1 Opening a New Hospital: A Case Study Healthcare Commissioning and the Authority Having Jurisdiction Matthew Tunnard, PE, CCP, LEED AP, Senior Engineer Horizon Engineering Associates, LLP

2 AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of the Completion for both AIA members and non-aia members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation. 2

3 Learning Objectives At the end of this session participants will be able to: 1. Explain how commissioning can help ensure smooth certification from the AHJ 2. Describe the commissioning authority s role in the building walk through 3. Identify the critical elements of healthcare facilities that require special attention 4. Specify scope for levels of effort for the Cx authority to meet expectations 3

4 Agenda for Session Project Background Cx Scope of Work Healthcare specific AHJ and turnover Walkthroughs Occupancy Calls for service, energy efficiency Lessons Learned How to specify

5 Bibliography Evan Mills Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emission Misc. Photos University of Michigan

6 Acknowledgements University of Michigan Mary L. Krasny Mary Pinegar-Koster Frank Marcinkiewicz Phil Shaughnessy

7 C.S. Mott Children s Hospital & Von Voigtlander Women s Hospital

8 C.S. Mott Children s Hospital & Von Voigtlander Women s Hospital

9 Project Background 1.1 Million Sqft Hospital and Medical Office Building (MOB) Pediatric and Women s care specialty hospital $750 million total project budget LEED Silver Certified Combination of self generated utilities and fed from central plant

10 Project Background 29 - Air Handlers, 9 Stair Pressurization Units, 2 Energy Recovery Units Feeds VAV system with Reheat. 4 pipe Fan Coil Unit for process loads Entire Hospital is HEPA Filtered

11 Project Background Ton Chillers with 4 Cooling Towers Electric Centrifugal Chillers Ability to utilize free cooling Primary/ Secondary loop

12 Project Background Heating Hot Water 3 Steam to Water Heat Exchangers Steam supplied from Central Plant Domestic Hot Water 2- Heat Exchangers 3- Booster pumps for each hot and cold water

13 Project Background 4 2 Mega Watt Diesel Generator Paralleling gear with load shedding Transfer switches Substations

14 Project Background 16 Operating Rooms Regional Infection Control Unit (RICU) Radiology with 3 MRI s Emergency Department Bone Marrow Transplant Unit (BMT)

15 Project Background Labor, Delivery, Recovery, Post-Partum (LDRP) Neonatal Intensive Care Unit (NICU) Pediatric Cardiothoracic Intensive Care Unit (PCTU ) Pediatric Intensive Care Unit (PICU)

16 Owner Expectations Reduced Energy Cost High reliability Low occupant complaints Reduce construction issues Change orders Time delays

17 Cx Scope of Work HVAC 100% testing of all equipment including VAVs Electrical Distribution, 100% check to panel level Plumbing, 100% supply side, 10% fixture check Medical Gas Witness blow down of system Work with inspector and certifier to witness necessary tests

18 Cx Scope of Work Security, 100% verification of all devices Infant Abduction, 100% verification of all devices Fire Alarm Verification of all interaction with other systems Security, HVAC, Infant Abduction

19 Cx Scope of Work Fire Protection Work with mechanical inspector to witness any tests. Coordinate all tests and certifications of fire pump Witness testing of Pre-Action systems Pre-testing of Helipad Foam system Pneumatic Tube Review installation and test final system

20 Cx Scope of Work Healthcare Specific Performance Tests Operating Rooms Designed with 25 air changes per hour HEPA filtered Must be positive pressure to adjacent spaces Transplant rooms must be able to raise temp from 55F to 95F in 15 minutes

21 Cx Scope of Work Healthcare Specific Operating Room

22 Cx Scope of Work Healthcare Specific Bone Marrow Transplant Area Severely Immuno-compromised patients Area needs to provide a clean space with minimum amount of contamination Patient rooms are positive pressure HEPA Filtered Room pressure monitors on all rooms

23 Cx Scope of Work Healthcare Specific Neonatal Intensive Care Unit (NICU) Area that cares for premature and high risk infants Immuno-compromised patients Need space for family Adjustable lighting levels from minimum to clinical care Precise temperature control

24 Cx Scope of Work Healthcare Specific NICU

25 Cx Scope of Work Healthcare Specific Labor, Delivery, Recovery, Post-partum Rooms where women prepare, deliver, and recover from giving birth Need area for family, comfortable room (can spend days here) Need to incorporate proper lighting and HVAC controls

26 Cx Scope of Work Healthcare Specific LDRP

27 Cx Scope of Work Healthcare Specific Regional Infection Control Unit (RICU) Floor that can be turned into an isolation area for an outbreak of an infectious disease. (ex: SARS, Ebola) Normal operation is standard patient floor RICU operation turns the entire area negative pressure to adjacent spaces with no HVAC return air. Need interlocks on entrance doors and with Fire Alarm In RICU mode, 100% OA

28 Cx Scope of Work Healthcare Specific Isolation Rooms Room Pressure Monitors Radiology Wall protection and magnetic protection Cafeteria and Kitchen Kitchen hoods, sanitation

