1 PonTex Bridge Inspection Management System Transportation Short Course October 12, 2011
2 What is PonTex? System to manage bridge safety inspections Developed in-house Relational database Web-based Role-based Will replace (but not yet retire) BRINSAP
3 Why PonTex? or What s Wrong with BRINSAP Legacy brige inspection data (BRINSAP) resides on the mainframe. BRINSAP is in flat file format not a relational database. BRINSAP data is not live updated weekly (or whenever batched mainframe transactions are run).
4 Why PonTex? BRINSAP won t accommodate elemental inspection data. BRINSAP error checking is on back end. BRINSAP has limited audit capability. BRINSAP will not willingly integrate into a Bridge Management Information System.
5 PonTex Attributes Security PonTex security is "role-based." A user can only perform those activities allowed by the role. Data Quality PonTex validates data before it can be submitted for approval. Activation Requirements A set of required fields must be validated before a new bridge can be added to inventory.
6 PonTex Attributes Elements PonTex stores elemental data. History All inspections are stored in PonTex (not just most current). Audit All changes to bridge, roadway and inspection data are logged (who, what, when). Digital Attachments - Capability to store images, etc. associated with inspection event.
7 PonTex Access Each individual user must have an account. Citrix connection through internet:
8 The Dreaded Citrix Gateway (more on this later)
9
10
11
12
13 PonTex Tabs
14
15
16
17
18
19
20
21
22
23 PonTex Overview: Inspection Life Cycle
24 Assignment Inspection Review
25 Assignments
26 Assignment
27 Assignments The "Assignment" tab is used to assign bridges to Bridge Division Inspectors, Primary Contractors, Subcontractors, and Team Leaders. Bridges are selected from the assignment tab, which can be filtered by County, Control, Section, System, etc. Company, contract information, team leaders, and subcontractors must first be created through the Company Tab, Contract Tab, and Users Tab.
28 Assignments A bridge is assigned to a Prime Contractor through a "Contract" and "Work Authorization. A District Bridge Inspection Office user can assign bridges to Prime Contractors. Prime Contractors can assign bridges to their own Team Leaders or to a Subcontractor.
29 Assignment to Team Leader
30 Inspection
31 Inspection
32 Inspection Team Leader retrieves assigned bridges. Span by span elements and components are created for on-system and Harris County bridges Team Leader conducts inspection, recording NBI data for all bridges and Elemental data. Team Leader submits inspection to Prime.
33 NBI Inspection Items
34
35
36
37
38
39 Review
40 Review Team Leader submits inspection to Prime. Prime accepts, rejects, or amends. Prime submits inspection to District Bridge Inspection Office. District accepts, rejects, or amends. Similar process when subs are involved.
41 Review
42 Review
43 Reject Inspection
44 "Prime Contractor" Amend Inspection
45 PonTex Implementation February 2008: Initial release (for testing only): Austin District Fort Worth District San Antonio District Dallas District
46 PonTex Implementation February 2009: Odessa District and Rio Engineering All districts moved to PonTex by July, 2011.
47 Initial Assessment PonTex Friend or Foe? PonTex is plagued by Citrix connection problems. Down time is at an unacceptable level. Inspection costs are up. Work authorizations are taking longer to complete. Inability to input and submit inspection data is affecting apparent compliance.
48 PonTex Friend or Foe? Citrix Issues Unreliable servers Load balancing problems (assigned servers) TxDOT is running the latest unsupported version of CITRIX.
49 PonTex Friend or Foe? Inspection costs have risen significantly from 2009 to 2011: On-system additions +35% Off-system additions +21% Increase in the number of extension requests for Work Authorizations. Increase in apparent number of bridges exceeding designated inspection frequency. Connection issues have slowed development of PonTex enhancements.
50 Friend or Foe? Connection issues have been elevated. TSD is working with TFT to resolve Citrix issues. Considering a stand-alone work station version of PonTex that doesn t require an active Citrix connection to input data.
51 Further Down the Road Implement version 5.2 of PONTIS (release date is unknown at this time). PonTex will feed PONTIS. Will use PonTex elemental inspection data to build initial deterioration models. Inspection data, deterioration models, and cost data will need to be integrated within PONTIS for bridge condition forecasting for various funding and action scenarios maintenance, rehabilitation, replacements.
