SP3 Design and implementation of solutions at test sites WP 3.9 Karlsruhe New installation methods for prefabricated track operator: VBK

Size: px
Start display at page:

Download "SP3 Design and implementation of solutions at test sites WP 3.9 Karlsruhe New installation methods for prefabricated track operator: VBK"

Transcription

1 SP3 Design and implementation of solutions at test sites WP 3.9 Karlsruhe New installation methods for prefabricated track operator: VBK presented by Thomas Rupp Verkehrsbetriebe Karlsruhe (VBK), construction department M48 Final Assembly June 25, 2010, Prague

2 Contents Objectives Initial position Description of test site Technical requirements on track modules Description of activities Engineering, technical details Constructing process Final activities Experiences Perspectives Final Conference - June 25, Prague 2

3 Initial position Need of renewing Final Conference - June 25, Prague 3

4 Initial position Superstructure has to be replaced urgently Karlsruhe is constructing a tram tunnel under the pedestrian district, construction has begun in may 2010 Re-Modulix : removable prefabricated track modules Final Conference - June 25, Prague 4

5 Description of test site installation location Final Conference - June 25, Prague 5

6 Description of test site Length: 375 m, double track The chosen section is the track section with the most rail traffic in the entire rail network of the VBK 7 lines of the light rail system (a tram train vehicle crosses every 85 seconds per direction) Extract of network diagram Final Conference - June 25, Prague 6

7 Technical requirements on track modules Surface of red pavement stones like the sand-stone building of the University of Karlsruhe (KIT) Prefabricated concrete pavement stones as integrated parts of the modules Maintenance free surface of the pavement stones Load: trams (11 to axle load) and busses (only at nights) Noise and vibration reduction (slab track!) Stable position and level of the track Integrated rail drainage system Fast construction process Completion of all works on test site within 3 weeks Removable track modules to use elsewhere in the VBK-network Final Conference - June 25, Prague 7

8 Engineering process 18 Re-Modulix out of 42 prefab modules Realisation of all plans for modules and panels Development of embedded hoisting anchors Application of anti-adhering coating allowing future module removal Final Conference - June 25, Prague 8

9 Production and transport Production & transport from Belgium to Karlsruhe

10 Production and transport Delivery of prefabricated slabs in Karlsruhe harbour Final Conference - June 25, Prague 10

11 Technical details Quantity: 247 slab elements ( ) Weight: kg Length: 18 metres Concrete quality: C30/37 Special vehicles for installing (existing catenary!) Final Conference - June 25, Prague 11

12 Construction process Works: Monday, August 10, 2009 until Friday, August 28, 2009 Six days a week (no works on sundays) Daily working time: 6 a.m. to 10. p.m. (two shifts) Detouring diagram for tram lines (3 tram lines replaced by busses) Final Conference - June 25, Prague 12

13 Construction process Production of track modules, transport to test site, cranes, installation: CDM, Brussels (Other) construction works: Heilit+Wörner, Munich Construction supervision: VBK, construction department Removal of superstructure Final Conference - June 25, Prague 13

14 Construction process Module positioning Rail welding Concreting Installation of the great elements within 3 days (average of 2 modules/hour) 750 m of rail Ri 59 N (59 Ri 2) 88 rail welds 210 fill-in panels 400 m³ of concrete (in 4 days) Finishing Panel assembly Final Conference - June 25, Prague 14

15 Constructing process rail underpour with concrete, assembly of small slabs in the centre and in the welding zones Final Conference - June 25, Prague 15

16 Works are finished Final Conference - June 25, Prague 16

17 Experiences: noise & vibration reduction Measurement and analysis by Karlsruhe Institute of Technology (KIT) (former University of Karlsruhe), department for railroading: Maximum amplitude of acceleration lower than before (see below) Amplitude more continuous, but a little stronger before after 4 bogies visible not visible Final Conference - June 25, Prague 17

18 Experiences + stable, quiet track, good visual appearance, fast and successful construction process, track used by trams and busses (bus only at night) +/- expensive (but: long transport distance, long engineering time...) -- Severe damages after only 9 months (!) at several points removal of pavement stones from the prefabricated concrete Joint between elements 7 cm Final Conference - June 25, Prague 18

19 Experiences Reasons (possibly): failure in the production process during the underpooring of the pavement stones: deficient ahesion! Solution (probably): Elastic joints in the pavement level (8 cm) between the elements Close open joints (frost damage!) Fix pavement stones on concrete 5 years of contractual warranty! Consequences: Significant reduction in expected LCC-Savings Final Conference - June 25, Prague 19

20 Perspectives Implementation of Modulix-system in Karlsruhe in the existing form not successful Re-use of Re-Modulix elements because of pavement damages doubtful or: only without pavement stone filling Room for improvement: quality level, tolerances (accuracy) elastic, closed joints adhesion between pavement stones and concrete assembly only with cross beam along the element production near the installation site Good chance for a better quality, durability, price level Competitive system! Final Conference - June 25, Prague 20

21 SP3 Design and implementation of solutions at test sites WP 3.9 Karlsruhe New installation methods for prefabricated track operator: VBK Thank You for attention Final Conference - June 25, Prague 21

