1 Infrastructure Evaluation Preliminary Scope and Cost Estimates January 25, 2016

2 Infrastructure Evaluation Existing Conditions Street Improvements Pavement Management Street Condition Inventory Underground Utilities Sanitary Sewer Watermain Storm Sewer Improvement Analysis Cost Estimates

3 What is under a typical city street?

4 Existing Conditions Street Pavement Management Goal Maximize life of pavement, minimize cost Low cost preventative maintenance vs. high cost reconstruction Preventative Maintenance Crack Sealing Seal Coating (Chip Sealing) Mill & Overlay Reconstruction Complete replacement of pavement

5 Existing Conditions Street Pavement Life Cycle

6 Existing Conditions Street Extended Pavement Life Cycle

7 Existing Conditions Street Pavement Life Cost Example 30 ft wide, urban section (curb/gutter), no sidewalk 50 year life cycle Full Reconstruction Cost $275/ft Mill & Overlay Cost $62/ft Crack Seal Cost $3/ft Chip Seal Cost $10/ft

8 Existing Conditions Street Pavement Life Cost Example With Maintenance Without Maintenance Year 7 Crack/Chip Seal Year 25 Reconstruct Year 14 Crack/Chip Seal Year 50 Reconstruct Year 20 Mill/Overlay Year 22 Crack Seal Year 27 Chip Seal Year 35 Crack/Chip Seal Year 40 Mill/Overlay Year 42 Crack Seal Year 47 Chip Seal Year 50 Crack/Chip Seal

9 Existing Conditions Street Pavement Life Cost Example

10 Existing Conditions Street Expected Pavement Life Highly dependent heavy commercial traffic, pavement design, subsurface moisture, and maintenance Point of failure is very subjective. When has a pavement failed? Newly reconstructed street years with no maintenance years with proper maintenance Mill and overlay years with no maintenance years with proper maintenance Highly dependent on condition of underlying pavement. What did you overlay?

11 Existing Conditions Street Streets were evaluated by Bolton & Menk staff in 2015 Evaluation used Pavement Surface Evaluation and Rating (PASER) Method Scale of Completely Failed 10 Brand New

12 Existing Conditions Street Bituminous Street Rating 10 Excellent (New Construction)

13 Existing Conditions Street Bituminous Street Rating 8 Good (Widely Spaced, Sealed Cracks)

14 Existing Conditions Street Bituminous Street Rating 6 Fair (Cracks Closer, Sealed)

15 Existing Conditions Street Bituminous Street Rating 4 Poor (Block Cracking, Blocks Tight)

16 Existing Conditions Street Bituminous Street Rating 2 Failed (Extensive Alligator Cracking)

17 Existing Conditions Street Typical maintenance based on PASER rating 7 10 Crack Seal and Chip Seal 4 6 Mill and Overlay 1 3 Full Reconstruction

18 Existing Conditions Street

19 Existing Conditions Street

20 Existing Conditions Street N. Elm Street PASER Rating 8 Crack Seal & Chip Seal

21 Existing Conditions Street Olson Drive PASER Rating 7 Crack Seal and Chip Seal

22 Existing Conditions Street Grandview Street PASER Rating 4 Mill & Overlay

23 Existing Conditions Street Lamplighters Lane PASER Rating 2 Reconstruct

24 Existing Conditions Street S. Burr Oak Street PASER Rating 1 Reconstruct

25 Existing Conditions Underground Utilities Street Condition Inventory Only one piece of the puzzle Underground Utility Condition Sanitary Sewer Video inspection Manhole inspection Pipe type & size (8 minimum, VCP, concrete) Age Watermain Watermain break history Pipe type and size (6 minimum, cast iron) Water pressure/quality issues Age Storm Sewer Video inspection Manhole/catch basin inspection Drainage issues

26 Existing Conditions Sanitary Sewer Video Inspection 2007 Many deficiencies noted Cracked pipes Root intrusion, infiltration Offset and broken joints Utility pipe penetrations Bad connections

27 Existing Conditions Sanitary Sewer Broken/cracked pipe example

28 Existing Conditions Sanitary Sewer Pipe blockage and utility conduit penetration

29 Existing Conditions Sanitary Sewer Roots

30 Existing Conditions Sanitary Sewer Root intrusion, service taps protruding, infiltration

31 Existing Conditions Sanitary Sewer

32 Existing Conditions Sanitary Sewer

33 Existing Conditions Watermain Much of the watermain in town ranges in age from years old, some over 100 years old Given the age, much of the watermain is likely cast iron, likely with lead packed joints 1940 s and 1950 s vintage watermain is likely 4 inch diameter

34 Existing Conditions Watermain Watermain pipe age map

35 Existing Conditions Watermain Watermain pipe age map

36 Existing Conditions Storm Sewer Much of the town served with storm sewer Extensive flood control system, pump stations, etc. Some isolated areas with long runs of surface drainage Some improvements required to meet COE/FEMA interior drainage standards (addressed in separate report by Barr Engineering) Look for localized improvements on a project by project basis