52 Questions Tom Yarbrough, P.E. (512)
TXDOT BRIDGE MANAGEMENT. BrMUG 2016
TXDOT BRIDGE MANAGEMENT BrMUG 2016 September 20, 2016 Howdy! 2 Texas Scope and Scale Texas has a surface area of 268,596 square miles bigger than the combined area of 14 other states Beaumont to El Paso;
More informationBrM (formerly Pontis)
BrM (formerly Pontis) What is BrM? BrM is a powerful Bridge Management Software tool that is used by over 44 State, Federal, local, and international agencies. BrM, stores bridge inventory and inspection
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Professional Engineering Procurement Services Contract and Work Authorizations TxDOT Internal Audit Division Objective Assess the status of corrective actions for high-risk
More informationReport on. Texas Bridges. as of September Prepared by the Bridge Division Texas Department of Transportation
Report on Texas Bridges as of September 2003 Prepared by the Bridge Division Texas Department of Transportation Printed April 30, 2004 Austin, Texas Copies of this publication have been deposited with
More informationINTERSTATE CORRIDOR PLANNING
INTERSTATE CORRIDOR PLANNING Prioritization of Corridor Studies July 29, 2015 Importance of the Interstate System Texas is an integral part of the national interstate system. The interstate system provides
More information2012 MdQI Conference Quality Transportation- A Hybrid Approach. MDTA Facility Inspection Program- An Inside Look. Ryan C. Nolan Lillian Sidrak
2012 MdQI Conference Quality Transportation- A Hybrid Approach MDTA Facility Inspection Program- An Inside Look Ryan C. Nolan Lillian Sidrak Agenda What we own: The Facilities Where we ve been: Early Inspection
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Construction Inspection Program TxDOT Internal Audit Division Objective To assess the status of corrective actions for high-risk Management Action Plans (MAPs) previously
More informationTXDOT Environmental Management System Verification Audit - Results. TxDOT Short Course October 16, 2013
TXDOT Environmental Management System Verification Audit - Results TxDOT Short Course October 16, 2013 EMS VERIFICATION - BACKGROUND WHY PERFORM AN EMS VERIFICATION? TxDOT and EPA entered into a Consent
More informationEnhanced Pavement Management Program. Pavement Management Program
Enhanced Pavement Management Program Presented to the Transportation and Environment Committee Feb. 12, 2007 VISION STATEMENT Creating the Most Cost Effective, Pavement Management Program in the Nation
More informationCity Contract Management System (CCMS) Prime and Subcontractor Training
City Contract Management System (CCMS) Prime and Subcontractor Training Economic Development Department Small Business Office Table of Contents Topic Slide No. What is SBEDA Compliance - Overview 3 Prime
More informationSAN ANTONIO STREET BRIDGE AT COMAL RIVER. Open House
SAN ANTONIO STREET BRIDGE AT COMAL RIVER Open House May 1, 2018 SAN ANTONIO STREET BRIDGE AT COMAL RIVER, NEW BRAUNFELS COMAL COUNTY OPEN HOUSE MAY 1, 2018 5:00 P.M 7:00 P.M. New Braunfels Civic/Convention
More informationWSP Parsons Brinckerhoff. How to Effectively Market to Prime Contractors. Ruben Landa Senior Communications Manager, Texas/Mountain Region
WSP Parsons Brinckerhoff How to Effectively Market to Prime Contractors Ruben Landa Senior Communications Manager, Texas/Mountain Region ESTABLISH YOURSELF AS AN EXPERT 2 Public Policy Funding Public Administration
More informationPEPS DIVISION SEPTEMBER 2018
