1 TIERRA July 9, 205 LOCHNER 4350 W. Cypress Street, Suite 800 Tampa, FL Attn: Mr. Douglas M. Hershey, P.E. RE: Report of Geotechnical Engineering Services Tierra Project No.: Mr. Hershey: Tierra, Inc. (Tierra) has completed geotechnical engineering services for the above referenced project. The results of our field exploration and laboratory testing program, foundation analyses and subsequent geotechnical recommendations are presented in this report. Should there be any questions regarding this report, please do not hesitate to contact our office at (83) Tierra would be pleased to continue providing geotechnical services throughout the implementation of the project. We look forward to working with you on this and future projects. Respectfully Submitted, TIERRA, INC..W/ (! fl~/ I,v J Kevin W. Lo, P.E. Senior Geotechnical Engineer Florida License No Temple Terrace Highway Tampa, FL Phone (83) Fax (83) Florida Certificate No. 6486

2 TABLE OF CONTENTS PROJECT DESCRIPTION... Project Information... Scope of Services... REVIEW OF PUBLISHED DATA... 2 USGS Quadrangle Map... 2 USDA Soil Survey... 2 SUBSURFACE EXPLORATION... 3 RESULTS OF SUBSURFACE EXPLORATION... 4 General Soil Conditions... 4 Groundwater Information... 5 Laboratory Testing... 5 EVALUATION AND RECOMMENDATIONS... 5 General... 5 Site Preparation... 6 Foundation Recommendations... 6 Settlement... 6 CONSTRUCTION CONSIDERATIONS... 7 General... 7 Fill Placement and Subgrade Preparation... 7 Scour/Slope Protection... 9 Drainage and Groundwater Concerns... 9 Structural Fill... 9 Excavations... 9 REPORT LIMITATIONS... 0 APPENDIX USGS/USDA Vicinity Maps (Sheet ) Boring Location Plan and Soil Profiles (Sheet 2) Proposed Foundation Dimensions and Depth

3 Tierra Project No.: Page of 0 Project Information PROJECT DESCRIPTION The project site is located within the limits of the existing St. Petersburg-Clearwater International Airport in. More specifically, the project site is located approximately 80 feet to the northeast of the intersection of Rescue Way and Spadco Drive near the western entrance to the airport facility. Based on information provided to us, it is our understanding that a new pedestrian bridge and associated sidewalk(s) are currently planned for the project site. The pedestrian bridge will be a single span structure approximately 54 feet long and 8 feet wide. The bridge will span an existing shallow drainage ditch/canal located on the north side of Rescue Way. We understand that the pedestrian bridge structure is planned to be supported on a shallow foundation system. Design loads provided by LOCHNER for each bridge abutment are as follows: Service Load: Factored Design Load: kips kips The finished grade at each bridge abutment is anticipated to be within to 2 feet of the existing site grades (approx. elevation +5 to +7 feet NGVD). If any of the project information noted is incorrect or has changed, Tierra should be notified as soon as possible so we can determine if the changes impact our recommendations. Scope of Services Tierra s involvement in the project was to obtain information concerning subsurface conditions at the pedestrian bridge site in order to establish geotechnical parameters and recommendations for the design of the proposed structure foundations. In order to meet this objective, Tierra performed the following services:. Reviewed published soils and topographic information. This published information was obtained from the Safety Harbor, Florida Quadrangle Map published by the United States Geological Survey (USGS) and the Soil Survey of, published by the United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS).

4 Tierra Project No.: Page 2 of 0 2. Executed a program of subsurface exploration consisting of borings, subsurface sampling, and field testing. Tierra performed two (2) Standard Penetration Test (SPT) borings to depths of approximately 40 feet below grade. 3. Visually classified the samples in the laboratory using the Unified Soil Classification System (USCS). Conducted a limited laboratory testing program and identified soil conditions at each boring location. 4. Collected groundwater level measurements at each boring location. 5. Prepared this formal report in accordance with the scope of services herein that summarizes the course of study pursued, the field data generated, subsurface conditions encountered and our engineering recommendations in each of the pertinent topic areas. The scope of our services did not include an environmental assessment for determining the presence or absence of wetlands or hazardous or toxic materials in the soil, bedrock, groundwater, or air, on or below or around this site. Any statements in this report or on the boring logs regarding odors, colors, unusual or suspicious items or conditions are strictly for the information of our client. USGS Quadrangle Map REVIEW OF PUBLISHED DATA Based on a review of the Safety Harbor, Florida United States Geological Survey (USGS) Quadrangle Map, the natural ground surface elevations at the project site are generally on the order of +5 to +0 feet, National Geodetic Vertical Datum of 929 (NGVD 29). This information is consistent with site specific topographic information provided to Tierra. A reproduction of the USGS Vicinity Map is illustrated on Sheet in the Appendix. USDA Soil Survey Based on a review of the Pinellas County Soil Survey, it appears that there is one () primary soil-mapping unit noted within the vicinity of the project site. The general soil description is presented in the following paragraph and table, as described in the Soil Survey. A reproduction of the USDA Vicinity Map is also illustrated on Sheet in the Appendix. Matlacha-St. Augustine-Urban land (Map Unit 6) The Matlacha component makes up 32 percent of the map unit. Slopes are 0 to 2 percent. This component is on fills on ridges on marine terraces on coastal plains. The parent material consists of sandy mine spoil or earthy fill. The natural drainage class is somewhat poorly drained. Shrink-swell potential is low. This soil is not flooded. It is not

5 Tierra Project No.: Page 3 of 0 ponded. A seasonal zone of water saturation is at a depth of 30 inches during the months of June to October. The St. Augustine component makes up 32 percent of the map unit. Slopes are 0 to 2 percent. This component is on ridges on marine terraces on coastal plains. The parent material consists of sandy mine spoil or earthy fill. The natural drainage class is somewhat poorly drained. Shrink-swell potential is low. This soil is not flooded. It is not ponded. A seasonal zone of water saturation is at a depth of 27 inches during the months of June to October. The Urban Land component of the map unit consists of areas where most of the soil surface is covered with impervious materials, such as buildings and paved areas. This land type consists of areas where the original soil has been modified through cutting, grading, filling, and shaping or has been generally altered for urban development. SUMMARY OF USDA SOIL SURVEY PINELLAS COUNTY, FLORIDA USDA Map Symbol and Soil Name Depth (in) Soil Classification USCS AASHTO Permeability (in/hr) ph Seasonal High Water Table Depth Months (feet) (6) Matlacha- St. Augustine- Urban land 0-42 SP, SP-SM A SP, SP-SM A SP, SP-SM A SP-SM A SP, SP-SM A SM, SP-SM A SP, SP-SM A June-Oct June-Oct It should be noted that information contained in the USDA Soil Survey may not be reflective of current subsurface conditions, particularly if development in the project vicinity has modified existing soils or surface/subsurface drainage. SUBSURFACE EXPLORATION Prior to commencing field activities, Tierra developed a boring location plan based on project information provided by LOCHNER. To evaluate the subsurface conditions within the footprint of the proposed pedestrian bridge structure, Tierra performed a total of two (2) SPT borings to depths of approximately 40 feet below grade.

6 Tierra Project No.: Page 4 of 0 The borings were located in the field by a representative of Tierra using a hand-held Garmin Etrex Global Positioning System (GPS) equipment with a reported accuracy of +0 feet. The approximate boring locations are presented on the Boring Location Plan sheet in the Appendix. If a more accurate determination of the boring locations is required, then Tierra recommends the boring locations be survey located by the project surveyor. The SPT borings were performed with the use of a drill rig equipped with an automatic hammer system using Bentonite Mud drilling procedures. The soil sampling was performed in general accordance with American Society for Testing and Materials (ASTM) Test Designation D-586 titled Penetration Test and Split-Barrel Sampling of Soils. SPT resistance N-values and soil samples were taken continuously to a depth of 0 feet and at intervals of 5 feet thereafter to the boring termination depths. As each soil type was encountered, samples were collected and visually classified in the field with representative soil samples collected and returned to Tierra for soil classification and stratification. The results of the SPT borings performed are presented on the Soil Profiles sheet in the Appendix. General Soil Conditions RESULTS OF SUBSURFACE EXPLORATION The SPT borings generally encountered loose to medium dense sandy soils to depths of approximately 8 feet below existing site grades underlain by very loose to loose sandy soils to depths of approximately 33 feet below existing site grades. Stiff sandy clay to sandy silt was then encountered to the boring termination depths of 40 feet below grade. The subsurface conditions encountered within each of the test borings performed are presented on the Soil Profile sheet in the Appendix. The soil strata encountered in the borings performed at the project site are summarized in the following table: Stratum Number Soil Description USCS Symbol Brown Fine SAND to SAND with Silt SP/SP-SM 2 Gray Silty SAND with Shell Fragments SM 3 Gray to Blue-Gray Sandy CLAY to Sandy SILT ML/CL The subsurface soil stratification is of a generalized nature to highlight the major subsurface stratification features and material characteristics. The Soil Profiles included in the Appendix should be reviewed for specific information at individual boring locations. These profiles include soil descriptions, stratifications, and penetration resistances. The stratifications shown on the boring profiles represent the conditions

