropical events and future relative sea level rise. The technical analysis identified and defined structural alternatives, evaluated the environmental impacts and economic benefits, and compared the benefits to the overall cost associated with constructing, operating, and maintaining each alternative. The GCCPRD has performed all operations in an open and transparent manner by engaging the public and local elected officials directly through public meetings and publishing all our reports, associated appendices, and data online for the public to review at Appendix A includes the comments received from the public meetings held in March and April During Phase 3, the study team executed public meetings and conducted numerous engagements with other stakeholders to gather comments on the alternatives that were presented in the Phase 2: Technical Mitigation report. The team also coordinated with the U.S. Army Corps of Engineers (USACE), the SSPEED Center at Rice University, and Texas A&M - Galveston (TAMUG) to reconcile the alternatives recommended in this plan. This report is a summary report and does not restate in detail the technical information that was previously published in the Phase 1 and Phase 2 reports. Those reports are included as Appendices B and C to this report Recommended Alternatives North Region: Jefferson and Orange Counties The study team in coordination with local elected officials recommend Northern Region Alternative #2 (NR#2) - levees only, as the alternative that best supports surge protection in the Jefferson and Orange County region of the study area. Phase 3 Report Recommended Actions Page 1

5 Figure 1: Recommended North Region Alternative (NR#2) - Levees Only Table 1: NR#2 Technical Details North Region Alternative Summary and Comparison NR#2 - The Jefferson/Orange Protection System without the Neches River Navigation Gate Total length of the system (miles) 92.2 miles Right of way required 1,401 acres Pump stations required / total capacity (CFS) 14 / 31,626 CFS Environmental mitigation required acres Construction cost $3,228,580,000 Annual Operations and maintenance cost $16,143,000 Total Annual Costs (TAC) 176,910,000 Total Annual Benefits (TAB) $140,877,000 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) 0.80 NR#2 is a technically feasible alternative that lacks complexity and will greatly enhance protection throughout the region. Economically and environmentally, NR#2 is sustainable and with future optimization the alternative is expected to meet all federal funding requirements. NR#2 is very similar to the USACE Sabine Pass to Galveston study s Tentatively Selected Plan. By staying aligned with USACE, future discussions associated with reconciling competing plans are avoided, which will keep the project on track for authorization and funding by Congress Central Region: Chambers, Harris and Galveston Counties The study team, in coordination with local elected officials, recommends Central Region Alternative #1 (CR#1) - The High Island to San Luis Pass Coastal Spine including the following elements from Central Region Phase 3 Report Recommended Actions Page 2

6 Alternative # 2 (CR#2): the navigation gate at Clear Lake and a modified Galveston ring levee, as the alternative that best supports surge protection in the Chambers, Galveston, and Harris counties region of the study area. (Figure 2) The CR#1/CR#2 combination provides a region-wide reduction in storm surge that extends from the Gulf of Mexico to Houston, providing enhanced protection for communities located along the shoreline of Galveston Bay and industry located along the Houston Ship Channel. Figure 2: Recommended Central Region Alternative (CR#1) - Coastal Spine Table 2: CR#1 Technical Details Central Region Alternative Summary and Comparison CR#1 - High Island to San Luis Pass Coastal Spine Total length of the system (miles) 55.6 miles Right of way required 1,220 acres Pump stations required / total capacity (CFS) 0 / 0 CFS Environmental mitigation required acres Construction cost $5,832,095,000* Annual operations and maintenance cost $29,160,000 Total Annual Costs (TAC) 319,569,000 Total Annual Benefits (TAB) $1,029,399,000 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) 3.22 * Construction costs and benefits to be updated in the future to include the addition of the Galveston ring levee and navigation gate at Clear Lake While CR#1 alone provides a dramatic reduction in overall surge, there are still heavily populated areas within the region that can expect to experience four to 12 feet of surge-related flooding. The addition of the Galveston ring levee and a navigation gate at Clear Lake, evaluated under alternative CR#2, to the coastal Phase 3 Report Recommended Actions Page 3

7 spine will enhance protection for the City of Galveston, Seabrook, Taylor Lake Village, El Lago, Clear Lake Shores and Kemah. With the coastal spine in place, the structure design elevation for the modified Galveston ring levee is expected to be in the 12 to 15 feet range which is much lower than the 23 feet originally proposed in CR#2. Due to resource and time constraints, the construction cost, the benefits, and the BCR for the addition of these two features will need to be updated in the future. Additional protective measures as proposed by the SSPEED Center at Rice University should also be further evaluated. The SSPEED Center at Rice University has proposed a layered defense for Galveston Bay. Its H- GAPS approach supports a coastal spine alignment, a ring levee for the City of Galveston, and an additional gate structure located along the Houston Ship Channel with an ancillary levee structure through the bay that ties the system northward into Baytown and southward to Texas City. (Figure 17) Conceptually, these additional elements appear to be effective for reducing the residual surge along the west side of Galveston Bay and the Houston Ship Channel. In the future, the study team will coordinate closely with SSPEED as it continues research on the H-GAPS initiative South Region: Brazoria County The study team, in coordination with local elected officials, recommends South Region Alternative #2 (SR#2) - Freeport Hurricane Flood Protection System Modernization with Extension North toward Angleton, Jones Creek Levee, Jones Creek Terminal Ring Levee, and Chocolate Bayou Ring Levee as the alternative that best supports surge protection in the Brazoria County region of the study area. Figure 3: Recommended South Region Alternative (SR#2) Phase 3 Report Recommended Actions Page 4

8 Table 3: SR#2 Technical Details South Region Alternative Summary and Comparison SR#2- Freeport Hurricane Flood Protection System Modernization and Extension North toward Angleton- Jones Creek Levee, Jones Creek Terminal Ring Levee, and Chocolate Bayou Ring Levee Total length of the system (miles) 74.2 miles Right of way required 383 acres Pump stations required / total capacity (CFS) 5 / 11,460 CFS Environmental mitigation required acres Construction cost $2,571,551,000 Annual operations and maintenance cost $12,858,000 Total Annual Costs (TAC) 140,907,000 Total Annual Benefits (TAB) $206,654,000 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) 1.47 SR#2 is technically, environmentally, and economically feasible and has a very good BCR of SR#2 provides a region-wide reduction in storm surge that extends from the coast at Freeport to Angleton and provides enhanced protection for the community of Jones Creek and the industrial complexes located along Jones Creek and Chocolate Bayou. The alternative includes the modernization of the Freeport Hurricane Protection System and the extension of the system to protect of the region from the 100-year event in Study Area Summary The combination of all the recommended alternatives into one comprehensive plan clearly illustrates that there are technically and economically feasible and environmentally sustainable alternatives that are supported by the public which will provide storm surge reduction in the six-county area. (Table 4) These alternatives should not be viewed as being mutually exclusive. Implementing a single regional alternative only buys down risk in that area leaving the other regions vulnerable. Any storm-related loss will have a lasting effect on the local, regional, state, and national economies. Table 4: GCCPRD Study Area Summary North Region NR#2 Central Region CR#1 + Clear Lake + Galveston Ring Levee South Region SR#2 Study Area Plan (NR#2+CR#1+ SR#2) Total length of the system (miles) Right of way required (acres) 1,401 1, ,062 Pump stations required / total capacity (CFS) 14/31,600 0/0 5/15,100 19/46,700 Environmental mitigation required ($ thousands) 0 72, ,075 Construction cost ($ thousands) 3,228,579 5,832,095* 2,571,551 11,632,225 Annual Operations and maintenance cost 16,143 29,160 12,857 58,160 ($ thousands) Total Annual Costs (TAC) 176, , , ,386 Total Annual Benefits (TAB) 140,872 1,029, ,654 1,296,056 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) * Construction costs and benefits to be updated in the future to include the addition of the Galveston ring levee and navigation gate at Clear Lake Phase 3 Report Recommended Actions Page 5

9 The total cost for implementing the GCCPRD Study Area Plan is $11.6 billion with a BCR of The federal government invested $14.5 billion dollars for hurricane protection for New Orleans following Hurricane Katrina protecting a population of 900,000 people. The upper Texas Coast has a population of more than six million people, generates over 31 percent of the state s $1.4 trillion GDP, and has a significant role in our nation s energy and national security. The GCCPRD Storm Surge Protection Study identifies the threat, the assets that need to be protected, and provides solutions on how to protect the region from storm surge flooding. The plan is ready to move forward to implementation. Phase 3 Report Recommended Actions Page 6

10 2. Introduction The upper Texas coast, stretching from Orange to Brazoria County, is blessed with over 120 miles of pristine coastline that has historically attracted people and industry to the region to take advantage of a multitude of economic opportunities and quality of life amenities. This six-county region is home to over six million people, the largest concentration of petrochemical complexes in North America, six of the top fifty ports in the United States, NASA s Johnson Space Center, and a highly productive coastal estuary system of national significance. Additionally, this region is vitally important to the security of the national economy and the nation s energy sector. The study area is comprised of more than 4,300 square miles of land vulnerable to storm surge flooding associated with hurricanes and other tropical storm events. History has proven that Texas remains most vulnerable to large storms from June to October. The frequency of hurricanes along any 50-mile segment of the coast is about one storm event every nine years. Annual probabilities of a storm event range from 31 percent in the Sabine Pass Region to 41 percent in the Matagorda Region. Figure 4: FEMA map illustrating coastal areas within the study vulnerable to storm surge In 2008, Hurricane Ike made landfall on the Texas coast in the vicinity of Galveston Island, causing 84 deaths and over $30 billion in damages. To date, Hurricane Ike has been the most expensive storm in Texas history. Phase 3 Report Recommended Actions Page 7