29 Responsibilities in Building Performance Designers Overall responsible for design and meeting code Authorities Having Jurisdiction Responsible for ensuring building meets code, not performance Cx Authority Responsible for ensuring building meets design performance

30 AHJ and Turnover Authorities Having Jurisdiction on the Project UM Mechanical Inspector UM Electrical Inspector UM Fire Marshall for all business occupancy State of Michigan Fire Marshall for hospital State of Michigan Department of Health for hospital and kitchen

31 AHJ and Turnover Cx interface with AHJ on different issues During construction Mechanical - Med Gas Blow Down, Duct work installation, Generator Stack Sealing Electrical Equipment clearance Fire Marshall Pre-testing of all fire systems Health Department HVAC and lighting systems

32 AHJ and Turnover Generator Stack Testing

33 AHJ and Turnover Walkthroughs Mechanical Plumbing Hot water at fixtures Mechanical Duct Cleaning Pressurization Equipment Clearance

34 AHJ and Turnover Walkthroughs UM Fire Marshall Business Occupancy Fire Alarm Pre-test Audible levels Fire Door Latching Stair Pressurization Exit Signs

35 AHJ and Turnover Walkthrough State Fire Marshall Healthcare Occupancy Fire Alarm Pre-test Audible levels Fire Door Latching Stair Pressurization Exit Signage Space Pressurization Interface with Infant Abduction and RICU

36 AHJ and Turnover Walkthrough Health Department Space Pressurization Lighting Sequence of Operations Staff Notification of Issues/Alarms RICU Operation

37 Issues During AHJ Walkthrough State Fire Marshall Stair Pressurization Provide a certified report as Special Inspector FA Pre-testing Ensure that all pre-testing occurred Made sure the final testing went very quickly

38 Issues During AHJ Walkthrough State Fire Marshall Testing of Release of exit doors in RICU and with Infant Abduction Helipad Foam System Audible Level Testing Smoke Capture Test in Kitchen Fire/Smoke Damper Inspections Provided a report showing all dampers

39 Issues During AHJ Walkthrough

40 Issues During AHJ Walkthrough State Health Department Positive Pressure Rooms BMT rooms control reset Negative pressure rooms Issues with Balancing, Rebalance Lighting levels in OR Sequence of Operations RICU

41 Occupancy During Construction over 3,500 deficiencies identified and corrected Power Loss tests found numerous issues that would affect operation Fire Damper inspections found numerous issues Testing of controls systems

42 Occupancy Pediatric Emergency Room

43 Occupancy Areas where Cx helped project Driving controls schedule Managing LEED concerns Temp Heating and Cooling Pre-testing of systems for AHJ Getting all deficiencies completed before occupancy

44 Occupancy Building Opening Calls for Service Patients were moved from the old hospital over a period of 12 hours During opening month about 10 calls for service Building occupants were very happy with the building Patients and family were overwhelmed by the upgrade

45 Occupancy Peds ICU

46 Occupancy Energy Efficiency Found numerous issues where the sequence of operation did not match the design Found areas where the design sequences didn t work as anticipated Found numerous valves and dampers that leaked by

47 Lessons Learned Commissioning was integral to completing the project on time Construction Scheduling made functional testing very difficult Floor completion did not match up with MEP systems Controls contractor needed more hand holding Fell behind schedule Integrated Power Loss Testing for durations was critical to finding issues

48 Lessons Learned How to specify Owner needs to determine the level of effort Cost is directly related to increased scope Owner needs to identify systems they want checked Systems such as Med Gas, Nurse Call, Fire Alarm, etc MEP is standard

49 Lessons Learned How to specify Get commissioning involved early Can help with construction scheduling Owner to set clear requirements for successful outcome (OPR) Owner needs to identify a partner not just based on cost, Cx is a professional service

50 Matthew Tunnard, PE, CCP, LEED AP Senior Engineer Horizon Engineering Associates, LLP

Mission Critical Commissioning for Healthcare Facilities

Mission Critical Commissioning for Healthcare Facilities Mission Critical Commissioning for Healthcare Facilities Steven R. Rusty Ross SSRCx, LLC Synopsis Healthcare Facilities serve a critical and unique mission. Few facilities delivered by the construction

More information

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE

Reducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE Reducing Hospital Energy Use and Maintaining Savings Glen Anderson, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing

More information

Commissioning & Retro-Commissioning Meet Energy Code

Commissioning & Retro-Commissioning Meet Energy Code Commissioning & Retro-Commissioning Meet Energy Code Agenda Introductions What is Commissioning Value of Commissioning Code Required Cx Process Customize your Cx Process What documentation should be expected

More information

Strategies for Persistence: Measurement and Verification. Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions

Strategies for Persistence: Measurement and Verification. Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions Strategies for Persistence: Measurement and Verification Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The

More information

2008 Questions & Solutions Engineering, Inc.

2008 Questions & Solutions Engineering, Inc. BNP Media is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates

More information

Commissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014

Commissioning at NYP. Joseph Lorino, PE, LEED Corporate Director April 1, 2014 1 Commissioning at NYP Joseph Lorino, PE, LEED Corporate Director April 1, 2014 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program NYP Commissioning Process

