University of Central Florida Main Campus. Chilled Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.

Size: px
Start display at page:

Download "University of Central Florida Main Campus. Chilled Water. Service and Meter Installations Requirements. Issued January 26 th, 2017."

Transcription

1 University of Central Florida Main Campus Chilled Water Service and Meter Installations Requirements Issued January 26 th, P a g e

2 Table of Contents 1. GENERAL INFORMATION DEFINITIONS TYPICAL REQUIREMENTS METER LOCATION PLAN REVIEW AND COORDINATION WITH UCF UES... 4 CHW - FIGURE 00: GENERAL NOTES RELATED TO CHILLED WATER SERVICE & METERING CHW FIGURE 01: CHILLED WATER METERING RESPONSIBILITY TABLE & SELECTION MATRIX CHW FIGURE 02: STANDARD ROADWAY OPEN CUT DETAIL CHW FIGURE 03: LOCATING WIRE TERMINAL CHW FIGURE 04: VALVE & VALVE BOX DETAIL CHW FIGURE 05A: BTU METER INSTALLATION FOR NON-CONDUCTIVE PIPE CHW FIGURE 05B: BTU METER INSTALLATION FOR CONDUCTIVE PIPE CHW FIGURE 06: CHILLED WATER REMOTE PRESSURE AND SAMPLING POINT CHW FIGURE 07: CHILLED WATER WET TAP CHW FIGURE 8: 3" AND LARGER MAKE-UP WATER METER 2 P a g e

3 1. GENERAL INFORMATION 1.1. UCF s Utilities and Energy Services (UES) maintain the campus CHW production and distribution system. These UCF Construction Standards are intended to identify any items that UCF UES finds particularly important in maintaining a consistent and reliable system. These requirements should be integrated into the project using the designer s best professional, while still meeting all Code requirements Chilled water metering (BTU and flow meter) is used to calculate utility billing, savings, demand profiling, and performance monitoring for each building s CHW service entrance(s). Essential to these functions are an accurate, properly selected and installed metering systems. While UCF UES will select and provide the meter, it is the designer and contractor s responsibility to install and integrate the components This information is not related to any CHW systems or sub-metering within a building If a chilled water service or application does not or cannot reflect the information in these standards, please contact UCF Utilities & Energy Services directly for specific requirements For ease of use, this section of the construction standards provides multiple 8.5 x11 details or Figures. These details are used to convey critical information to the designer, track the designers progress and verify the contractor s installation. These details or Figures are provided in the table below and are intended to be incorporated into the construction documents, by the designer, as applicable, after confirming they meet all current Code and design intent requirements. ALL Projects As Applicable CHW - Figure 00, 01, 05A OR 05B CHW - Figure 02, 03, 04, 06, 07, DEFINITIONS 2.1. Placeholder for future use. 3. TYPICAL REQUIREMENTS 3.1. Please refer to the Chilled Water Metering Responsibility Table in the attached Figures. The table identifies the parties responsible for designing, providing, installing, terminating and verifying the metering equipment All chilled water metering systems installed at the university, main or branch campuses, must adhere to this Standard. The university does not accept substitutes for Chilled Water metering as Onicon is the university standard. (Div 33 UCF) 3.3. All buildings, new or renovated, that are supplied with chilled water shall be metered per these standards. (Div 33 UCF) 4. METER LOCATION 4.1. Placeholder for future use. 3 P a g e

4 5. PLAN REVIEW AND COORDINATION WITH UCF UES 5.1. Coordination of chilled water service and metering requirements with UCF UES is important for the success of the project At the 50% Construction Document Phase the following shall be shown on plans and reviewed with UCF UES: Proposed routing of CHW service from campus distribution loop to the building Proposed location of meter Proposed metering configuration Proposed heat rejection into the CHW system, CHW supply temperature, CHW return temperature and volume Designer shall submit all included Figures identified by UCF for the service type. Designer shall identify any aspects of the Figure that cannot or will not be provided All requested Figures shall be submitted to UCF UES, through UCF s project manager At the 100% Construction Document Phase the following shall be shown on plans and reviewed with UCF UES: Final routing of CHW service from campus distribution loop to the building Final location of BTU and flow meter(s), including horizontal and vertical clearances Final heat rejection into the CHW system, CHW supply temperature, CHW return temperature and volume Proposed point of connection and integration of the BTU meter to the building level and campus level DDC system Proposed source of power for BTU and flow meter. This includes the panel name, circuit number, circuit breaker size and location of electrical panel on the floor plans Designer shall submit all included Figures identified by UCF for the service type. Designer shall identify any aspects of the Figure that cannot or will not be provided All requested Figures shall be submitted to UCF UES, through UCF s project manager. 4 P a g e

5

6

7

8

9

10

11

12

13

14

University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.

