1 Existing Building Cx: Processes & Results A Cultural Journey Barry Abramson Senior Vice President Servidyne
2 AIA Quality Assurance Learning Objectives 1. Define the key steps in the process of retrocommissioning an existing building. 2. Compare and contrast typical retrocommissioning findings by building type, size and climate. 3. Predict the range of savings attainable through retrocommissioning. 4. Avoid common pitfalls in the implementation and verification phases of a retrocommissioning project.
3 Man vs. Machine: That s so retro The Culture of Retrocommissioning
4 That s so retro
5 Building Performance Tracking Basic Tools Beyond Basic Tools
6 Defining RCx A collaborative process that looks at how and why a building s systems are operated and maintained as they are, and then identifies ways to improve overall building performance. A Retrocommissioning Guide for Building Owners developed by PECI with funding from US EPA
7 Undefining RCx RCx is not the same as: An energy audit Test & balance Controls calibration New building commissioning
8 Program Case Study California utility-sponsored programs 25 commercial buildings 6.2 million square feet Findings Electricity savings: 4.9% Natural gas savings: 12.1% Cost savings: $0.11/SF Payback: 1.7 Yrs
9 Program Case Study Chicago utility-sponsored programs 6 commercial buildings 4.2 million square feet Findings Electricity savings: 6.1% Cost savings: $0.07/SF Payback: 0.6 Yrs
10 Building Case Study Chicago office building Baseboard electric heating control AHU fan pressurization kwh (Million Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2009 Apr'10 - Mar'11
11 3/13/ :20 3/13/ :52 3/13/ :16 3/13/ :48 3/13/ :44 3/13/ :12 Building Case Study Los Angeles office building Chiller staging Chiller Loading Daily Profile with CH-2 & 3 then CH-1 Running Amps :08 3/13/2007 6:40 3/13/2007 7:12 3/13/2007 7:44 3/13/2007 8:16 3/13/2007 8:48 3/13/2007 9:20 3/13/2007 9:52 3/13/ :24 3/13/ :56 3/13/ :28 3/13/ :00 3/13/ :32 3/13/ :04 3/13/ :36 3/13/ :08 3/13/ :40 CH 1 CH 2 CH 3
12 Typical RCx Top Schedule HVAC Systems 2. Adjust Outside Air to Current Needs 3. Mitigate Simultaneous Heating and Cooling 4. Reduce Flow from Oversized Pumps 5. Reset Supply Air Temperatures 6. Enable Economizer Controls 7. Reset Static Pressures/Optimize VFD Operation 8. Stage Chillers Properly 9. Lower Condenser Water Setpoints 10. Correct Lighting Control Operation 12
13 Top 10 Characteristics of a Retrocommissioning Provider Another Top 10
14 Number 10 Doesn t like Top 10 lists or cookie-cutter approach
15 Number 9 Emulates Peter Falk as Columbo
16 Number 8 Has a love/hate relationship with utility incentive programs
17 Number 7 Is good at, but doesn t like to fill out forms AIR HANDLING UNIT INFORMATION FORM Facility: Date: Building: AIR HANDLING UNIT Unit Tag: MFGR MODEL NBR Area Served 1 System Type: DESIGN Constant Volume Variable Air Volume Total Air flow (CFM) Changeover Bypass Multi-zone Dual Duct O.A. Air flow (CFM) 2 Cooling Coil Type: TSP (in.) Direct Expansion (DX) Chilled Water None Fan BHP / Amps 3 Heating Coil Type: Motor HP Hot Water Electric Steam None RPM / VFD Output (Hz) Motor ACTUAL / MEASURED 4 Other Coils: Motor Voltage Heat Recovery None Motor Efficiency 5 Economizer Type: Cooling Capacity (MBH) Dry Bulb Enthalpy None Cooling Coil EDB (T1) 6 Economizer Setpoint Cooling Coil LDB (T2) o F