More information

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering

LEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering LEED Commissioning and Actual Energy Use John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering AIA Quality Assurance Learning Objectives 1. Why Best Practice and Fundamental Commissioning are

More information

Monitoring-Based Commissioning: A Case Study in Higher Education. Janelle H. Griffin, PE, CCP, LEED AP

Monitoring-Based Commissioning: A Case Study in Higher Education. Janelle H. Griffin, PE, CCP, LEED AP Monitoring-Based Commissioning: A Case Study in Higher Education Janelle H. Griffin, PE, CCP, LEED AP AIA Quality Assurance The Commissioning Association is a Registered Provider with The American Institute

More information

Optimizing Energy Use in a HealthCare Setting. Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning

Optimizing Energy Use in a HealthCare Setting. Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning Optimizing Energy Use in a HealthCare Setting Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered

More information

Performance Monitoring for Efficiency

Performance Monitoring for Efficiency Performance Monitoring for Efficiency THOMAS ANDERSON, CCP EMILY CROSS, MASc, PEng, CEM Burlington, Vermont cx associates.com tom@cx associates.com emily@cx associates.com Efficiency Vermont is a Registered

More information

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING

DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING DIRECTIVE 15H-9 Issue date: October 2018 COMMISSIONING Purpose: The purpose of this Directive is to describe, in outline, the requirements of Commissioning on SUCF Projects. 1. Applicability a. New York

More information

RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE

RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT Adam Renzi, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute

More information

Commissioning the Project Schedule

Commissioning the Project Schedule Commissioning the Project Schedule Matthew S. Malinosky, PE, LEED AP BD+C, CCP Mechanical Engineer Molly B. Meyer, PE, LEED AP BD+C, CEM Mechanical Engineer AIA Quality Assurance The Building Commissioning

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 23 08 00 Commissioning of HVAC Systems 1. GENERAL A. GENERAL PROVISIONS 1. Drawings and general provisions of the Contract, including General Conditions and Division - 1 Specifications Sections, apply

More information

Wireless Pneumatic Thermostats:

Wireless Pneumatic Thermostats: Wireless Pneumatic Thermostats: Quality Commissioning is Essential Peter Pollard, P.E. Principal kw Engineering AIA Quality Assurance The Building Commissioning Association is a Registered Provider with

More information

EBCx of the Connecticut Convention Center Complex

EBCx of the Connecticut Convention Center Complex EBCx of the Connecticut Convention Center Complex Presentation and Panel Discussion David Vallerie, Principal, Strategic Building Solutions May 20, 2014 AIA Quality Assurance The Building Commissioning

More information

Acceptance and Testing for Quality Turnover to Sustainable Operations & Maintenance

Acceptance and Testing for Quality Turnover to Sustainable Operations & Maintenance Acceptance and Testing for Quality Turnover to Sustainable Operations & Maintenance PAUL M. RASCHILLA, PARTNER M B A, E P M, C H C, C B C P, L E E D A P, C M V P, C S D P AKF GROUP LLC AKF Group LLC is....

More information

Smart Labs: Building Next Generation Labs While Maintaining Safety and Comfort

Smart Labs: Building Next Generation Labs While Maintaining Safety and Comfort Smart Labs: Building Next Generation Labs While Maintaining Safety and Comfort JAVIER NAVAR PAYAN, MSME, PE (MINNESOTA), CEM Senior Energy Engineer University of Minnesota AIA Quality Assurance The Building

More information

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015

Commissioning at NYP. Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 1 Commissioning at NYP Joseph Lorino, PE, LEED Vice President, Facilities Management November 4, 2015 Presentation Agenda 2 What is Commissioning Why Commission? Developing NYP s Commissioning Program

More information

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING

George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING AIA Quality Assurance Learning Objectives Demonstrate global results of the analysis of energy

More information

Energy Reduction in Hospitals

Energy Reduction in Hospitals Energy Reduction in Hospitals OSBORN ENGINEERING DAVE CHOUINARD, CBCP, LEED AP, DIRECTOR HEALTHCARE CARL SCHULTZ, PE, DIRECTOR ENERGY AND FACILITY SYSTEMS MARK WUTZ, PE, DIRECTOR ENERGY & COMMISSIONING

More information

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section.

