APPENDIX J CRYSTAL GEYSER ONSITE IRRIGATION SYSTEM TECHNICAL MEMORANDUM

Size: px
Start display at page:

Download "APPENDIX J CRYSTAL GEYSER ONSITE IRRIGATION SYSTEM TECHNICAL MEMORANDUM"

Transcription

1 APPENDIX J CRYSTAL GEYSER ONSITE IRRIGATION SYSTEM TECHNICAL MEMORANDUM

2 DRAFT TECHNICAL MEMORANDUM Crystal Geyser Onsite Irrigation System PREPARED FOR: PREPARED BY: REVIEWED BY: Richard Weklych/CGWC Barbara Brenner/Churchwell White Kerilyn Paris/CH2M Peter Rude/CH2M DATE: August 18, 2016 PROJECT NUMBER: This technical memorandum provides details for Alternative 4 proposed in the Crystal Geyser Mt. Shasta Facility Wastewater Discharge Alternatives technical memorandum. The onsite irrigation system is discussed below and may be further evaluated in the Environmental Impact Report (EIR). Background Information and Assumptions The Crystal Geyser Water Company (CGWC) Mt. Shasta Facility is located on 210 Ski Village Drive in Mt. Shasta, CA. The facility includes several acres of CGWC property available for land application of treated process wastewater. Alternative 4 involves treating the industrial wastewater onsite, and discharging it to either the onsite leach field or onsite irrigation locations as shown on Figure 1. The land application will occur during the irrigation season from May through October. It is assumed that plant operations will use one bottling line during Phase 1. In Phase 2, two bottling lines will be operational. In Phase 1, the treated process wastewater can meet the irrigation requirements of approximately 6.5 acres of trees. In Phase 2, 12 acres of trees can be irrigated. Soil Conditions A custom soil resource report was downloaded from the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) for the planned irrigation area. The soil is Deetz gravelly loamy sand, with 0 to 5 percent slopes. The depth to a restrictive feature is more than 80 inches and the natural drainage class is somewhat excessively drained. The hydraulic capacity of the soil is high to very high and the depth to the water table is more than 80 inches. Assumptions The tree crop is assumed to be irrigated from May through October. For the irrigation system design, plant operations are assumed to be 24 hours per day, Monday through Friday, therefore 22 days per month, on average. No irrigation is assumed to occur during any weekend operations. In Phase 1, one bottling line will produce 54,000 gallons per day of treated wastewater, a maximum flow rate of 37.5 gallons per minute (gpm) from the treatment plant. Phase 2 with two bottling lines will produce approximately 100,000 gallons per day, and a flow of 75 gpm from the treatment plant. To be conservative, an assumed flow rate of 30 gpm was used for the selection of the storage tank size. 1

3 CGWC Bottling Facility Aerial photo source: Google 2016, modified by CH2M HILL. LEGEND Dry Creekbed Exposed Rocks Eastern Field Northern Field Eastern Irrigated Area Northern Irrigated Area WT RDD Figure1_PotentialOffsiteIrrigation_V2.ai cmont 08/17/16 0 North 300 Approximate scale in feet 600 Figure 1 Potential Onsite Irrigation Locations Crystal Geyser Water Company Mt. Shasta, CA

4 Design Process CRYSTAL GEYSER ONSITE IRRIGATION SYSTEM The goal of the design is to meet crop evapotranspiration (ETc) of the crop with the land application of treated wastewater from the plant. The land application acreage of 9 and 3 acres was determined by balancing the demands of the crops with the outflow of the plant. In selecting the layout of the irrigation sets, the 50-foot buffer area for land application is included. Figure 1 shows the areas to be irrigated, along with the 50-foot buffer zones. The Eastern Field is approximately 9 acres and the Northern Field is approximately 3 acres. The ETc was obtained from the ITRC California Evapotranspiration Data for sprinkler irrigation for a typical year (ITRC, 2016). For irrigation design purposes, the crop to be grown was assumed to be similar to Christmas trees. Therefore, a peak ETc of 6.3 inches (in July) for Christmas trees is used for this design. Due to the height of the sprinklers (4 to 6-ft above ground), the spray losses are estimated to be 12- percent and the irrigation distribution uniformity of 75-percent, resulting in a 66-percent irrigation efficiency. The gross application rate determined using the irrigation efficiency is approximately 9.5 inches for the peak month of July. To meet this irrigation requirement, a flow rate of 98 gpm per acre is needed. Using the gross application rate and the maximum spacing recommendations listed above, the sprinklers and sprinkler spacing were selected. The maximum recommended spacing is 40% of the sprinkler diameter between sprinklers, and 65% of the sprinkler diameter between lateral pipes, for wind speeds less than 7 miles per hour (Burt, 2013). The average wind speed for a typical year (1997) from May through October is 3 miles per hour in Mt. Shasta, CA, therefore the maximum recommended spacing was used (Wunderground, 2016). The spacing is 30 feet down the lateral and 45 feet between laterals for both fields, for a 78-foot sprinkler diameter. From the sprinkler sizing and spacing, the pressure loss was calculated and then the pumps were sized. The following section presents the preliminary design selections. Phase 1 Preliminary Design Layout For Phase 1, only the Eastern Field will be irrigated in four sets for two hours per set per day, for a total of 22 days per month. This results in a total daily irrigation time of 8 hours each irrigation day. The Phase 1 system will use up to 80,000 gallons per day. To compensate for fluctuations in outflow and allow for adequate flow to the sprinklers, a 100,000 gallon storage tank will be used. This storage tank will also accommodate the additional flow in Phase 2. One inline pump will supply the field with pressurized water, with a standby pump for backup. Figure 2 shows the approximate mainline locations for Phase 1. Phase 2 Preliminary Design Layout In Phase 2, both the Eastern and Northern Fields will be irrigated with up to 108,000 gallons per day. The fields can use up to 120,000 gallons to meet the ETc of the trees. On the Eastern Field, irrigation will remain the same for Phase 2 as in Phase 1. For the Northern Field, two sets will be irrigated for two hours each, also for a total of 22 days per month. Total irrigation time for the two fields will be 12 hours each day. The storage tank from Phase 1 will be adequate for the additional flows. Two separate inline pumps will be used to supply each of the fields. For redundancy, a standby pump will be provided for each of the duty pumps. Figure 3 shows the approximate mainline locations for Phase 2. 3

