Attachment 20.40b SA Power Networks: IT Enterprise Asset Management Business Case

Size: px
Start display at page:

Download "Attachment 20.40b SA Power Networks: IT Enterprise Asset Management Business Case"

Transcription

1 Attachment 20.40b SA Pwer Netwrks: IT Enterprise Asset Management Business Case

2 Business Case Enterprise Asset Management - Categry Analysis RIN Executive Summary Business Case - addendum Enterprise Asset Management - Categry Analysis RIN Prject Ref Number : BC03 SA Pwer Netwrks Page 1 f 38

3 Business Case Enterprise Asset Management - Categry Analysis RIN Executive Summary Table f Cntents 1. Executive Summary Purpse Backgrund Assumptins / Cnstraints AER Categry Analysis Summary Overview High Level Impact Assessment Expenditure Summary & Recnciliatin Expenditure Categries Age Prfile Business Case Current Recmmendatin Overview f Current Recmmendatin AER Categry Analysis Implicatins Key Prerequisite Business Case Initiatives Key Enabling Business Case Initiatives Key Requirements and alignment with Business Cases Optin 2 Revisited Scpe Scpe Inclusins Scpe Exclusins Schedule AER Categry Analysis related capabilities Delivery and Change Management Csts Delivery Cst Assumptins Change Management Cst Assumptins Opex Step Change Opex Step Change Cst Assumptins Timescale Majr Business Risks Cst Cmparisn Dcument Authrisatin and Histry References Acrnyms and Abbreviatins Page 2 f 38

4 Business Case Enterprise Asset Management - Categry Analysis RIN Executive Summary 1. Executive Summary This addendum revisits the Business Case BC03 Enterprise Asset Management and cnsiders the impact related t the AER Categry Analysis Regulatry Infrmatin Ntice (RIN). The business case was written befre the Categry Analysis RIN was released and therefre needed t be revisited t assess the impact t the Enterprise Asset Management prject. The AER Categry Analysis data template (Cpy f AER Categry Analysis data templates fr distributin netwrk service prviders unprtected.xls) cntains a level f required infrmatin that is nt efficiently btained frm current SA Pwer Netwrks infrmatin systems and therefre must be btained by inefficient and tedius manual prcesses. The recmmended ptin (Optin 2) f the Business Case has been revisited in light f the AER requirements and the fllwing timescale and cst estimates reflect that review. Please nte the timescale and cst belw reflect the full cst f Optin 2 plus the extra effrt required t meet the requirements f the AER Categry Analysis RIN. Timescale revised Optin 2 Initiative H H H H H H H H H H H H H H EAM Blueprint Asset Data Dcument Management - EAM Mbility - EAM Cnditin Data Analytics Prcesses Ge enablement Legend: Fcussed n EAM and AER requirements fcussed n EAM The schedule abve indicates that the fundatinal AER Categry Analysis related capabilities shuld be in place by the end f the calendar year 2016, assuming the necessary pre-requisites initiatives are delivered n time. Initiative Deliverables / Outcmes Timeframe EAM Blueprint Blueprint design t include the applicable requirements f the AER Categry Analysis RIN. Blueprint design extended caters fr the EAM bjectives f the rganisatin. 01/07/2014 t 31/12/2014 Asset Data Phase 1 Definitin and implementatin f the data structures and prcesses required t supprt the requirements f the AER Categry Analysis RIN. 01/07/2015 t 31/12/2016 Dcument The capability t integrate dcuments with the technical bjects that represent the assets and wrk. Page 3 f 38 01/07/2015

5 Business Case Enterprise Asset Management - Categry Analysis RIN Executive Summary Initiative Deliverables / Outcmes Timeframe Management EAM t 30/12/2015 Mbility EAM The capability t enable asset data capture in the field thrugh asset inspectin and ther wrk prcesses. 01/01/2016 t 31/12/2016 Analytics Phase 1 The capability t execute Business Intelligence reprts that supprt the requirements f the AER Categry Analysis RIN. 01/01/2016 t 31/12/2016 Prcesses Phase 1 Prcesses fr all applicable wrk types have been mdified t supprt the requirements f the AER Categry Analysis RIN. 01/07/2015 t 31/12/2016 Cst Estimates revised Optin 2 ($M Real 2013/14) Capital Delivery and Financial Opex Step Change Management Ttal ($M) Year Change IT Nn-IT 2014/ / / / / / / / / / / / / Ttal Csts The cst estimates fr the Regulatry Cntrl Perid are: Delivery and Change Management Capex $29,357K Opex Step Change Opex $2,280K $31,637K Page 4 f 38

6 Business Case Enterprise Asset Management - Categry Analysis RIN Executive Summary Investment Appraisal Optin Measure Type Value Revised Optin 2 NPV (Net Present Value) -$8,379,299 PI (Prfitability Index) 0.74 Majr Business Risks The fllwing risks have been identified with prceeding with this ptin: 1. Insufficient senir management supprt t the rll ut due t under-estimating the effrt required t make it a success. 2. Lack f understanding and prvisin fr change management. 3. Insufficient training fr all staff assciated with the impact f new systems and prcesses, including new asset management strategies and standards. 4. Nt implementing prcess change and system change simultaneusly. 5. Lack f understanding f the initiatives in ther business cases that impact n the success acrss the rganisatin. SA Pwer Netwrks is cnfident that these risks can be managed t ensure the successful implementatin f the initiatives utlined in this Business Case. Page 5 f 38

7 Business Case Enterprise Asset Management - Categry Analysis RIN Purpse 2. Purpse The purpse f this addendum is t prvide a high level assessment f the impact upn the capabilities included within Optin 2 f the Business Case BC03 Enterprise Asset Management due t the AERs Categry Analysis RIN. 2.1 Backgrund The Business Case BC03 Enterprise Asset Management recmmends the fllwing ptin: Optin 2 - A Balanced Apprach twards Enterprise Asset Management This ptin prpses t enhance and upgrade SA Pwer Netwrks capabilities (prcess, peple, systems and data) in rder t mve away frm a siled and nn-integrated apprach twards an Enterprise apprach leveraging the capability f the existing SAP ERP system. As this represents a significant transfrmatinal change, the rate f change acrss business functins, capabilities and asset types will be balanced by an assessment f the realistic capacity f the business t absrb the rate f change. Enterprise Asset Management (EAM) can be described as the whle f life management f an rganisatin s physical asset base and the fundatin piece t the adptin f an EAM apprach is the reliable and efficient access t unified and accurate data. This in turn allws fr better business prcess integratin, timely decisin making and streamlined prcess executin. SA Pwer Netwrks currently has asset management related data stred in multiple, discnnected systems and databases and has a heavy reliance n MS Excel t cnslidate and bring data tgether. T maximise the benefits f adpting an EAM apprach requires an integrated landscape f crprate systems, each with asset centric data elements that traditinally have perated as largely stand-alne systems. It is imprtant t nte that the Business Case BC03 Enterprise Asset Management althugh titled as EAM des nt in itself prvide fr all the capability required in the adptin f an EAM apprach. EAM shuld nt be cnfused with the tls that enable it. Asset Management is a set f prcesses that manage assets thrugh their lifecycle. These prcesses must be implemented in a pragmatic way, and t be effective and t truly embed the changes that are significant in terms f culture and systems, SA Pwer Netwrks needs t take a cntinuus imprvement apprach. Enterprise Asset Management cmprises many functinal capabilities that have been identified and are cntained within the business cases utlined in the figure belw. Page 6 f 38

8 Business Case Enterprise Asset Management - Categry Analysis RIN Purpse BC01 CIS and CRM The current CIS O/V system is interfaced with SAP with respect t the Custmer Cnnectin activity with Wrk Orders being duplicated in bth systems. The current SAP functinality relies upn SAP standard cnfiguratin as well as a level f enhancements that will cntinue t be required unless SA Pwer Netwrks adpts the available Utilities specific functinality available in the industry specific slutin. The level f integratin regarding the Custmer data is rudimentary at current and requires an uplift including custmer, cnnectin pint, asset and wrk. BC02a Custmer Facing Initiatives Custmer facing initiatives such as Pwer at My Place and the Single Light Out Prcess will be imprved with the greater level f custmer & asset data integratin, ffering even greater pprtunities in the future. The REX applicatin used fr Custmer Cnnectins will als require mdificatin dependent upn the selectin f CIS and the resulting trigger fr wrk in SAP. BC04 Financial Management The definitin f an asset fr Asset Management and Financial purpses needs t be defined. This level is unlikely t be the same, hwever there des need t be a systematic linkage between the physical asset used fr asset management purpses and the financial asset used fr depreciatin purpses. There needs t be an understanding f the financial requirements fr Regulatry and Operatinal Reprting and hw these attributes are captured thrughut the business prcesses, and this must be built int an ver-arching design acrss the landscape. Page 7 f 38

9 Business Case Enterprise Asset Management - Categry Analysis RIN Purpse BC05a Supply Chain and Prcurement With an imprved maintenance prgram a maintenance plan is established fr each asset frm the beginning and resurce requirements defined fr maintenance activities via the use f cmpatible units well in advance. This in turn allws fr a greater degree f inventry planning and shuld be built int the Supply Chain and Prcurement prcesses. The MRP prcesses may be able t be executed in a mre scientific manner. With an accurate understanding f materials cnsumed n unplanned wrk the histrical cnsumptin patterns will enable greater frecasting capability. The material master fr majr equipment items shuld include asset related attributes that are cllected when defined by the Netwrk Standards grup. This data may then be systematically passed n t the equipment master fr asset management (SAP) and peratinal purpses (ADMS) BC05b Prject, Prgram and Prtfli Management In rder fr the maintenance prgram t be managed it is imperative that the business may visually manage the prgram and quickly understand the assciated risk prfiles fr wrk. This implies and effective integratin f maintenance tasks int the prgram & prtfli at a level that makes sense. This business case als includes uplift in the capacity planning, scheduling and dispatch functins. These capabilities are a key cmpnent f an EAM landscape and drive significant benefits in utilisatin. BC09 SAP Fundatins This business case includes an upgrade t the hardware and an upgrade t the User Interface. It is imperative fr user acceptance that the newer technlgies are available in rder t imprve the user experience. BC10 Integrated Design & Estimatin The integratin f design with GIS must include the asset layers in GIS with applicable statuses in service, in cnstructin, planned etc. T enable this all wrk must be assigned t assets thrugh the lifecycle. The utput f the design & estimatin prcess shuld trigger the creatin f assets at the agreed level, with the applicable status in the GIS and als in the ERP. This integratin starts with the definitin f Cmpatible Units used in the estimatin prcess. Attributes assigned t the material items and/r cmpatible unit shuld be systematically passed t the ERP n the creatin f the technical bjects used t represent the asset. BC11 Peple and Culture The integratin if the rganisatin structure managed in the ERP is critical fr the Apprval prcesses utilised thrughut the lifecycle f wrk. The integratin f the resurces and their availability is critical in the supprt f the asset lifecycle, including estimatin, capacity planning, scheduling & dispatch. BC14 IT Mbility Page 8 f 38