B. OPR, BoD, and BoD-HVAC documentation prepared by Owner and Architect contains requirements that apply to this Section. SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

Karl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois. Retrocommissioning Saving the Planet One Building at a Time

Karl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois. Retrocommissioning Saving the Planet One Building at a Time Karl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois Retrocommissioning Saving the Planet One Building at a Time AIA Quality Assurance Portland Energy Conservation, Inc is a registered

More information

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619

Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,

More information

THE IMPORTANCE OF EQUIPMENT ACCESSIBILITY IN BUILDINGS

THE IMPORTANCE OF EQUIPMENT ACCESSIBILITY IN BUILDINGS THE IMPORTANCE OF EQUIPMENT ACCESSIBILITY IN BUILDINGS Throughout the commissioning process, we often find issues with accessibility to equipment, whether it be a heat pump above a ceiling grid or an air

More information

Building Codes for Energy Efficiency and Cx. Randall Higa Codes and Standards Program Manager Southern California Edison

Building Codes for Energy Efficiency and Cx. Randall Higa Codes and Standards Program Manager Southern California Edison Building Codes for Energy Efficiency and Cx Randall Higa Codes and Standards Program Manager Southern California Edison AIA Quality Assurance Learning Objectives 1. High level understanding of California

More information

Commissioning for Energy Savings

Commissioning for Energy Savings Commissioning for Energy Savings Presented To: AEE / ASHRAE / USGBC 2013 Energy Expo St. Paul RiverCentre, St. Paul, Minnesota October 2, 2013 Presented By: Rebecca T. Ellis, PE LEED AP BD+C, CCP, CPMP

More information

CONSTRUCTION FIRM PUSHES THE INNOVATION ENVELOPE WITH RUGGED TABLETS

CONSTRUCTION FIRM PUSHES THE INNOVATION ENVELOPE WITH RUGGED TABLETS CONSTRUCTION FIRM PUSHES THE INNOVATION ENVELOPE WITH RUGGED TABLETS Company Industry Location Website Construction Michigan, USA www.bartonmalow.com BACKGROUND Building Information Modeling Leader It

More information

Good indoor air quality (IAQ) management has become paramount in the construction industry as study

Good indoor air quality (IAQ) management has become paramount in the construction industry as study Creating and Maintaining Good Indoor Air Quality Good indoor air quality (IAQ) management has become paramount in the construction industry as study after study shows that employee productivity and health

More information

USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit

USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit USGBC National Capital Region MasterClass Series: The Ins and Outs of Existing Building Commissioning Analysis Credit Jeffrey Salay, PE, CEM, LEED AP Senior Principal 13 December 2017 GHT Limited is a

More information

How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.

How LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc. How LEED & The Retro-Commissioning Credits Produce Energy Savings James Vallort Vice President Environmental Systems Design, Inc. Retro-Commissioning Today s session will focus on the following items:

More information

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202

COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202 COMMISSIONING PROCESS FOR BUILDINGS AND SYSTEMS ASHRAE STANDARD 202 Gerald J. Kettler, PE, CCP, CPMP 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning

More information

Optimizing BAS Information for Operator Effectiveness and Optimal Control

Optimizing BAS Information for Operator Effectiveness and Optimal Control Optimizing BAS Information for Operator Effectiveness and Optimal Control Len Beyea, CBCxP, EBCxP, HBDP, CEM, LEED AP Principal RetroCom Energy Strategies, Inc. AIA Quality Assurance The Building Commissioning

More information

Sequences, Integration: Who's in Control? Wick Fisher White Consulting Engineers Hanson Professional Services Inc.

Sequences, Integration: Who's in Control? Wick Fisher White Consulting Engineers Hanson Professional Services Inc. Sequences, Integration: Who's in Control? Tony DiLeonardo, LEED AP, CxA Robert J. Knoedler, P.E., CxA, EMP Wick Fisher White Consulting Engineers Hanson Professional Services Inc. AIA Quality Assurance

More information

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL

Banyan Air Service November 18, 2011 AVE Aviation and Commerce Center Building 1 Miami, FL SECTION 01815 - HVAC COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division

More information

ACHIEVE MULTI-BENEFITS USING THE. COMMISSIONING PROCESS FOR RETRO- COMMISSIONING OF BUILDINGS CLIMA 2005 Lausanne, Switzerland Paper Dorga274s

ACHIEVE MULTI-BENEFITS USING THE. COMMISSIONING PROCESS FOR RETRO- COMMISSIONING OF BUILDINGS CLIMA 2005 Lausanne, Switzerland Paper Dorga274s 1 ACHIEVE MULTI-BENEFITS USING THE COMMISSIONING PROCESS FOR RETRO- COMMISSIONING OF BUILDINGS CLIMA 2005 Lausanne, Switzerland Paper Dorga274s Authors Chad B. Dorgan, PE, PhD, CxAP, CCP Director, Facilities

More information

Army Exceeds Energy Goal Ahead of Mandate (Actual Energy Reduction of 38% vs 30% and Achieved in 2010 vs 2015)

Army Exceeds Energy Goal Ahead of Mandate (Actual Energy Reduction of 38% vs 30% and Achieved in 2010 vs 2015) Army Exceeds Energy Goal Ahead of Mandate (Actual Energy Reduction of 38% vs 30% and Achieved in 2010 vs 2015) NDIA E 2 S 2 May 9-12, 2011 New Orleans, LA Overview Background Energy Conservation Measures

More information

BUILD. CONNECT. ACHIEVE.

