1 P R E S E R V A T I O N A R C H I T E C T U R E Marilyn E. Kaplan, Architect and Principal 43 Marion Avenue Albany, NY fax preservationarchitecture@verizon.net ADDENDUM #1 June 26, 2015 HUDSON OPERA HOUSE RESTORATION CONTENTS 1. REVISED BID SHEETS. Pages 2,3 this file 2. REVISED DRAWINGS, SPECIFICATION AND ASBESTOS REPORTS. List of revised drawings and reports in table below. Posted on this website. A-00 Base Bid & Alt Summary Corrections to Alt.8 description A-1 Basement & First Floor Removals Add note to remove slab at 001 A-2 2 ND Floor & Mezz Removals NW egress stair room number correction (now Rm 224) A-5 2 nd Floor Plan NW egress stair room number correction (now Rm 224) A-15 RCP 2 nd Floor NW egress stair room number correction (now Rm 224) A-19 Misc. Details Misc. Details. Countertops. Revised detail F/A-19. A-26 Room Finish Schedule Plaster Restoration Note 8 added; Countertop BB Schedule, Carpet Plan noted for Reference Only (Material & Installation NIC) A-29 Door Schedules Revised Door Schedule to include Door (Casing) Trim column, notes 5&6 added, Existing Door Schedule note revisions. A-36 Alternate Schedules Alternate Countertop Schedule A-37 Alternate Schedules Revised Door Schedule TR-1 Theatrical Rigging Plan and Details Detail D to reference A-19.1 S-1 Foundation Improvement Plan Masonry notes modified S-1.1 FDN Improvement Elevations Masonry notes modified S-6.0 Roof Framing Plan Structural notes modified FP-2 (Fire Protection) First Floor Plan 1) Add sprinkler head and associated branch piping within Vault (106) 2) Change sprinkler branch piping sizes within Corr.2 (105) and Coat Stor. (104) P-6 (Plumbing) Foundation Plan 1) Delete reference to floor saw-cutting (drawing note #4) within Mechanical Room (001) and Green Room (009). E-6.2 First Floor Plan - Lighting 1) Delete (3) Type IF lighting fixtures in North Lobby (108) 2) ADD Note #1 to Type IF lighting fixture in Common Council Room (117) 3) Delete Drawing Note #1 in its entirety; Add new Drawing Note #1 in its place: Provide J-box and lighting branch circuit only. Lighting fixtures are not in contract (N.I.C.) provided by owner and installed by contractor. 4) Delete Drawing Note #2 & #3 its their entirety; Add new Drawing Note #2 & #3 in their place: NOT USED. Hudson Opera House, Addendum # page 1

2 E-8.1 Mezzanine Plan Power and Systems 1) Add location of Panelboard DP-STAGE. E-8.2 Mezzanine Plan Lighting 1) Add location of Panelboard DP-STAGE. 2) Delete Drawing Note #3 in its entirety; Add new Drawing Note #3 in its place: Provide J-box and lighting branch circuit only. Lighting fixtures are not in contract (N.I.C.) provided by owner and installed by contractor. E-10 One-Line Power Distribution Diagrams 1) Change Feeder designation A to A1 between Main Service Disconnect and PT/CT CAB. 2) Change Feeder designation A to A1 between PT/CT CAB. and HV-MDP Distribution Panelboard. 3) Add Ground Symbol to Main Service Disconnect. 4) Add 60A/3P Circuit Breaker designation in Panelboard HV- MDP for feeder to AHU-6. 5) Change Feeder Schedule description for A to read (2) Sets of 3#500 Phase Conductors, + (2)#500 Neutral Conductors with No Equip. Ground in (2) 3 ½ Conduits (Rated 800AMP). 6) Change Feeder Schedule description for A1 to read (2) Sets of 3#500 Phase Conductors, + (2)#500 Neutral Conductors with (2)#1/0 Equip. Ground Conductors in (2) 3 ½ Conduits (Rated 800AMP). 7) Add 100AMP description to ATS#1 and ATS#2. 8) Add 3 Phase nomenclature to Standby Generator description. E-12 Luminaire Schedule 1) Change Type IF Lighting Fixture description to Provided by Owner, Installed by Contractor. PDF Packaged Generator Assemblies PDF HOH, Alpine Asbestos Report PDF HOH, EMSL Asbestos Analysis MODIFICATIONS TO SUPPLEMENTAL NOTES. Page 4 of this file. 4. UDPATED PROJECT SUMMARY AND ALTERNATE SUMMARY. Pages 5-11 of this file. 5. REVISED SPECIFICATION SECTION , ALTERNATES. Pages of this file. Hudson Opera House, Addendum # page 2

3 P R E S E R V A T I O N A R C H I T E C T U R E Marilyn E. Kaplan, Architect and Principal 43 Marion Avenue Albany, New York preservationarchitecture@verizon.net CONTRACTOR S BID SHEET, page 1 of 2 / revised THE HUDSON OPERA HOUSE FULL RESTORATION 327 Warren Street Hudson, NY Notes: 1. Contractors must provide bid based on breakdown provided. Based on funding, owner retains the right to select which work items will be undertaken. 2. Bids due at 6 p.m. on Wednesday, July 1, 2015 at the Opera House. All prices to be valid through 90 days of submission of this bid. 3. Bidder agrees to pay as liquidated damages, the sum of $200 for each consecutive calendar day thereafter as provided in Section 15 of the General Conditions. Name of Firm: Address: Contact: Phone/ Fax: P F Name/printed: Signature/Date: Base Bid Work (include $15,000 for Allowance work, as directed by Architect) $ Unit Price 1: Additional masonry restoration work per Section Unit Price 2: Additional plaster removals and restoration per Section /square foot /square foot Alternates: See Page 2 of Bid Sheet Initial to acknowledge receipt: Addendum #1 Addendum #2 Hudson Opera House, Addendum # page 3

4 P R E S E R V A T I O N Marilyn E. Kaplan, Architect and Principal 43 Marion Avenue Albany, New York preservationarchitecture@verizon.net A R C H I T E C T U R E CONTRACTOR S BID SHEET, page 2 of 2 / revised THE HUDSON OPERA HOUSE FULL RESTORATION 327 Warren Street Hudson, NY Name of Firm: See Supplemental Notes and Drawings ALT # $ 1 (add) AIR CONDITIONING. 2 (add) MEZZANINE (M308), STAIR 10b, CONTROL BOOTHS (M309, M310, M311). 3 (add) TOILETS T3 (203) and T4 (204). 4 (add) NORTH ACCESSIBLE RAMP (108,109). 5 (add) ACCESSIBLE STAGE LIFT (213). 6 (add) BOX OFFICE (115a). 7 (add) COAT ROOM (104) 8 (add) 1 st FLOOR CORRIDOR 3 (125), JANITORS CLOSET (124), KITCHEN (102c). 9 (add) WORKSHOP (101). 10 (add) WEST ROOM (107). 11 (add) EXTERIOR METALS. 12 (add) STAGE LIGHT TROUGH (207). 13 (add) DRESSING ROOMS (208, M301, M306). 14 (add) RESERVED. 15 SECOND FLOOR WINDOWS. Indicate: Reduced or additonal cost from Base Bid 16a (add) 16b (add) SECOND FLOOR INTERIOR STORM WINDOWS. FIRST FLOOR INTERIOR STORM WINDOWS. 17 (add) BASEMENT : GREEN ROOM (005, 009, 010, 011, 012, 013, 017, 018, 020); STORAGE (002, 004); CORRIDOR (005). Hudson Opera House, Addendum # page 4