37 Existing Conditions Storm Sewer

38 Existing Conditions Storm Sewer

39 Improvement Analysis Improvement options need to consider both pavement condition and underground infrastructure condition Example 1 East Grandview Street Green Street to N. Money Creek Street

40 Improvement Analysis

41 Improvement Analysis Example 1 Street Condition Rating 4 Mill/Overlay Watermain vintage, cast iron Sanitary Sewer Numerous deficiencies in 2007 video inspection Recommendation is to fully reconstruct

42 Improvement Analysis Example 2 Industrial Drive Root River Trail to South Elm Street

43 Improvement Analysis

44 Improvement Analysis Example 2 Street Condition Rating 6 Mill/Overlay Watermain 1980 s vintage Sanitary Sewer No deficiencies in 2007 video inspection Recommendation is to mill/overlay

45 Improvement Analysis Example 3 South Burr Oak Street East Park Street to the south

46 Improvement Analysis

47 Improvement Analysis Example 3 Street Condition Rating 1 Reconstruct Watermain 1970 s vintage Sanitary Sewer Minimal deficiencies in 2007 video inspection Recommendation is to reconstruct

48 Improvement Analysis

49 Improvement Analysis

50 Recommended Improvements Estimated Costs Costs are reflective of infrastructure that has outlived it s useful life. This is not unique to Rushford, rather it is typical of many cities in Greater MN.

51 Improvement Analysis What if we can only afford to do the surfacing improvements? Mill & overlay may last years with proper maintenance, depending on condition of underlying pavement May need to completely mill and fully replace existing asphalt (pavement replacement) Risks are: Utilities may require repair prior to end of full pavement life (watermain break, sewer collapse, etc.), new pavement needs patch Street may require reconstruction due to utilities prior to end of useful life of overlay 80 year old watermain will be 125 years old at the end of the overlay life

52 Improvement Alternatives Estimated Costs No utility improvements addressed in these costs Mill and overlay not recommended on some streets (Burr Oak, Lamplighters, etc.)

53 Priorities Pavement Management Continue to fund crack seal and chip sealing on streets in PASER 7 10 range to keep them there as long as possible Streets previously discussed South Burr Oak Street Meadowview Drive Hillcrest Drive Southview Court

54 Options for 2016 Project Reconstruct South Burr Oak Street Total Cost $516,600 Reconstruct South Burr Oak Street & Southview Court Total Cost $839,600 Reconstruct South Burr Oak Street, Pavement Replacement on Hillcrest, Meadowview, and Southview Total Cost $832,000 Others?

55 Other Issues to Consider Assessments City s policy states that mill/overlay improvements are not assessed Is full asphalt pavement replacement considered a mill & overlay? Arguably yes, as the expected life would be similar to a mill & overlay. Streets such as Southview Court and Lamplighters Lane have minimal assessable frontage, which means larger City share of project costs

56 Questions? Infrastructure Evaluation Preliminary Scope and Cost Estimates January 25, 2016

Project Need and Evaluation

Project Need and Evaluation City of Brooklyn Center 2011 Palmer Lake East Street and Utility Reconstruction Project Public Hearings February 14, 2011 Public Improvement Hearing: Special Assessments Local public improvements to the

More information

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration

Puerto Rico. Pavement Preservation Conference and Technology Implementation. US. Department of Transportation Federal Highway Administration Puerto Rico Pavement Preservation Conference and Technology Implementation US. Department of Transportation Federal Highway Administration Cold In-Place Asphalt Recycling Overview Michael L. Polak E.J.

More information

Pavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011

Pavement Surface Evaluation and Rating Presentation. City of Oberlin Public Works Department July 5, 2011 Pavement Surface Evaluation and Rating Presentation City of Oberlin Public Works Department July 5, 2011 Causes of Pavement Deterioration Environmental : weathering and aging Structural: repeated traffic

More information

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17

E. GILMAN STREET, N. PINCKNEY STREET, AND N. BUTLER STREET RESURFACING WITH UTILITIES ASSESSMENT DISTRICT CONTRACT NO DATE: 9/22/17 S&L Gravel, Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $6,425.00 $6,425.00 $6,425.00 $10,000.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 25.00 $25.00 $625.00

More information

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES

CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES CITY OF DES PLAINES-CONCRETE PROGRAM SIDEWALK, CURB AND DRIVEWAY GUIDELINES SUMMARY AND INTENT OF PROJECT The City of Des Plaines Curb and Sidewalk Program is intended to repair hazardous sidewalk and

More information

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012 Project made possible by US Dept. of HUD Regional Substantiality Planning Grant and ND Energy Development Infrastructure and Impact

More information

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows.