University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017. University of Central Florida Main Campus Domestic Water Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS...

More information

SECTION FIELD PANELS

SECTION FIELD PANELS Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.

More information

Unit Substation Transformer Construction Checklist (under 500 kva)

Unit Substation Transformer Construction Checklist (under 500 kva) Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

UES INFO UTL 001. Rev 6-6/26/2018. Rate Information Page 1 of 15

UES INFO UTL 001. Rev 6-6/26/2018. Rate Information Page 1 of 15 Rate Information Page 1 of 15 Rate Information Utility services at the University of Central Florida are accounted for as an auxiliary operation. The Department of Utilities and Energy Services (UES) receives

More information

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)

SECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only) SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will

More information

STATE UNIVERSITY CONSTRUCTION FUND

STATE UNIVERSITY CONSTRUCTION FUND DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents

More information

APPLICABILITY/ACCOUNTABILITY

APPLICABILITY/ACCOUNTABILITY SUBJECT: Effective Date: Policy Number: Utility Rate Methodology and Billing 1/17/2016 FSP 2016 UES0001 Supersedes: Page Of 1 5 Responsible Authority: Associate Vice President, Facilities & Safety APPLICABILITY/ACCOUNTABILITY

More information

BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS

BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS Revised May 2014 BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS All backflow prevention assembly installation shall be in accordance with the following Standards unless otherwise directed or approved

More information

Low Voltage Switchgear Construction Checklist (under 500 kva)

Low Voltage Switchgear Construction Checklist (under 500 kva) Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.

More information

PIP PCEPA003 Process Analyzer System Field Installation Guidelines

PIP PCEPA003 Process Analyzer System Field Installation Guidelines January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,

More information

CHILLED WATER SUB-ELEMENT Goal 1 To provide heating water and chilled water to satisfy the building demands to support the mission of the University.

CHILLED WATER SUB-ELEMENT Goal 1 To provide heating water and chilled water to satisfy the building demands to support the mission of the University. ELEMENT 10 UTILITIES ELEMENT INCLUDING SUB-ELEMENTS: Chilled Water and Reheat Water Electrical Power and Other Fuels Telecommunications Systems UTILITIES ELEMENT CHILLED WATER SUB-ELEMENT Goal 1 To provide

More information

CHILLED WATER DISTRIBUTION SYSTEM

CHILLED WATER DISTRIBUTION SYSTEM Campus-Wide System: A campus-wide central chilled water system has been developed in recent years and is being expanded to serve additional cooling loads as need arises and opportunity affords. This system

More information

SECTION BASIC ELECTRICAL REQUIREMENTS

SECTION BASIC ELECTRICAL REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies

More information

Telecommunication Spaces

Telecommunication Spaces Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137

More information

Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools

Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools 1 Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools Version 1.0 May 28, 2008 Administrative All LEED-NC v2.2 or LEED for Schools projects that register with USGBC

More information

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.

A. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein. 16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to

More information

UNIVERSITY OF CENTRAL FLORIDA UTILITIES AND ENERGY SERVICES INFORMATION

UNIVERSITY OF CENTRAL FLORIDA UTILITIES AND ENERGY SERVICES INFORMATION Rev 5-11/14/2018 Rate Information Page 1 of 13 Rate Information Utility services at the University of Central Florida are accounted for as an auxiliary operation. The Department of Utilities and Energy

More information

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions

MECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. We were turned down for an underground installation of

More information

SDCS-02 CONSTRUCTION STANDARD FOR

SDCS-02 CONSTRUCTION STANDARD FOR CONSTRUCTION STANDARD FOR UNDER GROUND NETWORK This specification is property of SEC and subject to change or modification without any notice PART 3 Rev. 01 INSTALLATION OF RECESSED TYPE KWH METER BOXES

More information

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement CITY OF WACO RFB 18-022 Waco City Hall Chiller Replacement Purchasing Services Post Office Box 20 Waco, Texas 602-20 Phone: 2 / 0-80 Fax: 2 / 0-8063 kaseyg@wacotx.gov www.waco-texas.com Date: 3//18 RFP