11 2.1. Gulf Coast Community Protection and Recovery District (GCCPRD) The GCCPRD is a local government corporation that includes Brazoria, Chambers, Galveston, Harris, Jefferson, and Orange counties, which are the six counties included in this study area. The GCCPRD is governed by a board of directors comprised of the county judge of each participating county and three additional appointed members, each serving three-year terms. Board members include: Judge Ed Emmett Harris County Judge Mark Henry Galveston County Judge Matt Sebesta Brazoria County Judge Jimmy Silva Chambers County Judge Jeff Branick Jefferson County Judge Stephen Carlton Orange County Lisa LaBean At-large Member Jim Sutherlin At-large Member Victor Pierson At-large Member Robert Eckels serves as President of the District and is appointed by the Board. Figure 5: GCCPRD study area In September 2013, the GCCPRD received a $3.9 million grant funded by the Texas General Land Office (GLO) through the Federal Housing and Urban Development (HUD) Community Development Block Grant (CDBG) Program to conduct the Storm Surge Suppression Study Study Purpose The purpose of the Storm Surge Suppression Study is to investigate the feasibility of reducing the vulnerability of the upper Texas coast to storm surge and flood damages. The intent of this study is to develop a plan to protect the life, health, and safety of the community and provide environmental and economic resilience within the study region. These goals will be achieved through the study and analysis of integrated flood damage reduction systems comprised of natural or nature-based features, as well as structural and nonstructural alternatives. The study initiated in fall 2014 examined the technical, environmental, social, and economic factors to determine a cost-effective and efficient set of alternatives for flood damage reduction and surge suppression to help protect the six-county region. The study outcomes are critical to informing the general public of the potential risks associated with living and operating within this region and soliciting future support to procure the necessary resources to implement an integrated protection system. The goals of the study are to: Determine appropriate actions that may be taken to protect the life, health, and safety of the community and provide environmental and economic resilience within the study area. Develop a viable region-wide program that, once implemented, would better protect the region from future natural disasters associated with storm surge flooding events. Phase 3 Report Recommended Actions Page 8

12 The Storm Surge Suppression Study is a technical effort based on science to investigate opportunities to mitigate the vulnerability of the upper Texas coast from storm surge and flooding. Since 2013, the GCCPRD has been collecting, developing, and analyzing technical data and collaborating with other organizations and universities conducting similar work Phase 1 and Phase 2 In February 2015, the team completed Phase 1: Data Collection. All data collected during Phase 1 was consolidated into a data library and provided to the GLO to support future study efforts. As part of the Data Collection effort, the study team conducted a series of three large-scale public scoping meetings (one in Beaumont, Baytown, and League City, Texas) to encourage public participation and further define the need, purpose, and scope of the study. As a result of the research conducted during Phase 1, the team determined that the needs and types of protection varied across the six-county study area. Therefore, the study area was divided into three distinct regions: North Region: Orange and Jefferson Counties Central Region: Galveston, Chambers, and Harris Counties South Region: Brazoria County and Galveston County (vicinity of San Luis Pass) Alternatives were then scoped for each region with the understanding that the benefits and impacts of these alternatives would be confined to their respective regions. In February 2016, the Phase 2: Technical Mitigation report was published, defining two potential surge suppression alternatives within each region of the study area. The Phase 1 and Phase 2 reports and the data library were made available to the public through the GCCPRD s official website, The Phase 1 and Phase 2 reports are also included as appendices to this Phase 3 report. The Phase 3 report represents the Gulf Coast Community Protection and Recovery District s Storm Surge Suppression Study- Final Recommendations Phase 3 - Scope of Work During Phase 3, the study team conducted four additional public meetings and facilitated numerous engagements with other stakeholders to gather comments on the alternatives that were presented in the Phase 2: Technical Mitigation report. The study team also worked with the US Army Corps of Engineers, Texas A&M University Galveston, and the SSPEED Center at Rice University to reconcile the recommended alternatives presented in this report. Additionally, the team executed an extended regional economic review to help define the economic losses that are not directly related to the storm losses. These additional impacts will be published as an addendum to this report in the future once this effort is complete. Phase 3 Report Recommended Actions Page 9

13 3. Identifying the Threat Now, in 2035, and 2085 One of the major threats associated with any tropical event is storm surge-induced flooding. Storm surge is generated because low pressure and winds associated with a hurricane cause the water in the Gulf of Mexico adjacent to the center of the storm to rise as the storm moves closer to the shore and inland. The flood hazard at any given area along the coast can also be affected by waves, tides, and the storm s intensity, size, and angle of approach. Present-day conditions were established using the latest FEMA Flood Insurance Study (FIS) data. The team made the assumption that if construction began in 2020, all alternatives could conceivably be in place by A fifty-year design life was assigned to each alternative, targeting a design life through the year The goal was to identify the recommended structural elevations of all alternatives in Storm Simulations The study team executed extensive storm surge modeling for the years 2035 and 2085 to evaluate structural design elevations for each proposed alternative and understand expected damages based on future sea levels and storm conditions. These storm simulations are required because historical storm data does not sufficiently cover the wide variety of storm conditions that may affect the project region in the future. The storm surge modeling provides the required data by evaluating flood hazards throughout the project region for hundreds of possible hurricanes and also accounting for potential future conditions by including sea level rise in the model setup. The study team used the coupled ADvanced CIRCulation (ADCIRC) and Unstructured Simulating WAves in the Nearshore (UnSWAN) model system to simulate storm surge and waves throughout the project region. Relative sea level rise was evaluated using the data from the existing NOAA gauges at Sabine Pass, Galveston Pier 21, and Freeport. Mean sea level was increased by 0.9 feet and 2.4 feet in the model setups for the 2035 and 2085 timeframes respectively. Modeling scenarios were developed that analyzed the current conditions, the future without action (FWOA) in 2035 and 2085, and the future conditions with the alternatives (FWA) in place for 2035 and The FWOA configurations implemented existing storm risk management alignments and were used as a control to compare the effects of proposed alternatives during the FWA in place scenarios. For each scenario, 254 synthetic storms were simulated to determine maximum water surface elevations, maximum significant wave heights, and maximum wave periods in the study area. The suite of 254 storms selected for this study was coordinated with the US Army Corps of Engineers (USACE). The storm suite includes 152 high-intensity and 71 low-intensity storms from the Texas FEMA FIS storm suite, as well as 31 high-intensity storms from the Louisiana FEMA FIS storm suite (USACE 2008a, b) with landfall locations near the Louisiana-Texas border. (Figure 6) Phase 3 Report Recommended Actions Page 10

14 Figure 6: Storm tracks for the 254 ADCIRC storm simulations. Purple lines are Texas storm tracks, and green lines are Louisiana storm tracks Return Frequency Analysis After completing the 254 storm simulations for each modeling scenario, the USACE Joint Probability Analysis (JPA) Model was used to combine the results of the storm simulations to calculate the 10-, 50-, 100-, and 500-year stillwater elevations for each modeling scenario (FWOA 2035, FWOA 2085, FWA1 2085, and FWA2 2085). Sensitivity tests, model optimization, and a thorough review of the results were completed to confirm the quality of the output statistics. The 10-, 50-, 100-, and 500-year stillwater elevations were also extrapolated to determine the 1-, 2-, 5-, and 10-year frequencies. By calculating the return stillwater elevations, the JPA statistical model allows the effects of each modeling scenario configuration to be compared and assessed. The following figures show the 100-year stillwater elevations throughout the region for multiple-model scenarios. Phase 3 Report Recommended Actions Page 11

15 Figure 7: 100-year stillwater elevations for Current Conditions. Data referenced from FEMA 2008 FIS Map. Figure 8: 100-year stillwater elevations for FWOA 2035 conditions. This model scenario includes 0.9 feet of Relative Sea level Rise. Phase 3 Report Recommended Actions Page 12

16 Figure 9: 100-year Stillwater elevations for FWOA 2085 conditions. This model scenario includes 2.4 feet of Relative Sea level Rise. Stillwater return elevations at specific locations were also calculated. The following table compares 100-year stillwater elevations across the model scenarios at three sample locations within the project region. Table 5: 100-year stillwater elevations (feet, NAVD88) compared across the four model scenarios. FWOA 2035 FWOA 2085 FWA FWA Jones Creek Galveston Bay Sabine Lake Phase 3 Report Recommended Actions Page 13

17 Figure 10: Sample locations where stillwater elevations are extracted and compared in Table 5. Section 3 and Appendix A and B in the Phase 2: Technical Mitigation report provide additional details on the storm surge modeling and return frequency methodology Preliminary Design Elevations Results from the storm simulations and return frequency analysis were used to determine preliminary design elevations for each reach location included in the two proposed alternative configurations. Results from the 254 synthetic storm simulations were compared to the calculated 100-year return stillwater levels to determine 100-year wave conditions. These 100-year stillwater and wave conditions were reviewed in conjunction with overtopping criteria recommended by the USACE to determine the preliminary design elevations for the proposed alternatives. The USACE overtopping criteria were applied to each reach location separately to account for varying reach types such as floodwall, armored levee, or grass-covered levee. Unique circumstances along the Coastal Spine and the Galveston Seawall were also accounted for when determining the location-specific overtopping criteria. The 100-year wave and stillwater conditions were then assessed relative to the appropriate overtopping criteria to determine the preliminary design elevations for each reach location in the project area. In this manner, the stillwater and wave conditions generated by the storm simulations were processed and evaluated to determine the preliminary design elevations necessary for the subsequent economic evaluation Economic Evaluation: What needs to be protected? The economic analysis in this report was prepared in general accordance with policies and practices of the USACE. The analysis estimates the National Economic Development (NED) damages and benefits for existing and future conditions and all costs required for implementation of project alternatives. The NED benefits Phase 3 Report Recommended Actions Page 14