Drainage structure refers to manholes, catch basins, leaching basins, inlets and drop inlets. Drainage structures are designated as follows. 403.01 Section 403. DRAINAGE STRUCTURES 403.01 Description. Adjust, construct, or temporarily lower drainage structures. Clean existing drainage structures and leads as directed by the Engineer. Drainage

More information

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection

EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection EXHIBIT A SCOPE OF SERVICES Districtwide Storm Sewer Inspection 1.0 Objective: The Department desires to obtain services from the Vendor to inspect existing storm sewer systems. This includes the remote

More information

Project Type: Drainage and Storm Systems

Project Type: Drainage and Storm Systems 580 Dakin Avenue Box Culvert & Utility Improvements Project $944,952 Improvements to approx. 3,000 lf of existing 4'x5' concrete box culvert; clean interior, patch surface, fill joints/cracks; install

More information

PARKING LOT AND ROADWAY MAINTENANCE

PARKING LOT AND ROADWAY MAINTENANCE Village of Vernon Hills Community Development Engineering Division Phone 847-367-3704 Fax 847-367-2541 PERMIT APPLICATION PROCESS PARKING LOT AND ROADWAY MAINTENANCE Removal and replacement, concrete and

More information

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont.

17/03/2017 CONTENTS. Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation. Introduction CONTENTS. Introduction / Cont. E M I R A T E S Real Cases Studies in the Region for Pipelines Inspection & Rehabilitation i) Introduction Dubia, UAE 14 March 2017 Trenchless Middle East Faiz Alelweet & Eng. Hamza Ali Maintenance Manager

More information

LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS

LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS LANE ENTERPRISES, INC. STANDARDS & SPECIFICATIONS The following pages are an index of standards and specifications associated with Lane products. For quick reference purposes, Lane products are shown below

More information

ROAD CONDITION REPORT KALAMAZOO COUNTY MAY Prepared by the Kalamazoo Area Transportation Study (269)

ROAD CONDITION REPORT KALAMAZOO COUNTY MAY Prepared by the Kalamazoo Area Transportation Study (269) ROAD CONDITION REPORT KALAMAZOO COUNTY MAY 214 Prepared by the Kalamazoo Area Transportation Study (269) 343-766 info@katsmpo.org www.katsmpo.org TABLE OF CONTENTS Contents What is Asset Management? 2

More information

INSPECTION AND ACCEPTANCE FOR MAINTENANCE

INSPECTION AND ACCEPTANCE FOR MAINTENANCE Inspection and Acceptance For Maintenance Page 1 (Last revised 6/29/10) INSPECTION AND ACCEPTANCE FOR MAINTENANCE SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Acceptance Sewer As Built Drwg Example

More information

CIPP Lateral Renewal Connection System

CIPP Lateral Renewal Connection System Product Submittal Document Information CIPP Lateral Renewal Connection System ManEntry Lapel Liner Updated 6/12/14 Product Submittal Review ITEM 1. Manufacturer Company Name: LMK Technologies, LLC Contact

More information

DESIGN OF SEWER SYSTEMS

DESIGN OF SEWER SYSTEMS Wastewater Engineering (MSc program) DESIGN OF SEWER SYSTEMS Prepared by Dr.Khaled Zaher Assistant Professor, Public Works Engineering Department, Faculty of Engineering, Cairo University 1. Sewer Materials

More information

2013 PAVEMENT MANAGEMENT PLAN

2013 PAVEMENT MANAGEMENT PLAN BAKER CITY DEPARTMENT OF PUBLIC WORKS 2013 PAVEMENT MANAGEMENT PLAN Maintenance and Rehabilitation Planning 1655 1 st Street, Baker City, OR 97814 Phone: 541.523.6541 Fax: 541.524.2029 mowen@bakercity.com

More information

Electrical Work. NOV Embankments Over Swamps and Compressible Soils

Electrical Work. NOV Embankments Over Swamps and Compressible Soils GENERAL & CONSTRUCTION S OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 100 OPS General Conditions of Contract DIVISION 1 - GENERAL S 106 Electrical Work 120 180 The Use of Explosives General Specification

More information

ISO-9001:Quality Management System Progress Report

ISO-9001:Quality Management System Progress Report ISO-9001:Quality Management System Progress Report Department of Street Services May 2, 2007 Purpose Provide an overview of the Department of Street Services Provide background of ISO 9001 certification

More information

CHAPTER 6. Sanitary Sewer

CHAPTER 6. Sanitary Sewer CHAPTER 6 Sanitary Sewer A. Introduction All proposed developments, subdivisions, and buildings must have a properly designed and constructed sanitary sewer collection system. The system shall provide

More information

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002)

M I N N E S O T A D O T BID TABULATION SUMMARY JOB PAGE 1 ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BID TABULATION SUMMARY JOB 940094 PAGE 1 STATE PROJECT NO. 162-080-04 BIDS RECEIVED UNTIL 11:00 A.M. ON 03/16/94 MINNESOTA PROJECT NO.S: STP 5822(002) BETWEEN 2ND STREET NORTH AND 15 STREET NORTH IN ST.

