University of Central Florida Main Campus. Chilled Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.
|
|
- Sophia Harrell
- 6 years ago
- Views:
Transcription
1 University of Central Florida Main Campus Chilled Water Service and Meter Installations Requirements Issued January 26 th, P a g e
2 Table of Contents 1. GENERAL INFORMATION DEFINITIONS TYPICAL REQUIREMENTS METER LOCATION PLAN REVIEW AND COORDINATION WITH UCF UES... 4 CHW - FIGURE 00: GENERAL NOTES RELATED TO CHILLED WATER SERVICE & METERING CHW FIGURE 01: CHILLED WATER METERING RESPONSIBILITY TABLE & SELECTION MATRIX CHW FIGURE 02: STANDARD ROADWAY OPEN CUT DETAIL CHW FIGURE 03: LOCATING WIRE TERMINAL CHW FIGURE 04: VALVE & VALVE BOX DETAIL CHW FIGURE 05A: BTU METER INSTALLATION FOR NON-CONDUCTIVE PIPE CHW FIGURE 05B: BTU METER INSTALLATION FOR CONDUCTIVE PIPE CHW FIGURE 06: CHILLED WATER REMOTE PRESSURE AND SAMPLING POINT CHW FIGURE 07: CHILLED WATER WET TAP CHW FIGURE 8: 3" AND LARGER MAKE-UP WATER METER 2 P a g e
3 1. GENERAL INFORMATION 1.1. UCF s Utilities and Energy Services (UES) maintain the campus CHW production and distribution system. These UCF Construction Standards are intended to identify any items that UCF UES finds particularly important in maintaining a consistent and reliable system. These requirements should be integrated into the project using the designer s best professional, while still meeting all Code requirements Chilled water metering (BTU and flow meter) is used to calculate utility billing, savings, demand profiling, and performance monitoring for each building s CHW service entrance(s). Essential to these functions are an accurate, properly selected and installed metering systems. While UCF UES will select and provide the meter, it is the designer and contractor s responsibility to install and integrate the components This information is not related to any CHW systems or sub-metering within a building If a chilled water service or application does not or cannot reflect the information in these standards, please contact UCF Utilities & Energy Services directly for specific requirements For ease of use, this section of the construction standards provides multiple 8.5 x11 details or Figures. These details are used to convey critical information to the designer, track the designers progress and verify the contractor s installation. These details or Figures are provided in the table below and are intended to be incorporated into the construction documents, by the designer, as applicable, after confirming they meet all current Code and design intent requirements. ALL Projects As Applicable CHW - Figure 00, 01, 05A OR 05B CHW - Figure 02, 03, 04, 06, 07, DEFINITIONS 2.1. Placeholder for future use. 3. TYPICAL REQUIREMENTS 3.1. Please refer to the Chilled Water Metering Responsibility Table in the attached Figures. The table identifies the parties responsible for designing, providing, installing, terminating and verifying the metering equipment All chilled water metering systems installed at the university, main or branch campuses, must adhere to this Standard. The university does not accept substitutes for Chilled Water metering as Onicon is the university standard. (Div 33 UCF) 3.3. All buildings, new or renovated, that are supplied with chilled water shall be metered per these standards. (Div 33 UCF) 4. METER LOCATION 4.1. Placeholder for future use. 3 P a g e
4 5. PLAN REVIEW AND COORDINATION WITH UCF UES 5.1. Coordination of chilled water service and metering requirements with UCF UES is important for the success of the project At the 50% Construction Document Phase the following shall be shown on plans and reviewed with UCF UES: Proposed routing of CHW service from campus distribution loop to the building Proposed location of meter Proposed metering configuration Proposed heat rejection into the CHW system, CHW supply temperature, CHW return temperature and volume Designer shall submit all included Figures identified by UCF for the service type. Designer shall identify any aspects of the Figure that cannot or will not be provided All requested Figures shall be submitted to UCF UES, through UCF s project manager At the 100% Construction Document Phase the following shall be shown on plans and reviewed with UCF UES: Final routing of CHW service from campus distribution loop to the building Final location of BTU and flow meter(s), including horizontal and vertical clearances Final heat rejection into the CHW system, CHW supply temperature, CHW return temperature and volume Proposed point of connection and integration of the BTU meter to the building level and campus level DDC system Proposed source of power for BTU and flow meter. This includes the panel name, circuit number, circuit breaker size and location of electrical panel on the floor plans Designer shall submit all included Figures identified by UCF for the service type. Designer shall identify any aspects of the Figure that cannot or will not be provided All requested Figures shall be submitted to UCF UES, through UCF s project manager. 4 P a g e
5
6
7
8
9
10
11
12
13
14
University of Central Florida Main Campus. Domestic Water. Service and Meter Installations Requirements. Issued January 26 th, 2017.