BUILD. CONNECT. ACHIEVE. Continuous Commissioning How to make big Data work for you Michael P. Johnson BUILD. CONNECT. ACHIEVE. Business Development Executive 0 AIA Quality Assurance The Building Commissioning Association is a

More information

ASSESSMENT, CLEANING & RESTORATION OF HVAC SYSTEMS (ACR-2002)

ASSESSMENT, CLEANING & RESTORATION OF HVAC SYSTEMS (ACR-2002) ASSESSMENT, CLEANING & RESTORATION OF HVAC SYSTEMS (ACR-2002) C Cochrane * and T Yacobellis National Air Duct Cleaners Association ACR 2002 Committee, Washington, DC, USA ABSTRACT In the fall of 2001 NADCA

More information

Capital Projects Group Mechanical Work Commissioning Specification

Capital Projects Group Mechanical Work Commissioning Specification Capital Projects Group Mechanical Work Commissioning Specification Specification 20 05 40 Revision 0 Date: August 2018 Mechanical Work Commissioning Specification Specification 20 05 40 Publication Date:

More information

Ron Wilkinson October 12, 2016

Ron Wilkinson October 12, 2016 British Columbia Chapter ASHRAE Existing Building Commissioning RON WILKINSON P.E., LEED AP, CPMP Wilkinson Cx Management Seattle, WA, USA 1-206-602-4460 rwilk99@gmail.com WCxM Wilkinson Commissioning

More information

Retro-Commissioning for Existing Facilities

Retro-Commissioning for Existing Facilities Retro-Commissioning for Existing Facilities Tom Meyer Director, Technical Programs National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, Maryland 20877 (301) 977-3698 www.nebb.org

More information

Hotels: Water and Energy

Hotels: Water and Energy Hotels: Water and Energy Agenda 01 Introduction 05 Hotel System Options 02 Company Overview 06 Hotel Energy Conservation 03 Hotel Energy & Water Use 07 Hotel Project Examples 04 Design Philosophy Introduction

More information

Full-Scope Commissioning for High-Quality Buildings

Full-Scope Commissioning for High-Quality Buildings Full-Scope Commissioning for High-Quality Buildings Pieter L. van der Mersch, PE, QCxP University of Colorado Boulder 21 st National Conference on Building Commissioning AIA Quality Assurance The Building

More information

how to read an energy model

how to read an energy model how to read an energy model Kohler Ronan, LLC is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported

More information

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program

Audio Sessions. Session 5 MEETINGS. Construction Contract Administration Education Program Audio Sessions Session 5 MEETINGS Education Program Certified Construction Contract Administrator (CCCA) Preparatory Course 2011 The Construction Specifications Institute www.csinet.org This presentation

More information

NEBBinar: Technical Commissioning: The most effective commissioning process for new buildings. March 5, 2014

NEBBinar: Technical Commissioning: The most effective commissioning process for new buildings. March 5, 2014 NEBBinar: Technical Commissioning: The most effective commissioning process for new buildings March 5, 2014 0 Moderator Jim Huber, NEBB President-Elect and President of Complete Commissioning Jim Huber

More information

Higher Value Commissioning

Higher Value Commissioning Higher Value Commissioning Presented by: Erik Jeannette, PE May 2011 Commissioning What is it? Commissioning (Cx) is a comprehensive and systematic process to verify and document the systems of a facility

More information

Session: Date: Thursday, October 2, :00 am 11:00 am

Session: Date: Thursday, October 2, :00 am 11:00 am Session: 100205 Date: Thursday, October 2, 2014 Time: 10:00 am 11:00 am Serving a New Medical District The Utility Plant Challenge Presented by: Juan Ontiveros Executive Director Utilities and Energy Management

More information

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne

Existing Building Cx: Processes & Results A Cultural Journey. Barry Abramson Senior Vice President Servidyne Existing Building Cx: Processes & Results A Cultural Journey Barry Abramson Senior Vice President Servidyne AIA Quality Assurance Learning Objectives 1. Define the key steps in the process of retrocommissioning

More information

Absolute Energy Raters Commissioning Plan Outline Template

Absolute Energy Raters Commissioning Plan Outline Template IMPORTANT NOTICE: This sample document is provided for instructional purposes only. Absolute Energy Raters is not rendering advice concerning any commission project or practices. This document is neither

More information

Sustainability and Energy Use

Sustainability and Energy Use AIA Provider #: 40108008 Sustainability and Energy Use AIA Course #: SUS101 Presented by: Jason Borowski, PE LEED AP BD+C, Vice President jborowski@centuryeng.com 1 Sustainability and Energy Use Credit(s)

More information

Janice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431

Janice Reedus, Director of Business & Auxiliary Services Campus Center Building A, Room Houbolt Road Joliet, IL 60431 DATE: January 9, 2015 Addendum No. 1 Page 1 of 7 Joliet Junior College 1215 Houbolt Road Joliet, IL 60431 TO: Prospective Respondents SUBJECT: Addendum No. 1 PROJECT NAME: Commissioning Agent Services

More information

Design-Phase Commissioning. Glenn Hansen, P.E., Senior Engineer PECI

Design-Phase Commissioning. Glenn Hansen, P.E., Senior Engineer PECI Design-Phase Commissioning Glenn Hansen, P.E., Senior Engineer PECI November 13, 2013 Overview Background Applicability Required qualifications Process Checklists 2 Background CCC initiated and helped

More information

Energy Efficiency Opportunities in the OR

Energy Efficiency Opportunities in the OR Energy Efficiency Opportunities in the OR John D. Villani, P.E. Vice President, Grumman/Butkus Associates Laurence Steiner, P.E. Associate Vice President, Grumman/Butkus Associates BUILD. CONNECT. ACHIEVE.