5 3. MODIFICATIONS TO SUPPLEMENTAL NOTES Notes 4 and 5 of Supplemental Notes to be replaced with the following. Add new Supplemental Notes #38 and # Overall Project Schedule. The following general project schedule has been established. 5/21/2015 Pre-Bid Meeting onsite (1 p.m.) 7/1//2015 Bid Opening (6 p.m.) 7/15/2015 Project Award 8/15/2015 Construction Start 5. Funding Sources. This project is in part funded by a grant from the NYS Office of Parks, Recreation and Historic Preservation through Title 9 of the Environmental Protection Act of Under Article 15A, Executive Law, the State of New York is committed to providing Minority and Women Owned Business (MWBE) equal opportunity to participate in government contracts. The following goals have been set for this project: 8% of the grant value for MBE s and 7% of the grant value for WBE s. The 15% is based on the grant amount (not total project cost). At a minimum, contractor must retain at least $64,000 in services from an MBE sub or supplier, and $56,000 from a WBE. If the goals cannot be met, contractors may fill out Waiver Request forms with back up information provided to justify the waiver. The successful bidder may be required to furnish reports showing the participation of various business enterprises of subcontractors and suppliers on the contract. Additional funding is through Rural Development, U.S. Department of Agriculture. All payments to the Contractor will be made directly by the Owner. 38. Accessible Stage Lift. Corrections in Specification Section Vertical Platform Lifts: a B.5 to read 5. Car Access: Front/rear exit (in lieu of front/side exit). b. Eliminate 2.02 B.12 (emergency battery operation). For emergency operation, manual crank up/down will be used. CHANGES TO THE MECHANICAL SPECIFICATIONS: 1. Specification Section Temperature Controls: a. Part 1.06/A 1) ADD Automated Logic as an approved manufacturer. b. Part 2.04/A/4 1) ADD section to read: 4. Space Sensors: a. Standard space sensor shall be available in an off white enclosure for mounting in a standard electrical box. Mount at 60 AFF. b. Where blank plate sensors are required, plate shall be stainless steel face attached to electrical box. c. Where manual overrides are required, the sensor housing shall feature both an optional sliding mechanism for adjusting the space temperature set point, as well as a push button for selecting after hours operation. Where local display is specified, the sensor shall incorporate either an LED or LCD display for viewing the space temperature set point or other operator selectable parameters. Using built in buttons, the operators shall be able to adjust set points directly from the sensor. The DDC system shall program in high and low limits not to be exceeded regardless of temperature set point on local sensor. Initial limits shall be 75 F in cooling mode, and 70 F in the heating mode. c. Part 2.16/B and C: 1) DELETE section from specification. CHANGES TO THE FIRE PROTECTION SPECIFICATIONS: 1. Specification Section Fire Suppression Piping Systems and Accessories: a. Part 2.02/C/2/e: 1) CHANGE to read e. Design Equipment: Victaulic, rigid system, Style 009N couplings. CHANGES TO THE ELECTRICAL SPECIFICATIONS: 1. Specification Section Packaged Generator Assemblies: a. ADD Specification Section Packaged Generator Assemblies b. Specification Section Fire Detection and Alarm System Hudson Opera House, Addendum # page 5

6 1) CHANGE Design Make / Manufacturer Harrington Signal shall not be an acceptable alternate for the Fire Alarm System. Hudson Opera House, Addendum # page 6

7 PROJECT SUMMARY (rev. 6/26 with respect to Alternate 8) The intent of this Project Summary is to provide an overall description of scope and alternates and does not necessarily include all improvements required by the project drawings and specifications. Contractor must ensure that all work outlined in the Project Manual is included within the submitted bid and implemented through construction. I ABATEMENT BASE BID I - A.1 BASEMENT 1. 1 ST FLOOR LANDING AT BASEMENT STAIR (CEMENT BOARD ON CEILING AND FLOOR TILE). 2. REMOVE/ABATE ABANDONED BOILER IN 009. I - B.1 FIRST FL (FLOOR TILE). I - C.1 FIRST FL 1. WINDOW GLAZING PUTTY. I - D.1 SECOND FL/ MEZZANINE 1. ALL PAINT ON PLASTER. 2. BIRD DEBRIS. I - E.1 ATTIC 1. BIRD DEBRIS. I F.1 II REMOVALS GENERAL 1. ABATE ALL LEAD, ASBESTOS & BIRD MATTER IN PROJECT WORK AREAS WHERE NOTED FOR REMOVALS OR MATERIALS TO REMAIN. 1. ALL WORK: 001, 014, 015 AND GENERAL REMOVAL OF MASONRY COLUMNS (WHERE NOTED) THROUGHOUT BASEMENT. SAW CUT EXISTING SLAB FOR NEW DRAINAGE (VARIOUS LOCATIONS). ALTERNATE SUMMARY DESCRIPTION ALT 17 GREEN ROOM / BASEMENT (002, 004, 005, 009, 017). NEW OPENINGS IN FOUNDATION WALLS FOR STORAGE ACCESS (B3D, B2A, B4A, B11A). II - A.1 BASEMENT RELOCATED AHU, REMOVE MECHANICAL PIPING (WHERE NOTED), REMOVE SLAB AS NOTED, MASONRY OPENINGS FOR NEW DUCTS, ENLARGED EXISTING DOOR OPENING B1A AND NEW DOOR OPENING B3C REBUILT FOUNDATION WALL AT NE CORNER, SAW CUT SLAB AS NECESSARY FOR DRAINAGE REMOVAL OF SLAB, PARTITIONS, EXISTING WINDOW, DEBRIS, TEMPORARY COLUMNS AND ABANDONED BOILER. RELOCATED AHU 2 TO 008. OPENINGS IN MASONRY WALL AND WOOD FLOOR ABOVE FOR NEW DUCTS. 6. ENLARGED OPENING B5A AND NEW OPENING B9A. 7. EXCAVATION FOR ELEVATOR ADDITION FOUNDATION. 1. ALL WORK: 101 (EXCLUDING WINDOW REPAIR, PICTURE RAIL OR FLOORING), 105, 117, 119, 120. ALT 4. NORTH ACCESSIBLE RAMP (108/109) II - B.1 FIRST FLOOR , 107, CEILING SECTIONS REMOVAL FOR PH FLOOR REPAIRS. REMOVAL OF EXISTING RAIN LEADER (101, 107) /105 PENETRATIONS FOR DUCTWORK AT TOP OF WALLS (IN ROUTE TO WORKSHOP) AND FLOOR OF REMOVAL OF PORTION OF VAULT CEILING FOR DUCTWORK AND SALVAGE TIN CEILING ABOVE REMOVAL OF PORTIONS OF EXISTING STAIR AND FLOOR FOR NEW NORTH RAMP. ALT 6. BOX OFFICE (115A) REMOVAL OF DOORS AND FRAMES FOR 115A AND 116B. ENLARGE OPENING 115A. REMOVE EXISTING JANITOR SINK, NORTH WALL IN 115A AND DOOR 110A. Hudson Opera House, Addendum # page 7

8 REMOVAL OF 109 TEMP PARTITION, MAIN STAIR CENTER HANDRAIL (REMOVE FOR REFINISHING). ALT 7. COAT ROOM (104) II - C.1 SECOND FL/ MEZZANINE /119/123 REMOVAL OF EXISTING FLOORING AND JOISTS IN 119 FOR MECHANICAL OPENING AND EXISTING PARTITION IN BETWEEN 117/119. REMOVAL OF EXISTING MASONRY FOR NEW DOOR OPENINGS (OR ENLARGE EXISTING) IN 117, 119 AND REMOVAL OF EXISTING RAIN LEADER (119). 8. SALVAGE ALL HISTORIC TRIM, WHERE REMOVED. 1. ALL WORK: 201, 202, 203, 205, 206, 207, 208, 209, 210, 211, 212, 213 (EXCEPT HC LIFT), 214, M301, M307, M GENERAL REMOVAL/REPLACEMENT OF EXISTING PERFORMANCE HALL AND MEZZANINE CEILINGS (INCLUDING ABATEMENT OF BIRD DEBRIS). REMOVE EXISTING STAGE DRESSING ROOM WALLS AND CEILING. BRACE SOUTH EXTERIOR WALL PRIOR TO DEMOLITION AND REBUILDING OF MEZZANINE AND 2 ND FLOOR WALLS BELOW. REMOVE ALL EXISTING MECHANICAL PIPING AND RADIATORS REMOVAL OF EXISTING FLOORING AND JOISTS AT MECHANICAL OPENING IN 205 AND MASONRY FOR DOOR 205E. NEW OPENING IN EXISTING MASONRY WALL FOR ACCESS TO COAT STORAGE (104A), REMOVE EXISTING VAULT DOOR (107E). ALT 8. 1 ST FL CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C) REMOVAL OF EXISTING BATHROOM FIXTURES AND PARTITION IN 102. NEW OPENING 103A. ALT 12. STAGE LIGHT TROUGH MODIFICATIONS TO EXISTING STAGE FLOOR AND FRAMING FOR LIGHT TROUGH ALONG NORTH WALL. ALT 15. SECOND FLOOR WINDOWS REINFORCEMENT OF EXISTING 2 ND FLOOR BEAMS IN PERFORMANCE HALL/BELOW STAGE ALONG COLUMN LINES B & E. REPLACEMENT OF ALL 2 ND FLOOR WINDOWS; SOLAR AND BLACK OUT SHADES AT PERFORMANCE HALL, MEZZANINE AND STAGE REMOVAL OF STAGE PROSCENIUM EXTENSIONS AND STAIRS 11 AND 12. III EXTERIOR III A.1 III B.1 III E EXTERIOR METAL SITE MASONRY 6. SALVAGE REMOVED HISTORIC ARTIFACTS, TRIM, MEZZ.FLOORING, STAIR ALL WORK (EXCEPT CAST IRON AND PRESSED METAL REPAIR). 2. SALVAGE WINDOW 31 CAST IRON SILL. ALL WORK PER 'C' DRAWINGS. 1. REPAIR OF EXISTING MASONRY FAÇADE. 2. NEW ELEVATOR ADDITION WITH BRICK VENEER. 3. INFILL OF EXISTING BASEMENT WINDOWS B35 AND B37. IV GENERAL CONSTRUCTION IV A BASEMENT 1. ALL WORK: 001, 003 (EXCEPT B3D AND B4A OPENINGS), 006, 008, 014, 015, ADDITION OF NEW DOOR AT ENLARGED B5A, B1A AND B9A. ALT 11 EXTERIOR METALS RESTORATION OF CAST IRON AND PRESSED METAL ELEMENTS. ALT 4. NORTH ACCESSIBLE RAMP (108,109) COLUMNS FOR NEW RAMP. ALT 17. BASEMENT: GREEN ROOM (005, 009, 010, 011, 012, 013, 017, 018, 020); 014, 016, STORAGE (002, 004); CORRIDOR (005) Hudson Opera House, Addendum # page 8

