1 IAEA NPP Bidding Publications and Nuclear Contracting Toolkit John Moore Division of Nuclear Power Vienna, Austria, February 11, 2016 (Infrastructure Workshop)
2 Topics IAEA Bidding related publications Nuclear Contracting Toolkit project Demo! 2
3 IAEA BIDDING RELATED PUBLICATIONS 3
4 Milestones in the Development of a National Infrastructure for Nuclear Power (NG-G-3.1) Infrastructure development program 1 st. NPP Project MILESTONE 1 MILESTONE 2 MILESTONE 3 Nuclear power option Ready to make a Ready to invite bids Ready to commission and included within the knowledgeable commitment for the first NPP operate the first NPP national energy strategy to a nuclear programme PHASE 3 Maintenance and continuous infrastructure improvement Activities to implement a first NPP PHASE 2 Preparatory work for the construction of a NPP after a policy decision has been taken Preparing PHASE for 1 assuming Considerations commitments before & a decision obligations to launch a nuclear power programme is taken Pre project Project decision making Construction Feasibility study years Bidding Bidding process Process Operation / decommissioning Commissioning INFRASTRUCTURE DEVELOPMENT PROGRAMME 4
5 IAEA Guidance on Bidding Bid Invitation Specifications for Nuclear Power Plants (IAEA-TRS-275, 1987) Technical Evaluation of Bids for Nuclear Power Plants (IAEA-TRS-204, 1981) Economic Evaluation of Bids for Nuclear Power Plants (IAEA-TRS-396, 2000) Invitation and Evaluation of Bids for Nuclear Power Plants (IAEA-NG-T-3.9, 2011) 5
6 Bid Invitation Specifications (TRS-275, 1987) Content of a BIS for a new NPP Info to be provided by Owner; Information requested from bidders. Traditional competitive bid scenario. 6
7 Technical Bid Evaluation (TRS-204, 1981) Detailed guide on technical evaluation of bids. Objectives; Basis for evaluaiton; Scope of evaluation; Evaluation methods; Approaches; Preparation / organization; Implementation; Problem areas; Nuclear Fuel; Negotiations. 7
8 Economic Bid Evaluation (TRS-396, 2000) Details on economic bid evaluation. Contract approaches, Basis for evaluation; Evaluation methods; Financing; Implementation of evaluation; Technology transfer; IAEA System of accounts. Contained original BIDEVAL 3 software as an attached CD- ROM. 8
9 Invitation and Evaluation of Bids for Nuclear Power Plants (NG-T-3.9, 2011) Describes bidding process Emphasize activities related to bid invitation, technical & economic evaluation & contracting Indicates how and to what degree activities preceding preparation of bid invitation specification, evaluation of bids & contracting could influence the process. 9
10 Bidding Process 10
11 Remaining problem issues NG-T-3.9 refers to IAEA BIDEVAL-3 software in a number of places, however it is no longer supported by the IAEA and we no longer have access to the source code. Example: 2.9. IAEA ACCOUNT SYSTEM AND BIDEVAL-3 The IAEA has developed a comprehensive account system that can be utilized in the bidding process. The account system is capable of addressing a spectrum of capital costs, fuel cycle costs and O&M costs, from a complete NPP down to individual systems or components. Since the accounting system has a high degree of flexibility, it can be used with all types of reactors, single or dual purpose power plants, and various contractual approaches. The IAEA computer program package for economic bid evaluation (BIDEVAL-3) is a set of computer programs designed to assist the owner in the economic evaluation of bids for nuclear power plants. 11
12 Remaining problem issues (cont. d) Many current new NPP projects are not being handled in traditional manner (competitive bidding); Current documentation doesn t really address sole source / intergovernmental agreement processes {need to evaluate proposals against do nothing or other energy options}. 12
13 Procurement Engineering and Supply Chain Guidelines (new draft NP-T-3.21) New draft guide to be published 2016 (approved and currently in formal editing process); Covers information on: Typical procurement processes; Considerations of special importance and lessons learned; Procurement of services; Procurement of software; Counterfeit and fraudulent items; Proactive methods for new NPPs. 13
14 NUCLEAR CONTRACTING TOOLKIT PROJECT
15 Nuclear Contracting Toolkit Decision made to initiate new project on nuclear contracting toolkit (then called bid evaluation toolkit) starting in early 2015; Project designed to produce a web-based toolkit of easy to use model forms/spreadsheets to assist in various aspects of the bidding and contracting process.
