UNIVERSITY OF CALIFORNIA, SAN DIEGO

Size: px
Start display at page:

Download "UNIVERSITY OF CALIFORNIA, SAN DIEGO"

Transcription

1 UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES DESIGN & CONSTRUCTION TEL: (858) FAX: (858) GILMAN DRIVE #09I 6 LA JOLLA, CALIFORNIA March 3, 2017 TO: ALL HOLDERS OF PREQUALIFICATION DOCUMENTS UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO.: 5065/A4L-432/ Enclosed are the following: 1. Addendum No. 2 dated March 1, Revised Advertisement for Design Builder Prequalification dated March 1, Revised Design-Builder dated March 1, NOTE: This addendum is being issued to reflect the addition of a third mandatory Prequalification Conference, extended submittal due dates, and proposal schedule. THE PREQUALIFICATION DUE DATE HAS EXPANDED TO 4:00 P.M., THURSDAY, MARCH 16, Gillie Senior Director of Construction Services Facilities Design and Construction Enclosures

2 UCSD MEDICAL CENTER HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO ADDENDUM NO. TWO TO THE PREQUALIFICATION DOCUMENTS March 1, 2017 General: The following changes, additions, or deletions shall be made to the following documents; all other conditions shall remain the same. I. SPECIFICATIONS Item# 1. ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Delete Advertisement for Design Builder Prequalification and substitute Advertisement for Design Builder Prequalification revised 3/1/ DESIGN-BUILDER PREQUALIFICATION QUESTIONNAIRE Delete Design-Builder and substitute Design- Builder revised 3/1/2017. UCSD - FD&C Page 1 of 1

3 UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build contract are sought from Proposers for the following project: UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ ESTIMATED CONSTRUCTION COST $1,000,000 PREQUALIFICATION OF PROSPECTIVE PROPOSERS The University's primary objective in utilizing the design build approach is to bring the best available integrated design and construction experience to this project. The University strongly discourages Proposers from establishing exclusive arrangements with subcontractors or with subconsultants at this time. Only the names of the Architect(s) and or(s) are to be provided in response to this Request for Prequalification. The University has determined that Proposers who submit proposals on this project must be prequalified. Prequalified Proposers will be required to have the following California contractor's license: GENERAL BUILDING CONTRACTOR, B. GENERAL DESCRIPTION OF WORK In an effort to unify the healthcare branding across all facilities, UC San Diego Health hired BrandActive as a branding/way finding consultant to evaluate the Hillcrest Medical Center Campus and propose updates to the existing building and site signage. BrandActive has completed their assessment resulting in a recommendation document that the Health System has adopted. This project will take those recommendations and produce construction documents utilizing the necessary consultants, get regulatory approval (i.e. OSHPD, etc.), and install the updated signage. PROCEDURES The prequalification process will result in the selection of finalists who will be prequalified and will be issued proposal documents for this Project. The prequalified Proposers will submit price and technical proposals. The technical proposals will be scored according to an established scoring system. The price will be divided by the score to determine a price per technical point. The prequalified Proposer submitting the lowest price per technical point will be the apparent low Proposer for the Project. Level I will be the submittal of prequalification documents described in more detail below. After receipt of the prequalification documents, the University will review and determine a preliminary point score for each submittal. Requests for clarifying information and additional data will be made at this time, if required. After receipt and review of the clarifications and additional data, each prequalification submittal will receive a final point score. April 4, 2016 Advertisement for Prequalification (FDC Rev ) Revised March 1, 2017 Addendum 2 DB:ADBP 1

4 UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ Scoring of Proposers will be determined by the application of an established rating system to the following information (detailed submittal requirements are contained in the ): 1. California or s license 2. Surety and bonding capacity 3. Insurance 4. Construction experience 5. Design experience 6. Design-build experience 7. Design-build team members 8. Financial data 9. Arbitration and litigation claims history 10. Prior disqualification 12. Safety record A Proposer who falls under any of the following categories, will be excluded from further consideration in the prequalification process and from participating in the Level II Interview: 1. Proposer does not have the proper license. 2. Proposer does not meet established minimum standards for bonding capacity (as described in the ). 3. Proposer is not able to obtain required insurance. 4. Proposer does not have the required financial information. 5. Proposer has had a surety finish work on a contract in the last ten (10) years. 6. Proposer is presently disqualified from performing work for the University of California or another Entity. 7. Proposer did not submit required information. The Design-Build delivery process requires the prequalification of a responsible contractor and design firm working together as a Design-Build team. The University will review the Design-Build teams Prequalification Questionnaires. The three (3) Design-Build teams who receive the highest amount of points, with a minimum score of 324, based on the established rating system, will be considered the best qualified teams and designated as the only teams eligible to participate in the Request for Proposal (RFP) process. These Design-Build teams will be issued RFP documents and will be invited to submit a proposal to design and construct the Project. Additional information and details regarding proposal preparation, submittal and the University s evaluation and award process will be provided to the prequalified Design-Build teams in the RFP and at a mandatory pre-proposal conference. The three (3) prequalified proposers will submit proposals that will be evaluated based on a scoring system to be published in the RFP. The successful Design-Build team will be responsible for a subsequent design and construction phases including: completing construction documents and all work required to construct the project. Each member of the Design-Build team shall comply with the applicable laws and codes of the State of California. The Design- Builder shall hold all required licenses and be the financially responsible entity for bonding and insurance as a April 4, 2016 Advertisement for Prequalification (FDC Rev ) Revised March 1, 2017 Addendum 2 DB:ADBP 2

5 UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ mandatory prerequisite for qualification. PREQUALIFICATION SCHEDULE The prequalification documents are available at To view and download Prequalification Questionnaire click on CONTRACTING OPPORTUNITIES, WORK AVAILABLE FOR BID, and the PROJECT NAME. Scroll to the bottom of the page to Prequalification Documents and click to open each file. s will be received only at the following address: FACILITIES DESIGN & CONSTRUCTION UNIVERSITY OF CALIFORNIA, SAN DIEGO N. Torrey Pines Road, Ste. 465 s Department (MC 0916) La Jolla, CA Attention: Rhonda Mitchell, s Manager No prequalification documents will be accepted after 4:00 P.M., THURSDAY, MARCH 16, However, the University reserves the right to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Successful Proposers will be notified of date and time of Level II Interview. Confidentiality of the information provided will be respected to the extent permitted by law. Response to the must be submitted on the forms contained within the. All information requested in these forms must be provided in order to be considered "responsive" to the requirements of the prequalification. The University contacts are Shannon Sigler, Project Manager, or Rhonda Mitchell, s Manager, Facilities Design & Construction, A third mandatory Prequalification Conference will be conducted on Thursday, March 9, 2017, at 11:00 A.M. at Facilities Design and Construction, N. Torrey Pines Rd., Ste. 466, Large Conference Room, La Jolla, CA Campus maps can be found at Attendance at the Prequalification Conference is mandatory for Proposers attempting to become prequalified to bid on this specific project. If your firm has attended the previous meetings on December 14, 2016 or February 15, 2017, you are not required to attend the third meeting. Metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South. Please allow ample time to secure parking. Proposers must be present for the entire conference. PROPOSAL SCHEDULE Following is the anticipated proposal schedule: April 4, 2016 Advertisement for Prequalification (FDC Rev ) Revised March 1, 2017 Addendum 2 DB:ADBP 3

6 UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ Proposal Documents available to the prequalified Proposers March 28, Proposals received April 25, Proposal evaluation and the apparent low proposal determination May 8, The exact dates, times, and location of the RFP documents will be set forth in an Announcement to Prequalified Proposers (advertisement). The University reserves the right to reject any or all responses to s and any or all proposals and to waive non-material irregularities in any response or proposal received. Proposal security in the amount of 10% of the lump sum price proposal, excluding alternates, shall accompany each proposal. The surety issuing the Bid Bond shall be, on the proposal deadline, listed in the latest published State of California, Department of Insurance, list of Insurers Admitted to Transact Surety Insurance in this State. All insurance policies required to be obtained by Proposer shall be subject to approval by University for form and substance. All such policies shall be issued by a company rated by Best as A- or better with a financial classification of VIII or better, or have equivalent ratings by Standard and Poor's or Moody's. The Certificate of Insurance shall be issued on the University s form. Prospective Proposers desiring to be prequalified are informed that they will be subject to and must fully comply with all of the proposal conditions including 100% payment and 100% performance bonds. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Proposer may be required to show evidence of its equal employment opportunity policy. The successful Proposer and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Proposal Documents and to pay prevailing wage at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. ALL CONTRACTORS AND SUBCONTRACTORS MUST BE REGISTERED WITH THE DEPARTMENT OF INDUSTRIAL RELATIONS (DIR) AT THE TIME THE PROPOSALS ARE SUBMITTED. Go to for more information and to register. ors and subcontractors must use the DIR s upgraded electronic certified payroll reporting (ecpr) system to furnish certified payroll records (CPRs) to the Labor Commissioner. ors and subcontractors who have been submitting PDF copies of their CPRs for earlier projects must also begin using the new system. April 4, 2016 Advertisement for Prequalification (FDC Rev ) Revised March 1, 2017 Addendum 2 DB:ADBP 4