5 CGWC Bottling Facility Flow from Storage Tank Aerial photo source: Google 2016, modified by CH2M HILL. LEGEND Mainline Eastern Field Eastern Irrigated Area 0 North 150 Approximate scale in feet WT RDD Figure2_Phase1ApproxMainlineLayout_V2.ai cmont 08/17/ Figure 2 Phase 1 Approximate Mainline Layout for Onsite Irrigation Crystal Geyser Water Company Mt. Shasta, CA

6 CGWC Bottling Facility Flow from Storage Tank Aerial photo source: Google 2016, modified by CH2M HILL. LEGEND 0 Mainline Eastern Irrigated Area Eastern Field Exposed Rocks Eastern Irrigated Area Northern Field WT RDD Figure3_Phase2ApproxMainlineLayout_V2.ai cmont 08/17/16 North 300 Approximate scale in feet Northern Irrigated Area 600 Figure 3 Phase 2 Approximate Mainline Layout for Onsite Irrigation Crystal Geyser Water Company Mt. Shasta, CA

7 CRYSTAL GEYSER ONSITE IRRIGATION SYSTEM References Irrigation Training and Research Center (ITRC) California Polytechnic State University, San Luis Obispo ETc Table for Irrigation Scheduling and Design, Zone 10 Monthly Evapotranspiration, Sprinkler Irrigation Typical Year. Date accessed: 27 July Website: United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) Custom Soil Resource Report for Siskiyou County California, Central Part. Date accessed: 27 July Website: Burt, C Irrigation Design Manual. Irrigation and Training Research Center, California Polytechnic State University. 6

8 Appendix A Custom Soil Resource Report, Soil Description

9 Custom Soil Resource Report Siskiyou County, California, Central Part 125 Deetz gravelly loamy sand, 0 to 5 percent slopes Map Unit Setting National map unit symbol: hdnk Elevation: 3,000 to 5,000 feet Mean annual precipitation: 30 to 45 inches Mean annual air temperature: 46 to 48 degrees F Frost-free period: 125 days Farmland classification: Not prime farmland Map Unit Composition Deetz and similar soils: 85 percent Minor components: 15 percent Estimates are based on observations, descriptions, and transects of the mapunit. Description of Deetz Setting Landform: Outwash fans Landform position (two-dimensional): Summit Landform position (three-dimensional): Tread Down-slope shape: Linear Across-slope shape: Linear Parent material: Glaciofluvial deposits derived from igneous rock Typical profile H1-0 to 7 inches: gravelly loamy sand H2-7 to 38 inches: stratified sand to gravelly loamy sand H3-38 to 65 inches: stratified very gravelly sand to gravelly loamy sand Properties and qualities Slope: 0 to 5 percent Depth to restrictive feature: More than 80 inches Natural drainage class: Somewhat excessively drained Runoff class: Negligible Capacity of the most limiting layer to transmit water (Ksat): High to very high (5.95 to in/hr) Depth to water table: More than 80 inches Frequency of flooding: None Frequency of ponding: None Available water storage in profile: Very low (about 2.9 inches) Interpretive groups Land capability classification (irrigated): None specified Land capability classification (nonirrigated): 4s Hydrologic Soil Group: A Minor Components Rock outcrop Percent of map unit: 5 percent Riverwash Percent of map unit: 5 percent 12

10 Custom Soil Resource Report Landform: Drainageways Xerofluvents Percent of map unit: 5 percent Landform: Flood plains 13

APPENDIX I LESA MODELS

APPENDIX I LESA MODELS APPENDIX I LESA MODELS LESA ASSESSMENT SEVILLE 4 SOLAR PROJECT HORIZONTAL SINGLE-AXIS TRACKING ARRAY (T16S, R12E, S25, SBB&M) IMPERIAL COUNTY, CALIFORNIA July 2017 EMA Report No. 2375-01 Prepared for:

More information

LESA ASSESSMENT LAUREL SOLAR PROJECT (T16S, R12E, S26, SBB&M)