16 Models used : #1 Scottish Government Procurement Roadmap (original version) (current version {January 2016})
17 Models used : #2 Construction Industry Institute Front-End Planning toolkit 17
18 Current toolkit project status IT platform developed; Two consultancy meetings held with external experts to develop process flow and content; Beta version posted to public web site; Working on refining and populating content; Formal presentation at Feb IAEA Infrastructure Meeting (this meeting!); Formal launch to coincide with NP-T-3.21 issuance later in
19 Toolkit home page 19
20 Help still needed Review toolkit content and provide feedback on: Clarity of text (suggest edits as required); Usefulness of tools and guides; Provide: Company specific examples of tools (IAEA will make anonymous / general for use by others); Other useful external references (standards, web sites, documents etc.) that can be referenced within the tool. 20
21 Thank You for Your Participation COMMENTS/QUESTIONS? IAEA Nuclear Energy News available at: 21
Joint ICTP-IAEA School of Nuclear Energy Management November Workforce Planning for Nuclear Power Programmes
2374-58 Joint ICTP-IAEA School of Nuclear Energy Management 5-23 November 2012 Workforce Planning for Nuclear Power Programmes PAGANNONE Brenda International Atomic Energy Agency, IAEA Department of Nuclear
More informationOverview for a feasibility study
Overview for a feasibility study What, Why & Objectives of Feasibility Study? International Atomic Energy Agency Nuclear power option included within the national energy strategy MILESTONE 1 Ready to
More information27 June 2013 Warsaw, Poland. Platts 8 th Annual European Nuclear Power 2013 Procurement for New Nuclear Programs
27 June 2013 Warsaw, Poland Platts 8 th Annual European Nuclear Power 2013 Procurement for New Nuclear Programs 1 Procurement for New Nuclear Programs Nuclear power programs risk and opportunity Supplier
More informationIntegrated Review of Infrastructure for Safety - IRIS
Integrated Review of Infrastructure for Safety - IRIS Technical Meeting on Infrastructure Issues 2 February 2017, Vienna M - Board Room A - Department of Nuclear Safety & Security JUBIN Regulatory Activities
More informationTechnical Meeting on Managing Obsolescence, Spare Parts and Replacement in Operating Nuclear Power Plants
Technical Meeting on Managing Obsolescence, Spare Parts and Replacement in Operating Nuclear Power Plants Shanghai, China 6 9 June 2017 Ref. No: I2-TM-55086 A. Background Information Information Sheet
More informationWHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power
WHY NUCLEAR and to share relevant Government decisions with respect to Nuclear Power Development (COD 2025+). Deploying Nuclear Energy for Power Generation is one of Entry Point OGE Projects (EPP11) in
More informationIndonesia s Experience in Performing a Nuclear Energy System Assessment (NESA) National Nuclear Energy Agency, BATAN - Indonesia
Indonesia s Experience in Performing a Nuclear Energy System Assessment (NESA) Dr. Ferhat Aziz National Nuclear Energy Agency, BATAN - Indonesia Presented at Joint PESS/INPRO/INIG Side Event Nuclear Energy
More informationNPP Grid Interface Key Areas
IAEA Technical Meeting on Flexible (Non-Baseload) Operation for Load Follow and Frequency Control in New Nuclear Power Plants Erlangen, Germany, 6-8 October 2014 NPP Grid Interface Key Areas David Ward
More informationDECOMMISSIONING OF NUCLEAR FACILITIES IN UKRAINE
DECOMMISSIONING OF NUCLEAR FACILITIES IN UKRAINE Tatiana Kilochytska State Nuclear Regulatory Committee of Ukraine Annual Forum for Regulators and Operators in the Field of Decommissioning International
More informationResponding to RFPs. Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs.