or BTU/Lb CHW EWT 7 Supply Air Temp (VAV, MZ, DD) CHW LWT Setpoint o F Actual / Measured o F CHW Flow (GPM) Space Temp Setpoint (CV) CHW Press Drop (ft) Setpoint?? o F Actual / Measured o F DX Coil Suction Temp 8 Fan Volume Control Method Htg Coil Capacity (MBH) VFD IGV Other None Heating Coil EAT 9 Fan Volume Control Parameter Heating Coil LAT Supply duct static pressure Other None HW EWT 10 Control Parameter HW Flow (GPM) Setpoint in. w.g. Actual / Measured in. w.g. HW Delta-T 11 CHW Valve Type Htg Coil Press Drop (ft) 2-way 3-way None Electric Coil Capacity (kw) 12 CHW Valve Control Type Electric Coil Stages Pneumatic Electric/Electronic DDC Position 13 Filter Type Throwaway - fiberglass Filter Condition: Clean ON AM / PM Throwaway - pleated media Dirty 2" Schedule: Throwaway - pleated media 4" Very dirty OFF AM / PM Other
18 Number 6 Is addicted to trend data - in massive doses VAV Reheat Room Temp Setpoint Cycling Erratically; Reheat Hunting Hot Water Temperatures Daily Profile :30 5:55 6:20 6:45 7:10 7:35 8:00 8:25 8:50 9:15 9:40 10:05 10:30 10:55 11:20 11:45 12:10 12:35 13:00 13:25 13:50 14:15 14:40 15:05 15:30 15:55 16:20 16:45 17:10 17:35 18:00 Deg F 17:50 23:20 4:45 10:15 15:45 21:15 2:40 8:10 13:40 19:10 0:35 6:05 11:35 17:05 22:35 4:00 9:30 15:00 20:30 1:55 7:25 12:55 18:25 23:55 5:20 10:50 16:20 21:50 3:15 8:45 14:15 19:45 Deg F VAV 2113 Supply Temp VAV 2113 Set Point VAV 2113 Room Temp HW Setpoint HW Sup T HW Ret T
19 Number 5 Has multiple personalities Engineer Controls technician Psychologist/Therapist
20 Loves to tell war stories Number 4
21 Number 3 Holds a secret nostalgia for pneumatic controls
22 Feels a sense of accomplishment at the completion of a project, but always worries about the future Number 2
23 Has a healthy skepticism about technology Number 1
24 AIA Quality Assurance Portland Energy Conservation, Inc is a registered provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported to CES Records for AIA members. Certificates of Completion for non-aia members are available on request. This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.
25 Thank You Barry Abramson
Retrocommissioning Investigation Study of the Sheraton Chicago Hotel
Retrocommissioning Investigation Study of the Sheraton Chicago Hotel & Towers Cityfront Center Tracy Phillips May 4, 2007 May 4, 2007 You can go anywhere you want, if you look serious and carry a clip
More informationKarl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois. Retrocommissioning Saving the Planet One Building at a Time
Karl Helmink, P.E., CEM Retrocommissioning Manager University of Illinois Retrocommissioning Saving the Planet One Building at a Time AIA Quality Assurance Portland Energy Conservation, Inc is a registered
More informationRetro-Commissioning for Energy Efficiency
High Performance Buildings 2006 AABC Commissioning Group (ACG) April 6, 2006 Retro-Commissioning for Energy Efficiency Making buildings work. Better. Tom Poeling, P.E., CEM, LEED AP E M C Engineers, Inc.
More informationOptimizing Energy Use in a HealthCare Setting. Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning
Optimizing Energy Use in a HealthCare Setting Michael P. Della Barba Environmental Health & Engineering, Director of Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered
More informationConverting CAV to VAV in Florida: What does this really mean?