More information

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions

Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions Private Side Sewer Inspections for Sources of Inflow & Infiltration Frequently Asked Questions As of Oct. 1, 2010, Tacoma property owners are required to have a certified inspection of their private side

More information

3/20/2016. Porous Pavement in Public ROW, Puyallup s Experience. Mark A. Palmer, P.E., LEED AP City Engineer, City of Puyallup

3/20/2016. Porous Pavement in Public ROW, Puyallup s Experience. Mark A. Palmer, P.E., LEED AP City Engineer, City of Puyallup Porous Pavement in Public ROW, Puyallup s Experience Mark A. Palmer, P.E., LEED AP City Engineer, City of Puyallup 1 What is Porous Pavement? Pavement section designed to pass stormwater through it and

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013

SPECIAL PROVISIONS - SP2014 BOOK Page 1 October 8, 2013 SPECIAL PROVISIONS - SP2014 BOOK Page 1 S-1 (2104) REMOVE AND REPLACE BITUMINOUS PAVEMENT (ADA) Always include SP2014-119 (PLANT MIXED ASPHALT PAVEMENT) or SP2014-121 (PLANT MIXED ASPHALT PAVEMENT FOR

More information

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction. Design Manual Chapter 3 - Sanitary Sewers 3C - Facility Design 3C-1 Facility Design A. Capacity of Pipe Pipe sizes 15 inches and smaller should carry the peak flow at a depth of no more than 0.67 of the

More information

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26)

Washington State Department of Transportation Case Study. Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Washington State Department of Transportation Case Study Guidelines for the Preservation of High-Traffic-Volume Roadways (R26) Background Stretching the time between major rehabilitation projects can save

More information

Highway 15 Project Hutchinson, MN

Highway 15 Project Hutchinson, MN Highway 15 Project Hutchinson, MN Adjacent Properties and Businesses Meeting Hutchinson Area Chamber of Commerce 1 Agenda Topic 1) Introduce the project scope 2) Project goals and benefits 3) Project timeline

More information

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT Adopted by City Council: May 21, 2007 X:\General Eng\DESIGN STANDARDS\Engineering Design Standards

More information

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS

MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS MFOA/AMCTO FALL SEMINAR SERIES TANGIBLE CAPITAL ASSETS ACCOUNTING TOPIC: VALUATION OF ROADS AND OTHER NETWORKS Presented By: Joe Lombardo, ASA Regional Vice President Suncorp Valuations Ltd. Overview of

More information

FLORIDA DEPARTMENT OF TRANSPORTATION

FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 RFP-DOT-15/16-4006PM FLORIDA DEPARTMENT OF TRANSPORTATION ADDENDUM NO. 1 DATE: December 2, 2015 RE: RFP Number: RFP-DOT-15/16-4006PM Description: Districtwide Storm Sewer Inspection QUESTION:

More information

PART 5 WATER SYSTEMS

PART 5 WATER SYSTEMS PART 5 WATER SYSTEMS Abbreviations and Symbols Plan 501 Abbreviations and symbols for water... 205 Concrete Boxes and Hardware 502 27" Frame and cover... 207 503 38" Frame and cover... 209 505 Concrete

More information

For Public Input Period

For Public Input Period 20142018 CAPITAL IMPROVEMENT PLAN ( Thousands) CITY OF HOUSTON STREET & TRAFFIC CONTROL Project: Kingwood Drive N100011 Loop 494 to Woodland Hills Project Description Project provides for the ROW acquisition,

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL Page 312 VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS-12-01 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the IL ROUTE

More information

Alligator Cracking. Light. Medium. High

Alligator Cracking. Light. Medium. High Alligator Cracking Description: A series of interconnecting cracks caused by fatigue failure on the asphalt concrete surface under repeated traffic loading. Causes: Loads in excess of the current pavement

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Basics and Benefits David R. Johnson, P.E. Regional Engineer Asphalt Institute Rocky Mountain Region djohnson@asphaltinstitute.org Presentation Outline Definition Requirements

More information

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA

SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA 0 0 0 0 SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA Mohamed Elfino, Ph.D., P.E. * Assistant State Materials

More information

Summary of the 2011 Changes

Summary of the 2011 Changes The following is a list of amendments to the Residential Site Improvement s, N.J.A.C. 5:21, adopted in 2011. The Notice of Adoption of these changes appeared in the New Jersey Register on May 16, 2011.