9 3. REINFORCEMENT OF EXISTING BASEMENT STAIR. FULL GREEN ROOM SCOPE (009, 010, 011, 012, 013, 018, 020), STORAGE 3 (017), 002, 004, 005 CEILING: NEW MASONRY OPENINGS B2A, B3D, B4A. 4. INFILL WINDOW OPENINGS B35 AND B37. IV - B FIRST FL 1. ALL WORK: 105, 109, 117, 118, 119, 120, 121,122,123, DUCT ENCLOSURES (RISERS AND ALONG CEILING), CLOSET 101A, NEW RAIN LEADER DUCTWORK ABOVE CEILING, NEW CEILING INFILL FRAMING AND FINISHES REPAIR EXISTING WOOD RAILING AT STAIR REUSE SALVAGED TRIM, AS POSSIBLE. ALT 4. NORTH ACCESSIBLE RAMP (108,109). NEW RAMP/RAILINGS. ALT 6. BOX OFFICE (115B) INFILL OPENING 116B, NEW WINDOW, SHELVING AND FLOOR PATCHING.NEW DOOR 110B. ALT 7. COAT ROOM (104) NEW OPENING TO COAT STORAGE (104A) AND REPLACE VAULT DOOR WITH NEW DOOR AND FRAME WITHIN EXISTING VAULT FRAME (107F). ALT 8. 1 ST FLOOR CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C). NEW JAN. CLOSET (124) PARTITIONS, NEW KITCHEN CABINETS, FIXTURES, COUNTERS AND EQUIPMENT (I.E. VENTILATION) TO SUPPORT OWNER PURCHASED APPLIANCES. ALT 9. WORKSHOP (101). WOOD FLOORING, PICTURE RAIL, WINDOW RESTORATION. ALT 10. WEST ROOM (107). TIN CEILING REPAIR, PAINT WALLS AND CEILING, TRIM AT WINDOW 12, REFINISH FLOOR. 1. ALL WORK: 201, 202, 203 & 204, 205, 206, 208, 209, 210, 211, 212, 213 (TEMP. RAILING AT FUTURE HC LIFT), 214 (INCL. HEADROOM MODIFICATION), 215, 216, 217, 218, 219 (STAGE STORAGE), 220 (JAN.CL), 221. ALT 1. AIR CONDITIONING SOUND ABSORBING PANELS AT EXISTING EXTERIOR BRICK WALL AND DOOR 31B /204 - ALL WORK EXCEPT TILE ON WALL. ALT 2. MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, M311). MEZZ SEATING AND RAISED PLATFORMS, GUARDS AT LOGES AND MAIN RAIL, HANDRAILS FOR SEATING. HANDRAILS AND GUARDS AT STAIR 10B. M309, M310, M311: STRUCTURE AND FINISHES ALL WORK, EXCLUDING SE STAGE ACCESS LIFT OR LIGHT TROUGH. MODIFY PROSCENIUM ARCH AND REBUILD STAIRS 11 AND 12 AS SHOWN. REINSTALL SALVAGED FLOORING, AS POSSIBLE. IV - C SECOND FL/ MEZZANINE WALL/CEILING FINISH ONLY, ROUGH FRAME AND TEMP HANDRAIL AT STAIR 10B. HARDWOOD FLOOR AT 2 ND FL LANDING. 5. M304/M305 TEMPORARY RAIL AT TEMPORARY FLOOR OPENING ACCESSED BY WALL MOUNTED LADDERS AT CORRIDORS (209/212). 6. M301/ M306 FINISH STAGE SIDE OF WALLS ONLY. ALT 3. TOILETS T3 (203) AND T4 (204). T3, T4 (TILE WAINSCOT) ALT 5. ACCESSIBLE STAGE LIFT (213). WHEELCHAIR LIFT ALT 12. STAGE LIGHT TROUGH. MODIFICATIONS TO EXISTING STAGE FLOOR AND FRAMING FOR LIGHT TROUGH ALONG NORTH WALL. V DOORS V - C.1 DOORS 7. M308 - MEZZ CONSTRUCTION WITH TEMPORARY SPEED RAIL (NO FINISHES OR SEATING), ROUGH FRAME STAIR 10B WITH TEMP 2X4 HANDRAIL AND GUARD. DUCT ENCLOSURE. RESTORATION OF PLASTER WALLS WITH ACCESS PANELS AT CURVED CORNERS. 8. REUSE SALVAGED TRIM, AS POSSIBLE. 1. RESTORATION DOOR 34A (INCLUDING SIDELITES) AND DOOR 20A. ALT 13. DRESSING ROOMS 208, M301, M306. BUILT-INS IN 208 AND 212. FINISHES AND BUILT-INS IN DRESSING ROOMS M301 AND M306 ALT 1. AIR CONDITIONING NEW DOOR 31B. ALT 2. MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, M311). NEW DOORS 308A, 308B, 308C, 309B, 310B, 311B. Hudson Opera House, Addendum # page 9

10 VI WINDOWS VI - D WINDOWS VII MECHANICAL VII - A VII B VII - C BASEMENT FIRST FL SECOND FL/ MEZZANINE VIII PLUMBING 2. RESTORATION/FIX SHUT DOORS 118A, 15B AND 43A. 3. REPLACEMENT DOOR 39A; RESTORATION DOOR 42A. 4. NEW DOORS B1A, B3C, B5A, B14A (ELEVATOR), B14B, B14C, 101D, 120A, 117D, 117C, 117E, 118B, 118C, 118D, 119A, 119B, 123A, 121A, 121C (ELEVATOR), 201C, 203C, 203D, 204A, 206F, 206G, 205C, 205D, 205E, 206C, 206D, 206E, 207E (SHUTTERS), 207F (SHUTTERS), 207G (SHUTTERS), 208C, 210B, 211B, 217A, 31A, 303A, 308D (ATTIC), 308E (ATTIC), 308F (ATTIC). 5. RESTORATION OF EXISTING DOORS 201A, 202A, 42B. 6. ENLARGEMENT AND RESTORATION DOOR 206B. 1. RESTORATION OF 1 ST FLOOR WINDOWS 21, 22, 23. WINDOWS 11, 12 AND 13 (EXTERIOR ONLY). 2. RESTORATION OF ALL 2 ND FLOOR WINDOWS TO OPERABLE SINGLE HUNG UNITS (INCL. SINGLE MOTORIZED BLACKOUT SHADE IN PERFORMANCE HALL, MEZZ AND STAGE) 3. REPLACEMENT OF WINDOW 35 IN ROOM NEW CURTAIN WALL SYSTEM AT ELEVATOR ADDITION. 5. INSTALL MOTORIZED BLACK OUT SHADES IN PERFORMANCE HALL AT WINDOWS 1, 5, 14, 15, 16, 17, 18, 40, 41 AND INSTALL MANUAL BLACK OUT SHADES AT MEZZANINE WINDOWS 27, 28, 29 AND RELOCATION OF AHU 1 (INCL. DUCTWORK THROUGH 105, 104, 102, TO 101. ALT 7. COAT ROOM (104)NEW DOORS 104A, 107F ALT 8. 1 ST FL CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C) NEW DOORS 103A, 103B. ALT 13. DRESSING ROOMS 208, M301, M306.NEW DOORS 301B, 306A ALT 17. BASEMENT: GREEN ROOM (005, 009, 010, 011, 012, 013, 017, 018, 020); STORAGE (002, 004); CORRIDOR (005) NEW DOORS AT ALL NEW OPENINGS. ALT 2. MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, M311). NEW WINDOWS 309A, 310A, 311A. ALT 8. 1 ST FLOOR CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C).RESTORATION WINDOW 47. ALT 10. WEST ROOM (107).RESTORATION OF ALL WINDOWS. ALT 15. SECOND FLOOR WINDOWS REPLACEMENT ALL 2 ND FLOOR WINDOWS; INSTALL DOUBLE SHADE (SOLAR AND BLACK OUT) IN LIEU OF SINGLE SHADE NOTED IN BASE BID AT PERFORMANCE HALL, MEZZ AND STAGE. ALT 16A. SECOND FLOOR INTERIOR STORM WINDOWS NEW INTERIOR STORMS AT ALL EXISTING 2ND FLOOR WINDOWS. DOES NOT APPLY IF ALT 15 SELECTED. ALT 16B. FIRST FLOOR INTERIOR STORM WINDOWS. NEW INTERIOR OPERABLE STORMS AT WINDOWS 7-9, 21-26, 32, 46-47, ALT 1. AIR CONDITIONING 2. RELOCATION OF AHU 2 (INCL. ALL DUCTWORK) PIPING IN BASEMENT FOR AC INSTALLATION. 3. NEW AHU 4 (INCL. ALL DUCTWORK) ALT 4. NORTH ACCESSIBLE RAMP (108,109). MODIFICATION OF EXISTING DUCTWORK AT RAMP 4.NEW AHU 5 (INCL ALL DUCTWORK) SUPPORT LOCATIONS. ALT 17. BASEMENT: GREEN ROOM AND RELATED SPACES (005, 009, 010, 011, 012, 013, 017, 018, 020); STORAGE (002, 004); CORRIDOR (005) 5. NEW AHU 6 (INCL ALL DUCTWORK) HVAC FOR GREEN ROOM AND RELATED SPACES. 1. DUCTWORK, REGISTERS, SOFFITS AND CHASES PER DRAWINGS. 1. RADIATORS, VALANCES, DUCTWORK, SOFFITS CHASES AND REGISTERS PER DRAWINGS. 2. INDEPENDENT AC UNIT FOR M303. ALT 8. 1 ST FL. CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C). HOOD EXHAUST, MAKEUP AIR LOUVER/DUCTS, VENT FANS & LOUVERS. ALT 1. AIR CONDITIONING CHILLER ON ELEVATOR ADDITION ROOF CONNECTED TO INSTALLED DUCTWORK AND VALANCES. ALT 2. MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, M311). 3. T3, T4, T5 AND DR 2 BATHROOM VENTS. DUCTWORK FOR M309, M310, M311. Hudson Opera House, Addendum # page 10