More information

DESIGN & CONSTRUCTION GUIDELINES

DESIGN & CONSTRUCTION GUIDELINES DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550

More information

Guidelines for Design of Potable Water Distribution Facilities In New Developments

Guidelines for Design of Potable Water Distribution Facilities In New Developments Guidelines for Design of Potable Water Distribution Facilities In New Developments Prepared by: OUC Water Business Unit Water Resources and Engineering Division Latest Update: September 29, 2009 1. Development

More information

DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation

DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation This addendum is hereby made part of the Contract Documents

More information

SECTION BUSWAYS

SECTION BUSWAYS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and

More information

University of Delaware

University of Delaware SECTION 22 05 00_COMMON WORK FOR PLUMBING SYSTEM University Contact: Energy & Engineering Group (302) 831-1744 Part 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Start up 2. Factory Training 3. Quality

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:

More information

Standard of Practice - Campus Electrical Distribution System

Standard of Practice - Campus Electrical Distribution System A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all

More information

1 data PIC location (with 2 ports) typically asf for multiple staff members

1 data PIC location (with 2 ports) typically asf for multiple staff members 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

4 POINT INSPECTION REPORT

4 POINT INSPECTION REPORT 4 POINT INSPECTION REPORT ENTRY: SELLER / REALTOR / BUYER DAY: TIME: PICKUP KEY PERSON AT INSPECTION FULL INSPECTION $ TO: RE: INSUARNACE COMPANY: POLICY NUMBER : HOME INSPECTION SUBDIVISION / BLDG: SQUARE

More information

Communications Page 1 of 9

Communications Page 1 of 9 Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

A. Section includes busway and fittings including plug-in units.

A. Section includes busway and fittings including plug-in units. SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:

More information

Owner Project Requirements

Owner Project Requirements Owner Project Requirements How to get what you need From an Owner s Perspective Learning Objectives What is an OPR Case Study (CHC) Looking to the Future Closing Arguments Crafton Hills College 1 What

More information

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS 1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new

More information

Chilled Water Energy Savings Study

Chilled Water Energy Savings Study 1 Chilled Water Energy Savings Study Pressure Dependent Valve Sizing and Valve Authority Pressure Independent Valves (Mechanical and Electronic) Chilled Water System Design MIT Beta Site Study-Correcting

More information

LOCAL LAWS OF THE CITY OF NEW YORK FOR THE YEAR No. 100

LOCAL LAWS OF THE CITY OF NEW YORK FOR THE YEAR No. 100 LOCAL LAWS OF THE CITY OF NEW YORK FOR THE YEAR 2013 No. 100 Introduced by Council Members Oddo, Chin, Comrie, Dickens, Fidler, James, Koo, Lander, Mendez, Recchia, Richards and Rose. A LOCAL LAW To amend

More information

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6

PHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6 1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of

More information

Water cooled central plant (all-variable) Design Envelope application guide

Water cooled central plant (all-variable) Design Envelope application guide Water cooled central plant Design Envelope File No: 9.568 Date: november 14, 2014 Supersedes: 9.568 Date: september 19, 2014 design envelope s performance improvements are among the top priorities of many

More information

Retrocommissioning Investigation Report

Retrocommissioning Investigation Report Continuous Optimization for Commercial Buildings Program Retrocommissioning Investigation Report March 22, 2013 Prepared for: Thompson Rivers University International Building BC Hydro #:COP10-353 Prism

More information

16300 HIGH VOLTAGE DISTRIBUTION

16300 HIGH VOLTAGE DISTRIBUTION 16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served

More information

9.0 General Infrastructure Element

9.0 General Infrastructure Element 9.0 Element The purpose of this element is to ensure adequate provision of public facilities and services required to meet the future needs of the University, including the following: 1. Provision of adequate

More information

20 Add Hookups for Temporary Generators & Boilers

20 Add Hookups for Temporary Generators & Boilers NEW CODE 20 Add Hookups for Temporary Generators & Boilers I. Summary Issue: Buildings with extended service disruptions can use electricity and heat from temporary emergency generators and boilers. It

More information

UNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014

UNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014 UNITED COOPERATIVE SERVICES SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014 A member may obtain a new, single phase service from the Cooperative by providing or purchasing a meter loop.