More information

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017

2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 Resurfacing Project Central Business District Informational Meeting June 13, 2017 2017 CBD Improvements Agenda Meeting Agenda Introduction Scope of Improvements Time frames for improvements May vary

More information

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING

EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: PLUMBING SECTION: SANITARY WASTE AND VENT PIPING ICC-ES Report PMG-1273 Reissued 01/2018 This report is subject to renewal 01/2019 EVALUATION SUBJECT: HAMMERHEAD CURED-IN- PLACE PIPE (CIPP) LINING SYSTEM DIVISION: 22 00 00 PLUMBING SECTION: 22 13 16

More information

Benefits of Pavement Preservation

Benefits of Pavement Preservation Benefits of Pavement Preservation Simone Ardoin Systems Preservation Engineer Administrator LA DOTD 2011 LA Transportation Conference Baton Rouge, Louisiana January 2011 What is PAVEMENT PRESERVATION?

More information

Maintaining your roads with Asphalt

Maintaining your roads with Asphalt Maintaining your roads with Asphalt Maintaining your roads with Asphalt Asphalt Overlays Rehabilitation of Concrete Roads Asphalt for Preventive Maintenance Asphalt Overlays Functional overlays Typically

More information

550 Surface Treatments

550 Surface Treatments Table of Contents 550 Surface Treatments... 550-1 550.1 Introduction... 550-1 551 Crack Sealing... 550-1 551.1 Project Selection... 550-1 551.2 Design Considerations... 550-1 552 Chip Sealing... 550-2

More information

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS

DIVISION 3 PAVEMENT (FLEXIBLE AND RIGID) CONSTRUCTION SPECIFICATIONS OPS GENERAL CONDITIONS OF CONTRACT NOV 2006 General Conditions of Contract DIVISION 1 GENERAL S OCT 92 102 Weighing of Materials NOV 2004 106 Electrical Work NOV 2003 120 The Use of Explosives APR 2006

More information

Flexible Pavement of Ohio

Flexible Pavement of Ohio Flexible Pavement of Ohio 49 th Annual Meeting & Equipment Exposition Wednesday, March 9, 2011 Doug Davis, P.E., P.S. Muskingum County Engineer Zanesville, Ohio Roads are living and breathing organisms.

More information

This policy will generally explain the following in regards to the City sewerage collection systems:

This policy will generally explain the following in regards to the City sewerage collection systems: CITY OF SACO POLICY ON SEWER AND STORMWATER BACK-UPS PURPOSE The purpose of this policy is to explain how and why sewer or stromwater backups occur, what to do in the event a homeowner has a backup, and

More information

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES 3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES All sanitary sewers shall be designed in accordance with these Design Standards, LBWD Rules and Regulations, and to accepted engineering principles. In

More information

SECTION FACILITY SANITARY SEWERS

SECTION FACILITY SANITARY SEWERS SECTION 22 13 13 FACILITY SANITARY SEWERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

INLINER LAY_InLiner Brochure_FA_ indd 1

INLINER LAY_InLiner Brochure_FA_ indd 1 INLINER LAY_InLiner Brochure_FA_010913.indd 1 Layne Inliner, LLC is the second largest cured-in-place pipe (CIPP) lining company in the United States. We began as the first U.S. licensee of the Inliner

More information

COUNTY HIGHWAY ASSET MANAGEMENT FOR ELECTED OFFICIALS

COUNTY HIGHWAY ASSET MANAGEMENT FOR ELECTED OFFICIALS COUNTY HIGHWAY ASSET MANAGEMENT FOR ELECTED OFFICIALS Richard Domonkos, Indiana LTAP Pat Conner, Indiana LTAP November 29 th 2017 Indiana s Internal Improvements Act of 1836 The law addressed issues of

More information

Pipe Bursting Services. pipe bursting. services

Pipe Bursting Services. pipe bursting. services Pipe Bursting Services pipe bursting services We have decades of experience solving the really big problems. Concern over the condition of the nation s infrastructure has caused government, municipalities,

More information

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL

Municipal Inspection and Construction Guidelines Section I Roadworks SECTION I ROADWORKS I-1 GENERAL I-1 GENERAL SECTION I ROADWORKS The Consultant Engineer is to monitor all specified asphalt, granular materials and sub-grade preparation to ensure all road and curb construction is undertaken as outlined

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES

SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL PRECAST CONCRETE MANHOLES Section SECTION 39 - MANHOLES TABLE OF CONTENTS 39-1 GENERAL... 39-1 39-2 PRECAST CONCRETE MANHOLES... 39-1 39-2.01 Precast Concrete Storm Drain Manholes... 39-1 39-3 SADDLE MANHOLES... 39-2 39-3.01 Saddle

More information

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK

TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK TOWN OF MOUNT PLEASANT WESTCHESTER COUNTY, NEW YORK COST EVALUATION FOR ROLLING HILLS AREA WATER MAIN EXTENSION PROFESSIONAL CONSULTING, LLC. Octagon 10, Office Center 1719 Route 10, Suite 225 Parsippany,

More information

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination

Highway Drainage 1- Storm Frequency and Runoff 1.1- Runoff Determination Highway Drainage Proper drainage is a very important consideration in design of a highway. Inadequate drainage facilities can lead to premature deterioration of the highway and the development of adverse