18 analyzed represent the reduction of potential damages caused by inundation and the associated avoided debris removal costs. Inundation damage categories included: Physical damages to structures and contents (residential, commercial, and industrial) Damages to privately owned vehicles associated with residential structures The USACE Hydrologic Engineering Center-Flood Damage Analysis Model (HEC-FDA) version 1.2.5a was used to compute damages. HEC-FDA is an interdisciplinary program used to formulate and evaluate flood damage reduction plans. The primary inputs to HEC-FDA contain only the following information: Damage reaches (the geographic boundaries of reported model output) An inventory of structures (including depreciated structure replacement value and structure elevation) Damage functions describing the susceptibility of structures and contents to varying depths of inundation Stage-probability relationships (describing the annual probabilities associated with water surface elevations) Figure 11: Damage reaches established in HEC-FDA for the study area Saltwater, short-duration (approximately one-day) depth-damage relationships were used in the economic analysis. Model outputs were generated for the following damage categories: residential, commercial, Phase 3 Report Recommended Actions Page 15

19 industrial, and debris removal. The residential category includes damages to the structure, damages to contents, and damages to the associated vehicles for residential properties. The commercial and industrial damage categories include damages to the structure and contents. The debris removal damage category includes the debris removal costs associated with all residential and commercial properties. The economic model results were combined with project alternative cost information to perform benefitcost analysis. Benefit-cost analysis was used to verify that the value of the benefits exceeded the value of the costs and ensured the resources would be allocated in the most efficient manner possible. Benefit-cost analysis involves two mathematical comparisons: Net benefits are calculated by subtracting the total economic costs from the total economic benefits. Alternatives with positive net benefits contribute to economic efficiency. In an unconstrained budget situation, an alternative with higher net benefits is preferred over an alternative with lesser net benefits. This analysis can be used to help select and scale a recommended alternative from an array of alternatives. A benefit-cost ratio (BCR) is calculated by dividing the total economic benefits by the total economic cost. A BCR of 1.0 indicates that the total benefits equal the total costs. In other words, for every dollar spent, a dollar of benefits is produced. Because BCRs indicate which alternative produces the most benefits for every dollar of cost, it is useful for comparing or ranking alternatives when investment budgets are constrained. Section 7 of the Phase 2: Technical Mitigation report provides additional details on their economic modeling approach and the methodology used Technical and Environmental Evaluation: How do we protect while limiting environmental impacts? Technical Evaluation The study team developed an initial array of potential alternatives based on public feedback, utilization of prior USACE studies and reports, and through collaboration with other research teams concurrently studying surge protection within the region. The team scoped and screened each potential alternative and selected two distinct alternatives for each respective region of the study area for further analysis. For simplicity, the team divided the study area into three distinct regions: North Region: Orange and Jefferson Counties Central Region: Galveston, Chambers, and Harris Counties South Region: Brazoria County and Galveston County (vicinity of San Luis Pass) Once the alternatives for each region were selected for analysis, the study team developed preliminary alignments for each respective alternative. Structures were identified and sized for the proposed alignments to provide protection from the 2085 one percent (100-year storm) annual exceedance probability storm surge event. In heavily congested and urban areas, the team proposed the use of T-wall structures to limit intrusions; whereas, in undeveloped rural areas, the team proposed levee systems, which are less expensive. Ancillary structures were categorically separated into highway crossings, railroad crossings, gravity drainage structures, navigation gates, and pumping stations. Phase 3 Report Recommended Actions Page 16

20 Final alignments were based on the following factors: Input from the public meetings Potential environmental impacts Constructability of the alternative Social intrusion of protection systems within communities Impacts to existing infrastructure (right-of-way acquisition, road and railroad crossing, utility corridors, etc.) Long-term operations and maintenance expenses Interior drainage requirements Ancillary structures (drainage and navigation structures) The team developed a large library of unit and lump-sum costs from recently constructed hurricane protection projects in the Gulf Coast region. This data allowed the team to synchronize costs throughout the study area and develop costs for each proposed alignment. For all costs in this report, a 25 percent contingency was added to account for the vast array of uncertainties and unforeseeable market changes which could occur in the near future and drive present-day costs beyond the rate of inflation. Exceptions were made for the Houston Ship Channel and Neches River gates, where a 40 percent contingency was used due to the extreme complexity and uniqueness of such structures. Sections 2 and 6 of the Phase 2: Technical Mitigation report provide additional details on the alternative development process and the methodology for developing alternative costs Environmental Impacts The environmental analysis conducted for this study consisted of a desktop review of the most current and comprehensive data available to the team. These datasets included: National Wetlands Inventory Threatened and endangered species critical habitat Historic sites Coastal barriers Floodplain Essential fish habitat Hazardous material sites The potential environmental impacts associated with each proposed alternative were defined by evaluating the length of the alternative and the ground area that the structure would occupy in relation to the specific habitat that would be impacted. An additional buffer area of 150 feet was added to all alternatives to account for future operations and maintenance activities. Alternative alignments were continuously adjusted to avoid or minimize impacts to sensitive areas. Where impacts could not be avoided, the impacts were defined for each alternative by total acres impacted and by habitat type. Mitigation costs based on acreage and habitat type were then calculated and added to the overall cost of each alternative. Potential historic and hazardous waste sites were also identified for each alternative. These sites would require additional investigations once proposed projects enter the preliminary engineering and design phase to assess fully their potential impacts to the project. Phase 3 Report Recommended Actions Page 17

21 A preliminary tidal amplitude and exchange analysis was conducted for of the hurricane barriers proposed at Bolivar Roads and across the Neches River. The analysis indicated that the proposed hurricane barriers would result in a change in tidal amplitude of 5 and 10 percent over a range of various tidal conditions when sufficient vertical lift gates are added to the barriers. The analysis did not assess other potential impacts created by the hurricane barriers associated with water quality, salinity, sediment transfer, and aquatic species within the bay and estuary system. This analysis would need to occur to support the National Environmental Policy Act (NEPA) requirements and documentation for the final project. Section 2 of the Phase 1: Data Collection and Section 4 of the Phase 2: Technical Mitigation reports provide more detailed information about the environmental review and analysis conducted throughout the study Public Outreach The GGCPRD study team s efforts have remained open and transparent throughout the feasibility, scoping, and analysis process. In December of 2013, the team hosted three public scoping meetings throughout the region to inform the public of the study s intent and to solicit their input on potential alternatives. This input provided some initial guidance to the team on what the public would be willing to accept regarding project locations and alignments, and this information was used to help the team develop an array of potential alternatives. Following the release of the Phase 2 report, additional public meetings were held in March and April 2016 to review the alternatives that were selected for further analysis and to seek public feedback on the future recommended plan for each study region. More than 400 public comments were received, and these are consolidated for review in Appendix A of this report. In addition to the public meetings, numerous briefings were held with stakeholders throughout the region. These stakeholders included, among others: Commissioner Jack Morman, Harris County Precinct 2 Congressman Randy Weber Commissioner George P. Bush, Texas General Land Office State Senator Larry Taylor Joint Interim- Coastal Barrier System Committee Houston-Galveston Area Council Bay Area Houston Economic Partnership Galveston Bay Estuary Council South East Texas Regional Planning Organization City of Houston City of Galveston City and county officials throughout the region Texas Chemical Council and EHCMA Brazoria County Alliance Brazoria County Master Naturalists Rotary Club of Houston Phase 3 Report Recommended Actions Page 18

22 4. Recommended Alternatives 4.1. North Region Alternatives - Jefferson and Orange Counties The study team, in coordination with input from the public, community leaders and elected officials, recommends Northern Region Alternative #2 (NR#2) as the alternative that best supports surge protection in the Jefferson and Orange County region of the study area. NR#2 is very similar to the USACE Sabine Pass to Galveston study s Tentatively Selected Plan. By staying aligned with USACE, future discussions associated with reconciling competing plans are avoided which will keep the project on track for potential authorization and funding by Congress in Basis of Recommendation During the Phase 2, the study team developed and analyzed two distinct barrier systems that would provide comprehensive protection to the entire North region. (Figure 12) North Region Alternative #1 (NR#1) is a continuous regional hurricane protection system that includes a large navigation gate on the Neches River. North Region Alternative #2 (NR#2)-Levees Only- is composed of two hurricane protection systems which individually protect Orange and Jefferson Counties without the Neches River gate. Both NR#1 and NR#2 include the required modernization of the existing Port Arthur Hurricane Protection System to meet the standards required to protect the region from the 100-year event in Phase 3 Report Recommended Actions Page 19