11 VIII - A VIII B VIII - C BASEMENT FIRST FL SECOND FL 1. PIPING FOR MECHANICAL EQUIPMENT (EXCEPT PIPING NEEDED FOR CHILLER) AND WATER HEATER. PERIMETER DRAINAGE, SUMP BASINS, ELEVATOR SUMP PUMP, RAIN LEADER CONNECTIONS 2. NEW GAS REGULATOR AND METER AND ASSOCIATED PIPING. 3. GAS PIPING TO GENERATOR. 1. RAIN LEADERS, PIPING TO CONCESSION SINK AND PIPING BEING ROUTED TO 2 ND FLOOR. ALT 1. AIR CONDITIONING BASEMENT PIPING FOR CHILLER. ALT 17. BASEMENT: GREEN ROOMS AND RELATED SPACES (005, 009, 010, 011, 012, 013, 017, 018, 020); STORAGE (002, 004); CORRIDOR (005) TOILET T6 TOILET AND SINK, WASHER HOOKUP, KITCHENETTE SINK, SLOP SINK ALT 8. 1 ST FL. CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C). NEW SINK AND DISH WASHER IN KITCHEN AND JANITOR CLOSET SINK 1. NW, SW, SE RAIN LEADER REPLACEMENT. ALT 13. DRESSING ROOMS 208, M301, M HC BATHROOM/ DRESSING 211. SINKS IN M301 AND M WATER FOUNTAIN (215) AND CHILLER. 4. ROOF DRAIN (ROOF OF ELEVATOR ADDITION). 5. WATER HEATERS. 6. CONNECTIONS FOR FUTURE DRESSING ROOM SINKS. 7. TOILET 203 AND 204. Hudson Opera House, Addendum # page 11

12 PROJECT ALTERNATES (rev. 6/26 with respect to Alternate 8) 1 AIR CONDITIONING. a. PROVIDE CHILLER AT ELEVATOR TOWER ROOF AND CONNECT TO DUCTWORK (INSTALLED PER BASE BID). INCLUDE ALL ASSOCIATED BASEMENT PIPING, ACCESSORIES, AND ELECTRICAL TO MAKE FULLY OPERABLE. 2 MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, M311). b. PROVIDE SOUND ABSORBING PANELS TO EXISTING BRICK FAÇADE AND DOOR 31B. a. MEZZANINE. PROVIDE ALL SEATING AND RAISED PLATFORMS, GUARDS AT LOGES AND MAIN RAIL, AND HANDRAILS FOR SEATING. b. MEZZANINE. PROVIDE ALL FINISHES PER DRAWINGS AND SCHEDULES. c. FINISH STAIR 10B. d. CONSTRUCT CONTROL BOOTHS (M309, M310, M311) PER DRAWINGS. e. PROVIDE DOORS 308A, 308B, 308C, 309B, 310B, 311B PER SCHEDULE. 3 TOILETS T3 (203) AND T4 (204). 4 NORTH ACCESSIBLE RAMP (108,109). f. PROVIDE WINDOWS 309A, 310A, 311A PER SCHEDULE. a. PROVIDE CERAMIC WALL TILE, PER FINISH SCHEDULE. a. CONDUCT ALL REMOVALS OF FIRST FLOOR STRUCTURE AS REQUIRED TO INSTALL NEW RAMP. b. PROVIDE ALL STRUCTURAL SUPPORT AND INTERIOR CONSTRUCTION AT BASEMENT AND FIRST FLOOR. c. MODIFY EXISTING DUCTWORK AT RAMP LOCATION d. PROVIDE NEW RAILINGS, FLOORING AND PUSH PADS. PATCH AS REQUIRED. 5 ACCESSIBLE STAGE LIFT (213). a. PROVIDE WHEELCHAIR LIFT. INCLUDE ALL ELECTRICAL WORK AND PATCHING. 6 BOX OFFICE a. CONDUCT ALL REMOVALS AS REQUIRED FOR NEW BOX OFFICE, INCLUDING WITHIN 116B. b. PROVIDE NEW GLAZING AND ALL CARPENTRY WORK, INCLUDING INFILL OF DOOR 116B AND PATCHING OF FLOOR. PROVIDE NEW DOOR 110B. 7 COAT ROOM (104) 8 1ST FLOOR CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C). c. PROVIDE NEW ELECTRICAL WIRING, RECEPTACLES AND FIXTURES. a. UNDERTAKE REMOVALS, INCLUDING NEW DOOR OPENING IN EXISTING MASONRY WALL AND REMOVAL OF VAULT DOOR (107E). b. INSTALL NEW DOORS 104A AND 107F AND ALL FINISHES. PATCH AS REQUIRED. a. REMOVE ALL CONSTRUCTION AND PLUMBING FIXTURES ASSOCIATED WITH CORRIDOR 3 (103), AND 102A/102B PARTITION. b. INSTALL NEW PIPING AND FIXTURES (KITCHEN SINK, DISHWASHER, JANITORS SINK), NEW VENTS AND LOUVERS, NEW HOOD EXHAUST, AND MAKE-UP AIR LOUVER/DUCTS. c. PROVIDE NEW ELECTRICAL WIRING, RECEPTACLES, AND FIXTURES. d. PROVIDE NEW DOORS 103A, 103B. REVERSE SWING OF DOOR 107B. e. RESTORE WINDOW 47. f. PROVIDE NEW FINISHES WHERE NOTED. PATCH WALLS, FLOORING AND CEILING, AND TRIM TO MATCH EXISTING. PAINT g. PROVIDE NEW CABINETS AND COUNTERS. WORKSHOP (101 a. PROVIDE WOOD PICTURE RAIL AND PAINT. b. PROVIDE NEW WOOD FLOORING. c. RESTORE WINDOWS 32, d. PREPARE AND PAINT WALLS. WEST ROOM (107) a. REPAIR TIN CEILING, PREPARE & PAINT WALLS, REFINISH FLOOR, REPAIR TRIM AT WINDOW 12. b. RESTORE WINDOWS 11, 12, 13, 46. EXTERIOR METALS a. NORTH ELEVATION. RESTORE ALL CAST IRON COLUMN CAPITALS, BASES, TRIM AND WINDOW HEADS. b. SOUTH, EAST AND WEST ELEVATIONS. RESTORE AND PAINT ALL CAST IRON AND PRESSED Hudson Opera House, Addendum # page 12