7 Tierra Project No.: Page 5 of 0 only at the actual boring location. Variations did occur and should be expected between boring locations. The stratifications represent the approximate boundary between subsurface materials and the actual transition may be gradual. Groundwater Information At the time of drilling (April 7, 205), the groundwater table was encountered at a depth of 6 feet below the existing ground surface. Groundwater conditions will vary with environmental changes and seasonal conditions, such as the frequency and magnitude of rainfall patterns, as well as man-made influences, such as swales, drainage features and areas of covered soil (paved parking lots, sidewalks, etc.). The estimated normal seasonal high groundwater levels presented herein are based on the observed soil stratigraphy, measured groundwater levels in the borings, USDA Soil Survey information, and our past experience in the general project area. In this regard, we estimate the normal seasonal high groundwater will be approximately.5 feet below the existing site grades (approximate elevation +3.5 feet based on topographic information provided to Tierra). In general, the normal seasonal high groundwater level is not intended to define a limit or ensure that future seasonal fluctuations in groundwater levels will not exceed the estimated levels. Post-development groundwater levels could exceed the normal seasonal high groundwater level estimate as a result of a series of rainfall events, changed conditions at the site that alter surface water drainage characteristics, or variations in the duration, intensity, or total volume of rainfall. Laboratory Testing Representative soil samples collected from the SPT borings were classified and stratified in general accordance with the Unified Soil Classification System (USCS). Our classification was based on visual observations, using the results from the laboratory testing as confirmation. Laboratory testing consisted of fines content (percentage passing No. 200 mesh sieve) and environmental corrosion tests. The results of the laboratory tests are presented on the Soil Profile sheet in the Appendix. General EVALUATION AND RECOMMENDATIONS Based on the results of the borings and our understanding of the proposed pedestrian bridge as discussed herein, subsurface conditions are considered suitable for supporting the bridge structure on shallow foundations after being prepared in accordance with the recommendations provided herein. Our recommendations for site preparation, foundation design criteria, settlement, and construction considerations are presented in the following report sections.

8 Tierra Project No.: Page 6 of 0 Site Preparation Prior to construction, the location of any existing underground utilities within the construction area should be established. Material suitable for re-use may be stockpiled; however, any material stockpiled for re-use shall be tested for conformance to material specifications as indicated in the following sections of this report. Provisions should then be made to relocate any interfering utility lines within the construction area to appropriate locations and backfilling the resulting excavations with compacted approved fill. In this regard, it should be noted that if abandoned underground pipes are not properly removed or plugged, they might serve as conduits for subsurface erosion, which subsequently may result in excessive settlement. As a minimum, it is recommended that the clearing operations extend to the depth needed to remove material considered deleterious at least 5 feet beyond the proposed construction limits, where practical. Deleterious materials to be removed include roots, organics, tree stumps or other buried or surface debris. Fill placement and subgrade preparation recommendations are presented in the Construction Considerations section of this report. Foundation Recommendations Based on the results of our borings and our understanding of the proposed pedestrian bridge as discussed herein, subsurface conditions are considered suitable for supporting the structure on shallow spread foundations. A maximum factored bearing resistance of 2,700 pounds per square foot (psf) can be used for the design of the foundations. This value was developed based on the proposed foundation dimensions and depth provided by LOCHNER, which are shown in the Appendix. Based on the soil conditions encountered and the recommended site preparation requirements, a modulus of subgrade reaction of 50 pounds per cubic inch (pci) is recommended for use in design. The noted values presume that the foundations are surrounded by well-compacted sand backfill and can withstand horizontal movements on the order of one-quarter to threeeighth inches. Horizontal restraint determined in accordance with the recommended values should be considered resistance that is available rather than allowable. Therefore, the design should incorporate a minimum factor of safety of.5 to limit horizontal movement. Settlement The settlement of shallow foundations supported on compacted sand fill and/or natural sandy soils should occur rapidly after loading. Thus, the expected settlement should occur during construction as dead loads are imposed. Provided the recommended site preparation operations are properly performed and the recommendations noted herein are utilized, the total settlement should not exceed approximately ½ inch. The differential settlement is not expected to exceed one half of the total settlement.

9 Tierra Project No.: Page 7 of 0 Differential settlement of this magnitude is usually considered tolerable for the anticipated construction; however, the tolerance of the proposed structure to the predicted total and differential settlements should be confirmed by the structural engineer. General CONSTRUCTION CONSIDERATIONS It is recommended that Tierra be retained to provide observation and testing of construction activities involved in the foundation earthwork, and related activities of this project. Tierra cannot accept any responsibility for any conditions, which deviate from those described in this report, if not engaged to provide construction observation and testing for this project. Fill Placement and Subgrade Preparation The following are our recommendations for overall site preparation and mechanical densification work for the construction of the proposed improvements based on the anticipated construction and our test boring results. These recommendations should be used as a guideline for the project general specifications prepared by the design engineer.. The site should be cleared; this primarily includes removing any deleterious materials currently on the site. It is recommended that any unsuitable material be removed to the satisfaction of Tierra prior to beginning construction at the site. Resulting excavations should be backfilled with compacted structural fill. As a minimum, it is recommended that the clearing operations extend at least five (5) feet beyond the development perimeters, where practical. 2. Following the clearing operations, the exposed existing subgrade should be evaluated and proofrolled as directed by representatives of Tierra to confirm that all unsuitable materials have been removed. The proofrolling should consist of compaction using a fully loaded 2 cubic yard capacity front end loader or equivalent. Vibratory compaction equipment should not be used within 50 feet of any existing structures. 3. Careful observations should be made during proofrolling to help identify any areas of soft yielding soils that may require over excavation and replacement. The proofrolling equipment should make a minimum of eight (8) overlapping passes over the structure areas with the successive passes aligned perpendicular. It is recommended that within the pavement/sidewalk areas leading up to the pedestrian bridge, the natural ground, to a minimum depth of one () foot below stripped or excavated grade, be compacted to a minimum of 95% of the material s Modified Proctor maximum dry density.

10 Tierra Project No.: Page 8 of 0 4. Following satisfactory completion of the initial compaction, the structure areas may be brought up to finished subgrade levels, if needed, using structural fill. Imported fill should consist of fine sand with less than 2% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. Fill should be tested and approved prior to acquisition. Approved sand fills should be placed in loose lifts not exceeding 2 inches in thickness and should be compacted to a minimum density of 95% of the Modified Proctor maximum dry density. Density tests to confirm compaction should be performed in each fill lift before the next lift is placed. 5. Prior to beginning compaction, soil moisture contents may need to be adjusted in order to facilitate proper compaction. If additional moisture is necessary to achieve compaction objectives, then water should be applied in such a way that it will not cause erosion or removal of the subgrade soils. Moisture content within the range needed to achieve compaction is recommended prior to compaction of the natural ground and fill. 6. After proofrolling and compaction, the foundation excavations can begin. Foundation excavations should be observed by the geotechnical engineer or a representative to explore the extent of any loose, soft, or otherwise unsuitable materials. If the foundation excavations appear suitable as load bearing materials, the bottom of the foundation excavations should be compacted to a minimum density of 95% of the Modified Proctor maximum dry density for a minimum depth of two (2) feet below the bottom of the footing depth, as determined by field density compaction tests. 7. If soft pockets are encountered in the footing excavations, the unsuitable materials should be removed and the proposed footing elevation re-established by backfilling. This backfilling may be done with a very lean concrete or with a well-compacted, suitable fill such as clean sand, gravel, or crushed FDOT No. 57 or FDOT No. 67 stone. Sand backfill should be compacted to a minimum density of 95% of the modified Proctor maximum dry density. Gravel/stone should be compacted to a firm unyielding condition. 8. Immediately prior to reinforcing steel placement, it is suggested that the bearing surfaces of all footing excavations be compacted using hand operated mechanical tampers. In this manner, any localized areas which have been loosened by excavation operations should be adequately re-compacted. A representative of Tierra should be retained to provide on-site observation of earthwork and ground modification activities. Density tests should be performed in the top one () foot of compacted existing ground, each fill lift, and the bottom of foundation excavations. It is important that Tierra be retained to observe that the subsurface conditions are as we have discussed herein, and that foundation construction ground modification and fill placement is in accordance with our recommendations.