PEPS DIVISION SEPTEMBER 2018 Texas Department of Transportation, Right of Way Division May 2, 2016 Mission Mission Work with our TxDOT customers and external partners to procure the most qualified consultants
More informationINTEGRATING FREIGHT IN CORRIDOR PLANNING AND PROJECT DEVELOPMENT. Steve Linhart, AICP Caroline Mays, AICP
INTEGRATING FREIGHT IN CORRIDOR PLANNING AND PROJECT DEVELOPMENT Steve Linhart, AICP Caroline Mays, AICP June 17, 2016 The Importance of Freight Transportation in Texas Almost 4 billion tons of freight
More informationBRIDGE INSPECTION REPORTS 101. Protecting Your Bridge Inventory for the Future Jason Kelly, PE
BRIDGE INSPECTION REPORTS 101 Protecting Your Bridge Inventory for the Future Jason Kelly, PE >> Presentation Overview Program History Data Collection Reporting Sufficiency Rating 5/26/2016 Bridge Inspection
More informationJason Chapman Louisiana DOTD. [Transportation Innovation: Solving Tomorrow s Challenges]
Louisiana s Pontis Implementation Jason Chapman Louisiana DOTD Bridge Management [Transportation Innovation: Solving Tomorrow s Challenges] 2009 Louisiana Transportation Conference Summary: Introduction
More informationInternal Audit Report
Internal Audit Report Preventive Maintenance Equipment & Fleet TxDOT Internal Audit Division Objective To determine if there are adequate practices for ensuring the inspection, maintenance, and repair
More informationVALUE ENGINEERING FOR TxDOT PROJECT MANAGERS
VALUE ENGINEERING FOR TxDOT PROJECT MANAGERS DOs and DON Ts October 13, 2015 What is Value Engineering? From the FHWA website (http://www.fhwa.dot.gov/ve/) Value Engineering (VE) is defined as a systematic
More informationLouisiana s Pontis Implementation
Louisiana s Pontis Implementation Jason Chapman Louisiana DOTD LTRC Seminar Series: Bridge Structures February 21, 2008 Summary: Introduction Pontis Overview Pontis Implementation Status Analysis and Results
More informationAn Evaluation of the Condition of the Nation s Bridge Infrastructure Using Indicators Extracted from National Bridge Inventory Source Files
McClure, Daniell and Langehennig 1 An Evaluation of the Condition of the Nation s Bridge Infrastructure Using Indicators Extracted from National Bridge Inventory Source Files Authors: Scott McClure, P.E.
More informationPEPS DIVISION. October 2018 Where are we now where are we headed
PEPS DIVISION October 2018 Where are we now where are we headed Texas Department of Transportation, Right of Way Division May 2, 2016 Mission Mission Work with our TxDOT customers and external partners
More informationSTATEWIDE TRAFFIC ANALYSIS AND REPORTING SYSTEM (STARS II)
STATEWIDE TRAFFIC ANALYSIS AND REPORTING SYSTEM (STARS II) June 3-5, 2014 Overview: Why is STARS II important? STARS II Statewide Traffic Analysis and Reporting System II Federal requirement for all State
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PERFORMANCE MEASURE 2018 ANNUAL REPORT Per SDCL 2-6-38 1 PAVEMENT CONDITION Leading up to and during the 2015 Legislative Session, the Department worked with the
More informationTEXAS TRANSPORTATION PLAN
TEXAS TRANSPORTATION PLAN TxDOT Planning Conference June 5, 2014 Michelle Maggiore, P.E., CH2M HILL Agenda 1 Performance-based planning what is it? 3 2 How is performance-based planning addressed in the
More informationPROJECT MANAGEMENT. Short Course. October 15, October 15, 2014
PROJECT MANAGEMENT Short Course Agenda Moderator: Randy Hopmann, P.E. TxDOT Administration 8:30-8:50 AM 8:50-9:10 AM 1 ProjectWise and TxDOT: Where we are, and Where we are heading Brent Hillebrenner,
More informationWhy specify Surface Aggregate Classification A (SAC-A)?
