EECS Electricity Domain Protocol. for FRANCE

Size: px
Start display at page:

Download "EECS Electricity Domain Protocol. for FRANCE"

Transcription

1 EECS Electricity Dmain Prtcl fr FRANCE Prepared by Pwernext SA Based n EECS Rules Release 7 v5 Release

2 EECS Dmain Prtcl Dcument Cntrl Versin Date Originatr Reviewers 1 08/05/13 Pwernext C Pley, R van Stein Callenfels 2 19/08/16 Pwernext K Verwimp, R van Stein Callenfels Versin Apprver Date Respnsibility Change Histry Versin Descriptin 1 First Dmain Prtcl 2 Update after Decree f 11 July 2016 Pwernext 2016 Page 2 f 39

3 EECS Dmain Prtcl Cntents A Intrductin... 5 B General... 5 B.1 Scpe... 5 B.2 Status and Interpretatin... 6 B.3 Rles and Respnsibilities... 6 C Overview f Natinal Legal and Regulatry Framewrk... 8 C.1 The EECS Framewrk... 8 C.2 Natinal Electricity Surce Disclsure... 9 C.3 Natinal Public Supprt Schemes C.4 EECS Prduct Rules C.5 Lcal Deviatins frm the EECS Rules D Registratin D.1 Registratin f an Accunt Hlder D.2 Resignatin f an Accunt Hlder D.3 Registratin f a Prductin Device D.4 De-Registratin f a Prductin Device D.5 Maintenance f Prductin Device Registratin Data D.6 Audit f Registered Prductin Devices D.7 Registratin Errr/Exceptin Handling E Certificate Systems Administratin E.1 Issuing EECS Certificates E.2 Prcesses E.3 Measurement E.4 Energy Strage (Including Pumped Strage) E.5 Cmbustin Fuels (e.g. Bimass) E.6 Cgeneratin Prductin Devices E.7 Frmat E.8 Transferring EECS Certificates E.9 Administratin f Malfunctins, Crrectins and Errrs E.10 End f Life f EECS Certificates Cancellatin E.11 End f Life f EECS Certificates Expiry E.12 End f Life f EECS Certificates Withdrawal F Activity Reprting F.1 Public Reprts F.2 Recrd Retentin F.3 Orderly Market Reprting Pwernext 2016 Page 3 f 39

4 EECS Dmain Prtcl G Assciatin f Issuing Bdies G.1 Membership G.2 Cmplaints t the AIB H Change Cntrl H.1 Cmplaints t Pwernext H.2 Disputes H.3 Change Requests Annex 1: Cntacts List Annex 2: Accunt Applicatin/Amendment Frm Annex 3: Device Registratin Frm Annex 4: Prductin/Cnsumptin Declaratin Annex 5: Cancellatin Statement Annex 6: Definitins Pwernext 2016 Page 4 f 39

5 EECS Dmain Prtcl A Intrductin The framewrk specified in the EECS Rules and the detailed prcedures and cnditins specified in this Dmain Prtcl have the main bjective f ensuring rbustness and transparency in the facilitatin f EECS Schemes fr all EECS Participants. A Dmain Prtcl prmtes quality and clarity, as it: makes lcal rules transparent; prvides clear infrmatin t all stakehlders (cnsumers, market parties, ther members, gvernment, the EU Cmmissin etc.); facilitates assessment f cmpliance and permissible variance frm the EECS Rules; facilitates audit; and translates lcal rules int a single frmat and language, supprting each f the abve. Imprtant cntact infrmatin is prvided in Annex 1. The bjective is t ensure an acceptable level f rbustness and transparency in the facilitatin f the EECS Electricity Scheme fr all Scheme Participants. B General B.1 Scpe B.1.1. This Dmain Prtcl sets ut the prcedures, rights and bligatins, which apply t the Dmain f France (metrplitan and verseas) and relate t the EECS Electricity Scheme as defined in the EECS Rules. B.1.2. Prductin Device qualificatin fr this Dmain will be determined by cnnectin t the electricity system f France (metrplitan and verseas) such that, in electrical terms, the Prductin Device is effectively lcated in France. B.1.3. Pwernext is authrised t Issue EECS Certificates relating t the fllwing EECS Prduct(s): EECS-GO, including EECS-GO-RES and EECS-GO-CHP, ICS. Pwernext SA has been appinted as Authrised Issuing Bdy and Cmpetent Bdy by a decree f the French Ministry f Eclgy, Sustainable Develpment and Energy dated December 19th 2012 and published n January 15th 2013 t act as Issuing Bdy fr EECS-GO. This designatin enters int frce n May 1st 2013 and shall be valid fr five years thereafter. As such it registers Prductin Devices, issues, transfers and cancels EECS-GO. Pwernext als acts as Registry Operatr. As such, it administrates the peratin f the EECS Registry within France. The Registry technical and peratinal supprt is exercised by Pwernext. Pwernext 2016 Page 5 f 39

6 EECS Dmain Prtcl B.2 Status and Interpretatin B.2.1. The EECS Rules are subsidiary and supplementary t natinal legislatin. B.2.2. The EECS Rules and its subsidiary dcuments are implemented in France in the manner described in this Dmain Prtcl. Any deviatins frm the prvisins f the EECS Rules that may have material effect are set ut in sectin C.5 f this dcument. The capitalised terms used in this Dmain Prtcl shall have the meanings ascribed t them in the EECS Rules except as stated in sectin C.5 f this dcument. B.2.3. This Dmain Prtcl is made cntractually binding between an EECS Participant and Pwernext by agreement in the frm f the Standard Terms and Cnditins. B.2.4. In the event f a dispute, the apprved English versin f this Dmain Prtcl will take precedence ver a lcal language versin. B.3 Rles and Respnsibilities B.3.1. The Authrised Issuing Bdy fr EECS-GO in France is Pwernext. Its rle is t administer the EECS Registratin Database and its interface with the AIB Cmmunicatins Hub. As Authrised Issuing Bdy, Pwernext is the Prductin Registrar that registers the Prductin Devices and as such, carries ut a systematic verificatin f each Prductin Device registered. In this rle, it is entitled t request assistance frm the Measurement Bdies, wh are the relevant Transmissin r Distributin System Operatrs, fr the verificatin f Prductin Devices. Accrding t Article R f the Energy Cde, the relevant Transmissin r Distributin System Operatr is bliged t answer such verificatin request frm Pwernext in due time. B.3.2. The Cmpetent Authrity fr EECS-GO in France is the French Energy Ministry. Its rle is defined by legislatin t be respnsible fr the peratin f fr EECS-GO in France. B.3.3. The Authrised Measurement Bdy are listed hereunder: RTE (Réseau de Transprt d Electricité) ERDF (Electricité Réseau Distributin de France) List f Lcal Distributin Cmpanies (Entreprises lcales de distributin en France ELD) available n the fllwing website : They are the bdies established under natinal regulatin t be respnsible fr the cllectin and validatin f measured vlumes f energy used in natinal financial settlement prcesses. B.3.4. Cntact details fr the principal rles and Issuing Bdy agents are given in Annex 1. B.3.5. The EECS Registratin Database perated by Pwernext can be accessed via the website Als, the Registry can be accessed via the website The sftware and database used fr the Pwernext registry was built and is being maintained in-huse and uses SQL server technlgy. B.3.6. The fllwing are valid EECS Prduct: Independent Criteria Scheme cmbinatins which can be Issued under this Dmain Prtcl: EECS Prduct EECS - GO EECS GO Independent Criteria Scheme ICS:TUVSUDGENEE (TÜV SÜD Industrie Service GmbH) Pwernext 2016 Page 6 f 39

7 EECS Dmain Prtcl EECS GO ICS:NATUREMADE (Naturemade) Pwernext 2016 Page 7 f 39

8 EECS Dmain Prtcl C Overview f Natinal Legal and Regulatry Framewrk C.1 The EECS Framewrk C.1.1. Fr France, the relevant lcal enabling legislatin is as fllws: The relevant EU legislatin is Directive n /EC f April 23 rd 2009 n the prmtin f the use f energy frm renewable surces. This EU Directive has been implemented int French law by Ordnnance n f September 14 th This Ordnnance intrduces new articles in the Energy Cde. The mechanism f Guaranties f Origin in France fr renewable energy and cgeneratin is implemented in the law by the article R314 f the French Energy Cde. It specifies the bligatin and pwers f the entity in charge f issuing, transferring and cancelling GOs. It als details hw the French GO mechanism is functining. Disclsure rules and bligatin are implemented in the law by the article R333 f the French Energy Cde mdified by the Decree n f July 11 th French Energy Cde is available n this website: 208&dateTexte= The main items are the fllwing: Accrding t Article L f the French Energy Cde, nly GOs can certify the rigin f the electricity prduced frm renewable surces in rder t prve t final cnsumers that subscribed t a green ffer the quantity f energy prduced frm renewable surces. Guarantees f Origin are issued fr net prductin n a mnthly basis. Guarantees f Origin may be issued within 5 mnths frm the end f the related prductin perid and expire after 12 mnths after the end f the related prductin perid. Article R details the GO recgnitin frm ther Eurpean cuntries. Unless Pwernext has well-funded dubts abut the accuracy, reliability r veracity f GOs frm anther Eurpean Cuntry, then Pwernext ntifies the French Ministry. The French Ministry then decides whether r nt t accept GOs frm this cuntry. The article R specifies that t prve the rigin f electricity cnsumed in respect f a calendar year, GOs must be used befre the 31 st March f the fllwing year. The Energy Cde is cmpleted by an Arrêté: Pwernext 2016 Page 8 f 39

9 EECS Dmain Prtcl Arrêté f Nvember 8 th 2007, prvides rules relating t the prductin that can be certified as energy prduced frm renewable surces and CHP surces. C.1.2. Pwernext has been prperly appinted as an Authrised Issuing Bdy fr EECS-GO under Arrêté f December 19th 2012, published n January 15 th 2013 which designates Pwernext as the Cmpetent Bdy fr issuing, transferring and cancelling GOs. C.2 Natinal Electricity Surce Disclsure C.2.1. Legislatin and regulatin: Article R f the French Energy Cde mdified by the Decree n f July 11 th 2016, describes the bligatin fr suppliers t disclse infrmatin t the final cnsumer regarding the electricity supplied. Suppliers have t indicate n their bill (r an attached dcument) and n any prmtinal dcument the share f the different primary energy surces that have been used t prduce the electricity sld. Suppliers als have t indicate infrmatin n the quantity f carbn dixide emissins and/r radiactive waste per kwh prduced frm these primary energy surces.the French residual mix published by Pwernext must be used by the supplier insfar as his supplier mix cnsists f untracked electricity. GOs are the nly accepted tracking mechanism that is recgnised with regard t electricity frm renewable surces. Accrding t Article L f the French Energy Cde, nly GOs can certify the rigin f the electricity prduced frm renewable surces in rder t prve t final cnsumers that subscribed t a green ffer the quantity f energy prduced frm renewable surces. Fr cnsumptin f year N, GOs must be cancelled befre 31 st March f year N+1. Article R f the French Energy Cde mdified by the Decree n f July 11 th 2016, ntifies that Pwernext is in charge f the disclsure f the French residual mix. It is published befre June 15 th f the fllwing calendar year. The calculatin methd is in line with the methd used by the AIB, in that manner, it prevents duble cunting f renewable energy surces. Article R f the French Energy Cde mdified by the Decree n f July 11th 2016, describes the bligatin fr suppliers t reprt t the French Ministry f Energy their supplier mix befre December 31 st f the fllwing calendar year. Agents frm the Ministry have the pwer t enquire in rder t verify disclsed data. The same regulatin applies t verseas territries (DOM-TOM). The nly exceptin is that ne residual mix is calculated per territry (see C.3.2.). C.2.2. Summary f the disclsure methdlgy and prcess: Fr all their green ffers, suppliers have the bligatin t use guarantees f rigin t certify the renewable rigin f the energy sld. The quantity f guarantees used ver a certain perid must be at least equal t the quantity f green energy sld. Furthermre, suppliers can use additinal guarantees in rder t increase the renewable share in their supplier mix. Pwernext 2016 Page 9 f 39