13 12 13 STAGE LIGHT TROUGH (207). DRESSING ROOMS (208, M301, M306). METAL ELEMENTS. a. REMOVE PORTION OF EXISTING FLOOR AND FRAMING ALONG NORTH WALL OF STAGE. b. MODIFY EXISTING FRAMING FOR NEW LIGHT TROUGH IN STAGE FLOOR. PATCH. c. PROVIDE WIRING AND LIGHT FIXTURES WITHIN TROUGH. a. ADD BUILT-INS TO 208 (PERIMETER WALL FINISHES ONLY IN BB). b. PREPARE AND PAINT WALLS AND CEILING, PROVIDE TRIM AND COMPLETE ELECTRICAL AND PLUMBING FIT OUT. PROVIDE BUILT-INS IN M301 AND M RESERVED 15 SECOND FLOOR WINDOWS c. PROVIDE SPIRAL STAIRS 13 AND 14 AND FLOOR OPENINGS IN LIEU OF BASE BID WALL MOUNTED STAIR AND ACCESS OPENING/GUARD IN FLOOR. a. REPLACE ALL 2 ND FLOOR WINDOWS WITH NEW WOOD IGU UNITS (NOTE IF ADD OR DELETE AS COMPARED WITH BASE BID). 16A 16B 17 SECOND FLOOR INTERIOR STORM WINDOWS. FIRST FLOOR INTERIOR STORM WINDOWS. BASEMENT : GREEN ROOM (005, 009, 010, 011, 012, 013, 017, 018, 020); 014, 016, STORAGE (002, 004); CORRIDOR (005) b. PROVIDE DOUBLE, MOTORIZED AND MANUAL SOLAR AND BLACK OUT SHADES PER SCHEDULE. a. PROVIDE FIXED INTERIOR STORM WINDOWS: 1-5, 27-30, 14, 15, 19, 37, 38, 42, 43. b. PROVIDE OPERABLE INTERIOR STORM WINDOWS: 16, 17, 18, 40, 41. a. PROVIDE OPERABLE INTERIOR STORM WINDOWS: 7-9, 21-26, 32, 46-47, a. REMOVE MASONRY AS NECESSARY TO CREATE NEW OPENINGS B2A, B3D, B4A. b. CONSTRUCT PARTITIONS AND CEILINGS AS SHOWN IN DRAWINGS. INCLUDE ALL FINISHES PER SCHEDULE. c. PROVIDE ALL PLUMBING/FIXTURES FOR TOILET 6; WASHER HOOKUP AND KITCHENETTE SINK AND SLOP SINK. d. PROVIDE ALL ELECTRICAL WIRING, RECEPTACLES, AND FIXTURES. e. PROVIDE KITCHENETTE AS SHOWN ON DRAWINGS. f. WALL AND CEILING FINISHES, PER SCHEDULE. Hudson Opera House, Addendum # page 13

14 SECTION ALTERNATES PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. Work of this Section, as shown or specified, shall be in accordance with the requirements of the Contract Documents SUMMARY A. This Section specifies administrative and procedural requirements for Alternates DEFINITIONS B. An Alternate is an amount proposed by Bidders and stated on the Bid Form for certain construction activities defined in the Bidding Documents that may be added to or deducted from the Base Bid amount if the Owner decides to accept a corresponding change either in the amount of construction to be completed, or in the products, materials, equipment, systems, or installation methods described in the Contract Documents. 1. Alternates described in this Section are part of the Work only if enumerated in the Contract. 2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum PROCEDURES A. Coordination: Coordinate related Work and modify or adjust adjacent Work as necessary to ensure that Work affected by each accepted Alternate is complete and fully integrated into the Project. 1. Include as part of each alternate miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate. B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated modifications to alternates. C. Execution: Execute accepted alternates under the same conditions as other Work of the Contract. D. Schedule: A Schedule of Alternates is included herein. Specification Sections referenced in the Schedule contain requirements for materials and methods necessary to achieve the Work described under each Alternate. 1. Include as part of each Alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not mentioned as part of the Alternate. PART 2 PRODUCTS (NOT APPLICABLE) PART 3 EXECUTION 3.01 SCHEDULE OF ALTERNATES 1 AIR CONDITIONING. a. PROVIDE CHILLER AT ELEVATOR TOWER ROOF AND CONNECT TO DUCTWORK (INSTALLED PER BASE BID). INCLUDE ALL ASSOCIATED BASEMENT PIPING, ACCESSORIES, AND ELECTRICAL TO MAKE FULLY OPERABLE. b. PROVIDE SOUND ABSORBING PANELS TO EXISTING BRICK FAÇADE AND DOOR 31B. 2 MEZZANINE (M308), STAIR 10B, CONTROL BOOTHS (M309, M310, a. MEZZANINE. PROVIDE ALL SEATING AND RAISED PLATFORMS, GUARDS AT LOGES AND MAIN RAIL, AND HANDRAILS FOR SEATING. b. MEZZANINE. PROVIDE ALL FINISHES PER DRAWINGS AND SCHEDULES. Hudson Opera House, Addendum # page 14

15 M311). c. FINISH STAIR 10B. d. CONSTRUCT CONTROL BOOTHS (M309, M310, M311) PER DRAWINGS. e. PROVIDE DOORS 308A, 308B, 308C, 309B, 310B, 311B PER SCHEDULE. f. PROVIDE WINDOWS 309A, 310A, 311A PER SCHEDULE. 3 TOILETS T3 (203) AND a. PROVIDE CERAMIC WALL TILE, PER FINISH SCHEDULE. T4 (204). 4 NORTH ACCESSIBLE RAMP (108,109). a. CONDUCT ALL REMOVALS OF FIRST FLOOR STRUCTURE AS REQUIRED TO INSTALL NEW RAMP. b. PROVIDE ALL STRUCTURAL SUPPORT AND INTERIOR CONSTRUCTION AT BASEMENT AND FIRST FLOOR. c. MODIFY EXISTING DUCTWORK AT RAMP LOCATION d. PROVIDE NEW RAILINGS, FLOORING AND PUSH PADS. PATCH AS REQUIRED. 5 ACCESSIBLE STAGE LIFT (213). a. PROVIDE WHEELCHAIR LIFT. INCLUDE ALL ELECTRICAL WORK AND PATCHING. 6 BOX OFFICE a. CONDUCT ALL REMOVALS AS REQUIRED FOR NEW BOX OFFICE, INCLUDING WITHIN 116B. b. PROVIDE NEW GLAZING AND ALL CARPENTRY WORK, INCLUDING INFILL OF DOOR 116B AND PATCHING OF FLOOR. PROVIDE NEW DOOR 110B. c. PROVIDE NEW ELECTRICAL WIRING, RECEPTACLES AND FIXTURES. 7 COAT ROOM (104) 8 1ST FLOOR CORRIDOR 3 (103), JANITORS CLOSET (124), KITCHEN (102C) a. UNDERTAKE REMOVALS, INCLUDING NEW DOOR OPENING IN EXISTING MASONRY WALL AND REMOVAL OF VAULT DOOR (107E). b. INSTALL NEW DOORS 104A AND 107F AND ALL FINISHES. PATCH AS REQUIRED. a. REMOVE ALL CONSTRUCTION AND PLUMBING FIXTURES ASSOCIATED WITH CORRIDOR 3 (103), AND 102A/102B PARTITION. b. INSTALL NEW PIPING AND FIXTURES (KITCHEN SINK, DISHWASHER, JANITORS SINK), NEW VENTS AND LOUVERS, NEW HOOD EXHAUST, AND MAKE-UP AIR LOUVER/DUCTS. c. PROVIDE NEW ELECTRICAL WIRING, RECEPTACLES, AND FIXTURES. d. PROVIDE NEW DOORS 103A, 103B. REVERSE SWING OF DOOR 107B. e. RESTORE WINDOW 47. f. PROVIDE NEW FINISHES WHERE NOTED. PATCH WALLS, FLOORING AND CEILING, AND TRIM TO MATCH EXISTING. PAINT. g. PROVIDE NEW CABINETS AND COUNTERS. WORKSHOP (101 a. PROVIDE WOOD PICTURE RAIL AND PAINT. b. PROVIDE NEW WOOD FLOORING. c. RESTORE WINDOWS 32, d. PREPARE AND PAINT WALLS. WEST ROOM (107) a. REPAIR TIN CEILING, PREPARE & PAINT WALLS, REFINISH FLOOR, REPAIR TRIM AT WINDOW 12. b. RESTORE WINDOWS 11, 12, 13, 46. EXTERIOR METALS a. NORTH ELEVATION. RESTORE ALL CAST IRON COLUMN CAPITALS, BASES, TRIM AND WINDOW HEADS. b. SOUTH, EAST AND WEST ELEVATIONS. RESTORE AND PAINT ALL CAST IRON AND PRESSED METAL ELEMENTS. STAGE LIGHT TROUGH (207). DRESSING ROOMS (208, M301, M306). 14 RESERVED 15 SECOND FLOOR WINDOWS 16A 16B 17 SECOND FLOOR INTERIOR STORM WINDOWS. FIRST FLOOR INTERIOR STORM WINDOWS. BASEMENT : GREEN ROOM (005, 009, 010, 011, 012, 013, 017, 018, 020); 014, 016, STORAGE (002, 004); CORRIDOR (005) a. REMOVE PORTION OF EXISTING FLOOR AND FRAMING ALONG NORTH WALL OF STAGE. b. MODIFY EXISTING FRAMING FOR NEW LIGHT TROUGH IN STAGE FLOOR. PATCH. c. PROVIDE WIRING AND LIGHT FIXTURES WITHIN TROUGH. a. ADD BUILT-INS TO 208 (PERIMETER WALL FINISHES ONLY IN BB). b. PREPARE AND PAINT WALLS AND CEILING, PROVIDE TRIM AND COMPLETE ELECTRICAL AND PLUMBING FIT OUT. PROVIDE BUILT-INS IN M301 AND M306. c. PROVIDE SPIRAL STAIRS 13 AND 14 AND FLOOR OPENINGS IN LIEU OF BASE BID WALL MOUNTED STAIR AND ACCESS OPENING/GUARD IN FLOOR. a. REPLACE ALL 2 ND FLOOR WINDOWS WITH NEW WOOD IGU UNITS (NOTE IF ADD OR DELETE AS COMPARED WITH BASE BID). b. PROVIDE DOUBLE, MOTORIZED AND MANUAL SOLAR AND BLACK OUT SHADES PER SCHEDULE. a. PROVIDE FIXED INTERIOR STORM WINDOWS: 1-5, 27-30, 14, 15, 19, 37, 38, 42, 43. b. PROVIDE OPERABLE INTERIOR STORM WINDOWS: 16, 17, 18, 40, 41. a. PROVIDE OPERABLE INTERIOR STORM WINDOWS: 7-9, 21-26, 32, 46-47, a. REMOVE MASONRY AS NECESSARY TO CREATE NEW OPENINGS B2A, B3D, B4A. b. CONSTRUCT PARTITIONS AND CEILINGS AS SHOWN IN DRAWINGS. INCLUDE ALL FINISHES PER SCHEDULE. c. PROVIDE ALL PLUMBING/FIXTURES FOR TOILET 6; WASHER HOOKUP AND KITCHENETTE SINK AND SLOP SINK. d. PROVIDE ALL ELECTRICAL WIRING, RECEPTACLES, AND FIXTURES. e. PROVIDE KITCHENETTE AS SHOWN ON DRAWINGS. f. WALL AND CEILING FINISHES, PER SCHEDULE. Hudson Opera House, Addendum # page 15