Why specify Surface Aggregate Classification A (SAC-A)? TxDOT s Wet Surface Crash Reduction Program (WSCRP) Reduce wet surface crashes & fatalities FHWA mandate issued June 27, 1967 Highway Safety Program
More informationLeveraging Strip Map to Build a Sign Inventory System
Leveraging Strip Map to Build a Sign Inventory System John Nevares, P.E. Austin District Agenda Project Background Project Scope Benefits of Sign Inventory System Live Demonstration Challenges and Solutions
More informationPUNCH LIST MANAGEMENT USING THE CLOUD. John Dames, PE CH2MHILL Blake Axen, PE TxDOT
PUNCH LIST MANAGEMENT USING THE CLOUD John Dames, PE CH2MHILL Blake Axen, PE TxDOT October 15, 2014 North Tarrant Express (NTE) Project - Intro Project Purpose: Improved mobility along one of the most
More informationNEVADA BRIDGE PROGRAM
NEVADA BRIDGE PROGRAM Nancy Kennedy, P.E. Assistant Chief Bridge Engineer - Inventory/Inspection AASHTO SUBCOMMITTEE ON MAINTENANCE BRIDGE TECHNICAL WORKING GROUP July 19, 2016 NEVADA: WE RE #1!!! # Bridges
More informationProcurement and Contract Administration Challenges
Procurement and Contract Administration Challenges Gail Eileen Morea, P.E. PEPS Houston Service Center Manager June 16, 2016 1 Striving for Zero Incidents; Zero Fatalities & Zero Lost-Production Days!
More informationMSE Walls Problems and Solutions
MSE Walls Problems and Solutions Peter Narsavage, P.E. Foundation Engineering Coordinator Ohio Department of Transportation Office of Structural Engineering ODOT Geotechnical Workshop April 11, 2006 Problems
More informationAustin Avenue Bridges Project Walking Tour Agenda
Agenda Event Start End Introductions and Overview 9:00 Environmental Process Section 106 and Consulting Parties Historic Significance of Bridges Project Background Bridge Components Bridge Conditions 9:30
More informationWage Floor Discussion. City Council Briefing September 2, 2015
Wage Floor Discussion City Council Briefing September 2, 2015 Purpose Provide available policy options associated with implementing a wage floor Present Council with research surrounding wage floors in
More informationCity of Dallas Zero Waste Plan: Multi-family/Commercial Update
City of Dallas Zero Waste Plan: Multi-family/Commercial Update Quality of Life, Arts & Culture Committee January 22, 2017 Danielle McClelland Zero Waste Program Manager Sanitation Services Presentation
More informationTEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION
TEXAS DEPARTMENT OF TRANSPORTATION GENERAL SERVICES DIVISION SPECIFICATION NO. * INSPECTION AND TESTING SERVICES OF CRANES PUBLICATION This specification is a product of the Texas Department of Transportation
More informationLouisiana DOTD Our Experiences with Developing a TAMP. Presented by Michael Bridges, P.E. at the IHEEP Conference September 30, 2014
Louisiana DOTD Our Experiences with Developing a TAMP Presented by Michael Bridges, P.E. at the IHEEP Conference September 30, 2014 1 Outline TAMP development Asset management at LADOTD TAMP Requirements
More informationSTRUCTURE AND BRIDGE DIVISION
Sheet 1 of 8 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: State of Good Repair Bridge Project Selection and Eligible Work
More informationSS David L. Seago, P.E. Assistant Director of Construction Dallas District CST Conference
SS 1122 David L. Seago, P.E. Assistant Director of Construction Dallas District Guidance Document (SS 1122) Lists some of the main differences between previous specifications used and newly implemented
More informationResponses to questions received following I-526 Wando Bridge closure As of May 31, 2018
Responses to questions received following I-526 Wando Bridge closure As of May 31, 2018 Structurally Deficient: 1. What is the definition? Bridges are considered structurally deficient where significant
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 016 TITLE: PRE-CONSTRUCTION CONFERENCE APPROVED:
More informationCable Barriers: Texas Research. Scott Cooner, P.E. Program Manager Texas Transportation Institute Arlington Office
Cable Barriers: Texas Research Scott Cooner, P.E. Program Manager Texas Transportation Institute Arlington Office Presentation Outline Cross-median crash problem Evolution of cable barrier in Texas Overview
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Bulk Fuel Management and Reporting TxDOT Internal Audit Division Objective To assess the status of corrective actions for high risk Management Action Plans (MAPs) previously