10 EECS Dmain Prtcl The regulatin requires suppliers t infrm the cnsumer f the rigin fr the electricity prvided. Fr standard ffers, the residual mix is used as a basis fr the calculatin f the supplier mix fr untracked electricity. C.2.3. Residual Mix: A residual mix is required t be calculated by the Registry Operatr. The methdlgy f calculatin is based n the Transactin based Eurpean Standard. The residual mix is published by the Registry Operatr befre the 15 th f June f the fllwing year. It is published n the fllwing website: Overseas are nt taken int accunt in the metrplitan residual mix. In case f GOs transactins in ne f these territries, a residual mix wuld als be calculated fr this territry. In the meantime, the residual mix fr each versea territry is equal t the prductin mix f the same territry. C.3 Natinal Public Supprt Schemes In France, different types f supprt schemes are in place. Prductin supprts France intrduced a feed-in tariff mechanism t supprt renewable energy thrugh the applicatin f article 10 f Law n f 10 th February 2000.Sme French renewable energy prducers (running wind farms, phtvltaic and ther types f prductin devices depending n their size) are guaranteed regulated feed-in tariff fr their utput, regardless market price. A few defined market participants are bliged t buy this electricity at this feed-in price and are then reimbursed by the French state. Regulated feed-in tariffs depend n the type f prductin devices cncerned and are published by arrêté that are revised peridically. Details n this mechanism can be fund n the ministry website (in French): Prducers selling their renewable utput under this scheme cannt apply fr the issuance f guarantees f rigin fr this utput; nly bligated buyers can d s. Prductin supprts n a specific prductin device are systematically indicated n each EECS-GO f this prductin device, alng with their duratin and amunt in eur. France intrduced a feed-in premium mechanism thrugh the applicatin f Decree n f 27 th May Prducers selling their renewable utput under this scheme cannt apply fr the issuance f guarantees f rigin fr this utput. The amunt f green electricity prduced under this scheme will be cunted in the residual mix. Investment supprts There exist varius investment supprt schemes in France at natinal level r reginal level. Investment supprts n a specific prductin device have t be indicated n each EECS-GO f this prductin device, alng with the amunt received. C.4 EECS Prduct Rules C.4.1. The EECS Prduct Rules as applied in France are set ut within sectins D and E f this dcument. Pwernext 2016 Page 10 f 39

11 EECS Dmain Prtcl C.5 Lcal Deviatins frm the EECS Rules D Registratin French legislatin differs frm the EECS Rules n the fllwing pints: - "A Registrant may request Pwernext t issue Guarantees f Origin. Such request must be submitted t Pwernext n later than five mnths after the end f the prductin perid. A Registrant cannt request the issuance f GOs fr prductin perids exceeding ne calendar mnth, unless the Output f a Prductin Device during a calendar mnth is less than ne MWh. In that case, such Output may be carried frward fr a perid f up t five mnths until the lwer limit f ne MWh is reached, and the prductin perid in the request may be extended accrdingly. - Pwernext shall issue a number f Guarantees f Origin equal t the amunt f electricity prduced during the prductin perid t which the request relates, runding dwn t whle MWh. Any remaining amunts f electricity shall nt be carried frward. - Accrding t Decree f 8th Nvember 2007, the prductin f renewable electricity frm a pumped strage hydr pwer plant fed by natural inflw as well as by pumping that can be subject t EECS-GO issuance is equal t the ttal electricity prductin frm the Prductin Device, minus energy cnsumed in pumping, assuming a nrmative yield f 70% fr pumped energy - Accrding t Decree f 8th Nvember 2007, the prductin f energy frm a municipal waste incineratin plant that can be subject t EECS-GO issuance is equal t 50% f the ttal electricity prductin frm the Prductin Device. - Accrding t Decree f 8th Nvember 2007, EECS-GO can be delivered t cmbined Prductin Devices prducing electricity bth frm bimass and cmbustin fuels ther than thse mentined in the paragraph abve, nly if their fractin f nnrenewable energy is less than 15% f the primary energy it cnsumes n a yearly average. If such is the case, then the part f electricity that is renewable and can be subject t EECS-GO issuance is equal t 85% f the whle electricity prduced by the Prductin Device. - The Pwernext Registry handles EECS-GO and EECS-GO certificates with an additinal ICS label that can be used in France, accrding t the French legislatin. Pwernext des nt accept Nn-Gvernmental Certificates. D.1 Registratin f an Accunt Hlder D.1.1. Applicatins Any legal persn wh is nt a member f the Assciatin f Issuing Bdies r such member s affiliate r agent can be a participant f the EECS Scheme. An applicatin t becme an Accunt Hlder is dne by cnnecting t the public website f the Issuing Bdy in the registratin sectin in rder t btain the registratin frms (such request can als be dne by phne r by regular mail). Pwernext sends the applicant the dcumentatin that must be filled in rder t becme an Accunt Hlder. These dcuments must be cmpleted and signed by the applicant and sent back t Pwernext. They include : The Standard Terms and Cnditins; (2 cpies) Pwernext 2016 Page 11 f 39

12 EECS Dmain Prtcl The admissin frm, including a specific questinnaire n the future activity f the Accunt hlder n the registry; (1 cpy) Identificatin infrmatin abut the applicant (registered ffice address and VAT number); A list f the senir managers and ther representatives with the pwer t sign all f the dcuments relating t the peratin f the registry (authrised signatries) A cpy f the annual reprt, cmpany registratin, articles f assciatin and the senir managers pwers, prepared in accrdance with the legislatin f the applicant s hme cuntry. The cmpleteness and the adequacy f the dcuments sent back t Pwernext by the applicant are then checked by the market peratins and market surveillance team f Pwernext, which assess whether the applicant can be accepted. Mrever: As the case may be, additinal dcumentatin may be required frm the applicant; Depending n the analysis f the cmpany, a risk prfile will be attached t it. If a cmpany raises awareness, a specific attentin will be paid t its actins n the registry; In case the market surveillance team has serius dubts regarding the applicant cmpany, it can alert the cmpetent authrities (Ministry r else). When the assessment f the applicatin is cmpleted by Pwernext and the applicatin has been accepted, Pwernext signs the Standard Terms and Cnditins and sends its cpy back t the applicant wh then becmes an Accunt Hlder. Alng with the Standard terms and Cnditins, Pwernext sends the Accunt Hlder the physical ID keys tgether with the lgin and passwrd which will be used t cnnect t the secure part f the website. Fr security reasns, the lgin and passwrd are sent separately. Pwernext will answer any applicatin request as quickly as pssible. It shuld take place within ne mnth after receipt f the cmplete necessary data fr applicatin. Tariff f services can be fund n ur website: D.1.2. Maintenance f standing data An Accunt Hlder must ntify Pwernext withut any delay f any upcming changes that will result, r unplanned changes that have resulted, in the infrmatin recrded in the EECS registry in relatin t the Accunt Hlder becming inaccurate. The Accunt Hlder himself is respnsible fr keeping the Accunt Hlder infrmatin recrded in the EECS registry accurate. This can be dne by lgging nt the Registry and nly by an accredited user f the Accunt Hlder. Mrever, any change dne this way will ultimately be validated by Pwernext. D.2 Resignatin f an Accunt Hlder In accrdance with the Standard Terms and Cnditins, the Accunt Hlder must ntify Pwernext f its intent t clse its Accunt in written frm. Such request shall be effective ne (1) mnth after receipt by Pwernext. Pwernext 2016 Page 12 f 39

13 EECS Dmain Prtcl Once an accunt clsed, the accunt hlder has n lnger access t the registry. Any EECS-GOs remaining in the Accunt f the EECS registry at the time f lcking will remain there until being expired. Outstanding charges are still due accrding t the invices received. D.3 Registratin f a Prductin Device D.3.1. Prcesses: In rder t issue EECS-GOs, the Accunt Hlder must register prductin devices accrding t the prcess described in the chart hereunder and described in the fllwing paragraphs. Registratin f a Prductin Device 1. The Accunt Hlder cnnects t its persnal secure accunt n the Registry and g t the «Prductin Device» sectin. It fills in the Prductin registratin Frm. 2. The Accunt Hlder sends the dcuments needed abut the Prductin Device. 3. Autmatic and peratinal check: are the infrmatin n the Prductin Device adequate and sufficient in rder t prve its cmpliance with EECS rules and the French Dmain Prtcl? 4. Further infrmatin are asked by Pwernext t the Accunt Hlder. 5. An peratr frm Pwernext pre-validates the prductin device in the database and send the relevant data t the relevant TSO/DSO. Accunt Hlder N Pwernext A (cmpleteness) M (Cherence) 3 OY 5 Relevant Transmissin / Distributin System Operatr N 6 6. Check by the TSO/DSO: are the data prvided n the Prductin Device crrect? 7. The Prductin Device is registered in the Pwernext Registry and activated. 7 A (Cmpleteness) Y O Reminder frm Pwernext 8. The accunt hlder is ntified by Pwernext 8 D.3.2. Applicatin A: Autmatic check f cmpleteness, but the prcess is manual fr the Accunt Hlder/TSO Prductin Devices can nly be registered if they meet the Prductin Device Qualificatin Criteria fr EECS-GO and the French relevant legislatin. T be qualified, Prductin Devices must: M: The cherence f the infrmatin is manually checked by Pwernext be lcated in France (metrplitan r verseas), be capable f prducing electricity using renewable energy surces r cgeneratin, and be equipped with an electricity-metering device capable f measuring the electricity prduced. Only the wner f a Prductin Device, a cmpany duly authrised by the wner f a Prductin Device, r an bligated energy purchaser identified in the French feed-in tariffs scheme (as defined in article L , L et L f the French cde de l énergie ) may register a Prductin Device, which is lcated in France in the EECS registry. A prducer wner f a prductin device that satisfies the criteria in the paragraph abve and which prduces electricity sld t bligated energy purchasers at the French feed-in Pwernext 2016 Page 13 f 39

14 EECS Dmain Prtcl tariff price cannt register its prductin device in rder t issue guarantees f rigin; nly the bligated purchaser can d s. In rder t register a prductin device, the fllwing prcedure applies: The Accunt Hlder must cnnect n its persnal secure accunt n the Registry and g t the Prductin Devices sectin. The Accunt Hlder must fill in the Prductin Device electrnic registratin frm (see Annex 3) and send the dcumentatin requested abut the Prductin Device, in accrdance with the Prductin Device Qualificatin Criteria fr EECS-GO and the French relevant legislatin. This dcumentatin cmprises the infrmatin hereunder. This list might evlve depending n Prductin Device Qualificatin Criteria fr EECS-GO and the French relevant legislatin pssible evlutins. Prductin device: name, address/lcatin, start date, cmmissining date, installed capacity, the types f supprt (investment and/r prductin supprt, as apprpriate), wner, Accunt Hlder, transmissin r distributin system peratr n which the Prductin Device is cnnected, applied EECS Schemes, references f the explitatin authrizatin, references f the grid access cntract, Cdes f all pssible fuels which can be cnverted int electricity by the Prductin Device accrding t the fuel cdes in AIB EECS fact Sheet, Technlgy cde f the Prductin Device accrding t technlgy cdes in AIB EECS Fact Sheet 5, Specificatin whether the Prductin Device is eligible fr any kind f supprt scheme (including investment supprt and feed-in tariffs), crrespnding amunt and perid f the supprt scheme. In case f feed-in tariffs, reference t the purchasing bligatin cntract, Additinal fields can be required fr specific Prductin Devices such as cgeneratin devices. The attentin f the Accunt Hlders is drawn t the fact that sme f the required infrmatin n the Prductin Device will nt appear n the EECS- GO. In sme cases (e.g. the reference f the declaratin f cnnectin f the prductin device t the grid r the amunt and duratin f supprt schemes), the data will be indicated n the French EECS-GO but might be lst when the EECS-GO is exprted. An autmatic check is carried ut in rder t ascertain whether the frms have been crrectly filled in. Operatrs frm Pwernext will then check whether the infrmatin given by the Accunt Hlder is in the right frmat and cherent. If the infrmatin given t Pwernext is adequate, data are sent t the relevant Transmissin r Distributin System Operatr in rder fr it t check them subject t the cnditins f the cntract signed with each f them. The relevant Transmissin r Distributin System Operatr checks the data required based n the infrmatin it pssesses n the Prductin Device and sends the utcme f this check t Pwernext. If the check is psitive, the Accunt Hlder is ntified when its Prductin Device is activated. A unique number is assciated with the prductin device, accrding t the AIB numbering. If the check is negative, Pwernext ntifies the Accunt Hlder and the Prductin Device is nt activated. A Prductin Device is registered fr three years. Pwernext 2016 Page 14 f 39