INNOVATIVE SLAB TRACK CONCEPTS (generation, selection & design) March 15 th, FNTP - Paris

INNOVATIVE SLAB TRACK CONCEPTS (generation, selection & design) March 15 th, FNTP - Paris Amador Quintana Track engineer Capacity for Rail INNOVATIVE SLAB TRACK CONCEPTS March 15 th, FNTP - Paris v1 Contents: 1.- WHAT DO WE MEAN BY HIGH CAPACITY? 2.- OVERVIEW OF EXISTING SLAB TRACK SYSTEMS

More information

SIKA ICOSIT RAIL GROUT. System solutions for fixation of LRT tracks

SIKA ICOSIT RAIL GROUT. System solutions for fixation of LRT tracks SIKA ICOSIT RAIL GROUT System solutions for fixation of LRT tracks Embedded & road crossings Elastic rail fixing- Discrete Fixation Light Mass Spring Systems Lawn Track FIELDS OF APPLICATION Icosit KC

More information

One system crossing the boundaries

One system crossing the boundaries One system crossing the boundaries ERS - Embedded Rail System for optimum integration into tunnel, station and bridge structures How can you improve safety and accessibility in tunnels and stations? How

More information

report One system crossing the boundaries Always a step ahead in rail systems!

report One system crossing the boundaries Always a step ahead in rail systems! One system crossing the boundaries report Corkelast ERS - Embedded Rail System for optimum integration into tunnel, station and bridge structures Always a step ahead in rail systems! One system crossing

More information

Maintenance need when constructing new tram infrastructure

Maintenance need when constructing new tram infrastructure CIVITAS CATALIST Workshop Maintenance need when constructing new tram infrastructure May 25th, 2011 Natalie Rodriguez Contents > Brief presentation of Urban track > Regulatory framework of tramway infrastructure

More information

FLORIM MATERIAL STONES OF CERIM EXTRA-THICK FLOOR

FLORIM MATERIAL STONES OF CERIM EXTRA-THICK FLOOR FLORIM MATERIAL STONES OF CERIM EXTRA-THICK FLOOR New solution in extra-thick porcelain stoneware for outdoor tiling. 2 cm thick, coloured fine porcelain stoneware slabs obtained from atomizing high-class

More information

Special track. Jarosław Zwolski, PhD CE. 1. Slab track. 2. Track on bridges

Special track. Jarosław Zwolski, PhD CE. 1. Slab track. 2. Track on bridges Special track 1. Slab track 2. Track on bridges Jarosław Zwolski, PhD CE Genesis 1. Requirement of plastic deformation elimination in track. 2. Elimination of the ballast layer as the most flexible element

More information

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017

VT 14 East Montpelier Bridge Project Informational Meeting. February 22, 2017 VT 14 East Montpelier Bridge Project Informational Meeting February 22, 2017 Welcome & Introductions VTrans Mark Sargent, Project Manager Wayne Symonds, Structures Program Manager Chris Barker, Resident

More information

Present Status of Porous Elastic Rubber Surface (PERS) in Japan

Present Status of Porous Elastic Rubber Surface (PERS) in Japan Present Status of Porous Elastic Rubber Surface (PERS) in Japan Kazuyuki Kubo 1 1 Public Works Research Institute (PWRI) 1-6, Minamihara Tsukuba, Ibaraki 305-8516 JAPAN ABSTRACT Porous Elastic Rubber Surface

More information

Slab Track Austria. System ÖBB-PORR elastically supported slab

Slab Track Austria. System ÖBB-PORR elastically supported slab Slab Track Austria System ÖBB-PORR elastically supported slab 5. 2. 3. 4. 7. 6. Five holes for spindles 2. ÖBB-PORR slab 3. elastomeric layer 4. concrete joint sealing compound 5. rail support seat 6.

More information

ROADS2RAILS Innovative new concept for asphalt based railway construction

ROADS2RAILS Innovative new concept for asphalt based railway construction Innovative new concept for asphalt based railway construction Tulika Bose PhD student Russel da Silva Senior Consultant Permanent-Way Project Group Arkil Atkins Danish Technological Institute Rail Net

More information

RECENT DEVELOPMENTS IN SLAB TRACK APPLICATION

RECENT DEVELOPMENTS IN SLAB TRACK APPLICATION Delft University of Technology, The Netherlands Faculty of Civil Engineering, Section of Roads & Railways Delft University of Technology RECENT DEVELOPMENTS IN SLAB TRACK APPLICATION Coenraad Esveld Professor

More information

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls.

GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. GENERAL PROVISIONS: Furnish and install one steel platform motor truck scale and associated electronic controls. The scale shall have a clear and unobstructed weighing surface of not less than 70 feet

More information

JOB CA0608 BAPTIST HOSPITAL UNIVERSITY AVE. (WIDENING) (F) APRIL 4, 2018

JOB CA0608 BAPTIST HOSPITAL UNIVERSITY AVE. (WIDENING) (F) APRIL 4, 2018 JOB CA0608 BAPTIST HOSPITAL UNIVERSITY AVE. (WIDENING) (F) APRIL 4, 2018 Construction of the pedestrian bridge at Rock Creek (#07382) is shown to begin in MOT Stage 1. Because the current MOT staging plan

More information

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15

Table of Contents. Chapter 1 : Introduction 1. Chapter 2 : Structure and design 15 Table of Contents Chapter 1 : Introduction 1 1-1 Overview of Japan 1 1-1-1 Topography 1 1-1-2 Climate 1 1-1-3 Population 3 1-1-4 Economy 3 1-2 History and current status of roads in Japan 5 1-2-1 Road

More information

H e a v y R a i l T r. Pandrol CDM Track - Right on track. a m H I g h S p e e d M e. t r o F r e i g h t L i g h t R a i. l S u b w a y D e p o t s

H e a v y R a i l T r. Pandrol CDM Track - Right on track. a m H I g h S p e e d M e. t r o F r e i g h t L i g h t R a i. l S u b w a y D e p o t s Pandrol CDM Track - Right on track PANDROL CDM TRACK is a Belgian company pertaining to the PANDROL Group of companies (www.pandrol.com) who are a member of the DELACHAUX Group (www.delachaux.fr). PANDROL

More information

System DFF 21. Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track

System DFF 21. Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track System DFF 21 Highly elastic rail fastening for conventional rail and metro the optimum single support point for slab track System DFF 21 Highly elastic rail fastening for conventional rail and metro the

More information

2. WHY SPECIFY A PAVEMENT IN CONCRETE OR IN CONTINUOUS REINFORCED CONCRETE?

2. WHY SPECIFY A PAVEMENT IN CONCRETE OR IN CONTINUOUS REINFORCED CONCRETE? ROUNDABOUTS IN CONTINUOUSLY REINFORCED CONCRETE DESIGN CONSTRUCTION R. Debroux and R. Dumont Service Public de Wallonie, Belgium raymond.debroux@spw.wallonie.be C. Ployaert FEBELCEM, Belgium c.ployaert@febelcem.be

More information

LOW VIBRATION TRACK SYSTEM

LOW VIBRATION TRACK SYSTEM LOW VIBRATION TRACK SYSTEM LOW VIBRATION TRACK (LVT) THE SLAB TRACK SYSTEM FOR HIGHEST REQUIREMENTS THE PIONEERING WORK More than fifty years ago, Roger Sonneville developed one of the first slab track

More information

The impact of the geometry of rail welds on noise level in urban environments

The impact of the geometry of rail welds on noise level in urban environments The impact of the geometry of rail welds on noise level in urban environments Stjepan Lakusic (1), Roman Kecur (2) (1) University of Zagreb, Faculty of Civil Engineering, Kaciceva 26, Zagreb, Croatia (2)

More information

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening

Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening Rt. 15/29 (SBL) Bridge Superstructure Replacement and Roadway Widening March 5, 2009 Nicholas J. Roper NOVA District Bridge Engineer Robert F. Price Resident Administrator of Loudoun/ Prince William Construction

More information

25.August Guideline for planning floor coverings in open spaces

25.August Guideline for planning floor coverings in open spaces 25.August 2011 Guideline for planning floor coverings in open spaces Guideline for planning floor coverings in open spaces (25.8.2011) Preamble When constructing paved areas in public places such as paths,

More information

Senior Geotechnical Ing. Lars Mørk

Senior Geotechnical Ing. Lars Mørk NGM 2012 INFRASTRUCTURE PROJECTS Underpass of railway lines with a minimum disturbance to the railway traffic Senior Geotechnical Ing. Lars Mørk lars.moerk@multiconsult.no Multiconsult AS, Oslo 1 Agenda

More information

The impact of the rail welds geometry on the noise in urban zones

The impact of the rail welds geometry on the noise in urban zones Urban Transport XII: Urban Transport and the Environment in the 21st Century 643 The impact of the rail welds geometry on the noise in urban zones S. Lakusic University of Zagreb, Faculty of Civil Engineering,

More information

HSE Priorities for Construction Designers April 2007

HSE Priorities for Construction Designers April 2007 HSE CONSTRUCTION DIVISION PRIORITY RISKS 2004 ONWARDS Safety Priorities Work at height Reducing falls from height through: elimination by design; appropriate selection and use of equipment avoidance or

More information

Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge)

Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge) Construction of the Nhat Tan Bridge (Vietnam-Japan Friendship Bridge) Chodai Co., Ltd., Nippon Engineering Consultants Co., Ltd., IHI Infrastructure Systems Co,. Ltd., and Sumitomo Mitsui Construction

More information

Capacity for Rail. C4R Workshop on Dissemination Paris Dr Björn PAULSSON Trafikverket, Sweden

Capacity for Rail. C4R Workshop on Dissemination Paris Dr Björn PAULSSON Trafikverket, Sweden Capacity for Rail C4R Workshop on Dissemination Paris 205-06-0-- Dr Björn PAULSSON Trafikverket, Sweden Contents of presentation Contents Background and idea Objectives Traffic situations Infrastructure