7 UCSD MEDICAL CENTER - HILLCREST UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NO. 5065/A4L-432/ No contractor or subcontractor, regardless of tier, may be listed on a Proposal for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section and This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful Prequalified Proposer shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $13 per hour as of 10/1/15, $14 per hour as of 10/1/16, and $15 per hour as of 10/1/17) and shall comply with all applicable federal, state and local working condition requirements. THE REGENTS OF THE UNIVERSITY OF CALIFORNIA University of California, San Diego December 2016 April 4, 2016 Advertisement for Prequalification (FDC Rev ) Revised March 1, 2017 Addendum 2 DB:ADBP 5

8 DESIGN-BUILDER PREQUALIFICATION QUESTIONNAIRE Hillcrest Exterior Signage Update UCSD Medical Center - Hillcrest 5065/A4L-432/ DESIGN-BUILD DELIVERY PREQUALIFICATION DOCUMENTS AVAILABLE: Thursday, December 8, 2016 MANDATORY PREQUALIFICATION CONFERENCE: Wednesday, December 14, 10:00 A.M. THIRD MANDATORY PREQUALIFICATION CONFERENCE: Thursday, March 9, 11:00 A.M. SUBMITTAL DUE DATE: Thursday, March 16, 4:00 P.M. University of California, San Diego Facilities Design & Construction N. Torrey Pines Rd. Ste. 465 La Jolla, CA Rhonda Mitchell UCSD FD&C s Manager (858) rcmitchell@ucsd.edu Issue Date: Revised March 1, 2017 Addendum 2

9

10 (Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this prequalification questionnaire is required to be submitted to the University of California at San Diego.) Note: Submission of an incomplete and/or unclear may result in the determination of the prospective or as NON-PREQUALIFIED. SUBMITTED BY: (Name and Title) Printed or Typed (Signature) (Firm Name. If a Joint Venture, state name if JV Entity) (Contact Name for all notices and correspondence) (Address) (City, State, Zip Code) (Telephone Number) (Facsimile Number) ( Address) Each prospective Proposer must have the following California or s License, License Code: General Building or, B, current, active and in good standing with the California or s State License Board on the date and time of the submittal is due and must submit this Prequalification Questionnaire with all portions completed, including required attachments. Page 1 of 46

11 Each prospective Proposer must answer all of the following questions and provide all requested information, where applicable. Any prospective Proposer failing to do so may be deemed to be not responsive and not responsible with respect to this prequalification at the sole discretion of the University of California. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University of California will maintain its confidentiality to the extent permitted by law. Any prospective Proposer found to be not prequalified as a result of the Proposer's answers to this will receive written response from the University Facility explaining the Facility's decision. If the Proposer can refute some of the facts upon which the decision was based, the Proposer can request a hearing at the Facility to appeal the decision. The appeal shall state the basis of the appeal and must be submitted in writing within three (3) working days of receipt of notification and must request a hearing or a written response from University. The decision of the Facility is final and not appealable within the University of California. The Design Build contract will require the successful Proposer to provide both design and construction services. The entity that provides these services is the Proposer, but the actual structure of the entity is up to each Proposer. The Proposer may, as an example, be a construction company with a design firm as a subcontractor or it may be a joint venture between a construction company and a design firm. In such cases, each member of the Proposer shall submit project experience as required below and such design firms shall comply with the laws of the State of California, applicable to such firms. However, all information required herein shall be submitted within the following parameters: 1. The Proposer shall hold all required licenses. 2. The Proposer shall be the financially responsible entity for bonding and insurance. 3. The University strongly discourages Proposers from establishing exclusive arrangements with subcontractors or with subconsultants at this time. Only the names of the Architect(s) and or(s) are to be provided in response to this Request for Prequalification. Page 2 of 46

12 TABLE OF CONTENTS I. GENERAL... 5 A. Objective... 5 B. Project Description... 5 C. Project Timing... 5 D. Prequalification Process Questionnaire Mandatory Prequalification Conference Submittal Procedures and Deadline Rating and Evaluation Procedures Scoring of Components Proposal Tentative Proposal Schedule (RFP) E. Joint Ventures II. PREQUALIFICATION QUESTIONNAIRE (PART 1) A. Company Name and Address B. Contact Information C. Entity Submitting this D. Type of Business Organization E. Year Company was Established F. Parent Company Information (if applicable) G. List All Former Company Names H. License I. Design Firm (Architect) J. Labor Code Violations K. Unsettled Warranties or Claims III. PREQUALIFICATION QUESTIONNAIRE (PART 2) A. Surety B. Financial Capability C. Financial Data D. Insurance E. Experience Modification Rate IV. DESIGN-BUILD TEAM EXPERIENCE A. Completed Construction Project Experience Page Page 3 of 46

13 1. or's Comparable Projects Design Firm's Comparable Projects B. Supplemental Company Information (or Only) Safety Program Quality Control Processes V. KEY PERSONNEL VI. CLAIMS HISTORY VII. REQUIRED COMPLETED ATTACHMENTS VIII.DECLARATION Page 4 of 46

14 I. GENERAL A. OBJECTIVE The University's primary objective is to utilize the Design-Build approach and bring the best available integrated design and construction experience to this project. The Design-Build delivery process requires the prequalification of a responsible contractor possessing a Class B California General Building or s License and a responsible architectural firm working together as a Design-Build (DB) team. B. PROJECT DESCRIPTION In an effort to unify the healthcare branding across all facilities, UC San Diego Health hired BrandActive as a branding/way finding consultant to evaluate the Hillcrest Medical Center Campus and propose updates to the existing building and site signage. BrandActive has completed their assessment resulting in a recommendation document that the Health System has adopted. This project will take those recommendations and produce construction documents utilizing the necessary consultants, get regulatory approval (i.e. OSHPD, etc.), and install the updated signage. C. PROJECT TIMING The Project will proceed in phases: Phase 1: CONSTRUCTION DOCUMENTS Phase 2: CONSTRUCTION The Project will commence with a Notice to Proceed (NTP) for Phase 1 upon selection and award of the. The anticipated Time is six (6) months from the NTP of Phase 1 to project completion. The Time will include completion of the (Phase 1) Construction Documents and (Phase 2) Construction. D. PREQUALIFICATION PROCESS The Design-Build delivery process requires the prequalification of a responsible contractor and design firm working together as a Design-Build team. The University will review the Design-Build teams Prequalification Questionnaires and the top three (3) scoring Design Build Teams receiving the highest amount of points, scoring of at least 324 points, after the review of the s, based on the established rating system, will be considered the best qualified. The successful Design-Build team will be responsible for completing construction documents, and related work required to construct the project. Each member of the Design-Build team shall comply with the applicable laws and codes of the State of California. The Design-Builder shall hold all required licenses and be the financially responsible entity for bonding and insurance as a mandatory prerequisite for qualification. The purpose of the is to provide the University with sufficient information to determine if a Design-Build team is both experienced and responsible. Page 5 of 46

15 1. Questionnaire Provide all requested information, as applicable, on the questionnaire. Any prospective Design-Build team failing to do so may be deemed non-responsive with respect to the prequalification process for this project. All information submitted for prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law. Availability of s: Thursday, December 8, 2016 s will be available for interested Design-Build teams at: Click on CONTRACTING OPPORTUNITIES, WORK AVAILABLE FOR BID, and the PROJECT NAME. Scroll to the bottom of the page to Prequalification Documents and click to open each file. 2. Mandatory Prequalification Conference Design-Build teams interested in prequalifying to propose on this project are required to attend the Third Mandatory Prequalification Conference on Thursday, March 9, 2017, beginning promptly at 11:00 A.M. IF YOUR FIRM HAS ATTENDED THE PREVIOUS MEETINGS ON DECEMBER 14, 2016 OR FEBRUARY 15, 2017, YOU ARE NOT REQUIRED TO ATTEND THE THIRD MEETING. ANY DESIGN-BUILD TEAM FAILING TO HAVE A REPRESENTATIVE SIGN IN ON THE OFFICIAL ATTENDANCE SHEET AT THE PREQUALIFICATION CONFERENCE WILL NOT BE ELIGIBLE TO PARTICIPATE IN THE PREQUALIFICATION PROCESS. LATE ARRIVALS MAY BE DISQUALIFIED FROM PARTICIPATING. Prospective Design-Build team representatives must participate in the prequalification conference in its entirety. Attendees are urged to arrive approximately 20 minutes prior to the meeting to allow time to secure parking. Limited metered parking spaces are available (for up to 2 hours) in the service yard/shuttle stop parking lot and underground parking area of Torrey Pines Center South. Parking permits are also available at the Information Booth on North Point Drive. 3. Submittal Procedures and Deadline Participants shall meet at: Facilities Design and Construction N. Torrey Pines Rd. Suite 466, Large Conference Room La Jolla, CA Design-Build teams interested in prequalifying to propose on this project must submit a completed. The University is not responsible for any costs that Design-Build teams may incur to complete the prequalification process. All applicable portions of the attached forms or requested (separate) narratives shall be completed with attachments if the space provided on the questionnaire is not sufficient. QUESTIONNAIRES FAILING TO CLEARLY PRESENT ALL OF THE REQUESTED INFORMATION, OR THAT ARE NOT IN THE FORMAT REQUESTED MAY BE CONSIDERED NON-RESPONSIVE AND REJECTED ON THAT BASIS. Each copy of the submittal must be complete and fully responsive to the requirements of the. Last day to ask questions to clarify submittal requirements: 4:00 P.M. Monday, March 13, Address all questions to: Rhonda Mitchell, s Manager Tel.: (858) ; rcmitchell@ucsd.edu Page 6 of 46