More information2017 Educational Series RAIL
2017 Educational Series RAIL RAIL OVERVIEW The state of Texas has the most rail lines of any state with a total of 10,469 miles of track, and the most public highway-rail grade crossings with a total of
More informationBridge Management. Developments in Short and Medium Span Bridge Engineering 94. Summary
Developments in Short and Medium Span Bridge Engineering 94 Bridge Management Performance of Steel, Concrete, Prestressed Concrete, and Timber Bridges Kim Stantill-McMcillan Research General Engineer USDA
More informationSTATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple
STATEWIDE ANALYSIS MODEL (SAM-V3) June 5, 2014 Janie Temple Introduction Brief SAM History Intro to SAM-V3 functionality Past and Current SAM projects Future additions to SAM Suggestions from model users
More informationHistoric Bridge Adoption Information Packet
Historic Bridge Adoption Information Packet Harris County Navigation Boulevard Underpass Bridge Commerce Street and Houston Belt & Terminal Railroad over Navigation Boulevard May, 2018 Table of Contents
More informationSummary of Findings. Bridge Inspection and Monitoring. Introduction. Findings
Summary of s Introduction The Province s bridges are aging and their related condition is deteriorating. This situation highlights the need for an adequate system of bridge inspection and planning for
More informationLID Design Competitions
LID Design Competitions Presented by Don Thieman, CPESC, LEED GA ASP Enterprises The Midwest s Most Trusted Site Solutions Provider Purpose of LID Design Competition: To accelerate adoption, adaptation
More informationRail Division 2012 Annual Summary
Rail Division 2012 Annual Summary Overview The Rail Division oversees rail planning and inspection, highway rail crossings, management of stateowned lines (such as the South Orient Rail line (SORR) and
More informationopensap course Build Your Own SAP App in the Cloud 2016 Edition
opensap course Build Your Own SAP App in the Cloud 2016 Edition STORY BRIDGE INSPECTION TRACKER Department of Transportation is responsible for safety of thousands of bridges along the State s highways
More informationDistributed Generation. David C. Schanbacher, P.E. TCEQ Chief Engineer
Distributed Generation David C. Schanbacher, P.E. TCEQ Chief Engineer Background Federal CAA directs EPA to establish National Ambient Air Quality Standards (NAAQS) for commonly-occurring air pollutants
More informationBRIDGIT: User-Friendly Approach to Bridge Management
BRIDGIT: User-Friendly Approach to Bridge Management HUGH HAWK National Engineering Technology Corporation, Canada ABSTRACT BRIDGIT is a bridge management system (BMS) software package intended to meet
More informationSTATE OF ALASKA RFP NUMBER 2515H005 AMENDMENT NUMBER FIVE (5)
STATE OF ALASKA RFP NUMBER 2515H005 AMENDMENT NUMBER FIVE (5) AMENDMENT ISSUING OFFICE: Department of Transportation & Public Facilities Statewide Contracting & Procurement P.O. Box 112500 (3132 Channel
More informationTexas Freight Mobility Plan. Chapter 1: Introduction
Texas Freight Mobility Plan Chapter 1: Introduction Draft August 8, 2014 The Texas Freight Mobility Plan (the Freight Plan) gives Texas a road map for boosting our economic growth potential through a solid
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION PERFORMANCE MEASURE 2016 ANNUAL REPORT Per SDCL 2-6-38 1 PAVEMENT CONDITION Leading up to and during the 2015 Legislative Session, the Department worked with the
More informationPEPS DIVISION PEPS Conference Martin Rodin, P.E.
PEPS DIVISION 2017 PEPS Conference Martin Rodin, P.E. November 3, 2017 Texas Department of Transportation, Right of Way Division May 2, 2016 Mission Mission Work with our TxDOT customers and external partners
More informationSOUTH DAKOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT SYSTEM IMPLEMENTATION. Todd S. Thompson, PE 1
SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION BRIDGE MANAGEMENT SYSTEM IMPLEMENTATION Todd S. Thompson, PE 1 ABSTRACT: The South Dakota Department of Transportation (SDDOT) has successfully taken the standard
More informationThe Metropolitan Transportation Plan. Public Meetings January 2016
The Metropolitan Transportation Plan for North Central Texas Public Meetings January 2016 Presentation Agenda Mobility 2040 Draft Recommendations 2016 Transportation Conformity RTC Policy Bundle Concept
More information1. Q: Should the as-authorized Task 6 be included in the consultant cost proposals?