15 EECS Dmain Prtcl In case the Accunt Hlder r its affiliate is nt the wner r the sle wner f the Prductin Device, it must include in the applicatin Either a pwer(s) f attrney signed by the (ther) wner(s) f the Prductin Device, Or the Cntract f Purchasing Obligatin that links the prducer and the Accunt Hlder. Metering data f each Prductin Device are sent as described in E.2. Tariffs fr registering a Prductin Device are disclsed n the Pwernext website D.3.3. Prductin devices lcated n brder between dmains Fr plants being lcated n brder with ther dmains, Pwernext will ntify the Cmpetent Bdy fr EECS-GO in the respective dmain in rder t agree n the pssibilities t register the Prductin Device. Such agreement shall particularly ensure that duble issuing f EECS-GO is excluded. D.4 De-Registratin f a Prductin Device The Registrant must ntify Pwernext in the GO registry f its intentin t unregister a Prductin Device via written frm. The applicant must warn Pwernext at least 15 business days in advance f its intentin f de-registering a prductin device. Pwernext will answer the request by deactivating the prductin device in the shrtest delay and at maximum in a ne-mnth perid f time. Re-registratin requirements are similar t the registratin requirements described in D.3.2. Outstanding charges are still due accrding t the invices received. D.5 Maintenance f Prductin Device Registratin Data D.5.1. The Registrant f a Prductin Device must ntify Pwernext f any upcming planned changes that will result, r unplanned changes that have resulted, in: the infrmatin recrded in the EECS registry in relatin t the Prductin Device becming inaccurate; r the Qualificatin Criteria fr the EECS Prduct ceasing t be satisfied with respect t that Prductin Device. The Registrant ntifies Pwernext f such changes by making the necessary amendments t Prductin Device infrmatin in the EECS registry. On receipt f a change f details ntificatin (fllwing an inspectin r therwise), Pwernext will evaluate the impact f the changes n the Prductin Device Qualifying Criteria and respnd t the Registrant within sixty (60) days specifying the decisin taken. Pwernext may respnd t the changes by apprving r disapprving them in the EECS registry, r by requiring verificatin by the relevant Transmissin r Distributin System Operatr. If Pwernext des apprve the change, the prductin device is mdified with an effective date assciated t the change. Certificates issued after the effective date will cntain the new characteristics f the prductin device. Pwernext 2016 Page 15 f 39

16 EECS Dmain Prtcl When Pwernext becmes aware that a Prductin Device n lnger fulfils, r will n lnger fulfil, the Prductin Device Qualificatin Criteria, the EECS registry recrd fr that Prductin Device will be updated t shw that the Prductin Device n lnger qualifies fr EECS-GO Prduct Certificates with effect frm: the date n which such planned changes are due t cme int effect, when such change has been planned and ntified in advance; r as sn as reasnably practicable after becming s aware, in case f ther changes. D.5.2. The registratin f a Prductin Device expires after three years. The Registrant must cnfirm the re-registratin f the Prductin Device befre expiry. D.6 Audit f Registered Prductin Devices D.6.1. Re-registratin f the Prductin Device every 3 years Pursuant t article R f the Energy Cde, Pwernext shall verify the accuracy f the data given in the requests fr issuance that it has received with the supprt f Transmissin System Operatrs and Distributin System Operatrs if needed. When re-registering a Prductin Device, Pwernext will verify tgether with the Accunt Hlder that the data n the Prductin Device have nt changed. In case a change is reprted, the relevant Grid Operatr will be cntacted. D.6.2. Regular check f the Prductin Devices with the Transmissin and Distributin System Operatrs At the regular meetings between Pwernext and the Grid Operatrs wh check the reliability f the Prductin Device data and the Issuance data, a systematic check is dne t verify the validity f the data registered n the Prductin Devices. In case f a change, the prcedure described in D.5.1. will apply. D.6.3. On-site audits are perfrmed t a sample f prductin devices by Pwernext Registered Prductin Devices which have been used fr requests r prcurement f EECS- GOs can be subject t n-site audits within the three years fllwing their registratin in the database f the Registry. This prcess is distinctive as it is mstly managed utside the sftware tl and implicates bth functinal peratrs and auditrs. The prcess described hereunder targets the cases where the auditr: belngs t the Pwernext emplyees authrized by reginal prefects fr this task r is a subcntractr chsen by Pwernext and whse emplyees have been authrized by reginal prefects fr this task. Audits are carried ut accrding t a prcedure, methds and evaluatin criteria which are transparent and in cnfrmity with Article R f the Energy Cde. This prcess is described hereunder: A ntificatin is sent t the Accunt Hlder (and t the wner f the Prductin Device if the Accunt Hlder has a pwer f attrney). The Accunt Hlder (and the wner f the Prductin Device if applicable) answer n its availability. Pwernext 2016 Page 16 f 39

17 EECS Dmain Prtcl The audit is carried ut by the agent wh verifies the accuracy f the data cmmunicated t the Registry. A specific attentin is drawn t the Prductin Device Diagram, the place f the Meters and the calculatin f the net energy certified. The result f the audit is cmmunicated t the peratinal team f the Registry. If the result f the audit is psitive, the peratr indicates that the Prductin Device has been audited and is in cnfrmity with the registratin. The Accunt Hlder is ntified f this. A reprt stating the date, lcatin and nature f the bservatins made and testifying f the cnfrmity with the declaratin made n the Registry is sent t the Accunt Hlder and t the reginal prefect. If the result f the audit is negative, the peratr indicates n the Registry interface that the Prductin Device has been audited and is nt cmpliant. The Accunt Hlder is ntified f this and the Prductin Device is deactivated. If it appears that EECS-GOs were inaccurately issued as a result f this errr, then the prcedure described in E.9 may apply. A reprt stating the date, lcatin and nature f the bservatins made and testifying f the nn-cnfrmity with the declaratin made n the Registry is sent t the Accunt Hlder and t the reginal prefect. After deactivatin f the Prductin Device, the Accunt Hlder cannt request issuance f EECS-GOs fr this Prductin Device. In rder fr the Prductin Device t be reactivated, the Accunt Hlder will have t ask fr an additinal audit, which will be inviced t it. The Prductin Device will be reactived nly if the new audit is psitive. All the Prductin Devices registered can be subject t n-site audits. Peculiar attentin will be paid t the Prductin Devices whse EECS-GO s issuance fllws particular rules such as, fr instance, pumped strage hydr pwer plants, bimass prductin devices, cgeneratin devices, prductin devices cmbining bth renewable and nn-renewable surces. Fr n-site audits f Prductin Devices carried ut in accrdance with Article R f the Energy Cde, the Prductin auditrs can either be emplyees frm Pwernext authrized by reginal prefects r subcntractrs appinted by Pwernext whse emplyees have been authrized by reginal prefects. Fr cnsumptin declaratin apprvals in case f bimass cmbined prductin devices and cgeneratin plants, Prductin Auditrs must be independent frm the wner f the prductin device and need t be accredited by Pwernext; they d nt hwever need t be authrized by reginal prefects. The prcess f accreditatin is the fllwing: the legal entity (r the persn) wanting t becme a Prductin Auditr needs t apply fr such a rle, by sending t Pwernext a frmal letter alng with its credentials. On the basis f this applicatin, Pwernext will decide whether r nt t apprve such applicant. The answer will be given within tw mnths fllwing the receipt f the letter by Pwernext. Frm its date f registratin, and during the three years fllwing this registratin, the Prductin Device can be audited n-site by authrized agents. D.6.4. Accunt Hlders and wners f Prductin Devices agree t grant access t Pwernext agents fr n-site audits. Refusal t permit access shall be cnsidered a breach f the Standard Terms and Cnditins. D.6.5. If an inspectin identifies material differences frm the details recrded n the EECS Registratin Database, the Registrant must re-apply fr registratin f the Prductin Device. Pwernext 2016 Page 17 f 39

18 EECS Dmain Prtcl D.7 Registratin Errr/Exceptin Handling D.7.1. Any errrs in EECS Certificates resulting frm an errr in the registered data f a Prductin Device will be handled in accrdance with sectin E.9. D.7.2. Errr handling If Pwernext detects errrs in the Accunt Hlder infrmatin, it will ntify the Accunt Hlder in rder t ensure that the errr is rectified by the Accunt Hlder. If expressly authrised by the Accunt Hlder, Pwernext may rectify the errr itself. If Pwernext detects an errr in the infrmatin f a Prductin Device in the EECS Registry, the fllwing prcedure is applied: If the errr is minr and that the Prductin Device is still eligible fr EECS- GOs issuance, then Pwernext will ntify the Accunt Hlder in rder t ensure that the errr is rectified by the Accunt Hlder. If expressly authrised by the Accunt Hlder, Pwernext may rectify the errr itself; If the errr means that the Prductin Device ceases t be eligible fr EECS- GOs issuance, then the Prductin Device is deactivated. Fr the Prductin Device t be reactivated, the Accunt Hlder will have t ask fr an nsite audit, as described in Sectin D.6, which will be inviced t it. If it appears that EECS-GOs were inaccurately issued as a result f this errr, then the prcedure described in E.9 may apply. When apprpriate, Pwernext will reprt t the AIB in respect f the Sectin F.3.2. Pwernext 2016 Page 18 f 39

19 EECS Dmain Prtcl E Certificate Systems Administratin E.1 Issuing EECS Certificates EECS-GOs can be issued: in respect f the qualifying energy utput f such a Prductin Device during any perid in which it was registered in the Pwernext registry fr the purpse f the EECS-GO Scheme; and fr a prductin perid f 1 mnth, it can be f a lnger perid in case f very small plants if the mnthly prductin is fewer than 1MWh. Even in that case, they can never exceed 5mnths;and when the issuing request fr a specific prductin was submitted nt later than 5 mnths after end f the prductin perid; and t an Accunt Hlder wh des nt have any utstanding fees payable t Pwernext in cnjunctin with EECS-GOs; and Each unit f qualifying energy utput can nly be certified nce fr electricity disclsure. One EECS-GO is issued fr each whle ne MWh f qualifying net energy f the Prductin Device. The EECS-GOs shall be issued in such frmat as may be determined by AIB frm time t time and including the details in accrdance t the relevant French law and the AIB standards. Pwernext 2016 Page 19 f 39