University of Central Florida Main Campus Domestic Water Service and Meter Installations Requirements Issued January 26 th, 2017 1 P a g e Table of Contents 1. GENERAL INFORMATION... 3 2. DEFINITIONS...
More informationSECTION FIELD PANELS
Stanford University Facilities Design Guidelines SECTION 25 14 23 FIELD PANELS PART 1 - GENERAL 1.1 SUMMARY A. This section includes control panel and enclosure requirements for building control systems.
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationUES INFO UTL 001. Rev 6-6/26/2018. Rate Information Page 1 of 15
Rate Information Page 1 of 15 Rate Information Utility services at the University of Central Florida are accounted for as an auxiliary operation. The Department of Utilities and Energy Services (UES) receives
More informationSECTION HVAC INSTRUMENTATION AND CONTROLS INSTALLATION. (Applicable to IUPUI Only)
SECTION 15957 (Applicable to IUPUI Only) I. GENERAL A. NOTES 1. The University has a pre-purchase agreement (PPA) with Johnson Controls (JCI) and Siemens Building Technologies (SBT). The University will
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 2-1 Issue date: September 2012 1. General SITEWORK OVERVIEW This Directive outlines the Fund s requirements for the Consultant relative to the development, design and presentation of documents
More informationAPPLICABILITY/ACCOUNTABILITY
SUBJECT: Effective Date: Policy Number: Utility Rate Methodology and Billing 1/17/2016 FSP 2016 UES0001 Supersedes: Page Of 1 5 Responsible Authority: Associate Vice President, Facilities & Safety APPLICABILITY/ACCOUNTABILITY
More informationBACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS
Revised May 2014 BACKFLOW PREVENTION ASSEMBLY INSTALLATION STANDARDS All backflow prevention assembly installation shall be in accordance with the following Standards unless otherwise directed or approved
More informationLow Voltage Switchgear Construction Checklist (under 500 kva)
Low Voltage Switchgear Checklist (under 500 kva) Project: Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationPIP PCEPA003 Process Analyzer System Field Installation Guidelines
January 2016 Process Control PIP PCEPA003 Process Analyzer System Field Installation Guidelines PURPOSE AND USE OF PROCESS INDUSTRY PRACTICES In an effort to minimize the cost of process industry facilities,
More informationCHILLED WATER SUB-ELEMENT Goal 1 To provide heating water and chilled water to satisfy the building demands to support the mission of the University.
ELEMENT 10 UTILITIES ELEMENT INCLUDING SUB-ELEMENTS: Chilled Water and Reheat Water Electrical Power and Other Fuels Telecommunications Systems UTILITIES ELEMENT CHILLED WATER SUB-ELEMENT Goal 1 To provide
More informationCHILLED WATER DISTRIBUTION SYSTEM
Campus-Wide System: A campus-wide central chilled water system has been developed in recent years and is being expanded to serve additional cooling loads as need arises and opportunity affords. This system
More informationSECTION BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions, apply to work of this section. 1.2 SUMMARY A. This section specifies
More informationTelecommunication Spaces
Telecommunication Spaces October 19, 2016 Page 1 Revision History Telecommunication Spaces Standard Effective Date Email Version Contact Phone OIT-TS strevena@csustan.edu 1.0 Stan Trevena 209.667.3137
More informationRequired Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools
1 Required Treatment of District Thermal Energy in LEED-NC version 2.2 and LEED for Schools Version 1.0 May 28, 2008 Administrative All LEED-NC v2.2 or LEED for Schools projects that register with USGBC
More informationA. Provide a complete Distribution Panelboard system as indicated on the drawings, and as specified herein.