AABC Commissioning Group AIA Provider Number 50111116 Converting CAV to VAV in Florida: What does this really mean? Course Number: CXENERGY1707 Steve Harrell, CxA, CEM, SSRCx April 26, 2017 Credit(s) earned
More informationSample Reports. for. HAP v4.80 Example Problem
Sample Reports for HAP v4.80 Example Problem October, 2013 Carrier Software Systems Copyright 2013 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using the
More informationCOOLING COIL (35% ETHYLENE GLYCOL)
APPENDIX Contents A1.1 Existing Mechanical Equipment Schedules A1.2 Existing Mechanical System Schematic Drawings A2. Building Design Loads, Energy Loads and Cost Data Tables A3. Standard 62n-2001 Ventilation
More informationReducing Hospital Energy Use and Maintaining Savings. Glen Anderson, PE
Reducing Hospital Energy Use and Maintaining Savings Glen Anderson, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute of Architects Continuing
More informationSample Reports. for. HAP v4.90 Example Problem
Sample Reports for HAP v4.90 Example Problem December, 2014 Carrier Software Systems Copyright 2014 Carrier Corporation, All Rights Reserved Introduction This document contains reports generated using
More informationPECI s RCx Programs: The Next Generation. Michelle Lichtenfels Program Manager PECI
PECI s RCx Programs: The Next Generation Michelle Lichtenfels Program Manager PECI AIA Quality Assurance Learning Objectives 1. Understand the background and history of PECI s 2006-2009 California RCx
More informationSteve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University
Post Occupancy Building Commissioning Successes through Continuous Commissioning Steve Harrell, LEED AP, CEM, CxA SSRCx Dr. David Claridge, P.E. Energy Systems Lab, Texas A&M University AIA Quality Assurance
More informationEBCx of the Connecticut Convention Center Complex
EBCx of the Connecticut Convention Center Complex Presentation and Panel Discussion David Vallerie, Principal, Strategic Building Solutions May 20, 2014 AIA Quality Assurance The Building Commissioning
More informationMonitoring-Based Commissioning Best Practices Award Welch Hall
Monitoring-Based Commissioning Best Practices Award Welch Hall California State University, Dominguez Hills June 17th, 2014 Monitoring-Based Commissioning CSU Dominguez Hills Welch Hall Content Project
More information9/13/2011. Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center. Terry Malloy P.E., Cxa, Project Manager, Teng & Associates
Mark Hanicits, Director of Facilities and Safety, MetroSouth Medical Center September 21 st, 2011 4:15pm 5:15pm Terry Malloy P.E., Cxa, Project Manager, Teng & Associates Energy consumption (BTU/SF) in
More informationProject Information. Measure Description
Project Information Project ID#: CE07M016 Measure: Multiple Electric : 452,593 kwh, 8.84 kw, 39.26 kw Facility Type School Technology: Multiple Measure Description CH-1 - Chiller Plant Optimization and
More informationWireless Pneumatic Thermostats:
Wireless Pneumatic Thermostats: Quality Commissioning is Essential Peter Pollard, P.E. Principal kw Engineering AIA Quality Assurance The Building Commissioning Association is a Registered Provider with
More informationCHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM
CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New
More informationRecommissioning Workshop
Recommissioning Workshop October 2, 2013 Dave Moser, PE Senior Engineer PECI PECI 2013 1 Preview for the Day Topic Start time What is existing building commissioning (EBCx)? 8:30 Costs / benefits Case
More informationIndiana University Glick Eye Institute. LEED Measurement & Verification Plan
Indiana University Glick Eye Institute LEED Measurement & Verification Plan April 10, 2012 1 Table of Contents General Introduction... 3 Facility Description... 4 M&V Objectives... 4 M&V Approach/Option...
More informationCondenser Water Heat Recovery"
PLEASE MUTE CELL PHONES Condenser Water Heat Recovery" Julian de Bullet ASHRAE Distinguished Lecturer Director of Industry Relations McQuay International 703-395-5054 1 What Is Sustainability? sustainable
More informationStrategies for Persistence: Measurement and Verification. Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions
Strategies for Persistence: Measurement and Verification Ryan Hughes PE, CEM, LEED AP Eaton Energy Solutions AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The
More informationContinuous Commissioning Leading Energy Project Process - An Industry Approach
Continuous Commissioning Leading Energy Project Process - An Industry Approach Mingsheng Liu, Ph.D., P.E. Energy Systems Laboratory, University of Nebraska Jinrong Wang, P.E., Ken Hansen, P.E. Omaha Public
More informationLarge Campus Chilled Water System RetroCx
Large Campus Chilled Water System RetroCx Leonard Rozek, President E Cube, Inc. 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered
More informationManaging. Delta T in Buildings
dp(ft) 83 dp (ft) 35 dp (ft) 41 105 140 180 188 1,800 GPM Tout(F)= 50 Tin (F)= 40 9000 MBH Managing Tout(F)= 50 1,800 GPM AHU 2 Delta T in Buildings Tout(F)= 50.0 1,800 GPM 192.5 FT 5,400 GPM 77 309 HP
More informationTeague Research Center
Continuous Commissioning Report for the Teague Research Center Building #445 Submitted to: Utilities Energy Office Physical Plant Department Texas A&M University Prepared by: Energy Systems Laboratory
More informationRetro-Commissioning in Hospitals
Retro-Commissioning in Hospitals American Society of Healthcare Engineering () Introduction Elements of the Health Facility Retro-Cx Process Retro-Cx Case Studies Hospital Hospital Oklahoma Heart Hospital
More informationVariable Frequency Drive Retrofit Opportunities. Michael Kuk CERx Solutions LLC
Variable Frequency Drive Retrofit Opportunities Michael Kuk CERx Solutions LLC Speaker Introduction» Founder / owner of CERx Solutions LLC» Veteran Owned Small Business Enterprise founded in 2013» 27+
More informationBuilding Load and Energy Estimates Analysis. Instructor: Dr. Mumma. October 28, Thesis Building Sponsor s: INOVA Fairfax Hospital
David Peterson Penn State AE, Mechanical INOVA Fairfax Hospital The INOVA Heart Institute David J. Peterson Mechanical Option Mechanical Technical Report #2b The INOVA HEART INSTITUTE AT INOVA Fairfax
More informationCity of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training
City of Fort Collins Building Automation Systems Enhances Savings and Commissioning Efficiency Works Training November 18, 2015 Agenda Commissioning Monitoring Based Commissioning Building Tune up Case
More informationMonitoring-Based Commissioning: A Case Study in Higher Education. Janelle H. Griffin, PE, CCP, LEED AP
Monitoring-Based Commissioning: A Case Study in Higher Education Janelle H. Griffin, PE, CCP, LEED AP AIA Quality Assurance The Commissioning Association is a Registered Provider with The American Institute
More informationSCHOOL ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC
SCHOOL ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance
More informationUCSF Mission Bay Campus Arthur and Toni Rembe Rock Hall th Street San Francisco, California
UCSF Mission Bay Campus Arthur and Toni Rembe Rock Hall 1550 4th Street San Francisco, California Monitoring Based Recommissioning Project Project Implementation: June 2005 to December 2005 Funded by a
More informationMechanical Project Proposal
Mechanical Project Proposal Miller Children s Hospital Prepared for: Dr. James Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared by: Stephen Haines December 18
More informationLEED Commissioning and Actual Energy Use. John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering
LEED Commissioning and Actual Energy Use John Kokko, P.Eng. LEED A.P. Vice President Enermodal Engineering AIA Quality Assurance Learning Objectives 1. Why Best Practice and Fundamental Commissioning are
More informationRetrocommissioning Investigation Report
Continuous Optimization for Commercial Buildings Program Retrocommissioning Investigation Report March 22, 2013 Prepared for: Thompson Rivers University International Building BC Hydro #:COP10-353 Prism
More informationGeorge Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING
George Bourassa, National Director, Commissioning Services Robert Bucey, Program Manager RETRO-COMMISSIONING AIA Quality Assurance Learning Objectives Demonstrate global results of the analysis of energy
More informationRetro-Commissioning for Existing Facilities
Retro-Commissioning for Existing Facilities Tom Meyer Director, Technical Programs National Environmental Balancing Bureau 8575 Grovemont Circle Gaithersburg, Maryland 20877 (301) 977-3698 www.nebb.org
More information2/17/2017. Energy Accounting & Education. Topics (Electricity) Creating Electricity
Energy Accounting & Education Energy Managers Kermit King School District of La Crosse John Daily School District of Holmen 1 Topics (Electricity) Creating electricity Defining degree days Customer charges
More informationFundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619
AABC Commissioning Group AIA Provider Number 50111116 Fundamentals of Test & Balance for Engineers, Cx & Energy Providers Course Number: CXENERGY1619 Jim Hall, PE, TBE, CxA Systems Management & Balancing,
More informationLIBRARY ENERGY WALK- THROUGH. Andy Robinson, Training and Education, SEDAC
LIBRARY ENERGY WALK- THROUGH Andy Robinson, Training and Education, SEDAC ILLINOIS ENERGY NOW University of Illinois 360 Energy Group 2 WHAT WE DO SEDAC Free Services Outreach and Training Energy Assistance
More informationASHRAE. Wxá zç Performance Innovation Experience. Why Geothermal HVAC Systems Fill The Bill. Kirk Mescher, PE P PE. Education.