20 EECS Dmain Prtcl E.2 Prcesses Issuance f EECS-GOs is dne accrding t the prcess described in the chart and in the paragraphs hereunder. Issuing f Guaranteesf Origin 1. The Accunt Hlder cnnects t its persnal secure accunt n the Registry and g t the «Issuing» sectin and select a Prductin Device already registered. It fills in the Issuance Frm. 2. The Accunt Hlder sends the relevant dcuments if required. 3. Autmatic and peratinal check: are the infrmatin n prductin adequate and sufficient in cherent in rder t issue the Guarantees f Origin? Accunt Hlder 1 2 N Pwernext A (Cmpleteness) M (Cherence) 3 Relevant Transmissin / Distributin System Operatr 4. Further infrmatin are asked by Pwernext t the Accunt Hlder. 4 Y O 5. An peratr frm Pwernext pre-validates the issuance in the database and sends the relevant data t the relevant TSO/DSO. 6. Check by the TSO/DSO: d the metering data prvided by the Accunt Hlder crrespnd t the metering data? 7. The EECS-GO is issued by Pwernext. 5 7 A N Y O 6 Reminders by Pwernext 8. The Accunt Hlder is ntified by Pwernext 8 A: Autmatic check f cmpleteness, but the prcess is manual fr the Accunt Hlder/TSO M: The cherence f the infrmatin is manually checked by Pwernext Once a Prductin Device has been registered and activated, the Accunt Hlder t which the Prductin Device relates can request the issuance f EECS-GOs fr electricity prductin starting at the latest f the fllwing date: when the Prductin Device has been cmmissined r If applicable, when the Prductin Device has been transferred t a new Accunt Hlder (either as wner r as beneficiary f a pwer f attrney)r if applicable, when the Prductin Device has left r entered the feedin tariffs mechanism (purchasing bligatin system). 5 mnths befre the date f the issuing request in respect with the sectin E.1. In rder t btain this issuance, the Accunt Hlder cnnects t its persnal secure accunt n the Registry in the issuance sectin. It is then requested t fill in an electrnic frm with the relevant infrmatin fr such issuance: Start date and end date f the prductin perid: this perid shall cincide with measurement data (in general, perids shuld be ne mnth r a multiple f a mnth; except in specific cases such as the first GO issued frm the Prductin Device cncerned) Net prductin f renewable electricity injected t the grid fr the relevant perid. Fr energy strage Prductin Devices, fr prductin devices using cmbustin fuels and fr cgeneratin, net renewable Pwernext 2016 Page 20 f 39

21 EECS Dmain Prtcl electricity prduced shuld respectively be cnsidered such as described in E4, E5 and E.6. Net prductin means the electricity prduced by the Prductin Device excluding cnsumptin f auxiliary devices f the Prductin Device r any prductin which cannt be subject t EECS-GOs. The amunt f the prductin cncerned shall cincide with measurement data frm the Transmissin r Distributin System Operatr. These data will be checked by the relevant Transmissin r Distributin System Operatr. Additinal fields can be required fr specific Prductin Devices such as cgeneratin devices. An autmatic check is carried ut by Pwernext in rder t ascertain whether the initial infrmatin given by the applicant at this stage is sufficient and adequate, including a first check n the amunt f net prductin declared by the Accunt Hlder cmpared t the installed capacity f the Prductin Device and a check n the validity f the EECS-GO (dates f the issuance request accrding t E.1). The cmpleteness and the adequacy f the dcuments sent t Pwernext by the Accunt Hlder are then checked by Pwernext. As the case may be, the Accunt Hlder may als be requested t send additinal infrmatin. Specifically in case f cgeneratin r cmbined Prductin Devices, additinal dcuments are required in rder t check the additinal data required as mentined ine5 and E6. If the utcme f this check is negative, the Accunt Hlder is required t mdify its request. In case the check is psitive, tw different prcesses will be implemented t have the data checked by the relevant Measurement Bdies depending n the cntract signed between Pwernext and the relevant Measurement Bdy: Systematic check prcess: The Measurement Bdy sends the net prductin data based n the metering data it pssesses n the Prductin Device regarding this prductin perid. The EECS-GO is issued depending n the net prductin and the Accunt Hlder is ntified. Regular check prcess: In this case, the Accunt Hlder is required t send the metering data crrespnding t the EECS-GO t be issued. This dcument is checked by Pwernext tgether with metering data prvided by the Measurement Bdy. If the check is psitive, the EECS-GO is issued and the Accunt Hlder is ntified. Several times a year n a regular basis, (t be defined in the cntract with the Measurement Bdy), data n EECS-GO issued are then recnciled by the Measurement Bdy. The EECS-GO wuld then be crrected afterwards accrding t the methdlgy described in E.9 if any errr was detected by the Measurement Bdy during ne f its regular checks. Pwernext will answer any issuing request as quickly as pssible. Accrding t Article R f the Energy Cde, issuing shuld take place within thirty (30) days after receipt f the cmplete necessary data fr issuance. In case f EECS-GO issuance frm a new Prductin Device r frm a Prductin Device cnnected t a Distributin System Operatr, this delay is increased up t sixty (60) days. Pwernext 2016 Page 21 f 39

22 EECS Dmain Prtcl E.3 Measurement.The EECS GOs are awarded fr the amunt f electricity prductin frm renewable resurces r High Efficient Cgeneratin, as described in E2. Frequency f measurement: Fr installatin f less than 36kVA, Distributin System Operatrs send metering data t prducers nce every tw mnths, Fr installatins f mre than 36kVA, Distributin and Transmissin System Operatrs send metering data n a mnthly basis. The verificatin is carried ut n the net prductin f renewable electricity injected t the grid fr the relevant perid. Fr energy strage Prductin Devices, fr cmbined prductin devices using bth cmbustin fuels and fr cgeneratin, net renewable electricity prduced shuld respectively be cnsidered such as described ine.4, E.5 and E.6. Fr any such electricity, n EECS-GOs will be issued. This must ensure that the certificates issued based n the Prductin Declaratin can prvide unique and exclusive evidence f the prductin f electricity frm particular energy surces. The metering devices in place shuld crrespnd t the technical standards apprved by CRE (Cmmissin de Régulatin de l Energie) and defined by the different Transmissin System Operatrs and Distributin System Operatrs in the respective dcuments cnditins techniques d accès aux réseaux publics d électricité, available n the fllwing website The verificatin f the measurement is carried ut as described in paragraph E.2. The registrant is respnsible fr the measurement data it sends t Pwernext. E.4 Energy Strage (Including Pumped Strage) Accrding t Decree f 8th Nvember 2007, the prductin f renewable electricity frm a pumped strage hydr pwer plant fed by natural inflw as well as by pumping that can be subject t EECS-GO issuance is equal t the ttal electricity prductin frm the Prductin Device, minus energy cnsumed in pumping, assuming a nrmative yield f 70% fr pumped energy Metering data f bth the prductin and the pumping cnsumptin must be sent t Pwernext. E.5 Cmbustin Fuels (e.g. Bimass) Accrding t Decree f 8th Nvember 2007, implementing Article R314 f the Energy Cde, the prductin f energy frm a municipal waste incineratin plant that can be subject t EECS-GO issuance is equal t 50% f the ttal electricity prductin frm the Prductin Device. Accrding t Decree f 8th Nvember 2007, implementing Article R314 f the Energy Cde, EECS-GO can be delivered t cmbined Prductin Devices prducing electricity bth frm bimass and cmbustin fuels ther than thse mentined in the paragraph abve, nly if their fractin f nn-renewable energy is less than 15% f the primary energy it cnsumes, n a yearly average. If such is the case, then the part f electricity that is renewable and can be subject t EECS-GO issuance is equal t 85% f the whle electricity prduced by the Prductin Device. This yearly average is calculated n the basis f the previus calendar year r n the basis f the expected values fr new prductin devices. In rder t prve this data, a specific cnsumptin declaratin reviewed by a Prductin Auditr has t be sent t Pwernext. This dcument has t be Pwernext 2016 Page 22 f 39

23 EECS Dmain Prtcl sent t Pwernext n a yearly basis within ne mnth after the end f each calendar year. This dcument als needs t be sent when the prductin device is registered fr the first time. The Prductin Auditr shall be preliminarily accredited by Pwernext fllwing the prcess described ind.6.3.depending n the results f the auditr s statement and taking int accunt Decree f 8th Nvember 2007,implementing Article R314 f the Energy Cde, Pwernext will decide whether r nt t issue EECS-GO fr the fllwing calendar year. The EECS-GOs issued frm such Prductin Devices indicate the fractin f nnrenewable energy prduced n the primary energy the Prductin Device cnsumes. E.6 Cgeneratin Prductin Devices The way t calculate the amunt f prductin n which EECS-GOs can be issued is fully in line with Directive n 2012/27/EC. Accrding t Decree f 8 th Nvember 2007,implementing Article R314 f the Energy Cde, amngst cgeneratin Prductin Devices, nly thse justifying a rati f mre than 10% f primary energy saving calculated accrding t Annex I and II f the herementined Decree can issue guarantees f rigin. Accrding t the same Decree, a cgeneratin Prductin Device, the installed capacity f which is belw 1 MW, can be cnsidered eligible t the issuance f guarantees f rigin if their energy savings are higher than 0%, as ppsed t the 10% limit set fr larger devices. Accrding t Decree f 8 th Nvember 2007, implementing Article R314 f the Energy Cde, the prductin f electricity frm cgeneratin that can be subject t GOs is equal t: the entire electricity prductin in case the prductin device has a glbal annual yield f mre than 80% and is a cmbined cycle gas turbine with heat recvery r a steam turbine with cndensatin turbine (clsed cycle), the prductin device has a glbal annual yield f mre than 75% and is anther type f cgeneratin plants (accrding t EECS types f prductin devices fact sheets) the quantity f heat issued frm the prductin device multiplied by the pwer t heat rati, as calculated in annex I and II f Decree f 8 th Nvember 2007, implementing Article R314 f the Energy Cde. In rder t facilitate calculatin f the number f MWh t be issued, Pwernext asks the Accunt Hlder t use the Excel file AIB CHP-GO mdel and t send it back t the market peratins team f Pwernext. Specific attentin will be paid t thse prductin devices, in particular fr in situ audits. In rder t prve this data, a specific cnsumptin declaratin reviewed by a Prductin Auditr has t be sent t Pwernext. This dcument has t be sent t Pwernext n a yearly basis within ne mnth after the end f each calendar year. This dcument als needs t be sent when the prductin device is registered fr the first time. The Prductin Auditr shall be preliminarily accredited by Pwernext fllwing the prcess described ind.6.3. Depending n the results f the auditr s statement and taking int accunt Decree f 8th Nvember 2007, implementing Article R314 f the Energy Cde, Pwernext will decide whether r nt t issue EECS-GO fr the fllwing calendar year and hw many. Accrding t Article R f the Energy Cde, additinal infrmatin are needed fr the issuance f GOs fr high-efficient cgeneratin: The thermal capacity f the prductin device The lwer calrific value f fuel used Pwernext 2016 Page 23 f 39