16 s must be received at: Hand Delivery or Overnight Express Carrier: Rhonda Mitchell, s Manager University of California, San Diego Facilities Design & Construction North Torrey Pines Road, Suite 465 La Jolla, CA US Mail: Rhonda Mitchell, s Manager University of California, San Diego Facilities Design & Construction 9500 Gilman Drive 0916 La Jolla, CA Provide one (1) original, four (4) copies, and one (1) flash drive of completed Prequalification Questionnaire. Submittals must be received at the above address no later than 4:00 P.M., THURSDAY, MARCH 16, s must be submitted in 3-ring binders with tabs indicating all appropriate sections. Attachments/narratives/statements must be placed behind the appropriate tabs. The front of the binders must indicate the Design-Build team s name and address using the following format: PREQUALIFICATION QUESTIONNAIRE Company Name and Address: Project No.: Project Name: Due Date and Time: Design-Build teams shall assume full responsibility for timely delivery at the location designated for receipt of s. ORAL, TELEPHONIC, FACSIMILE, TELEGRAPHIC, OR ED PREQUALIFICATION QUESTIONNAIRES ARE INVALID AND WILL NOT BE ACCEPTED. NO PREQUALIFICATION DOCUMENTS WILL BE ACCEPTED AFTER THE DUE DATE AND TIME. SUPPLEMENTAL DATA OR ADDITIONAL PROJECT INFORMATION WILL NOT BE ACCEPTED AFTER THE DUE DATE AND TIME UNLESS SPECIFICALLY REQUESTED BY THE UNIVERSITY. Page 7 of 46

17 4. Rating and Evaluation Procedures A. To be considered for prequalification, a prospective Design-Build team must meet the following requirements: 1. CALIFORNIA CONTRACTORS LICENSE: Hold the proper license(s) in good standing, current, and active. 2. SURETY AND BONDING CAPACITY: Submit a notarized statement from the proposed surety(ies) that states: a. or s current available bonding capacity meets or exceeds the minimum capacity described in the Questionnaire. (Must meet or exceed $1,000,000.) b. or s total bonding capacity. c. Surety(ies) proposed to be used on the project is an admitted surety insurer as defined in the California Code of Civil Procedure Section d. Surety (ies) acknowledges its intent to provide bonding of the Project in the event or is awarded the Project. 3. FINANCIAL DATA: a. Have an average annual revenue for the past five (5) years equal to or greater than $6,000,000. b. or should have a financial ratio of at least 1.0 for assets to liabilities (cash, accounts receivable net of allowance for uncollectible receivables) / (accounts payable, current portion of long term debt) c. or should have a debt to net worth ratio (long term debt) / (net worth) of less than 35%. d. THE UNIVERSITY WILL DEEM CONTRACTORS WITH POOR FINANCIAL STANDING NOT QUALIFIED. 4. INSURANCE: Submit a written declaration from its insurance agent/broker/carrier stating that the or is able to obtain insurance that meets or exceeds the limits and ratings required for this project. Submit a copy of or s insurance certificate. 5. DESIGN-BUILD TEAM EXPERIENCE: Have sufficient project experience for the Design- Build team as referenced in the Questionnaire. The projects submitted will receive points based on the extent to which they meet the listed criteria. 6. KEY PERSONNEL: Demonstrate adequate experience for Design-Build team Key Personnel as referenced in Item V (information submitted will receive points based on experience). 7. DECLARATION: Certify that all requested information is current, accurate, and complete. B. To be considered for prequalification, a prospective Design-Build team, including any proposed joint venture partners, must not have: 1. EXPERIENCE MODIFIER RATE: An Experience Modifier Rate (EMR: Workers Comp) injury rating above 1.15 for the past five (5) years. 2. SURETY: A surety required to complete work on any contract within the past ten (10) years. 3. CONTRACTOR LICENSE BOARD DISCIPLINARY PROCEEDINGS: A ors State License Board disciplinary action in the past ten (10) years. 4. LABOR CODE VIOLATIONS: Willful Labor Code violations including, but not limited to, repeated or willful violations of applicable laws and/or regulations pertaining to the payment of prevailing wages or employment of apprentices during the past ten (10) years. 5. CLAIMS HISTORY: Unfavorable claims history or claims for projects of the University of California system. 6. UNSETTLED WARRANTIES OR CLAIMS: Pending or unsettled warranties. After review of the, the University may request clarifying information. The Questionnaire must be complete and address all the stated requirements. Responses such as Page 8 of 46

18 N/A are not acceptable. If not applicable, state Not Applicable and explain why. If none, state NONE. Do not leave any spaces blank. Design-Build teams selected for interviews will be notified in writing, and will specify the date, time, and location of their interviews and outline the interview process. The University reserves the right to reopen the Design-Build team Prequalification process if the University determines that there are insufficient prequalified Design-Build teams to support the Proposal process. 5. Scoring of Components Scoring of Design-Build teams will be determined by the application of an established rating system based on the following information: A. Licenses and Certifications prerequisite (Pass/Fail) 1. All firms shall be licensed and registered to perform design and construction services in the State of California. Copies of appropriate documents are to be included with the RFQ submittal. B. Surety/Financial/Insurance prerequisite (Pass/Fail) 1. All firms shall indicate their form of business, (e.g., corporation, partnership, joint venture, or sole proprietor). The Design-Build team member firms shall provide a copy of their last financial statements and quarterly updates if requested by the University. 2. All teams shall provide the evidence of their bonding capacity for the amount of $1,000,000. This evidence shall be in the form of a letter from a licensed bonding company or from an agent normally representing the firm. 3. All firms will prove ability to provide Professional Liability Insurance in the amount of $1,000,000 each occurrence and $2,000,000 aggregate. All firms will prove ability to provide certificates of general liability insurance on the Owner s form in the minimum amounts of $1,000,000 per occurrence and $2,000,000 in the Aggregate, and $1,000,000 business automobile liability. 4. All firms shall disclose their arbitration and litigation claims history. Claims that are unresolved but still pending are not required to be submitted. If the Design-Builder is not a public company, all financial information shall be held in confidence and shall be examined only by the officials responsible for its evaluation. C. Design-Build Team Project Experience (50 points possible) The Architect and or of the proposed Design-Build team shall each have ideally completed a minimum of three (3) and a maximum of six (6) projects with comparable signage scope, in the last ten (10) years which have the following qualifications: Work completed in an operational healthcare setting Site involved exterior high-rise elements Site involved limited access (both physical and time) Project involved OSHPD review, approval, and construction Design-Build contract delivery Page 9 of 46

19 Project included underground utilities Project included exterior site signage D. Qualifications of Key Personnel (45 points possible) 1. Key personnel members and their role for this project shall be identified in the RFQ. A onepage résumé describing relevant education, project experience, and professional certifications of each team member shall be attached. 2. Provide a description of key personnel s role in this project. 3. After the RFQ phase, the selected Design-Build teams may not make any significant changes in the composition of the team member firms, personnel assignments, and individuals roles and responsibilities without the University s written approval. E. Knowledge of Design Build Process (50 points possible) 1. The Design-Build teams shall demonstrate their experience with the Design-Build delivery method including familiarity with the process, risks, responsibilities, and types of participants on both the owner s and Design-Build teams. 2. The evidence shall include a portfolio of the Design-Build teams projects that utilized the Design-Build delivery method. These projects can be of a different building type. Design-Build team shall each submit a minimum of three (3) and a maximum of six (6) projects indicating design team members, building type, size, cost, date complete, and contact references. F. Organization and Management Plan (45 points possible) 1. The Design-Build teams shall demonstrate the team s organizational and management capacity to deliver the project within schedule, quality level and budget specified in this RFQ. 2. Each team shall provide an organizational chart to describe how the Design-Builder intends to manage this project, including internal, subconsultants (design team members and consultants), and owner lines of communication and responsibilities. 3. The organizational chart submitted should have placeholders for subconsultants/ subcontractors at this time. G. Familiarity with the Local Construction Market and Small, Underutilized Business Development Plan (25 points possible) 1. The Design-Build teams shall demonstrate their level of familiarity with the San Diego, California construction market based on their past project experience in this area. Page 10 of 46