1. Q: Should the as-authorized Task 6 be included in the consultant cost proposals? A: No, this will be added by amendment so don't include Task 6 in your cost proposals. The other as-authorized task of
More informationGE - Aviation, Services Supplier Quality Specification
GE - Aviation, Services Supplier Quality Specification Printed Copies Will Not Be Kept Up To Date NUMBER: S-485 Part II Revision: 04 ISSUE DATE: 08 Feb 2012 Title: QUALITY SYSTEM STANDARD FOR DISTRIBUTORS
More informationTECHNICAL PROPOSAL SECTION A.
TECHNICAL PROPOSAL SECTION A. A. EXECUTIVE SUMMARY Executive Summary ENERGY SECTOR EXECUTIVE SUMMARY The Kiewit Infrastructure South Co. (Kiewit) design-build team has investigated the challenges specific
More informationFinancial Close Best Practices
The following section will introduce you to the paradigm shift in the way finance departments operate. You will learn about the major subprocesses within a close process and the related best-in-class principles/concepts
More informationMGD 001. Guidance Document for MCS 001. Version 1.0
MGD 001 Guidance Document for MCS 001 Version 1.0 This Microgeneration Installation Standard is the property of Department of Energy and Climate Change (DECC), 3 Whitehall Place, London,SW1A 2HH. DECC
More informationDesign and Implementation of a New Bridge Management System for the Ministry of Transport of Québec
Design and Implementation of a New Bridge Management System for the Ministry of Transport of Québec Reed M. Ellis Stantec Consulting Ltd. Paul D. Thompson Consultant Rene Gagnon Ministère des Transports,
More informationThe ProjectWise Advantage
2014 Bentley Systems, Incorporated The ProjectWise Advantage October 15, 2013 Eddie Anderson Global Practice Leader - ProjectWise Email Eddie.Anderson@Bentley.com LinkedIn - linkedin.com/in/eddiejanderson
More informationTxDOT Public-Private Partnerships Lessons Learned. OMW: Market, Communication, and Policy Trends in Tolling
OMW: Market, Communication, and Policy Trends in Tolling International Bridge, Tunnel and Turnpike Association Monday, June 18, 2012 Edward P. Pensock, Jr., P.E. Director, Strategic Projects Division Texas
More informationMEETING MINUTES. ACEC-IL / IDOT Bridge Committee
MEETING MINUTES ACEC-IL / IDOT Bridge Committee Location: Illinois Department of Transportation 2300 S. Dirksen Parkway Springfield, IL Lower Level Auditorium Meeting Date: March 14, 2017 Topics Discussed:
More informationUtilizing Software to improve Bridge Inspection and Management. inspecttech. Presented by: Jeremy Shaffer, Ph.D. Mike Schellhase
Utilizing Software to improve Bridge Inspection and Management inspecttech Presented by: Jeremy Shaffer, Ph.D. Mike Schellhase Agenda Vision Basics of Inspection and Management Examples of Software Usage
More informationSEATTLE S NEW WMBE INCLUSION PLAN
SEATTLE S NEW WMBE INCLUSION PLAN This past summer Seattle Mayor Mike McGinn announced a new WMBE program for Seattle public works contracts he called an Inclusion Plan to increase women and minority owned
More informationDECEMBER P R O G R E S S R E P O R T
DECEMBER 201 2 P R O G R E S S R E P O R T The My 35 Plan is a dynamic document and will continue to be re-evaluated and updated by the Committee as needed. The My 35 Plan contains the ideas and recommendations
More informationEXHIBIT A SCOPE OF SERVICES MAINTENANCE PERSONNEL SUPPORT
EXHIBIT A SCOPE OF SERVICES I. PURPOSE: MAINTENANCE PERSONNEL SUPPORT The Department is requesting Personnel Support Services to augment the Department s Maintenance personnel in the administration of
More informationUsing Integrated Asset Management System to perform Corridor-Level Analysis