24 EECS Dmain Prtcl The efficiency f the prductin device The quantity f heat prduced tgether with the electricity during the prductin perid The use f heat The primary energy saved expressed as a percentage accrding t Annex II f the Directive n 2012/27/EC The infrmatin previusly mentined will be included n guarantees issued fr high-efficient cgeneratin E.7 Frmat E.7.1. EECS Certificates shall be Issued in such frmat as may be determined by AIB frm time t time. E.8 Transferring EECS Certificates The Accunt Hlder can transfer EECS-GO t anther Accunt in the same EECSregistry r t anther EECS registry fr EECS-GO in anther Dmain thrugh the registry website. Only persns duly authrized by the Accunt Hlder may request the transfer f EECS-GO ut f that Accunt Hlder s Transferable Accunt. Only EECS-GO can be transferred frm and t the Pwernext Registry. This excludes the transfer f cancelled r expired EECS-GO. In particular, nly EECS-GO still valid accrding t French law can be imprted in the Pwernext Registry. EECS- GO with additinal label (ICS prducts) can als be transferred frm and t the Pwernext Registry. Only RES EECS-GO and CHP EECS-GO can be imprted t and exprted frm the Pwernext registry. E.8.1. The initiatin f transfers is made by the selling Accunt Hlder. E.8.2. The transfer f EECS-GO and the cnfirmatin f that transfer are dne in accrdance with the fllwing prcedure: The selling Accunt Hlder cnnects t its persnal secure accunt n the Registry and ges t the Transfer sectin. It is then requested t indicate the beneficiary Accunt Hlder f the transfer (frm the Pwernext registry r frm anther AIB registry) as well as the EECS-GOfrm ne f its Transferable Accuntst be transferred. This excludes withdrawn, expired r already cancelled EECS-GOs that are in his cancellatin accunt. An autmatic check is carried ut in rder t ascertain whether the infrmatin given by the applicant at this stage is sufficient and adequate. In the case f an imprt, the AIB hub sends t Pwernext an imprt request f EECS-GOs frm an Accunt Hlder in anther AIB registry. This request details the EECS-GOs t be transferred t a specific Accunt Hlder in the Pwernext registry. The infrmatin given by the Accunt Hlder r by the AIB hub (in the case f an imprt) is then autmatically checked by Pwernext (type f certificates allwed in the French registry). In case f an exprt r an imprt, the peratr might cntact the ther AIB registry in which the cunterpart is lcalized in rder t be sure f Pwernext 2016 Page 24 f 39

25 EECS Dmain Prtcl the identity f the ther cunterpart r fr any ther infrmatin regarding the transfer. As the case may be, the Accunt Hlder may als be requested t send additinal infrmatin. If the infrmatin is cmplete and adequate, Pwernext pre-validates the transfer: data n the EECS-GO are shwn t the beneficiary wh must cnfirm the transfer. In the case f an exprt, data are sent t the relevant AIB registry via the AIB hub, which may accept r refuse the exprt. If the beneficiary (r the relevant AIB registry in the case f an exprt) refuses the transfer, the transfer is cancelled and the EECS-GO certificates are returned t the riginal transferable accunt f the Accunt Hlder; the selling Accunt Hlder is ntified f the rejectin. If the beneficiary cnfirms the transfer, the EECS-GO are withdrawn frm the Accunt f the selling Accunt Hlder and transferred t the Accunt f the beneficiary. Bth Accunt Hlders are ntified f the transfer f the EECS-GOs. E.8.3. Administratin f malfunctins, crrectins and errrs Pwernext has the right t perfrm crrective actins such as withdrawal r transfer f EECS-GOs in the Pwernext Registry. Shuld Pwernext ntice an errr in anther EECS registry, it will cntact the ther registry in rder fr a slutin t be fund. E.8.4. Where it is impssible t transfer fr technical reasns, this can be vercme by cancelling certificates fr use in anther dmain, with the agreement f the imprting issuing bdy. Any such cancellatins are ntified t the imprting issuing bdy and the AIB Secretariat. E.9 Administratin f Malfunctins, Crrectins and Errrs E.9.1. Once issued, the details f an EECS Certificate cannt be altered r deleted except t crrect an errr. In the event that it transpires that the data in any EECS-GOs is inaccurate (whether r nt thrugh an act r missin f the Registrant f the riginating Prductin Device): Pwernext shall either withdraw thse Certificates (prvided that such EECS- GOs are, at the time f such Withdrawal, in the Transfer Accunt f that Registrant) r crrect this errr n the fllwing mnths by issuing mre r less EECS-GOs frm the same Prductin Device f the Accunt Hlder. In case the Prductin Device is nt active anymre, the certificates frm similar Prductin Devices culd be withdrawn ; and The Accunt Hlder shall pay Pwernext the cst f securing the agreement f anther Accunt Hlder t the Withdrawal f EECS-GOs f the same type frm that ther Accunt Hlder s Transfer Accunt, s that, as far as reasnably practicable, EECS-GOs are withdrawn with an adequate vlume and financial value. In case the Certificates are n lnger in the French dmain, Pwernext might cperate with ther Issuing Bdies t withdraw the errneus Certificates. Pwernext may als alter EECS-GOs held in its EECS registry s as t rectify an errr which ccurred prir t its transfer int the Accunt in which it is held at such time, prvided: the Accunt Hlder has agreed t such alteratin; it is reasnably satisfied that any unjust enrichment f a EECS Participant as a cnsequence f such errr has, t the extent reasnably practicable, been nullified; it is reasnably satisfied that the alteratin itself des nt give rise t undue enrichment f the Accunt Hlder. Pwernext 2016 Page 25 f 39

26 EECS Dmain Prtcl E.9.2. In case f internatinal transfer failure, Pwernext immediately reacts as sn as pssible in rder t crrect the transfer and avid any risk f duble cunting f GOs. The GO registry is checked every business day s that transfer failure issues are addressed quickly. When a transfer failed, Pwernext first cntacts (r is cntacted by) the SuperUser f the AIB Hub. Pwernext cnfirms whether the EECS-GOs are still in the French GO registry r if the EECS-GOs are already deleted frm the Transferrable Accunt f the Accunt Hlder. In case the EECS-GOs are still in the French GO registry, then Pwernext retry the transfer, after having crrected the ptential technical errrs. In case the EECs-GOs are nt in the French GO registry anymre, Pwernext immediately cntact the ther registry t cnfirm the transfer. When an bvius errr has ccurred and is agreed between tw registries, Pwernext can mdify the crrespnding EECS-GO even if Pwernext was nt the Issuing Bdy fr this EECS-GO. E.10 End f Life f EECS Certificates Cancellatin E Cancellatin is remving a Certificate frm circulatin. Once Cancelled, a Certificate cannt be mved t any ther accunt, and s is n lnger tradable. E The initiatin f Cancellatins is undergne by the relevant Accunt Hlderin accrdance with the fllwing prcedure: The Accunt Hlder cnnects t its persnal secure accunt n the Registry and ges t the Cancellatin sectin. The Accunt Hlder specifies the EECS-GO t be cancelled amngst the list EECS-GOs in ne f its Transferable Accunts. This excludes withdrawn, expired r already cancelled EECS-GO. The Accunt Hlder can specify as well the cuntry f cnsumptin (being mandatrily France, with the nly exceptin f exdmain cancellatins), cancellatin purpse, usage categry (being mandatrily disclsure), name, type and lcatin f beneficiary and related cnsumptin perid. E The cancellatin f certificates is partly autmated. When an Accunt Hlder asks fr the cancellatin f EECS-GO, an autmatic check is carried ut. The cmpleteness and adequacy f the infrmatin is then verified by the peratinal team f Pwernext. If the data are nt crrect, the cancellatin f the EECS-GO is abandned. If the data are cmplete and accurate, the EECS- GOs are cancelled by Pwernext. Cancelled certificates are remved frm the Transferable Accunt f the Accunt Hlder and cannt be cancelled r transferred anymre. E The cnfirmatin f the success r failure f a cancellatin is ntified t the accunt hlder by Pwernext. In case f success, a dcument (cancellatin statement) can be dwnladed by the Accunt Hlder thrugh the registry by Pwernext cnfirming the cancellatin f the EECS-GO Certificates (see E.9.6 Frms). In case f rejectin f a cancellatin, the Accunt Hlder is furthermre explicitly ntified by Pwernext abut the rejectin and the reasns fr it. E Only EECS-GOs relating t renewable electricity and cgeneratin may be cancelled in the Pwernext registry. E A cancellatin statement can be printed ut frm the registry by the Accunt Hlder rganisatin that has perfrmed the cancellatin. A template is available in Annex 5. E Ex-dmain cancellatins are permitted fr Eurpean cuntries where Registries d nt have access t the AIB Hub and cannt imprt Certificates electrnically. Pwernext 2016 Page 26 f 39

27 EECS Dmain Prtcl E.11 End f Life f EECS Certificates Expiry E EECS Certificates which have expired are n lnger valid fr cancellatin nr transfer. E In accrdance with legal regulatins, EECS-GOs expire ne year after the end f the respective prductin perid. E EECS Certificates expire autmatically after the legal expiry date. E Imprts f certificates that have already expired are prevented. E.12 End f Life f EECS Certificates Withdrawal E Pwernext may withdraw an EECS-GO held in a Transfer Accunt n its EECS registry at the request f the Accunt Hlder f that Accunt, r therwise in accrdance with the prvisins f the relevant Prduct Rules, thereby withdrawing it. Withdrawal f Certificates can ccur fllwing errrs as described n E.9. E Pwernext may withdraw an EECS Certificate held in its EECS Registratin Database t give effect t an agreement reached with an EECS Market Participant under prvisins f its Standard Terms and Cnditins. E When Pwernext withdraws an EECS-GO, it n lnger appears n the Accunt Hlder accunt and it is n lnger transferable nr eligible t be cancelled. Pwernext 2016 Page 27 f 39

28 EECS Dmain Prtcl F Activity Reprting F.1 Public Reprts F.1.1. Pwernext publishes n a mnthly basis the list f EECS GOs which have been issued and cancelled n the registry. Data are available n pwernext website: and fllws the French legislatin requirements. Data includes: the ID Number f the GO, date f delivery, name f the accunt hlder having issued the Certificate, Legal frm f the Accunt Hlder, Prductin Device Name, Prductin Device Lcatin, Prductin Device installed capacity, Prductin Device cmmissining date, Energy Surce, Natinal supprt type, amunt and duratin f natinal supprt, prductin start date, prductin end date, quantity certified, cancellatin date. F.2 Recrd Retentin F.2.1. Retentin f printed and electrnic infrmatin regarding registries and data is dne in accrdance with the fllwing table: Data Time Medium Standard terms and cnditins and its appendices Prductin Device Registratin frms, audit reprts Issuing Request (Cnsumptin Declaratin / Prductin Declaratins) Minimum 5 years (paper) and 10 years (scans) after terminatin f cntract Minimum 10 years after de-registratin Minimum 10 years Bth paper and electrnic archive (scans) Electrnic frms Electrnic frms Transactin data Minimum 10 years Database backups F.3 Orderly Market Reprting F.3.1. When apprpriate, Pwernext will reprt failures by EECS Market Participants t cmply with the prvisins f Prduct Rules t the Cmpetent Authrities. Such failures include behaviur by EECS Market Participants f which Pwernext is aware and which, in its reasnable pinin, amunts t a breach f Cmpetitin Law, r applicable law gverning the cnduct f financial markets. F.3.2. When apprpriate, Pwernext will ntify the AIB f any reprt made by it under Sectin F.3.1 and will prvide the AIB with as much infrmatin in relatin t such reprt as is cnsistent with any duty f cnfidentiality it may have t the relevant EECS Market Participant(s). Pwernext 2016 Page 28 f 39