20 2. Describe how small, local business participation will be maximized on this project, including outreach to SBE, DBE, WBE, and/or DVBE firms. H. Written and Graphic Methodology for High-Rise Signage Replacement (100 points possible) The Design-Build team shall describe their methodology (written and graphic) for the removal and replacement of the signage located at the top floor of the patient tower. The methodology should include a timeline that addresses the working constraints (physical and radio frequency exposure) and minimizes construction impacts to the operational facility. Methodology should also address the repair and/or upgrade of existing surfaces after the existing signage is removed. I. Quality Control Design and Construction (45 points possible) The Design-Build team shall demonstrate the team s process for providing internal quality control (QC) and coordination of the design document evolution and construction administration to insure coordination between disciplines and subcontractors. Show how the University review comments are tracked and incorporated into the construction documents. Show how the design team will adhere to the project guideline specifications. Illustrate how the processing of submittals and deferred approvals (shop drawings and material data) will flow. Demonstrate how installation QC, testing, and project closeout will occur. Each RFQ shall follow the order of the selection criteria above. Although there is no page count restriction, teams are asked to prepare as efficiently as possible so as to minimize number of pages, using doublesided printing where appropriate. The scoring system shown will be used in evaluating the RFQs. Highest Score Possible Selection Category Associated RFQ Form Prerequisite License / Surety / Financial / Insurance 50 Design-Build Team Project Experience 45 Qualifications of Key Personnel 50 Knowledge of Design-Build Process 45 Organization and Management Plan Familiarity with the Local Construction Market 25 and Small, Underutilized Business Dev. Plan Written and Graphic Methodology for High- 100 Rise Signage Replacement 45 Quality Control Design and Construction 360 TOTAL POINTS Page 11 of 46

21 6. Proposal Up to three (3) of the top scoring Design-Build teams meeting the prequalification requirements and awarded the highest number of points by the evaluation committee, based on the established rating system, will be invited to participate in the Request for Proposals process. Proposers who receive fewer than 324 points will be excluded from further consideration in the prequalification process. Design-Build teams will be notified of their prequalification status after evaluation of the s. Prospective Design-Build teams that do not prequalify as a result of their response to the Questionnaire will receive written notice from the University and may request an informal debriefing. The University reserves the right to reject any or all responses to s and any or all proposals and to waive any non-material irregularities in any response or proposal received. Based on the questionnaire scores, the top three (3) highest scoring teams with a minimum score of 324 will be considered the best qualified teams and designated as the only teams eligible to participate in the Request for Proposal process.design-build teams that successfully prequalify will be invited to submit a proposal to design and construct the project. Additional information and details regarding proposal preparation, submittal and the University s evaluation and award process will be provided to the prequalified Design-Build teams in the RFP and mandatory pre-proposal conference. PROPOSERS SHALL AVOID A CONFLICT OF INTEREST. Any consultant hired with the primary role of developing the program plan or project proposal documents on behalf of the University shall be precluded from participating as a member of the Design-Build team. 7. Tentative Proposal Schedule (RFP) Following is the anticipated proposal schedule: 1. Proposal Documents available to the prequalified proposers March 28, Proposals received April 25, Proposals evaluated and the lowest cost per point determined May 8, 2017 The exact dates, times and location will be set forth in an Announcement to Prequalified Proposers. Page 12 of 46

22 E. Joint Ventures If two (2) entities intend to form a Joint Venture for the purpose of executing the work on the Project, they must state their intentions on the Form. Each entity of the proposed Joint Venture must submit a separate and independent set of the Prequalification Questionnaire forms. To be considered, each entity must meet all the requirements in Paragraph 4, Rating and Evaluation Procedures. Item 4.A.2, Surety, shall be submitted on one of the two applicants forms completely documenting the stated requirements by a qualified Surety. Requests of Design- Builder Joint Ventures to prequalify for this project will not be considered after close of acceptance of prequalification questionnaires unless the University decides that it is in its best interest to reopen the prequalification process in a manner stated in the prequalification questionnaire. Page 13 of 46

23 II. CONTRACTOR PREQUALIFICATION QUESTIONNAIRE PART 1 (Pass/Fail No Points Awarded) All information requested must be furnished on the forms provided below and must be completed in order to prequalify. A. COMPANY NAME AND ADDRESS Company Name: Telephone Facsimile Street Address:,, Street Address City & State Zip Code B. CONTACT INFORMATION Contact Person #1: Contact Person #2: Name, Title Telephone Name, Title Telephone C. ENTITY SUBMITTING THIS PREQUALIFICATION QUESTIONNAIRE Parent Company: Subsidiary: Other: Branch Office: Division: (Please list) D. TYPE OF BUSINESS ORGANIZATION Corporation: Partnership: Sole Proprietorship: State of Incorporation: Joint Venture: Other: (Please list) Total number of employees on payroll in the corporation: Total number of employees on payroll in the local office submitting this prequalification: Principal Office (if different from above): Street Address President s Name: Vice President s Name: Secretary s Name: City, State & Zip Code Page 14 of 46

24 Treasurer s Name: If a partnership, provide the following information: Date of Organization: General: Association Name and complete legal address of each general partner: (Partner s Name) (Partner s Name) (Legal Address) (Legal Address) If a Joint Venture, provide the above information for the financially responsible party. (If more space is needed, provide the information on your company s letterhead with reference to the project name and number, and attach it to this Questionnaire.) E. YEAR COMPANY WAS ESTABLISHED Year established: F. PARENT COMPANY INFORMATION (if applicable) Company Name: Telephone Facsimile Street Address:,, Street Address City & State Zip Code Contact Person: G. LIST ALL FORMER COMPANY NAMES Name, Title Telephone Page 15 of 46

25 H. LICENSE (ALL LICENSES LISTED MUST BE CURRENT, ACTIVE, AND IN GOOD STANDING.) or must have a current and active California State ors license in good standing with a B General Building or Classification for this Project. For Joint Venture applications by two or more licensees, the Joint Venture entities must submit a written commitment to obtain the proper California joint venture license by the submittal deadline, and at least one entity of the joint venture must have a proper license in good standing that is current and active upon submission of the or/design-builder Prequalification Questionnaire. The letter of commitment must include: 1. Name, address, and phone number of the Joint Venture as it will appear on the records of the ors State License Board 2. Name, address, and telephone number of each entity comprising the Joint Venture as it appears on the records of the ors State License Board 3. Name of the Responsible Managing Officer of the Joint Venture 4. Organizational chart of the Joint Venture 5. Signatures of the Responsible Managing Officers for each entity comprising the Joint Venture NOTE: The entity submitting this must be the holder of the requisite license. ALL LICENSES MUST BE MAINTAINED IN GOOD STANDING, CURRENT AND ACTIVE THROUGHOUT THE PROJECT. Does your firm have the required California State ors license? Yes No (Name of Licensee as it appears on record with the California ors State License Board) License No. Issue Date: Expiration Date: License Class/Classes: Description of Classification(s): For Joint Venture: List Joint Venture entity s license information above as the Design-Builder and the license information for the proposed Joint Venture license in the space below: (Name of Licensee as it appears on record with the California ors State License Board) License No. Issue Date: Expiration Date: License Class/Classes: Description of Classification(s): Has the above contractor license(s) been suspended or revoked by the California ors State License Board within the past ten years? If yes, please explain: Yes No Page 16 of 44

26 I. DESIGN FIRM (EXECUTIVE ARCHITECT) TO BE USED ON THIS PROJECT Firm Name: Telephone Facsimile Street Address:,, Street Address City & State Zip Code Contact Person: Name, Title Telephone Provide the name of the Architect of Record to be used on the Project: Name, Title Current License Number J. LABOR CODE VIOLATIONS Has your company, during the past ten years, received a determination by a court or an administrative agency of any Labor Code violations including, but not limited to laws and/or regulations pertaining to the payment of prevailing wages or employment of apprentices on public works projects? Yes No Determinations by a court or an administrative agency of a violation of laws and/or regulations pertaining to the payment of prevailing wages or employment of apprentices on public works projects due to the mistake, inadvertence or neglect of your organization may be grounds for disqualification if there are three or more such determinations during the past ten years. If yes, give details including dates: Page 17 of 44