More information

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:

1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,

More information

SECTION CHEMICAL FEED SYSTEM

SECTION CHEMICAL FEED SYSTEM SECTION 11800 PART 1 GENERAL 1.1 SUMMARY A. This section includes the requirements for the chemical feed system shall be a complete turnkey system inclusive of all necessary fluid handling and ancillary

More information

ELECTRICAL SAFETY INSPECTION REPORT

ELECTRICAL SAFETY INSPECTION REPORT ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:

More information

Optimizing Central Chilled Water Systems

Optimizing Central Chilled Water Systems Optimizing Central Chilled Water Systems OPTIMIZING CENTRAL CHILLED WATER SYSTEMS kent.peterson@p2seng.com 1 O P T I M I Z I N G C E N T R A L C H I L L E D W A T E R S Y S T E M S Kent W. Peterson, PE,

More information

2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7.

2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7. February 3, 207 Office of the Director of Purchasing: Shelly Albert Purchasing Officer ADDENDUM NO. 3 RECONSTRUCTION OF SEVEN PARKING LOTS AT THE SCHOOL OF DENTAL MEDICINE LOCATED ON THE ALTON CAMPUS OF

More information

GUIDE TO WATER SERVICE APPLICATIONS

GUIDE TO WATER SERVICE APPLICATIONS How To Apply Please contact our Call Center at 1-800-272-1325 with your site specifics, including block and lot information. Your information will be reviewed to determine preliminary service availability.

More information

LUNA SECONDARY PREPARATORY SCHOOL DALLAS, TEXAS ADDENDUM NO. 1

LUNA SECONDARY PREPARATORY SCHOOL DALLAS, TEXAS ADDENDUM NO. 1 LUNA SECONDARY PREPARATORY SCHOOL DALLAS, TEXAS ADDENDUM NO. 1 PROJECT: Luna Secondary Preparatory School HKS Project No. 16389.000 DATE: 17 December 2013 TO: All Offerors The Proposal Documents shall

More information

Water cooled central plant (vp/vs) Design Envelope application guide

Water cooled central plant (vp/vs) Design Envelope application guide Water cooled central plant (vp/vs) Design Envelope File No: 9.570 Date: march 11, 2015 Supersedes: 9.570 Date: november 14, 2014 design envelope s performance improvements are among the top priorities

More information

Management Committee December 3, Johnson County Community College Retrocommissioning Report

Management Committee December 3, Johnson County Community College Retrocommissioning Report Johnson County Community College Retrocommissioning Report Management Committee December 3, 2014 What is Retrocommissioning? Retrocommissioning is a systematic process to improve an existing building s

More information

RESIDENTIAL FIRE SERVICE METERS Addendum #1

RESIDENTIAL FIRE SERVICE METERS Addendum #1 109 WATER METERS (Addendum #1) 109.1 GENERAL All meters to be used for billing purposes shall be provided by the Water Utility. The Water Utility reserves the right to read, inspect, test or replace the

More information

University of Delaware

University of Delaware SECTION 23 05 00_COMMON WORK FOR HVAC SYSTEMS University Contact: Energy & Engineering Group (302) 831-1744 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Start up 2. Factory Training 3. Quality Control

More information

Metering Requirements Version 3.0

Metering Requirements Version 3.0 Metering Requirements Version 3.0 Prepared by Center for Energy and Environment Center for Sustainable Building Research, University of Minnesota January 2014 A critical aspect of the SB 2030 Energy Standards

More information

It is acceptable to place all required information in the main element (such as D5010) and delete the sub-elements provided in this template.

It is acceptable to place all required information in the main element (such as D5010) and delete the sub-elements provided in this template. 6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEMS REQUIREMENTS ELECTRICAL TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements.

More information

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST

CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,

More information

Ground source heat pump system (vp) Design Envelope application guide

Ground source heat pump system (vp) Design Envelope application guide Ground source heat pump system (vp) Design Envelope File No: 9.564 Date: november 14, 2014 Supersedes: 9.564 Date: september 19, 2014 design envelope s performance improvements are among the top priorities

More information

Brown University Updated March 11, 2013 Facilities Design & Construction Standards

Brown University Updated March 11, 2013 Facilities Design & Construction Standards SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution

More information

ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION

ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ~ Condensing Boilers, Furnaces, Hot Water Heaters, Flue Economizers, and Flue Drains~ Part 1 - GENERAL / Heater Units with BTU Inputs of 2,001-3,000