More information

Pavement Maintenance Best Practices. Thomas J. Wood

Pavement Maintenance Best Practices. Thomas J. Wood Pavement Maintenance Best Practices Thomas J. Wood Agenda Why pavement maintenance / preservation is important Dealing with cracks When to apply a surface treatment Fog Sealing Micro Milling UTBWC Thin

More information

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan

ODOT ADA Program 10/31/2017. Recent ADA outcomes. What you need to know. Settlement Agreement approved. Updated Transition Plan Recent ADA outcomes What you need to know ODOT ADA Program Lisa Strader, ODOT ADA Program Manager Settlement Agreement approved Updated Transition Plan What does it mean? Public Transportation Advisory

More information

DIVISION 5 STORM DRAINAGE CRITERIA

DIVISION 5 STORM DRAINAGE CRITERIA DIVISION 5 STORM DRAINAGE CRITERIA Section 5.01 GENERAL The following storm drainage design criteria shall apply to all storm drainage designs in the City. Additional design criteria are specified in the

More information

Liquid Road Bituminous Surface Treatment for Parking Lots

Liquid Road Bituminous Surface Treatment for Parking Lots BEST PRACTICES FOR SEALCOATING Liquid Road Bituminous Surface Treatment for Parking Lots A Premium Surface Coating for Superior Durability, Protection and Beautification sealmaster.net (800) 395-7325 Copyright

More information

Introduction to Pavement Overlays

Introduction to Pavement Overlays Introduction to Pavement Overlays Course No: C02-046 Credit: 2 PDH J. Paul Guyer, P.E., R.A., Fellow ASCE, Fellow AEI Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

Cold Foam In-Place Recycling (CIR)

Cold Foam In-Place Recycling (CIR) Cold Foam In-Place Recycling (CIR) FONSECA/McELROY GRINDING CO., INC. Cold Foam CIR CIR Method/Foamed Asphalt Cold In-Place Recycling Foamed Asphalt Hot Bitumen Water Air Foamed Asphalt The larger surface

More information

Index. Composition and Order of Plan Set. Utility Plan... 5

Index. Composition and Order of Plan Set. Utility Plan... 5 City of Des Plaines Public Works and Engineering Department Revised-October 5, 2012 Index Composition and Order of Plan Set Title Page Number Cover Sheet... 1 Requirements for Site Development... 2 Grading

More information

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES

SECTION EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES SECTION 02221 EXCAVATING, BACKFILLING, AND COMPACTION FOR UTILITIES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 02200 - Earthwork. 2. 02660 - Water Systems. 3. 02720 - Storm Drainage System. 4.

More information

Village of Arlington Heights. Sewer Back-up Rebate Program

Village of Arlington Heights. Sewer Back-up Rebate Program Village of Arlington Heights Sewer Back-up Rebate Program (Including Enhanced Program Information) Updated: October 1, 2017 Village of Arlington Heights Building & Life Safety Department 33 S. Arlington

More information

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number)

ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / (Budget Account Number) EXHIBIT A CONTRACTOR'S COMPENSATION SCHEDULE FOR ENLOE CAMPUS STORM DRAIN AND STREET IMPROVEMENTS (Project Title) PROJECT NO. MAJGC / 50103-000-4150 (Budget Account Number) ITEM NO. P-S-F DESCRIPTION QTY

More information

CONCRETE PIPE JOINTS, YOUR BEST CHOICE

CONCRETE PIPE JOINTS, YOUR BEST CHOICE CONCRETE PIPE JOINTS, YOUR BEST CHOICE www.concretepipe.org FREQUENTLY ASKED QUESTIONS Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints.

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 02630 - STORM DRAINAGE PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

Task Order Authorization

Task Order Authorization Task Order Authorization Task Order Number: 6 Task Order Name: 2017 Small Drainage Program Hourly Rate: See attached Exhibit B Budget Not To Exceed: $79,795.00 This Task Order pertains to the On-Call Agreement

More information

Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager

Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager Association of State Floodplain Managers May 2, 2017 Rob Davis, P.E., ENVSP Flood Control System Program Manager 2008 vs. 2016 Cedar Rapids Population 130,000 Second largest city in Iowa Industrial roots:

More information

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS

CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS CHAPTER 10 PAVEMENT DESIGN AND REPORT TABLE OF CONTENTS Section Title Page 10.1 General... 10-1 10.1.1 Existing Streets...10-1 10.1.2 AASHTO Design...10-1 10.1.3 Pavement Type...10-1 10.1.4 Treated Subgrade...10-1

More information

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation

SECTION STORM DRAINAGE UTILITIES. B. Section : Site Restoration and Rehabilitation SECTION 33 40 00 STORM DRAINAGE UTILITIES 1. PART 1 GENERAL 1.1 RELATED WORK A. Section 31 23 00: Excavation and Fill B. Section 32 00 01: Site Restoration and Rehabilitation C. Special Conditions for