ASHRAE AEDG K-12K Why Geothermal HVAC Systems Fill The Bill Kirk Mescher, PE Education Wxá zç Performance Innovation Experience ENGINEERING Bright Solutions in Engineering P PE 1 Simply Efficient 1 2 3
More informationAcknowledgements 4. Executive Summary 5
Table of Contents Acknowledgements 4 Executive Summary 5 Building Overview.. 6 Building Summary.. 6 Site. 6 Evaluation of Existing Mechanical System. 7 Mechanical System Overview 7 Design Objective 7 Outdoor
More informationHow LEED & The Retro-Commissioning Credits Produce Energy Savings. James Vallort Vice President Environmental Systems Design, Inc.
How LEED & The Retro-Commissioning Credits Produce Energy Savings James Vallort Vice President Environmental Systems Design, Inc. Retro-Commissioning Today s session will focus on the following items:
More informationOutline Chilled Water T Study AHU Coil Overview Cooling Overview Test Setup Data Analysis Findings Summary
Improved Chilled Water Plant Performance with New Energy Valve (EV) Outline Chilled Water T Study AHU Coil Overview Cooling Overview Test Setup Data Analysis Findings Summary 6 December 2012 Boston Hotels
More informationGeorgetown University New Science Center
Georgetown University New Science Center Final Thesis Proposal PENN STATE UNIVERSITY Prepared For: Dr. William P. Bahnfleth Department of Architectural Engineering Prepared By: Kevin M Edstrom Mechanical
More informationBaffled Openings at Chain Link Fencing: Design shall consist of two end-posts set 4 feet apart, and a 10 foot wide chain-link fence panel equal in height as the adjacent fence. Chain link fence panel shall
More informationRETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT. Adam Renzi, PE
RETRO-COMMISSIONING: AN OWNER S LOOK AT THE TRUE COSTS AND RETURN ON INVESTMENT Adam Renzi, PE AIA Quality Assurance The Building Commissioning Association is a Registered Provider with The American Institute
More informationJune 4, 2009 Dave Moser, PE, Senior Engineer Portland Energy Conservation, Inc.
Time Savers for Energy Savers: Available EBCx Tools and Resources Based on Natural Resources Canada s Assessment (March 2009) Existing Building Cx for Energy Savings June 4, 2009 Dave Moser, PE, Senior
More informationManagement Committee December 3, Johnson County Community College Retrocommissioning Report
Johnson County Community College Retrocommissioning Report Management Committee December 3, 2014 What is Retrocommissioning? Retrocommissioning is a systematic process to improve an existing building s
More informationEnergy Management Journey
Energy Management Journey Arnold Granger, P.E., CEM Director of Energy Management Dr. Yeqiao Zhu, P.E., MBA Director of Facilities Patient Care and Prevention Facilities Patient Treatment Research Facilities
More informationPacific Energy Center
Pacific Energy Center's Retro-Commissioning Workshops: Developing Expertise through Interactive Training Ryan Stroupe, Pacific Energy Center Virginia Waik, City of Palo Alto Rishabh Kasliwal, Cogent Energy
More informationExisting Building Commissioning (or Retro-Commissioning)
SOUTHEAST REGION Existing Building Commissioning (or Retro-Commissioning) SERBCA Annual Meeting Covington, KY December 6, 2013 Session Learning Objectives o Definition of Existing Building Cx / RetroCx
More informationThe Biggest Loser REDUCING HIGHER EDUCATION COSTS BY 50%
The Biggest Loser REDUCING HIGHER EDUCATION COSTS BY 50% Ian Hadden, PE, LEED AP BD+C, CEM Director, Energy Management Services University of Arkansas at Little Rock 501-313-9597 ithadden@ualr.edu.com
More informationMN/CO Xcel Energy Recommissioning Program
MN/CO Xcel Energy Recommissioning Program Derek Shockley, Xcel Energy 21 st National Conference on Building Commissioning AIA Quality Assurance The Building Commissioning Association is a Registered Provider
More informationhow to read an energy model
how to read an energy model Kohler Ronan, LLC is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this program will be reported
More informationEMD SERONO RESEARCH CENTER EXISTING
EMD SERONO RESEARCH CENTER EXISTING BILLERICA, MA SHIYUN (SHARON) CHEN MECHANICAL AE SENIOR THESIS Building System Dedicated Outdoor Air System/ Systems Breadth Building Design Team Building: EMD Serono
More informationPerformance Monitoring for Efficiency
Performance Monitoring for Efficiency THOMAS ANDERSON, CCP EMILY CROSS, MASc, PEng, CEM Burlington, Vermont cx associates.com tom@cx associates.com emily@cx associates.com Efficiency Vermont is a Registered
More informationMBCx: The Next Wave of Energy Savings in Utility Incentive Programs
AABC Commissioning Group AIA Provider Number 50111116 MBCx: The Next Wave of Energy Savings in Utility Incentive Programs Course Number: CXENERGY1716 Walid Guerfali, ComEd Ben Talbot, DLR Group Ruairi
More informationEnergy Modeling Tools Solutions for Creating an Intelligent Building
AABC Commissioning Group AIA Provider Number 50111116 Energy Modeling Tools Solutions for Creating an Intelligent Building Course Number: CXENERGY1601 Neil Maldeis, PE, CEM TRANE April 12, 2016 Credit(s)
More informationFY14 SRP Business Solutions Retrocommissioning Plan
FY14 SRP Business Solutions Poston Butte High School Located at: 32375 N Gantzel Rd San Tan Valley, Arizona 85132 Presented to: Florence Unified School District Project # RCS02_000072 March 10 th, 2014
More informationGreening Your Business Energy Efficiency in Buildings
Greening Your Business Energy Efficiency in Buildings Ben J. Sliwinski Building Research Council School of Architecture University of Illinois at Urbana-Champaign Overview Introduction Where is the Money?