More information

RUBBER AND THERMOPLASTICS IN RAILWAY TRAFFIC

RUBBER AND THERMOPLASTICS IN RAILWAY TRAFFIC EN RUBBER AND THERMOPLASTICS IN RAILWAY TRAFFIC Pruduction is controlled by high competitive standards COMPANY PROFILE Rex Articoli Tecnici SA is based in Mendrisio, in the Italian speaking part of Switzerland,

More information

FLOORING SOLUTIONS FOR AUTOMOTIVE INDUSTRY

FLOORING SOLUTIONS FOR AUTOMOTIVE INDUSTRY SOLUTIONS FOR AUTOMOTIVE INDUSTRY SELECTION GUIDE SOLUTIONS FOR THE AUTOMOTIVE INDUSTRY SIKA S SYSTEMS have been installed on millions of square meters floors within all the largest car manufacturers,

More information

Vehicle Impact Barriers for Elevated Structures

Vehicle Impact Barriers for Elevated Structures technical notes CAR IMPACT BARRIERS FOR ELEVATED STRUCTURES Wheel stops should not be relied upon to prevent cars falling off elevated structures. Impact barriers must be provided. Impact barriers must

More information

The study of design on the urban track transportation vibration prevention: floating slab track in the bored tunnel at Taipei

The study of design on the urban track transportation vibration prevention: floating slab track in the bored tunnel at Taipei Computers in Railways X 895 The study of design on the urban track transportation vibration prevention: floating slab track in the bored tunnel at Taipei Sy. Chang 1, K. Y. Chang 2, K. H. Cheng 3 & R.

More information

EINRIP. Specification and Construction Issues

EINRIP. Specification and Construction Issues EINRIP Specification and Construction Issues There are a significant number of changes in the Specification Not all issues can be discussed here A more detailed list of changes will be provided with bid

More information

ICPI TECH SPEC NUMBER 3

ICPI TECH SPEC NUMBER 3 ICPI TECH SPEC NUMBER 3 Edge Restraints For Interlocking Concrete Pavements 1994 ICPI Tech Spec No. 3 Interlocking Concrete Pavement Institute Revised January 2005 Introduction Edge restraints are an essential

More information

TRANSPORT and LIFTING spherical head anchors

TRANSPORT and LIFTING spherical head anchors Technical specification head anchors The best way of calculating the lifting anchors is step by step. The following steps are in the correct sequence: Determine the weight of the element. (concrete : +/-

More information

ATD-G and RHEDA CITY GREEN The green tracks for urban traffic

ATD-G and RHEDA CITY GREEN The green tracks for urban traffic ATD-G and RHEDA CITY GREEN The green tracks for urban traffic ATD-G and RHEDA CITY GREEN RAIL.ONE - the way to go We develop innovative track systems, to help you get ahead fast and safely. And what are

More information

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015

SHRP2 SOLUTONS. Innovative Bridge Designs for Rapid Renewal. Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 SHRP2 SOLUTONS Innovative Bridge Designs for Rapid Renewal Peer-to-Peer Exchange Workshop Atlanta, GA November 2015 VIJAYKUMAR THAKER, PE HARDEV DAVÉ INTRODUCTION VIJAYKUMAR THAKER, PE EXECUTIVE MANAGER

More information

Lesner Bridge Replacement

Lesner Bridge Replacement Lesner Bridge Replacement Rendering of the Completed Lesner Bridge Structure Construction Camera A Construction Camera has been installed to view images of the bridge construction. Images are updated on

More information

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT From 10/01/2017 to 10/07/2017 AECOM Field Office 3550 Water Street, NW Under the Key Bridge North Abutment REHABILITATION OF FRANCIS SCOTT KEY BRIDGE FROM ROSSLYN, ARLINGTON, VIRGINIA TO GEORGETOWN WASHINGTON, DC. DC Contract No.:

More information

Keep workers and products out of harms way. STRUCTURAL GUARDS

Keep workers and products out of harms way. STRUCTURAL GUARDS Keep workers and products out of harms way. STRUCTURAL GUARDS 2 Prevent costly accidents with Anderson s structural guards. Anywhere in your building that there is moving equipment, forklifts or people,

More information

INTENDED USE: Driveways Pool sides Terraces Car parking. Expansion joints are necessary and joints must be filled with cementitious grout.

INTENDED USE: Driveways Pool sides Terraces Car parking. Expansion joints are necessary and joints must be filled with cementitious grout. MANUAL LAYING ON SCREED WITH GLUE LAYING ON WET SAND WITH CEMENT RAISED LAYING WITH SUPPORTS LAYING ON GRAVEL LAYING ON SAND LAYING ON GRASS LAYING ON SCREED WITH ADHESIVE The advanced technical features

More information

Audit questions for DB Audit Tool Version 4.00

Audit questions for DB Audit Tool Version 4.00 Pos. Audit questions Management 1 How is your company organised? 2 Present the company and explain responsibilities. What strategic orientations are in place and are being pursued? 3 What manufacturing