16 END OF SECTION Hudson Opera House, Addendum # page 16

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

PROCUREMENT AND CONTRACTING DOCUMENTS GROUP PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6

FRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6 PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA

More information

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School

Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School A D D E N D U M # 1 DATE: TO: FROM: PROJECT: All Bidders Michael Teller, CBI Consulting Inc. Gymnasium & Auditorium Restoration at South Middle School CBI JOB NO.: 11063 The following items shall modify

More information

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS

CLARIFICATIONS. Item 3. Specification Sections and A. All finish wood shall have sealer coat and two coats of finish material REVISIONS Addendum #2 Project Name: Global Campus Interior Renovation Project Address: 2 E. Center Street Fayetteville, AR 72701 Date: 06/14/17 This document is issued as a response to Clarifications. These revisions

More information

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington

Franklin Hall Renovation TABLE OF Document Indiana University Bloomington VPS Project No. 2013022.00 Page 1 SPECIFICATIONS VOLUME I INTRODUCTORY INFORMATION Document 000010 - Table of Contents... 6 Document 000011 - Certification and Seals... 2 Document 000012 - Project Directory...

More information

B. RESIDENTIAL MASTER PLUMBER $ $ $

B. RESIDENTIAL MASTER PLUMBER $ $ $ FEE SCHEDULE FOR LICENSE Res. Non-Res. Out of State BUILDING CATEGORIES A. GENERAL CONTRACTOR (Unlimited Scope) B. BUILDING CONTRACTOR $ 100.00 $ 150.00 $ 300.00 Limited to construction and remodeling

More information

Appendix J - Custom Uniformat for EDU Migration

Appendix J - Custom Uniformat for EDU Migration Appendix J - Custom Uniformat for EDU Migration Nr. MTC Uniformat for VFA.facility Life (Years) Weight (1-100) Out of Scope Cost Y/N 1 A Substructure 150 N 2 A10 Foundations 150 N 3 A1010 Standard Foundations

More information

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS

ALL PROSPECTIVE CONTRACTORS, PLAN ROOMS AND SUPPLIERS Architect: Studio 2H Design, LLC 1721 4 th Avenue North, Suite 101 Birmingham, Alabama 35203 (205) 264-9988 July 26, 2018 ADDENDUM NO. 5 UA Project No.: 712-17-1081 EDA Investment No.: 04-79-07154 B.C.

More information

TABLE OF CONTENTS Public Safety Building

TABLE OF CONTENTS Public Safety Building DOCUMENT 00 01 10 - TABLE OF CONTENTS VOLUME I DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 00 31 32 Geotechnical Data DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary

More information

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free

Work Write Up / Specification of Repairs HUD DIVISION 1. MASONRY HUD DIVISION 2. SIDING. Toll Free / / Paperport 2000 official estimating report Work Write Up / Specification of Repairs Toll Free 1-877-932-7177 Clients Name. GREAT CLIENT Property Address. NUMBER ONE GOOD ROAD METRO, VA 20000 Primary

More information

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C

Minneapolis Community and Technical College T-Building Floor 2 Student Affairs Cost Estimating Form Templates - Exhibit C 2 3 4 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2 22 23 24 25 26 27 28 29 30 3 32 33 34 35 36 37 38 39 40 4 42 43 44 45 46 DIVISION 02 EXISTING CONDITIONS Demolition; Removal & Disposal: CMU Partitions AD Quan UM

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

ADDENDUM NO. 2 Consisting of 3 pages and Attachments

ADDENDUM NO. 2 Consisting of 3 pages and Attachments 10404-125 Street, Edmonton, AB. T5N 1T2 Tel: 780.455.5975 Fax: 780.454.2397 info@cdyarchitect.com ADDENDUM NO. 2 Consisting of 3 pages and Attachments PROJECT: Maina Centre Ville Phase II, Beaumont, Alberta

More information

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California

PROGRAM COST MODEL. for. PEER Tall Buildings Study Concrete Structural Option Los Angeles, California PROGRAM COST MODEL for PEER Tall Buildings Study Concrete Structural Option Los Angeles, California March 8, 2010 PEER Tall Buildings Study Concrete Structural Option March 8, 2010 CONTENTS Page Nos. Overall

More information

BUREAU Joe Iuviene, AIA January 20, 2017

BUREAU Joe Iuviene, AIA January 20, 2017 architectural BUREAU Joe Iuviene, AIA January 20, 2017 Alterations & Additions NEW TOWN HALL for TOWN OF AUSTERLITZ 816 State Route 203, Spencertown, New York 12165 ADDENDUM NO. 1 This addendum amends

More information

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist

CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist CONSTRUCTION DOCUMENTS CHECKLIST for the 2012 Michigan Building Code Including Building Permit Application Checklist This checklist is a convenient reference to the 2012 Michigan Building Code. The checklist

More information

Project Manual Index of Specifications Shenandoah Schools Concession Building

Project Manual Index of Specifications Shenandoah Schools Concession Building INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions

More information

Exhibit A Library Shell Construction

Exhibit A Library Shell Construction Exhibit A Library Shell Construction Library Component Building Requirements Approximately 15,000-17,000 square feet plus 900 square feet for mechanical room and additional space on roof for installation

More information

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS This guide is intended to provide the homeowner or contractor with the

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

ADDENDUM 2 - JULY 14, 2015

ADDENDUM 2 - JULY 14, 2015 7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures

More information

KU West Campus LEEP II High Bay Facility Project # , A (c)

KU West Campus LEEP II High Bay Facility Project # , A (c) Number Revision Title Rev Date Discipline Bulletin Drawings B-West Structural Category S051 0 General Notes - Sheet 1 7/31/13 Structural Bid Package B- West Campus S052 0 General Notes - Sheet 2 7/31/13

More information

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS

THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND CONDOMINIUMS THE CITY OF WALTHAM MASSACHUSETTS PURCHASING DEPARTMENT PHASE II RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING CONDOMINIUMS AND PHASE III RENOVATIONS TO THE FORMER BANKS SCHOOL ELDERLY HOUSING

More information

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT

SPARTANBURG COUNTY BUILDING CODES DEPARTMENT SPARTANBURG COUNTY BUILDING CODES DEPARTMENT PLAN REVIEW CHECK LIST REQUIREMENTS FOR COMMERCIAL BUILDING PERMITS Plan Review Coordinator Kris Brannon 864-596-3180 366 N. Church St Room 500 Spartanburg,

More information

Proposal. Lexington, MA. Price Work Description

Proposal. Lexington, MA. Price Work Description PROPOSAL Assumptions Sample Client Lexington, MA The is based on plans dated 3/3/15, with Sally's list of adjustments The price assumes the owners will be living in the house The owners will be responsible

More information

Timberglen Recreation Center Summary

Timberglen Recreation Center Summary Timberglen Recreation Center Summary Address Building Purpose 3810 Timberglen Road Dallas, TX 75287 Recreation Center Original Year of Construction 2003 Building Area 15,000 SF Inspection Date August 2,

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Smokey Ridge, Christiansburg, Virginia

Smokey Ridge, Christiansburg, Virginia Smokey Ridge, Christiansburg, Virginia Outline Specifications Prepared by Community Design Studio, LLC Project # 1305, March 15, 2013 The following describes the Sections to be included in each Division

More information

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements

CM ASSIGNMENT OF TEMPORARY FACILITIES see included IU Project Site Requirements SECTION A CM INSTRUCTIONS TO BIDDERS SECTION B BID CATEGORY DESCRIPTIONS & BID FORMS BC-07: Building HVAC and Plumbing BC-08: Building Electric BC-09: General Trades BC-10: Masonry BC-11: Precast Structural

More information

Lake Highlands North Recreation Center Summary

Lake Highlands North Recreation Center Summary Lake Highlands North Recreation Center Summary Address Building Purpose 9940 White Rock Trail Dallas, TX 75238 Recreation Center Original Year of Construction 1971 Building Area 33,036 SF Inspection Date

More information

Schedule of Values Cruise Terminal 2 Expansion

Schedule of Values Cruise Terminal 2 Expansion Schedule of Values The Schedule of Values outlined below is intended to reflect the standard format that would be used in a Contractors Application for Payment. Values reflect materials and labor. General

More information

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7

TABLE OF CONTENTS. (Δ = Rev 11/15) Update #7 TABLE OF CONTENTS ( = Rev 11/15) Update #7 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes (New) B-9 Record Drawings B-10 Variance Procedure

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform Statewide

More information

See attached answers to questions and requests for clarification received.