11 Tierra Project No.: Page 9 of 0 Scour/Slope Protection Normal slope protection measures (i.e. grassed/vegetated side slopes) and periodic maintenance of the drainage ditch/canal will be required to protect the bridge foundations from scour/erosion impacts at all times. Drainage and Groundwater Concerns Groundwater levels were encountered at a depth of 6 feet below the existing grade at the time of our field activities. We recommend that the Contractor determine the actual groundwater levels at the time of construction to determine potential groundwater impacts that may occur during the proposed construction. Structural Fill All materials used for structural fill or backfill should be evaluated and, if necessary, tested by Tierra prior to placement to determine if they are suitable for the intended use. Suitable fill materials should consist of sand with less than 2% passing the No. 200 sieve, free of rubble, organics, clay, debris and other unsuitable material. In general, the majority of the Stratum sands (SP/SP-SM) can be moved and used for grading purposes, site leveling, general engineering fill, structural fill and backfill in other areas, provided the fill is free of organic material, clay, debris or any other material deemed unsuitable for construction. All fill should be placed in accordance with the recommendations provided in this report. Excavations Excavations and temporary side slopes should comply with the Occupational Safety and Health Administration s (OSHA) trench safety standards, 29 C.F.R., s , Subpart P, all subsequent revisions or updates of OSHA s referenced standard adopted by the Department of Labor and Employment Security and Florida s Trench Safety Act, Section , Florida Statutes. We are providing this information solely as a service to our client. Tierra does not assume responsibility for construction site safety or the contractor s or other party s compliance with local, state, and federal safety or other regulations. Excavated materials should not be stockpiled at the top of the slope within a horizontal distance equal to the excavation depth.

12 Tierra Project No.: Page 0 of 0 REPORT LIMITATIONS The analyses, conclusions and recommendations contained in this report are professional opinions based on the site conditions and project layout described herein and further assume that the conditions observed in the exploratory borings are representative of the subsurface conditions throughout the site, i.e., the subsurface conditions elsewhere on the site are the same as those disclosed by the borings. If, during construction, subsurface conditions different from those encountered in the exploratory borings are observed or appear to be present beneath excavations, we should be advised at once so that we can review these conditions and reconsider our recommendations where necessary. This report was prepared for the exclusive use of LOCHNER and the St. Petersburg- Clearwater International Airport for evaluating the design of the project as it relates to the geotechnical aspects discussed herein. It should be made available to prospective contractors for information on factual data only and not as a warranty of subsurface conditions included in this report. Unanticipated soil conditions may require that additional expense be made to attain a properly constructed project. Therefore, some contingency fund is recommended to accommodate such potential extra costs.

13 APPENDIX USDA/USGS Vicinity Maps (Sheet ) Boring Location Plan and Soil Profiles (Sheet 2) Proposed Foundation Dimensions and Depth

14 USDA VICINITY MAP USGS VICINITY MAP APPROXIMATE PROJECT LOCATION ' PLAN SCALE REFERENCE: USDA SOIL SURVEY OF PINELLAS COUNTY, FLORIDA REFERENCE: "SAFETY HARBOR, FLORIDA" USGS QUADRANGLE MAP TOWNSHIP: RANGE: SECTION: 29 S 9 E 33 & 34 DRAWN BY: SW CHECKED BY: KLS APPROVED BY: KLS DATE: JUL 205 ENGINEER OF RECORD: KENNETH L. SYMONDS JR., P.E. FLORIDA LICENSE NO.: 5958 TIERRA 735 Temple Terrace Highway Tampa, Florida Phone: Fax: FL Cert. No.: 6486 SCALE: PROJECT NUMBER: NOTED GEOTECHNICAL ENGINEERING SERVICES USCG PEDESTRIAN BRIDGE ST. PETERSBURG-CLEARWATER INT'L AIRPORT SHEET

15 BORING LOCATION PLAN 0 50' SOIL PROFILES LEGEND PLAN SCALE BOR. # LAT.: LON.: DATE: DRILLER: HAMMER: RIG: B- N W /7/5 R. SCRUGGS AUTOMATIC D-25 BOR. # LAT.: LON.: DATE: DRILLER: HAMMER: RIG: B-2 N W /7/5 R. SCRUGGS AUTOMATIC D-25 2 BROWN FINE SAND TO SAND WITH SILT (SP/SP-SM) GRAY SILTY SAND WITH SHELL FRAGMENTS (SM) = = 2 N = 5 N N GRAY TO BLUE-GRAY SANDY CLAY TO SANDY SILT (ML/CL) APPROXIMATE LOCATION OF SPT BORING GROUNDWATER LEVEL ENCOUNTERED DURING INVESTIGATION SPT N-VALUE IN BLOWS/FOOT FOR 2 INCHES OF PENETRATION (UNLESS OTHERWISE NOTED) PC STA PT STA CURVE DATA CLCONST2 PI STA. = = 35 37' 05" (RT) D = 90 59' 09" T = 9.64 L = 8.65 R = PC STA. = PT STA. = CURVE DATA CLCONST PI STA. = = 4 22' 26" (LT) D = 90 59' 09" T =.33 L = 2.66 R = PC STA. = PT STA. = N 85 42' 29" E B-2 POT STA DEPTH IN FEET DEPTH IN FEET SP UNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2488) GROUP SYMBOL AS DETERMINED BY VISUAL REVIEW AND LABORATORY TESTING ON SELECTED SAMPLES FOR CONFIRMATION OF VISUAL REVIEW -200 PERCENT PASSING #200 SIEVE NOTE: LATITUDE AND LONGITUDE WERE ESTIMATED BASED ON COORDINATES OBTAINED IN THE FIELD USING A HAND-HELD GPS DEVICE AND SHOULD BE CONSIDERED APPROXIMATE NOTE: BASE MAP PROVIDED BY H.W. LOCHNER RECOMMENDED ENVIRONMENTAL CLASSIFICATION: SUBSTRUCTURE CONCRETE: MODERATELY AGGRESSIVE (ph=6.0) SUBSTRUCTURE STEEL: MODERATELY AGGRESSIVE (ph=6.0) SOIL TEST RESULTS: RESISTIVITY 3,500 OHM-CM CHLORIDES 5 PPM SULFATES 43.3 PPM ph 6.0 GRANULAR MATERIALS- RELATIVE DENSITY VERY LOOSE LOOSE MEDIUM DENSE VERY DENSE SILTS AND CLAYS CONSISTENCY VERY SOFT SOFT FIRM STIFF VERY STIFF HARD SPT N-VALUE (BLOWS/FT.) LESS THAN 3 3 TO 8 8 TO TO 40 GREATER THAN 40 SPT N-VALUE (BLOWS/FT.) LESS THAN TO 3 3 TO 6 6 TO 2 2 TO 24 GREATER THAN 24 DRAWN BY: SW CHECKED BY: KLS APPROVED BY: KLS DATE: JUL 205 ENGINEER OF RECORD: KENNETH L. SYMONDS JR., P.E. FLORIDA LICENSE NO.: 5958 TIERRA 735 Temple Terrace Highway Tampa, Florida Phone: Fax: FL Cert. No.: 6486 SCALE: PROJECT NUMBER: NOTED GEOTECHNICAL ENGINEERING SERVICES USCG PEDESTRIAN BRIDGE ST. PETERSBURG-CLEARWATER INT'L AIRPORT SHEET 2