More information

ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION

ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ~ Condensing Boilers, Furnaces, Hot Water Heaters, Flue Economizers, and Flue Drains~ Part 1 - GENERAL / Heater Units with BTU Inputs of 600-1,500

More information

C o u n t y o f F a i r f a x, V i r g i n i a

C o u n t y o f F a i r f a x, V i r g i n i a 001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System

More information

PRE-INSTALLATION GUIDE

PRE-INSTALLATION GUIDE TRUMPF MEDICAL SYSTEMS Inc. Charleston, SC PRE-INSTALLATION GUIDE FOR CEILING MOUNTED EQUIPMENT MANAGEMENT SYSTEMS, SURGICAL / EXAM LIGHTS, AND FLAT PANELS EMS and Light Pre-installation Guide File: 110720

More information

Village of Gurnee Construction Documents Submittal Requirements

Village of Gurnee Construction Documents Submittal Requirements Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS

More information

Technical Summary. 1. Purpose

Technical Summary. 1. Purpose 1. Purpose Technical Summary The purpose of this procurement is to establish a contract to provide mechanical and electrical plant installation works in the following areas on the ITER Site in Saint-Paul

More information

lates.htm. LIST OF EXHIBITS

lates.htm. LIST OF EXHIBITS LIST OF EXHIBITS Exhibit A B C Page Typical Residential Water Service and Meter Installation... 27 Typical Manufactured Home Water Service and Meter Installation... 27 Typical Commercial/Industrial Meter

More information

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:

A. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows: SECTION 16050 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: General requirements for providing basic electrical materials and methods. B. Related Work Specified in Other Sections Includes: 1. Certain

More information

PROJECT TITLE PROJECT NO.: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA

PROJECT TITLE PROJECT NO.: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA PRE-START-UP/START-UP CHECKLIST CHILLED WATER SYSTEM NOTE: University s Representative must be notified and scheduled to witness test prior to any start up of equipment. A. Chilled Water Pumps 1. Submittal

More information

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure

More information

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS

SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,

More information

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System

REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,

More information

Engineering Standard Minimum Checklist

Engineering Standard Minimum Checklist Collier County Planning and Zoning Engineering Standard Minimum Checklist Engineering Stormwater, Utilities, and Engineering Transportation Engineering Stormwater Standard Minimum Checklist Please be advised:

More information

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY

More information

Norwood High Service Pump Replacement

Norwood High Service Pump Replacement T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017

More information

Effective Date: November 2, 2010 Reaffirmed Date: June 19, 2012 Reaffirmed Date: July 21, 2015

Effective Date: November 2, 2010 Reaffirmed Date: June 19, 2012 Reaffirmed Date: July 21, 2015 11 - Engineering & Public Works Cross-Connection Control Effective Date: November 2, 2010 Reaffirmed Date: June 19, 2012 Reaffirmed Date: July 21, 2015 Policy Statement: A Cross-Connection Control Program

More information

Monitoring-Based Commissioning Best Practices Award Welch Hall

Monitoring-Based Commissioning Best Practices Award Welch Hall Monitoring-Based Commissioning Best Practices Award Welch Hall California State University, Dominguez Hills June 17th, 2014 Monitoring-Based Commissioning CSU Dominguez Hills Welch Hall Content Project

More information

Characteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate

Characteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 216 Characteristics of Energy Consumption by building type of a U.S. Navy Installation

More information

MATERIAL ALLOWANCES AND UNIT PRICES

MATERIAL ALLOWANCES AND UNIT PRICES PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. Provide a building temperature control/building automation system (BAS) for the space temperature control and monitoring of defined environmental conditions. General system

More information

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL

SECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL 1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.

More information

Retro-Commissioning in Hospitals

Retro-Commissioning in Hospitals Retro-Commissioning in Hospitals American Society of Healthcare Engineering () Introduction Elements of the Health Facility Retro-Cx Process Retro-Cx Case Studies Hospital Hospital Oklahoma Heart Hospital

More information

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)

READ ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below) CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX C - ALTERNATE PLUMBING SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority

More information

CHILLED WATER PRODUCTION SUB-ELEMENT

CHILLED WATER PRODUCTION SUB-ELEMENT CHILLED WATER PRODUCTION SUB-ELEMENT The University of Central Florida employs three chilled water production plants combined with a three million gallon thermal energy storage tank to augment the chilled

More information

MONITORING AND DATA COLLECTION FOR DISTRIBUTED GENERATION/ COMBINED HEAT AND POWER (DG/CHP) SYSTEMS AT ALLIED FROZEN FOODS BROCKPORT, NEW YORK.