16470 PANELBOARDS ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 26 24 16 An optional keynote to
More informationUNIVERSITY OF CENTRAL FLORIDA UTILITIES AND ENERGY SERVICES INFORMATION
Rev 5-11/14/2018 Rate Information Page 1 of 13 Rate Information Utility services at the University of Central Florida are accounted for as an auxiliary operation. The Department of Utilities and Energy
More informationMECKLENBURG COUNTY. Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING. Code Consistency Questions
MECKLENBURG COUNTY Land Use and Environmental Service Agency Code Enforcement 7/14/10 ELECTRICAL CONSISTENCY MEETING Code Consistency Questions 1. We were turned down for an underground installation of
More informationSDCS-02 CONSTRUCTION STANDARD FOR
CONSTRUCTION STANDARD FOR UNDER GROUND NETWORK This specification is property of SEC and subject to change or modification without any notice PART 3 Rev. 01 INSTALLATION OF RECESSED TYPE KWH METER BOXES
More informationRFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement
CITY OF WACO RFB 18-022 Waco City Hall Chiller Replacement Purchasing Services Post Office Box 20 Waco, Texas 602-20 Phone: 2 / 0-80 Fax: 2 / 0-8063 kaseyg@wacotx.gov www.waco-texas.com Date: 3//18 RFP
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationGuidelines for Design of Potable Water Distribution Facilities In New Developments
Guidelines for Design of Potable Water Distribution Facilities In New Developments Prepared by: OUC Water Business Unit Water Resources and Engineering Division Latest Update: September 29, 2009 1. Development
More informationDATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation
DATE: July 27, 2018 TO: All Bidders FROM: Jo Nell Miller, Purchasing Specialist SUBJECT: Addendum 2 Bid 550 Moorpark College Gymnasium Renovation This addendum is hereby made part of the Contract Documents
More informationSECTION BUSWAYS
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 26 25 11 BUSWAYS SPEC WRITER NOTE: Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable to the section and
More informationUniversity of Delaware
SECTION 22 05 00_COMMON WORK FOR PLUMBING SYSTEM University Contact: Energy & Engineering Group (302) 831-1744 Part 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Start up 2. Factory Training 3. Quality
More informationBuilding Permit Application
Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: ARCHITECT/ENGINEER ADDRESS:
More informationStandard of Practice - Campus Electrical Distribution System
A26.3 Standard of Practice - Campus Electrical Distribution System NOTE: Significant revisions or additions to the previous standards are highlighted in italics. GENERAL Designers shall verify that all
More information1 data PIC location (with 2 ports) typically asf for multiple staff members
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More information4 POINT INSPECTION REPORT
4 POINT INSPECTION REPORT ENTRY: SELLER / REALTOR / BUYER DAY: TIME: PICKUP KEY PERSON AT INSPECTION FULL INSPECTION $ TO: RE: INSUARNACE COMPANY: POLICY NUMBER : HOME INSPECTION SUBDIVISION / BLDG: SQUARE
More informationCommunications Page 1 of 9
Page 1 of 9 Last Update: April 23 rd, 2014 Introduction Design In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a
More informationBID PACKAGES 3-21, Addendum No. 03
WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs
More informationA. Section includes busway and fittings including plug-in units.
SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:
More informationOwner Project Requirements
Owner Project Requirements How to get what you need From an Owner s Perspective Learning Objectives What is an OPR Case Study (CHC) Looking to the Future Closing Arguments Crafton Hills College 1 What
More informationPHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS
1 Introduction 1.1 In the design of Telecommunications systems in Purdue facilities, the overall consideration should be to understand and treat telecom as a utility. It should be assumed that all new
More informationChilled Water Energy Savings Study
1 Chilled Water Energy Savings Study Pressure Dependent Valve Sizing and Valve Authority Pressure Independent Valves (Mechanical and Electronic) Chilled Water System Design MIT Beta Site Study-Correcting
More informationLOCAL LAWS OF THE CITY OF NEW YORK FOR THE YEAR No. 100
LOCAL LAWS OF THE CITY OF NEW YORK FOR THE YEAR 2013 No. 100 Introduced by Council Members Oddo, Chin, Comrie, Dickens, Fidler, James, Koo, Lander, Mendez, Recchia, Richards and Rose. A LOCAL LAW To amend
More informationPHYSICAL FACILITIES Consultant s Handbook Specifications Division 27 Communication 0528 Pathways. Page 1 of 6
1 General 1.1 Scope of work 1.1.1 The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the completion of
More informationWater cooled central plant (all-variable) Design Envelope application guide
Water cooled central plant Design Envelope File No: 9.568 Date: november 14, 2014 Supersedes: 9.568 Date: september 19, 2014 design envelope s performance improvements are among the top priorities of many
More informationRetrocommissioning Investigation Report
Continuous Optimization for Commercial Buildings Program Retrocommissioning Investigation Report March 22, 2013 Prepared for: Thompson Rivers University International Building BC Hydro #:COP10-353 Prism
More information16300 HIGH VOLTAGE DISTRIBUTION
16300 HIGH VOLTAGE DISTRIBUTION PART 1: GENERAL 1.01 WORK INCLUDED A. Most new loads will be served from the underground electric distribution system. This system is a primary open loop configuration served
More information9.0 General Infrastructure Element
9.0 Element The purpose of this element is to ensure adequate provision of public facilities and services required to meet the future needs of the University, including the following: 1. Provision of adequate
More information20 Add Hookups for Temporary Generators & Boilers
NEW CODE 20 Add Hookups for Temporary Generators & Boilers I. Summary Issue: Buildings with extended service disruptions can use electricity and heat from temporary emergency generators and boilers. It
More informationUNITED COOPERATIVE SERVICES. SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014
UNITED COOPERATIVE SERVICES SPECIFICATIONS FOR SELF-CONTAINED METER INSTALLATIONS August 2014 A member may obtain a new, single phase service from the Cooperative by providing or purchasing a meter loop.
More information1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information:
SECTION 260500 - GENERAL REQUIREMENTS FOR ELECTRICAL 1.0 In addition to the requirements previously presented herein, each specification shall contain the following general information: A. Codes, Laws,
More informationSECTION CHEMICAL FEED SYSTEM
SECTION 11800 PART 1 GENERAL 1.1 SUMMARY A. This section includes the requirements for the chemical feed system shall be a complete turnkey system inclusive of all necessary fluid handling and ancillary
More informationELECTRICAL SAFETY INSPECTION REPORT
ELECTRICAL SAFETY INSPECTION REPORT FASHION FORUM LTD. 53-54, Diakhali, Zamgara, savar, Dhaka, Bangladesh. Factory List: 1. Fashion Forum Ltd. 2. IDS Washing Ltd. Inspected by: Karma Report Generated by:
More informationOptimizing Central Chilled Water Systems
Optimizing Central Chilled Water Systems OPTIMIZING CENTRAL CHILLED WATER SYSTEMS kent.peterson@p2seng.com 1 O P T I M I Z I N G C E N T R A L C H I L L E D W A T E R S Y S T E M S Kent W. Peterson, PE,
More information2. Question: Could not find a detail for Type A3 Expansion Joints? Answer: A Type A3 Expansion Joint detail has been added to sheet C4.7.
February 3, 207 Office of the Director of Purchasing: Shelly Albert Purchasing Officer ADDENDUM NO. 3 RECONSTRUCTION OF SEVEN PARKING LOTS AT THE SCHOOL OF DENTAL MEDICINE LOCATED ON THE ALTON CAMPUS OF
More informationGUIDE TO WATER SERVICE APPLICATIONS
How To Apply Please contact our Call Center at 1-800-272-1325 with your site specifics, including block and lot information. Your information will be reviewed to determine preliminary service availability.