27 K. UNSETTLED WARRANTIES OR CLAIMS Provide the following information if or has unsettled/pending claims, demands or notices of default issued by any project Owner: Owner Name: Facility s Contact Person: Project Name: Project Number: Recorded Date of Claim/Notice: Type of Warranty: Basis of Claim: Status of Unsettled Warranty: (If more space is needed, provide the information on your company s letterhead with reference to the project name and number and attach it to this Questionnaire. If additional projects need to be included, copy the table above to include the appropriate information.) If the or or Joint Venture partner does not have any unsettled/pending claims, demands or notices of default, please indicate None in the space provided: [THIS SPACE LEFT INTENTIONALLY BLANK] Page 18 of 46

28 III. PREQUALIFICATION QUESTIONNAIRE PART 2: CONTRACTOR S SURETY / FINANCIAL / INSURANCE (Pass/Fail No Points Awarded) A. SURETY List below all Surety companies used by your company within the past ten years and state whether the Surety had to complete any part of your work including, but not limited to warranty-related repairs or other defective workmanship on any contract within the past ten years: Surety Company #1: Surety s Name Telephone Street Address:,, Street Address City & State Zip Code Period Covered Has listed Surety Company #1 completed work for your Company within the past ten years? Yes No Surety Company #2: Surety s Name Telephone Street Address:,, Street Address City & State Zip Code Period Covered Has listed Surety Company #2 completed work for your Company within the past ten years? Yes No Surety Company #3: Surety s Name Telephone Street Address:,, Street Address City & State Zip Code Period Covered Has listed Surety Company #3 completed work for your Company within the past ten years? Yes No Surety Company #4: Surety s Name Telephone Street Address:,, Street Address City & State Zip Code Period Covered Has listed Surety Company #4 completed work for your Company within the past ten years? Yes No (If more space is needed, provide the information on your company s letterhead with reference to the project name and number and attach it to this Questionnaire.) Page 19 of 44

29 B. FINANCIAL CAPABILITY Attach a notarized statement from the surety(ies) that states: (i) evidence of bonding capacity for the amount of $1,000,000; (ii) total bonding capacity; (iii) Surety(ies) proposed to be used on the project is an admitted surety insurer as defined in the California Code of Civil Procedure Section ; and (iv) Surety(ies) acknowledges its intent to provide bonding of the Project in the event or is awarded the Project. C. FINANCIAL DATA For the purposes of this prequalification questionnaire, business construction revenue shall be defined as payments to prospective or for construction services as a General or. 1. Can you truthfully state that your firm has had an average annual business construction revenue of at least $6,000,000 (excluding any and all legal awards) over the last five (5) consecutive years? YES NO 2. If the entity submitting this prequalification questionnaire is a Joint Venture, can the Joint Venture entity truthfully state that each member of the Joint Venture has had an average annual business construction revenue of at least $6,000,000 (excluding any and all legal awards) over the last five (5) consecutive years? YES NO N/A 3. What is your total available bonding capacity? $ 4. Is your company s financial ratio at least 1.0 for assets to liabilities (cash, accounts receivable net of allowance for uncollectible receivables) / (accounts payable, current portion of long term debt)? YES NO If answer is NO, what is your company s current financial ratio for assets to liabilities? 5. Does your company have a debt to net worth ratio (long term debt) / (net worth) of less than 35%? YES NO If answer is NO, what is your company s current debt to net worth ratio? Page 20 of 46

30 6. Can you provide audited financial statements for the last ten (10) years? YES NO If answer is NO, what type of statements will you provide? DO NOT INCLUDE FINANCIAL STATEMENTS WITH THIS PREQUALIFICATION QUESTIONNAIRE. THE UNIVERSITY RESERVES THE RIGHT TO REQUEST AUDITED FINANCIAL STATEMENTS AT A LATER DATE. 7. List average yearly volume of work for each of the past five (5) years. Revenue and amount of reinvestment income. YEAR REVENUE/VOLUME REINVESTED INCOME Page 21 of 46

31 THE FOLLOWING DECLARATION MUST BE SIGNED BY CHIEF FINANCIAL OFFICER OR EQUIVALENT: I,, hereby declare that I am the (Printed Name) (Title) of (Name of Company) and that all of the information submitted under Financial Data above is true, accurate, and complete as of its submission date. (Date) (Signature) Page 22 of 46

32 D. INSURANCE The or wishing to prequalify hereunder is required to submit a copy of or s certificate of insurance evidencing that it shall furnish and maintain Commercial Form of General Liability, Excess Liability (if applicable), or s Professional Liability, Business Automobile Liability, and Workers Compensation insurance in the amounts below. The insurance required for Commercial Form General Liability, Excess Liability, or s Professional Liability, and Business Automobile Liability insurance shall be issued by companies with a Best rating of A- or better, and a financial classification of VIII or better (or an equivalent rating by Standard & Poor or Moody s) written for not less than the following: Minimum COMMERCIAL FORM GENERAL LIABILITY INSURANCE Limits of Liability Requirements Each Occurrence - Combined Single Limit for Bodily Injury and Property Damage: $1,000,000 Products-Completed Operations Aggregate: $2,000,000 Personal and Advertising Injury: $1,000,000 General Aggregate: $2,000,000 Minimum PROFESSIONAL (ERRORS AND OMISSIONS) LIABILITY Limits of Liability Requirement or s Professional Liability (Each Occurrence) $1,000,000 or s Professional Liability (Each Aggregate) $2,000,000 Minimum BUSINESS AUTOMOBILE LIABILITY INSURANCE Limits of Liability Requirement Each Accident - Combined Single Limit for Bodily Injury and Property Damage: $1,000,000 WORKERS COMPENSATION As required by Federal and State of California law EMPLOYER S LIABILITY Limits of Liability Minimum Requirement Each Employee: $1,000,000 Each Accident: $1,000,000 Policy Limit: $1,000,000 Minimum EXCESS/UMBRELLA Limits of Liability Requirement Each Occurrence: Aggregate: N/A N/A Insurance required for Workers Compensation and Employer s Liability Insurance shall be issued by companies that have a (i) Best rating of B+ or better, and a financial classification of VIII or better (or an equivalent rating by Standard & Poor or Moody's) or (ii) that are acceptable to the University. Such insurance shall be written to be not less than the amount required by Federal and State of California law. Page 23 of 46

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION

ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION ADVERTISEMENT FOR DESIGN BUILDER PREQUALIFICATION Subject to conditions prescribed by the University of California, San Diego, responses to the University's prequalification documents for a Design Build

More information

LEVEL I PREQUALIFICATION DOCUMENTS

LEVEL I PREQUALIFICATION DOCUMENTS Project No. LEVEL I PREQUALIFICATION DOCUMENTS for MUIR BIOLOGY BUILDING 3RD FLOOR RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La Jolla,

More information

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA

LEVEL I PREQUALIFICATION DOCUMENTS OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA Project No. 4484/A4L-379/964840 LEVEL I PREQUALIFICATION DOCUMENTS for OUTPATIENT PAVILION UCSD MEDICAL CENTER LA JOLLA University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION

LEVEL I PREQUALIFICATION DOCUMENTS COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION Project No. 4863/A4L-396 LEVEL I PREQUALIFICATION DOCUMENTS for COMPUTER SCIENCE ENGINEERING (CSE) ADDITION AND RENOVATION University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North

More information

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS

LEVEL I PREQUALIFICATION DOCUMENTS GEISEL RESTROOM RENOVATIONS Project No. 5005/A4L-424/ 962520 LEVEL I PREQUALIFICATION DOCUMENTS for GEISEL RESTROOM RENOVATIONS University of California, San Diego FACILITIES DESIGN & CONSTRUCTION 10280 North Torrey Pines Road La

More information

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX

BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA OFC FAX BERRYESSA UNION SCHOOL DISTRICT PURCHASING DEPARTMENT 1376 PIEDMONT RD SAN JOSE, CA 95132 408-923-1871 OFC 408-926-8329 FAX PREQUALIFICATION PACKAGE INSTRUCTIONS FOR PROSPECTIVE MEP SUBCONTRACTORS FEBRUARY

More information

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION

NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION University of California, Irvine 2016-17 State Funded Reroof Multiple Buildings Project No. 5110248 NOTICE INVITING GENERAL CONTRACTOR PREQUALIFICATION The University of California, Irvine (UCI) requests

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANT A BARBARA SANT A CRUZ OFFICE OF THE ASSOCIATE VICE CHANCELLOR CAPITAL PROGRAM MANAGEMENT TEL: (858) 534-2177 FAX: (858) 534-4363