16 DESIGNED GENERAL NOTES DESIGN SPECIFICATIONS: FDOT STRUCTURES MANUAL DATED JANUARY 205 AND SUBSEQUENT STRUCTURES DESIGN BULLETINS. AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO) LOAD AND RESISTANCE FACTOR (LRFD) BRIDGE DESIGN SPECIFICATIONS, 7TH EDITION. 3. REINFORCING STEEL: A. PROVIDE ASTM A65 GRADE 60 CONVENTIONAL REINFORCING STEEL IN ACCORDANCE WITH SPECIFICATION 45. B. TYPICAL REINFORCING BARS ARE DESIGNATED AS: FDOT PLANS PREPARATION MANUAL DATED JANUARY 205. GOVERNING STANDARDS AND CONSTRUCTION SPECIFICATIONS: FLORIDA DEPARTMENT OF TRANSPORTATION, 205 DESIGN STANDARDS AND REVISED INDEX DRAWINGS AS APPENDED HEREIN AND 205 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION, AS AMENDED BY CONTRACT DOCUMENTS. VERTICAL DATUM: NAVD 88 DESIGN METHODOLOGY: LOAD AND RESISTANCE FACTOR DESIGN (LRFD) METHOD USING STRENGTH, SERVICE AND FATIGUE LIMIT STATES. DESIGN LOADING:. LIVE LOAD: H-5 2. PEDESTRIAN LOAD: 90 PSF 3. DEAD LOADS: ALUMINUM PEDESTRIAN RAILING: 20 PLF REINFORCED CONCRETE: 50 PCF FUTURE WEARING SURFACE: 0 PSF 4. UTILITIES: NO ALLOWANCE FOR UTILITY LOADS HAS BEEN INCLUDED IN THE DESIGN. MATERIALS:. CONCRETE: ALL CONCRETE SHALL CONFORM TO SPECIFICATIONS SECTION E0 QUANTITY MARK SIZE ENVIRONMENT: SUPERSTRUCTURE SUBSTRUCTURE MODERATELY CONCRETE AND STEEL: AGGRESSIVE MODERATELY AGGRESSIVE PLAN DIMENSIONS: ALL DIMENSIONS IN THESE PLANS ARE MEASURED IN FEET EITHER HORIZONTALLY OR VERTICALLY UNLESS NOTED OTHERWISE. JOINTS IN CONCRETE: CONSTRUCTION JOINTS WILL BE PERMITTED ONLY AT THE LOCATIONS INDICATED IN THE PLANS. ADDITIONAL CONSTRUCTION JOINTS OR ALTERATIONS TO THOSE SHOWN SHALL REQUIRE APPROVAL OF THE ENGINEER. ABBREVIATIONS: E.F. DENOTES "EACH FACE" E.J. DENOTES "EXPANSION JOINT" N.F. DENOTES "NEAR FACE" E DENOTES "EXPANSION BEARING" F.F. DENOTES "FAR FACE" U.N.O. DENOTES "UNLESS OTHERWISE NOTED" MIN. 28-DAY CONCRETE COMPRESSIVE CLASS STRENGTH (PSI) II (BRIDGE DECK) 4500 IV 5500 V CONCRETE COVER: LOCATION OF CONCRETE IN STRUCTURE APPROACH SLABS END BENTS PRESTRESSED DOUBLE-TEE BEAM FOR ADDITIONAL ABBREVIATIONS SEE FDOT INDEX NO. 00. SHOP DRAWINGS: SHOP DRAWINGS SHALL BE SUBMITTED TO: DOUGLAS M. HERSHEY, PE HW LOCHNER, INC W. CYPRESS STREET, SUITE 800 TAMPA, FL CONCRETE COVER DIMENSIONS SHOWN IN THE PLANS DO NOT INCLUDE PLACEMENT AND FABRICATION TOLERANCES UNLESS SHOWN AS "MINIMUM COVER". SEE SPECIFICATION 45 FOR ALLOWABLE TOLERANCES. ALL DIMENSIONS PERTAINING TO THE LOCATION OF REINFORCING STEEL ARE TO THE CENTERLINE OF BAR EXCEPT WHERE CLEAR DIMENSION IS NOTED TO FACE OF CONCRETE. PRECAST PRESTRESSED BEAM (UNLESS NOTED OTHERWISE) CAST-IN-PLACE SUBSTRUCTURE (CAST AGAINST EARTH) CAST-IN-PLACE SUBSTRUCTURE (FORMED SURFACES) CAST-IN-PLACE APPROACH SLAB (TOP OF SLAB) CAST-IN-PLACE APPROACH SLAB (BOTTOM OF SLAB) 2" 4½" 3" DESCRIPTION DATEREV. BY DRAWN CHECKED DMH DMH CS OFFICE OF ENGINEERING AND TECHNICAL SUPPORT 4 S. FT. HARRISON AVE., CLEARWATER, FL PROJECT: DESCRIPTION: APPROVED BY: DATE: H.W. LOCHNER, INC. 7/9/ W. CYPRESS ST, U.S. COAST GUARD PROJECT NO. SUITE 800 STRUCTURES GENERAL NOTES 00743A TAMPA, FLORIDA SIDEWALK Douglas M. Hershey, P.E. DATE SHEET: CERT. OF AUTH. #894 FLA. LIC. NO B-

17 N BEGIN BRIDGE FFBW END BENT STA BEGIN APPROACH SLAB STA SURVEYED TOP OF BANK 5 5 B ~ DRAINAGE DITCH 8" SURVEYED TOP OF BANK END BRIDGE FFBW END BENT 2 STA P.I. STA EL P.I. STA EL P.I. STA EL N 85 42'29" E 90 0'0" 90 0'0" 4'-0" 4'-0" 8'-0" CLEAR W ALKW AY 90 0'0" 90 0'0" B-2 03 DIRECTION OF STATIONING CONST. BEGIN BRIDGE STA END BRIDGE STA ALUMINUM PEDESTRIAN/BICYLE RAILING (TYP. EACH SIDE) END APPROACH SLAB STA VERTICAL CURVE DATA EXISTING FENCE (TO REMAIN) TB PLAN BEGIN BRIDGE FFBW END BENT 4'-6" APPRH. SLAB 54'-0" 42" ALUMINUM PEDESTRIAN/BICYCLE RAILING TYPE (INDEX 86 & 862) END BRIDGE FFBW END BENT 2 4'-6" APPRH. SLAB 0 0 LEGEND: E.J. E.J. INDICATES BORING LOCATION. FOR BORING 5 WINGWALL E E ~ ~ WINGWALL 5 DATA, SEE SHEET B-3. REMOVAL OF EXISTING GROUND UNDERNEATH PROPOSED STRUCTURE 0-5 PROPOSED GROUND IN FRONT OF END BENT (EL. 4.75) (LEVEL) PRESTRESSED DOUBLE-TEE BEAM EXISTING GROUND ALONG CONST. PROPOSED GROUND IN FRONT OF END BENT (EL. 4.75) (LEVEL) 0-5 NOTES:. SEE THE ROADWAY PLANS FOR SIDEWALK DETAILS LEADING UP TO THE APPROACH SLABS. 2. THE PROPOSED BEAM LOW MEMBER ELEVATION IS ELEVATION EL THE MEAN HIGH WATER ELEVATION IS EL. 0.7 AND THE MEAN HIGH HIGH WATER ELEVATION IS EL..06. DESCRIPTION DESIGNED DRAWN CHECKED DATEREV. BY DMH DMH CS OFFICE OF ENGINEERING AND TECHNICAL SUPPORT 4 S. FT. HARRISON AVE., CLEARWATER, FL PROJECT: DESCRIPTION: APPROVED BY: H.W. LOCHNER, INC. U.S. COAST GUARD PLAN AND ELEVATION SIDEWALK 4350 W. CYPRESS ST, SUITE 800 TAMPA, FLORIDA Douglas M. Hershey, P.E. CERT. OF AUTH. #894 FLA. LIC. NO DATE DATE: 7/9/5 PROJECT NO A SHEET: B-2

18 DESIGNED B 4'-9" '-3" '-6" '-0" '-0" 2'-6" (TYP.) '-0" 4'-9 2" ½" PREFORMED EXPANSION JOINT FILLER MATERIAL (TYP.) 90 0'0" FFBW 90 0'0" 6E0 (TYP.) CONST '0" 4'-9 2" BEGIN BRIDGE FFBW END BENT STA END BRIDGE FFBW END BENT 2 STA '0" 90 0'0" '-0" DIRECTION OF STATIONING (END BENT ) (END BENT 2) BEARING DIRECTION OF STATIONING EL (END BENT ) EL (END BENT 2) (END BENT ) 6" (END BENT 2) 5 7" 2" 5 5 6" 6" 4 C 2'-6" 4'-6" EL '-6" 6" EL E04 (TYP. OF 0) B STEM STEM '-0" 2'-9 2'-0" 2'-0" 2'-9 '-0" 4W03 (E.F.) C '-0" (MIN.) '-6" '-7" 4 2" 7½" 8 2" 7¾" 5 2" '-3" PLAN = '-0 2'' (E.F.) = 2'-7'' (E.F.) VIEW B-B APPROACH SLAB EL EL. X.XXX EL. X.XXX EL EL..750 '-5 2" '-4 2" A 5-5E03 5-5E02 2'-2" = 8'-8" APPROACH SLAB OUTLINE 4-4E03 5E03 (E.F.) 0-4E0 & 0-4E02 ¾" (+) = 8'-0" '-5 2" '-4 2" ½" PREFORMED EXPANSION JOINT FILLER MATERIAL (TYP.) 3-4E04 (E.F.) '-6" 4E04 SPACING 6" = '-0' 4 3" 7" (E.F.) 5E03 (E.F.) CL. 6E0 4E02 '-0" CL. '-0" 7 2" 0 '-3" 6" CL. C.J. '-0" (MIN.) C.J. BRG. 4-4E03 (EQ. SPA.) CL. (TYP.) 4E0 5E0 CL. 2'-0" 9" 9" VARIES (END BENT ) 2" PREFORMED EXPANSION JOINT FILLER MATERIAL 6" (END BENT 2) 4 6" 6" 5 2" 5 7" 5 RAILING APPROACH SLAB 4W0 4W03 (TYP. OF 6) CL. (TYP.) 4 2" ¾" (+) = 0'-0" 4 6 2" " = 3'-8" (TOP) 6 " = 3'-8'' (BOTTOM) '-0" A 4'-9" SECTION C-C ELEVATION SECTION A-A DESCRIPTION DATEREV. BY DRAWN CHECKED DMH DMH CS OFFICE OF ENGINEERING AND TECHNICAL SUPPORT 4 S. FT. HARRISON AVE., CLEARWATER, FL PROJECT: DESCRIPTION: APPROVED BY: DATE: H.W. LOCHNER, INC. 7/9/ W. CYPRESS ST, U.S. COAST GUARD PROJECT NO. SUITE 800 END BENT DETAILS 00743A TAMPA, FLORIDA SIDEWALK Douglas M. Hershey, P.E. DATE SHEET: CERT. OF AUTH. #894 FLA. LIC. NO B-4