Slide 1 Responding to RFIs and RFPs Welcome this module on responding to RFIs and RFPs. Slide 2 In this module Companies today are spending more time planning and conducting a comprehensive screening process
More informationMultiple approaches on supporting nuclear program development and contracting of NPPs
Multiple approaches on supporting nuclear program development and contracting of NPPs STATE NUCLEAR ENERGY CORPORATION ROSATOM Technical Meeting Topical Issues on Infrastructure Development: Development
More informationConstruction Technologies and Management of NPP
Construction Technologies and Management of NPP Nuclear Power Division Ki Sig Kang International Atomic Energy Agency Nuclear power option included within the national energy strategy MILESTONE 1 Ready
More informationGlobal Nuclear Fuel Assurance
Global Nuclear Fuel Assurance William Szymanski Director, Global Nuclear Fuel Assurance Office of Nuclear Energy U.S. Department of Energy February 25, 2009 International Activities International Nuclear
More informationSafety Framework for Nuclear Power Source Applications in Outer Space
Safety Framework for Nuclear Power Source Applications in Outer Space NASA/ESA/ASI/JPL The IAEA Safety Glossary clarifies and harmonizes terminology and usage in the IAEA safety standards. To this end,
More informationNuclear Power: An Option for Kenya s Future Power Mix. By Winfred Ndubai Kenya Nuclear Electricity Board
Nuclear Power: An Option for Kenya s Future Power Mix By Winfred Ndubai Kenya Nuclear Electricity Board PRESENTATION OUTLINE 1 CURRENT & FUTURE ELECTRICITY CAPACITY IN KENYA 2 WHY NUCLEAR? 3 BENEFITS AND
More informationASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR
ASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR Study on Establishing an ASEAN Telecommunications Single Market Post-2015 The ASEAN Secretariat and the Australian
More informationNPP PROGRAM IN INDONESIA
NPP PROGRAM IN INDONESIA Suparman National Nuclear Energy Agency (BATAN) Republic of Indonesia TM on CNPP, Vienna, 18-21 March 2013 General Information An archipelago with 17,508 islands 1.9 million square
More informationThe specific tasks of RF TSO - FSUE VO Safety, related with Implementation of Obligations under the Convention on Nuclear Safety
The specific tasks of RF TSO - FSUE VO Safety, related with Implementation of Obligations under the Convention on Nuclear Safety V.Potapov, M.Kuznetsov, E.Kapralov FSUE VO Safety, Moscow, Russia Under
More informationSudan Development of a National Position for Nuclear Power
Sudan Development of a National Position for Nuclear Power Technical Meeting on Establishing a National Position for New Nuclear Power Programmes and the Pre-Feasibility Studies Vienna 27-30 October, 2015
More informationCNSC Oversight of Counterfeit, Fraudulent and Suspect Items
CNSC Oversight of Counterfeit, Fraudulent and Suspect Items Chantal Gélinas Hosted by the IAEA Bratislava, Slovakia January 19 22, 2016 e-doc: 4898218 nuclearsafety.gc.ca Canadian Nuclear Power Reactor
More informationManaging the supply chain: Challenges and Overcoming in Korean nuclear industry
Managing the supply chain: Challenges and Overcoming in Korean nuclear industry TM on Topical Issues in the Development of Nuclear Power Infrastructure 4-7 February 2014, Vienna, Austria International
More informationIAEA HONG-KONG IAEA APPROACH ON NUCLEAR POWER INTRODUCTION
HONG-KONG APPROACH ON NUCLEAR POWER INTRODUCTION February, 2014 International Atomic Energy Agency V. NKONG-NJOCK INTRODUCTION International Atomic Energy Agency WORLD CHALLENGES - NUCLEAR OPPORTUNITIES
More informationCountermeasures for the Falsification of Quality Verification Documents
Technical Meeting on Procurement Activities and on Counterfeit, Fraudulent and Substandard Items: Experiences and Lessons Learned, IAEA Headquarters, Vienna, Austria, 8-11 September 2014 Countermeasures
More informationDecommissioning Planning
Decommissioning Planning Ingemar Lund - Swedish Radiation Protection Authority, SSI, Sweden IAEA Regional Workshop: Legal and Regulatory Aspects of Decommissioning of Research Reactors Manila, Philippines,
More information2007 ANS Topical Meeting on Decommissioning, Decontamination and Reutilization September 2007, Chattanooga, TN, United States of America
2007 ANS Topical Meeting on Decommissioning, Decontamination and Reutilization 16-19 September 2007, Chattanooga, TN, United States of America Safety of Decommissioning of Nuclear Facilities B. Batandjieva,