10 Business Case Enterprise Asset Management - Categry Analysis RIN Purpse The Mbility framewrk is an essential pre-requisite t the EAM Mbility initiatives. The current apprach t mbility in SA Pwer Netwrks is disparate resulting in a number f framewrks and applicatins. The result f this being a user may have multiple devices in the field r may be required t tggle thrugh multiple applicatins in the curse f their day. BC16 Field frce Mbility It is essential that this initiative is integrated with EAM Mbility and that there is a lifecycle apprach. Field Frce Mbility must be mre than time sheeting and will need t include cnfirmatins f ther resurces cnsumed, cnfirmatin f utput quantities fr standard tasks (i.e. unit csting), ability t capture and view asset attribute and cnditin data etc. BC18 Systems Integratin The integratin f large crprate systems such as SAP, ADMS, OMS, GIS and CIS O/V is critical t the success f an EAM apprach. This includes the ability t simplify asset data entry & maintenance fr the users as well as the ability t utilise the pwer f these systems t imprve the efficiency f the business prcesses. BC21 Business Intelligence Enablement This enablement is a critical pre-requisite piece f the puzzle. Withut the analytical capability the significant and grwing data quantities will nt allw the business t extract the benefit f taking an EAM apprach. BC24 Enterprise Dcument and Cntent Management Again this fundatin technlgy is a critical pre-requisite. The EAM business case will be asking users t capture a large amunt f data and systematically link that data t technical bjects that represent the assets and wrk bjects. This data takes n many different frms including dcuments such as e-drawings, equipment schematics, CAD drawings, and phtgraphs. It is essential t the efficient business prcess that a user may simply access this required infrmatin abut an asset whether at head ffice r in the field by accessing the cntent via an asset f a piece f wrk (rder/prject0 assciated with that asset. BC32 Regulatry Cmpliance The AERs benchmarking and categry analysis Regulatry Infrmatin Ntices are asking fr a level f infrmatin that is currently nt available frm the SA Pwer Netwrks Crprate systems. This infrmatin is a cmbinatin f financial, asset, wrk (rder/prject), site/lcatin, and utput (unit csts) specific data. It is imperative that an ver-arching business & slutin architecture is cmpleted prir t the design f the financial and EAM slutins. Withut a detailed architecture that supprts the AERs cmpliance requirements any design and build effrt may be subject t a review and mdificatin at a future date. Page 9 f 38

11 Business Case Enterprise Asset Management - Categry Analysis RIN Purpse 2.2 Assumptins / Cnstraints SA Pwer Netwrks will undertake a prject t develp an ver-arching business and slutin architecture that includes a Blueprint encmpassing the necessary transfrmatin acrss prcess, peple, systems and data. The fllwing assessment is based upn the scpe f the Business Case BC03 Enterprise Asset Management, and the readers f this dcument understand that EAM is nt a system, nr des the scpe f the afre-mentined business case deliver all f the capability required t adpt an EAM apprach. There are a number f Business Cases that cntain an uplift in capability that will be required t satisfy the requirements f the AERs Categry Analysis RIN. This addendum is nly fcused n the EAM Business Case. The fllwing assessment has been cmpiled under a restricted timeframe and therefre there is a level f risk assciated with this. Page 10 f 38

12 Business Case Enterprise Asset Management - Categry Analysis RIN Summary AER Categry Analysis 3. AER Categry Analysis Summary 3.1 Overview The AER Categry Analysis data template (Cpy f AER Categry Analysis data templates fr distributin netwrk service prviders unprtected.xls) cntains a level f required infrmatin that is nt efficiently btained frm current SA Pwer Netwrks infrmatin systems and therefre must be btained by lengthy and tedius manual prcesses. Due t gaps in the current data set, it is als subject t a level f estimatin. Cllecting the data has a significant impact n the current business prcesses due t the level f granularity required t cmplete the template and the fact that this data, if directly available, is held in disparate systems (e.g. SAP, Excel, external service prvider systems etc.). SA Pwer Netwrks seeks t ensure the expenditure infrmatin required t cmplete the AER Categry Analysis data template is available efficiently frm it infrmatin systems. The business will need t underg a level f transfrmatinal change in rder t achieve this. This change will encmpass changes t the assciated prcesses, peple, systems and data. 3.2 High Level Impact Assessment The fllwing high level business impact assessment has been cmpiled frm the AER Categry Analysis draft template in rder t gain an understanding f the amunt f change required. The wrksheets that have been cnsidered are thse that have a relatinship with the capabilities included within the scpe the Business Case BC03 Enterprise Asset Management Expenditure Summary & Recnciliatin The business currently manages the equivalent categrisatin f expenditure using the custmised EU Activity which frms a dimensin f the Prfit Centre number assigned t all cst and revenue bjects in SAP. This ensures all transactinal data is assigned t a Regulatry expenditure categry. The prcess f Prfit Centre determinatin is a critical prcess with the wrks management prcesses. The future apprach may be satisfied in ne f tw ways: 1. Cntinue use f SAP Prfit Centre accunting. This will require a change t the custm expenditure classificatin structure, and als changes t the Business Warehuse infrmatin prviders and reprts. 2. Explre use f SAPs FERC mdule. The FERC (Federal Energy Regulatry Cmmissin) mdule was created t slve the cst f service reprting at Pacific Gas & Electric (PG&E). The adptin f this mdule will require a change t the use f SAP Prfit Centre Accunting as well as changes t the prcesses by which maintenance Ntificatins and Orders are created. Finally, it will require changes t the reprting landscape t supprt the current level f reprting. Because f the tight integratin between the financial mdules f SAP this requirement must be cnsidered within the scpe f the Business Case BC04 Financial Management and frms a critical dependency fr the Business Case BC03 Enterprise Asset Management. Page 11 f 38

13 Business Case Enterprise Asset Management - Categry Analysis RIN Summary AER Categry Analysis Expenditure Categries The fllwing expenditure categries require cnsideratin frm an EAM scpe pint f view: Replacement expenditure (Repex) Augmentatin expenditure (Augex) Cnnectins Vegetatin Management Maintenance Emergency Respnse Public lighting Metering Ancillary services - Fee-Based Ancillary services Quted The wrksheet requirements include a cmbinatin f data as fllws: Asset Data Asset Class / Gruping / Categries Attributes vltage, material type, vltage, functin, etc. Lcatin CBD, Urban, Rural Vegetatin spans, crridrs, lengths Prject/Wrk Data Custmer Type Classificatins regarding cmplexity Cnnectin types Clearance methds Numbers f assets/categries maintained and type f maintenance Cst & Vlume Metrics $ and vlumes by year Replacements by year Failures by year Asset Units (number, kms etc.) added by year MVA added by year Average unit csts by asset / categry The listing abve des nt give ne a sense f the full depth and breadth f the requirements as it represents nly a small sample, in rder t give the reader a sense f the requirements embdied in the RIN assciated with the asset and wrks prgram. The impact n the current business prcesses is substantial and indeed transfrmatinal as the RIN bviusly includes all assets and wrk types assciated with the Regulated business. In rder fr SA Pwer Netwrks t be in a psitin whereby all the data and infrmatin requirements may be generated using an autmated reprting functin, a change t systems as fllws is required: Hw the asset base and assciated asset attributes are represented; Page 12 f 38

14 Business Case Enterprise Asset Management - Categry Analysis RIN Summary AER Categry Analysis Hw wrk is assigned t the asset base; Hw prject/wrk attributes are represented; Hw the expenditure ($) is represented; and Hw vlume metrics are represented Age Prfile The age prfile is required by: Asset Grup Asset Categry / Type Metrics Ecnmic Life (years) Mean & Standard Deviatin Number Cmmissined by year This requirement means that all Asset Grups / categries / assets included in the RIN must be assigned the applicable acquisitin/cmmissining dates required t calculate the mean and standard deviatin. Further t this, the systems must be capable f capturing the vlume metric at the Asset Grups / categries / asset level. Page 13 f 38

15 Business Case Enterprise Asset Management - Categry Analysis RIN Recmmendatin Business Case Current 4. Business Case Current Recmmendatin 4.1 Overview f Current Recmmendatin The Business Case BC03 Enterprise Asset Management was nt written with the requirements f the AER Categry Analysis RIN in mind. Rather, the business case is fcused n delivering an uplift in capability acrss the fllwing: Asset Management Accuntability Asset Infrmatin Management Asset Lifecycle Management This is achieved by initiatives that include: EAM Blueprint Asset data EAM Dcument & Recrds Management EAM Mbility Cnditin Data Analytics Prcesses Ge Enablement The fllwing figure displays a high level schedule f the initiatives that have been identified: Initiative H H H H H H H H H H H H H H EAM Blueprint Asset Data Dcument Management - EAM Mbility - EAM Cnditin Data Analytics Prcesses Ge enablement The initiatives at the level stated in the business case d nt adequately allw the Reset Team t understand the capability delivered in rder t meet the RIN requirements. Page 14 f 38