More information

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR

PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR 1. PROJECT TICE PREQUALIFICATION DOCUMENTS FOR SUBCONTRACTORS FOR York Hall Biology/Chemistry Renovation UNIVERSITY OF CALIFORNIA SAN DIEGO a) BNBuilders, Inc. (BNB) intends to award lump sum contracts

More information

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE

CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE CONTRACTOR PREQUALIFICATION REQUIREMENTS DATA CONTRACTORS FOR THE AZUSA UNIFIED SCHOOL DISTRICT 1 TABLE OF CONTENTS Filing of PreQualifications Submittals 3 PREQUALIFICATION QUESTIONNAIRE 6 Page Part I:

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT- FACILITIES

More information

Albany Unified School District Contractor Prequalification

Albany Unified School District Contractor Prequalification Albany Unified School District Contractor Prequalification The Albany Unified School District ( District ) has determined that contractors providing construction services ( Contractor(s) or Firm(s) ) must

More information

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

IRVINE UNIFIED SCHOOL DISTRICT CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Irvine Unified School District ( District ) has determined that bidders on an annual basis must be prequalified prior to submitting a bid on a project

More information

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20

Maintenance and Operations 1302 Service Road Tustin, California (714) CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 Maintenance and Operations 1302 Service Road Tustin, California 92780 (714) 730-7515 CONTRACTOR S PREQUALIFICATION QUESTIONNAIRE, 20 The Tustin Unified School District ( District ) has determined that

More information

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL

OAKLAND UNIFIED SCHOOL DISTRICT FOR NON-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT FOR N-LOCAL PRIME CONTRACTORS PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY QUALIFIED FIRMS RENEWAL OAKLAND UNIFIED SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR CURRENTLY

More information

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS

Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS Morgan Hill Unified SCHOOL DISTRICT SEMI-ANNUAL PREQUALIFICATION QUESTIONNAIRE FOR PROSPECTIVE BIDDERS The Morgan Hill Unified School District ( District ) has determined that contractors on future projects

More information

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT

PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT PREQUALIFICATION PACKAGE FOR MECHANICAL, ELECTRICAL OR PLUMBING CONTRACTORS WARM SPRINGS/ SOUTH FREMONT COMMUNITY NEW ELEMENTARY SCHOOL PROJECT JUNE 23, 2016 NOTICE TO CONTRACTORS TO PREQUALIFY FOR MECHANICAL,

More information

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET

PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Exhibit A PREQUALIFICATION OF CONSTRUCTION CONTRACTORS QUESTIONNAIRE PACKET Submission of Pre-Qualification Packet Deadline: TBD Newcomb Academy AB300 New Construction Project Place of Pre-Qualification

More information

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805)

SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California (805) SANTA PAULA UNIFIED SCHOOL DISTRICT 201 S. Steckel Drive Santa Paula, California 93060 (805) 933-3908 Annual Pre-Qualification for MEP Contractors per Public Contract Code 20111.6 License Classifications:

More information

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK

MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK MASSACHUSETTS STATE COLLEGE BUILDING AUTHORITY REQUEST FOR QUALIFICATIONS TRADE CONTRACTOR SERVICES PART I PROJECT INFORMATION AND DESCRIPTION OF WORK DATE ISSUED: January 10, 2018 DEADLINE FOR WRITTEN

More information

UNIVERSITY OF CALIFORNIA, RIVERSIDE BARN EXPANSION PROJECT. ADVERTISEMENT FOR PREQUALIFICATION for CONSTRUCTION MANAGER/GENERAL CONTRACTOR AT RISK

UNIVERSITY OF CALIFORNIA, RIVERSIDE BARN EXPANSION PROJECT. ADVERTISEMENT FOR PREQUALIFICATION for CONSTRUCTION MANAGER/GENERAL CONTRACTOR AT RISK UNIVERSITY OF CALIFORNIA, RIVERSIDE BARN EXPANSION PROJECT ADVERTISEMENT FOR PREQUALIFICATION for CONSTRUCTION MANAGER/GENERAL CONTRACTOR AT RISK PROJECT. 950493 University of California, Riverside Architects

More information

PREQUALIFICATION QUESTIONNAIRE

PREQUALIFICATION QUESTIONNAIRE PREQUALIFICATION QUESTIONNAIRE FOR HUENEME ROAD RECYCLED WATER PIPELINE PROJECT PHASE II THE PROJECTS AND PREQUALIFICATION In the coming months, the City of Oxnard ( City ) will be bidding a project for

More information

ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS)

ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) ADVERTISEMENT FOR SUBCONTRACTOR QUALIFICATION AND ADVERTISEMENT FOR PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) PROJECT NOTICE DPR Construction, hereinafter called DPR, intends to award

More information

The Bid Date has changed to 03/16/2010 at 2:30 PM.

The Bid Date has changed to 03/16/2010 at 2:30 PM. , Chinatown / North Beach Campus Main Building & Annex Building Curbs Gutters and Sidewalk CCSF Project No. 107 A 1. Summary DOCUMENT 00900 Bid Package 7.20 Curbs Gutters and Sidewalk ADDENDUM NO. 4 (02/22/2009)

More information

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1)

2. Provide a revised bid form which includes revised language in Section II, Bidder Responsiveness Section. (attached to this Addendum 1) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 30, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-110.1

More information

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO.

ACKNOWLEDGMENT OF RECEIPT OF ADDENDUM NO. Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 February 19, 2019 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 4 Project 19-011.3

More information

VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR

VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR VICTOR VALLEY UNION HIGH SCHOOL DISTRICT PREQUALIFICATION QUESTIONNAIRE FOR GENERAL CONTRACTOR AND MECHANICAL, ELECTRICAL, PLUMBING, FIRE PROTECTION AND UNDERGROUND PIPELINE SUBCONTRACTOR LICENSEES (License

More information

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017

REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF CLAIMS LITIGATION INVOICE REVIEW SERVICES GSMJIF. ISSUE DATE: October 2, 2017 NOTE: The GSMJIF will consider qualifications only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the manner described in this Request

More information

UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION

UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION UNIVERSITY OF CALIFORNIA, LOS ANGELES REQUEST FOR PREQUALIFICATION TEACHING AND LEARNING CENTER FOR HEALTH SCIENCES BP 15 CAST IN PLACE CONCRETE & REINFORCING STEEL UCLA PROJECT NUMBER 944020.02 Advertisement:

More information

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272

CHAPTER AUXILIARY SERVICES. Prequalification of Contractors for Educational Facilities Construction 8.272 Prequalification of Contractors for Educational Facilities Construction 8.272 The School Board shall prequalify contractors for a one (1) year period or for a specific project in accordance with the following:

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017 REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: December 11, 2017 DUE DATE: December 28, 2017 Issued by: Rahway Parking Authority NOTE: In the event an interested

More information

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower

DAG Architects, Inc. July South Walton Fire District Fleet Maintenance/Logistics Building & Training Tower DOCUMENT 001153 - REQUEST FOR QUALIFICATIONS 1.1 PURPOSE, LAWS, AND REGULATIONS A. The purpose of the Prequalification Procedure described in this Document is to provide Owner with a mechanism to evaluate

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) DESIGN CONSULTANT FOR EXPANSION JOINT REPLACEMENT Small Business Reserve Procurement M&T BANK STADIUM MSA Project No. 19-021 ISSUE DATE: October

More information

UCLA LUSKIN CONFERENCE AND GUEST CENTER Project

UCLA LUSKIN CONFERENCE AND GUEST CENTER Project UCLA LUSKIN CONFERENCE AND GUEST CENTER Project UNIVERSITY OF CALIFORNIA, LOS ANGELES SEPTEMBER 6, 2013 REQUEST FOR PREQUALIFICATION STRUCTURAL CONCRETE FOR CONSTRUCTION OF THE LUSKIN CONFERENCE AND GUEST

More information

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue

Bidding Conditions. March 22, (Project# 0192) at the. Fresno Chaffee Zoo. Project : Warthog Exhibit. Located at. 894 West Belmont Avenue Bidding Conditions March 22, 2018 (Project# 0192) at the Fresno Chaffee Zoo Project : Warthog Exhibit Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS Addendum - A document issued

More information

2. Provide a revised Section 17 and 27 to our Instructions to Bidders (attached)

2. Provide a revised Section 17 and 27 to our Instructions to Bidders (attached) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 November 19, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-152.0

More information

MARYLAND STADIUM AUTHORITY

MARYLAND STADIUM AUTHORITY MARYLAND STADIUM AUTHORITY REQUEST FOR QUALIFICATIONS (RFQ) GENERAL CONTRACTOR RENOVATIONS TO OPERATIONS OFFICE M&T BANK STADIUM MSA Project No. 19-013 ISSUE DATE: October 9, 2018 MARYLAND STADIUM AUTHORITY