More informationNuclear Education & Training in the Philippines
Nuclear Education & Training in the Philippines Roel A. Loteriña Nuclear Training Center Nydia C. Medina International Cooperation Department of Science and Technology Focal agency for nuclear HRD Department
More informationMALAYSIA: OPTIMIZING IAEA & INTERNATIONAL COOPERATION FOR A NEW NUCLEAR POWER PROJECT
MALAYSIA: OPTIMIZING IAEA & INTERNATIONAL COOPERATION FOR A NEW NUCLEAR POWER PROJECT By Dato Dr Muhamad Lebai Juri Director General Malaysian Nuclear Agency IAEA National Liaison Agency OUTLINE Introduction
More information2. General description of the Consulting Services
Reconstruction of Mingachevir Hydroelectric Power Plant Cascade 1. Introduction The main objectives of the Reconstruction of Mingachevir Hydroelectric Power Plant Cascade are to (a) rehabilitation of the
More informationDEVELOPMENT OF INDONESIA S NUCLEAR FUEL CYCLE ROADMAP
11 th INPRO Dialogue Forum Roadmaps for a Transition to Globally Sustainable Nuclear Energy Systems 20-23 October 2015, IAEA, Vienna, Austria DEVELOPMENT OF INDONESIA S NUCLEAR FUEL CYCLE ROADMAP OUTLINE
More informationREQUEST FOR QUOTES. Period of Performance: March 1, 2017 to June 30, Statement of Work:
International Republican Institute 1225 Eye St. NW, Suite 700 REQUEST FOR QUOTES Washington, DC 20005 (202) 408-9450 Procurement Number: GOV2017SC01o Open Date: January 23, 2017 Questions Deadline: January
More informationInternational Experience with PPP Programs: Success, Failure and Key Lessons. 22 February 2012
International Experience with PPP Programs: Success, Failure and Key Lessons Delivering Public-Private Private Partnerships in PNG 22 February 2012 Why PPPs? Value for Money Synergies between design, construction,
More informationExam Duration: 2 hours and 30 minutes
The PRINCE2 Practitioner Examination Sample paper TR Question Booklet Multiple Choice Exam Duration: 2 hours and 30 minutes Instructions 1. You should attempt all 75 questions. Each question is worth one
More informationHIGH-LEVEL MEETING ON INTERNATIONAL AVIATION AND CLIMATE CHANGE
International Civil Aviation Organization 10/8/09 WORKING PAPER HIGH-LEVEL MEETING ON INTERNATIONAL AVIATION AND CLIMATE CHANGE Montréal, 7 to 9 October 2009 Agenda Item 1: Aspirational goals and implementation
More informationIAEA-TECDOC Managing modernization of nuclear power plant instrumentation and control systems
IAEA-TECDOC-1389 Managing modernization of nuclear power plant instrumentation and control systems February 2004 The originating Section of this publication in the IAEA was: Nuclear Power Engineering Section
More informationTECHNICAL MEETING ON TECHNICAL SUPPORT ORGANIZATION (TSO) ROLE AND RESPONSIBILITIES May 2013
TECHNICAL MEETING ON TECHNICAL SUPPORT ORGANIZATION (TSO) ROLE AND RESPONSIBILITIES May 2013 1 MARCH 13 What is TSO? What do we understand as a Technical Support Organization (TSO) in the nuclear business?
More informationJoint ICTP-IAEA School on Nuclear Energy Management. 15 July - 3 August, Lecture Notes. I. Mele IAEA, Vienna, Austria
2473-9 Joint ICTP-IAEA School on Nuclear Energy Management 15 July - 3 August, 2013 Lecture Notes I. Mele IAEA, Vienna, Austria The IAEA Nuclear Energy Management School ICTP, Trieste, 15-2 August 2013
More informationEvolutionary Differences Between CMM for Software and the CMMI
Evolutionary Differences Between CMM for Software and the CMMI Welcome WelKom Huan Yín Bienvenue Bienvenido Wilkommen????S???S??? Bienvenuto Tervetuloa Välkommen Witamy - 2 Adapting an An Integrated Approach
More informationFare Systems Project Management
0 PRESENTATION Fare Systems Project Management 2011 APTA Fare Collection Workshop Fare Collection 101 Miami, FL March 28, 2011 1 Table of Contents Team Formation Project Lifecycle Project Definition Specification
More informationMILA SULLIVAN PROCUREMENT CONSULTANT
PRELIMINARY MARKET CONSULTATIONS IN PRACTICE IRISH EXPERIENCE MILA SULLIVAN PROCUREMENT CONSULTANT MILA@DAXPARTNERSHIP.COM EU PROCUREMENT COMPLIANT COMMUNICATION Treat all suppliers equally Be transparent,
More informationARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK
ARTICLE 4 SPECIFICATIONS AND SCOPES OF WORK As discussed in Article 3, all Standard, Simplified, and Sole Source Purchases begin with written Specifications or a written Scope of Work ( SoW ). The importance