23 North Region Alternatives Orange and Jefferson Counties North Region Alternative #1 (NR#1) - The Jefferson/Orange Protection System with the Neches River Navigation Gate North Region Alternative #2 (NR#2) - The Jefferson/Orange Protection System Levees Only (without the Neches River Navigation Gate) Figure 12: North Region Alternatives Selected for Development Table 6 provides a comparison of the two alternatives. North Region Alternative Summary and Comparison Table 6: Comparison of Alternatives NR#1 and NR#2 NR#1 - The Jefferson/Orange Protection System with the Neches River Navigation Gate NR#2 - The Jefferson/Orange Protection System without the Neches River Navigation Gate Total length of the system (miles) 55.2 miles 92.2 miles Right of way required 612 acres 1,401 acres Pump stations required / total capacity (CFS) 7 / 25,711 CFS 14 / 31,626 CFS Environmental mitigation required acres acres Construction cost $2,502,650,000 $3,228,580,000 Annual Operations and maintenance cost $12,513,000 $16,143,000 Total Annual Costs (TAC) 137,132, ,910,000 Total Annual Benefits (TAB) $140,877,000 $140,877,000 Benefit - Cost Ratio (TAB/TAC)(3.125% Interest Rate) Phase 3 Report Recommended Actions Page 20

24 Alternatives NR#1 and NR#2 are both technically feasible, providing the same level of protection and the same average annual benefits for the region. NR#1 is a much more complex system that is dependent upon the proper functioning of the Neches River Navigation Gate and the Neches River bypass pump station. NR#2, a fixed levee system, is much less complex and does not carry the risks associated with mechanical failures, ensuring its overall performance. The increased cost of Alternative NR#2 without additional benefits decreases the benefit to cost ratio (BCR) for this alternative. NR#2 will require additional future analysis to optimize the alternative and develop better damage function curves for the petrochemical industries within the region in order to capture additional benefits. Figure 13 illustrates the reduction in surge throughout the North region with NR#2 in place for the 100-year event in Figure 13: Surge reduction 100-year event in 2085 with NR#2 The selection of the recommended plan for the North region was also heavily influenced by the on-going USACE Sabine Pass to Galveston study for the Jefferson and Orange region. USACE has recommended an alternative as their Tentatively Selected Plan (TSP) that is very similar to NR#2. (Figure 14). Phase 3 Report Recommended Actions Page 21

25 Figure 14: USACE Tentatively Selected Plan for Orange and Jefferson Counties The USACE TSP is based on the National Economic Development (NED) plan that examines each segment within the system to ensure the overall benefits within a particular segment are greater than the cost of construction for that segment. For Orange County, the USACE TSP truncates the alternative alignment west of Bridge City, whereas NR#2 extends the alignment to the west and north of I-10. During GCCPRD s Phase 3 public meetings, local elected officials and residents in the Rose City and Vidor areas expressed their concern with being left out of the USACE plan. Rose City and portions of Vidor were heavily damaged by surge during Hurricane Ike and will likely become more vulnerable in the future with sea level rise. USACE is willing to include the segment which extends their proposed alignment to Rose City as a Locally Preferred Plan (LPP). All planning, design, and construction costs associated with an LPP will be the responsibility of the projects local sponsors. The USACE plan will include the required environmental documentation to meet all NEPA requirements and keep the future project on track for authorization and appropriation of construction funding by Congress. Future Actions: Optimize NR#2 to reduce cost and increase benefits Develop the segment for Bridge City to Vidor as an LPP in the USACE plan Continue to collaborate with USACE on their proposed NED plan Continue to work with industry and the Texas Chemical Council to update petrochemical damage function curves to provide a more accurate assessment of benefits within the region Phase 3 Report Recommended Actions Page 22

26 4.2. Central Region - Chambers, Harris and Galveston Counties The study team, in coordination with input from the public, community leaders and elected officials, recommends Central Region Alternative #1 (CR#1)- High Island to San Luis Pass Coastal Spine including the following elements of CR#2: the navigation gate at Clear Lake and a modified Galveston ring levee, as the approach that best supports surge protection in the Chambers, Galveston, and Harris counties region of the study area. CR#1/CR#2 provides a region-wide reduction in storm surge that extends from the Gulf of Mexico to Houston providing enhanced protection for communities in Chambers, Galveston and Harris Counties located along the shoreline of the Bay and industry located along the Houston Ship Channel Basis of Recommendation During Phase 2, the study team developed and analyzed two distinct barrier systems that would provide enhanced storm surge protection for the central region. (Figure 15) Central Region Alternative #1 (CR#1) is a continuous regional barrier system that follows an alignment along the coast parallel to State Highways 87 and 3005 and includes a barrier system composed of a large navigation gate with 25 vertical lift gates across Bolivar Roads. Central Region Alternative #2 (CR#2) is a series of separate systems that provide protection to the City of Galveston and the west side of Galveston Bay. Alternative CR#2 was developed based on the assumption of potential consequences resulting from not protecting the region if a gate could not be built along the Houston Ship Channel. This assumption was not based on technical or constructability judgements/expertise, but is focused on potential environmental impacts to the bay and estuary system. Phase 3 Report Recommended Actions Page 23

27 Central Region Alternatives Galveston, Chambers, and Harris Counties Central Region Alternative #1 (CR#1) - High Island to San Luis Pass Coastal Spine Central Region Alternative #2 (CR#2) - Texas City Levee Modifications and Extensions North (SH-146) and West--Galveston Ring Levee Figure 15: Central Region Alternatives Selected for Development Table 7 provides a comparison of the two alternatives. Central Region Alternative Summary and Comparison Table 7: Comparison of Alternatives CR#1 and CR#2 CR#1 - High Island to San Luis Pass Coastal Spine CR#2 - Texas City Levee Modifications and Extensions North (SH-146) and West--Galveston Ring Levee Total length of the system (miles) 55.6 miles 62.6 miles Right of way required 1,220 acres acres Pump stations required / total capacity (CFS) 0 / 0 CFS 13 / 61,611 CFS Environmental mitigation required acres acres Construction cost $5,832,095,000 $3,534,442,000 Annual operations and maintenance cost $29,160,000 $17,672,000 Total Annual Costs (TAC) 319,569, ,669,000 Total Annual Benefits (TAB) $1,029,399,000 $1,230,928,000 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) Phase 3 Report Recommended Actions Page 24

28 During the Phase 3 public meetings, numerous citizens, communities, and local elected officials voiced their support of CR#1 and their dissatisfaction with CR#2. Many felt the proposed alternative alignment for CR#2 left too many citizens and too much public infrastructure forward of the barrier system and outside the line of protection. The public was also concerned about their ability to procure flood insurance in the future. The local elected officials were especially concerned about the lack of protection CR#2 provided for industries located along the Houston Ship Channel. These industries are vital components to their local tax base as well as providing well-paying jobs for citizens within their communities. Based on the lack of public support for CR#2, the GCCPRD study team will abandon future efforts associated with this alternative alignment. CR#1 is a technically feasible and constructible alternative with a very good BCR of Figure 16 illustrates the reduction in surge across Galveston Bay with the proposed Coastal Spine in place for the 100-year event in Figure 16: Surge reduction 100-year event in 2085 with CR#1 While CR#1 alone provides a dramatic reduction in overall surge, there are still heavily populated areas within the region that can expect to experience four to 12 feet of surge-related flooding with the spine in place. The addition of the Galveston ring levee and a navigation gate at Clear Lake, evaluated under alternative CR#2, to the coastal spine will enhance protection for the City of Galveston, Seabrook, Taylor Lake Village, El Lago, Clear Lake Shores, and Kemah. With the coastal spine in place, the design elevation for the Galveston ring levee is expected to be in the 12 to 15 feet range, which is much lower than the 23 feet originally proposed in CR#2. Due to resource and time constraints, the construction cost and the benefits for the addition of these two features will need to be updated in the future. Additional protective measures as proposed by the SSPEED Center at Rice University should also be further evaluated. Phase 3 Report Recommended Actions Page 25

29 The SSPEED Center at Rice University has proposed a layered defense for Galveston Bay. Their H-GAPS approach supports a coastal spine alignment, a ring levee for the City of Galveston, and an additional gate structure located along the Houston Ship Channel with an ancillary levee structure through the bay that ties the system northward into Baytown and Southward to Texas City. (Figure 17) Conceptually, these additional elements appear to be effective for reducing the residual surge along the west side of Galveston Bay and Houston Ship Channel. Figure 17: SSPEED H-GAPS During Phase 3, the GCCPRD study team met with the SSPEED Center to discuss the H-GAPS as a potential solution to reduce the residual surge along the western shoreline and the Houston Ship Channel. The GCCPRD study team was concerned that adding the additional gate structure and levee system within the bay would significantly increase environmental impacts associated with water quality, salinity, sediment transfer, and aquatic resources. The study team was also concerned with the constructability and the construction and long-term operations and maintenance costs associated with the additional in-bay features. Adding a second line of defense will potentially increase benefits, but it remains to be seen if those benefits will be enough to enhance the overall BCR within the Central Region when compared to the construction cost. The SSPEED Center acknowledged our concerns and is continuing to fully develop their H- GAPS initiative which will address the environmental and cost concerns in the future. To optimize the recommended alignment, additional modeling and technical analysis would need to occur to validate the required elevation of in-bay features, access potential environmental impacts, determine construction and operations and maintenance costs, and economic benefits. Phase 3 Report Recommended Actions Page 26