See attached answers to questions and requests for clarification received. Office of the Vice President 971 Elmore Drive and Chief Financial Officer PO Box 115250 Procurement Services Gainesville, FL 32611-5250 http://procurement.ufl.edu/ (352) 392-1331 Fax 352-392-8837 June

More information

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following:

A UCC Building permit is not required for the exceptions listed below for COMMERCIAL application: (403.42): Building construction for the following: New buildings or renovations to existing buildings for which an application for a permit was made to the Department or a municipality before April 9, 2004. New buildings or renovations to existing buildings

More information

APPLICATION AND CERTIFICATE FOR PAYMENT

APPLICATION AND CERTIFICATE FOR PAYMENT AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in

More information

Common Plan Review Rejection Reasons

Common Plan Review Rejection Reasons (CPHD) (ISD) Common Plan Review Rejection Reasons Submitted plans must contain sufficient information for plan reviewers to be able to verify that the proposed construction complies with the Virginia Uniform

More information

INTERNATIONAL CODE INTERPRETATIONS

INTERNATIONAL CODE INTERPRETATIONS 2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction

More information

Alabama Home Inspections

Alabama Home Inspections Cover Page Property Inspection Report 1000 Sample Dr., Sampletown USA Inspection prepared for: Report Sample Inspection Date: 1/21/2010 Time: 400pm Size: Approx. 2,200sf Weather: Cloudy 62 Inspector: Bobby

More information

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017 SDSU requests approval of this Facility Design Plan for renovation and addition to Harding

More information

Delta Gamma Sorority Renovation Budget Scope 3/7/2018

Delta Gamma Sorority Renovation Budget Scope 3/7/2018 Delta Gamma Sorority Renovation Budget Scope 3/7/2018 PROJECT: Barbara Cerni Delta Gamma Sorority Tallahassee, Fla. This scope is based on the 50% Construction Documents drawn by BKJ Architecture dated

More information

Resolution : 102 Change Orders #3 and #11 through #25 to Manning Squires Hennig Contract (John Walton Spencer School 16)

Resolution : 102 Change Orders #3 and #11 through #25 to Manning Squires Hennig Contract (John Walton Spencer School 16) Resolution 2018-19: 102 Change Orders #3 and #11 through #25 to Manning Squires Hennig Contract (John Walton Spencer School 16) By Board Member Michael Schmidt WHEREAS, the Rochester School Facilities

More information

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS

CITY AND COUNTY OF DENVER DEPARTMENT OF PUBLIC WORKS STATEMENT OF QUANTITIES. Item No. Description Quantity Estimated Mobilization 1 LS 010100-01 Mobilization 1 LS 010500-01 Construction Surveying 1 LS 015000-01 Temporary Construction Fence 1 LS 029100-01 Tree Retention and Protection 1 LS 015150-01 Erosion and Sediment Control 1 LS Division

More information

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D

BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS ARCHITECTURE, LLC 1827 1 ST AVENUE NORTH, SUITE 104 BIRMINGHAM, ALABAMA 35203 205.321.4122 ADDENDUM NO. 3 PROJECT: BIRMINGHAM CITY SCHOOLS (BCS) OPERATIONAL CENTER COMPLEX: BID PACKAGE D HOSKINS

More information

Division 00 Procurement and Contracting Requirements

Division 00 Procurement and Contracting Requirements SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Five fewer bus stalls than minimum standard. Parking and Access - Service / Delivery 1.0 1.0 0.08 No delivery parking adjacent to delivery entrance. Parking

More information

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8

TABLE OF CONTENTS. (Δ = Rev 04/17) Update #8 TABLE OF CONTENTS ( = Rev 04/17) Update #8 INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-4 International Suite of Codes B-9 As-Builts and Record Drawings B-10 Variance

More information

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS BASEMENT FINISH REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS A construction permit is required. A homeowner may perform the construction work on his own property where he resides, without a

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

RESIDENTIAL BUILDING REQUIREMENTS

RESIDENTIAL BUILDING REQUIREMENTS RESIDENTIAL BUILDING REQUIREMENTS Residential Building Requirements This is an informational booklet with some of the general residential construction requirements taken from the codes adopted by Campbell

More information

TABLE OF CONTENTS. (Δ = Rev 06/08)

TABLE OF CONTENTS. (Δ = Rev 06/08) TABLE OF CONTENTS (Δ = Rev 06/08) INTRODUCTION REQUEST FOR REVISION FORMS TAB A TABLE OF CONTENTS TAB B PROCEDURES B-9 Record Drawings B-10 Variance Procedure B-11 Surface Water Procedures (New Section)

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

Bonadio Residence. Renovations to Existing Dwelling: new kitchen. 23 Albert Street Waltham, MA. Addition to existing structure.

Bonadio Residence. Renovations to Existing Dwelling: new kitchen. 23 Albert Street Waltham, MA. Addition to existing structure. December 1, 6 Renovations to Existing Dwelling: new kitchen 3 Albert Street Waltham MA Addition to existing structure. Renovations for 3 Albert Street Waltham, MA Cover sheet First Floor Demolition D1

More information

REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES I. PURPOSE REQUEST FOR QUALIFICATIONS ARCHITECTURAL/ENGINEERING SERVICES The Greensboro Housing Authority (GHA) invites qualifications for the Architectural/Engineering Services for RAD Renovations at

More information

A/E Design Deliverable Checklist

A/E Design Deliverable Checklist A/E Design Deliverable Checklist Design deliverables for the Design Development phase shall include all items listed in the Design Development column as well as those all items listed in the Schematic

More information

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018

Addendum #4 To Request for Proposal For Rackham Relocations: Project / Dated December 13, 2018 ` Division of Finance and Business Operations Procurement & Strategic Sourcing 5700 Cass Avenue, suite 4200 Detroit, Michigan 48202 (313) 577-3734 FAX (313) 577-3747 January 11, 2019 Addendum #4 To Request

More information

T H E T O W N O F G U I L F O R D V E R M O N T

T H E T O W N O F G U I L F O R D V E R M O N T Project Title: Contact: Capital Needs Assessments Town of Guilford Buildings Peder Rude, Town Administrator Email: pederrude@guilfordvt.net (802) 254-6857, ext. 105 Town of Guilford 236 School Road Guilford,

More information

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number:

RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: RENOVATION OF THE VIA BUILDING FOR THE GUELPH TRANSIT TERMINAL FROM THE PRE- QUALIFIED GENERAL CONTRACTORS Reference Number: 13-146 A D D E N D U M NO. 1 The following shall form part of the tender documents

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

Building Excellence IV Capital Levy Projects Under Construction

Building Excellence IV Capital Levy Projects Under Construction Building Excellence IV Capital Levy Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 14 Genesee Hill Elementary

More information

Beckley-Saner Recreation Center Summary

Beckley-Saner Recreation Center Summary Beckley-Saner Recreation Center Summary Address Building Purpose 114 West Hobson Avenue, Dallas, TX 75224 Recreation Center Original Year of Construction 1949 Building Area 34,510 SF Inspection Date July

More information

Columbia County Health Care Center Added Amenities

Columbia County Health Care Center Added Amenities Columbia County Health Care Center Added Amenities Columbia County Board Meeting on January 16th, 2013 Building Exterior Added Amenities 1. Upgraded nail-base roofing insulation to 3 thickness on Center

More information

Handyman & Maintenance Cost Estimator

Handyman & Maintenance Cost Estimator Handyman & Maintenance Cost Estimator 2013 Quickly & Accurately Estimate Small Jobs Compiled & Edited by Bill O'Donnell ISBN 978-1-300-58228-1 Copyright 2013 by RemodelMAX, Inc. Printed in the United States

More information

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications Carter's Oshkosh (SIS) #1185 - The Center at Pearland Parkway - Pearland, TX 77581 - Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words

More information

SECTION ALTERNATES

SECTION ALTERNATES SECTION 01 23 00 - ALTERNATES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages

TABLE OF CONTENTS VOLUME 1. DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages TABLE OF CONTENTS VOLUME 1 DIVISION 00 - INTRODUCTORY INFORMATION, BIDDING REQUIREMENTS, CONTRACT FORMS & CONDITIONS OF THE CONTRACT Pages SCHEDULE OF DRAWINGS...... 1 PROJECT PERSONNEL & DIRECTORY......