More informationChallenges for Regulators
Challenges for Regulators Past, Present and Future Dr. Michael Binder President and Chief Executive Officer Canadian Nuclear Safety Commission Presentation to the Federal Provincial Territorial Radiation
More informationPlant Life Management Canada
2017/02/22 TWG on LM for NPP Plant Life Management Canada - Copyright - General Utility Focus/Concerns Expanded focus last few years: Still driven primarily by desire to improve Equipment Reliability Index
More informationNEWCOMER STATES AND FINNISH SAFEGUARDS SUPPORT PROGRAMME TO THE IAEA
NEWCOMER STATES AND FINNISH SAFEGUARDS SUPPORT PROGRAMME TO THE IAEA Elina Martikka 1, Tapani Honkamaa 1, Marko Hämäläinen 1, Tommi Lamminpää 2, Päivi Tuulensuu 2. 1 STUK, Helsinki, Finland, 2 TVO, Olkiluoto,
More informationManagement System Standards in the Canadian Nuclear Industry
Canadian Nuclear Safety Commission Commission canadienne de sûreté nucléaire Management System Standards in the Canadian Nuclear Industry Presented by: Pierre Lahaie Director, Management Systems Division
More informationTHE ESTABLISHMENT OF REGULATION FOR SUPPORTING THE DEVELOPMENT OF THE FIRST NPP IN INDONESIA
THE ESTABLISHMENT OF REGULATION FOR SUPPORTING THE DEVELOPMENT OF THE FIRST NPP IN INDONESIA AMIL MARDHA, M.Eng DIRECTORATE FOR REGULATING CONTROL OF NUCLEAR INSTALLATION AND MATERIAL BAPETEN International
More informationProject Charter. Academic Toolbox Renewal Project. Project Manager: Haniyeh Yousofpour. Division: CIO Department: Project Management Office
ITS Project Management Framework Project Charter Academic Toolbox Renewal Project Project Manager: Haniyeh Yousofpour Division: CIO Department: Project Management Office 1 ITS Project Management Framework
More informationManage Deliverables - Construction Step 6 February 2015
Manage Deliverables - Construction Step 6 February 2015 1 Construction Phase Step 1: Needs Development Step 2: Scope Development Step 3: Selection of Design Team Step 4: Design Phase Step 5: Selection
More informationEA Best Practice Workshop Developing an assessment and improvement framework for managing an EA Program
EA Best Practice Workshop Developing an assessment and improvement framework for managing an EA Program The Open Group Conference Washington DC, 18 July 2012 EA Best Practice : 18 July 2012 Slide 1 Aims
More informationCNSC Evaluation of Plant-Specific SAMG
CNSC Evaluation of Plant-Specific SAMG Quanmin Lei IAEA Technical Meeting on Verification and Validation of SAMG Vienna, Austria December 12-14, 2016 e-docs # 5104918 nuclearsafety.gc.ca Outline Summarize
More informationPHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008)
PHASE TWO FOLLOW-UP REPORT ON THE AUDIT OF CONTRACTS (2008) PREPARED BY: Government Audit Services Branch Government of Yukon APPROVED BY: Audit Committee Table of Contents Page PREFACE 3 EXECUTIVE SUMMARY
More informationEU Clearinghouse for NPP OEF
EU Clearinghouse for NPP OEF Artur Mühleisen European Comission Directorate-General Joint Research Center Institute for Energy and Transport P.O. Box 2, Westerduinweg 3 NL-1755ZG Petten, The Netherlands
More informationAgeing Management and Long Term Operation of Nuclear Power Plants
Ageing Management and Long Term Operation of Nuclear Power Plants Senior Regulators Meeting 17 September 2015 Jan BENS AGENDA Belgian Nuclear Reactor Sites LTO Legal Framework LTO Regulatory Framework
More informationYear in Review: Global Water Quality Data
Year in Review: Global Water Quality Data Results: Development and maintenance of global water quality data and information systems to improve accessibility to credible and comparable data; and contribution
More informationMDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3
MDOT ~ Public-Private Partnerships (P3 s) Metro Region Freeway Lighting P3 P3 Definition FHWA defines Public-Private Partnerships (P3 s) as contractual agreements formed between a public agency and a private
More informationIAEA SUPPORT OF GLOBAL DECOMMISSIONING ACTIVITIES
International Conference ECED 2015 Eastern and Central European Decommissioning, 23-25 June 2015, Trnava, Slovakia IAEA SUPPORT OF GLOBAL DECOMMISSIONING ACTIVITIES Ian Gordon Head of Waste Technology
More informationNUPIC General Membership and Vendor Meetings June Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S.