MONITORING AND DATA COLLECTION FOR DISTRIBUTED GENERATION/ COMBINED HEAT AND POWER (DG/CHP) SYSTEMS AT ALLIED FROZEN FOODS BROCKPORT, NEW YORK. MONITORING AND DATA COLLECTION FOR DISTRIBUTED GENERATION/ COMBINED HEAT AND POWER (DG/CHP) SYSTEMS AT ALLIED FROZEN FOODS BROCKPORT, NEW YORK. SYSTEM OVERVIEW The power generation shall be delivered via

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements 15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes

More information

Ground source heat pump system (vp)

Ground source heat pump system (vp) Ground source heat pump system (vp) Design Envelope File No: 9.564uk Date: january 23, 2015 Supersedes: new Date: new design envelope s performance improvements are among the top priorities of many building

More information

Treatment of District or Campus Thermal Energy in LEED for Existing Buildings: Operations and Maintenance

Treatment of District or Campus Thermal Energy in LEED for Existing Buildings: Operations and Maintenance Treatment of District or Campus Thermal Energy in LEED for Existing Buildings: Operations and Maintenance Pertains to the LEED 2009 for Existing Buildings: Operations and Maintenance Rating System and

More information

Specification for UDC Electrical Testing

Specification for UDC Electrical Testing Ergon Energy Corporation Limited Specification for UDC Electrical Testing RSC10 Abstract: Electrical Testing for Underground Distribution Construction (UDC) Specification RSC10 Ver 5 Contents 1. Purpose

More information

Teague Research Center

Teague Research Center Continuous Commissioning Report for the Teague Research Center Building #445 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory

More information

City of Branson APPLICATION FOR CONSTRUCTION PERMIT

City of Branson APPLICATION FOR CONSTRUCTION PERMIT 110 W. Maddux St., Ste. 215 Branson, MO 65616 417 337 8549 Fax 417 334 2391 Project Project 911 Name Address Owner City of Branson licensed contractor Missouri registered architect/engineer Residential

More information

SECTION EXTERIOR ATHLETIC LIGHTING

SECTION EXTERIOR ATHLETIC LIGHTING PART 1 GENERAL 1.1 SECTION INCLUDES A. Sports luminaries and accessories B. Poles 1.2 REFERENCES SECTION 26 58 68 EXTERIOR ATHLETIC LIGHTING A. ANSI C78.379 - Classification of Beam Patterns of Reflector

More information

Cornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2017 Annual Analysis Purpose and Methodology. ECI Campus Summary:

Cornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2017 Annual Analysis Purpose and Methodology. ECI Campus Summary: Purpose and Methodology ECI Campus Summary: Starting in the 2011/2012 fiscal year, a yearly energy metrics analysis is being performed. This analysis supports creating Facilities Metrics and evaluation

More information

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.

TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115. TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM SECTION TITLE PAGE 115.1 GENERAL 115.1 115.2 SIZING LINES 115.1 115.3 DISTRIBUTION SYSTEM 115.2 115.3.1 Layout

More information

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating

More information

Central Utilities at UNL: NU Corp & Development of Thermal Energy Storage (TES) at UNL East Campus

Central Utilities at UNL: NU Corp & Development of Thermal Energy Storage (TES) at UNL East Campus Central Utilities at UNL: NU Corp & Development of Thermal Energy Storage (TES) at UNL East Campus Big Ten and Friends Mechanical & Energy Conference U of Nebraska-Lincoln October 15, 2012 Before NU Corp

More information

Answer: These are existing piles. There is not any new work to the pile themselves. See electrical for new lighting in that area.

Answer: These are existing piles. There is not any new work to the pile themselves. See electrical for new lighting in that area. 1. Drawing A105 shows bold black circles at the north side of the east pier gazebo, and Drawing A107 shows the same bold black circles at the south side of the west pier gazebo. The bold black circles

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Building Automation PART 1 - GENERAL 1.01 OVERVIEW A. Provide a building temperature control/building automation system (BAS) for the space temperature control and monitoring of defined environmental conditions.

More information

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION

SECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.

More information

Basic Service. This Section provides information regarding a. Introduction

Basic Service. This Section provides information regarding a. Introduction Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.