Using Integrated Asset Management System to perform Corridor-Level Analysis Jim Edgerton AgileAssets Inc. September 30, 2014 Acknowledgements Neil Mastin, P.E. Pavement Program Analyst, Pavement Management
More informationProtecting Your Software Throughout the Development Lifecycle (and During Migration)
Protecting Your Software Throughout the Development Lifecycle (and During Migration) Migration Perspectives It s your primary application that s migrating Many HPe3000 applications are home grown ISVs
More informationCONSTRUCTION SOLUTION (CIS MODULE INCLUDED)
UNITED KINGDOM & IRELAND MIDDLE EAST EUROPE CONSILIA TECHNOLOGY CONSTRUCTION SOLUTION (CIS MODULE INCLUDED) Leave the hard work on site sage X3 Construction Solution www.consiliatechnology.com/uk/ INTEGRATE
More informationUNCOVER SAGE 50 CIS. Leave the hard work on site
UNCOVER SAGE 50 CIS Leave the hard work on site Leave the hard work on site It s time to trade up The construction industry is made up of various contracts and subcontracts, so it can be hard to keep track
More informationAASHTOWare Bridge Management Update. Todd Thompson, PE AASHTOWare Bridge Task Force Chairman
AASHTOWare Bridge Management Update Todd Thompson, PE AASHTOWare Bridge Task Force Chairman AASHTOWare Bridge Bridge Rating Bridge Design Bridge Management Software is owned by the states and it s a cooperative
More informationE2 D0 U 1 C 3 A E T D IUOCNA A T IL O S N E A R L I E S S E R I E S HUB/DBE/SBE R A I L
2E 0D1U3CEAT D UI O CN ATAI LO NSAELR ISEESR I E S R AIL HUB/DBE/SBE RAIL IN TEXAS OVERVIEW Since its inception, the Texas Department of Transportation (TxDOT) has focused on meeting the transportation
More informationInternal Audit Report. Rail Project Management TxDOT Office of Internal Audit
Internal Audit Report Rail Project Management TxDOT Office of Internal Audit Objective To evaluate the contract management and oversight of state wide rail projects and programs, specifically, Railroad
More informationINSPECTION OF STEEL & TIMBER PILING
INSPECTION OF STEEL & TIMBER PILING Deterioration and Findings October 17, 2018 Table of contents 1 Numbers of Structures 3-4 2 Aging Structures 5-6 3 4 5 6 7 Critical Findings Bridge Division Guidance
More informationWINDFARM DEVELOPMENT. FM 1847, Pharr District, Cameron County. Date. Footer Text
WINDFARM DEVELOPMENT FM 1847, Pharr District, Cameron County Table of Contents 1 2 3 4 Location Map Windfarm Planning Activities Windfarm Construction Closeout/Negotiations 5 Lessons Learned 2 Location
More informationCurrent Trends in Data Quality and Integrity Issues in Inspections and Risk Based Approach to Investigations; EU perspective
Current Trends in Data Quality and Integrity Issues in Inspections and Risk Based Approach to Investigations; EU perspective Mark Birse / Richard Andrews, MHRA Data Integrity has no relationship with product
More informationInnovative Construction Management. Jim Foringer, PE - ADEC District Contact: (412)
Innovative Construction Management Jim Foringer, PE - ADEC District 11-0 Contact: (412)429-5007 jforinger@state.pa.us Project Personnel 2 Construction Inspection Summary The Construction Inspector uses
More informationIncorporating Performance Measures into NCDOT s Bridge Management System. Rick Nelson, P.E. Jim Edgerton
Incorporating Performance Measures into NCDOT s Bridge Management System Rick Nelson, P.E. Jim Edgerton Agenda About NCDOT Departmental Goals NCDOT s Integrated AMS Performance Management Framework Planning
More informationRelease Notice. Version Release Date: June 18, 2015
Release Date: June 18, 2015 SedonaOffice 8401 Chagrin Blvd Suite 15-B 45185 Joy Road Chagrin Falls, OH 44023 Canton, MI 48187 440.247.5602 Contents About this Document... 5 Overview... 5 Application Enhancements/Improvements...