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

NAAHB Workgroup Index General Ledger Account

NAAHB Workgroup Index General Ledger Account NAAHB Workgroup Index General Ledger Account 1000 Series Preparation/Preliminaries 1000 Permits/Fees 1010 Building Permits 1020 HBA Assessments 1030 Warranty Fees 1100 Architectural/Engineering 1110 Blue

More information

REHABILITATION STANDARDS CHECKLIST

REHABILITATION STANDARDS CHECKLIST Project Name Date Built Date Last Rehabilitated (If applicable) EXTERIORS REHABILITATION STANDARDS CHECKLIST ROOF Age (Yrs) Poor Fair Good Excellent Roof /Pitch/Flat # of Layers Substrate Material Insulation

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE:

Town of Falmouth FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage COSTS FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: S FOR SUBSTANTIAL IMPROVEMENTS / REPAIR OF SUBSTANTIAL DAMAGE: Included Costs: Items that must be included in the costs of improvement or costs to repair are those that are directly associated with the

More information

CONSTRUCTION REQUIREMENTS

CONSTRUCTION REQUIREMENTS CONSTRUCTION REQUIREMENTS Note: The buildings on the UCCS campus are divided into two categories: General Fund and Auxiliaries. General Fund Buildings include academic and administrative functions. Auxiliary

More information

Building Architecture

Building Architecture The front of the building consists of the three story town homes with facades to remain, as well as one leg of the condominium tower that reaches the street. The main condo portion of the building is L

More information

Minuteman Regional Vocational Technical School

Minuteman Regional Vocational Technical School Minuteman Regional Vocational Technical School List of Recommendations L1 AAB compliance: Improvements to front entrance (concrete ramps, railings, etc.) Required by AAB cost trigger L2 AAB compliance:

More information

STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department

STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department STANDARD PLAN RELEASE SUMMARY(SPR) Physical Facilities Department Building Design: Release Date: Release Number: Heritage 98 May 00 10 HER-TRA-98-10, HER-NEW-98-10, HER-CLA-98-10, HER-COL-98-10 Summarized

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION Section 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Invitation

More information

CHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY

CHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY PROJECT SUMMARY OF CHANGES TOTAL SITE CHANGES $0.00 $6,791.92 ($11,656.12) $11,902.24 $0.00 TOTAL CONCRETE CHANGES $644.78 $2,282.00 $0.00 $2,141.90 TOTAL MASONRY CHANGES $12,815.85 $0.00 $0.00 TOTAL STRUC.

More information

PROJECT SPECIFICATIONS

PROJECT SPECIFICATIONS PROJECT SPECIFICATIONS CITY OF PORTLAND BUREAU OF ENVIRONMENTAL SERVICES PROJECT SPECIFICATIONS FOR ANKENY PUMP STATION UPGRADE BES project number E07833 STANDARD REQUIREMENTS (DIVISION 0) GENERAL REQUIREMENTS

More information

Permit Posting and Inspection Procedures

Permit Posting and Inspection Procedures Permit Posting and Inspection Procedures Boone County Area Plan Commission 116 Washington Street Room 101 * Lebanon, IN 46052 * (765) 482-3821 * www.boonecounty.in.gov/apc 1. Permit. The following permit

More information

Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT

Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT Montgomery County Public Schools Facilities Guide DIVISION 0 - CONDITIONS OF THE CONTRACT SECTION 00510 CONTRACTOR S REQUISITION FOR PAYMENT 1.1 The Standard Monthly Contractor s Requisition for Payment,

More information

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE

PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE HUMPHREYS COUNTY BOARD OF SUPERVISOR BELZONI, MISSISSIPPI APRIL 20, 2016 EMILY POOLE ARCHITECTURE,

More information

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE

TABLE OF CONTENTS Updated 1/2014 SECTION TITLE DATE TABLE OF CONTENTS SECTION TITLE DATE Division 00 Procurement and Contracting Requirements 000101... Project Title Page 000116... CAD Standards 001116... Invitation to Bid 002113... Instructions to Bidders

More information

TRIAD ENGINEERING CONSULTANTS, INC.

TRIAD ENGINEERING CONSULTANTS, INC. TRIAD ENGINEERING CONSULTANTS, INC. 2638 Willard Dairy Rd Providing High Point, NC Suite 100 Plumbing, Mechanical and 27265 (336) 454-0225 Electrical Engineering Services Since 1984 admin@triadengmep.com

More information

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST

DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST DESIGN DEVELOPMENT REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Design Development Review Package. Provide a written explanation for any omissions. The following items,

More information

AMENDMENT OF SOLICITATION

AMENDMENT OF SOLICITATION Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement

More information

ADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT:

ADDENDUM NO. 2 PROJECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No ARCHITECT: ADDENDUM NO. 2 PROJECT: ARCHITECT: Omaha Nation Food Distribution Building Macy, Nebraska Project No. 7-7 PETERS AND ASSOCIATES, ARCHITECTS, P.C. 427 Dayton Circle, Suite Omaha, Nebraska 6837-5558 Date

More information

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA

RIVERSIDE CHURCH OF CHRIST. Lafayette, LA SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,

More information

Northwestern Facilities

Northwestern Facilities Northwestern Facilities NU Master Specification - Issuances Record & Summary of Changes Only the most current version of an NU Master Specification is included as a PDF for download on this website. The

More information

FACILITY COMPONENTS - ELEMENTARY SCHOOL

FACILITY COMPONENTS - ELEMENTARY SCHOOL SITE AREAS Parking and Access - Buses 1.0 2.0 0.16 Two stalls fewer than minimum standard. Parking and Access - Service / Delivery 2.0 1.0 0.16 Parking and Access - Staff 1.0 3.0 0.24 Thirty-seven stalls

More information

Village of Gurnee Construction Documents Submittal Requirements

Village of Gurnee Construction Documents Submittal Requirements Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS

More information

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested.

Inspection requests submitted by 2:30pm will be scheduled for the following business day unless otherwise requested. Purpose 355 West Queens Road Single Family New Construction Required Inspection Stages Master Requirement GEN 110 Building Department: 604-990-2480, building@dnv.org, fax: 604-984-9683 The following procedure

More information

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO.

J~e~~r Senior Director of Construction Services Facilities Design and Construction UNIVERSITY OF CALIFORNIA, SAN DIEGO. BERKELEY DAVIS IR VINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SAN!' A BARBARA SANT A CRUZ OFFICE OF THE ASSIST ANT VICE CHANCELLOR CAMPUS ARCHITECT - FACILITIES DESIGN & CONSTRUCTION TEL:

More information

Harry Stone Recreation Center Summary

Harry Stone Recreation Center Summary Harry Stone Recreation Center Summary Address Building Purpose 2400 Millmar Drive Dallas, TX 75228 Recreation Center Original Year of Construction 1957 (Expansion 2013) Building Area 22,281 SF Inspection

More information

CHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY

CHANGE ORDER LOG FOR MOUNT NITTANY ELEMENTARY PROJECT SUMMARY OF CHANGES TOTAL SITE CHANGES $0.00 $6,791.92 ($11,656.12) $11,902.24 $8,075.87 $3,881.00 TOTAL CONCRETE CHANGES $644.78 $2,282.00 ($1,493.50) $1,746.09 TOTAL MASONRY CHANGES $12,815.85

More information

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B

$308,900. Caleb Crescent Collection The Algonquin Model 1113 Sq. Ft. Elevation A. Updated: September 28, Elevation B The Algonquin Model 1113 Sq. Ft. $308,900 The Frontenac Model 1128 Sq. Ft. $309,900 The Bon Echo Model 1342 Sq. Ft. $344,900 The Bonnechere Model 1395 Sq. Ft. $344,900 The Kawartha Model 1516 Sq. Ft. $349,900

More information

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings

PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT. Construction requirements for LOWER LEVEL DEVELOPMENT. in residential dwellings PLANNING, PROPERTY AND DEVELOPMENT DEPARTMENT Construction requirements for LOWER LEVEL DEVELOPMENT in residential dwellings January 2018 contents GENERAL INFORMATION... 3 BUILDING CODE REQUIREMENTS...

More information

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No

LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No LANSING HOUSING COMMISSION NOTICE OF REQUEST FOR PROPOSALS RFP No. 103-111-5-2016 Waterproofing lower level of house, Mold Remediation and Unit Turn Scope of Work AGENCY CONTACT PERSON PRE-PROPOSAL WALK