19 DESIGNED 53'-0½" (OVERALL LENGTH OF BEAM INCLUDING LENGTH INCREASE REQUIRED TO COMPENSATE FOR ELASTIC AND TIME DEPENDENT SHORTENING EFFECTS) 42" ALUMINUM PEDESTRIAN/BICYCLE PICKET RAILING TYPE (INDEX 86 & 862) (TYP.) 3" 2 3" = 3'-0" 6" 6" 22 '-0" 8 4 " 5S SPACING SYMMETRICAL 8'-0" CLEAR = 22'-0" ABOUT BEAM (TYP. EA. FLANGE) 2'-0" 4'-0" 2'-0" S (TOP & '-0" = 26'-0" 8 4 " (SYMMETRICAL ABOUT BEAM) BEAM 2" CL. A 0-4S2 4S (TYP.) 8" FLANGE STEM 8" FLANGE STEM ½" CHAMFER (TYP.) 5S (TYP.) BEAM ELEVATION 2" CL. 2" CL. 2 - ½" DIA. STRANDS (EACH STEM) (SEE NOTE 8) A '-6" STEM SIDE MOUNTED RAILING (SEE INDEX 86 SCHEME 3 [SIDE MOUNTED] FOR DETAILS & DETAIL B BELOW) (TYP.) 8 2" (TYP.) '-6" (TYP.) STEM 2" RADIUS (TYP.) 6 TYPICAL SECTION 3" (TYP.) ½" CONTINUOUS V-GROOVE (TYP. EACH SIDE) ¾" CHAMFER (TYP., U.N.O.) STEM 8'-0" 3" 0" = 7'-6" (TOP & BOTTOM) 3" 8" STEM 4S 2" CL. STEM STRAND DEBONDING LEGEND - FULLY BONDED STRANDS " " 4 2" ANCHOR 2" CL. ½" DIA. STRAND (TYP.) 3 BOLT (TYP.) 5S 4 2" 5S 4 2" STRAND DESCRIPTION: USE ½" DIAMETER, GRADE 270, LOW RELAXATION STRANDS STRESSED AT 3.0 KIPS EACH. AREA PER STRAND EQUALS 0.5 SQ. IN. STRAND PATTERN " " 3 " " 3 NOTES: SECTION A-A. PRESTRESSED CONCRETE BEAM SHALL HAVE AN INITIAL CONCRETE STRENGTH AT RELEASE, f'ci, OF 5000 PSI AND A 28-DAY STRENGTH, f'c, OF 6500 PSI. 2. PRESTRESSED BEAM COVER SHALL BE 2" UNLESS NOTED OTHERWISE. '-0" MIN. EMBEDMENT " 2" 8" TOP SURFACE OF PRESTRESSED BEAM SHALL RECEIVE A TOP SURFACE TREATMENT IN ACCORDANCE WITH FDOT SPECIFICATION BARS 4S AND 4S2 SHALL BE TYPE AS PER INDEX BAR 5S SHALL BE TYPE 6 AS PER INDEX 2300 WITH B = '-8", C = 6", D = 5" & E = 6". BARS LOCATED IN PRESTRESSED BEAM ARE NOT TABULATED IN THE REINFORCING ANCHOR BOLT 8" ¾" STEEL PLATE STEEL LIST. THE COST OF THE BARS LOCATED IN THE PRESTRESSED BEAM SHALL BE CONSIDERED INCIDENTAL TO THE COST OF THE PRESTRESSED BEAM. IN LIEU OF CORE DRILLING HOLES FOR PLACEMENT OF THE ANCHOR BOLTS, THE CONCRETE PRECASTER MAY PLACE THE ANCHOR BOLT DURING FABRICATION OF THE PRESTRESSED BEAM. STEEL SPACER PLATE SHALL BE IN ACCORDANCE WITH ASTM A36 AND SHALL BE HOT-DIP GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH SECTION 962 OF THE FDOT SPECIFICATIONS. ¾" x 8" x " STEEL SPACER PLATE ƃ" THICK RESILIENT OR NEOPRENE PAD (8" x ") 2 - ¾" DIAMETER x '-3" HEADLESS ANCHOR BOLTS (SEE NOTE 5) Ǝ" DIAMETER HOLE THE MATERIAL AND LABOR REQUIRED FOR PLACEMENT OF THE STEEL SPACER PLATE SHALL BE INCLUDED IN THE COST OF THE ALUMINUM PEDESTRIAN RAILING. "STRAND CUTTING AND PROTECTING DETAIL" SHOWN IN INDEX 2000 SHALL BE UTILIZED. PRESTRESSED BEAMS SHALL BE STORED, TRANSPORTED AND HANDLED IN AN UPRIGHT POSITION. UNLESS OTHERWISE APPROVED BY THE ENGINEER, THE BEAMS SHALL BE SUPPORTED DURING STORAGE AND TRANSPORT NO CLOSER THAN DETAIL B STEEL SPACER PLATE DETAIL 6 INCHES TO THE END NOR FURTHER THAN 8 INCHES FROM THE END AND THE BEAMS SHALL BE PICKED UP FROM POINTS LOCATED BETWEEN 2 FEET AND 3 FEET FROM THE ENDS. DESCRIPTION DATEREV. BY DRAWN CHECKED DMH DMH CS OFFICE OF ENGINEERING AND TECHNICAL SUPPORT 4 S. FT. HARRISON AVE., CLEARWATER, FL PROJECT: DESCRIPTION: APPROVED BY: DATE: H.W. LOCHNER, INC. 7/9/ W. CYPRESS ST, U.S. COAST GUARD PROJECT NO. SUITE 800 SUPERSTRUCTURE DETAILS 00743A TAMPA, FLORIDA SIDEWALK Douglas M. Hershey, P.E. DATE SHEET: CERT. OF AUTH. #894 FLA. LIC. NO B-5

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA AREHNA PROJECT NO. B-15-008 March 11, 2015 Prepared For: City of Tampa Stormwater Division 306 W. Jackson Street, 6N Tampa, Florida

More information

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1

April 7, Webster Street Sub-Surface Stormwater Storage System Bid No Bid Date: 4/13/17 ADDENDUM NO 1 PUBLIC WORKS DEPARTMENT David A. Jones, P.E., Director April 7, 2017 Webster Street Sub-Surface Stormwater Storage System Bid No. 2017-022 Bid Date: 4/13/17 ADDENDUM NO 1 Please make the following changes

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Nassau Reclaimed Water Main From Radio Avenue to Harts Road Nassau County, Florida CSI Geo Project No.: 71-17-329-04 Client Project No.: JEA 09302-049-01

More information

Geotechnical Engineering Report

Geotechnical Engineering Report BIG CYPRESS SEMINOLE INDIAN RESERVATION WATER TREATMENT FACILITY October 29, 2015 Terracon Project No. HD155065 Prepared for: REISS ENGINEERING, INC. 1016 Spring Villas Pt. Winter Springs, FL 32708 Prepared

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois

Subsurface Investigation Report. Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois AGI Project No. -11 Subsurface Investigation Report For the Proposed New 1-Story Building 6447 Grand Avenue Gurnee, Illinois Prepared for Mr. Steve Panko Key Development Partners, LLC North State Street,

More information

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA 14-3001 - Construct Bin Wall at HERD Eglin AFB, Florida MTEC Project Number 2014-101 November 10, 2014 Revised: January 5, 2015 Prepared For: Peterson Engineering,

More information

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION PROPOSED OUTFALL LOCATION CITY OF MORGAN S POINT DRAINAGE HARRIS COUNTY, TEXAS REPORT NO. 1140198001 Reported to: SIRRUS ENGINEERS, INC. Houston, Texas Submitted by: GEOTEST

More information

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY

REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY REPORT OF GEOTECHNICAL EXPLORATION BYFORGE ENGINEERING FOR REFERENCE ONLY HERITAGE BAY MASTER PUMP STATION ISSUED FOR BID REPORT OF GEOTECHNICAL EXPLORATION PROPOSED INLINE WASTEWATER BOOSTER STATION Collier

More information

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS

REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS FIGURE 3 Geotechnical Report (2) REPORT OF GEOTECHNICAL EXPLORATION AND ENGINEERING ANALYSIS RIVER TOWER RESTORATION RIVER TOWER PARK TAMPA, FLORIDA AREHNA PROJECT NO. B-13-002 February 22, 2013 Prepared

More information

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA PRELIMINARY GEOTECHNICAL STUDY ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA November 9, 2015 Prepared For: Ms. Diane H. Crews, A.A.E. Sanford Airport Authority 1200 Red Cleveland

More information

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink.