30 SSPEED is also developing a probabilistic model that will help determine direct damages associated with surge-induced failures of large petrochemical tanks and their associated clean-up costs. The development of depth-damage curves associated with tank failures will enable the GCCPRD study team to potentially capture additional direct damage reduction benefits that were not adequately defined for this asset in our current model. There were numerous public comments associated with the GGCPRD study team s proposed alignment of the CR#1 surge barrier parallel to SH-87 and In its studies, the SSPEED Center proposed placing the barrier in the roadway right of way and raising the highways. The public on the west end of Galveston Island preferred the alignment to run along the existing dune line as proposed by Texas A&M - Galveston (TAMUG). The study team reviewed the dune line alignment during alternatives development. The team had concerns about the environmental impacts the alignment would have on the existing dune system as well as the overall construction and long-term operations and maintenance cost. The Gulf of Mexico side of the dune/levee would have to be constructed with an elongated slope to protect the toe of the dune/levee system from surge induced wave erosion. (Figure 18) This construction would increase the overall quantity of material that would be required to build the system and drive up the cost. Normal wave action will continue to erode the forward slope of the dune and require more frequent maintenance than a system along the roadways thereby driving up the long-term operations and maintenance costs. The District s limited funding and schedule constrained our ability to fully evaluate the potential beach alignment alternative for the coastal spine. Figure 18: Example of a levee cross section with elongated slopes During Phase 3, the study team met with TAMUG to discuss their work on the coastal spine. TAMUG has been working closely with Delft University to develop a version of the coastal spine that follows a dune alignment. TAMUG is expected to publish their technical report with estimated construction and long-term operation and maintenance costs in the future. The study team will then be able to develop and compare BCRs for the respective dune and roadway alignments. Whether the final alignment remains in or along the roadway or is moved to the beach will not have any effect on the overall performance of the system and regional benefits are expected to remain largely the same. We look forward to the completion of the work of TAMUG on the dune alignment option and exploring additional aesthetic and recreational benefits that option may provide. The concerns of the local community, the social and environmental issues, and the construction and long-term operations and Phase 3 Report Recommended Actions Page 27

31 maintenance costs of each alignment will have to be evaluated to determine the overall impact on the BCR and the potential need to develop a locally preferred plan. The study team did not have the resources to conduct a full environmental analysis of the potential impacts that the gate system at Bolivar Roads would have on water quality, salinity, sediment transport, and aquatic resources within the Galveston Bay estuary system. A preliminary tidal amplitude and exchange analysis was conducted for the hurricane barriers at Bolivar Roads, and the analysis indicated that the proposed hurricane barriers would result in a change in tidal amplitude of 5 and 10 percent over a range of various tidal conditions when twenty-five vertical lift gates were added to the barriers. This impact is expected to have a minimal effect on the overall health of the Galveston Bay but will still need to be verified to ensure the project complies with all NEPA requirements South Region - Brazoria County The study team, in coordination with input from the public, community leaders and elected officials, recommends South Region Alternative #2 (SR#2) - Freeport Hurricane Flood Protection System Modernization with Extension North toward Angleton, Jones Creek Levee, Jones Creek Terminal Ring Levee, and Chocolate Bayou Ring Levee as the alternative that best supports surge protection in the Brazoria County region of the study area. SR#2 provides a region-wide reduction in storm surge that extends from the coast at Freeport to Angleton and provides enhanced protection for the community of Jones Creek and the industrial complexes located along Jones Creek and Chocolate Bayou Basis of Recommendation The study team developed two alternatives that evaluated the current Freeport Hurricane Protection System (HPS) as well as areas outside of the system that will require protection within (Figure 19) Alternative SR#1 consisted of evaluating the existing Freeport HPS and the development of extensions to the system to keep surge from running around the ends in Alternative SR#2 included the evaluation of the Freeport HPS and other areas within the region outside the HPS that will become vulnerable in Phase 3 Report Recommended Actions Page 28

32 South Region Alternatives Brazoria County and Galveston County (vicinity of San Luis Pass) South Region Alternative #1 (SR#1) - Freeport Hurricane Flood Protection System Modernization and Extension North toward Angleton South Region Alternative #2 (SR#2) - Freeport Hurricane Flood Protection System Modernization and Extension North toward Angleton- Jones Creek Levee, Jones Creek Terminal Ring Levee, and Chocolate Bayou Ring Levee Figure 19: South Region Alternatives Selected for Development Phase 3 Report Recommended Actions Page 29

33 Table 8 provides a summary and a side-by-side comparison for each alternative. South Region Alternative Summary and Comparison Table 8: Comparison of Alternatives SR#1 and SR#2 SR#1 - Freeport Hurricane Flood Protection System Modernization and Extension North toward Angleton SR#2- Freeport Hurricane Flood Protection System Modernization and Extension North toward Angleton- Jones Creek Levee, Jones Creek Terminal Ring Levee, and Chocolate Bayou Ring Levee Total length of the system (miles) 49.1 miles 74.2 miles Right of way required 73 acres 383 acres Pump stations required / total 2 / 2,500 CFS 5 / 11,460 CFS capacity (CFS) Environmental mitigation required 49 acres acres Construction cost $1,897,635,000 $2,571,551,000 Annual operations and $9,488,000 $12,858,000 maintenance cost Total Annual Costs (TAC) 103,981, ,907,000 Total Annual Benefits (TAB) $186,583,000 $206,654,000 Benefit - Cost Ratio (TAB/TAC) (3.125% Interest Rate) SR#1 and SR#2 are both technically feasible and constructible alternatives with good BCRs. SR#2 includes three additional segments and provides more benefits overall to the south region. However, the additional cost of constructing these segments is greater than the additional benefits which has reduced the BCR when compared to SR#1 Figure 20: Surge reduction 100-year event in 2085 with SR#2 Phase 3 Report Recommended Actions Page 30

Gulf Coast Community Protection and Recovery District Storm Surge Suppression Study October 9, 2014

Gulf Coast Community Protection and Recovery District Storm Surge Suppression Study October 9, 2014 Gulf Coast Community Protection and Recovery District Storm Surge Suppression Study October 9, 2014 Purpose To investigate the feasibility of reducing the vulnerability of the upper Texas coast to hurricane

More information

Sabine Pass to Galveston Bay, Texas Coastal Storm Damage Reduction and Ecosystem Restoration Project. An Update

Sabine Pass to Galveston Bay, Texas Coastal Storm Damage Reduction and Ecosystem Restoration Project. An Update Sabine Pass to Galveston Bay, Texas Coastal Storm Damage Reduction and Ecosystem Restoration Project An Update Sharon Manzella Tirpak Project Manager 25 September 2013 US Army Corps of Engineers Study

More information

Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study

Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study Public Comment Meetings October 6, 2015 Beaumont, TX October 8, 2015 Freeport, TX Sharon Tirpak,

More information

Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study

Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study Sabine Pass to Galveston Bay, TX, Coastal Storm Risk Management and Ecosystem Restoration Feasibility Study Public Comment Meetings October 6, 2015 Beaumont, TX October 8, 2015 Freeport, TX Sharon Tirpak,

More information

Coastal Texas Protection and Restoration Study

Coastal Texas Protection and Restoration Study Coastal Texas Protection and Restoration Study SSPEED Center Conference Sheri Willey Project Manager Galveston District April 26, 2016 US Army Corps of Engineers US Army Corps of Engineers BUILDING STRONG

More information

Appendix B. Plan Formulation

Appendix B. Plan Formulation Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration Final Integrated Feasibility Report and Environmental Impact Study Appendix B Plan Formulation May 2017 TABLE

More information

Developing a Texas Preferred Ike Dike/Coastal Spine

Developing a Texas Preferred Ike Dike/Coastal Spine Developing a Texas Preferred Ike Dike/Coastal Spine Planning Environment Time All truth passes through three stages. First, it is ridiculed. Second, it is violently opposed. Third, it is accepted as being

More information

GENERAL OVERVIEW MEETING JANUARY 10, 2019

GENERAL OVERVIEW MEETING JANUARY 10, 2019 Upper Barataria Basin Coastal Storm Risk Management and The Amite River and Tributaries-Comprehensive Study East of the Mississippi River, Louisiana Feasibility Studies GENERAL OVERVIEW MEETING JANUARY

More information

TEXAS COASTAL PROTECTION PLANNING INITIATIVES

TEXAS COASTAL PROTECTION PLANNING INITIATIVES TEXAS COASTAL PROTECTION PLANNING INITIATIVES Ray Newby, P.G. Coastal Resources Program Texas General Land Office GICA Annual Seminar New Orleans, Louisiana July 27, 2017 THE TEXAS GENERAL LAND OFFICE

More information

Coastal Texas Protection and Restoration Project

Coastal Texas Protection and Restoration Project Coastal Texas Protection and Restoration Project Sharon Tirpak / Sheridan Willey / Janelle Stokes Project Management / Planning / Environmental USACE, Galveston District August 2014 US Army Corps of Engineers

More information

Storm Surge Mitigation: Status and Questions. Scott A. Jones Director of Advocacy Galveston Bay Foundation

Storm Surge Mitigation: Status and Questions. Scott A. Jones Director of Advocacy Galveston Bay Foundation Storm Surge Mitigation: Status and Questions Scott A. Jones Director of Advocacy Galveston Bay Foundation Galveston Bay Foundation Mission: To preserve, protect, and enhance the natural resources of Galveston

More information

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT 237 217 200 80 237 217 200 119 FEASIBILITY 237 217 200 STUDY 27 255 0 163 131 239 110 112 62 102 130 National Environmental Policy

More information

Appendix C. Economic Analysis

Appendix C. Economic Analysis Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration Final Integrated Feasibility Report and Environmental Impact Study Appendix C Economic Analysis May 2017 TABLE

More information

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT 237 217 200 80 237 217 200 119 FEASIBILITY 237 217 200 STUDY 27 255 0 163 131 239 110 112 62 102 130 National Environmental Policy

More information

Draft Appendix A. Measure Information Sheets

Draft Appendix A. Measure Information Sheets Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Reduction and Ecosystem Restoration Draft Integrated Feasibility Report and Environmental Impact Study Draft Appendix A Measure Information Sheets

More information

Appendix G.1 Cost Estimation

Appendix G.1 Cost Estimation Appendix G.1 Cost Estimation Cost Estimation Methodology Due to the large study area and vast array of measures analyzed, cost estimates employed standardization and simplification techniques to ensure

More information

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study

Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study 1 Virginia Beach Comprehensive Sea Level Rise and Recurrent Flooding Planning Study Policy Recommendations and City-wide Flood Protection Strategies January 15, 2019 2 Agenda Project Overview Hazards and

More information

SSPEED. Apr 26, 2016 Update. Philip Bedient, Jim Blackburn, Larry Dunbar

SSPEED. Apr 26, 2016 Update. Philip Bedient, Jim Blackburn, Larry Dunbar Apr 26, 2016 Update Philip Bedient, Jim Blackburn, Larry Dunbar The Center The Center is based at Rice University and collaborates with leading academic institutions, the private sector and public entities.