More information

Firefighting: The Commoditization of Cx. Jim Givens, CxA, EMP and Craig Hawkins, CxA, CCP

Firefighting: The Commoditization of Cx. Jim Givens, CxA, EMP and Craig Hawkins, CxA, CCP Firefighting: The Commoditization of Cx Jim Givens, CxA, EMP and Craig Hawkins, CxA, CCP AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute

More information

Practices for Installing

Practices for Installing Quality Management Best Practices for Installing Self-Adhering Sheet Air Barriers Chris Bubser, AIA, LEED AP BD+C Mortenson Construction Air Barrier Association of America (ABAA) is a Registered Provider

More information

Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS

Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS Codes, Standards & Guidelines, Oh My! Michael Chelednik, AIA Sr. Airport Terminal Architect URS AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute

More information

MODULE #5 MECHANICAL, ELECTRICAL, PLUMBING II

MODULE #5 MECHANICAL, ELECTRICAL, PLUMBING II MODULE #5 MECHANICAL, ELECTRICAL, PLUMBING II MICHAEL WALSH PRINCIPAL, R.G. VANDERWEIL ENGINEERS, LLP 274 Summer Street, Boston, MA 02210 (T) 617-423-7423 (F) 617-423-7401 mwalsh@vanderweil.com Module

More information

Technical Report Three

Technical Report Three Technical Report Three Mechanical System Existing Conditions Evaluation Prepared by: Timothy Berteotti Prepared for: Date: November 16, 2011 Table of Contents Executive Summary...3 Design Objectives...3

More information

High Impact Hotel Projects

High Impact Hotel Projects High Impact Hotel Projects Greater Boston Energy Efficient Hotels Conference December 6, 2012 Agenda High Energy Impact Projects Case Studies Millennium Bostonian Viking Hotel Available Resources Questions

More information

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED

DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED DESIGN CHECKLIST PROJECT NAME DISCIPLINE DATE TYPE REVIEW REVIEWER DRAWINGS REVIEWED EVERY ITEM WILL BE REVIEWED AND NOTED FOR COMPLIANCE (C), OR NON- APPLICABILITY (NA). 1. HEATING SYSTEMS: A. GENERAL

More information

OUT OF THE DARKNESS, INTO THE LIGHTING

OUT OF THE DARKNESS, INTO THE LIGHTING OUT OF THE DARKNESS, INTO THE LIGHTING Commissioning Lighting Systems in the Predesign & Design Phase James Donson P.E. LC Senior Engineer, kw Engineering 21 st National Conference on Building Commissioning

More information

A. All drawings and general provisions of the contract, including all other Division 01 and general and supplementary conditions.

A. All drawings and general provisions of the contract, including all other Division 01 and general and supplementary conditions. SECTION 23 0800 COMMISSIONING HVAC PART 1 - GENERAL 1.1 OWNER FURNISHED 1.2 RELATED DOCUMENTS A. All drawings and general provisions of the contract, including all other Division 01 and general and supplementary

More information

MODULE #6 COMMISSIONING, VALIDATION, CERTIFICATIONS

MODULE #6 COMMISSIONING, VALIDATION, CERTIFICATIONS MODULE #6 COMMISSIONING, VALIDATION, CERTIFICATIONS MICHAEL WALSH PRINCIPAL, R.G. VANDERWEIL ENGINEERS, LLP 274 Summer Street, Boston, MA 02210 (T) 617-423-7423 (F) 617-423-7401 mwalsh@vanderweil.com Module

More information

Executive Summary. Sample Company. BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA PHONE: FAX:

Executive Summary. Sample Company. BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA PHONE: FAX: Executive Summary Sample Company BETA Engineers, P.C. 36 W. Main Street Mechanicsburg, PA 17070 PHONE: 717-697-6300 FAX: 717-697-1699 Executive Summary Sample Company has constructed a 80,000 sf. addition

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Planning, Design & Construction November 26, 2014 Re: Request for Qualifications - Commissioning Services Bowen Science Building Modernize Building Systems University of Iowa The

More information

Mechanical Project Proposal

Mechanical Project Proposal Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18

More information

LEED Credits for Healthcare

LEED Credits for Healthcare LEED Credits for Healthcare By WINSTON HUFF, CPD, LEED AP U.S. hospitals are significant water users with many local facilities using an average of 300 gallons of water per bed each day and large research

More information

Conference For Catholic Facility Management. Track 8 Making Cents of Financing and Building in this Economy