29 EECS Dmain Prtcl G Assciatin f Issuing Bdies G.1 Membership G.1.1. Pwernext cnsiders AIB membership as a paramunt pint t remve pssible barriers that might impair GO s imprts and exprts. G.1.2. In the case Pwernext wuld be replaced by ther Issuing Bdy fr the French dmain by a new Decree, AIB wuld be infrmed immediately. In this situatin, Pwernext wuld take the necessary actins t guarantee a right transitin t the new Issuing Bdy. G.2 Cmplaints t the AIB G.2.1. Accunt Hlders can send cmplaints and questins by t GOsupprt@pwernext.cm. Fr cmplaints related t AIB, Pwernext will be the liaisn and will respnd back t the participant. H Change Cntrl H.1 Cmplaints t Pwernext Pwernext endeavur t deal with cmplaints received as sn as pssible. Cmplaints can be filed by , phne call cnfirmed by r registered letter. They shuld be addressed t the relevant cntact listed in Annex 1, accrding t whether the cmplaint cncerns general, peratinal r administrative issues. Pwernext will answer within five (5) wrking days after receipt f such cmplaint, infrming the custmer f the applicable prcedures. Pwernext strives t reslve all cmplaints within ne (1) mnth. Where fr whatever reasn this prves impssible, Pwernext will infrm the custmer f the reasn fr the delay and keep them infrmed n further prgress. Upn reslutin f a cmplaint, Pwernext will send written cnfirmatin f the utcme. H.2 Disputes All disputes arising ut f r in cnnectin with the validity, interpretatin, perfrmance, nnperfrmance r terminatin f the Standard Terms and Cnditins shall be submitted t mediatin accrding t the CMAP s 1 Rules f Mediatin and, in the event that n settlement is thereby reached, t arbitratin accrding t the CMAP s Rules f Arbitratin, t which the parties undertake t adhere. H.3 Change Requests An Accunt Hlder may prpse a mdificatin t this Dmain Prtcl. Such a prpsal will include a detailed descriptin, including an exact specificatin f any prpsed mdificatin f this Dmain Prtcl and be passed in writing t Pwernext. On receipt f such a request, Pwernext will: 1 Centre fr Mediatin and Arbitratin f Paris, Paris Chamber f Cmmerce and Industry - 39, avenue Franklin D. Rsevelt, Paris Pwernext 2016 Page 29 f 39

30 EECS Dmain Prtcl respnd t the request, describing the prcedures t be fllwed, and estimating when a reply can be expected; cnsult with the ther EECS Accunt Hlders within France that might be affected by such a mdificatin; decide whether the request and its cnsequences are in its pinin reasnable; infrm the EECS Accunt Hlders within France n the utcme f its decisin. Pwernext may make such mdificatins t this Dmain Prtcl as are in its pinin necessary t the effective and efficient peratin f the market. Subject t applicable law, any mdificatins t this Dmain Prtcl are subject t apprval by the AIB that such changes d nt cnflict with the EECS Rules. Implementatin f mdificatins will be ntified by t the Accunt Hlder and will take effect n publicatin f the dcumentatin n the website f Pwernext ( Pwernext 2016 Page 30 f 39

31 EECS Dmain Prtcl Annex 1: Cntacts List Authrised Issuing Bdy/Registry Operatr Fr any general questins, please cntact: Cmpany Pwernext Cntact Persn Aude FILIPPI Address 5 bulevard Mntmartre PARIS Cuntry France Phne GO-inf@pwernext.cm Fr questins regarding the admissin f an Accunt Hlder, please cntact: Cmpany Pwernext Cntact Persns Alexandra PHILIPPE / Olatz GARCIA Address 5 bulevard Mntmartre PARIS Cuntry France Phne / GO-admissin@pwernext.cm Fr peratinal questins, please cntact: Cmpany Pwernext Address 5 bulevard Mntmartre PARIS Cuntry France Phne GO-supprt@pwernext.cm If the peratinal questin asked need t invlve Measurement Bdies, Pwernext will cntact them. Here is the list f Measurement Bdies in France: RTE (Réseau de Transprt d Electricité) ERDF (Electricité Réseau Distributin de France) List f Lcal Distributin Cmpanies (Entreprises lcales de distributin en France ELD) available n the fllwing website : Pwernext 2016 Page 31 f 39

32 EECS Dmain Prtcl Annex 2: Accunt Applicatin/Amendment Frm The Accunt Applicatin Frm can be fund n the Pwernext website: Pwernext 2016 Page 32 f 39

33 EECS Dmain Prtcl Annex 3: Device Registratin Frm This frm is available under electrnic frm. Prductin Devices must be registered n the registry website. The Accunt Hlder needs t cnnect t its persnal secure accunt n the Registry. Pwernext 2016 Page 33 f 39

34 EECS Dmain Prtcl Annex 4: Prductin/Cnsumptin Declaratin This frm is available under electrnic frm. The Accunt Hlder needs t cnnect t its persnal secure accunt n the Registry. EECS-GOs are issued accrding t data filled in the electrnic versin f the registry. In case f EECS-GOs frm a cgeneratin prductin device, the Accunt Hlder needs t add the Excel file CHP-GO mdel t its nline demand. Standard Case Pwernext 2016 Page 34 f 39

35 EECS Dmain Prtcl Annex 5: Cancellatin Statement 1 Pwernext 2016 Page 35 f 39

36 EECS Dmain Prtcl Pwernext 2016 Page 36 f 39

Country profiles: Iceland

Country profiles: Iceland Cuntry prfiles: Iceland Last updated: 26/06/2015 1 Implementatin f Tracking Systems 1.1 Electricity Disclsure Electricity disclsure in Iceland is implemented by Regulatin number 757/2012, Regulatin n disclsure

More information

Inquiry processing. 1. Purpose. 2. Scope. 3. Description

Inquiry processing. 1. Purpose. 2. Scope. 3. Description 1. Purpse T describe the assessment f inquiry dssiers submitted t ECHA accrding t Article 26(1) f the REACH Regulatin and the steps taken t ensure that the data sharing amng ptential and previus registrants

More information

Country profiles: Denmark

Country profiles: Denmark Cuntry prfiles: Denmark Last updated: date (22/04/2015) 1 Implementatin f Tracking Systems 1.1 Electricity Disclsure Disclsure is regulated in Denmark by the Bekendtgørelse m deklaratin af elektricitet

More information

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION

PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION ENVIRONMENTAL PROTECTION AGENCY AER / PRTR GUIDANCE DOCUMENT N. 1: PRINCIPLES OF PRTR AND AER REPORTING OF ANNUAL ENVIRONMENTAL INFORMATION Fr use in reprting f: 1 PRTR Emissins and Waste Transfers infrmatin

More information

Manual 11: Energy & Ancillary Services Market Operations Revision History

Manual 11: Energy & Ancillary Services Market Operations Revision History 2.3.4 Minimum Generatr Operating Parameters Parameter Limited Schedules Belw is the list f business rules t require units t submit schedules that meet minimum accepted parameters. Market Sellers are required

More information

NEW LAWS REGARDING BUILDING PRODUCTS (QLD)

NEW LAWS REGARDING BUILDING PRODUCTS (QLD) BUILDING SERVICES Ref: LEG 17-05 Current at Nvember 2017 NEW LAWS REGARDING BUILDING PRODUCTS (QLD) Frm 1 Nvember new laws regarding nn-cnfrming building prducts apply t all building prjects in Queensland.

More information

Resource Tracker User Guide

Resource Tracker User Guide Revisin: 05 Effective Date: 02/22/2019 Prepared By: PJM Client Management [Type text] PJM User Guide: Resurce Tracker Table f Cntents Apprval... 2 Current Revisin... Errr! Bkmark nt defined. Intrductin...

More information

Lions Ski Club Privacy Policy (Version 1: 23/05/2018)

Lions Ski Club Privacy Policy (Version 1: 23/05/2018) Lins Ski Club Privacy Plicy (Versin 1: 23/05/2018) Summary f hw Lins Ski Club use, share and stre yur data Lins Ski Club uses yur persnal data t manage and administer yur membership and yur invlvement

More information

SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS

SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS SECTION I: RBC ROYAL BANK ONLINE APPLICATION TERMS AND CONDITIONS Please review the fllwing RBC Ryal Bank Online Applicatin Terms and Cnditins (the "Terms and Cnditins"). Yu must read them, check the tick

More information

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS ` ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS Please review the fllwing Ryal Bank f Canada Online Applicatin Terms and Cnditins (the "Terms"). Yu must read them alng with yur Accunt Disclsures

More information

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/

Procurement Gateway & I Want Doc User Guide https://gateway.procurement.cornell.edu/ Prcurement Gateway & I Want Dc User Guide https://gateway.prcurement.crnell.edu/ Prcurement Gateway Once yu lg int the Prcurement Gateway, the system will identify wh yu are and yur primary FTC/BSC yu

More information

ICP Linking and Fusing Service Enquiry Procedure

ICP Linking and Fusing Service Enquiry Procedure UK Pwer Netwrks ICP Linking and Fusing Service Enquiry Prcedure Owner Name Title Neil Clarke Head f Highway Services Signature Date 03 April 2018 Authriser Name Title Kevin Newnham Majr Prgrammes & ICP

More information

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels.

Quality Hotel View is a full-service conference hotel located in Malmö, Sweden, and is a part of the hotel chain Nordic Choice Hotels. Privacy Plicy - Quality Htel View Quality Htel View is a full-service cnference htel lcated in Malmö, Sweden, and is a part f the htel chain Nrdic Chice Htels. This privacy plicy explains which persnal

More information

1 The types of personal information we collect

1 The types of personal information we collect ICBC (LONDON) PLC NEW CANDIDATE PRIVACY NOTICE As part f ur recruitment prcess, the Industrial and Cmmercial Bank f China (ICBC) cllects and prcesses persnal data relating t jb applicants. The Bank is

More information

OLA Privacy Policy for Australia

OLA Privacy Policy for Australia 1. Respecting yur privacy OLA Privacy Plicy fr Australia OLA Australia Pty Limited and its related bdies crprate (including its Indian parent cmpany, ANI Technlgies Private Limited) (the OLA Grup) is cmmitted

More information

Heat Pump KEYMARK. Date Description of modification Revision number Initial version 1

Heat Pump KEYMARK. Date Description of modification Revision number Initial version 1 Page: 1 f 26 Date Descriptin f mdificatin Revisin number 14-12-2015 Initial versin 1 10/03/2017 Additin f air/air Editrial changes Annex E included in reference t pren12102-2 suppressed Reference t EN

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

Country profiles: Luxembourg

Country profiles: Luxembourg Cuntry prfiles: Luxemburg Last updated: date (09/04/2015) 1 Implementatin f Tracking Systems 1.1 Electricity Disclsure Electricity disclsure is legally implemented in Luxemburg by the electricity law frm

More information

Data Protection Officer: Phil Oakman

Data Protection Officer: Phil Oakman Cmpany Name: Cmpany Cntact details: Unitemps Nrthamptn ( the Cmpany ) Unitemps Nrthamptn Park Campus, Charles Bradlaugh Building, University f Nrthamptn Nrthamptn, NN2 7AL Telephne: 01604 892121 Data Prtectin

More information

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018

Executive Summary European Union s General Data Protection Regulation (EU GDPR) January 2018 Executive Summary Eurpean Unin s General Data Prtectin Regulatin (EU GDPR) January 2018 Legal Disclaimer The infrmatin in this presentatin is cnfidential and prprietary t SAP and may nt be disclsed withut

More information

Data Protection Officer: David Parkes

Data Protection Officer: David Parkes Cmpany Name: Cmpany Cntact details: Unitemps De Mntfrt University ( the Cmpany ) Unitemps DMU 1st Flr, Campus Centre, De Mntfrt University, Leicester, LE1 9BH Telephne: 0116 207 8351 Data Prtectin Officer:

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Data Protection Officer: Tracy Landon

Data Protection Officer: Tracy Landon Cmpany Name: Cmpany Cntact details: Unitemps Nttingham Trent University ( the Cmpany ) Unitemps NTU 50 Shakespeare Street, Nttingham Trent University Nttingham, NG1 4FQ Telephne: 0115 848 4740 Data Prtectin

More information

OPM RFC PRIVACY NOTICE

OPM RFC PRIVACY NOTICE OPM RFC PRIVACY NOTICE Summary f hw we and the RFU use yur data OPM RFC uses yur persnal data t manage and administer yur membership and yur invlvement with its teams and club, and t keep in cntact with