More informationTechnical Assignment 2 Building and Plant Energy Analysis
Technical Assignment 2 Building and Plant Energy Analysis Des Places Residence Hall Duquesne University Pittsburgh, PA Peter Edwards Advisor: James Freihaut October 4, 2010 Table of Contents Executive
More informationThe Milton S. Hershey Medical Center Academic Support Building. AE Senior Thesis Kari Anne Donovan Mechanical Option
The Milton S. Hershey Medical Center Academic Support Building AE Senior Thesis Kari Anne Donovan Mechanical Option Presentation Outline Existing Conditions Distributed Chilled Water Feasibility Study
More informationCCC/IOU Statewide Partnership SCE Pilot RCx Program
CCC/IOU Statewide Partnership SCE Pilot RCx Program Investigation Report College of the Desert Multi-Agency Library 43-500 Monterey Ave Palm Desert, CA 92260 December 31, 2013 Prepared by (562) 439-1600
More informationFEMP M&V Methods: No Silver Bullet Tinker AFB and Humphreys Engineer Center
Track 12, Session 3 FEMP M&V Methods: No Silver Bullet Tinker AFB and Humphreys Engineer Center Dusty Wheeler & Jeff Stringfield Honeywell August 15, 2017 Tampa Convention Center Tampa, Florida Agenda
More informationAdvantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure
Advantages of Financing Continuous Commissioning As An Energy Conservation Retrofit Measure Guanghua Wei, P.E. Malcolm Verdict, C.E.M Joseph T. Martinez Energy Systems Laboratory, 3581 TAMU Texas A&M University
More informationCxI (Commissioning Investigations): Uncovering Energy Waste, Operational Issues and Other Offences Found Within Existing Buildings
CxI (Commissioning Investigations): Uncovering Energy Waste, Operational Issues and Other Offences Found Within Existing Buildings Ryan Stroupe, PG&E Pacific Energy Center Arik Cohen, kw Engineering AIA
More informationBuilding Control Strategies That Work to Improve Your Energy Bottom Line
Building Control Strategies That Work to Improve Your Energy Bottom Line William D. (Skip) Milton MBA, CEM, CEA Assistant Director of Facilities Operations Texas Children s Hospital Objective: Learn how
More informationChilled Water Energy Savings Study
1 Chilled Water Energy Savings Study Pressure Dependent Valve Sizing and Valve Authority Pressure Independent Valves (Mechanical and Electronic) Chilled Water System Design MIT Beta Site Study-Correcting
More informationNEBBinar: Retro-Commissioning for Comfort and Energy Efficiency. August 21, 2013
NEBBinar: Retro-Commissioning for Comfort and Energy Efficiency August 21, 2013 0 Moderator Jim Huber, NEBB Vice President and President of Complete Commissioning Jim Huber is the President of Complete
More informationRETROCOMMISSIONING S GREATEST HITS
RETROCOMMISSIONING S GREATEST HITS Tudi Haasl Associate Director PECI Portland, Oregon Amanda Potter Project Manager PECI Portland, Oregon Linda Irvine Program Assistant PECI Portland, Oregon Larry Luskay
More informationBuilding Retro-Commissioning
Building Retro-Commissioning Greg Swiss SEDAC Building Energy Specialist Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign WHAT IS RETRO-COMMISSIONING? Commissioning
More informationXavier University of Louisiana
Annual Savings Report Year 2 May 1, 2012 to April 30, 2013 July 2013 For Marion Bracy Vice President Xavier University Facilities Planning 1 Drexel Drive New Orleans LA 70125 (504) 520 1056 Submitted By
More informationOptimizing Chilled Water Systems for Energy Efficiency and Occupant Comfort
AABC Commissioning Group AIA Provider Number 50111116 Optimizing Chilled Water Systems for Energy Efficiency and Occupant Comfort Course Number: CXENERGY1709 Mark Benevides Siemens April 26, 2017 Page
More informationLow-Hanging Fruit Simple Steps Toward Energy Effective Building Operations