More informationLUNA SECONDARY PREPARATORY SCHOOL DALLAS, TEXAS ADDENDUM NO. 1
LUNA SECONDARY PREPARATORY SCHOOL DALLAS, TEXAS ADDENDUM NO. 1 PROJECT: Luna Secondary Preparatory School HKS Project No. 16389.000 DATE: 17 December 2013 TO: All Offerors The Proposal Documents shall
More informationWater cooled central plant (vp/vs) Design Envelope application guide
Water cooled central plant (vp/vs) Design Envelope File No: 9.570 Date: march 11, 2015 Supersedes: 9.570 Date: november 14, 2014 design envelope s performance improvements are among the top priorities
More informationManagement Committee December 3, Johnson County Community College Retrocommissioning Report
Johnson County Community College Retrocommissioning Report Management Committee December 3, 2014 What is Retrocommissioning? Retrocommissioning is a systematic process to improve an existing building s
More informationRESIDENTIAL FIRE SERVICE METERS Addendum #1
109 WATER METERS (Addendum #1) 109.1 GENERAL All meters to be used for billing purposes shall be provided by the Water Utility. The Water Utility reserves the right to read, inspect, test or replace the
More informationUniversity of Delaware
SECTION 23 05 00_COMMON WORK FOR HVAC SYSTEMS University Contact: Energy & Engineering Group (302) 831-1744 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Start up 2. Factory Training 3. Quality Control
More informationMetering Requirements Version 3.0
Metering Requirements Version 3.0 Prepared by Center for Energy and Environment Center for Sustainable Building Research, University of Minnesota January 2014 A critical aspect of the SB 2030 Energy Standards
More informationIt is acceptable to place all required information in the main element (such as D5010) and delete the sub-elements provided in this template.
6. ENGINEERING SYSTEMS REQUIREMENTS D50 ELECTRICAL SYSTEMS REQUIREMENTS ELECTRICAL TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT Level 2 Group Elements.
More informationCONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST
CONTRACT DOCUMENTS REVIEW PACKAGE CHECKLIST Check off each item that is included within the submitted Contract Documents Review Package. Provide a written explanation for any omissions. The following items,
More informationGround source heat pump system (vp) Design Envelope application guide
Ground source heat pump system (vp) Design Envelope File No: 9.564 Date: november 14, 2014 Supersedes: 9.564 Date: september 19, 2014 design envelope s performance improvements are among the top priorities
More informationBrown University Updated March 11, 2013 Facilities Design & Construction Standards
SECTION 01 17 90 UTILITY & CRITICAL SYSTEM CONNECTIONS AND INTERRUPTIONS PART 1 - GENERAL 1.1 SUMMARY: A. Brown University operates and maintains extensive campus and building utilities and distribution
More informationACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION
ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ~ Condensing Boilers, Furnaces, Hot Water Heaters, Flue Economizers, and Flue Drains~ Part 1 - GENERAL / Heater Units with BTU Inputs of 2,001-3,000
More informationACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION
ACIDIC CONDENSATE WASTEWATER ph TREATMENT SPECIFICATION ~ Condensing Boilers, Furnaces, Hot Water Heaters, Flue Economizers, and Flue Drains~ Part 1 - GENERAL / Heater Units with BTU Inputs of 600-1,500
More informationC o u n t y o f F a i r f a x, V i r g i n i a
001961 Page 2 C o u n t y o f F a i r f a x, V i r g i n i a A D D E N D U M DATE: August 2, 2016 ADDENDUM NO. 4 TO: REFERENCE: FOR: DUE DATE/TIME: ALL PROSPECTIVE BIDDERS Government Center Generator System
More informationPRE-INSTALLATION GUIDE
TRUMPF MEDICAL SYSTEMS Inc. Charleston, SC PRE-INSTALLATION GUIDE FOR CEILING MOUNTED EQUIPMENT MANAGEMENT SYSTEMS, SURGICAL / EXAM LIGHTS, AND FLAT PANELS EMS and Light Pre-installation Guide File: 110720
More informationVillage of Gurnee Construction Documents Submittal Requirements
Commercial New Construction 4 sets of complete plans Commercial Alterations 2 sets of complete plans Residential New Construction, Remodel and/or Addition 2 sets of complete plans DETAILED PLAN REQUIREMENTS
More informationTechnical Summary. 1. Purpose
1. Purpose Technical Summary The purpose of this procurement is to establish a contract to provide mechanical and electrical plant installation works in the following areas on the ITER Site in Saint-Paul
More informationlates.htm. LIST OF EXHIBITS
LIST OF EXHIBITS Exhibit A B C Page Typical Residential Water Service and Meter Installation... 27 Typical Manufactured Home Water Service and Meter Installation... 27 Typical Commercial/Industrial Meter