More information

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY Draft Reformulation Public Information October 2016 US Army Corps of Engineers Presentation Outline Project Overview

More information

NEW JERSEY BACK BAYS COASTAL STORM RISK MANAGEMENT INTERIM FEASIBILITY STUDY AND ENVIRONMENTAL SCOPING DOCUMENT. Executive Summary 1 March 2019

NEW JERSEY BACK BAYS COASTAL STORM RISK MANAGEMENT INTERIM FEASIBILITY STUDY AND ENVIRONMENTAL SCOPING DOCUMENT. Executive Summary 1 March 2019 NEW JERSEY BACK BAYS COASTAL STORM RISK MANAGEMENT INTERIM FEASIBILITY STUDY AND ENVIRONMENTAL SCOPING DOCUMENT Executive Summary 1 March 2019 Document Overview This U.S. Army Corps of Engineers (USACE)

More information

Hurricane Ike: 5 Years Later September 24-25, 2013 SSPEED Center RICE University

Hurricane Ike: 5 Years Later September 24-25, 2013 SSPEED Center RICE University Hurricane Ike: 5 Years Later September 24-25, 2013 SSPEED Center RICE University Background Orange County sustained major damage from Hurricane Ike County Commissioners authorized expenditure of some Disaster

More information

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY

COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY COASTAL TX PROTECTION AND RESTORATION FEASIBILITY STUDY Stakeholders Forum Dr. Kelly Burks-Copes, Project Manager Mr. Tony Williams, Coastal Resources US Army Corps of Engineers, Galveston District Texas

More information

New Jersey Back Bays Coastal Storm Risk Management Feasibility Study. Ocean and Burlington Counties Mayor s Meeting Toms River, NJ June 19, 2018

New Jersey Back Bays Coastal Storm Risk Management Feasibility Study. Ocean and Burlington Counties Mayor s Meeting Toms River, NJ June 19, 2018 New Jersey Back Bays Coastal Storm Risk Management Feasibility Study Ocean and Burlington Counties Mayor s Meeting Toms River, NJ June 19, 2018 1 State of New Jersey Shore Protection Program State of New

More information

Preliminary Feasibility Study for South San Francisco Bay Shoreline Economic Impact Areas 1-10 Executive Summary

Preliminary Feasibility Study for South San Francisco Bay Shoreline Economic Impact Areas 1-10 Executive Summary Economic Impact Areas 1-10 Executive Summary Prepared For: Department of Water Resource Division of Flood Management State Of California Prepared By: Santa Clara Valley Water District February 2017 A preliminary

More information

STRUCTURAL PLAN COMPONENT APPENDIX

STRUCTURAL PLAN COMPONENT APPENDIX LOUISIANA COASTAL PROTECTION AND RESTORATION FINAL TECHNICAL REPORT STRUCTURAL PLAN COMPONENT APPENDIX June 2009 U. S. Army Corps of Engineers New Orleans District Mississippi Valley Division Table of

More information

A Vision for a Healthy, Productive, and Sustainable Galveston Bay

A Vision for a Healthy, Productive, and Sustainable Galveston Bay A Vision for a Healthy, Productive, and Sustainable Galveston Bay Bob Stokes, President Preserving, protecting, and enhancing Galveston Bay for 29 years A bit about our Bay Largest bay in Texas (660 square

More information

East St. Tammany Storm Surge Protection Project Request

East St. Tammany Storm Surge Protection Project Request East St. Tammany Storm Surge Protection Project Request Submitted to Coastal Protection & Restoration Authority of Louisiana (CPRA) August 2015 Contact Information: Thomas Nolan Thompson The East St. Tammany

More information

Vulnerability Assessment

Vulnerability Assessment Brief coastal vulnerability assessment for the City of Cocoa Beach, conducted utilizing available NOAA and UF GeoPlan tools. Vulnerability Assessment City of Cocoa Beach East Central Florida Regional Planning

More information

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study

GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study GIWW Brazos River Floodgates and Colorado River Locks Feasibility Study Stakeholder Partnering Forum Modernizing of the GIWW August 4, 2016 Partnering Under a Systems Approach for Sustaining Commercial

More information

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience

Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience Mississippi Coastal Improvements Program A Comprehensive Plan for Coastal Resilience 200 Coastal Resilience Symposium 26 May 200 US Army Corps of Engineers BUILDING STRONG Mississippi Coastal Improvements

More information

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality

AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental Quality DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 April 11, 2017 AGENCY: Department of the Army; Corps of Engineers; and Texas Commission on Environmental

More information

Achieving the Philosophy of GOMA Through MsCIP

Achieving the Philosophy of GOMA Through MsCIP Achieving the Philosophy of GOMA Through MsCIP 4 th National Conference on Ecosystem Restoration August 3, 2011 The Spirit of Cooperation Integrating Partnerships for Sustainable Ecosystem Restoration

More information

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS May 26, 2017

DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS May 26, 2017 DEPARTMENT OF THE ARMY GALVESTON DISTRICT, CORPS OF ENGINEERS P. O. BOX 1229 GALVESTON, TEXAS 77553-1229 May 26, 2017 AGENCY: Department of the Army; Corps of Engineers Notice of Availability for the Sabine

More information

THE TEXAS COASTAL RESILIENCY MASTER PLAN. Texas General Land Office

THE TEXAS COASTAL RESILIENCY MASTER PLAN. Texas General Land Office THE TEXAS COASTAL RESILIENCY MASTER PLAN Texas General Land Office ENSURING A RESILIENT COAST THROUGH COMPREHENSIVE PLANNING Coastal Stressors: Coastal Population Growth Critical Habitat Loss Coastal Hazards

More information

Collaboration: Sea Level Marin Adaptation Response Team Phase II

Collaboration: Sea Level Marin Adaptation Response Team Phase II Collaboration: Sea Level Marin Adaptation Response Team Phase II 2018-2020 Scope of Work Background Climate experts estimate that by 2100, sea level could rise by up to 70 inches, though recent projections

More information

Billing Code DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT

Billing Code DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT This document is scheduled to be published in the Federal Register on 04/02/2014 and available online at http://federalregister.gov/a/2014-07366, and on FDsys.gov Billing Code 4210-67 DEPARTMENT OF HOUSING

More information

Executive Summary Page

Executive Summary Page (*NEPA Required) The 2013 Southwest Coastal Louisiana Draft Integrated Feasibility Report and Programmatic Impact Statement ( 2013 Initial Draft Report ) identified a Tentatively Selected Plan (TSP) for

More information

Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration

Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration U.S. Army Corps of Engineers Galveston District Southwestern Division Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration Final Integrated Feasibility Report Environmental

More information

CITY OF NORFOLK COASTAL STORM RISK MANAGEMENT STUDY

CITY OF NORFOLK COASTAL STORM RISK MANAGEMENT STUDY 1 CITY OF NORFOLK COASTAL STORM RISK MANAGEMENT STUDY 255 255 255 File Name 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62 102

More information

REGIONAL CONSIDERATIONS FOR LACPR AND MSCIP APPENDIX

REGIONAL CONSIDERATIONS FOR LACPR AND MSCIP APPENDIX LOUISIANA COASTAL PROTECTION AND RESTORATION FINAL TECHNICAL REPORT REGIONAL CONSIDERATIONS FOR LACPR AND MSCIP APPENDIX June 2009 U. S. Army Corps of Engineers New Orleans District Mississippi Valley

More information

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603)

ACKNOWLEDGEMENTS. Sincerely, Executive Director and Staff. Rockingham Planning Commission. 156 Water Street Exeter, NH (603) ACKNOWLEDGEMENTS The gratefully acknowledges the participation of coastal New Hampshire municipalities in the preparation of this report: City of Portsmouth Town of New Castle Town of Rye Town of North

More information

ENGINEERING ECOSYSTEM RESTORATION

ENGINEERING ECOSYSTEM RESTORATION APPENDIX D ENGINEERING ECOSYSTEM RESTORATION ENGINEERING APPENDIX FOR EXISTING CONDITION ANALYSIS FOR RISK INFORMED DECISION MAKING FOR PROJECT ALTERNATIVE SELECTION DELTA ISLANDS AND LEVEES FEASIBILITY

More information

SWG Dredging Conference. Status of Corps Studies and Projects

SWG Dredging Conference. Status of Corps Studies and Projects SWG Dredging Conference Status of Corps Studies and Projects 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130

More information

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads

Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads VIRGINIA D.C. MARYLAND CHAPTER Sea Level Rise Impacts on Municipal Stormwater Systems in Hampton Roads Presentation at the APWA Mid-Atlantic Chapter May Regional Conference Virginia Beach, Virginia May