LESA ASSESSMENT LAUREL SOLAR PROJECT (T16S, R12E, S26, SBB&M) LESA ASSESSMENT LAUREL SOLAR PROJECT (T16S, R12E, S26, SBB&M) IMPERIAL COUNTY, CALIFORNIA May 2017 EMA Report No. 2377-01 Prepared for: 90FI 8me LLC 111 Woodmere Road, Suite 250 Folsom, CA 95630 ENVIRONMENTAL

More information

APPENDIX E. LESA Models

APPENDIX E. LESA Models APPENDIX E LESA Models LESA ASSESSMENT CALEXICO SOLAR FARM I PHASE A PROJECT AREA CALEXICO SOLAR FARM I PHASE A PROJECT (SW/4 Section 13, S/2 Section 14, S/2 NE/4 Section 15, NW/4 Section 15, T17S, R13E,

More information

LESA ASSESSMENT MOUNT SIGNAL SOLAR FARM I PROJECT AREA

LESA ASSESSMENT MOUNT SIGNAL SOLAR FARM I PROJECT AREA LESA ASSESSMENT MOUNT SIGNAL SOLAR FARM I PROJECT AREA MOUNT SIGNAL SOLAR FARM I PROJECT (SW/4 Section 16, S/2 Section 15, NE/4 Section 14 (portion), N/2 Section 13 (portion) and SE/4 Section 13, T17S,

More information

Custom Soil Resource Report for Polk County, Wisconsin

Custom Soil Resource Report for Polk County, Wisconsin United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM

APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM APPENDIX D ONSITE WASTEWATER TREATMENT TECHNICAL MEMORANDUM DRAFT FINAL TECHNICAL MEMORANDUM Crystal Geyser Onsite Wastewater Treatment PREPARED FOR: Richard Weklych/Crystal Geyser Barbara Brenner/Churchwell

More information

TIERRA SOUTH FLORIDA, INC. Geotechnical Engineering / Material Testing / Inspection Services

TIERRA SOUTH FLORIDA, INC. Geotechnical Engineering / Material Testing / Inspection Services TIERRA SOUTH FLORIDA, INC. Geotechnical Engineering / Material Testing / Inspection Services March 11, 2016 Kimley-Horn 1920 Wekiva Way Suite 200 West Palm Beach, Fl. 33411 Attn: Matthew B. Fursetzer,

More information

NRCS Soils Information and Maps. Appendix F

NRCS Soils Information and Maps. Appendix F NRCS Soils Information and Maps Appendix F United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United

More information

Custom Soil Resource Report for St. Lucie County, Florida Gopherbroke Farms

Custom Soil Resource Report for St. Lucie County, Florida Gopherbroke Farms United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Appendix M Land Evaluation and Site Assessment (Calipatria I, Midway I and Midway II)

Appendix M Land Evaluation and Site Assessment (Calipatria I, Midway I and Midway II) Appendix M Land Evaluation and Site Assessment (Calipatria I, Midway I and Midway II) LESA ASSESSMENT CALIPATRIA SOLAR FARM I PROJECT AREA CALIPATRIA SOLAR FARM I PROJECT (Section 10 (portion), T12S, R14E,

More information

Custom Soil Resource Report for Okeechobee County, Florida

Custom Soil Resource Report for Okeechobee County, Florida United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Okeechobee County, Florida

Custom Soil Resource Report for Okeechobee County, Florida United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Polk County, Wisconsin

Custom Soil Resource Report for Polk County, Wisconsin United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Isle of Wight County, Virginia, Southampton County, Virginia, and Surry County, Virginia

Custom Soil Resource Report for Isle of Wight County, Virginia, Southampton County, Virginia, and Surry County, Virginia United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Land Evaluation and Site Assessment Model

Land Evaluation and Site Assessment Model Land Evaluation and Site Assessment Model Citizens Imperial Solar, LLC Project Imperial County, CA June 6, 2018 This page is intentionally blank. Land Evaluation and Site Assessment Model Citizens Imperial

More information

Custom Soil Resource Report for Dallam County, Texas

Custom Soil Resource Report for Dallam County, Texas United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Logan County, Oklahoma

Custom Soil Resource Report for Logan County, Oklahoma United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Columbus County, North Carolina

Custom Soil Resource Report for Columbus County, North Carolina United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for St. Lucie County, Florida

Custom Soil Resource Report for St. Lucie County, Florida United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Pamlico County, North Carolina

Custom Soil Resource Report for Pamlico County, North Carolina United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Douglas County, Washington

Custom Soil Resource Report for Douglas County, Washington United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Santa Clara Area, California, Western Part

Santa Clara Area, California, Western Part Santa Clara Area, California, Western Part 101 Urban land, 0 to 2 percent slopes, basins Map Unit Setting Landscape: Alluvial plains, basins Elevation: 0 to 80 feet Mean annual precipitation: 14 to 30

More information

Planting # Planting History Senger planting Prepared by Kim Elsenbroek Maps by: Jocelyn Frazelle

Planting # Planting History Senger planting Prepared by Kim Elsenbroek Maps by: Jocelyn Frazelle Planting # 117 2015 Planting History Senger planting Prepared by Kim Elsenbroek 11.13.2015 Maps by: Jocelyn Frazelle 30 Acres Total all in burned cornfield Mesic: 40 lbs/acre over 30 acres, total 1200