More information

Design of Steel-Concrete Composite Bridges

Design of Steel-Concrete Composite Bridges Design of Steel-Concrete Composite Bridges to Eurocodes Ioannis Vayas and Aristidis Iliopoulos CRC Press Taylor & Francis Croup Boca Raton London New York CRC Press is an imprint of the Taylor & Francis

More information

CABLE STAYED FOOTBRIDGE MADE OF UHPC

CABLE STAYED FOOTBRIDGE MADE OF UHPC CABLE STAYED FOOTBRIDGE MADE OF UHPC J.L. Vitek (1), M. Kalný (2) and R. Coufal (3) (1) Metrostav a.s. and CTU Prague, Prague, Czech Republic (2) PONTEX, Ltd., Prague, Czech Republic (3) TBG Metrostav,

More information

Bandung City Government

Bandung City Government Bandung City Government 2016 Bandung City Bandung city is the capital of West Java Province in Indonesia, the country s third largest city with the population of 2.5 million in 2013. Bandung City Located

More information

SECTION 941 PRECAST REINFORCED CONCRETE BARRIERS

SECTION 941 PRECAST REINFORCED CONCRETE BARRIERS 941.01 Scope - This Section covers the quality and manufacture of precast reinforced concrete roadside and median barriers for highway and other off-highway traffic confinement use. The concrete traffic

More information

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00

WORK BELOW LOWEST FLOOR FINISH 1/7 230, , , FRAME 2/6 96, , ,056.00 Description Page No Summary Amount Summary 1/7 230,694.60 22,019.25 22,642.65 2/6 96,801.30 80,150.60 114,056.00 Total Per Unit (MYR) 327,495.90 102,169.85 136,698.65 Total Unit(s) X 1 2 2 Total Per Type

More information

LAKE + FOREST CONSTRUCTION TIMELINE

LAKE + FOREST CONSTRUCTION TIMELINE LAKE + FOREST CONSTRUCTION TIMELINE Below is a construction timeline in connection with the project at Lake Street and Forest Avenue. All dates are approximate and subject to change based on weather and

More information

EUROPEAN COATINGS SHOW 2013: WACKER Presents Novel Polymer Binders for Concrete and Construction Applications

EUROPEAN COATINGS SHOW 2013: WACKER Presents Novel Polymer Binders for Concrete and Construction Applications Wacker Chemie AG Hanns-Seidel-Platz 4 81737 München, Germany www.wacker.com PRESS RELEASE Number 1 EUROPEAN COATINGS SHOW 2013: WACKER Presents Novel Polymer Binders for Concrete and Construction Applications

More information

Structural Breadth Study

Structural Breadth Study Structural Breadth Study Connection Redesign Structural Breadth Study Connection Redesign Existing EIFS Connection The expansion project is a steel frame structure with concrete slab on deck. There is

More information

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA

SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA ASHE NATIONAL PROJECT OF THE YEAR SR 0136-G10 ABC BRIDGE REPLACEMENT in Eighty Four, PA For the PENNSYLVANIA DEPARTMENT OF TRANSPORTATION Engineering District 12-0 Submitted By: January 29, 2018 AMERICAN

More information

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000)

Bids JANUARY 25, 2017 AT 2:00 P.M. (EASTERN TIME) (Estimated Cost: $3,600,000) General Info Number: PROJECT NO. 43-7-05 Description: BRIDGE DECK REPAIR AND REHABILITATION, BOSTON MILLS ROAD OVER OHIO TURNPIKE M.P. 78.0, OLDE EIGHT ROAD OVER OHIO TURNPIKE M.P. 79.5, NICHOLS ROAD OVER

More information

Technical Working Group Meeting. Peninsula Rail Program October 21, 2010

Technical Working Group Meeting. Peninsula Rail Program October 21, 2010 Technical Working Group Meeting Peninsula Rail Program October 21, 2010 1 TWG Agenda Review of TWG and PWG summaries Presentation Draft EIR/EIS Impact Methodology for Noise and Visual Analyses Statewide

More information

EXPENDO. WEIGHING PLATFORMS METALLIC NORMAL-DUTY

EXPENDO.  WEIGHING PLATFORMS METALLIC NORMAL-DUTY WEIGHING PLATFORMS EXPENDO WEIGHBRIDGES An exceptional design, which is based on the most advanced calculation and construction techniques. Technical specification METALLIC NORMAL-DUTY Length* [m] Platform

More information

FAST. WEIGHING PLATFORMS METALLIC HEAVY-DUTY

FAST.  WEIGHING PLATFORMS METALLIC HEAVY-DUTY WEIGHING PLATFORMS FAST WEIGHBRIDGES An exceptional design, which is based on the most advanced calculation and construction techniques. Technical specification METALLIC HEAVY-DUTY Length* [m] Platform

More information

Structures - steel. Structures - steel

Structures - steel. Structures - steel Structures - steel This section includes summary sheets for the following technical solutions: Assemble structures on site and move into place; Steel with high recycled content; and Lightweight bridge

More information

Commercial Structures

Commercial Structures Commercial Structures Structural Components Footing Piles Foundation Beams Joists Column Substructure Superstructure Reinforced concrete Re-bar Pre-cast concrete panel Deflection Cantilever Footings A