Please include this addendum in your Bid proposal for the above referenced project. Questions are in black ink, and the answers are in red ink. JAHarchitects, LLC PROJECT NO. 393 RIVERCREST CDD 11560 RAMBLE CREEK DRIVE, RIVERVIEW FL ADDENDUM TO BID PROJECT: RIVERCREST CDD MULTI PURPOSE FIELD MAINTENANCE BUILDING & DOG PARK POOL & CABANNA JAH PROJECT

More information

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description

This report presents the findings of the subsurface exploration concerning the design of the taxiway rehabilitation. Description September 22, 2016 American Infrastructure Development, Inc. 3810 Northdale Boulevard, Suite 170 Tampa, Florida 33624 Attn: Mr. Mohsen Mohammadi, Ph.D., P.E. Senior Consultant Mob: (813) 244-6609 E-mail:

More information

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois

Applied GeoScience, Inc Hammond Dr., Suite 6 Schaumburg, Illinois AGI Project No. 13-276 Subsurface Investigation Report For the Proposed New Retail Center 9601 South Pulaski Road Evergreen Park, Illinois Prepared for Mr. Feras Sweis FHS Design + Build LLC 2010 West

More information

DRAFT Geotechnical Technical Memorandum

DRAFT Geotechnical Technical Memorandum DRAFT Geotechnical Technical Memorandum US 19 (SR 55) Reevaluation from 66 th Avenue North to SR 690/118 th Avenue North Work Program Item Segment No. 435914-1 Project Development and Environment Study

More information

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No.

PROPOSED CONDOS 1129 Victoria Drive, Dunedin Parcel: , Pinellas County Geotechnical Services June Report No. Central Florida Testing Laboratories, Inc. Testing, Development and Research 12625-40th Street North Clearwater, Florida 33762 ENGINEERING BUSINESS NO. 1066 GEOLOGY BUSINESS NO. 224 TAMPA BAY AREA (727)

More information

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E

GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO E GEOTECHNICAL STUDY PROPOSED CONCRETE ROADWAY TIKI ISLAND COMMUNITY GALVESTON COUNTY, TEXAS PROJECT NO. 15-945E TO VILLAGE OF TIKI ISLAND TIKI ISLAND, TEXAS BY SERVICING TEXAS, LOUISIANA, NEW MEXICO, OKLAHOMA

More information

Lantz-Boggio Architects, P.C LBA Project No

Lantz-Boggio Architects, P.C LBA Project No SECTION 313430- PART 1 GENERAL 1.1 WORK INCLUDED A. Provide all equipment, material, labor and supervision to design and install Engineered Aggregate Piers for the soil reinforcement. Design shall rely

More information

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) PART 1 GENERAL 1.01 WORK INCLUDED SECTION 02360 / 31 34 30.13 ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM) A. Provide all equipment, material, labor and supervision to design and

More information

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784

REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO CLIENT ID: 4784 REPORT OF GEOTECHNICAL EXPLORATION PEPSI PLACE WATER MAIN REPLACEMENT JACKSONVILLE, FLORIDA E&A PROJECT NO. 35-55 CLIENT ID: 78 Prepared for: Construction & Engineering Services Consultants, Inc. 93 Baymeadows

More information

Civil Geotechnical Surveying

Civil Geotechnical Surveying Civil Geotechnical Surveying Mr. David Burnett Cabarrus County Schools 4425 Old Airport Road Charlotte, North Carolina 28025 May 16, 2017 Reference: Geotechnical Engineering Evaluation Future PLC Site

More information

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants

Ardaman & Associates, Inc. Geotechnical, Environmental and Materials Consultants SUBSURFACE SOIL EXPLORATION ANALYSIS AND RECOMMENDATIONS PROPOSED WEIRS AT STATIONS 130+00 AND 16+00 DRAINAGE IMPROVEMENTS TO THE FOUR CORNERS MSBU HENDRY COUNTY, FLORIDA Ardaman & Associates, Inc. Geotechnical,

More information

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC

May 2, Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC Washington Street Raleigh, NC Mr. Tim Kurmaskie, AIA ARCHITECT KURMASKIE ASSOCIATES, INC. 1030 Washington Street Raleigh, NC 27605-1258 May 2, 2017 Re: Report of Subsurface Investigation Westfield Rehabilitation & Health Care Additions

More information

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA

PROPOSED SEGMENTAL RETAINING WALLS ARGONAUT RETAIL VILLAGE - PHASE I PENSACOLA, FLORIDA CERTIFICATE AUTHORIZATION: 2 24 ANCHOR WALL ENGINEERING, LLC MATERIAL NOTES. Concrete Retaining Wall Units: "Anchor Diamond Pro Retaining Wall Units" as manufactured by Block USA under license from Anchor

More information

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133

CONDUCTED FOR: PREPARED FOR: 18 October 2010 YPC Project No. 10GY133 GEOTECHNICAL EXPLORATION AND ENGINEERING SERVICES REPORT CONDUCTED FOR: Immokalee Stormwater Master Plan Implementation Immokalee, Collier County, Florida PREPARED FOR: Mr. Marc Stonehouse, P. E. Project

More information

SECTION SOILS REPORT

SECTION SOILS REPORT SECTION 02300 SOILS REPORT 1. GENERAL: 1.1 All work included under this heading shall be subject to the General Conditions of the entire operation. This Contractor is required to refer especially thereto.

More information

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction

More information

Typical Subsurface Profile. November 28, 2016

Typical Subsurface Profile. November 28, 2016 November 28, 2016 RSCCD Facility Planning, District Construction and Support Services 2323 N. Broadway, Suite 112, Santa Ana, CA 92706 Attn: Re: Ms. Allison Coburn Facilities Project Manager P: (714) 480-7530

More information

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464

SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 SUBSURFACE INVESTIGATION & GEOTECHNICAL RECOMMENDATIONS PROPOSED MONOPOLE CELL TOWER INDIANAPOLIS, INDIANA A&W PROJECT NO: 15IN0464 PREPARED FOR: AAA DEVELOPMENT AND CONSULTING, INC GREENFIELD, INDIANA

More information

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5

TABLE OF CONTENTS. 5.0 LABORATORY TESTING Corrosion Series Testing Consolidation Testing... 5 TABLE OF CONTENTS 1.0 SITE AND PROJECT DESCRIPTION... 1 2.0 NRCS SOIL SURVEY... 1 3.0 USGS POTENTIOMETRIC MAP DATA... 2 4.0 SUBSURFACE EXPLORATION... 3 4.1 SPT Borings... 3 4.2 Groundwater Measurement...

More information

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS Highway 99 and Kelly Street TABLE OF CONTENTS PROJECT INFORMATION... 1 FIELD EXPLORATION... 1 SITE CONDITIONS... 2 Surface Conditions:... 2 Subsurface Conditions:... 2 FILL.... 2 Topsoil.... 2 Clay Alluvium....

More information

SECTION FILL AND BACKFILL

SECTION FILL AND BACKFILL PART 1 GENERAL 1.1 SECTION INCLUDES A. Filling, backfilling, and compacting for building volume below grade, footings, slabs-on-grade, paving, site structures, and utilities within the building. B. Backfilling

More information

Report of Exploratory Test Pits

Report of Exploratory Test Pits Report of Exploratory Test Pits UNF Transportation Projects Stockpile Investigation Osprey Ridge Road Extension Jacksonville, Florida CSI Geo Project No.: 71-17-135-20 Arcadis Project No.: JK017002.0001

More information

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E.

DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET. Revised Soil Survey Report November 24, 2015 Matthew G. Moore, P.E. LD-0 /12/09 DEPARTMENT OF TRANSPORTATION DIVISION: MATERIALS REPORT COVER SHEET Revised Soil Survey Report November 2, 201 Matthew G. Moore, P.E. VDOT (Division) or Company Name Insert Location, Virginia

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Geotechnical Exploration Report Minto Westlake Retail & Sales Center 00 Seminole Pratt Whitney Road, Loxahatchee, Florida September 1, 01 GFA Project

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular

More information

Geotechnical Exploration and Evaluation Report

Geotechnical Exploration and Evaluation Report Geotechnical Exploration and Evaluation Report Pavement Coring and Evaluation UNF Parking Lot 3 Jacksonville, Florida CSI Geo Project No.: 71-18-135-23 Prepared by CSI Geo, Inc. 2394 St. Johns Bluff Road

More information

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light

100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light 100% Report of Geotechnical Engineering Investigation CENTRAL FLORIDA COMMUTER RAIL TRANSIT SUNRAIL PHASE 2 SOUTH Poinciana Vehicle Storage & Light Maintenance Facility (VSLMF) Osceola County, Florida

More information

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912

April 21, Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 April 21, 2016 Odom Investments, Inc. Attn: Mr. Jerry Odom 7100 Westwind Dr., Suite 230 El Paso, TX 79912 Re: GEOTECHNICAL ENGINEERING REPORT Proposed San Elizario Retail Center Socorro Road & Chicken

More information

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199

REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO A CLIENT ID: 0199 REPORT OF GEOTECHNICAL EXPLORATION KINLOCK FM REPLACEMENT NEW MANHOLE STRUCTURE JACKSONVILLE, FLORIDA ECS PROJECT NO. 3-6187-A CLIENT ID: 0199 Prepared for: JEA 1 West Church Street Jacksonville, Florida

More information

Civil and Structural Engineering CONSTRUCTION OF BRIDGE STRUCTURES SHALL BE IN ACCORDANCE WITH THE FOLLOWING SPECIFICATIONS, LISTED IN ORDER OF PRECEDENCE: 1. CDOT STANDARD SPECIFICATIONS FOR ROAD AND

More information

SECTION 500 STRUCTURES

SECTION 500 STRUCTURES SECTION 500 STRUCTURES 500.1 GENERAL This section defines the various construction items that are associated with the completion of a concrete, steel, timber, or masonry unit structures, or a combination

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 11 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 11 Jacksonville, Florida MAE Project No. 0019-0008 January 13, 2017 Prepared for: GAI Consultants 1301 Riverplace Boulevard,

More information

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE

LETTER OF TRANSMITTAL AS REQUESTED FOR REVIEW AND COMMENT FOR APPROVAL PLEASE RECYCLE 199 Highland Vista Dr., Suite 170 (703) 726-8030 www.geoconcepts-eng.com TO: LETTER OF TRANSMITTAL Mr. Rob McGinnis FASLA FROM: Rebecca L. Smith-Zakowicz, CPG 108 Second Street, SW, Unit #36 Charlottesville,

More information

October 11, 2011 Re-Issued November 15, 2011

October 11, 2011 Re-Issued November 15, 2011 Shadow Wood Investors LLC 425 W New England Avenue, Suite 425 Winter Park, FL 32789 October 11, 2011 Re-Issued November 15, 2011 LOCATIONS: Atlanta Daytona Beach Fort Myers Fort Pierce Gainesville Jacksonville

More information

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations. Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet

More information

TIERRA TIERRA, INC. November 19, TPA Group LLC 3350 Riverwood Parkway, Suite 750 Atlanta, Georgia 30339

TIERRA TIERRA, INC. November 19, TPA Group LLC 3350 Riverwood Parkway, Suite 750 Atlanta, Georgia 30339 ovember 9, TIERRA TPA Group LLC Riverwood Parkway, Suite 7 Atlanta, Georgia 9 Attn: Mr. Paul Michael Mr. Charlie Otero (Otero Engineering) RE: Report of Geotechnical Engineering Services orthpointe Mass

More information

File No Supplemental November Geotechnical and Environmental Consulting Engineers

File No Supplemental November Geotechnical and Environmental Consulting Engineers Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction

More information

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE

GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE GFA INTERNATIONAL FLORIDA S LEADING ENGINEERING SOURCE Report of Geotechnical Exploration Addie s Corner Entry Bridge and Lake Areas 8799 Immokalee Road Naples, Collier County, Florida October 26, 2016

More information

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT

Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Report of Geotechnical Exploration PROPOSED SANITARY SEWER AND FORCE MAIN REPLACEMENT Collier County Project Number 70043.14.1 Vanderbilt Drive and Finger Streets From Vanderbilt Beach Road to 111th Avenue

More information

SECTION EXCAVATION AND FILL

SECTION EXCAVATION AND FILL SECTION 02315 EXCAVATION AND FILL PART 1 GENERAL 1.01 SUMMARY A. Furnish labor, materials, equipment, and incidentals necessary to perform excavation, backfill, grading, and slope protection required to

More information

SECTION TRENCHING

SECTION TRENCHING SECTION 31 23 17 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating trenches for utilities and utility structures. 2. Bedding. 3. Backfilling and compacting to subgrade elevations.

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB#

ADDENDUM NO. 1. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: Wakulla Co ITB# ADDENDUM NO. 1 DATE: January 22, 214 TO: Prospective Bidders via individual e-mails FROM: Alan Wise, P.E. PROJECT NAME: Bostic Pelt Road NRCS Drainage Improvements PRI PROJECT NO: 23.15 ---- Wakulla Co

More information

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH

SECTION SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH DIVISION 32 EXTERIOR IMPROVEMENTS SECTION 32 32 23.13 SEGMENTAL CONCRETE UNIT MASONRY RETAINING WALL MAXIMUM HEIGHT OF 5-0 HIGH PART 1: GENERAL 1.01 Scope of Standards A. This standard provides general

More information

REPORT OF GEOTECHNICAL CONSULTING SERVICES

REPORT OF GEOTECHNICAL CONSULTING SERVICES REPORT OF GEOTECHNICAL CONSULTING SERVICES Escambia County Public Works Department Thompson, Crary and McNeal Roadway Project Escambia County, Century,FL Thompson Engineering Project No.: 15-1101-0297

More information

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill. SECTION 312000- EARTHWORK PART 1 - GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the Contract, including General and Special Conditions, apply to this Section. 1.2 SUMMARY This Section

More information

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL

Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD 6 inch Reclaimed Water Main Jacksonville, FL Report of Geotechnical Exploration For Baymeadows Road/Old Still PUD inch Reclaimed Water Main Jacksonville, FL MAE Project No. 0 000 June, 0 Prepared for: CPH, Inc. 00 Belfort Road, Suite 0 Jacksonville,

More information

Geotechnical Investigation Report

Geotechnical Investigation Report MC Squared, Inc. Geotechnical Investigation Report City of St. Petersburg Forcemain Pinellas County, Florida Prepared for: Hazen and Sawyer 10002. Princess Palm Ave., Suite 200 Tampa, Florida 33610 Prepared

More information

August 15, 2006 (Revised) July 3, 2006 Project No A

August 15, 2006 (Revised) July 3, 2006 Project No A August 15, 2006 (Revised) July 3, 2006 Project No. 01-05-0854-101A Mr. David Reed, P.E. Protean Design Group 100 East Pine Street, Suite 306 Orlando, Florida 32801 Preliminary Soil Survey Report Polk Parkway

More information

DIVISION 4100 SITEWORK

DIVISION 4100 SITEWORK DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES

More information

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL

SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL SECTION XXXXX AGGREGATE PIERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 00 and Division

More information

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the

More information

SECTION UTILITY BACKFILL MATERIALS

SECTION UTILITY BACKFILL MATERIALS SECTION 31 23 23 UTILITY BACKFILL MATERIALS PART 1: GENERAL 1.01 SECTION INCLUDES A. Material Classifications B. : 1. Concrete sand 2. Gem sand 3. Pea gravel 4. Crushed stone 5. Crushed concrete 6. Bank

More information

GEOTECHNICAL INVESTIGATION

GEOTECHNICAL INVESTIGATION GEOTECHNICAL INVESTIGATION SHEETZ CONVENIENCE STORE FREEPORT ROAD AND CALIFORNIA AVENUE NATRONA HEIGHTS, PENNSYLVANIA Prepared For: Mr. David J. Mastrostefano, P.E. Sheetz Incorporated 817 Brookfield Drive

More information

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION 31 23 00 EXCAVATION AND BACKFILL, GENERAL PART 1 GENERAL... 2 1.1 Description... 2 1.2 Submittals... 2 1.3 Reference

More information

MagnumStone Specifications Gravity

MagnumStone Specifications Gravity MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of

More information

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146

CONDUCTED FOR: PREPARED FOR: 5 May 2016 YPC Project No. 16GY146 GEOTECHNICAL EXPLORATION SERVICES REPORT CONDUCTED FOR: Collier Boulevard PREPARED FOR: Mr. Christopher L. Johnson Director of Land Development Stock Development, LLC Professional Circle, Suite 01 Naples,

More information

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO

REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO REPORT OF GEOTECHNICAL EXPLORATION GLYNN COUNTY DETENTION CENTER GLYNN COUNTY, GEORGIA E&A PROJECT NO. - Prepared for: IPG Architects, Inc. Northwood Park Drive Valdosta, Georgia Prepared by: Ellis & Associates,

More information

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Report of Geotechnical Exploration For St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St. Johns County, FL MAE Project No. 0106-0005 June 14, 2017 Prepared for: CPH, Inc.