More information

Wastewater System Environmental Setting Wastewater Conveyance Facilities

Wastewater System Environmental Setting Wastewater Conveyance Facilities February 20, 2017 To: Mr. Ryan Sawyer AICP Analytical Environmental Services 1801 7 th Street Sacramento, CA 95811 Subject: Comments on the Crystal Geyser Draft EIR (DEIR) Dear Mr. Sawyer: This letter

More information

Custom Soil Resource Report for Douglas County, Washington

Custom Soil Resource Report for Douglas County, Washington United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

Custom Soil Resource Report for Wright County, Minnesota

Custom Soil Resource Report for Wright County, Minnesota United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

PARKER GROUNDWATER w Technology, Innovation, Management

PARKER GROUNDWATER w Technology, Innovation, Management Hydrogeologic Consulting in Groundwater Resources Technical Memorandum September 16, 2017 To: W.A.T.E.R. & Gateway Neighborhood Association (GNA) From: Timothy K. Parker, PG, CEG, CHG, Parker Groundwater

More information

PRELIMINARY WASTEWATER CAPACITY STUDY

PRELIMINARY WASTEWATER CAPACITY STUDY PRELIMINARY WASTEWATER CAPACITY STUDY Tentative Tract Map No. 18955 CITY OF HESPERIA Prepared for: HESPERIA VENTURES I, LLC 10410 Roberts Road Calimesa, CA 92320 Tel (714) 785 2381 Mr. John Ohanian Prepared

More information

Low Pressure Drip/Micro System Design Analysis of Potential Rebate

Low Pressure Drip/Micro System Design Analysis of Potential Rebate Low Pressure Drip/Micro System Design Analysis of Potential Rebate Prepared by: Dr. Charles Burt, ITRC Dr. Dan Howes, ITRC Drip/micro irrigation systems are often referred to as low pressure systems because

More information

Custom Soil Resource Report for Colquitt and Cook Counties, Georgia

Custom Soil Resource Report for Colquitt and Cook Counties, Georgia United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. Part 257.82 PLANT MCINTOSH ASH POND 1 GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R. Part

More information

December 4, Hingham School Building Committee Hingham Town Hall 210 Central Street Hingham, MA 02043

December 4, Hingham School Building Committee Hingham Town Hall 210 Central Street Hingham, MA 02043 P a r e C O R P. C O M E n g i n e e r s S c i e n t i s t s P l a n n e r s December 4, 2017 Hingham School Building Committee Hingham Town Hall 210 Central Street Hingham, MA 02043 Re: Foster Elementary

More information

At its December 14, 2017 meeting, the Planning Commission recommended approval of the voluntary agricultural and forestal district.

At its December 14, 2017 meeting, the Planning Commission recommended approval of the voluntary agricultural and forestal district. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i January 22, 2018 11B. PUBLIC HEARING AG & FORESTAL DISTRICT DARDEN, FALLS, BROWN, WIDMEYER AND BELTRAMI OPENING STATEMENT This public hearing is

More information

The Big Picture SOILS, WETLANDS AND DEVELOPMENT SOILS OVERVIEW BRUCE BARBER. PWS, Soil Scientist Certified Ecologist CORNERSTONE ASSOCIATES

The Big Picture SOILS, WETLANDS AND DEVELOPMENT SOILS OVERVIEW BRUCE BARBER. PWS, Soil Scientist Certified Ecologist CORNERSTONE ASSOCIATES SOILS, WETLANDS AND DEVELOPMENT BRUCE BARBER PWS, Soil Scientist Certified Ecologist CORNERSTONE ASSOCIATES 1770 CENTRAL STREET YORKTOWN HEIGHTS NY 10598 PHONE: (914) 962-7733 FAX: (914) 962-0330 EMAIL:

More information

VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION

VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION FORM B ANIMAL WASTE Department of Environmental Quality VPA FORM B ANIMAL WASTE INSTRUCTIONS This form is to be completed by applicants requesting a VPA

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GREENE COUNTY ASH POND ALABMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment

More information

At its November 8, 2018 meeting, the Planning Commission recommended approval of the voluntary agricultural and forestal district.

At its November 8, 2018 meeting, the Planning Commission recommended approval of the voluntary agricultural and forestal district. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session December 17, 2018 11G. PUBLIC HEARING AG & FORESTAL DISTRICT CARTER A. SMITH. ET ALS OPENING STATEMENT This public hearing is held pursuant to Section

More information

Variable Frequency Drive (VFD) Controlled Irrigation Pumps Analysis of Potential Rebate

Variable Frequency Drive (VFD) Controlled Irrigation Pumps Analysis of Potential Rebate Variable Frequency Drive (VFD) Controlled Irrigation Pumps Analysis of Potential Rebate Well pumps, booster pumps, and a combination of the two are used throughout the agricultural sector to provide water

More information

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington

APPENDIX A. Hydraulic Investigations: Cascade Mall at Burlington APPENDIX A m SUMMARY REPORT FOR E.I.S. Hydraulic Investigations: Cascade Mall at Burlington July 12, 1982 John E. Norman, P.E. 14779 Northeast 32nd, #A201 Bellevue, WA 98007 (206) 882-1767 92 General A