16 Business Case Enterprise Asset Management - Categry Analysis RIN Implicatins AER Categry Analysis 5. AER Categry Analysis Implicatins The fcus f the fllwing discussin relates t a review f the capabilities within the Business Case BC03 Enterprise Asset Management n the basis that the AER categry Analysis RIN requirements have pririty. Given this fcus, this sectin utlines what wuld be the likely impacts upn the deliverables and timeframes. 5.1 Key Prerequisite Business Case Initiatives Given the fact that the AER Categry Analysis RIN cvers all expenditure related t the Regulatry Business it is therefre by nature related t a number f Business Cases that cntain an uplift in capability. The fllwing business cases cntain initiatives that are a pre-requisite fr the EAM Business Case initiatives. BC04 Financial Management This business case must define the apprach t the reprting f the categries cntained with the Expenditure Summary as discussed in sectin (Expenditure Summary & Recnciliatin) abve. If the functinality in use tday is changed there is an impact n hw the wrk ntificatins and wrks rders are created in the business. BC05b Prject, Prgram and Prtfli Management The RIN requires unit cst level infrmatin in parts and a physical cunt fr vlume metrics. This will require the business t breakdwn the wrk packages t mre granular level and schedule these t the field. This in turn relies upn the level f Cmpatible Unit data defined and aggregated thrugh the estimatin prcess. BC10 Integrated Design & Estimatin The Cmpatible Unit (CU) data requirements must be changed in rder that attributes may be included at the CU level. This is als required t enable the capability t capture a physical cunt fr the vlume metrics. BC14 IT Mbility The Mbility framewrk is an essential pre-requisite t the EAM Mbility initiatives. BC16 Field Frce Mbility It is essential that this initiative is integrated with EAM Mbility and that there is a lifecycle apprach. Field Frce Mbility must be mre than time sheeting and will need t include cnfirmatins f ther resurces cnsumed, cnfirmatin f utput quantities fr standard tasks (i.e. unit csting), ability t capture and view asset attribute and cnditin data etc. BC24 Enterprise Dcument and Cntent Management Again this fundatin technlgy is a critical pre-requisite. The EAM business case will be asking users t capture a large amunt f data and systematically link that data t technical bjects that represent the assets and wrk bjects. Page 15 f 38

17 Business Case Enterprise Asset Management - Categry Analysis RIN Implicatins AER Categry Analysis 5.2 Key Enabling Business Case Initiatives The fllwing business cases cntain initiatives that if included as in scpe will enable the ability t mre efficiently meet the infrmatin requirements f the AER Categry Analysis RIN: BC05b Prject, Prgram and Prtfli Management The functinal capability f SAP PPM will enable the business t manage prgrams f wrk and prduce reprts that are aligned t the classificatins within the Draft Template. BC18 Systems Integratin The integratin f large crprate systems such as SAP, ADMS, OMS, GIS and CIS O/V is critical t the success f an EAM apprach. This includes the ability t simplify asset data entry & maintenance fr the users as well as the ability t utilise the pwer f these systems t imprve the efficiency f the business prcesses. Page 16 f 38

18 Business Case Enterprise Asset Management - Categry Analysis RIN AER Categry Analysis Implicatins 5.3 Key Requirements and alignment with Business Cases The fllwing table gives an verview f the key requirements cntained within the AER Categry Analysis data template (Cpy f AER Categry Analysis data templates fr distributin netwrk service prviders unprtected.xls) that are related t the EAM Business Case and the prpsed business case that shuld cntain initiatives t prvide the applicable capability. High Level Requirement Descriptin Business Case Initiative EAM Blueprint A number f the wrksheets ask fr a level f asset related infrmatin. Asset Data: The asset data and classificatin requirements need t defined, built in ur systems and then data cleansing & data capture activities may cmmence. Asset Data Asset Class / Gruping / Categries Attributes vltage, material type, vltage, functin, etc. Lcatin CBD, Urban, Rural BC03 Enterprise Asset Management Dcument Management EAM: The capability t integrate dcuments with the technical bjects that represent the asset. Mbility - EAM: The capability t capture asset infrmatin using mbile technlgy and applicatins. Vegetatin spans, crridrs, lengths Analytics: The capability t execute the applicable reprts using the Business Intelligence tls. BC10 Integrated Design & Estimatin Definitin f the Cmpatible Units with the applicable attributes fr reprting. Prject / Wrk Data A number f the wrksheets ask fr a level f prject/wrk related BC03 Enterprise Asset Management EAM Blueprint: Page 17 f 38

19 Business Case Enterprise Asset Management - Categry Analysis RIN AER Categry Analysis Implicatins High Level Requirement infrmatin. Descriptin Business Case Initiative Custmer Type Classificatins regarding cmplexity Cnnectin types Clearance methds Numbers f assets/categries maintained and type f maintenance Prcesses: The prcesses fr all applicable wrk types will require a review and mdificatin t ensure the applicable data is captured during the lifecycle f the wrk. Dcument Management EAM: The capability t integrate dcuments with the technical bjects that represent the wrk. Mbility - EAM: The capability t use mbile technlgy and applicatins t simplify the increased level f data capture required frm an asset management perspective. Analytics: The capability t execute the applicable reprts using the Business Intelligence tls. BC10 Integrated Design & Estimatin BC16 Field Frce Mbility BC05b Prject, Prgram and Prtfli Management Estimatin prcess creates wrk packages and wrk breakdwn structures that enable the capability t cunt physical vlumes and assign csts at the applicable unit level. It is critical the applicatins in the field enable the simple capture f an increased level f data. This data includes the cunt f physical vlumes and the assignment f csts at the applicable wrk package/unit level. Resurce Capacity Planning & Scheduling f the wrk packages that enable the capability t cunt physical vlumes and assign csts at the applicable unit level. Cst Metrics Expenditure Summary & BC04 Financial Re-visit use f Prfit Centre Accunting fr Expenditure Categry Page 18 f 38

20 Business Case Enterprise Asset Management - Categry Analysis RIN AER Categry Analysis Implicatins High Level Requirement recnciliatin (wrksheet 2.1): Descriptin Business Case Initiative The use f the EU Activity included as a dimensin within the Prfit Centre assigned t all cst and revenue bjects acrss the business prvides this capability. Management BC03 Enterprise Asset Management reprting. Re-visit use f CO Activity Type functinality in SAP t meet the requirements f the Labur wrksheet (2.11). This in turn impacts the wrk prcesses and cllectins f actuals in the field. EAM Blueprint Prcesses: Based upn the utcmes f BC04 abve, the prcess by which wrk ntificatins and wrk rders are created may need t be mdified. Analytics: The capability t execute the applicable reprts using the Business Intelligence tls, including the ability t reprt by Calendar Year and the Regulatry Year. Cst & Vlume Metrics A number f the wrksheets ask fr a level f cst and vlume metrics. $ and vlumes by year Replacements by year Failures by year Asset Units (number, kms etc.) added by year MVA added by year BC03 Enterprise Asset Management EAM Blueprint Prcesses: The prcess by which wrk ntificatins and wrk rders are created, managed and clsed ut will need t be mdified. Analytics: The capability t execute the applicable reprts using the Business Intelligence tls, including the ability t reprt by Calendar Year and the Regulatry Year. Average unit csts by asset / categry BC10 Integrated Design & Estimatin Estimatin prcess creates wrk packages and wrk breakdwn structures that enable the capability t cunt physical vlumes and assign csts at the applicable unit level. Page 19 f 38

21 Business Case Enterprise Asset Management - Categry Analysis RIN AER Categry Analysis Implicatins High Level Requirement Descriptin Business Case Initiative BC16 Field Frce Mbility It is critical the applicatins in the field enable the simple capture f an increased level f data. This data includes the cunt f physical vlumes and the assignment f csts at the applicable wrk package/unit level. BC05b Prject, Prgram and Prtfli Management Resurce Capacity Planning & Scheduling f the wrk packages that enable the capability t cunt physical vlumes and assign csts at the applicable unit level. Prject, Prgram and Prtfli management functinality t assist in the classificatin, management and reprting f the expenditure prgrams. Please nte: The table abve is by n means a definitive table. Fr example, changes related t custmer and systems such as CRM/CIS /v have nt been cnsidered. Page 20 f 38

22 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited 6. Optin 2 Revisited This ptin represents a balanced apprach twards Enterprise Asset Management acrss the rganisatin, and has nw been re-visited t take int accunt the AER Categry Analysis RIN requirements. The fcus f the initial initiatives will be n meeting the AER Categry Analysis RIN requirements and as such it is anticipated that there will need t be a level f cmprmise which is likely t result in a level f re-wrk t attain the final bjectives f the business case. It must be nted up frnt that this represents a significant transfrmatinal step fr the business requiring SA Pwer Netwrks t enhance and upgrade existing capabilities acrss prcess, peple, systems and data, in rder t mve away frm a siled and nn-integrated apprach twards an Enterprise apprach. 6.1 Scpe Scpe Inclusins The high level scpe f this ptin includes initiatives that seek t drive imprvements acrss the three key Asset Management capabilities and are detailed as fllws: Asset Management Capability Initiative Discussin Asset Management Accuntability EAM Blueprint Cntinued adptin f ISO as the Asset Management Standard fr SA Pwer Netwrks. Definitin f the Asset Management Plicy, Strategy and Objectives. Definitin f the Asset Management Plans. In rder t enact the chsen Asset Management Standard prepare an Enterprise Asset Management Blueprint that sets the fundatin fr subsequent initiatives, that includes: Adptin f an agreed Gvernance mdel. Definitin f Asset Management prcesses. Define and agree the asset management rles, respnsibilities and accuntabilities. Ensure thse filling the asset management rles have the capacity and apprpriate level f capability, up-skilling as necessary. Definitin f the system and data requirements. Definitin f the infrmatin requirements. Definitin f a radmap f initiatives fr the way frward, including the depth and breadth f assets t be addressed in the asset data and cnditin data initiatives. Blueprint design t include the applicable requirements f the AER Categry Analysis RIN. Page 21 f 38