More information

St Albans Musical Theatre Company

St Albans Musical Theatre Company St Albans Musical Theatre Cmpany ST ALBANS MUSICAL THEATRE COMPANY PRIVACY POLICY This ntice describes hw St Albans Musical Theatre Cmpany (als referred t as "SAMTC", "we", "us" r ur ), prcess yur persnal

More information

Isetan Personal Data Protection Policy (PDPP)

Isetan Personal Data Protection Policy (PDPP) Isetan Persnal Data Prtectin Plicy (PDPP) ISETAN OF JAPAN SDN BHD (IOJ) and ICJ DEPARTMENT STORE (M) SDN BHD (ICJ) are cmmitted t ensure that Custmer s privacy is prtected in accrdance t the Persnal Data

More information

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS

North Hockey Umpiring Association (NHUA) PRIVACY NOTICE FOR OUR MEMBERS Nrth Hckey Umpiring Assciatin (NHUA) PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur

More information

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX

Mersham Sports Club Flood Street, Mersham, Ashford, Kent, TN25 6NX Mersham Sprts Club Fld Street, Mersham, Ashfrd, Kent, TN25 6NX www.mershamsprtsclub.cm PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal

More information

Company Policy Buying Additional Annual Leave

Company Policy Buying Additional Annual Leave Cmpany Plicy Buying Additinal Annual Leave Dcument Cntrl Table Dcument title: Buying Additinal Annual Leave Versin number: 2.3 Date apprved: 22.11.17 Apprved by: D Wythe Date f last review: 22.11.17 Departments

More information

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE

CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE CHERRYTREE FARM CAMPING WEBSITE AND MARKETING PRIVACY NOTICE INTRODUCTION Welcme t the Cherry Tree Farm Camping's privacy ntice. Cherry Tree Farm Camping respects yur privacy and is cmmitted t prtecting

More information

CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS

CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS CHIPPING SODBURY GOLF CLUB PRIVACY NOTICE FOR VOLUNTEERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur relatinship

More information

Guidelines to Freight Billing valid from

Guidelines to Freight Billing valid from Page 1 frm 5 G-FFS/PF C106 Freight Calculatin & Accunting Guidelines t Freight Billing valid frm 01.07.2016 (Invicing issuing and distributin fr transprt services fr the accunt f BASF SE r all ther Eurpean

More information

PRIVACY POLICY. Last Modified: 23 rd of May, 2018

PRIVACY POLICY. Last Modified: 23 rd of May, 2018 PRIVACY POLICY Last Mdified: 23 rd f May, 2018 Infrmatin abut Us ALTIUS INSURANCE LTD (hereinafter we, us r ur ) is the cntrller f the infrmatin cllected r prvided directly. We respect yur privacy and

More information

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613

Safety and Security Checks for Tank Container HSE CoP 613. Safety and Security Checks for Tank Container. HSE Code of Practice 613 Safety and Security Checks fr Tank Cntainer HSE Cde f Practice 613 Table f Cntents 1. Purpse... 3 2. Definitins... 3 3. Scpe... 3 4. Mandatry principles r standards... 3 4.1 Legal... 4 4.2 Prcess requirements...

More information

Company Accounts are identified by a 4-5 digit account number and can be used in all company stores nationally.

Company Accounts are identified by a 4-5 digit account number and can be used in all company stores nationally. TRADE ACCOUNTS (This sectin is t be read in cnjunctin with Custmer Orders V2) POLICY Beacn Lighting seeks t fster custm with all relevant streams f the Building Industry. Team Members must carefully fllw

More information

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2

Flaw indications in the reactor pressure vessels of Doel 3 and Tihange 2 Flaw indicatins in the reactr pressure vessels f Del 3 and Tihange 2 1. Cntext Technical infrmatin nte 2013.02.01 Del 3 and Tihange 2 are tw f the seven Belgian nuclear reactrs perated by Electrabel, a

More information

Shipper asset details reconciliation

Shipper asset details reconciliation UNC Wrkgrup Reprt UNC 0632S: At what stage is this dcument in the prcess? 01 Mdificatin 02 Wrkgrup Reprt Shipper asset details recnciliatin 03 04 Draft Mdificatin Reprt Final Mdificatin Reprt Purpse f

More information

Our Intent. We are committed to safeguarding the privacy of users to our website and we will only use the information we collect about you lawfully.

Our Intent. We are committed to safeguarding the privacy of users to our website and we will only use the information we collect about you lawfully. PRIVACY NOTICE LGfL GENERAL OVERVIEW Our Intent. We are cmmitted t safeguarding the privacy f users t ur website and we will nly use the infrmatin we cllect abut yu lawfully. Changes t Data Prtectin Legislatin.

More information

Experian (Data Quality) UK&I Support Policy

Experian (Data Quality) UK&I Support Policy Experian (Data Quality) UK&I Supprt Plicy Cntents page 1 Intrductin 1 2 Explanatin f terms 1 3 Terms f Technical Supprt 2 4 Availability f Technical Supprt 3 5 Prvisin f Technical Supprt 4 Appendix A-

More information

References to we, our or us in this privacy notice are to MIDLANDS NORDIC WALKING

References to we, our or us in this privacy notice are to MIDLANDS NORDIC WALKING Midlands Nrdic Walking PRIVACY NOTICE FOR OUR GROUP MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

Notice to all Participants, 9 March 2017

Notice to all Participants, 9 March 2017 Ntice t all s, 9 March 2017 Ntice t s n AEMO decisin t apprve amendments t the Cnnectivity Testing and Technical Certificatin (SA and WA), Gas FRC B2B Cnnectivity Testing and Sys Certificatin (Vic, QLD

More information

MSCM Logistics Services Limited

MSCM Logistics Services Limited Infrmatin n Imprtatin int Nigeria In Nigeria, althugh the Frm M is a very imprtant dcument fr all imprt, there are sme exceptins. The fllwing prducts can be imprted withut the frm M: Diplmatic carges Ship

More information

Penketh Panther Netball Club

Penketh Panther Netball Club Penketh Panther Netball Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

WILTSHIRE AND SWINDON SPORT (WASP) PRIVACY NOTICE 20 APRIL 2018

WILTSHIRE AND SWINDON SPORT (WASP) PRIVACY NOTICE 20 APRIL 2018 WILTSHIRE AND SWINDON SPORT (WASP) PRIVACY NOTICE 20 APRIL 2018 References t we, ur r us in this privacy ntice are t Wiltshire and Swindn Sprt (WASP) We are cmmitted t respecting yur privacy. This ntice

More information

DATE FOR COMING INTO EFFECT 1 April 2014*

DATE FOR COMING INTO EFFECT 1 April 2014* Lndn, 24 March 2014 EMA/14522/2007-Rev.1 The Revised Checking Prcess f Mck-Ups and Specimens f uter/immediate labelling and package leaflets in the Centralised Prcedure fr Veterinary Medicinal Prducts

More information

Introduction to Enlighten

Introduction to Enlighten Intrductin t Enlighten Cntents Cntents ------------------------------------------------------------------------------------------------------------------------------------------- Enlighten verview -----------------------------------------------------------------------------------------------------------------------------

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

BROKER SELECTION AND ASSESSMENT POLICY

BROKER SELECTION AND ASSESSMENT POLICY BROKER SELECTION AND ASSESSMENT POLICY Date created: 1 Nvember 2007 Last updated: 19 Nvember 2012 Departments affected: Management departments, senir management, CICD Subject: Definitin f brker selectin

More information

Packaging regulations

Packaging regulations Packaging regulatins This guidance applies t yu if yu wn, manage r wrk fr a business that prduces, uses r handles packaging r packaging materials. Prducer Respnsibility Obligatins - What yu must d! If

More information

The Data Processor. This eadmissions website is owned and operated by LGfL. The eadmissions support team can be contacted at:

The Data Processor. This eadmissions website   is owned and operated by LGfL. The eadmissions support team can be contacted at: PRIVACY POLICY LGfL eadmissins OVERVIEW Our Intent. We are cmmitted t safeguarding the privacy f users wh use the eadmissins website service and we will nly use the infrmatin we cllect abut yu lawfully.

More information

The Grannies Cricket Club

The Grannies Cricket Club The Grannies Cricket Club PRIVACY NOTICE FOR OUR MEMBERS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

PRIVACY NOTICE - STUDENTS

PRIVACY NOTICE - STUDENTS Page: 1 f 8 1. Scpe All student data subjects whse persnal data is cllected, in line with the requirements f the GDPR. 2. Respnsibilities 2.1 The Data Prtectin Officer / GDPR Owner is respnsible fr ensuring

More information

Craw-Kan Telephone Cooperative Inc. CPNI / Privacy Policy

Craw-Kan Telephone Cooperative Inc. CPNI / Privacy Policy Craw-Kan Telephne Cperative Inc. CPNI / Privacy Plicy Craw-Kan Telephne Cperative Inc. is cmmitted t maintaining yur privacy. We believe that yu are entitled t knw hw Craw-Kan Telephne Cperative Inc. will

More information

BANBURY UNITED COMMUNITY FOOTBALL CLUB LTD

BANBURY UNITED COMMUNITY FOOTBALL CLUB LTD BANBURY UNITED COMMUNITY FOOTBALL CLUB LTD PRIVACY NOTICE We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur membership

More information

Aggregate LLC ( AGGREGATE LLC ) is committed to protecting your privacy. We have prepared

Aggregate LLC ( AGGREGATE LLC ) is committed to protecting your privacy. We have prepared PRIVACY POLICY Last Revised: August 8, 2017 Aggregate LLC ( AGGREGATE LLC ) is cmmitted t prtecting yur privacy. We have prepared this Privacy Plicy t describe t yu ur practices regarding the Persnal Data

More information

End of Year Planning and Checklists

End of Year Planning and Checklists TechnlgyOne Financials End f Year Planning End f Year Planning and Checklists This dcument prvides checklists and discussin pints fr sme f the main Technlgy One mdules. The TechnlgyOne Supprt Centre knwledge

More information

Self- certification criteria for signatories of the IAB Europe OBA Framework

Self- certification criteria for signatories of the IAB Europe OBA Framework Self- certificatin criteria fr signatries f the IAB Eurpe OBA Framewrk Date: 12 April 2012 Table f cntents 1. Intrductin 3 2. General criteria fr self- certificatin f cmpliance 4 2.1. Data security 4 2.1.1.

More information

References to we, our or us in this privacy notice are to The Joanne Banks Dancers, Studio 10, Durham Street, Spennymoor, Co.

References to we, our or us in this privacy notice are to The Joanne Banks Dancers, Studio 10, Durham Street, Spennymoor, Co. The Janne Banks Dancers PRIVACY NOTICE FOR OUR CUSTOMERS AND PUPILS We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur

More information

Release Notes for SAP ERP Financial Accounting and Operations 2.0

Release Notes for SAP ERP Financial Accounting and Operations 2.0 Release Ntes fr SAP ERP Financial Accunting and Operatins 2.0 What's New? Release Ntes Cpyright 2013 SAP AG r an SAP affiliate cmpany. All rights reserved. N part f this publicatin may be reprduced r transmitted

More information

Reregistration of voluntarily deregistered CDM project activities

Reregistration of voluntarily deregistered CDM project activities Paragraph 4 f the anntated agenda, Annex 1 Reregistratin f vluntarily deregistered CDM prject activities CDM EB 87 Paris, France, 23 27 Nvember 2015 UNFCCC Secretariat SDM prgramme Prcedural backgrund

More information

The agreement consists of three key elements: a framework agreement, Action Plans for different subsectors or branches and accession documents.