Conference For Catholic Facility Management. Track 8 Making Cents of Financing and Building in this Economy Track 8 Making Cents of Financing and Building in this Economy Course Description In October 2010, the AIA/CES system was updated with the new CES Discovery system, in that time we have transferred more

More information

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain Brian D. Kelley, RA David J. Meyer, PE, LEED AP BD+C David R. Norton Best Practices The Eastern Regional Association

More information

Owner Project Requirements

Owner Project Requirements Owner Project Requirements How to get what you need From an Owner s Perspective Learning Objectives What is an OPR Case Study (CHC) Looking to the Future Closing Arguments Crafton Hills College 1 What

More information

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal

David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option. Proposal 0 David H. Koch Institute for Integrative Cancer Research Senior Capstone Mechanical Option Proposal David H. Koch Institute for Integrative Cancer Research Massachusetts Institute of Technology Cambridge,

More information

Form 9: Infection Control Preventive Measures Level 4

Form 9: Infection Control Preventive Measures Level 4 Form 9: Infection Control This form is filled out by the construction planning team or designated person(s) to identify the required preventive measures for the activity described in Form 1 Infection Control

More information

Small Building Tune-up Pilot Program. Kevin Afflerbaugh, LEED AP Jim Zarske, PE, CEM, LEED AP Nexant, Inc.

Small Building Tune-up Pilot Program. Kevin Afflerbaugh, LEED AP Jim Zarske, PE, CEM, LEED AP Nexant, Inc. Small Building Tune-up Pilot Program Kevin Afflerbaugh, LEED AP Jim Zarske, PE, CEM, LEED AP Nexant, Inc. AIA Quality Assurance Learning Objectives 1. The significant, yet untapped commissioning opportunities

More information

Energy Management Journey

Energy Management Journey Energy Management Journey Arnold Granger, P.E., CEM Director of Energy Management Dr. Yeqiao Zhu, P.E., MBA Director of Facilities Patient Care and Prevention Facilities Patient Treatment Research Facilities

More information

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE

Changes to the Minnesota Commercial Energy Code. Presented by: Andy Thielen, PE Changes to the Minnesota Commercial Energy Code Presented by: Andy Thielen, PE Warning! The following is an outline of proposed code changes. There is no guarantee that the final code adopted by the State

More information

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68%

PARK PLACE CASE STUDY VANCOUVER. Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Heat reclaim system expected to reduce steam consumption 80%, GHG emissions 68% Address 666 Burrard St, Vancouver Management QuadReal Property Group Type of Building Office Year of Construction 1984 Number

More information

5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations

5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations Ensuring a Successful Transition to Sustainable, High-Performance Operations Ed Tinsley, PE, LEED AP, HFDP, CHFM, CHC Managing Principal, TME, Inc. Agenda What is High Performance Operations? High Performance

More information

Energy Management in Operations and Maintenance

Energy Management in Operations and Maintenance Energy Management in Operations and Maintenance Summer 2017 Course Number: David Norvell Credit Designation: PE, LEED AP Assistant VP Sustainability Initiatives Matthew Wiechart PE, LEED AP Senior Mechanical

More information

Challenges Facing Commissioning Firms and Strategies to Overcome Them

Challenges Facing Commissioning Firms and Strategies to Overcome Them Challenges Facing Commissioning Firms and Strategies to Overcome Them Mark Warren, CCP, LEED AP, WSP 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning

More information

South Carolina Society for Hospital Engineers

South Carolina Society for Hospital Engineers South Carolina Society for Hospital Engineers Selecting Energy Partners: Criteria & Pitfalls and the Top 10 Ways to Reduce Energy in a Hospital Presented by Jon Dierking, PE, CEM, LEED AP Director of Energy

More information

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS

PROJECT NAME SECTION GENERAL COMMISSIONING REQUIREMENTS PART 1 - GENERAL 1.1 SUMMARY A. The Owner has contracted an independent Commissioning Authority. The Commissioning Authority is an independent and knowledgeable third party, hired to verify that the systems

More information

The owner is Oral Roberts University, while management and leasing is handled by Trinity Corporate Real Estate Advisors, LLC.

The owner is Oral Roberts University, while management and leasing is handled by Trinity Corporate Real Estate Advisors, LLC. CityPlex Towers is Oklahoma s largest mixed use office and medical complex comprising of approximately 2.2 million square feet. The structure is reinforced, poured in place concrete, built in 1980. The

More information

Building Commissioning, Energy Efficiency & Building Automation Systems

Building Commissioning, Energy Efficiency & Building Automation Systems Independent Building Automation & Energy Management Building Commissioning, Energy Efficiency & Building Automation Systems June 1 st 2017 Overview Focus Energy Solutions Introduction Building Commissioning,

More information

Large Campus Chilled Water System RetroCx

Large Campus Chilled Water System RetroCx Large Campus Chilled Water System RetroCx Leonard Rozek, President E Cube, Inc. 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered

More information

Mechanical Systems Proposal

Mechanical Systems Proposal Mechanical Systems Proposal Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option December