23 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative Discussin Asset Infrmatin Management Asset Data Implement an Asset Data & Infrmatin Gvernance mdel acrss the business. Implement imprved asset data capture prcesses (including creatin, maintenance and display) and maintain reliable asset related infrmatin, including: Cnfirmatin f the asset data structure defining the single surce f truth fr each data element and integratin rules with ther surces; Definitin f the master data standards fr each data element; Definitin f the asset attribute data required by asset class such as brand, mdel, type, rating, duty, physical lcatin and netwrk lcatin; Enable views f the asset data that include the fllwing dimensins: Maintenance Ge spatial Netwrk cnnectivity Custmer Operatinal Financial Envirnmental & Safety Vegetatin Management A vegetatin and bushfire management capability t track and mnitr vegetatin and grwth rates ver time. Implementatin f Linear Asset management t assist with segmentatin f the netwrk asset. EAM Dcument & Recrds Management This initiative will be brken dwn int 3 phases with the initial phase fcused upn the applicable requirements f the AER Categry Analysis RIN. Implement Dcument and Recrds Management fr EAM, based upn an enterprise wide framewrk defined in the Dcument Management Business Case (BC24), including: Integrate dcuments such as e-drawings, Page 22 f 38

24 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative Discussin equipment schematics, CAD drawings, and phtgraphs with technical bjects (equipment, task lists) that represent the asset. EAM Mbility Implement imprved mbile capability fr EAM based upn a based upn an enterprise wide framewrk defined in the IT Mbility Business Case (BC14), including: Mbile asset inspectins; Field frce asset infrmatin display & updates; Access t drawings, equipment manuals and ther dcuments assciated with the asset. Cnditin Data Implement imprved prcesses by which asset cnditin and perfrmance data is created, maintained and displayed, including: Histrical asset cnditin and measurement data; Planned and cmpleted wrk histry; Integrated with the asset data capture prcesses. Analytics Implement imprved asset analytics capability, including: Ability t analyse and frecast the relatinship f asset cnditin t asset and netwrk perfrmance ver time (e.g., prbability f failure, cnnectin pint reliability). This initiative will be brken dwn int 4 phases with the initial phase fcused upn the applicable requirements f the AER Categry Analysis RIN. Asset Lifecycle Management Prcess Implementatin f integrated asset life cycle prcesses as per the EAM Blueprint, including tuch pints with: Netwrk Standards; Design and Estimatin; Material master data management; Cllectin f asset data thrughut the lifecycle; Assignment f all netwrk related asset wrk t an asset fr asset histry purpses. Page 23 f 38

25 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative Discussin Implement the fllwing prcesses and capability: Asset Management Prgram develpment; Preventative Maintenance Prgram: Realign and cleanse Maintenance Planning data in the ERP (maintenance strategy, maintenance plan, task lists); Wrk Management prcesses including: Inspectins, Cnnectins, Preventative & Crrective maintenance Outage Management Vegetatin management Cnditin Based Maintenance and Reliability Centred Maintenance ; and A Rtable cncept (including refurbishment) fr key assets such as transfrmers. Implement required system interfaces required t supprt the agreed prcesses defined in the EAM blueprint, including: Integratin f SAP with GIS enabling mre efficient asset data maintenance and wrk management prcesses; Integratin f SAP with ADMS fr the management f the switching prcess; Integratin f SAP with OMS fr the management f unplanned utages; Integratin f SAP with Custmer Infrmatin System (CIS O/V replacement) t enable the linkage f asset, custmer and wrk. Integratin with EAM related initiatives that are the subject f the fllwing Business Cases: BC02a Custmer Facing Initiatives BC04 Financial Management BC05a Supply Chain & Prcurement BC05b Prject, Prgram and Prtfli Management BC09 SAP Fundatins BC10 Integrated Design & Estimatin BC11 Peple and Culture BC14 IT Mbility BC16 Field Frce Mbility BC18 Systems Integratin Page 24 f 38

26 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative EAM Dcument & Recrds Management Discussin BC21 Business Intelligence Enablement BC24 Enterprise Dcument and Cntent Management BC32 Regulatry Cmpliance This initiative will be brken dwn int 3 phases with the initial phase fcused upn the applicable requirements f the AER Categry Analysis RIN. Implement Dcument and Recrds Management fr EAM, based upn an enterprise wide framewrk defined in the Dcument Management Business Case (BC24), including: Integrate dcuments such as e-drawings, equipment schematics, CAD drawings, and phtgraphs with wrk management bjects (ntificatins, rders, prjects, measurement dcuments). EAM Mbility Implement imprved mbile capability fr EAM based upn a based upn an enterprise wide framewrk defined in the IT Mbility Business Case (BC14), including: Mbile wrk delivery and dispatch; Mbile asset inspectins; Ge enablement; Access t drawings, equipment manuals and ther dcuments assciated with the asset. Analytics Implement imprved asset analytics capability, including: Ability t mdel whle f life asset cst ver time; Integrated Business Risk Management framewrk; Ability t deliver Level f Service perfrmance reprting. Ge Enablement This initiative will be brken dwn int 4 phases with the initial phase fcused upn the applicable requirements f the AER Categry Analysis RIN. Implement required system interfaces required t supprt the agreed prcesses defined in the EAM blueprint, including: Page 25 f 38

27 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative Discussin Ge enablement f SAP thrugh integratin with GIS enabling mre efficient asset data maintenance and wrk management prcesses; Extensin f ge enablement t mbility Scpe Exclusins The scpe f this ptin excludes the fllwing initiatives that shuld be addressed beynd 2020 based upn the SA Pwer Netwrks Strategic Plan fundatin f Innvatin and Relentless Imprvement. Asset Management Capability Initiative Discussin Asset Infrmatin Management Asset Lifecycle Management Asset Data Implement imprved asset data capture prcesses (include creatin, maintenance & display) fr Real Estate and Fleet assets. EAM Dcument & Recrds Management Integratin f imagery frm Lidar, Drne and ther surces with technical bjects representing the asset fr asset management purpses. Cnditin Data Implement real time cnditin mnitring thrugh the transfer f cnditin and/r perfrmance data frm systems such as ADMS t the ERP fr asset management purpses. Analytics Implement imprved asset analytics capability, including: Mnitring f perfrmance indicatrs such as SAIDI & SAIFI by identifying assets r asset grups that directly affect such indicatrs. Investment mdelling capability including what if scenari analytics Prcess Implement the prcess / capability t supprt Real Estate and Fleet. Implement enhanced asset management prcess / capability including: Wrk Clearance Management t enable the tagging prcess (includes SAP / ADMS / OMS interfaces); Implement Operatinal Risk Management t assist with peratinal risk management and imprve envirnmental, health and safety Page 26 f 38

28 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Asset Management Capability Initiative Discussin EAM Dcument & Recrds Management standards. Implement enhanced reliability prcess and sftware. Investigate Augmented Reality technlgy Integratin f imagery frm Lidar, Drne and ther surces with wrk management bjects (ntificatins, rders). Cnditin Data Implement real time cnditin mnitring thrugh the transfer f cnditin and/r perfrmance data frm systems such as ADMS t the ERP triggering the creatin f wrk management bjects (ntificatins, rders) fr asset management purpses. Analytics Implementatin f imprved analytics t supprt the fllwing prcesses: Real Estate and Fleet; Wrk Clearance Management Operatinal Risk Management Ge Enablement Investigate ability t stre Lidar images t the right ge-lcatin. Further t the abve, the scpe excludes thse capabilities that are included in ther Business Cases including thse identified at Sectin 5 (AER Categry Analysis Implicatins) abve. Page 27 f 38

29 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited 6.2 Schedule The fllwing figure displays a high level schedule f the initiatives that have been identified: Initiative H H H H H H H H H H H H H H EAM Blueprint Asset Data Dcument Management - EAM Mbility - EAM Cnditin Data Analytics Prcesses Ge enablement Legend: Fcussed n EAM and AER requirements fcussed n EAM AER Categry Analysis related capabilities The schedule abve indicates that the AER Categry Analysis related capabilities shuld be in place by the end f the calendar year 2016, assuming the necessary pre-requisites are achieved. Initiative Deliverables / Outcmes Timeframe EAM Blueprint Blueprint design t include the applicable requirements f the AER Categry Analysis RIN. Blueprint design extended t cater fr the EAM bjectives f the rganisatin. 01/07/2014 t 31/12/2014 Asset Data Phase 1 Definitin and implementatin f the data structures and prcesses required t supprt the requirements f the AER Categry Analysis RIN. 01/07/2015 t 31/12/2016 Dcument Management EAM The capability t integrate dcuments with the technical bjects that represent the assets and wrk. 01/07/2015 t 30/12/2015 Mbility EAM The capability t enable asset data capture in the field thrugh asset inspectin and ther wrk prcesses. 01/01/2016 t 31/12/2016 Analytics Phase 1 The capability t execute Business Intelligence reprts that supprt the requirements f the AER Categry Analysis RIN. 01/01/2016 t 31/12/2016 Prcesses Phase 1 Prcesses fr all applicable wrk types have been mdified t supprt the requirements f the AER Categry Analysis RIN. 01/07/2015 t 31/12/ Page 28 f 38

30 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited 6.3 Delivery and Change Management Csts The table belw is a summary f the capital prject delivery and change management csts t deliver capability t supprt the businesses EAM bjectives as well as thse related t the AER Categry Analysis RIN. A detailed breakdwn f these csts is prvided in the attached MS Excel Financial Assessment spreadsheet (refer t Appendix I). Table 1 Delivery and Change Management csts by Business Unit ($M Real 2013/14) Business Unit 2014/ / / / / /20 Ttal 2015/ / / /22 Ttal IT Delivery and Change Management Nn-IT Delivery and Change Management TOTAL CAPITAL Table 2 utlines the cmbined IT and nn-it capital csts by initiative. Table 2 Delivery and Change Management csts by Prject ($M Real 2013/14) Prject Name 2014/ / / / / /20 Capital 2015/ / / /22 Ttal EAM Blueprint Asset Data Dcument management Mbility Cnditin data Analytics Prcesses Ge enablement Enterprise Asset Management Recurrent Functinal Upgrade TOTAL CAPITAL Page 29 f 38