More information

Hydrologic Study Report for Single Lot Detention Basin Analysis

Hydrologic Study Report for Single Lot Detention Basin Analysis Hydrologic Study Report for Single Lot Detention Basin Analysis Prepared for: City of Vista, California August 18, 2006 Tory R. Walker, R.C.E. 45005 President W.O. 116-01 01/23/2007 Table of Contents Page

More information

Loam Ridge Almond Orchard

Loam Ridge Almond Orchard AG-LAND Investment Brokers 645 Antelope Blvd., Suite 17 PO Box 896 Red Bluff, CA 96080 530-529-4400 Fax 530-527-5042 Loam Ridge Almond Orchard Contact: AG-LAND Investment Brokers Prepared by FSA Date:

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT YATES ASH POND B (AP-B ) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

BIG HORN BASIN IRRIGATION WATER MANAGEMENT P ROGRAM

BIG HORN BASIN IRRIGATION WATER MANAGEMENT P ROGRAM BIG HORN BASIN IRRIGATION WATER MANAGEMENT P ROGRAM Lateral Move Sprinkler System B I G H O R N B A S I N I R R I G A T I O N W A T E R M A N A G E M E N T P R O G R A M Looking at a New System: The Systems

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT DANIEL ASH POND B MISSISSIPPI POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY

BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY BENEFITS FROM IMPROVING FLOOD IRRIGATION EFFICIENCY Report of Progress 544 Agricultural Experiment Station Kansas State University, Manhattan Walter R. Woods, Director BENEFITS FROM IMPROVING FLOOD IRRIGATION

More information

Use of Irrigation in East Texas - Pastures and Forages

Use of Irrigation in East Texas - Pastures and Forages Use of Irrigation in East Texas - Pastures and Forages Pineywoods Cattle Congress April 13, 2012 Guy Fipps, P.E. Professor and Extension Agricultural Engineer Charles Swanson Extension Program Specialist

More information

Custom Soil Resource Report for Kent County, Michigan

Custom Soil Resource Report for Kent County, Michigan United States Department of Agriculture Natural Resources Conservation Service A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other

More information

SAMPLE DRAINAGE STATEMENT

SAMPLE DRAINAGE STATEMENT Firm Name & Logo Hidalgo County Drainage District No. 1 Drainage Statement Subdivision Name Hidalgo County, Texas Prepared By: Firm's Name Address City, State, Zip Telephone Fax Email Date SAMPLE DRAINAGE

More information

IRRIGATION SYSTEM EVALUATION

IRRIGATION SYSTEM EVALUATION Coastal San Luis Resource Conservation District 645 Main Street, Suite F, Morro Bay, CA 93442 (805) 772-4391 www.coastalrcd.org IRRIGATION SYSTEM EVALUATION For Grower DATE EVALUATOR G.W. Bates, PE, CPESC

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT BARRY ASH POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or any

More information

MOLOAʻA VALLEY FARMS SUBDIVISION

MOLOAʻA VALLEY FARMS SUBDIVISION MOLOAʻA VALLEY FARMS SUBDIVISION TAX MAP KEY (4) 4-9-011-013 Agricultural Master Plan - 1 - Introduction:...3 Parcel-wide Agricultural Considerations...3 Agricultural Use Details by Unit:...6 Unit 1:...6

More information

FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO

FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO FINAL DRAINAGE REPORT FOR LOT 2 BECKETT AT WOODMEN HILLS FILING NO. 3 7368 MCLAUGHLIN ROAD COLORADO SPRINGS, COLORADO October 4, 2017 Revised November 2018 Prepared For: TBONE CONSTRUCTION 1310 FORD STREET

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN 40 C.F.R. PART 257.82 PLANT BOWEN ASH POND 1 (AP-1) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals from Electric Utilities Final Rule (40 C.F.R.

More information

IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL

IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL IMPROVED WATER RESOURCE MANAGEMENT USING AN ACOUSTIC PULSED DOPPLER SENSOR IN A SHALLOW OPEN CHANNEL Mike Cook 1, PhD Craig Huhta 1 SonTek/YSI Inc., San Diego, California, USA Abstract. Over the years

More information

Michael Cahn and Barry Farrara, UC Cooperative Extension, Monterey Tom Bottoms and Tim Hartz, UC Davis

Michael Cahn and Barry Farrara, UC Cooperative Extension, Monterey Tom Bottoms and Tim Hartz, UC Davis Water Use of Strawberries on the Central Coast Michael Cahn and Barry Farrara, UC Cooperative Extension, Monterey Tom Bottoms and Tim Hartz, UC Davis As acreage of strawberries has steadily increased in

More information

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257

INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257 INITIAL RUN-ON AND RUN-OFF CONTROL PLAN 40 C.F.R. PART 257.81 PLANT BOWEN PRIVATE INDUSTRY SOLID WASTE DISPOSAL FACILITY (ASH LANDFILL) GEORGIA POWER COMPANY EPA s Disposal of Coal Combustion Residuals