NUPIC General Membership and Vendor Meetings June 2014 Greg Galletti Quality Electrical Vendor Branch Office of New Reactors U.S. NRC 1 Insights from the Fukushima Event 2014 NRC Vendor Inspections Recent
More informationGuidelines for the Development of a Policy for Managing Unsolicited Proposals in Infrastructure Projects
Draft Document Shared for Consultation Purposes Only Not for Redistribution Guidelines for the Development of a Policy for Managing Unsolicited Proposals in Infrastructure Projects March 2017 Draft Document
More informationRadioecological Parameter Values: Revision of the IAEA TRS
OBJECTIVES Revise the IAEA Technical Reports Series No. 364, "Handbook of parameter values for the prediction of radionuclide transfer in temperate environments", published in collaboration with the IUR
More informationJim Reed Group Director Environment, Energy and Transportation Presented to Fiscal Analysts Seminar, Seattle, October 2014
Evaluating PPPs for Transportation: An Analytical Approach for State Legislators Jim Reed Group Director Environment, Energy and Transportation Presented to Fiscal Analysts Seminar, Seattle, October 2014
More informationStatus of Decommissioning Preparation for Kori #1
Status of Decommissioning Preparation for Kori #1 http://www.khnp.co.kr December 6, 2017 KHNP Overview (1/2) AA (S&P), Aa2 (Moody s) KHNP Overview (2/2) Power Plants Operational status in Korea 24 22,529
More informationFor the Project. 1.1 Purpose and Role
Call for Tenders Contract Title: ETUI online course development & Maintenance Contract Reference: Ref. N 2018 ETUI 01. Deadline for Response: 28 March 2018 Contracting Authority: European Trade Union Institute
More informationGuidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities
DRAFT Regulatory Document RD-152 Guidance on the Use of Deterministic and Probabilistic Criteria in Decision-making for Class I Nuclear Facilities Issued for Public Consultation May 2009 CNSC REGULATORY
More informationMaking Access Possible (MAP) Nepal. Pre-bid briefing 21 May 2015
Making Access Possible (MAP) Nepal Pre-bid briefing 21 May 2015 Agenda 1. MAP Objectives 2. MAP Process 3. The MAP Nepal project management landscape 4. The MAP Research process 5. MAP Quality Control
More informationThe eafip innovation procurement Toolkit
The eafip innovation procurement Toolkit Brussels, 4 th of December 2015 12/7/2015 1 The eafip-initiative The eafip initiative focuses on promotion of the benefits of innovation procurement, as well as
More informationSustainable Nuclear Energy technology Platform: SNETP. Deployment strategy: DS 2015
Sustainable Nuclear Energy technology Platform: SNETP Deployment strategy: DS 2015 Task force coordinated by Marylise Caron-Charles Status on July 8, 2015 NEA workshop on Nuclear Innovation roadmap 1 Purpose
More informationPublic Private Partnership PPP & The Egyptian Experience
Public Private Partnership PPP & The Egyptian Experience Bassel Shoirah Project Manager / Utilities Sector - Egypt Good Governance for Development In Arab Countries initiatives of the OECD July 8, 2009
More informationReadiness for Regulating Small Modular Reactors
Readiness for Regulating Small Modular Reactors Nuclear Energy Agency Workshop: Multilateral Cooperation in the Regulatory Reviews of Small Modular Reactors August 10-11, 2017 Ottawa, Ontario, Canada Ramzi
More informationRequirements of Pebble Bed Reactor's Plant Information Model
Requirements of Pebble Bed Reactor's Plant Information Model Topan Setiadipura Research Group on Design and Computational Aspect of HTGR Center for Nuclear Reactor Technology and Safety BATAN - Indonesia
More informationJordan s Nuclear Energy Programme
Technical Meeting on the Country Nuclear Power Profiles Jordan s Nuclear Energy Programme Yasmin Majali 10-13 May 2016 0 Jordan s Country Profile Total Area: 89,213 Km 2 Sea Port: Aqaba Coastline: 26 Km
More informationEU Submission on Mitigation in the 2015 Agreement i
SUBMISSION BY GREECE AND THE EUROPEAN COMMISSION ON BEHALF OF THE EUROPEAN UNION AND ITS MEMBER STATES This submission is supported by Albania, Bosnia and Herzegovina, the Former Yugoslav Republic of Macedonia,
More informationINPRO methodology in the area of economics
9th GIF/INPRO-IAEA Interface Meeting IAEA HQs, Vienna, Austria. 4-5 March 2015 INPRO methodology in the area of economics Developed by B.Dabbs, A.Korinny, J.Phillips, R.Tucci Presented by A.Korinny Introduction
More informationContractor Selection & Management Guideline Rev01. Revision 00. April 2011
Contractor Selection and Management Guideline Revision 00 April 2011 Document Details and Issue Record Rev No. Details Date Author 00 Draft 10/04/2011 CJMD Checked Text Calcs Approved Document Reference:
More informationProject Delivery 101 What Does It All Mean & How Do I Fit?