31 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Delivery Cst Assumptins The fllwing additinal assumptins have been made in the estimatin f the delivery cst: EAM Blueprint The EAM Blueprint will include a Blueprint t address the requirements f the AER Categry Analysis RIN. Asset Data The first phase f the Asset Data initiative will fcus upn the capability t supprt the AER Categry Analysis RIN. Estimatins indicate this initiative will need t be extended by apprximately 6 mnths. Included is the cst fr 30 external cntractrs t accelerate the data cllectin prcess ver a 15 mnth perid. EAM Dcument & Recrds Management There is n perceived extra requirement t supprt the AER Categry Analysis RIN. EAM Mbility There is n perceived extra requirement t supprt the AER Categry Analysis RIN. Cnditin Data There is n perceived extra requirement t supprt the AER Categry Analysis RIN. Analytics The first phase f the Asset Data initiative will fcus upn the capability t supprt the AER Categry Analysis RIN. Estimatins indicate this initiative will need t be extended by abut 12 mnths. Prcess The first phase f the Asset Data initiative will fcus upn the capability t supprt the AER Categry Analysis RIN. Estimatins indicate this initiative will need t be extended by abut 6 mnths. Ge enablement There is n perceived extra requirement t supprt the AER Categry Analysis RIN. Page 30 f 38

32 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited Change Management Cst Assumptins The fllwing assumptins have been made when estimating the Change Management csts: 1. Training f staff during and pst-delivery f the new systems and prcesses has been prvided fr all new initiatives detailed in this ptin. 2. Onging training f staff with regards t the use f the SAP ERP system utside the scpe f the new functinality prvided under this business case is nt included in the cst f Change Management. 3. Operatinal Change Management, including IT training and supprt are included. 4. The amunt includes change csts during Planning & Delivery, pst-implementatin and warranty stages. 5. A detailed breakdwn f these csts is prvided in the Financial Evaluatin Wrksheet attached t this dcument. Page 31 f 38

33 Business Case Enterprise Asset Management - Categry Analysis RIN Optin 2 Revisited 6.4 Opex Step Change The table belw is a summary f the pex step change subsequent t the delivery f the capability t supprt the businesses EAM bjectives as well as thse related t the AER Categry Analysis RIN. A detailed breakdwn f these csts is prvided in the attached MS Excel Financial Assessment spreadsheet (refer t Appendix I). Table 3 Opex Step Change ($M Real 2013/14) Business Unit 2014/ / / / / /20 Ttal 2015/ / / / / / / / /27 Ttal IT Opex Nn-IT Opex TOTAL Opex Step Change Cst Assumptins Recurrent Csts are made up f: 1. Annual sftware maintenance fees f 22% f riginal purchase price. 2. Uplift f resurces t supprt Asset Data prcesses, Mbility and Ge enablement. 3. The cst f data gvernance has nt been included as part f Recurrent Csts and is assumed t be included in Business As Usual. 4. Frm time t time, there will be a requirement t apply upgrades and patches t the crprate systems, which will impact the mdules used by EAM prcesses. The csts related t this wrk is nt included in recurring csts fr this Business Case as it applies acrss the entire landscape and will included in the verall nging upgrade and enhancement csts. Page 32 f 38

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap

Digital Advisory Services Professional Service Description Software Defined Networking Strategy and Roadmap Digital Advisry Services Prfessinal Service Descriptin Sftware Defined Netwrking Strategy and Radmap 1. Descriptin f Services. 1.1 Sftware Defined Netwrking Strategy and Radmap. Verizn will prvide Sftware

More information

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request

0XXX: Meter Reading Submission for Advanced & Smart Metering. Stage 01: Request Stage 01: Request 0XXX: Meter Reading Submissin fr Advanced & Smart Metering At what stage is this dcument in the prcess? The rllut f Advanced and Smart Metering delivers the pprtunity t utilise mre frequent

More information

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report

UNC 0594R: Meter Reading Submission for Advanced & Smart Metering. UNC Request Workgroup Report UNC Request Wrkgrup Reprt At what stage is this dcument in the prcess? UNC 0594R: Meter Reading Submissin fr Advanced & Smart Metering The rllut f Advanced and Smart Metering delivers the pprtunity t utilise

More information

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership

EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directorate B Growth and Innovation Circular Economy and Industrial Leadership EUROPEAN COMMISSION DIRECTORATE-GENERAL JOINT RESEARCH CENTRE Directrate B Grwth and Innvatin Circular Ecnmy and Industrial Leadership Seville, 6 th April 2018 Level(s) testing phase Guidance and rules

More information

Certificate in Construction Project Management

Certificate in Construction Project Management Certificate in Cnstructin Prject Management Duratin: 6 Mnths Distance Learning Prgramme Language: English RICS Member: 895.00 + VAT Nn RICS Member 1075.00 + VAT Curse Summary This prgramme explres the

More information

IESBA Meeting (March 2013) Agenda Item

IESBA Meeting (March 2013) Agenda Item Agenda Item 7-A Backgrund Lng Assciatin f Senir Persnnel (Including Partner Rtatin) with an Audit Client Matters fr Cnsideratin 1. Paragraph 290.150 f the IESBA Cde f Ethics fr Prfessinal Accuntants (the

More information

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge

IBM Global Services. Server Optimization ... Trends and Value Proposition That Can Drive Efficiencies and Help Businesses Gain A Competitive Edge IBM Glbal Services Server Optimizatin.......... Trends and Value Prpsitin That Can Drive Efficiencies and Help Businesses Gain A Cmpetitive Edge Intrductin A typical rganizatin s success and ability t

More information

In this fact sheet we answer the four most common questions new clients ask:

In this fact sheet we answer the four most common questions new clients ask: Wrking With Federal Prpsals Intrductin In this fact sheet we answer the fur mst cmmn questins new clients ask: What tasks d yu perfrm and what d yu need frm us? Hw d we use the Virtual War Rms? Hw much

More information

Chapter 1: Purchasing & Supply Management January :10 PM

Chapter 1: Purchasing & Supply Management January :10 PM Chapter 1: Purchasing & Supply Management January-10-13 1:10 PM Crprate Supply Challenges Opprtunities Increased utsurcing --> suppliers need t respnd t end-custmer's needs Dependence n supplier's respnsibility

More information

RESTRICTED JOB SPECIFICATION. Senior Software Developer

RESTRICTED JOB SPECIFICATION. Senior Software Developer JOB SPECIFICATION FUNCTION JOB TITLE REPORTING TO GRADE WORK PATTERN LOCATION TRAVEL REQUIRED ROLE ID IT & Digital Senir Sftware Develper Develpment Manager Band E Full-time Birmingham Occasinally TBC

More information

Down Under. Project Management Essential in Process Management Projects

Down Under. Project Management Essential in Process Management Projects A BPTrends Clumn Dwn Under December 2007 Jhn Jestn & Jhan Nelis BPM Cnsultants, Sydney Australia Authrs: Business Prcess Management Practical Guidelines t Successful Implementatins jhn.jestn@managementbyprcess.cm

More information

Marketing activities and events manager

Marketing activities and events manager Rle Brief Marketing activities and events manager Directrate Marketing and cmmunicatins directrate Base lcatin Bristl Grade C 16 Date April 2018 Reprts t Head f marketing prductin Respnsible fr 1. Backgrund

More information

Request for Proposal

Request for Proposal Request fr Prpsal DMDII-17-02 Advanced Analytics fr Supply Chain Operatins Technlgy Thrust Area: Agile, Resilient Supply Chain Revisin 1.0 Release Date: 4 August 2017 POC: Sctt Kruse Prject Innvatin Engineer

More information

Curdridge Reading Room Invitation to tender for renewable energy feasibility study

Curdridge Reading Room Invitation to tender for renewable energy feasibility study Curdridge Reading Rm Invitatin t tender fr renewable energy feasibility study Abut Curdridge Reading Rm Curdridge is a cmmunity f arund 1,500 residents in Suth Hampshire. The Reading Rm is effectively

More information

Defining and Delivering A Service Level Agreement OLA Element Discovery Summary of Findings, Next Steps, and Recommendations

Defining and Delivering A Service Level Agreement OLA Element Discovery Summary of Findings, Next Steps, and Recommendations Defining and Delivering A Service Level Agreement OLA Element Discvery Summary f Findings, Next Steps, and Recmmendatins 3/22/07 Final Authr: Ann Berry-Kline THINKING AT THE EDGE UC Santa Cruz Defining

More information

B&B Food Distributors Data Synchronization Initiative

B&B Food Distributors Data Synchronization Initiative B&B Fd Distributrs Data Synchrnizatin Initiative Frequently Asked Questins fr B&B Fd Distributrs Suppliers Versin 1 Cpyright 2012. All Rights Reserved. FAQs fr B&B Fds Distributrs Suppliers REVISION HISTORY

More information

Project Status Report

Project Status Report Prject Status Reprt Fr perid: March 2007 Defining and Delivering a Service Level Agreement Submitted by: Ann Berry-Kline Distributin: ITSMG Status Item Current Status Prir Status Status Ntes: Overall Prject

More information

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL

IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IMI2 PROPOSAL TEMPLATE FIRST STAGE PROPOSAL IN TWO-STAGE PROCEDURE (TECHNICAL ANNEX) RESEARCH AND INNOVATION ACTIONS & INNOVATION ACTIONS Nte: This is fr infrmatin nly. The definitive template fr yur call

More information

Marketing activities and events manager

Marketing activities and events manager Rle Brief Marketing activities and events manager Directrate Marketing and cmmunicatins directrate Base lcatin Bristl Grade C 16 Date September 2016 Reprts t Head f marketing prductin Respnsible fr 1.