More information

INSTRUCTIONS TO BIDDERS

INSTRUCTIONS TO BIDDERS INSTRUCTIONS TO BIDDERS CONTENTS I. Bid Documents II. Ethical Business Practices III. Contractor Qualifications IV. Performance and Quality Standards V. Bid Evaluation VI. Contract Award VII. Work Operations

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE LEASE-LEASEBACK DEVELOPERS 2017/2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, the Manhattan Beach Unified School District

More information

RE-ADVERTISEMENT FOR PREQUALIFICATION. Bid Package No. 28 Toilet Partitions and Accessories +Fire Extinguishers/Cabinets

RE-ADVERTISEMENT FOR PREQUALIFICATION. Bid Package No. 28 Toilet Partitions and Accessories +Fire Extinguishers/Cabinets RE-ADVERTISEMENT FOR Subject to conditions prescribed by the CM/Contractor, responses to the CM/Contractor s prequalification documents for a Lump Sum Subcontract are sought from prospective Toilet Partitions

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017. REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/BUILD TRADE PARTNERS PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award design-build subcontracts to HVAC, Electrical,

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS NOTE: The City of New Brunswick Parking Authority will consider proposals only from firms or organizations that have demonstrated the capability and willingness to provide high quality services in the

More information

NOTICE TO BIDDERS FOR

NOTICE TO BIDDERS FOR CITY OF SAN LEANDRO STATE OF CALIFORNIA ENGINEERING AND TRANSPORTATION DEPARTMENT NOTICE TO BIDDERS FOR MONARCH BAY DRIVE BRIDGE REPAIR PROJECT NO. 12-144-38-324 BID NO. 12-13.013 1. BID OPENING: The bidder

More information

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center.

ADDENDUM #2. Design/Build Contractor RFP Bid # for the. Joint-Use 21 st Century Post-Century Education Center. ADDENDUM #2 Design/Build Contractor RFP Bid #0606-14 for the Joint-Use 21 st Century Post-Century Education Center SJECCD California July 7, 2014 SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San

More information

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502

PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502 PREQUALIFICATION OF CONTRACTORS FOR EDUCATIONAL FACILITIES CONSTRUCTION 8.502 The School Board shall prequalify contractors for a one (1) year period or for a specific project. This policy prescribes uniform

More information

Fax: (949) Phone: (949)

Fax: (949) Phone: (949) Marissa Lidyoff From: Sent: To: Subject: Attachments: Marissa Lidyoff on behalf of Marissa Lidyoff Monday, February

More information

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached)

1. Provide a revised bid form that reflects revisions to Bidder Responsiveness Section(attached) Philadelphia Regional Port Authority 3460 North Delaware Ave. 2 nd Floor Philadelphia, PA 19134 October 17, 2018 To: All Bidders From: Kate Bailey Director of Procurement Re: ADDENDUM NO. 1 Project 18-074.1

More information

City of Eagle Point 2017 Paving Instruction to Bidders

City of Eagle Point 2017 Paving Instruction to Bidders City of Eagle Point 2017 Paving Instruction to Bidders Issued: August 2, 2017 Closing Date and Time: Wednesday August 16, 2016 at 2:00 pm Project Summary The City of Eagle Point is requesting bids for

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED MAXIMUM PRICE CAYUCOS SANITARY DISTRICT 200 Ash Avenue P.O. Box 333, Cayucos, California 93430-0333 www.cayucossd.org 805-995-3290 REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK (CMAR) SERVICES WITH GUARANTEED

More information

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal

If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be considered non-responsive.

More information

Request for Qualifications Statements

Request for Qualifications Statements Request for Qualifications Statements BND WATER DISTRIBUTION AND WASTEWATER TREATMENT ENGINEERING STATEMENTS ENGINEERING DESIGN SERVICES FOR BND WATER DISTRIBUTION AND WASTEWATER TREATMENT The Brownsville

More information

Bidding Conditions Attachment C

Bidding Conditions Attachment C Bidding Conditions Attachment C REV Date: November 9, 2018 Project Name (Permit Nos. xxx) at the Fresno Chaffee Zoo Project No. xxxx Located at 894 West Belmont Avenue Fresno, CA 93728 Page 1 of 8 DEFINITIONS

More information

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT)

PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) PUBLIC ANNOUNCEMENT REQUEST FOR DESIGN-BUILD SERVICES STATEMENTS OF QUALIFICATIONS (GREENVILLE CITY SCHOOL DISTRICT) The Greenville City School District (the "District") invites interested parties to submit

More information

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION)

ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) ADVERTISEMENT FOR BIDS (AFTER PREQUALIFICATION) Subject to conditions prescribed by the University of California, San Francisco (the University or UCSF ), bids for a Construction Manager at Risk Agreement

More information

ATTENTION CONTRACTORS

ATTENTION CONTRACTORS ATTENTION CONTRACTORS If you download this RFQ from the website, it is your responsibility to advise WOU's Planning Office that you have done so. This will allow us to add you to the Respondent's List,

More information

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department

LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA Phone (916) FAX (916) Purchasing Department Addendum 1 Text 5-9-17 LOS RIOS COMMUNITY COLLEGE DISTRICT 1919 Spanos Court, Sacramento, CA 95825 Phone (916) 568-3071 FAX (916) 568-3145 Purchasing Department Sacramento City College American River College

More information

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL

NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL NEW YORK LIQUIDATION BUREAU REQUEST FOR PROPOSAL June 1, 2009 I. BACKGROUND The New York Liquidation Bureau (the Bureau ) carries out the responsibilities of the New York State Superintendent of Insurance

More information

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature:

Date: Telephone: Company Name: Address: City: State: Zip Code: Contact Person: Title: Authorized Signature: SUBMISSION INFORMATION Kenton County Fiscal Court P.O. Box 792 303 Court Street, Room 207 Covington, Kentucky 41012-0792 QUALIFICATION: Radio Project Phase II RFQ OPENING DATE: December 7, 2015 TIME: 2:00

More information

Pennsylvania Turnpike Commission Harrisburg, Pennsylvania

Pennsylvania Turnpike Commission Harrisburg, Pennsylvania Pennsylvania Turnpike Commission Harrisburg, Pennsylvania NOTICE TO CONTRACTORS REQUEST FOR PREQUALIFICATION PLYMOUTH MEETING MAINTENANCE FACILITY RELOCATION AND CONSTRUCTION PLYMOUTH TOWNSHIP, MONTGOMERY

More information

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS

PREQUALIFICATION AND ADVERTISEMENT FOR BIDS PREQUALIFICATION AND ADVERTISEMENT FOR BIDS Sealed Bid Proposals for UAB Project No. 170177 Honors College Building located at 1321 10th Avenue South, Birmingham AL 35205 will be received by The Facilities

More information

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE

Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Dear Firm Representative: Invitation for Bids for Armed and Unarmed Security Guard Services ADDENDUM NO. 1 ACKNOWLEDGEMENT NOTICE Included with this cover page please find Addendum No. 1 Modification to

More information

New York City Transit (NYCT) DATE: July 19, 2018 CONSTRUCTION/ARCHITECTURAL & ENGINEERING CONTRACT SOLICITATION NOTICE/PROJECT OVERVIEW MTA-NYCT IS NOW ADVERTISING FOR THE FOLLOWING: SSE #: 0000226381

More information

UCSF Precision Cancer Medicine Building January 31, th Street R&S Job No San Francisco, CA Page 1 of 1

UCSF Precision Cancer Medicine Building January 31, th Street R&S Job No San Francisco, CA Page 1 of 1 UCSF Precision Cancer Medicine Building January 31, 2017 San Francisco, CA Page 1 of 1 AMENDMENT F INSTRUCTIONS BIDDERS 1. Bid Security: REVISED Each Bid shall be accompanied by Bid security in the amount

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019. NOTE: In the event an interested firm has downloaded these specifications from the TPA website, you are responsible for providing the TPA via email at Trentonparkingph@aol.com your contact information,

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER AT RISK FOR THE NEW Fire Station No. 1, Fire Administration, Training/Emergency Operations, and Public Works Service Center DUE April 17, 2017 BY 4:00

More information

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW

MANHATTAN BEACH UNIFIED SCHOOL DISTRICT PREQUALIFICATION INFORMATION FOR, 2018 I. BACKGROUND AND OVERVIEW PROSPECTIVE MEP SUBCONTRACTORS FOR LEASE-LEASEBACK PROJECTS, 2018 I. BACKGROUND AND OVERVIEW Pursuant to Education Code section 17406 and Public Contract Code section 20111.6, all prospective first tier,

More information

REQUEST FOR PRE-QUALIFICATION FROM DESIGN-BUILD ENTITIES (RFQ) ACCESS CONTROL PROJECT, PHASE 1 DESIGN-BUILD PROJECT SADDLEBACK COLLEGE