More informationTEXAS DEPARTMENT OF TRANSPORTATION LAREDO DISTRICT EAGLE FORD SHALE: IMPACTS TO THE TRANSPORTATION SYSTEM
TEXAS DEPARTMENT OF TRANSPORTATION LAREDO DISTRICT EAGLE FORD SHALE: IMPACTS TO THE TRANSPORTATION SYSTEM Melisa D. Montemayor October 23, 2012 Overview 1. Eagle Ford Shale 2. Impact to The System 3. Pavement
More informationEngineering & Capital Improvements. Shore Acres Civic Association August 21 st, 2017
Engineering & Capital Improvements Shore Acres Civic Association August 21 st, 2017 40 th Avenue N Bridge 34 th Avenue NE Storm Drainage Improvements Resiliency Planning Continued Maintenance 40 th Avenue
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 038 TITLE: ENVIRONMENTAL NON-CONFORMANCE
More informationTRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO)
TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) TxDOT TSMO Program Plan Update Tom Fowler, PE Kimley-Horn TxDOT TxDOT Statewide Statewide TSMO TSMO November 27, 2018 Program Program November 27,
More informationCE & I for Construction. Brian Buckel. HQ Construction Division Chief Construction Engineer
CE & I for Construction Brian Buckel. HQ Construction Division Chief Construction Engineer Talking Points Outline the duties and responsibilities of both a) the sponsor s personnel b) DOTD personnel Definitions
More informationKing County Department of Judicial Administration. DOCUMENT EXTRACTION AND CONVERSION PROJECT Part C Scope of Work
King County Department of Judicial Administration DOCUMENT EXTRACTION AND CONVERSION PROJECT Part C Scope of Work CONTENTS 1.0 PURPOSE OF RFP... 4 1.1 The Client Agency...4 1.2 Project Background...4 1.2.1
More informationDesign-Builder Peformance Evaluation (DBPE)
Design-Builder Peformance Evaluation (DBPE) There are five (5) major components of the DBPE document. Each component has multiple categories to facilitate performance evaluation for the Design-Builder,
More informationImplementing EMS to Improve Operational Performance and Energy Management for Dallas Water Utilities. TACWA Meeting May 31, 2013
Implementing EMS to Improve Operational Performance and Energy Management for Dallas Water Utilities TACWA Meeting May 31, 2013 City of Dallas - Continued Growth Dallas' forecast calls for continued growth
More informationProceedings of the 4th Annual Texas Water Reuse Conference. A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas
Proceedings of the 4th Annual Texas Water Reuse Conference A Case Study for Decentralized Wastewater Treatment Plants in Sugar Land, Texas Michael Rolen, P.E. Page 1 Reasons for this Study Subsidence issues
More informationOWNER INITIATED MODERNIZATION OF BRIDGE SAFETY INSPECTIONS
INNOVATIVE ASSET MANAGEMENT Full Paper OWNER INITIATED MODERNIZATION OF BRIDGE SAFETY INSPECTIONS THOMAS MILLS, RON WAKEFIELD Department of Building Construction, Virginia Tech University, 122 Burruss
More informationALTERNATIVE PROJECT DELIVERY
ALTERNATIVE PROJECT DELIVERY 2017 Educational Series ALTERNATIVE PROJECT DELIVERY OVERVIEW TxDOT uses comprehensive development agreements (CDAs) an umbrella term for public-private partnerships in order
More informationResident Management System Newsletter
June 25, 2003 Resident Management System Newsletter Special Points of Interest CEFMS Changes Enhancements Program Fixes RMS Version 2.33 Now Available The RMS Center has posted the latest version of the
More informationInternal Audit Follow-Up Report
Internal Audit Follow-Up Report Rail Project Management TxDOT Internal Audit Division Objective Assess the status of corrective actions for high risk Management Action Plans (MAPs) previously communicated
More informationFinal Estimates Level 2
Florida Department of TRANSPORTATION Final Estimates Level 2 Module 8 Final As Built Plans 11/1/2017 FDOT Final Estimates Level 2 Release 11, Module 8 1 Final As-Built Plans are important to construction,
More informationRetaining Walls. and Going Beyond the Standards
Retaining Walls and Going Beyond the Standards Aesthetic Focus Appropriate roadway structures Level one (basic) designs and example Level two (semi-urban) designs, examples, and processes Level three (major
More informationChapter 1 Introduction
Chapter 1 Introduction KEY POINTS The amount and value of freight are critical components of the overall economic health of Missouri. Missouri s multimodal freight system supports the movement of trucks,