Project Delivery 101 What Does It All Mean & How Do I Fit? Session Roadmap Speaker Introductions / Audience Makeup Survey David Westphalen, Director, Public Consulting Group Francisco Lujano, Branch Chief,
More informationM. Laraia International Atomic Energy Agency Wagramerstrasse 5 P.O. Box 100 A-1400 Vienna Austria
The History and Evolution of the IAEA Technical Assistance Programme on Decommissioning and the International Decommissioning Network as its Highest Point-9000 ABSTRACT M. Laraia International Atomic Energy
More informationREQUEST FOR COUNCIL ACTION
REQUEST FOR COUNCIL ACTION Date: 8/10/09 Item No.: 1.b Department Approval Acting City Manager Approval Item Description: Discussion of Revised Professional Services Policy 1 6 7 8 9 BACKGROUND The City
More information1. Introduction. 2. Background of the revision process. 1 RASSC, WASSC and NUSSC
The IAEA BSS Revision Status P.Deboodt, R. Czarwinski, NSRW/RSM International Atomic Energy Agency ph.:+43(1)2600-22721/26173 - fax: + 43(1)26007 R.Czarwinski@iaea.org, P.Deboodt@iaea.org 1. Introduction
More informationPOSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT
POSTAL STATION B ENVELOPE REHABILITATION & BASE BUILDING UPGRADE CONSTRUCTION MANAGER FAIRNESS MONITOR FINAL REPORT Submission Date: September 23, 2015 Submitted To: Director, Fairness Monitoring Departmental
More informationInternational Update. Iain Davidson Principal Inspector. Professional Lead Transport Assessment
International Update Iain Davidson Principal Inspector Professional Lead Transport Assessment What ONR Transport are involved in: IAEA (and other regs) EACA ISO Patram IAEA Process Current state of play
More informationIAEA-TECDOC Guidelines for upgrade and modernization of nuclear power plant training simulators
IAEA-TECDOC-1500 Guidelines for upgrade and modernization of nuclear power plant training simulators June 2006 IAEA-TECDOC-1500 Guidelines for upgrade and modernization of nuclear power plant training
More information«TITAN-2 in Hanhikivi 1 NPP project» Big Projects Info Day, Kalajoki Alexander Entin
«TITAN-2 in Hanhikivi 1 NPP project» Big Projects Info Day, Kalajoki 25.08.2016 Alexander Entin The Holding s Geography TITAN-2 Holding is one of the largest group of companies in Northwest Russia TITAN-2
More informationDEFENSE ACQUISITION UNIVERSITY FE Intermediate Facilities Engineering
1 Describe the relationship that exists between weapons systems acquisition and facilities requirements. Identify the milestones within the systems acquisition framework that may require the application
More informationChapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids
Chapter 6. Competitive Sealed Bidding: Elements of an Invitation for Bids Summary This chapter identifies the minimum elements of an invitation for bids when procuring goods or services using the competitive
More informationSecIGD2 Project (Contract Number: )
tso SecIGD2 Project (Contract Number: 323260) RD&D Planning Towards Geological Disposal of Radioactive Waste DELIVERABLE (D-N : 2.3) Guidance for Author(s): T. Beattie, R. Kowe, J. Delay, G. Buckau, D.
More informationGuidelines for Assessors
FP7 288028 Framework Programme (FP) 7 ICT -2011.5.3 Patient Guidance Service (PGS), safety and healthcare record information reuse Combination of CP & CSA Page 1 of 7 Table of Contents GUIDELINES FOR ASSESSORS...