More information

NATIONAL OCEAN SERVICE

NATIONAL OCEAN SERVICE NATIONAL OCEAN SERVICE Jeff Payne, Ph.D., Office for Coastal Management Steve Thur, Ph.D., Acting Director National Centers for Coastal Ocean Science February 23, 2017 NATIONAL OCEAN SERVICE oceanservice.noaa.gov

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT

NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT NEW YORK NEW JERSEY HARBOR AND TRIBUTARIES COASTAL STORM RISK MANAGEMENT 237 217 200 80 237 217 200 119 FEASIBILITY 237 217 200 STUDY 27 255 0 163 131 239 110 112 62 102 130 National Environmental Policy

More information

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study NEPA Scoping Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study U.S. Army Corps of Engineers New York District New Jersey Department of Environmental Protection Non-Federal

More information

Appendix M. Summary of Local Sea Level Rise Planning Efforts. Draft

Appendix M. Summary of Local Sea Level Rise Planning Efforts. Draft Appendix M Summary of Local Sea Level Rise Planning Efforts Appendix M: Summary of Local Sea Level Rise Planning Efforts Summary of Local Sea Level Rise Planning Efforts Half Moon Bay SLR Planning Efforts

More information

SOUTH ATLANTIC COASTAL STUDY Creating a shared vision to address coastal vulnerability

SOUTH ATLANTIC COASTAL STUDY Creating a shared vision to address coastal vulnerability SOUTH ATLANTIC COASTAL STUDY Creating a shared vision to address coastal vulnerability Jacksonville Environmental Symposium September 14th, 2018 Presented by: Matthew Schrader, P.E. US Army Corps of Engineers

More information

Texas Water Resources Institute

Texas Water Resources Institute Texas Water Resources Institute May/June 1985 Volume 11 No. 3 Stopping the Sinking By RIC JENSEN Staff Writer, TWRI The notion that some parts of Houston may be sinking is a harsh reality. Some unique

More information

SABINE PASS TO GALVESTON BAY, TEXAS, COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION STUDY. Public Comment Meeting.

SABINE PASS TO GALVESTON BAY, TEXAS, COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION STUDY. Public Comment Meeting. SABINE PASS TO GALVESTON BAY, TEXAS, COASTAL STORM RISK MANAGEMENT AND ECOSYSTEM RESTORATION STUDY Public Comment Meeting October, Freeport, Texas (Meeting commenced at :00 p.m.) COLONEL RICHARD PANNELL:

More information

Salt Bayou Beneficial Use Project on J.D. Murphree WMA

Salt Bayou Beneficial Use Project on J.D. Murphree WMA Salt Bayou Beneficial Use Project on J.D. Murphree WMA 1300-Acre Marsh Restoration Project at J.D. Murphree WMA Most people would be hard-pressed to find a use for 2 million cubic yards of silt-saturated

More information

U.S. Army Corps of Engineers New Jersey Back Bays Flood Risk Management Planning Workshop. Background Reading/Pre Workshop Activity

U.S. Army Corps of Engineers New Jersey Back Bays Flood Risk Management Planning Workshop. Background Reading/Pre Workshop Activity U.S. Army Corps of Engineers New Jersey Back Bays Flood Risk Management Planning Workshop Background Reading/Pre Workshop Activity Introduction The U.S. Army Corps of Engineers (USACE), the USACE National

More information

beachsamp Rhode Island Shoreline Change Special Area Management Plan

beachsamp Rhode Island Shoreline Change Special Area Management Plan beachsamp Rhode Island Shoreline Change Special Area Management Plan Nowhere else in the U.S. is there a management plan for tackling the complicated impacts associated with sea level rise, and Rhode Island

More information

Climate Adaptation & Disaster Risk Reduction Building Coastal Resilience

Climate Adaptation & Disaster Risk Reduction Building Coastal Resilience Climate Adaptation & Disaster Risk Reduction Building Coastal Resilience Dr. Michael Beck & Dr. Borja Reguero The Nature Conservancy & Univ. of California Santa Cruz www.nature.org & www.coastalresilience.org

More information

TOWN OF RHINEBECK RESOLUTION

TOWN OF RHINEBECK RESOLUTION TOWN OF RHINEBECK RESOLUTION 2018197 REQUESTING AN ETENSION OF THE SCOPING COMMENT PERIOD WITH ADDITIONAL PUBLIC INFORMATION AND SCOPING MEETINGS, FOR THE NY/NJ HARBOR & TRIBUTARIES COASTAL STORM RISK

More information

Coastal Texas Protection and Restoration Feasibility Study. Draft Integrated Feasibility Report and Environmental Impact Statement

Coastal Texas Protection and Restoration Feasibility Study. Draft Integrated Feasibility Report and Environmental Impact Statement Galveston District Southwestern Division October 2018 Coastal Texas Protection and Restoration Feasibility Study Draft Integrated Feasibility Report and Environmental Impact Statement EXECUTIVE SUMMARY

More information

Coastal Texas Protection and Restoration Feasibility Study. Draft Integrated Feasibility Report and Environmental Impact Statement

Coastal Texas Protection and Restoration Feasibility Study. Draft Integrated Feasibility Report and Environmental Impact Statement Galveston District Southwestern Division October 2018 Coastal Texas Protection and Restoration Feasibility Study Draft Integrated Feasibility Report and Environmental Impact Statement EXECUTIVE SUMMARY

More information

EXHIBIT # ATTACHMENT #

EXHIBIT # ATTACHMENT # EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00

More information

EXHIBIT # ATTACHMENT #

EXHIBIT # ATTACHMENT # EXHIBIT # ATTACHMENT # Proposed Text Amendment to the Broward County Land Use Plan II. GOALS, OBJECTIVES AND POLICIES SMART GROWTH, AND GREEN/ENERGY EFFICIENT AND SUSTAINABLE LAND USE PATTERNS GOAL A.00.00

More information

The newly updated and comprehensive SWMP shall:

The newly updated and comprehensive SWMP shall: RFQ SCOPE OF SERVICES 2.1 Project Purpose The City of Miami, ( City ) is seeking professional engineering services from a qualified firm for the purpose of planning and developing a newly updated and comprehensive

More information

The U.S. Gulf Coast: Risk and Adaptation. Brent Dorsey, Director Corporate Environmental Programs Entergy

The U.S. Gulf Coast: Risk and Adaptation. Brent Dorsey, Director Corporate Environmental Programs Entergy The U.S. Gulf Coast: Risk and Adaptation Brent Dorsey, Director Corporate Environmental Programs Entergy International Energy Agency Experts Group on R&D Priority Setting and Evaluation November 13-14,

More information

Everglades Restoration Climate Program

Everglades Restoration Climate Program Sea Level Change and Long Range Water Resources Planning for Florida Everglades Restoration Climate Program Change Application Concerns of USACE and Guidance Draft Sea Level on Sea Rise Level Planning

More information

The Galveston Bay Estuary Program and Partnerships

The Galveston Bay Estuary Program and Partnerships The Galveston Bay Estuary Program and Partnerships Galveston Bay is Valuable The second most productive fishery in the country The most productive bay in the state supporting fisheries for oysters, shrimp,

More information

COASTAL STRATEGIES FOR DRAINAGE RESILIENCE

COASTAL STRATEGIES FOR DRAINAGE RESILIENCE COASTAL STRATEGIES FOR DRAINAGE RESILIENCE FDOT S APPROACH AND VISION TODAY S TOPICS Current Concerns and Trends Risk Tolerance and Design Criteria Long-Term Coastal Planning Area of Recurring Flooding

More information

CHAPTER 7. San Dieguito River Flooding Adaptation

CHAPTER 7. San Dieguito River Flooding Adaptation CHAPTER 7 San Dieguito River Flooding Adaptation This chapter includes a range of adaptation measures to address vulnerabilities from flooding along the San Dieguito River, including the river valley,

More information

Houston Ship Channel Expansion Channel Improvement Project, Harris, Chambers, Galveston Counties, Texas

Houston Ship Channel Expansion Channel Improvement Project, Harris, Chambers, Galveston Counties, Texas U.S. Army Corps of Engineers Galveston District Southwestern Division Houston Ship Channel Expansion Channel Improvement Project, Harris, Chambers, Galveston Counties, Texas Draft Integrated Feasibility

More information

The Ike Dike. A Coastal Barrier Protecting the. Hurricane Storm Surge. Protecting the Houston/Galveston Region from Hurricane Storm Surge

The Ike Dike. A Coastal Barrier Protecting the. Hurricane Storm Surge. Protecting the Houston/Galveston Region from Hurricane Storm Surge The Ike Dike A Coastal Barrier Protecting the Houston/Galveston A Coastal Barrier System Region from Hurricane Storm Surge Protecting the Houston/Galveston Region from Hurricane Storm Surge If farther

More information

A Federal Family Comes Together Association of State Floodplain Managers Conference

A Federal Family Comes Together Association of State Floodplain Managers Conference A Federal Family Comes Together 2016 Association of State Floodplain Managers Conference Region 6 by the Numbers 5 States 5 USGS Offices 6 USACE Districts 6 HUC2 Regions 40 HUC4 Subregions 403 HUC8 Watersheds

More information

Adaptation to Extreme Weather Events and Climate Change

Adaptation to Extreme Weather Events and Climate Change Office of Planning, Environment and Realty Office of Infrastructure Adaptation to Extreme Weather Events and Climate Change SASHTO Meeting Robert Kafalenos, FHWA August 25, 2014 1 Planning for the Future

More information

REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS

REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS OCTOBER 31, 2017 GREG ABBOTT, GOVERNOR OF TEXAS JOHN SHARP, COMMISSIONER GOVERNOR S COMMISSION TO REBUILD TEXAS October 31, 2017 Dear Gov.