More informationA. Hazardous Areas: Hazardous areas as defined by the NEC as Class I, Division 1, Group D, or Class I, Division 2, Group D hazardous are as follows:
SECTION 16050 PART 1 GENERAL 1.1 SUMMARY A. Section Includes: General requirements for providing basic electrical materials and methods. B. Related Work Specified in Other Sections Includes: 1. Certain
More informationPROJECT TITLE PROJECT NO.: CONTRACT TITLE UNIVERSITY OF CALIFORNIA, DAVIS CITY, CALIFORNIA
PRE-START-UP/START-UP CHECKLIST CHILLED WATER SYSTEM NOTE: University s Representative must be notified and scheduled to witness test prior to any start up of equipment. A. Chilled Water Pumps 1. Submittal
More informationPLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS
PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS NOTE: Building Code compliance is the obligation of design professionals and/or contractors. Plan review and inspection guidelines are to be used to ensure
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationREQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System
REQUEST FOR PROPOSALS (RFP) Design Services for District Heat Distribution System Issued by the City of Montpelier, Vermont Department of Planning and Community Development Responses Due: August 12, 2011,
More informationEngineering Standard Minimum Checklist
Collier County Planning and Zoning Engineering Standard Minimum Checklist Engineering Stormwater, Utilities, and Engineering Transportation Engineering Stormwater Standard Minimum Checklist Please be advised:
More informationCITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application
CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application DATE: / / PERMIT # REQUEST FOR: NEW BUILDING ADDITION REMODEL PLUMBING ONLY ELECTRIC ONLY
More informationNorwood High Service Pump Replacement
T E C H N I C A L M E M O R A N D U M 737-02 NORWOOD HIGH SERVICE PUMP REPLACEMENT 737-02 Norwood High Service Pump Replacement PREPARED FOR: JEA Planning PREPARED BY: Joshua M. Brown DATE: February 2017
More informationEffective Date: November 2, 2010 Reaffirmed Date: June 19, 2012 Reaffirmed Date: July 21, 2015
11 - Engineering & Public Works Cross-Connection Control Effective Date: November 2, 2010 Reaffirmed Date: June 19, 2012 Reaffirmed Date: July 21, 2015 Policy Statement: A Cross-Connection Control Program
More informationMonitoring-Based Commissioning Best Practices Award Welch Hall
Monitoring-Based Commissioning Best Practices Award Welch Hall California State University, Dominguez Hills June 17th, 2014 Monitoring-Based Commissioning CSU Dominguez Hills Welch Hall Content Project
More informationCharacteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate
Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 216 Characteristics of Energy Consumption by building type of a U.S. Navy Installation
More informationMATERIAL ALLOWANCES AND UNIT PRICES
PART 1 - GENERAL 1.1 SECTION INCLUDES ADDITIONS AND RENOVATIONS TO WEST YORK AREA HIGH SCHOOL - #1231 SECTION 012200 MATERIAL ALLOWANCES AND UNIT PRICES A. Measurement and payment criteria applicable to
More informationElement D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. Provide a building temperature control/building automation system (BAS) for the space temperature control and monitoring of defined environmental conditions. General system
More informationSECTION GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL
1.01 DESCRIPTION SECTION 16000 GENERAL ELECTRICAL REQUIREMENTS PART 1- GENERAL A. This Section includes the general provisions applicable to electrical work and testing of the completed electrical systems.
More informationRetro-Commissioning in Hospitals
Retro-Commissioning in Hospitals American Society of Healthcare Engineering () Introduction Elements of the Health Facility Retro-Cx Process Retro-Cx Case Studies Hospital Hospital Oklahoma Heart Hospital
More informationREAD ONLY. Adopting Agency BSC SFM. Adopt Entire Chapter Adopt Entire Chapter as amended (amended sections listed below)
CALIFORNIA PLUMBING CODE MATRIX ADOPTION TABLE APPENDIX C - ALTERNATE PLUMBING SYSTEMS (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority
More informationCHILLED WATER PRODUCTION SUB-ELEMENT
CHILLED WATER PRODUCTION SUB-ELEMENT The University of Central Florida employs three chilled water production plants combined with a three million gallon thermal energy storage tank to augment the chilled
More informationMONITORING AND DATA COLLECTION FOR DISTRIBUTED GENERATION/ COMBINED HEAT AND POWER (DG/CHP) SYSTEMS AT ALLIED FROZEN FOODS BROCKPORT, NEW YORK.