More information

Geotechnical Engineering Report

Geotechnical Engineering Report Geotechnical Engineering Report Coquina Beach Drainage Improvements Bradenton Beach, Florida July 16, 2018 Dunkelberger Project No. HC1032 Prepared for: Manatee County Construction Services Division Bradenton,

More information

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES

ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES AFTER MARCH 1, 2012 ITEM 430 CONSTRUCTION OF UNDERGROUND UTILITIES 430.1 Description. This item shall govern for all excavation required for the construction of sewers, sewer structures, pipe culverts,

More information

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida

For. Report of Geotechnical Exploration. University of North Florida Parking Lot 47 Jacksonville, Florida Report of Geotechnical Exploration For University of North Florida Parking Lot 47 Jacksonville, Florida MAE Project No. 0019-0009 April 5, 2017 Revised: April 6, 2017 Prepared for: Prepared by: Jacksonville,

More information

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS. SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract

More information

ADDENDUM NO. 1. Clarification/Question/Answer/Updated Plan Sheets

ADDENDUM NO. 1. Clarification/Question/Answer/Updated Plan Sheets ADDENDUM NO. 1 DATE: July 20, 2016 INVITATION FOR BID: IFB K160021767 Bellemeade Park Pedestrian Trails and Bridge Project (UPC 107531) DATED: June 28, 2016 RECEIPT DATE: July 28, 2016 @ 2:30 P.M. OPENING

More information

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5

PROJECT INFORMATION... 1 SITE AND SUBSURFACE CONDITIONS... 2 EVALUATION AND RECOMMENDATIONS... 4 CONSTRUCTION CONSIDERATIONS... 5 TABLE OF CONTENTS Page No. PROJECT INFORMATION... 1 Project Authorization... 1 Project Description... 1 Purpose and Scope of Services... 1 SITE AND SUBSURFACE CONDITIONS... 2 Site Location and Description...

More information

TABLE OF CONTENTS 1.0 INTRODUCTION SCOPE OF WORK SUBSURFACE EXPLORATION Sampling Techniques Sample Disposal...

TABLE OF CONTENTS 1.0 INTRODUCTION SCOPE OF WORK SUBSURFACE EXPLORATION Sampling Techniques Sample Disposal... TABLE OF CONTENTS Page No 1.0 INTRODUCTION... 1 2.0 SCOPE OF WORK... 1 3.0 SUBSURFACE EXPLORATION... 2 3.1 Sampling Techniques... 2 3.2 Sample Disposal... 2 4.0 LABORATORY TESTING... 3 5.0 SUBSURFACE STRATIGRAPHY...

More information

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS

Draft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.

More information

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM Anchor Vertica SECTION 02832 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Retaining wall system constructed of concrete segmental retaining wall units. B. Geosynthetic

More information

Preliminary Soil Survey Report

Preliminary Soil Survey Report Florida Department of TRANSPORTATION Preliminary Soil Survey Report Malabar Road (SR 514) PD&E Study From East of Babcock Street (SR 507) to US 1 Brevard County, Florida FPID: 430136 1 22 01 ETDM: 13026

More information

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards... SECTION 02210 - SITE GRADING CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement and Payment...

More information

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION UNCLASSIFIED EXCAVATION AND GRADING SECTION 02210 UNCLASSIFIED EXCAVATION AND GRADING PART 1 GENERAL 1.1 DESCRIPTION Work in this section includes the excavation, undercut excavating, grading, earthwork and compaction required as shown on

More information

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by

WILLMER ENGINEERING INC. Willmer Project No Prepared for. Clark Patterson Lee Suwanee, Georgia. Prepared by SOIL SURVEY REPORT (Revised March 6, 2013) New Hospital Connector Road GDOT Project No. CSSTP-0006-00(276), PI No. 0006276 Duluth, Gwinnett County, Georgia WILLMER ENGINEERING INC. Willmer Project No.

More information

Appendix A - Vicinity Map Vicinity Map: Palm Beach Gardens City Hall Additions, 000 N Military Trail, Palm Beach Gardens, FL Proposed Location of Police Dept. Attached Addition Proposed Location of New

More information

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER CHAPTER 3 Site Preparation In preparation for constructing buildings on a property, the builder must consider a number of factors related to code requirements. The buildings must be located according to

More information

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager

May 1, THE CORRADINO GROUP 4055 N.W. 97 th Avenue Miami, Florida Mr. Carlos E. Verson, P.E. Project Manager May 1, 213 THE CORRADINO GROUP 455 N.W. 97 th Avenue Miami, Florida 33178 Attention: Mr. Carlos E. Verson, P.E. Project Manager Re: Report of Geotechnical Engineering Services - Roadway Soil Survey Bird

More information

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No.

Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W340) AID Project No. GOA16001 Orange County, Florida GEC Project No. Report of Geotechnical Engineering Investigation OIA SOUTH CELL LOT (W40) AID Project No. GOA16001 Orange County, Florida GEC Project No. 956G July 6, 2017 American Infrastructure Development, Inc. 7 North

More information

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES SECTION 2831 ITEM F-162 CHAIN-LINK FENCES PART 1 - GENERAL 1.1 DESCRIPTION. This item shall consist of furnishing and erecting a chain-link fence in accordance with these specifications and the details

More information

T-WALL Retaining Wall System

T-WALL Retaining Wall System CONSTRUCTION MANUAL T-WALL Retaining Wall System The T-WALL Solution... THE NEEL COMPANY 8328 Traford Lane Springfield, VA 22152 Phone 703-913-7858 Fax 703-913-7859 T-WALL Retaining Wall System CONSTRUCTION

More information

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO

GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO GEOTECHNICAL INVESTIGATION MDACC GUHN ROAD FLOOD MITIGATION PROJECT 5610 GUHN ROAD HOUSTON, TEXAS REPORT NO. 1140189301 Reported to: URS CORPORATION Houston, Texas Reported by: GEOTEST ENGINEERING, INC.

More information

Geotechnical Investigation Report

Geotechnical Investigation Report Geotechnical Investigation Report Proposed,000-Gallon Water Storage Tank Fagasa Pass Tank Upper Pago Pago, American Samoa Prepared for: ASPA Water Engineering Division Tafuna, American Samoa PO Box PPB

More information

CHAPTER 11: WALLS.

CHAPTER 11: WALLS. CHAPTER 11: WALLS MODULAR BLOCK WALL (DRY CAST) Rather than being pre-approved as systems, the components of Modular block walls (dry cast) are pre-approved separately. The approved MBW components are

More information

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017

1.0 PROJECT INFORMATION. 1.1 Site Location and Description. October 31, 2017 October 31, 2017 City of Oelwein c/o Fox Engineering 414 South 17 th Street, Suite 107 Ames, IA 50010 Attn: Re: Ms. Jessica M.B. Fisher, P.E. Project Manager P: (515) 233-0000 E: jmf@foxeng.com Proposal

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18) Page 1 of 8 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA

PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTERSTATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA PAVEMENT DESIGN SUMMARY TANGERINE ROAD CORRIDOR PROJECT INTETATE 10 TO LA CANADA DRIVE PIMA COUNTY, ARIZONA Terracon Project No. 3105079, Revision 3 1.0 INTRODUCTION This report presents the results of

More information

March 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625

March 28, Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625 11917 NE 95 th Street, Vancouver, Washington 98682 Phone: 360-823-2900, Fax: 360-823-2901 March 28, 2014 Port of Kalama Mr. Jacobo Salan 380 West Marine Drive Kalama, Washington 98625 Re: Construction

More information

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL

Sepetember 27, Florida Department of Environmental Protection Attn: Dawn Templin 160 Governmental Center Pensacola, FL Bay County Solid Waste 11411 Landfill Rd. Panama City Beach, Florida 32413 Telephone: (850) 236-2212 Fax: (850) 233-5053 Board of County Commissioners www.baycountyfl.gov Sepetember 27, 2018 Florida Department

More information

GEOTECHNICAL ENGINEERING REPORT

GEOTECHNICAL ENGINEERING REPORT GEOTECHNICAL ENGINEERING REPORT GRAND AVENUE PEDESTRIAN BRIDGE RELOCATION ROARING FORK RIVER GLENWOOD SPRINGS, COLORADO April 18, 2016 Prepared By: Prepared For: Mr. Bob Pattillo, P.E. Pattillo Associates

More information

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels

More information

PERMEABLE INTERLOCKING PAVERS

PERMEABLE INTERLOCKING PAVERS PERMEABLE INTERLOCKING PAVERS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subgrade Preparation B. Placement of Storage Aggregate C. Placement of Filter Aggregate D. Placement of Bedding Course E. Placement

More information