More information

Railway technology. PhD CE Jarosław Zwolski. 1. Technology of building a new line. 2. Track geometry measurement. 3. Maintenance and auxiliary works

Railway technology. PhD CE Jarosław Zwolski. 1. Technology of building a new line. 2. Track geometry measurement. 3. Maintenance and auxiliary works Railway technology 1. Technology of building a new line 2. Track geometry measurement 3. Maintenance and auxiliary works 4. Existing lines modernization PhD CE Jarosław Zwolski sleepers spacing rail ballast

More information

An information series from the national authority on concrete masonry technology. Drainage swale. (optional) Cap unit. (optional)

An information series from the national authority on concrete masonry technology. Drainage swale. (optional) Cap unit. (optional) Provided by: Brown's Concrete Products Limited An information series from the national authority on concrete masonry technology ROLES AND RESPONSIBILITIES ON SEGMENTAL RETAINING WALL PROJECTS TEK 15-3A

More information

Final Report. Non-Destructive Bridge Testing With Advanced Micro-II Digital AE system

Final Report. Non-Destructive Bridge Testing With Advanced Micro-II Digital AE system Final Report Non-Destructive Bridge Testing With Advanced Micro-II Digital AE system Devendra S Parmar Research Professor School of Engineering and Technology Hampton University Hampton, VA 23668 757-728-6874

More information

Public Information Session Elgar Community Centre, Nuns Island, Verdun June 8, New Champlain Bridge Corridor Project 1

Public Information Session Elgar Community Centre, Nuns Island, Verdun June 8, New Champlain Bridge Corridor Project 1 Public Information Session Elgar Community Centre, Nuns Island, Verdun June 8, 2015 1 Purpose of the meeting To provide information about the new Champlain Bridge early works on Nuns Island, particularly

More information

The Ballastless Track Technology For China High Speed Line

The Ballastless Track Technology For China High Speed Line The Ballastless Track Technology For China High Speed Line Jijun Wang Senior Researcher, CARS May 4 th 2011 1 Contents 1. Application of Ballastless Track in China 2. Technical Features of Ballastless

More information

Hamilton Rapid Transit Preliminary Design and Feasibility Study

Hamilton Rapid Transit Preliminary Design and Feasibility Study Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT DESIGN BRIEF Version:1.0 Hamilton Rapid Transit Preliminary Design and Feasibility Study B-LINE STRUCTURAL ASSESSMENT

More information

Market approach. Rijkswaterstaat

Market approach. Rijkswaterstaat Market approach 1 Contents history types of functional contracts in the Netherlands performance contracts engineering and construct (E&C) contracts design and construct (D&C) contracts design, build, finance

More information

Extruder NANO Machines Products

Extruder NANO Machines Products NORDIMPIANTI P R O D U C T S APPLICATIONS T U R N K E Y S E R V I C E G L O B A L Extruder NANO Machines Products Technology for the Precast and Prestressed Concrete Industry EXTRUDER NANO MACHINE PRODUCTS

More information

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick

STONE PRODUCT SPECIFICATION SANDSTONE. Some typical installation methods are: Pedestrian traffic only: reinforced concrete* 75mm thick Please note these tips are guides only and should be used in addition to the relevant Australian Standards for trade practices. Note that installation may vary from site to site with varying conditions

More information

Constructability Guidelines

Constructability Guidelines Constructability Guidelines The Constructability Guidelines offer a list of items that should be considered by Constructability function personnel during the Concept Development Phase through the Final

More information

Accelerated Bridge Construction (ABC) National Status

Accelerated Bridge Construction (ABC) National Status Accelerated Bridge Construction (ABC) National Status by Mary Lou Ralls, P.E., Ralls Newman, LLC 88 th Annual Transportation Short Course Texas A&M University College Station, Texas Session: Construction

More information

StormTech Construction Guide

StormTech Construction Guide REQUIRED MATERIALS AND EQUIPMENT LIST An 80-7 DC 0/ 74 C/S 10-3 SC StormTech Construction Guide company ~ Bc^a\CTRW b^[xs T]S RP_b P]S _at R^aTS T]S RP_b ~ Bc^a\CTRW RWP\QTab ~ Bc^a\CTRW \P]XU^[Sb P]S

More information

Construction of Polish PERS test section

Construction of Polish PERS test section PoroElastic Road SUrface: an innovation to Avoid Damages to the Environment EUROPEAN COMMISSION - DG RESEARCH Directorate 1 - Environment Seventh Framework Programme - Contract No. 226313 Document type

More information

Landscaping and Fencing

Landscaping and Fencing Landscaping and Fencing Fences, driveways, paving, retaining walls, landscaping & other garden features To be read in conjunction with General Requirements: A guide to building on properties containing

More information

Polymeric Sand. Guide. for Pavement Joints. Installation. Easy to use Stays within joints HP POLYMERIC SAND RG+ POLYMERIC SAND. techniseal.