MONITORING AND DATA COLLECTION FOR DISTRIBUTED GENERATION/ COMBINED HEAT AND POWER (DG/CHP) SYSTEMS AT ALLIED FROZEN FOODS BROCKPORT, NEW YORK. SYSTEM OVERVIEW The power generation shall be delivered via
More informationB. System Design and Performance Requirements
15625 Water Chillers This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications or in notes
More informationGround source heat pump system (vp)
Ground source heat pump system (vp) Design Envelope File No: 9.564uk Date: january 23, 2015 Supersedes: new Date: new design envelope s performance improvements are among the top priorities of many building
More informationTreatment of District or Campus Thermal Energy in LEED for Existing Buildings: Operations and Maintenance
Treatment of District or Campus Thermal Energy in LEED for Existing Buildings: Operations and Maintenance Pertains to the LEED 2009 for Existing Buildings: Operations and Maintenance Rating System and
More informationSpecification for UDC Electrical Testing
Ergon Energy Corporation Limited Specification for UDC Electrical Testing RSC10 Abstract: Electrical Testing for Underground Distribution Construction (UDC) Specification RSC10 Ver 5 Contents 1. Purpose
More informationTeague Research Center
Continuous Commissioning Report for the Teague Research Center Building #445 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationCity of Branson APPLICATION FOR CONSTRUCTION PERMIT
110 W. Maddux St., Ste. 215 Branson, MO 65616 417 337 8549 Fax 417 334 2391 Project Project 911 Name Address Owner City of Branson licensed contractor Missouri registered architect/engineer Residential
More informationSECTION EXTERIOR ATHLETIC LIGHTING
PART 1 GENERAL 1.1 SECTION INCLUDES A. Sports luminaries and accessories B. Poles 1.2 REFERENCES SECTION 26 58 68 EXTERIOR ATHLETIC LIGHTING A. ANSI C78.379 - Classification of Beam Patterns of Reflector
More informationCornell University Energy and Sustainability: ECI Campus Energy Metrics Fiscal Year 2017 Annual Analysis Purpose and Methodology. ECI Campus Summary:
Purpose and Methodology ECI Campus Summary: Starting in the 2011/2012 fiscal year, a yearly energy metrics analysis is being performed. This analysis supports creating Facilities Metrics and evaluation
More informationTABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM GENERAL SIZING LINES 115.
TABLE OF CONTENTS PART III MINIMUM DESIGN STANDARDS Section 115 WATER DISTRIBUTION SYSTEM SECTION TITLE PAGE 115.1 GENERAL 115.1 115.2 SIZING LINES 115.1 115.3 DISTRIBUTION SYSTEM 115.2 115.3.1 Layout
More informationDOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES
Guidelines effective March 5, 2007 NES is committed to providing safe, reliable electric service at a reasonable price for all of our customers. These guidelines offer direction for activities relating
More informationCentral Utilities at UNL: NU Corp & Development of Thermal Energy Storage (TES) at UNL East Campus
Central Utilities at UNL: NU Corp & Development of Thermal Energy Storage (TES) at UNL East Campus Big Ten and Friends Mechanical & Energy Conference U of Nebraska-Lincoln October 15, 2012 Before NU Corp
More informationAnswer: These are existing piles. There is not any new work to the pile themselves. See electrical for new lighting in that area.
1. Drawing A105 shows bold black circles at the north side of the east pier gazebo, and Drawing A107 shows the same bold black circles at the south side of the west pier gazebo. The bold black circles
More informationElement D Services Heating, Ventilating, and Air Conditioning
Building Automation PART 1 - GENERAL 1.01 OVERVIEW A. Provide a building temperature control/building automation system (BAS) for the space temperature control and monitoring of defined environmental conditions.
More informationSECTION CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION
SECTION 22 11 16.13 CROSS CONNECTION CONTROL AND BACKFLOW PREVENTION PART 1: GENERAL 1.01 SUMMARY A. This Section includes water-distribution backflow prevention products and installation specifications.
More informationBasic Service. This Section provides information regarding a. Introduction
Basic Service Introduction This Section provides information regarding a new electric Basic Service for a single phase service less than or equal to 400 amps, and a three phase service less than 50kW.
More informationMETERING INSTALLATION
4.01 METERING SPECIFICATIONS METERING INSTALLATION Metering specifications will be issued to the customer by OPPD. Metering specifications are required before any work is started on all new wiring or additions
More information