More information

CDM Plan Submission and Review Criteria Rules

CDM Plan Submission and Review Criteria Rules Cnservatin First Framewrk LDC Tl Kit Final v4.0 January 17, 2018 CDM Plan Submissin and Review Rules 1) Purpse and definitins 1.1 These Rules set ut: a) the rles, respnsibilities and timing fr CDM Plan

More information

Application Portfolio Analysis: Tool for Cloud Migration Dr. Gopala Krishna Behera December 5, 2017

Application Portfolio Analysis: Tool for Cloud Migration Dr. Gopala Krishna Behera December 5, 2017 Applicatin Prtfli Analysis: Tl fr Clud Migratin Dr. Gpala Krishna Behera December 5, 2017 Tday, a majrity f custmers are getting ut f the data center business and mving twards the use f Clud Services.

More information

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number:

Request for Quotes PennDOT Leadership Academy for Managers (PLAM) Solicitation Number: www.dt.state.pa.us Request fr Qutes PennDOT Leadership Academy fr Managers (PLAM) Slicitatin Number: 6100041372 Curse Title: Curse Date(s) & Lcatins: PennDOT Leadership Academy fr Managers (PLAM) This

More information

Week 1 Introduction to Management Accounting:

Week 1 Introduction to Management Accounting: Week 1 Intrductin t Management Accunting: Objective #1: What is management accunting?! Accunting Infrmatin System: the prcess f gathering, rganising and cmmunicating financial infrmatin.! Management Accunting:

More information

Integration of SAP TM with SAP Global Trade Services

Integration of SAP TM with SAP Global Trade Services SAP Transprtatin Management Integratin f SAP TM with SAP Glbal Trade Services CUSTOMER Dcument Versin: 2.1 December 2013 SAP AG 1 Cpyright Cpyright 2013 SAP AG. All rights reserved. SAP Library dcument

More information

Marketing business partner

Marketing business partner Marketing business partner Rle Brief Directrate Marketing and cmmunicatins Base lcatin Bristl Grade B 17 Date September 2016 Reprts t Marketing business partner - team leader Respnsible fr 1. Backgrund

More information

Project Charter. Current 8/23/2006. Version 2

Project Charter. Current 8/23/2006. Version 2 Prject Charter Current 8/23/2006 Versin 2 Dcument Cntrl Dcument Title: Authr(s): Prject Charter CMS Prject Team Date By Actin Versin Pages 8/23/06 SKC Template applied 1.0 All 9/13/06 KKee Updated TOC

More information

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors

Career Entry and Development Profile Companion Guide. A Guide for ITT Tutors and Induction Tutors Career Entry and Develpment Prfile Cmpanin Guide A Guide fr ITT Tutrs and Inductin Tutrs Intrductin Wh is the cmpanin guide fr? This guide is fr initial teacher training (ITT) tutrs wrking with trainees/teachers,

More information

NZATD Education Trust Awards elearning Award Guidelines for Entrants

NZATD Education Trust Awards elearning Award Guidelines for Entrants NZATD Educatin Trust Awards elearning Award Guidelines fr Entrants Fcus f Award NZATD intrduced this award t recgnise excellence in the design and implementatin f elearning initiatives within rganisatins.

More information

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes

Corporate Value Chain (Scope 3) Accounting & Reporting Standard. Summary of Changes Nvember 2010 Wrld Business Cuncil fr Sustainable Develpment Crprate Value Chain (Scpe 3) Accunting & Reprting Standard Summary f Changes 1. Intrductin This dcument summarizes the changes made t the GHG

More information

Efficiency Bulletin: Further Streamline the Work Management Process

Efficiency Bulletin: Further Streamline the Work Management Process Oct. 24, 2017 Clr Cde: Green Efficiency Bulletin: 17-20 Further Streamline the Wrk Management Prcess Previusly issued efficiency bulletins (EBs) have targeted reductins in the number f rutine preventive

More information

Examiner Tip Sheet Independent Review

Examiner Tip Sheet Independent Review Examiner Tip Sheet Independent Review Welcme t Independent Review! The purpse f Independent Review is fr each team member t independently evaluate the applicant s prcesses and results by identifying areas

More information

A method of securing cellular services information is being implemented under the

A method of securing cellular services information is being implemented under the Cellular Telephne Service Descriptin The Cellular Telephne service plan prvides cellular telephne service and equipment frm a number f cellular telephne service prviders. The plan is intended t cver the

More information

White Paper on Distributor Inventory Why distributors have too much Inventory

White Paper on Distributor Inventory Why distributors have too much Inventory 2014 White Paper n Distributr Inventry Why distributrs have t much Inventry Since 2007 the United States has been In and wrking its way ut f a recessin In 2013-14 Whlesalers are finding that THINGS are

More information

JOB TITLE: Business and Systems Analyst

JOB TITLE: Business and Systems Analyst JOB TITLE: Business and Systems Analyst 1. PURPOSE OF POSITION This psitin has a strng service delivery fcus and is respnsible fr functinal supprt and nging imprvement f the applicatins and systems envirnment.

More information

P&H Mining Equipment. P&H Response to Surface Mining Association for Research & Technology (SMART) Scope of Vision

P&H Mining Equipment. P&H Response to Surface Mining Association for Research & Technology (SMART) Scope of Vision P&H Mining Equipment P&H Respnse t Surface Mining Assciatin fr Research & Technlgy (SMART) Scpe f Visin SMART Summit Meeting Vancuver, BC, Canada May 8, 2010 SMART Scpe f Visin The Surface Mining Assciatin

More information

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board

Report on Inspection of Grant Thornton LLP (Headquartered in Chicago, Illinois) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2013 (Headquartered in Chicag, Illinis) Issued by the Public Cmpany Accunting Oversight

More information

Demo Script. Project Management Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. <Business Scenario Name>

Demo Script. Project Management Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. <Business Scenario Name> Dem Script Classificatin: Internal and fr Partners SAP Business ByDesign Reference Systems SAP AG 2012 Octber 23, 2017 1 Table f Cntent 1 Dem Script Overview... 3 1.1 Dem Overview...

More information

Epicor Commerce Connect (ECC) Services Specification

Epicor Commerce Connect (ECC) Services Specification Epicr Cmmerce Cnnect (ECC) Services Specificatin This Epicr Cmmerce Cnnect Services Specificatin ( Specificatin ) utlines the services and services levels assciated with Epicr s delivery f its Epicr Cmmerce

More information

Avantis.PRO Training (January December 2018)

Avantis.PRO Training (January December 2018) Avantis.PRO Training (January 2018 - December 2018) This dcument prvides the curse schedule and fees fr the Avantis.PRO training classes cvering the perid f January 2018 thrugh December 2018. The curse

More information

Delivering World Class Support Services

Delivering World Class Support Services The Cmpass Service Framewrk Delivering Wrld Class Supprt Services Our Standard Operating Platfrm The Cmpass Service Framewrk (CSF) is ur Standard Operating platfrm develped t deliver high quality and efficient

More information

Best Practice Checklist for EPC

Best Practice Checklist for EPC Best Practice Checklist fr EPC / A Definitins, interpretatin Technical aspect & what t lk fr in the EPC cntract 1. Is there a set f definitins f imprtant terms prvided and are thse clear and understd by

More information

Institutional Knowledge Management: Leveraging Your Firm's Most Valuable Asset

Institutional Knowledge Management: Leveraging Your Firm's Most Valuable Asset Fr several decades the wrld s best knwn frecasters f scietal change have predicted the emergence f a new ecnmy in which brainpwer, nt machine pwer, is the critical resurce. But the future has already turned

More information

Records Management Policy

Records Management Policy Recrds Management Plicy Main Authr: Cnsultatin Rute: Apprved By: Date f Issue: Applicable: Organisatinal wide Versin: 1.0 Review Date: February 2011 Versin 1.0: February 2010 Change Cntrl Versin Change

More information

The Well Lifecycle & Data Management

The Well Lifecycle & Data Management The Well Lifecycle & Data Management PPDM April Lunchen Rbert Lvelace Rbert.Lvelace@sbti.cm 214-870-1235 4/22/13 Agenda Intrductin Well Lifecycle Overview Rle f Data Management Data management impacts

More information

Maintenance Cost Optimisation for Process & Power Generation Plants

Maintenance Cost Optimisation for Process & Power Generation Plants Reliability Imprvement Prgramme & Maintenance Cst Optimisatin fr Prcess & Pwer Generatin Plants Date: Venue: 24 t 28 September 2012 (5 days) Hliday Villa, Subang, Malaysia COURSE INTRODUCTION: This Curse

More information

Strategic review outcomes

Strategic review outcomes Head ffice Level 3, Energy Huse, 18-20 Cavenagh St, Darwin NT 0800 GPO Bx 2394, Darwin NT 0801, Australia T +61 8 8924 3500 F +61 8 8924 3555 Ranger mine Lcked Bag 1, Jabiru NT 0886 Australia T +61 8 8938

More information

BROKER SELECTION AND ASSESSMENT POLICY

BROKER SELECTION AND ASSESSMENT POLICY BROKER SELECTION AND ASSESSMENT POLICY Date created: 1 Nvember 2007 Last updated: 19 Nvember 2012 Departments affected: Management departments, senir management, CICD Subject: Definitin f brker selectin

More information

Information Technology Master Plan. City of Georgetown, Texas

Information Technology Master Plan. City of Georgetown, Texas Infrmatin Technlgy Master Plan City f Gergetwn, Texas Dcument Infrmatin and Revisin Histry Vers in Date Authr(s ) R evis in Ntes 1.0 12/18/2009 Bill Llyd Initial Dcument 2.1 12/19/2009 Bill Llyd Editing