The agreement consists of three key elements: a framework agreement, Action Plans for different subsectors or branches and accession documents. Title f the measure: FIN15 Energy Efficiency Agreement f Energy Prductin General descriptin The Energy Efficiency Agreement fr Industries is part f the Finnish energy efficiency agreement scheme applied

More information

Customer best practices

Customer best practices Custmer dcument Custmer best practices Recmmendatins fr new Basware transactin services custmers Basware Crpratin Cpyright Basware Crpratin All rights reserved 1 (11) 1 Intrductin Our best advice This

More information

Appendix A outlines what Bankline can offer to schools, in terms of online payments.

Appendix A outlines what Bankline can offer to schools, in terms of online payments. Access fr Schls t Make Online Payments by Bankline A number f maintained schls have requested that the LA makes a prcess fr undertaking nline payments available t them (currently they undertake payments

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

Safer and Fair Recruitment Policy

Safer and Fair Recruitment Policy Safer and Fair Recruitment Plicy Intrductin This dcument sets ut the plicy and prcedures t be adpted in rder t ensure that the recruitment prcess fr ur Schl is as safe and as fair as pssible. The prcedures

More information

Industry Guide to Cancel Other

Industry Guide to Cancel Other Industry Guide t Cancel Other Aviding errneus cancellatins f rders 1. Intrductin This dcument prvides guidance t Cmmunicatins Prviders (CPs) and resellers n the apprpriate use f the Cancel Other facility

More information

Effective Date: 21 Aug 2018 Issued: 06 Aug 2018 Issue: 3 SI No: P3282 Prepared: K. Osborne. Reviewed by: G. Ostacchini

Effective Date: 21 Aug 2018 Issued: 06 Aug 2018 Issue: 3 SI No: P3282 Prepared: K. Osborne. Reviewed by: G. Ostacchini Page 1 f 11 Effective Date: 21 Aug 2018 Issued: 06 Aug 2018 Issue: 3 SI N: P3282 Prepared: K. Osbrne Reviewed by: G. Ostacchini Apprved by: M. Sanders Date: 06 Aug 2018 (DD/MMM/YYYY) Title: Device Technical

More information

PRIVACY NOTICE FOR IMPERIAL COLLEGE LONDON EVENTS

PRIVACY NOTICE FOR IMPERIAL COLLEGE LONDON EVENTS PRIVACY NOTICE FOR IMPERIAL COLLEGE LONDON EVENTS This Privacy Ntice (Ntice) explains hw Imperial Cllege Lndn (the Cllege, we, ur, us) prcesses yur persnal data when yu attend its events (including public

More information

Headquarter: BTC Europe GmbH Rheinpromenade Monheim am Rhein Germany Tel: Fax:

Headquarter: BTC Europe GmbH Rheinpromenade Monheim am Rhein Germany Tel: Fax: BTC Eurpe GmbH PO Bx 13 01 23 40551 Düsseldrf Germany Guidelines t Freight Billing valid frm 01.07.2016 (Invicing issuing and distributin fr transprt services fr the accunt f BASF SE r all ther Eurpean

More information

Pacific Timesheet Sustainability Policy

Pacific Timesheet Sustainability Policy Pacific Timesheet Sustainability Plicy Visin We strive t deliver sftware and services t help ur custmers better achieve their wn sustainability gals, including significantly reducing their use f paper

More information

Epicor Commerce Connect (ECC) Services Specification

Epicor Commerce Connect (ECC) Services Specification Epicr Cmmerce Cnnect (ECC) Services Specificatin This Epicr Cmmerce Cnnect Services Specificatin ( Specificatin ) utlines the services and services levels assciated with Epicr s delivery f its Epicr Cmmerce

More information

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

Management of Supplier Complaints and Feedback Procedure

Management of Supplier Complaints and Feedback Procedure Prcedure 224 - Versin 1 Valid t: January 2019 Management f Supplier Cmplaints and Feedback Prcedure Cntext This prcedure ensures that feedback received frm suppliers (past, current and ptential) is managed

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

What You Should Know About GDPR. What is the GDPR?

What You Should Know About GDPR. What is the GDPR? What Yu Shuld Knw Abut GDPR What is the GDPR? The Eurpean Unin s General Data Prtectin Regulatin ( GDPR), effective May 25, 2018, is a far-reaching regulatin applicable t rganizatins with Eurpean Ecnmic

More information

ABC Business Magazines Reporting Standards (UK)

ABC Business Magazines Reporting Standards (UK) September 2016 ABC Business Magazines Reprting Standards (UK) Changes have been agreed t the ABC Business Magazine and Multi-Platfrm Reprting Standards. We have updated the latest Reprting Standards t

More information

Industry Guide to Cancel Other

Industry Guide to Cancel Other Office f the Telecmmunicatins Adjudicatr Industry Guide t Cancel Other Aviding errneus cancellatins f rders 1. Intrductin This dcument prvides guidance t Cmmunicatins Prviders (CPs) and resellers n the

More information

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline 5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary

More information

5.2 RPM Auction Timeline

5.2 RPM Auction Timeline 5.2 RPM Auctin Timeline The fllwing Auctin timeline prvides the deadline fr key RPM activities: RPM Activity Submittal f preliminary request t remve resurce frm Capacity Resurce status and preliminary

More information

MEDICAID SERVICES UPDATE: August 8, 2014

MEDICAID SERVICES UPDATE: August 8, 2014 OKLAHOMA DEPARTMENT OF HUMAN SERVICES Aging Services, Medicaid Services Unit ADvantage Administratin PO Bx 50550 Tulsa, Oklahma 74150-0550 (918) 933-4900 www.kdhs.rg MEDICAID SERVICES UPDATE: August 8,

More information

BRITISH COLUMBIA VEGETABLE MARKETING COMMISSION STORAGE CROP NEW ENTRANT PROGRAM POLICY

BRITISH COLUMBIA VEGETABLE MARKETING COMMISSION STORAGE CROP NEW ENTRANT PROGRAM POLICY PURPOSE BRITISH COLUMBIA VEGETABLE MARKETING COMMISSION STORAGE CROP NEW ENTRANT PROGRAM POLICY The BC Vegetable Marketing Cmmissin (VMC) has identified that thrugh the creatin f a Strage Crp New Entrant

More information

PROCESSING NOTICE ALUMNI

PROCESSING NOTICE ALUMNI PROCESSING NOTICE ALUMNI SUMMARY This summary is intended t cnvey essential infrmatin nly. Fr mre detailed infrmatin abut hw Ravensburne cllects, stres and prcesses yur persnal data can be fund in the

More information

Giovanni Migliaccio Head, Section of Gene and Cell Therapy Istituto Superiore di Sanità

Giovanni Migliaccio Head, Section of Gene and Cell Therapy Istituto Superiore di Sanità REGULATION (EC) N 1394/2007 Advanced Therapy Medicinal Prducts Givanni Migliacci Head, Sectin f Gene and Cell Therapy Istitut Superire di Sanità Rme Italy REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE

More information

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know?

Table of Contents. Section 1 - I am a Manager in an ETB, how will the ESBS affect me & what do I need to know? ESBS ETB Payrll Shared Services FREQUENTLY ASKED QUESTIONS Nvember 2018 Table f Cntents Sectin 1 - I am a Manager in an ETB, hw will the ESBS affect me & what d I need t knw? 1.1. What are the risks assciated

More information

Operator Certification Program Proposed Draft ORO/OIC Guideline. Wastewater Practitioners Group Meeting November 29, 2017

Operator Certification Program Proposed Draft ORO/OIC Guideline. Wastewater Practitioners Group Meeting November 29, 2017 Operatr Certificatin Prgram Prpsed Draft ORO/OIC Guideline Wastewater Practitiners Grup Meeting Nvember 29, 2017 Tday s Tpic Overall Respnsible Operatr (ORO) and Operatr-in-Charge (OIC) Updating the Guideline

More information

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations

Guidelines on Use of Electronic Data Collection in Censuses: Systems for Management and Monitoring Field Operations Guidelines n Use f Electrnic Data Cllectin in Censuses: Systems fr Management and Mnitring Field Operatins Management and Mnitring Systems Increasing access t mdern technlgy has led t significant prgress

More information

HAMPSHIRE CRICKET BOARD LTD PRIVACY NOTICE

HAMPSHIRE CRICKET BOARD LTD PRIVACY NOTICE HAMPSHIRE CRICKET BOARD LTD PRIVACY NOTICE We are cmmitted t respecting yur privacy. This ntice is t explain hw we may use persnal infrmatin we cllect befre, during and after yur invlvement with us. This

More information

Privacy Notice Alumni Relations and Fundraising

Privacy Notice Alumni Relations and Fundraising 1 Privacy Ntice Alumni Relatins and Fundraising Intrductin This ntice explains hw and why the Fundatin Develpment & Alumni Relatins Office cllects persnal infrmatin abut yu when carrying ut ur alumni relatins

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

Trading Region Upgrade (TRU) - Service Description Pilot Phase 2017/18

Trading Region Upgrade (TRU) - Service Description Pilot Phase 2017/18 Trading Regin Upgrade (TRU) - Service Descriptin Pilt Phase 2017/18 1. General Descriptin TRU in General, Runtime & Ttal Quantity TRU is a specially designed service t facilitate market integratin and

More information

Family Support Service Provider Quick Reference Guide to CYBER

Family Support Service Provider Quick Reference Guide to CYBER Welcme Page: Family Supprt Service Prvider Quick Reference Guide t CYBER Links t Mnitr Regularly: Authrizatin Current: Will list all currently pen authrizatins; shuld include nly thse yuth currently receiving

More information

Disaster Recovery Planning Guide

Disaster Recovery Planning Guide Disaster Recvery Planning Guide Disaster Recvery Planning Guide A Business Cntinuity Plan (BCP) is a written strategy which ensures that persnnel and assets are prtected and able t functin in the event

More information

Please contact us if you have questions about our privacy practices that are not addressed in this Privacy Policy.

Please contact us if you have questions about our privacy practices that are not addressed in this Privacy Policy. 1. Overview We have develped this Privacy Plicy t explain hw we may cllect, retain, prcess, share and transfer yur Persnal Data when yu visit ur Sites r use ur Services. This Privacy Plicy applies t yur

More information

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2

PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 PROFESSIONAL SERVICES BULLETIN 17-3 ADDENDUM 2 ADDENDUM 2 des nt change the due date r time. STATEMENTS OF INTEREST are due by 4:30:00 p.m. (lcal time) Due Date: May 4, 2017 Successful Offerrs will be

More information

Certification Manual for SQF Code

Certification Manual for SQF Code SCS Glbal Services Manual Certificatin Manual fr SQF Cde Fd and Agricultural Services (SCS-FAS) 2000 Pwell Street, Ste. 600, Emeryville, CA 94608 USA +1.510.452.8000 main +1.510.452.8001 fax www.scsglbalservices.cm

More information

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5

Revision Date: May Paragraph Table of Contents Page. 1.0 Scope Purpose Overview of Steps Approving an MRA Document 5 f 6 Dcument Owner: Justin Lee Owners Department: Supply Chain Management Paragraph Table f Cntents Page.0 Scpe 3 2.0 Purpse 3 3.0 Respnsibilities 3 4.0 MRA Term Definitins 3 5.0 Overview f Steps Apprving

More information

CAPIEL Position Paper - RoHS Scope

CAPIEL Position Paper - RoHS Scope CAPIEL Psitin Paper - RHS Scpe 1 - Purpse f this paper The purpse f this CAPIEL paper is t help manufacturers t determine whether r nt the prducts they place n the market fall within the scpe f the recast

More information

Title: Procurement Card (Visa Purchasing Card) Implementing Procedure For Policy # N/A

Title: Procurement Card (Visa Purchasing Card) Implementing Procedure For Policy # N/A COLLEGE f CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Prcurement Card (Visa Purchasing Card) Page 1 f 8 Implementing Prcedure Fr Plicy # N/A Date Apprved: 02/05/2007 Divisin: Administratin and Finance/Purchasing

More information