More information

IRRIGATION SYSTEM DEVELOPMENT CHECK LIST Project Name: Project No: Project Date: Client Name: Ph:

IRRIGATION SYSTEM DEVELOPMENT CHECK LIST Project Name: Project No: Project Date: Client Name: Ph: ATTACHMENT A IRRIGATION AUSTRALIA LIMITED IRRIGATION SYSTEM DEVELOPMENT CHECK LIST Project Name: Project No: Project Date: Client Name: Ph: Email: Project Address: General Aim of the Irrigation System:

More information

Sprinkler System Capacity. AE-91 (Revised), August 2005 Tom Scherer, Extension Agricultural Engineer

Sprinkler System Capacity. AE-91 (Revised), August 2005 Tom Scherer, Extension Agricultural Engineer AE-91 (Revised), August 2005 Tom Scherer, Extension Agricultural Engineer Click here for an Adobe Acrobat PDF file suitable for printing. (220KB) The four basic methods of irrigation are: subsurface irrigation

More information

SOP 21: Evaluation of design and operation of a micro-sprinkler system

SOP 21: Evaluation of design and operation of a micro-sprinkler system SOP 21: Evaluation of design and operation of a micro-sprinkler system Updated 7/28/14 Estimated completion time: 8 hours Materials and equipment needed: 1. Data sheet 2. Clipboard 3. Sharpie pen 4. Flags

More information

Executive Summary. 164 South Quaker Lane Hyde Park, Dutchess County, New York Tax parcel identification number:

Executive Summary. 164 South Quaker Lane Hyde Park, Dutchess County, New York Tax parcel identification number: Executive Summary 164 South Quaker Lane Hyde Park, Dutchess County, New York Tax parcel identification number: 1332-6264-2-73765 South Quaker Lane (Dutchess County Route 16) divides this 8.5 acre parcel

More information

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake

Upper Lightning Lake Water Level Management Environmental Assessment Worksheet. Attachment D Design Report for Upper Lightning Lake Upper Lightning Lake Water Level Management Environmental Assessment Worksheet Attachment D Design Report for Upper Lightning Lake DESIGN REPORT for Upper Lightning Lake Wetland Enhancement MN-332-2 I

More information

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship

Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Embedded Energy in Water Studies Study 1: Statewide and Regional Water-Energy Relationship Prepared by GEI Consultants/Navigant Consulting, Inc. Prepared for the California Public Utilities Commission

More information

DESIGN OF A DRIP IRRIGATION SYSTEM FOR 80 ACRES OF ALMONDS IN ARBUCKLE, CALIFORNIA. Alexander E. Marsh

DESIGN OF A DRIP IRRIGATION SYSTEM FOR 80 ACRES OF ALMONDS IN ARBUCKLE, CALIFORNIA. Alexander E. Marsh DESIGN OF A DRIP IRRIGATION SYSTEM FOR 80 ACRES OF ALMONDS IN ARBUCKLE, CALIFORNIA. by Alexander E. Marsh BioResource and Agricultural Engineering BioResource and Agricultural Engineering Department California

More information

Technical Memorandum

Technical Memorandum Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum To: Joel Carrasco From: Monica Salguero Company: Tetra Tech Date: August 10, 2010

More information

Erosion Control Through the Application of Gypsum. Erick Osorno. College of The Sequoias. July Sept Advisors

Erosion Control Through the Application of Gypsum. Erick Osorno. College of The Sequoias. July Sept Advisors 1 Erosion Control Through the Application of Gypsum Erick Osorno College of The Sequoias July 1 2016 - Sept 15 2016 Advisors Kelli Woods, NRCS Visalia Bradley Pannett, NRCS Visalia Dr. Larry Owens, College

More information

For the Irrigation Association Annual Technical Conference Phoenix, AZ. November, 1995

For the Irrigation Association Annual Technical Conference Phoenix, AZ. November, 1995 FERTIGATION TECHNIQUES FOR DIFFERENT IRRIGATION METHODS For the Irrigation Association Annual Technical Conference Phoenix, AZ. November, 1995 by Dr. Charles M. Burt, Director Irrigation Training and Research

More information

Appendix G Soils Characterization Report

Appendix G Soils Characterization Report Appendix G Soils Characterization Report Draft Environmental Impact Report Beacon Photovoltaic Project July 2012 AECOM (805)388-3775 tel 1220 Avenida Acaso (805)388-3577 fax Camarillo, CA 93012 Memorandum

More information

SOP 20: Evaluation of design and operation of a surface drip system

SOP 20: Evaluation of design and operation of a surface drip system SOP 20: Evaluation of design and operation of a surface drip system Updated 7/1/2010 Estimated completion time: field: 8 person hours, data analysis: 4 person hours Materials and equipment needed: 1. Data

More information

Michael Cahn, Barry Farrara, Tim Hartz, Tom Bottoms, and Mark Bolda

Michael Cahn, Barry Farrara, Tim Hartz, Tom Bottoms, and Mark Bolda Strawberry water use on the Central Coast Michael Cahn, Barry Farrara, Tim Hartz, Tom Bottoms, and Mark Bolda With few options for importing water from other areas of the state, water supplies on the Central