Polymeric Sand. Guide. for Pavement Joints. Installation. Easy to use Stays within joints HP POLYMERIC SAND RG+ POLYMERIC SAND. techniseal. Polymeric Sand for Pavement Joints Easy to use Stays within joints Installation Guide techniseal.com TECHNISEAL POLYMERIC SAND FOR PAVEMENT JOINTS is a high-tech mix of graded sand and binder, specially

More information

Building Knowledge: Research Highlights

Building Knowledge: Research Highlights Building Knowledge: Research Highlights Modular and Prefabricated Housing Ideas, Innovations, and Considerations to Improve Affordability, Efficiency, and Quality Background Modular and prefabricated units

More information

Project s fiche INOV. Frisomat Case study project's fiche INOV

Project s fiche INOV. Frisomat Case study project's fiche INOV Project s fiche INOV Clear Flatro building 49 metres long The Flatro industrial building in Villers-le-Bouillet measures 15 metres by 49 metres and is 6 metres high. The building rests on concrete plinths

More information

vibration and structural isolation

vibration and structural isolation vibration and structural isolation construction / industrial applications Regupol Regufoam General overview General M&E Plant ACU s Refrigeration equipment Pumps Lift motors General workshop machinery

More information

Latest Developments in Concrete Research

Latest Developments in Concrete Research Latest Developments in Concrete Research Presented by: Elsabe Kearsley University of Pretoria Introduction Background Concrete properties Appropriate test methods and specifications Examples of applications

More information

StormTech Construction Guide

StormTech Construction Guide M /M 00 35 C- A division of REQUIRED MATERIALS AND EQUIPMENT LIST 00 45 C- StormTech Construction Guide Detention Retention Water Quality Acceptable fill materials per Table 1 Woven and non-woven geotextiles

More information

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure.

AGENDA AGENDA. Route 15/29 SBL Bridge Superstructure Replacement & Widening. NOVA District. Bridge Views SCOPE. Existing Structure. Route 15/29 SBL Bridge Superstructure Replacement & Widening Existing Structure Scope Accelerated Procedure Staging (Superstructure) Preparatory Work (Substructure) NOVA District Questions EXISTING STRUCTURE

More information

Professional solar mounting systems

Professional solar mounting systems Professional solar mounting systems 2 Schletter GmbH - Your partner for fast and safe solutions 40 years of experience in steel and aluminium processing as well as in light metal construction design. Worldwide

More information

DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES

DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES Nebraska Department of Roads (NDOR) Project Number: SPR-P1(11) M3 July 11 DEVELOPING DETERIORATION MODELS FOR NEBRASKA BRIDGES Nebraska Department of

More information

Specification for Road Works Series Road Restraints Systems (Vehicle and Pedestrian)

Specification for Road Works Series Road Restraints Systems (Vehicle and Pedestrian) Specification for Road Works Series 400 - Road Restraints Systems (Vehicle and Pedestrian) CC-SPW-00400 March 2013 CC Construction & Commissioning Standards TRANSPORT INFRASTRUCTURE IRELAND (TII) PUBLICATIONS

More information

RHINO-STOP Modular Vehicle Impact Barriers

RHINO-STOP Modular Vehicle Impact Barriers RHINO-STOP Product Manual Ref: PM 019/05 Leading Safety Full-scale crash tested systems Compliance to AS/NZS 2890.1 Parking Facilities Compliance to AS/NZS 1170.1 Structural Design Actions BCA compliant

More information

commuting Transport Calculator

commuting Transport Calculator commuting Mass Transport Calculator Guide June 2009 TABLE OF CONTENTS 1.0 INTRODUCTION 3 2.0 DIFFERENCES BETWEEN GREEN STAR RATING TOOLS 3 3.0 HOW THE CALCULATOR WORKS 3 3.1 Definition of Terms used in

More information

Design strategies for the future

Design strategies for the future Design strategies for the future Tailor Made Concrete Structures Walraven & Stoelhorst (eds) 2008 Taylor & Francis Group, London, ISBN 978-0-415-47535-8 Expansion joints with low noise emission T. Spuler,

More information

Facts that provide correct decision-making input

Facts that provide correct decision-making input Road data brochure Ask us at Road Data. We know. Facts that provide correct decision-making input Road Data operations at the Swedish Road Administration (SRA) exist all over the country. Just as our name

More information

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc.

SPECIAL PROVISION Detours, Barricades, Warning Signs, Sequence of Work, etc. 2004 Specifications CSJ 0299-04-049, Etc. SPECIAL PROVISION 000---979 Detours, Barricades, Warning Signs, Sequence of Work, etc. 1. Description of Project. A. General. This project provides for the construction

More information

Carbon fibre shear links for structural strengthening

Carbon fibre shear links for structural strengthening Product Data Sheet Edition 21/02/2012 Identification no: 02 04 01 01 004 0 000002 Sika CarboShear L Carbon fibre shear links for structural strengthening Construction System Description Uses Sika CarboShear

More information

THE SLAB TRACK SOLUTION FOR SPECIAL TRACKWORK LVT FOR SWITCHES & CROSSINGS (LVT S & C)