More informationManaging the Bid Process
Managing the Bid Process This document is concerned with the process suppliers of goods and services will typically go through when they are asked to submit a price for undertaking a piece of work. In
More informationFinal minutes of the 21 st meeting of ENSREG 19 th November 2012 Brussels
Final minutes of the 21 st meeting of ENSREG 19 th November 2012 Brussels Participants Members from all EU Member States as well as the European Commission, with the exception of, Cyprus, Denmark, Ireland,
More information9100 Team July, IAQG is a trademark the International Aerospace Quality Group. Copyright 2014 IAQG. All rights reserved.
9100 Series 2016 Revision Overview 9100 Team July, 2014 1 9100 Revision The Plan 9100 Series Revision High Level Plan The 9100 is based on ISO 9001 and is thus affected by the ISO TC176 revision activity
More informationREDD + ANNUAL COUNTRY PROGRESS REPORTING (with semi-annual update) COUNTRY: [Bhutan] PERIOD: [Jan-June 2015]
REDD + ANNUAL COUNTRY PROGRESS REPORTING (with semi-annual update) COUNTRY: [Bhutan] PERIOD: [Jan-June 2015] Background: This country reporting framework has been developed following the structure of the
More informationUNCITRAL Model Legislative Provisions
UNCITRAL Model Legislative Provisions on Privately Financed Infrastructure Projects Prepared by the United Nations Commission on International Trade Law UNITED NATIONS UNCITRAL Model Legislative Provisions
More informationOffice of the Procurement Ombudsman
PROCUREMENT PRACTICE REVIEW Employment and Social Development Canada Information Technology Services Ottawa June 2015 Promoting Fairness Openness and Transparency in Federal Procurement Table of Contents
More informationPacifiCorp 2017R Request for Proposals. Pre-Issuance Bidders Conference May 31, 2017
PacifiCorp 2017R Request for Proposals Pre-Issuance Bidders Conference May 31, 2017 Logistics Conference Date May 31, 2017, 1:00 2:00 PM (Mountain) Location Rocky Mountain Power, North Temple Office 1407
More informationThe 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th
The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not
More informationW I N D A N D S O L A R R F Q / R F P P R O C E S S
W I N D A N D S O L A R R F Q / R F P P R O C E S S S a s k a t c h e w a n R e n e w a b l e s I P P and Supplier I n f o r m a t i o n S e s s i o n S a s k a t o o n, S a s k a t c h e w a n N o v e
More informationDraft Regulatory Guide DG-1080 (Proposed Revision 3 of Regulatory Guide 1.149)
Draft Regulatory Guide DG-1080(Proposed Revi... Page 1 of 6 U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REGULATORY RESEARCH August 1999 Division 1 Draft DG-1080 DRAFT REGULATORY GUIDE Contact:
More informationBackground. Introduction. Overview of vendor design review process
Executive Summary A pre-licensing review of a new nuclear power plant (NPP), also referred to as a vendor design review (VDR), provides an opportunity for CNSC staff to assess a design prior to any licensing
More informationNuclear Energy and Greenhouse Gas Emissions Avoidance in the EU
Position Paper Nuclear Energy and Greenhouse Gas Emissions Avoidance in the EU The European Atomic Forum (FORATOM) is the Brussels-based trade association for the nuclear energy industry in Europe. The
More informationPPP procurement processes in New Zealand A review for the New Zealand Treasury
PPP procurement processes in New Zealand A review for the New Zealand Treasury Consultation questions for PPP market participants 24 March 2017 kpmg.com/nz Purpose of this consultation Purpose KPMG has
More informationWorkshop on Reorganization of the Secretariat General of Commerce: Enhancing SGC s Function as CPB
Workshop on Reorganization of the Secretariat General of Commerce: Enhancing SGC s Function as CPB Sessions 5 and 6 Communication Strategy and Change Management Angela Russo, Head International Cooperation
More informationJoint ICTP-IAEA School of Nuclear Knowledge Management. 1-5 September Elements of Knowledge Management and KM Assessment
1962-24 Joint ICTP-IAEA School of Nuclear Knowledge Management 1-5 September 2008 Elements of Knowledge Management and KM Assessment A. KOSILOV IAEA, INIS & Knowledge Management Section P.O. Box 100 A-1400
More informationNUCLEAR CONSULTING SERVICES
NUCLEAR CONSULTING SERVICES AN EXPERIENCED DEVELOPER OF NEW NUCLEAR POWER PLANTS ABOUT US Brief history Lithuania has more than 30 years of experience operating and decommissioning the Ignalina NPP and
More information