More information

CREATIVE ENERGY NES Building Compatibility Design Guide October 15

CREATIVE ENERGY NES Building Compatibility Design Guide October 15 City Builders Energy Innovators Creative Thinkers CREATIVE ENERGY NES Building Compatibility Design Guide October 15 CREATIVE ENERGY VANCOUVER PLATFORMS INC. Suite 1 720 Beatty Street Vancouver, Canada

More information

City Of Mendota Construction Procedures

City Of Mendota Construction Procedures City Of Mendota Construction Procedures Building Permit Application: A permit shall be obtained prior to commencing work of any type. Failure to do so may result in doubling the permit fees. At the time

More information

What Contractors Need to Know about LEED Commissioning & IAQ Management

What Contractors Need to Know about LEED Commissioning & IAQ Management What Contractors Need to Know about LEED Commissioning & IAQ Management Presented by Energy Ace, Inc. Wayne Robertson, PE, CxA What is Commissioning? Commissioning is a systematic process of assuring that

More information

Paul Ehrlich, PE Ira Goldschmidt, PE

Paul Ehrlich, PE Ira Goldschmidt, PE Paul Ehrlich, PE Ira Goldschmidt, PE This event will begin shortly. Music is now playing, if you are unable to hear the audio, please take a moment to test your system by clicking Technical Help. For an

More information

BID PACKAGES 3-21, Addendum No. 03

BID PACKAGES 3-21, Addendum No. 03 WEBER MURPHY FOX Addendum Date: January 23, 2018 Bid Due Date: January 26, 2018 BID PACKAGES 3-21, Addendum No. 03 to the Plans and Specifications for Cuyahoga Community College West Science and IT Labs

More information

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY?

Fact Sheet. Commissioning WHAT IS THE PURPOSE OF THIS REQUIREMENT? WHAT VALUE DOES IT PROVIDE TO THE OWNER? HOW DOES IT SAVE ENERGY? Commissioning Fact Sheet Funding for this publication is provided by the Northwest Energy Efficiency Alliance. OCTOBER 2017 VOLUME 1, ISSUE 2 WHAT IS THE PURPOSE OF THIS REQUIREMENT? There is a saying

More information

Building Operator Certification Level I

Building Operator Certification Level I Building Operator Certification Level I A Partnership of the CUNY Institute for Urban Systems Building Performance Lab, the CUNY School of Professional Studies, and the New York State Energy Research &

More information

Owner/Operator Involvement in Cx Cx to Facilitate Owner Training & Turnover. Kent Barber, PE Managing Principal KBA

Owner/Operator Involvement in Cx Cx to Facilitate Owner Training & Turnover. Kent Barber, PE Managing Principal KBA Owner/Operator Involvement in Cx Cx to Facilitate Owner Training & Turnover Kent Barber, PE Managing Principal KBA AIA Quality Assurance Learning Objectives 1. Understand how turnover is critical to long

More information

Mirza Shah, PhD, P.E. Dr. Shah has worked on a wide variety of projects. His work has included:

Mirza Shah, PhD, P.E. Dr. Shah has worked on a wide variety of projects. His work has included: Mirza Shah, PhD, P.E. Engineering Projects Dr. Shah has worked on a wide variety of projects. His work has included: Design and analysis of HVAC systems for all type of buildings and facilities including

More information

June 4, 2009 Dave Moser, PE, Senior Engineer Portland Energy Conservation, Inc.

June 4, 2009 Dave Moser, PE, Senior Engineer Portland Energy Conservation, Inc. Time Savers for Energy Savers: Available EBCx Tools and Resources Based on Natural Resources Canada s Assessment (March 2009) Existing Building Cx for Energy Savings June 4, 2009 Dave Moser, PE, Senior

More information

Improving the efficiency, occupant comfort, and financial well-being of campus buildings

Improving the efficiency, occupant comfort, and financial well-being of campus buildings GHAUSI HALL ENERGY PROJECT REPORT Improving the efficiency, occupant comfort, and financial well-being of campus buildings ACE TEAM, ENERGY CONSERVATION OFFICE UC DAVIS FACILITIES MANAGEMENT Executive

More information

KCAHE 2011 ANNUAL CONFERENCE LOW ENERGY HEALTHCARE DESIGN

KCAHE 2011 ANNUAL CONFERENCE LOW ENERGY HEALTHCARE DESIGN KCAHE 2011 ANNUAL CONFERENCE LOW ENERGY HEALTHCARE DESIGN Benchmarking energy usage - How hospitals use energy? - Why some facilities use more? - What should you be using? - Are you operating efficiently?

More information

MSBA OWNERS PROJECT MANAGER ROUNDTABLE

MSBA OWNERS PROJECT MANAGER ROUNDTABLE MSBA OWNERS PROJECT MANAGER ROUNDTABLE September 12, 2018 Winchester High School Winchester, MA AGENDA 9:00 A.M. Welcome and Introduction 9:05 A.M. Presentation Commissioning Experiences on MSBA Projects

More information