More information

ROOF REPORT 3130 TCHULAHOMA

ROOF REPORT 3130 TCHULAHOMA ROOF REPORT 3130 TCHULAHOMA MEMPHIS, TENNESSEE BUILDING OWNER: Memphis Shelby County Airport Authority BUILDING MANAGER: MSCAA SURVEY DATE: 6/12/17 BUILDING CONSTRUCTION COMPLETED: 1985 ROOF AREA (SF):

More information

Implementing Asset Management: WSDOT s Experience

Implementing Asset Management: WSDOT s Experience Implementing Asset Management: WSDOT s Experience 6 th National Conference on Transportation Asset Management Aaron Butters, P.E. Systems Analysis and Program Development Manager November 2, 2005 1 Highway

More information

بسم هللا الرحمن الرحيم

بسم هللا الرحمن الرحيم بسم هللا الرحمن الرحيم )ملحقات شبكة الصرف الصحي( Class Sewer Appurtenances- 3 rd Dr. Sataa Al-Bayati (10-11) 1. Manholes They are used for inspection & cleaning. They placed when: 1. Intervals between

More information

Construction Specification for Utility Adjustments

Construction Specification for Utility Adjustments Engineering & Construction Services Division Standard Specifications for Road Works TS 4.50 September 2017 for Utility Adjustments Table of Contents TS 4.50.01 SCOPE... 2 TS 4.50.02 REFERENCES... 2 TS

More information

SECTION 806 MANHOLE REHABILITATION

SECTION 806 MANHOLE REHABILITATION SECTION 806 MANHOLE REHABILITATION 806-1 DESCRIPTION: This specification consists of all work, materials, labor and equipment required for manhole rehabilitation for the purpose of eliminating infiltration

More information

MONROE STREET CONTRACT NO DATE: 12/21/17

MONROE STREET CONTRACT NO DATE: 12/21/17 Section B: Proposal Page 10701.0 - TRAFFIC CONTROL - LUMP SUM 1.00 $100,000.00 $100,000.00 $48,300.00 $264,800.00 10720.0 - TRAFFIC CONTROL SIGN - PORTABLE ARROW BOARD - DAYS 510.00 $15.00 $7,650.00 $10.00

More information

Concrete Pipe Joints Your Best Choice

Concrete Pipe Joints Your Best Choice Frequently Asked Questions Q. Are joints covered by National Standards? A. Yes. There are ASTM and AASHTO standards for concrete products joints. The various standards are discussed in this publication.

More information

Sandstone Curb Replacement Standards

Sandstone Curb Replacement Standards Sandstone Curb Replacement Standards Division of Infrastructure Management SCOPE OF CURB REPLACEMENT (Funding Dependent) Sandstone Curb Section I - Purpose: Sandstone curb may be replaced only if existing

More information

Information Bulletin:

Information Bulletin: Equipment Advisory Adv. No. 2015-020 1 Supersedes: 0 Issue Date: Aug 19, 2015 File: 1613.9.1 Information Bulletin: Duct Spacers and Warning Boards for PVC Duct evision Note evised text in this advisory

More information

Annual CSAH Needs Update for 2017

Annual CSAH Needs Update for 2017 Annual CSAH Needs Update for 2017 MnDOT - State Aid for Local Transportation CSAH Needs Unit These instructions provide guidance for updating CSAH Needs segments and project data using the SANeeds system.

More information

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc.

Protective Coatings for Underground Utility Concrete Structures. By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. Protective Coatings for Underground Utility Concrete Structures By: John E. Davis Inside Sales & Marketing Specialist: Sauereisen, Inc. As our cities and municipalities grow older, the utility and wastewater

More information

THE MUNICIPALITY OF SIOUX LOOKOUT

THE MUNICIPALITY OF SIOUX LOOKOUT THE MUNICIPALITY OF SIOUX LOOKOUT CONSULTANT TERMS OF REFERENCE TO PREPARE DETAILED DESIGN FOR PARK STREET LANE INFRASTRUCTURE UPGRADES IN URBAN SIOUX LOOKOUT RFP R013-2017 July 21, 2017 Terms of Reference

More information

ONE PIPE LENGTH MAX (REFER TO 1/4"/FT SLOPE (MIN) 5'-0" (MIN) OR 4" LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4"x6" REFER TO TYPICAL EXCAVATION,

ONE PIPE LENGTH MAX (REFER TO 1/4/FT SLOPE (MIN) 5'-0 (MIN) OR 4 LATERAL NOTE #1) INCREASER RIGHT-OF-WAY/ 4x6 REFER TO TYPICAL EXCAVATION, VENT CAP (MUSHROOM TYPE) SOLID CAP EXIST GRADE MIN BUILDING REFER TO NOTE #4 MIN CONCRETE SIDEWALK CURB OR EDGE OF SIDEWALK STREET CLEANOUT (REFER TO NOTE #3) VENT PIPE 4" PVC 6" PVC CLEANOUT CONCRETE

More information

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way

CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY. Guidance on restoration of City Rights-of-Way CITY OF TACOMA RIGHT-OF-WAY RESTORATION POLICY Guidance on restoration of City Rights-of-Way Public Works Department Directors Office 747 Market Street Suite 408 Tacoma, WA 98402 253-591-5525 Right-of-Way

More information

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General

DESIGN STANDARDS. Division 02 Existing Conditions- Site Work. General DESIGN STANDARDS Division 02 Existing Conditions- Site Work General I. This Division includes: A. Demolition B. Clearing and Grubbing C. Excavation, Backfill and Compaction D. Pavement Base E. Paving and

More information

Jacobi, Toombs, and Lanz, Inc.