REQUEST FOR PRE-QUALIFICATION FROM DESIGN-BUILD ENTITIES (RFQ) ACCESS CONTROL PROJECT, PHASE 1 DESIGN-BUILD PROJECT SADDLEBACK COLLEGE REQUEST FOR PRE-QUALIFICATION FROM DESIGN-BUILD ENTITIES (RFQ) FOR ACCESS CONTROL PROJECT, PHASE 1 DESIGN-BUILD PROJECT AT SADDLEBACK COLLEGE SOCCCD PROJECT NO. 2060 October 24, 2017 South Orange County

More information

MAHASKA COUNTY, IOWA PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL

MAHASKA COUNTY, IOWA PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL MAHASKA COUNTY, IOWA REQUEST FOR PROPOSALS PUBLIC SAFETY RADIO SYSTEM ANALYSIS PROPOSAL THE MAHASKA COUNTY BOARD OF SUPERVISORS & THE MAHASKA COUNTY EMERGENCY MANAGEMENT AGENCY Contact: Jamey A Robinson

More information

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders

City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders City of Eagle Point South Shasta Pedestrian Bridge Instruction to Bidders Issued: November 15, 2017 Closing Date and Time: January 16, 2018, at 2:00 pm Project Summary The City of Eagle Point is requesting

More information

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary

A D D E N D U M. REPLACE: Project Summary with attached revised Project Summary. 1 Specification Section Project Summary A D D E N D U M 1 TO All Plan Holders ISSUE DATE 20 January 2017 PROJECT # 15-028 REGARDING Switchgear Replacement NARRATIVE PAGES 1 15-02812 KVa Switchgear Replacement Project SPECIFICATION PAGES 10 DRAWING

More information

DOCUMENT POST BID INTERVIEW

DOCUMENT POST BID INTERVIEW DOCUMENT 00 45 90 POST BID INTERVIEW PART 1 GENERAL 1.01 SUMMARY By request of the District, this Section requires the apparent low bidder to attend and participate in a Post Bid Interview with the Construction

More information

Ohio Public Employees Retirement System. Request for Proposal

Ohio Public Employees Retirement System. Request for Proposal Ohio Public Employees Retirement System For: Consulting Services for Development of the Business Intelligence & Analytics Office Date: 9/11/2017 Project Name: Business Intelligence & Analytics Program

More information

As a state agency, the College administration is required to develop procedures for Construction Manager selection.

As a state agency, the College administration is required to develop procedures for Construction Manager selection. COLLEGE of CENTRAL FLORIDA ADMINISTRATIVE PROCEDURE Title: Construction Management Selection Process Page 1 of 2 Implementing Procedure For F.S. 1013.45 Date Approved: 09/11/02 Division: Administration

More information

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION

700 CMR: MASSACHUSETTS DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION 700 CMR 14.00: PREQUALIFICATION OF CONTRACTORS FOR HORIZONTAL CONSTRUCTION Section 14.01: Definitions 14.02: Application for Prequalification of Contractors 14.03: Aggregate Bonding Capacity and Single

More information

Invitation for Bid - Standard Office Furniture / Task Chair

Invitation for Bid - Standard Office Furniture / Task Chair Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described

More information

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION

Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION Request for Proposals for: Construction Management Services For The ADDISON PUBLIC LIBRARY INTERIOR RENOVATION May 19, 2015 The Addison Public Library invites you to submit a reply to this Request for

More information

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015

NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT. Revised February 11, 2015 NOTICE TO PROSPECTIVE BIDDERS REGARDING PRE-QUALIFICATION FOR CONTRACTS FOR ALISAL UNION SCHOOL DISTRICT Revised February 11, 2015 For Projects to be bid from February 12, 2015 to February 11, 2016 Alisal

More information

2060 FOLSOM APARTMENTS

2060 FOLSOM APARTMENTS REQUEST FOR QUALIFICATIONS FOR GENERAL CONTRACTOR SERVICES 2060 FOLSOM APARTMENTS Chinatown Community Development Center and Mission Economic Development Agency ( Chinatown CDC and MEDA ; together, Sponsors

More information

House Doctor Consulting Services Application Package

House Doctor Consulting Services Application Package Public Facilities Department House Doctor Consulting Services Application Package For FY2013 FY2015 House Doctor Consulting Services Project #7005 City of Boston Thomas M. Menino, Mayor Michael Galvin

More information

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1

SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES, DESIGN AND CONSTRUCTION ADDENDUM NO. 1 PROJECT: Longfellow ES Exit Balcony Addition DATE: March 4, 2019 755 Morse Street, SF, CA 94112 SFUSD Project No.12059

More information

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect.

This Addendum is directed to all prime Contract Bidders, and all others to whom Drawings and Specifications have been issued by the Architect. North Campus Entrance and related work Wallace State Community College ADDENDUM 3 PART 1 - GENERAL Project: North Campus Entrance and related work [B.C. # 2016259] Owner: Wallace State Community College

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER SERVICES AT RISK WITH GUARANTEED MAXIMUM PRICE Memphis Cook Convention Center Renovation City of Memphis, Department of Housing and Community Development

More information

PUBLIC CONTRACT CODE SECTION

PUBLIC CONTRACT CODE SECTION PUBLIC CONTRACT CODE SECTION 22160 22169 22160. (a) The Legislature finds and declares that the design build method of project delivery, using a best value procurement methodology, has been authorized

More information

August 31, To Whom It May Concern:

August 31, To Whom It May Concern: August 31, 2017 To Whom It May Concern: The Aerotropolis Atlanta Community Improvement Districts (AACIDs) is soliciting Statements of Qualifications (RFQ) from qualified firm(s) or organization(s) to develop

More information

Ohio Public Employees Retirement System. Request for Proposal

Ohio Public Employees Retirement System. Request for Proposal Ohio Public Employees Retirement System For: Application Performance Monitoring Software Date: March 23, 2018 277 East Town Street Columbus, Ohio 43215 1-800-222-PERS (7377) www.opers.org PLEASE NOTE:

More information

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS

REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION PROJECTS DEPARTMENT OF TRANSPORTATION Transportation Commission and Office of Transportation Safety REQUIREMENTS FOR PROCUREMENT BY THE COLORADO DEPARTMENT OF TRANSPORTATION OF DESIGN-BUILD CONTRACTS FOR TRANSPORTATION

More information

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications: Borough of Park Ridge Request for Qualifications From Engineering Firms Interested in Serving as Environmental Engineer to the Borough of Park Ridge Board of Public Works For the Period January 1, 2019

More information

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations)

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN BUILD SUBCONTRACTORS (DB SUBCONTRACTORS) (BUILDING 590 Deep Foundations) PROJECT NOTICE Skanska USA Inc. hereinafter called SKANSKA, intends to award

More information

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications:

Introduction. Definitions. The following definitions shall apply to and are used in this Request for Qualifications: Borough of Park Ridge Request for Qualifications from Engineering Firms Interested in Serving as Borough Engineer to the Borough of Park Ridge For the Period January 1, 2019 through December 31, 2019 Dated:

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS Delivery Method: Prequalification for Design-Bid-Build Contracts Issue Date: November 17, 2017 Project Name: SWaM 18-20 Pre-qualified Contractors Term Project Code: SWaM-18-20 Commodity/Service: Construction

More information

General Contractor Prequalification for the Biosolids Handling Facility at the Hailey Wastewater Treatment Plant

General Contractor Prequalification for the Biosolids Handling Facility at the Hailey Wastewater Treatment Plant City of Hailey Public Works Department Hailey, Idaho Request for Prequalification Proposals General Contractor Prequalification for the Biosolids Handling Facility at the Hailey Wastewater Treatment Plant

More information

Purchasing and Procurement Policy

Purchasing and Procurement Policy Purchasing and Procurement Policy Purpose The purpose of this document is to implement the requirements of state law with regard to procurement and bidding on public contracts for public works, goods,

More information

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No.

ADDENDUM NO. 1. Date: January 11, for. RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College. BID No. ADDENDUM NO. 1 Date: January 11, 2017 for RFQ for Design-Build Entity, Health Center/ Concession Project at Irvine Valley College BID No. 332 South Orange County Community College District General-All

More information

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C-22 Bid Package No. 2 Hard Demolition C-21 Bid Package No.

More information

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS

REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS OLYMPIA, WASHINGTON REQUEST FOR QUALIFICATIONS AND QUOTES 1716 VEHICLE WRAPS AND DECALS REQUEST FOR QUALIFICATIONS AND QUOTES (RFQQ) RELEASE DATE: April 13, 2017 PRE-PROPOSAL MEETING: Date: April 24, 2017

More information