Low-Hanging Fruit Simple Steps Toward Energy Effective Building Operations Roger Ebbage Northwest Water / Energy Education Institute Lane Community College May 7-9 Enzian Inn - Leavenworth, Washington
More informationUniversity of Pennsylvania Pre K-8 th Grade School. James W. Meacham. Philadelphia, Pennsylvania. Construction Management Spring 2003 Senior Thesis
Outline Unique Aspects & Existing Conditions Thesis Approach Four Mechanical Redesigns Recommended Design issues 3D CAD & Mechanical Contractors Research Unique Aspects Educational Forces Involved University
More informationOptimizing Central Chilled Water Systems
Optimizing Central Chilled Water Systems OPTIMIZING CENTRAL CHILLED WATER SYSTEMS kent.peterson@p2seng.com 1 O P T I M I Z I N G C E N T R A L C H I L L E D W A T E R S Y S T E M S Kent W. Peterson, PE,
More informationGo Green Go Geothermal
Go Green Go Geothermal What We ll Cover Today Market Status Current Status Growth Potential System Advantages and Disadvantages Competing Technologies Case Studies Lessons Learned Feasibility of Geothermal
More informationUtilities Infrastructure Cooling Distribution. Purpose of Today s Presentation. Agenda. GLHN Architects & Engineers, Inc.
Utilities Infrastructure Cooling Distribution APPA Institute for Facilities Management Dallas Jan 2017 Bill Nelson PE 1 Purpose of Today s Presentation To provide a broad understanding of Chilled water
More informationBuilding Codes for Energy Efficiency and Cx. Randall Higa Codes and Standards Program Manager Southern California Edison
Building Codes for Energy Efficiency and Cx Randall Higa Codes and Standards Program Manager Southern California Edison AIA Quality Assurance Learning Objectives 1. High level understanding of California
More informationEnergy Saving Calculations for Recommissioning and Design
ASHRAE December Chapter Meeting Energy Saving Calculations for Recommissioning and Design Gustav Brändström Angela Vreeland December 13, 2011 Agenda Agenda Introduction Trending and Trend Data TMY and
More informationNational Indian Gaming Association 2005 Certification: Energy Management for Cost Savings Larry Kinney Synertech Systems Corporation On behalf of
National Indian Gaming Association 2005 Certification: Energy Management for Cost Savings Larry Kinney Synertech Systems Corporation On behalf of CERT Wild Horse Casino in Umatilla Country, Oregon Dancing
More informationCharacteristics of Energy Consumption by building type of a U.S. Navy Installation in Hot and Humid Climate
Purdue University Purdue e-pubs International High Performance Buildings Conference School of Mechanical Engineering 216 Characteristics of Energy Consumption by building type of a U.S. Navy Installation
More informationAcceptance Testing, Design Phase Commissioning, & NR HVAC Topics Stakeholder Meeting #2
Acceptance Testing, Design Phase Commissioning, & NR HVAC Topics Stakeholder Meeting #2 California Statewide Utility Codes and Standards Program Energy Solutions Heschong Mahone Group Portland Energy Conservation,
More informationOSU Richardson and Peavy Hall Energy Study: Energy Conservation Measure Analysis. January 25, 2012 {Revised April 30, 2012}
OSU Richardson and Peavy Hall Study: Conservation Measure Analysis January 25, 2012 OSU Richardson and Peavy Hall Study: Conservation Measure Analysis CONTENTS 1.0 Executive Summary... 1 2.0 Building
More informationTimmins and District Hospital
Opportunity Assessment Timmins and District Hospital Draft Report December 10 th 2013 Submitted to: Tim Prokopetz, Manager, Materials - Biomedical Engineering Timmins and District Hospital Submitted by:
More informationENERGY MODELING TOOLS: SOLUTIONS FOR CREATING A HIGH PERFORMANCE BUILDING. Presented by Neil Maldeis Energy Solutions Engineering Leader, Trane
ENERGY MODELING TOOLS: SOLUTIONS FOR CREATING A HIGH PERFORMANCE BUILDING Presented by Neil Maldeis Energy Solutions Engineering Leader, Trane LEARNING OBJECTIVES Learn how to use and apply modeling tools,