More information

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017

PJM Manual 14C: Generation and Transmission Interconnection Facility Construction Revision: 12 Effective Date: June 22, 2017 PJM Manual 14C: Generatin and Transmissin Intercnnectin Facility Cnstructin Revisin: 12 Effective Date: June 22, 2017 Prepared by System Planning Divisin PJM 2017 PJM Manual 14C: Generatin and Transmissin

More information

How to Work with Production in SAP Business One 9.3

How to Work with Production in SAP Business One 9.3 Hw-t Guide Dcument Versin: 4.0 2017-08-18 Hw t Wrk with Prductin in SAP Business One 9.3 Typgraphic Cnventins Type Style Example Descriptin Wrds r characters quted frm the screen. These include field names,

More information

Project Management Professional

Project Management Professional Prject Management Prfessinal 2 Prgram Overview This 4-day training & hmewrk is structured t prepare and facilitate the participants in line with appearing fr and achieving the PMP Certificatin. It helps

More information

Water and sewerage retail competition in Scotland

Water and sewerage retail competition in Scotland Water and sewerage retail cmpetitin in Sctland www.watercmmissin.c.uk Water and sewerage cmpetitin in Sctland All nn-husehld custmers (every business and public sectr rganisatin) can chse wh supplies their

More information

Guidance on the Privacy and Electronic Communications (EC Directive) Regulations

Guidance on the Privacy and Electronic Communications (EC Directive) Regulations Infrmatin Security Guidance Title: Status: Guidance n the Privacy and Electrnic Cmmunicatins (EC Directive) Regulatins Released 1. Purpse This guidance n the Privacy and Electrnic Cmmunicatins (EC Directive)

More information

In this Document: EMV 3-D Secure General and Testing FAQs. EMV 3-D Secure General FAQs

In this Document: EMV 3-D Secure General and Testing FAQs. EMV 3-D Secure General FAQs In this Dcument: EMV 3-D Secure General and Testing FAQs 1. What is EMV 3-D Secure? EMV 3-D Secure General FAQs EMV Three-Dmain Secure (3DS) is a messaging prtcl develped by EMVC t enable cnsumers t authenticate

More information

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014

Sage 300 ERP Payroll Sage HRMS Link Integration Guide. April 2014 Sage 300 ERP Payrll Sage HRMS Link Integratin Guide April 2014 This is a publicatin f Sage Sftware, Inc. Dcument versin: April 16, 2014 Cpyright 2014. Sage Sftware, Inc. All rights reserved. Sage, the

More information

Job Announcement Utah Climate Action Network Program Manager

Job Announcement Utah Climate Action Network Program Manager Jb Annuncement Utah Climate Actin Netwrk Prgram Manager Overview The Utah Climate Actin Netwrk (the Netwrk) is seeking a dynamic individual t lead its grwth and success as a hub fr cllabratin and psitive

More information

Frequently Asked Questions (FAQs) Goals and Performance

Frequently Asked Questions (FAQs) Goals and Performance AUDIENCE BACKGROUND Frequently Asked Questins (FAQs) Gals and Perfrmance mycareer @CHOP Gals and mycareer @CHOP Perfrmance are electrnic, integrated tls that supprt develping gals and tracking perfrmance.

More information

Monitoring, Evaluation and Adaptive Management Following INFFER Assessment (INFFER step 7)

Monitoring, Evaluation and Adaptive Management Following INFFER Assessment (INFFER step 7) Mnitring, Evaluatin and Adaptive Management Fllwing INFFER Assessment (INFFER step 7) www.inffer.rg David Pannell, Geff Park, April Curatl, Anna Rberts, Stephanie Spry, Sally Marsh Intrductin The Investment

More information

Silverlake Symmetri Islamic OmniCard

Silverlake Symmetri Islamic OmniCard Silverlake Symmetri Islamic OmniCard The Current Landscape Islamic banks are faced with a persistent demand frm their custmers t prduce card-based financing ptins, payment cnvenience, and the ability t

More information

REALTIME PREDICTIVE AND PRESCRIPTIVE ANALYTICS WITH REAL-TIME DATA AND SIMULATION. Hosni Adra. Simulation and Optimization Manager/Partner

REALTIME PREDICTIVE AND PRESCRIPTIVE ANALYTICS WITH REAL-TIME DATA AND SIMULATION. Hosni Adra. Simulation and Optimization Manager/Partner Prceedings f the 2016 Winter Simulatin Cnference H. Adra REALTIME PREDICTIVE AND PRESCRIPTIVE ANALYTICS WITH REAL-TIME DATA AND SIMULATION Hsni Adra Simulatin and Optimizatin Manager/Partner CreateASft,

More information

Service Catalogue. Your secure data centric guardians. Units 1-3 Trinity Court, Brunel Rd, Totton, Hampshire SO40 3WX

Service Catalogue. Your secure data centric guardians. Units 1-3 Trinity Court, Brunel Rd, Totton, Hampshire SO40 3WX Service Catalgue Yur secure data centric guardians Units 1-3 Trinity Curt, Brunel Rd, Tttn, Hampshire SO40 3WX www.amicusits.c.uk +44 2380 429429 24x365 Cre Managed IT Services 1 Intrductin Amicus ITS

More information

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT

MEVION SOURCING STRATEGY SUPPLIER CODE OF CONDUCT MEVION SOURCING STRATEGY The MEVION S250, while being the mst cmpact prtn therapy system in the wrld, is still a relatively large and cmplex prduct. As such, ur supply chain utilizes a high-mix, lw vlume

More information

Office for Capital Facilities

Office for Capital Facilities Office fr Capital Facilities Guidance Dcument February 20, 2015 Phtvltaic Slar Prjects A resurce cntaining infrmatin related t the acquisitin f phtvltaic slar panels by state-perated campuses. Phtvltaic

More information

1. Elements of an Integrated Report 1.1 Organizational overview and external environment

1. Elements of an Integrated Report 1.1 Organizational overview and external environment Pg Ref Marks 1. Elements f an Integrated Reprt 1.1 Organizatinal verview and external envirnment An integrated reprt shuld disclse the main activities f the rganizatin and the envirnment f which it perates.

More information

Business Process Framework (etom) Suite

Business Process Framework (etom) Suite Business Prcess Framewrk (etom) Suite Release Ntes fr Release 12.0 RN311 Versin 12.2 April, 2012 TM Frum 2012 Business Prcess Framewrk (etom) Suite Release Ntes R12.0 Ntice N recipient f this dcument and

More information

Reregistration of voluntarily deregistered CDM project activities

Reregistration of voluntarily deregistered CDM project activities Paragraph 4 f the anntated agenda, Annex 1 Reregistratin f vluntarily deregistered CDM prject activities CDM EB 87 Paris, France, 23 27 Nvember 2015 UNFCCC Secretariat SDM prgramme Prcedural backgrund

More information

DIRECTV POLICY Corrective Action Home Services Workforce Management

DIRECTV POLICY Corrective Action Home Services Workforce Management DIRECTV POLICY Wrkfrce Management DIRECTV Cmpany Plicy July 2015 Scpe... 3 Definitins... 3 Respnsibilities... 4 Emplyees... 4 Supervisrs... 4 Human Resurces... 4 Crrective Actin Categries... 4 Crrective

More information

Appendix C: Country Case Study Methodology

Appendix C: Country Case Study Methodology Appendix C: Cuntry Case Study Methdlgy Guiding Principles Cuntry cases fllw a multiple cuntry case study design, that is, fcus n three reginal clusters each with three sets f PPP prjects with distinct

More information

System Implementation Project Approach

System Implementation Project Approach System Implementatin Prject Apprach Phase I Current State Analysis Gal: Dcument current state peratins and categrize current state prcedures and reprting assets as: Deliverables: Mandatry Internal Reprting

More information

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL)

Making the move from Sage Abra Suite (FoxPro) to Sage HRMS (SQL) Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) 5272 S. LEWIS, SUITE 100 TULSA, OK 74105 918.496.1600 TOLL FREE: 877.496.1600 Making the mve frm Sage Abra Suite (FxPr) t Sage HRMS (SQL) As

More information

INTRODUCTION. If additional information is needed, please contact The IIA Research Foundation:

INTRODUCTION. If additional information is needed, please contact The IIA Research Foundation: INTRODUCTION The Institute f Internal Auditrs Research Fundatin TM (IIARF TM ) is the glbal leader in prviding research and knwledge resurces t enhance the internal audit prfessin. The IIARF cntinually

More information

UDI Compliance Service

UDI Compliance Service UDI Cmpliance Service What is UDI? The US Fd and Drug Administratin (FDA) has issued a ruling that medical devices must cnfrm t a Unique Device Identificatin (UDI) standard. The UK Department f Health

More information

Commercialisation & Income Generation Strategy

Commercialisation & Income Generation Strategy Cmmercialisatin & Incme Generatin Strategy P a g e 1 CONTENTS Backgrund 3 Page Aims & Objectives 3 Statutry Requirements The Legal Framewrk 4-5 Strategic Apprach 5-6 Pursuing New Business Opprtunities

More information

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department

PJM Manual 14A: New Services Request Process Revision: 22 Effective Date: April 26, Prepared by Interconnection Planning Department PJM Manual 14A: New Services Request Prcess Revisin: 22 Effective Date: April 26, 2018 Prepared by Intercnnectin Planning Department PJM 2018 Table f Cntents Table f Cntents Table f Exhibits...7 Apprval...8

More information

Administrative Portal Data Management

Administrative Portal Data Management Administrative Prtal Data Management Reference Guide fr Prgram Managers, Prject Managers, and Supervisrs This guide is intended t supprt staff wh perfrm administrative tasks within the SAS system using

More information

Solution: Unix and Linux are examples of multi-user operating systems used to handle voluminous data and complex reporting requirements.