Jacobi, Toombs, and Lanz, Inc. Area 5: Blackiston Mill Road at Dead Man's Hollow Flooding Assessment Jacobi, Toombs, and Lanz, Inc. This document summarizes an assessment of drainage and flooding concerns and provides recommendations

More information

on the eastbound side of Route 29). identified in the table.

on the eastbound side of Route 29). identified in the table. To: Jeannie Swim, Memo From: Ken Demmons, P.E. Project: Route 29 Bridge Replacement over Little Rocky Run Per plans received on January 23, 2012 CC: File Date: February 21, 2012 Job No: P2464 RE: Review

More information

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation

Lessons [being] learnt 2016 Flood in Cedar Rapids. Sandy Pumphrey Project Engineer II Flood Mitigation Lessons [being] learnt 2016 Flood in Cedar Rapids Sandy Pumphrey Project Engineer II Flood Mitigation 319 286 5363 s.pumphrey@cedar-rapids.org Agenda 2008 Flood Event 2016 Flood Event [Long Term] Flood

More information

Water supply components

Water supply components Water supply components Water sources structures (Dams, wells, reservoirs) Surface water Groundewater Pipelines from source Water treatment plant components Pumping stations Storage (elevated tanks) Distribution

More information

ASSET MANAGEMENT GUIDE

ASSET MANAGEMENT GUIDE ASSET MANAGEMENT GUIDE For Local Agencies in Indiana JUNE 2017 This Guide was developed for the Indiana LTAP by Applied Pavement Technology, Inc. 115 West Main Street Suite 400 Urbana, Illinois 61801 (217)

More information

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies

Sunnyside Heights (Grandview Heights Area #2) Neighbourhood Concept Plan (NCP) - Engineering Servicing and Financial Strategies CORPORATE REPORT NO: R236 COUNCIL DATE: November 15, 2010 REGULAR COUNCIL TO: Mayor & Council DATE: November 10, 2010 FROM: General Manager, Engineering FILE: 6520-20 (GH#2) SUBJECT: Sunnyside Heights

More information

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015

FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES. OTEC - October 27, 2015 FULL DEPTH RECLAMATION FOR CITIES AND COUNTIES OTEC - October 27, 2015 OVERVIEW Time + Traffic + Environment = Deterioration Temporary repairs include overlays or mill and fills to extend service life

More information

SECTION MEASUREMENT AND PAYMENT

SECTION MEASUREMENT AND PAYMENT SECTION 01025 - MEASUREMENT AND PAYMENT PART 1 - GENERAL 1.01. BASIS FOR MEASUREMENT AND PAYMENT Measurement and Payment will be made for only those items included in the Schedule of Unit Prices or Contract

More information

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES

GUIDANCE MEMO NO : GUIDANCE CRITERIA FOR THE SEPARATION OF WATER MAINS AND NON-POTABLE PIPELINES State of California Memorandum Department of Health Services Date: April 4, 2003 To: From: Subject: Regional and District Engineers David P. Spath, Ph.D., Chief (Original signed by Dave) Drinking Water

More information

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin

Overview. Preventive Maintenance Concepts. What are thin and ultra thin mixes. Experience in Michigan with ultra thin Overview Preventive Maintenance Concepts What are thin and ultra thin mixes Experience in Michigan with ultra thin Case Study- Washington County Thin mix overlays Preventive Maintenance The planned strategy

More information

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects

Town of New Tecumseth Engineering Design Criteria and Standards for Subdivisions and Capital Works Projects 2.0 ROADWAYS 2.1 Road Classification 2.1.1 Standard Drawing Classification All Road Widths and Road Allowances shall be designed in accordance with the most recent Town of New Tecumseth Standards: TNT.SD

More information

STANDARD SPECIFICATIONS DEPARTMENT OF PUBLIC WORKS

STANDARD SPECIFICATIONS DEPARTMENT OF PUBLIC WORKS SECTION 1 STANDARD SPECIFICATIONS DEPARTMENT OF PUBLIC WORKS C I T Y O F M A N T E C A S T A N D A R D S P E C I F I C A T I O N S I N D E X DESCRIPTION PAGE NO. DEFINITIONS AND TERMS...1 SECTION 10 -