More informationA Case Study of Control Problems and Resolutions in a High rise
A Case Study of Control Problems and Resolutions in a High rise Office Building U.S. General Services Administration, Mark O. Hatfield U.S. Courthouse, Portland, Oregon Program Sponsors California Energy
More informationCase Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency
Case Study for Fortune 500 Telecom: Retrofitting Pneumatic Controls for Energy Efficiency Summary Major Fortune 500 Telecom Company Estimated 40% the corporate building portfolio still use pneumatic thermostats
More information5/7/2012. Agenda. What is High Performance? Ensuring a Successful Transition to Sustainable, High-Performance Operations
Ensuring a Successful Transition to Sustainable, High-Performance Operations Ed Tinsley, PE, LEED AP, HFDP, CHFM, CHC Managing Principal, TME, Inc. Agenda What is High Performance Operations? High Performance
More informationCommissioning for the 2015 IECC Code. Lunch & Learn Presentation O Connell Robertson - TEMA March 10, 2016
Commissioning for the 2015 IECC Code Lunch & Learn Presentation O Connell Robertson - TEMA March 10, 2016 Learning Objectives Impact of Statewide Change from IECC 2009 to IECC 2015 At the end of this program,
More informationHow to Reduce Energy Use in Your Labs by Up to 50%
How to Reduce Energy Use in Your Labs by Up to 50% Illinois Chapter of ASHRAE April 11, 2017 Dan Doyle, Chairman Grumman/Butkus Associates 1 Course Description Labs have high exhaust requirements and large
More informationRetrocommissioning (RCx)
Retrocommissioning (RCx) Facilities & Services - Engineering Services Saving the planet, two buildings at a time. Mr. Karl Helmink Mr. Damon McFall Creating a Sustainable Campus What is Retrocommissioning
More informationBEYOND O&M. Shawn Maurer SEDAC Building Energy Specialist. Smart Energy Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign
BEYOND O&M Shawn Maurer SEDAC Building Specialist Smart Design Assistance Center (SEDAC), University of Illinois at Urbana Champaign PRESENTATION OVERVIEW and Take away: Regular costs less over the long
More informationSeminar 4 Energy Performance of Active Chilled Beam Installations
Paul Christy Superintendent Clark County Public Schools paul.christy@clark.kyschools.us Seminar 4 Energy Performance of Active Chilled Beam Installations Successful Application of Chilled Beams in a High
More informationUse of Building Automation Systems for (Retro)Commissioning
Center for Energy and Environment Use of Building Automation Systems for (Retro)Commissioning Neal Ray, Center for Energy and Environment Gustav Brändström, Center for Energy and Environment January 17,
More informationFarm Energy IQ. Future. Tom Manning, New Jersey Agricultural Experiment Station
Farm Energy IQ Farms Farm Today Energy Securing Audits Our Energy Future Tom Manning, New Jersey Agricultural Experiment Station An energy audit is the process of determining energy consumption of a building
More informationDriving Efficiency with Interval Meter/Smart Meter Data. Mukesh Khattar, Energy Director, Oracle
Driving Efficiency with Interval Meter/Smart Meter Data Mukesh Khattar, Energy Director, Oracle SVLG Energy Summit, June 8, 2012 Oracle Hardware and Software, Engineered to Work Together Annual Revenues:
More informationLaboratory Building Energy Analysis
Laboratory Building Energy Analysis Course No: M4-11 Credit: 4 PDH Steven Liescheidt, P.E., CCS, CCPR Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 198 P: (877) 322-58
More informationEnergy & Climate Action
Energy & Climate Action John Onderdonk Matthew Berbee Manager for Sustainability Programs Energy & LEED Manager June 11, 2010 0 Overview Energy Conservation Initiatives & Projects Alternative Energy Climate