Solution: Unix and Linux are examples of multi-user operating systems used to handle voluminous data and complex reporting requirements. 1. State the fur basic requirements f a database applicatins. Slutin: The fur basic requirements f database applicatins are Frnt-end interface Back-end database Data prcessing Reprting System 2. Name the

More information

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act

Energy Storage Ontario Submission to the Standing Committee on General Government Bill 172, Climate Change Mitigation and Low-Carbon Economy Act April 4, 2016 Energy Strage Ontari Submissin t the Standing Cmmittee n General Gvernment Bill 172, Climate Change Mitigatin and Lw-Carbn Ecnmy Act Intrductin Gd afternn members f the Standing Cmmittee

More information

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide

INTERCEPT SURVEY DATA GUIDE JUNE Visitor/Shopper Intercept Survey Data Guide Visitr/Shpper Intercept Survey Data Guide June 26, 2014 Table f Cntents 1 Intrductin... 3 1.1 Timeline... 3 1.2 Availability f Data... 3 2 Overview... 4 2.1 Summary f Cntents... 4 2.2 Data Dictinary...

More information

MIS Exam Revision Modules 1-11!

MIS Exam Revision Modules 1-11! MIS Exam Revisin Mdules 1-11 Mdules 1-4 Chapter 1: Why MIS? The Imprtance f MIS All based arund Mre s Law. The number f transistrs per square inch n an integrated chip dubles every 18 mnths. Speed f a

More information

Energy Efficiency and Conservation Working Group Meeting #4. May 24, 2016; 1:00 pm 3:00 pm. Meeting Summary

Energy Efficiency and Conservation Working Group Meeting #4. May 24, 2016; 1:00 pm 3:00 pm. Meeting Summary Energy Efficiency and Cnservatin Wrking Grup Meeting #4 May 24, 2016; 1:00 pm 3:00 pm Meeting Summary I. Meeting Objectives T develp draft bjectives fr recmmendatin t the energy plan leadership team. T

More information

COURSE INFORMATION ENTR 7336 ENTREPRENEURSHIP TUESDAYS 6pm 9pm ; Room MH112 FALL 2013

COURSE INFORMATION ENTR 7336 ENTREPRENEURSHIP TUESDAYS 6pm 9pm ; Room MH112 FALL 2013 COURSE INFORMATION ENTR 7336 ENTREPRENEURSHIP TUESDAYS 6pm 9pm ; Rm MH112 FALL 2013 INSTRUCTOR Keith Rassin 713-545-4531 keithrassin@yah.cm READING MATERIALS Blackbard pstings and class handuts Articles

More information

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN

EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN EMISSION REDUCTIONS UNDER CAP-AND-TRADE PROPOSALS IN THE 111 TH CONGRESS Jhn Larsen and Rbert Heilmayr June 25, 2009 This analysis prvides an assessment f reductins in greenhuse gas (GHG) emissins relative

More information

Addendum No. 1 - Page 1 of 10 SPEC. NO

Addendum No. 1 - Page 1 of 10 SPEC. NO JUNE 1, 2015 ADDENDUM NO. 1 Fr REQUEST FOR PROPOSAL ( RFP ) Fr AIRPORT ELECTRONIC MASS NOTIFICATION/ALERT SYSTEM AND SERVICES FOR O HARE AND MIDWAY INTERNATIONAL AIRPORTS Specificatin and Cntract Dcument

More information

OP 1: Greenhouse Gas Emissions

OP 1: Greenhouse Gas Emissions OP 1: Greenhuse Gas Emissins 10 pints available A. Credit Ratinale This credit recgnizes institutins that have inventried their greenhuse gas (GHG) emissins and that have reduced their adjusted net Scpe

More information

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS

ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS ` ROYAL BANK OF CANADA ONLINE APPLICATION TERMS AND CONDITIONS Please review the fllwing Ryal Bank f Canada Online Applicatin Terms and Cnditins (the "Terms"). Yu must read them alng with yur Accunt Disclsures

More information

AIM BRIEFING PAPER CONSIGNMENT STOCK APRIL 2011 ASSOCIATION DES INDUSTRIES DE MARQUE EUROPEAN BRANDS ASSOCIATION EUROPÄISCHER MARKENVERBAND

AIM BRIEFING PAPER CONSIGNMENT STOCK APRIL 2011 ASSOCIATION DES INDUSTRIES DE MARQUE EUROPEAN BRANDS ASSOCIATION EUROPÄISCHER MARKENVERBAND ASSOCIATION DES INDUSTRIES DE MARQUE EUROPEAN BRANDS ASSOCIATION EUROPÄISCHER MARKENVERBAND AIM BRIEFING PAPER CONSIGNMENT STOCK APRIL 2011 9 AVENUE DES GAULOIS B-1040 BRUSSELS BELGIUM TEL +322 7360305

More information

Notes and guidance: Paper 1 Section B Poetic voices

Notes and guidance: Paper 1 Section B Poetic voices Ntes and guidance: Paper 1 Sectin B Petic vices This resurce explains hw the questin in the specimen assessment materials fr AS Paper 1, Sectin B, Petic vices, addresses the assessment bjectives, with

More information

Guide to the consultation: 'Draft common EU framework of core indicators for the environmental performance of EU buildings'

Guide to the consultation: 'Draft common EU framework of core indicators for the environmental performance of EU buildings' Guide t the cnsultatin: 'Draft cmmn EU framewrk f cre indicatrs fr the envirnmental perfrmance f EU buildings' Nichlas Ddd, Shane Dnatell, Miguel Gama-Caldas (JRC-IPTS) July 2016 1 Eurpean Cmmissin Jint

More information

WITH EXAMPLES FROM THE WINDWARD ISLANDS. Andrew Bartlett. Keynote Presentation. 1st National Workshop on Development Communications.

WITH EXAMPLES FROM THE WINDWARD ISLANDS. Andrew Bartlett. Keynote Presentation. 1st National Workshop on Development Communications. PRINCIPLES OF EFFECTIVE DEVELOPMENT COMMUNICATION: WITH EXAMPLES FROM THE WINDWARD ISLANDS Andrew Bartlett Keynte Presentatin 1st Natinal Wrkshp n Develpment Cmmunicatins March 1986 Federal Agricultural

More information

SYDNEY FESTIVAL MARKETING MANAGER

SYDNEY FESTIVAL MARKETING MANAGER SYDNEY FESTIVAL MARKETING MANAGER 1 PURPOSE OF POSITION The Marketing Manager (alngside the Digital Marketing Manager, Publicity Manager and Ticketing and Custmer Services Manager) is a key player in the

More information

TG 19 SOUTH AUSTRALIAN WATER CORPORATION

TG 19 SOUTH AUSTRALIAN WATER CORPORATION TG 19 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE Checklist: Water Netwrk Requirements fr Land Develpment Applicatins Issued by: Principal Engineer Water & Wastewater Netwrks Issue Date: SA

More information

CAPIEL Position Paper - RoHS Scope

CAPIEL Position Paper - RoHS Scope CAPIEL Psitin Paper - RHS Scpe 1 - Purpse f this paper The purpse f this CAPIEL paper is t help manufacturers t determine whether r nt the prducts they place n the market fall within the scpe f the recast

More information

Integration of SAP TM and SAP CRM

Integration of SAP TM and SAP CRM SAP Transprtatin Management Integratin f SAP TM and SAP CRM CUSTOMER Dcument Versin: 1.0 December 2013 SAP AG 1 Cpyright Cpyright 2013 SAP AG. All rights reserved. SAP Library dcument classificatin: PUBLIC

More information

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board

Report on Inspection of PricewaterhouseCoopers LLP (Headquartered in New York, New York) Public Company Accounting Oversight Board 1666 K Street, N.W. Washingtn, DC 20006 Telephne: (202) 207-9100 Facsimile: (202) 862-8433 www.pcabus.rg Reprt n 2014 (Headquartered in New Yrk, New Yrk) Issued by the Public Cmpany Accunting Oversight

More information

Three priority issues have been identified. They are supported by joint projects presented in more detail online at

Three priority issues have been identified. They are supported by joint projects presented in more detail online at JOINT PROJECTS FOCUSED ON THREE ISSUES Under the St. Lawrence Actin Plan 2011 2026, the gvernments f Canada and Quebec cntinue t wrk tgether by pling their expertise and their resurces t prtect and enhance

More information

Country profiles: Iceland

Country profiles: Iceland Cuntry prfiles: Iceland Last updated: 26/06/2015 1 Implementatin f Tracking Systems 1.1 Electricity Disclsure Electricity disclsure in Iceland is implemented by Regulatin number 757/2012, Regulatin n disclsure

More information

Domain Architect Information Services (IS)

Domain Architect Information Services (IS) Dmain Architect Infrmatin Services (IS) Reprting t: Chief Architect Salary: 49,230-58,754 per annum (pr rata) depending n skills and experience. Salary prgressin beynd this scale is subject t perfrmance

More information

Governance Drill Down: Don't Forget About SharePoint WCM/Publishing! Todd Ray, August 2014

Governance Drill Down: Don't Forget About SharePoint WCM/Publishing! Todd Ray, August 2014 Briefing: Gvernance Drill-Dwn Dn t Frget Abut WCM/Publishing Gvernance Drill Dwn: Dn't Frget Abut SharePint WCM/Publishing! Tdd Ray, August 2014 tddray@alumni.stanfrd.edu Executive Summary In my May 2014

More information

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 92 Effective Date: November 1, 2017

PJM Manual 11: Energy & Ancillary Services Market Operations Revision: 92 Effective Date: November 1, 2017 PJM Manual 11: Energy & Ancillary Services Market Operatins Revisin: 92 Effective Date: Nvember 1, 2017 Prepared by Day-Ahead and Real-Time Market Operatins PJM 2017 PJM Manual 11: Energy & Ancillary Services

More information

White paper Ti-Rate billing and real-time rating solution. Version 1.0

White paper Ti-Rate billing and real-time rating solution. Version 1.0 White paper Ti-Rate billing and real-time rating slutin. Versin 1.0 Yu need mdern BSS slutins t adpt t new reality Ti-Rate slutin n etom map Billing shuld nt be hard and cmplicated High Cncurrent Lad handling,

More information