More information

Passaic Tidal, New Jersey Coastal Storm Risk Management General Reevaluation Study

Passaic Tidal, New Jersey Coastal Storm Risk Management General Reevaluation Study Passaic Tidal, New Jersey Coastal Storm Risk Management General Reevaluation Study CAG Newark, NJ March 9, 2017 The views, opinions and findings contained in this report are those of the authors(s) and

More information

Building Community Resilience in Southeast Florida. Jason Liechty Environmental Projects Coordinator, Broward County 1 December 2016

Building Community Resilience in Southeast Florida. Jason Liechty Environmental Projects Coordinator, Broward County 1 December 2016 Building Community Resilience in Southeast Florida Jason Liechty Environmental Projects Coordinator, Broward County 1 December 2016 Climate Trends and Predictions Sea level rise Rising temperatures Extreme

More information

Southwest Coastal Louisiana Integrated Final Feasibility Report and EIS

Southwest Coastal Louisiana Integrated Final Feasibility Report and EIS Southwest Coastal Louisiana Integrated Final Feasibility Report and EIS Johnny Bradberry, Chair Coastal Protection and Restoration Authority Civil Works Review Board April 21, 2016 committed to our coast

More information

21st International Conference of The Coastal Society GLOBAL SEA LEVEL RISE: POLICY AND PLANNING IMPLICATIONS FOR HAWAII S COASTAL COMMUNITIES

21st International Conference of The Coastal Society GLOBAL SEA LEVEL RISE: POLICY AND PLANNING IMPLICATIONS FOR HAWAII S COASTAL COMMUNITIES 21st International Conference of The Coastal Society GLOBAL SEA LEVEL RISE: POLICY AND PLANNING IMPLICATIONS FOR HAWAII S COASTAL COMMUNITIES Dolan Eversole, University of Hawaii Sea Grant College Program

More information

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study

PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study PUBLIC INFORMATION MEETING Rahway River Basin Flood Risk Management Feasibility Study COL Paul E. Owen District Engineer U.S. Army Corps of Engineers New York District New Jersey Department of Environmental

More information

Climate Change, Conservation and Coastlines Critical Concerns in South Florida?

Climate Change, Conservation and Coastlines Critical Concerns in South Florida? Climate Change, Conservation and Coastlines Critical Concerns in South Florida? Contents Greenhouse gas emissions Climate Challenges Interrelated Impacts Concepts for the Comprehensive Plan Dr. Ana Puszkin-Chevlin

More information

Flooding - Tidal and Rainfall. Presentation to City Council Informal Session May 24, John M. Keifer PE

Flooding - Tidal and Rainfall. Presentation to City Council Informal Session May 24, John M. Keifer PE Flooding - Tidal and Rainfall Presentation to City Council Informal Session May 24, 2011 John M. Keifer PE Purpose of Presentation 1. Review flooding causes and implications to the City 2. Discuss mitigation

More information

REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS

REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS REQUEST FOR FEDERAL ASSISTANCE CRITICAL INFRASTRUCTURE PROJECTS UPDATED DECEMBER 2017 GREG ABBOTT, GOVERNOR OF TEXAS JOHN SHARP, COMMISSIONER GOVERNOR S COMMISSION TO REBUILD TEXAS Introduction Rebuilding

More information

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District

NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District NOVATO FLOOD CONTROL ZONE No. 1 Marin County Flood Control and Water Conservation District Photo by R. Tong. Marin IJ INFORMATION ON MEASURE E: NOVEMBER 7, 2017 PARCEL TAX MEASURE PRESENTATION TO NOVATO

More information

CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW

CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW CONTINUING AUTHORITIES PROGRAM (CAP) OVERVIEW USACE Jacksonville District Brandon Burch Project Manager Trusted Partners Delivering Value, Today and Tomorrow Trusted Partners Delivering Value, Today and

More information

Sea Level Rise and Subsidence Issues and the Coastal Northern Gulf

Sea Level Rise and Subsidence Issues and the Coastal Northern Gulf Sea Level Rise and Subsidence Issues and the Coastal Northern Gulf 1897 The effects of the withholding by the levees from the great areas of the delta of the annual contribution of sedimentary matters

More information

Proactive Planning for Resilient Coasts Lessons for North Texas

Proactive Planning for Resilient Coasts Lessons for North Texas Proactive Planning for Resilient Coasts Lessons for North Texas Kimberly M. Miller, Senior Planner & Operations Manager, Allen Engineering and Science Overview of Today s Program 1. Planning for Coastal

More information

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas

Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Manhattan Levee Section 216 Feasibility Study Public Workshop 17Apr13 Manhattan Kansas Tuttle Creek Dam and Lake Kansas City District Project Development Team Manhattan, KS US Army Corps of Engineers 1

More information

Appendix D. Engineering Design, Cost Estimates, and Cost Risk Analysis

Appendix D. Engineering Design, Cost Estimates, and Cost Risk Analysis Appendix D Engineering Design, Cost Estimates, and Cost Risk Analysis U.S. Army Corps of Engineers Galveston District Southwestern Division Appendix D Engineering Design, Cost Estimates, and Cost Risk

More information

Ice Mass & Sea Level Change Unit 5: Southern California vignettes

Ice Mass & Sea Level Change Unit 5: Southern California vignettes Ice Mass & Sea Level Change Unit 5: Southern California vignettes Becca Walker and Leigh Stearns Part 1: Background With current sea levels, California s coastline is already susceptible to flooding and

More information

ECONOMIC ANALYSIS OF NATURE BASED ADAPTATION TO CLIMATE CHANGE A DASHBOARD APPROACH

ECONOMIC ANALYSIS OF NATURE BASED ADAPTATION TO CLIMATE CHANGE A DASHBOARD APPROACH ECONOMIC ANALYSIS OF NATURE BASED ADAPTATION TO CLIMATE CHANGE A DASHBOARD APPROACH DR. GRETCHEN GREENE GRETCHEN GREENE, GREG REUB, FELIX KRISTANOVICH, RAMBOLL ENVIRON; SARAH NEWKIRK AND LILY VERDONNE,

More information

Appendix A. Plan Formulation Supporting Documentation

Appendix A. Plan Formulation Supporting Documentation Appendix A Plan Formulation Supporting Documentation U.S. Army Corps of Engineers Galveston District Southwestern Division Appendix A Plan Formulation Supporting Documentation for the Coastal Texas Protection

More information

Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration

Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration U.S. Army Corps of Engineers Galveston District Southwestern Division Sabine Pass to Galveston Bay, Texas Coastal Storm Risk Management and Ecosystem Restoration Draft Integrated Feasibility Report Environmental

More information

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2009 H 1 HOUSE BILL 1808*

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2009 H 1 HOUSE BILL 1808* GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 00 H 1 HOUSE BILL 0* Short Title: NC Climate Change Adaptation Strategy. (Public) Sponsors: Representatives Harrison, Underhill, Wilkins (Primary Sponsors); M.

More information

Westminster East Garden Grove, California Flood Risk Management Feasibility Study

Westminster East Garden Grove, California Flood Risk Management Feasibility Study 1 Public Scoping Meeting Westminster East Garden Grove, California 255 255 255 237 237 237 217 217 217 200 200 200 0 0 0 163 163 163 131 132 122 239 65 53 80 119 27 252 174.59 110 135 120 112 92 56 62

More information

Coastal Hazards Vulnerability and Fiscal Impact Study Report:

Coastal Hazards Vulnerability and Fiscal Impact Study Report: Agenda Item B.1 Coastal Hazards Vulnerability and Fiscal Impact Study Report: Vulnerability Assessment and Adaptation Strategies Review October 12, 2015 Planning Commission Meeting Presentation by: Anne

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

The Flood of 1993 resulted in catastrophic

The Flood of 1993 resulted in catastrophic 31 UNIVERSITIES COUNCIL ON WATER RESOURCES ISSUE 130, PAGES 31-35, MARCH 2005 The Upper Mississippi River Comprehensive Flood Damage Reduction Study: Taking a Fresh Look at an Old Problem on a Basin-Wide

More information

CHNEP/SWFRPC Climate Ready Programs

CHNEP/SWFRPC Climate Ready Programs CHNEP/SWFRPC Climate Ready Programs Southwest Florida is currently experiencing climate change. The natural setting of southwest Florida coupled with extensive overinvestment in the areas closest to the

More information

Briefing to Elected Officials

Briefing to Elected Officials Passaic River Main Stem Flood Risk Management Project Preliminary Alternative Analysis Report Briefing to Elected Officials Bob Martin Commissioner New Jersey Department of Environmental Protection COL

More information

Adapting to Rising Tides

Adapting to Rising Tides Adapting to Rising Tides Getting to Flood Resilience through Collaborative Planning and Capacity Building San Francisco Bay Conservation and Development Commission www.adaptingtorisingtides.org Wendy Goodfriend,

More information

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT

DRAINAGE AND NATURAL AQUIFER GROUNDWATER RECHARGE ELEMENT Goal 7.0. To optimize integrated stormwater management in order to reduce damage and impacts from sea level rise and flooding, promotes recharge to the Surficial Aquifer System (SAS), improve and protect

More information