More information

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY

INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY INFLOW DESIGN FLOOD CONTROL SYSTEM PLAN PLANT GASTON GYPSUM POND ALABAMA POWER COMPANY Section 257.82 of EPA s regulations requires the owner or operator of an existing or new CCR surface impoundment or

More information

Irrigation Management Practices Cropping A*Syst Katie L. Droscha 01/14/ /15/2013 minor edits by Linda Zabik

Irrigation Management Practices Cropping A*Syst Katie L. Droscha 01/14/ /15/2013 minor edits by Linda Zabik Irrigation Management Practices Cropping A*Syst Katie L. Droscha 01/14/2013-01/15/2013 minor edits by Linda Zabik 7.01) Have all irrigation systems been evaluated for application of uniformity? Low Risk

More information

Technical Memorandum Mine Plan of Operations Stormwater Assessment

Technical Memorandum Mine Plan of Operations Stormwater Assessment Tucson Office 3031 West Ina Road Tucson, AZ 85741 Tel 520.297.7723 Fax 520.297.7724 www.tetratech.com Technical Memorandum Mine Plan of Operations Stormwater Assessment To: Kathy Arnold From: David R.

More information

PHYSICAL SOIL PROPERTIES

PHYSICAL SOIL PROPERTIES PHYSICAL SOIL PROPERTIES Physical Soil Properties Santa Cruz County, California Scotts Valley Target Physical Soil Properties This table shows estimates of some physical characteristics and features that

More information

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary

APPENDIX J-3. Orcem Stormwater Management and Treatment Facilities Design Summary APPENDIX J-3 Orcem Stormwater Management and Treatment Facilities Design Summary Stormwater Management & Treatment Facilities Design Summary INTRODUCTION KPFF Consulting Engineers has compiled this report

More information

Waller Ranch SANTA MARIA VALLEY, CALIFORNIA. West Side Santa Maria Berry Ground. 39± Useable Acres ($64,000± per acre) Available for $2,503,000

Waller Ranch SANTA MARIA VALLEY, CALIFORNIA. West Side Santa Maria Berry Ground. 39± Useable Acres ($64,000± per acre) Available for $2,503,000 Waller Ranch SANTA MARIA VALLEY, CALIFORNIA West Side Santa Maria Berry Ground 39± Useable Acres ($64,000± per acre) Available for $2,503,000 Presented by: Rincon corporation WALLER Ranch, Santa Maria

More information

SOUTH HADLEY HIGH SCHOOL ATHLETIC CAMPUS IMPROVEMENTS SOUTH HADLEY, MASSACHUSETTS

SOUTH HADLEY HIGH SCHOOL ATHLETIC CAMPUS IMPROVEMENTS SOUTH HADLEY, MASSACHUSETTS STORMWATER MANAGEMENT REPORT SOUTH HADLEY HIGH SCHOOL ATHLETIC CAMPUS IMPROVEMENTS SOUTH HADLEY, MASSACHUSETTS TABLE OF CONTENTS 1.0 CHECKLIST FOR STORMWATER REPORT 2.0 PROJECT DESCRIPTION 3.0 EXISTING

More information

Manure Management Milk Shake Dairy Ken Johnson Cache County, Utah

Manure Management Milk Shake Dairy Ken Johnson Cache County, Utah Manure Management Milk Shake Dairy Ken Johnson Cache County, Utah Purpose: To provide the site specifications necessary to properly utilize manure generated on the Milk Shake Diary owned and operated by

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

ZEBRA MUSSEL PROJECT STATUS

ZEBRA MUSSEL PROJECT STATUS ZEBRA MUSSEL PROJECT STATUS San Benito County Water District July 8, 2008 Reviewed by: Prepared by: Ali Hasan Christopher Dinsmore, PE Introduction HDR has been contracted with San Benito County Water

More information

PRELIMINARY DRAINAGE STUDY

PRELIMINARY DRAINAGE STUDY PRELIMINARY DRAINAGE STUDY FOR BIG ROCK CLUSTER SOLAR FARMS PREPARED FOR: Daniel Kolta 90FI 8me LLC & 92JT 8me LLC 211 Sutter Street, Fl. 6 San Francisco, CA. 94108 Prepared 5 15 17 Revised 5 26 17 Revised

More information

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 217 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 2-S3N-R2 AFIN: 32-42 JANUARY 17, 218 217 Landfill Inspection Report Entergy Independence Plant Class 3N

More information

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company

Inflow Design Flood Control System Plan for Louisa Generating Station CCR Impoundment. MidAmerican Energy Company Control System Plan for Louisa Generating Station CCR Impoundment MidAmerican Energy Company October 10, 2016 Control System Plan for Louisa Generating Station CCR Impoundment Prepared for MidAmerican

More information

USING CPNOZZLE FOR SPRINKLER PACKAGE SELECTION

USING CPNOZZLE FOR SPRINKLER PACKAGE SELECTION USING CPNOZZLE FOR SPRINKLER PACKAGE SELECTION Bill Kranz Associate Professor Biological Systems Engineering University of Nebraska Northeast Research and Extension Center Norfolk, Nebraska VOICE: 402-370-4012