THE SLAB TRACK SOLUTION FOR SPECIAL TRACKWORK LVT FOR SWITCHES & CROSSINGS (LVT S & C) THE SLAB TRACK SOLUTION FOR SPECIAL TRACKWORK LVT FOR SWITCHES & CROSSINGS (LVT S & C) THE SLAB TRACK SOLUTION FOR SPECIAL TRACKWORK LVT FOR SWITCHES & CROSSINGS (LVT S & C) Following the development of

More information

Vibration Isolation by Floating Track Systems

Vibration Isolation by Floating Track Systems Vibration Isolation by Floating Track Systems Vibration Isolation by Floating Track Systems The GERB Floating Track Systems The Situation Today, rail-bound systems are modern and serviceable transport

More information

Suggested laying methods for STONE pavers

Suggested laying methods for STONE pavers Suggested laying methods for STONE pavers These suggestions are a guide only and should be used in addition to the relevant Australian Standards for trade practices. It is to be noted that installation

More information

Construction Revolution. Eco Underpass Method. Solution for Traffic Congestion in Urban Area

Construction Revolution. Eco Underpass Method. Solution for Traffic Congestion in Urban Area Construction Revolution Eco Underpass Method Solution for Traffic Congestion in Urban Area Introduction Inspiration of Public Structure Appearance Current Concept of Public Structures Structures that are

More information

Construction. Carbon fiber shear links for structural strengthening. System Description. (Template for local translation, only for internal use)

Construction. Carbon fiber shear links for structural strengthening. System Description. (Template for local translation, only for internal use) Product Data Sheet Edition 12/08/2008 Identification no: 02 04 01 01 004 0 000002 (Template for local translation, only for internal use) Sika CarboShear L Carbon fiber shear links for structural strengthening

More information

Folie 2 ISM 2006, 7 th International Workshop on Micropiles May 3-7, 2006, Schrobenhausen, Germany Design Guide for TITAN Micropile Heads Dipl.-Ing. E

Folie 2 ISM 2006, 7 th International Workshop on Micropiles May 3-7, 2006, Schrobenhausen, Germany Design Guide for TITAN Micropile Heads Dipl.-Ing. E Folie 1 Standard Micropile Heads FE-Modelling of Micropile Heads Design Guide Harbour City Hamburg Micropile TITAN 103/78 for Sheet Pile Wall Folie 2 ISM 2006, 7 th International Workshop on Micropiles

More information

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE

SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE SIBLEY POND DESIGN-BUILD BRIDGE REPLACEMENT ROUTE 2 CANAAN/PITTSFIELD, MAINE Keith Donington, P.E. October 2012 1 Sibley Pond - Bridge Elevation 2 Bridge Open to Traffic November 2011 3 Bridge Highlights

More information

Jonathan Lange, Planner Community Development Department

Jonathan Lange, Planner Community Development Department DATE: March 12, 2014 TO: FROM: Planning Commission Jonathan Lange, Planner Community Development Department FILE NO.: USE2014 0004 PROPOSAL: A Conditional Use Permit for Brotherhood Bridge replacement

More information

The Ton-Tel Weighbridge

The Ton-Tel Weighbridge The Ton-Tel Weighbridge Plug-and-Weigh Technology Built to last in a tough environment Proven reliability, lower total cost of ownership. Digital Load Cell weight sensors sealed to IP68. Plug-and-Weigh

More information

Chambers Wharf Community Liaison Working Group 12 February 2018

Chambers Wharf Community Liaison Working Group 12 February 2018 Chambers Wharf Community Liaison Working Group 12 February 2018 Legacy 2 Recruitment 42 local people have started working with us 34% of new starters were previously workless 5 ex-offenders 14 apprentices

More information

StormTech Construction Guide

StormTech Construction Guide A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED

More information

TOP ACCESS LOW PROFILE CONCRETE & STEEL DECK TRUCK SCALES. TOP ACCESS LOW PROFILE CONCRETE and STEEL DECK TRUCK SCALES.

TOP ACCESS LOW PROFILE CONCRETE & STEEL DECK TRUCK SCALES. TOP ACCESS LOW PROFILE CONCRETE and STEEL DECK TRUCK SCALES. TOP ACCESS LOW PROFILE CONCRETE & STEEL DECK TRUCK SCALES TOP ACCESS LOW PROFILE CONCRETE and STEEL DECK TRUCK SCALES www.ricelake.com NTEP-certified widths to 14 feet! SURVIVOR TM OTR Concrete or Steel

More information

2 pack Polyurethane grout for rail fixing

2 pack Polyurethane grout for rail fixing Product Data Sheet Edition 11/05/2011 Icosit KC 340/65 2 pack Polyurethane grout for rail fixing Product Description Uses Characteristics / Advantages Icosit KC 340/65 is a flexible two-component polymer

More information

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal

SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal SHRP 2 - R04 Innovative Bridge Designs for Rapid Renewal FEHRL Long Life Bridges SQUARE (Brussels) Thursday June 10, 2010 Objective RAPID RENEWAL Bridge Systems WHAT IS THE BIG IDEA? Manufactured Bridges

More information