More information

Appendix J Effluent Pump Station

Appendix J Effluent Pump Station Appendix J Effluent Pump Station TECHNICAL MEMORANDUM Salmon Creek Treatment Plant Effluent Pump Station Hydraulics and Phasing Analysis for the Phase 5A Project Columbia River Outfall and Effluent Pipeline

More information

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs) VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM B - ANIMAL FEEDING OPERATIONS (AFOs) Department of Environmental Quality Rev. 02-2013 VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION FORM

More information

Using Evapotranspiration Reports for Furrow Irrigation Scheduling IRRIGATION MANAGEMENT S E R I E S

Using Evapotranspiration Reports for Furrow Irrigation Scheduling IRRIGATION MANAGEMENT S E R I E S IRRIGATION MANAGEMENT S E R I E S Using Evapotranspiration Reports for Furrow Irrigation Scheduling Danny H. Rogers Extension Agricultural Engineer Cooperative Extension Service Manhattan, Kansas Efficient

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

Hydromodification Management Measures

Hydromodification Management Measures Chapter 7 Hydromodification Management Measures This Chapter summarizes the requirements for controlling erosive flows from development projects. 7.1 Why Require Hydromodification Management? Changes in

More information

RETENTION BASIN EXAMPLE

RETENTION BASIN EXAMPLE -7 Given: Total Tributary Area = 7.5 ac o Tributary Area within Existing R/W = 5.8 ac o Tributary Area, Impervious, Outside of R/W = 0.0 ac o Tributary Area, Pervious, Outside of R/W = 1.7 ac o Tributary

More information

Central Oregon Irrigation District

Central Oregon Irrigation District Central Oregon Irrigation District On-Farm Water Conservation Report Prepared by: Black Rock Consulting 320 SW Upper Terrace Drive, Suite #102, Bend, Oregon 97702 (541) 480-6257 & Farmers Conservation

More information

Long-Term Salinity Buildup on Drip/Micro Irrigated Trees in California

Long-Term Salinity Buildup on Drip/Micro Irrigated Trees in California Long-Term Salinity Buildup on Drip/Micro Irrigated Trees in California Charles M. Burt 1, Brett Isbell 2, and Lisa Burt 3 Executive Summary The Irrigation Training and Research Center (ITRC) of Cal Poly

More information

MBARI Sanitary Sewer Analysis Report

MBARI Sanitary Sewer Analysis Report Revised 9-10-08 MBARI Sanitary Sewer Analysis Report Executive Summary: This Sanitary Sewer Analysis Report has been prepared for the Monterey Bay Aquarium Research Institute (MBARI) located on Moss Landing

More information

McColl Fence Addition GEOTECHNICAL ASSESSMENT

McColl Fence Addition GEOTECHNICAL ASSESSMENT McColl Fence Addition GEOTECHNICAL ASSESSMENT Prepared For: Stuart McColl 1038 Hooker Road Sequim, WA 98382 SEPTEMBER 2012 Prepared By: Trent T. Adams, EIT Justin C. Wilson, PE NTI ENGINEERING & LAND SURVEYING

More information

TOOLS FOR BETTER IRRIGATION. Room December

TOOLS FOR BETTER IRRIGATION. Room December TOOLS FOR BETTER IRRIGATION Room 308-309 December 6 2017 CEUs New Process Certified Crop Advisor (CCA) Sign in and out of each session you attend. Pickup verification sheet at conclusion of each session.

More information

Sizing Calculations and Design Considerations for LID Treatment Measures

Sizing Calculations and Design Considerations for LID Treatment Measures SCVURPPP C.3 Workshop December 18, 2012 Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program

More information

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc.

Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. Appendix J: The Project Stormwater Control Plan by Lea & Braze Engineering, Inc. STORMWATER CONTROL PLAN 23 LOT SUBDIVISION ON PROCTOR ROAD CASTRO VALLEY, CALIFORNIA Owner/Developer: Hue Tran 4584 Ewing

More information

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment. POND SITE SELECTION AND CONSTRUCTION Uses, Planning, & Design David Krietemeyer Area Engineer USDA-NRCS June 20, 2008 Uses Considerations for Location of Commonly Used Terms Pond A water impoundment made

More information

DRIP EMITTER SYSTEM STUDY GUIDE

DRIP EMITTER SYSTEM STUDY GUIDE DRIP EMITTER SYSTEM STUDY GUIDE Minimum Criteria for Pressurized Subsurface Absorption Fields Utilizing Emitters. Subsurface systems utilizing emitters may be used in lieu of conventional or other alternative

More information

IRRIGATION DESIGN & MAINTENANCE FOR MAXIMUM EFFCIENCY

IRRIGATION DESIGN & MAINTENANCE FOR MAXIMUM EFFCIENCY IRRIGATION DESIGN & MAINTENANCE FOR MAXIMUM EFFCIENCY Donald D. Franklin CID, CLIA, don.franklin@hunterindustries.com (916) 899-9437 What Are The Goals Of Irrigation Design? Provide adequate soil moisture

More information

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition STANDARD FOR SLOPE PROTECTION STRUCTURES Definition Structures to safely conduct surface runoff from the top of a slope to the bottom of the slope. Purpose The purpose of this practice is to convey storm

More information